ER27-526-000 · 2026-11-18 · Clean Energy Advocate, S
Motion of Community Organizations and Clean Energy Advocates for a 30-day extension of time to submit comments re Midcontinent Independent System Operator,…
PDF page 1
1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
Midcontinent Independent System
)
Operator, Inc.
)
Docket No. ER27-526
)
MOTION OF COMMUNITY ORGANIZATIONS AND CLEAN ENERGY
ADVOCATES FOR EXTENSION OF TIME TO SUBMIT COMMENTS
Pursuant to Rule 212 and 2008 of the Federal Energy Regulatory
Commission’s (“Commission”) Rules of Practice and Procedure,1 Community Organizations2 and Clean Energy Advocates3 respectfully move for a 30-day extension of time to submit comments on Midcontinent Independent System Operator, Inc.’s (“MISO”) November 16, 2026 filing.4 As discussed further below, Community Organizations and Clean Energy Advocates have shown good cause for such extension.51 18 C.F.R. §§ 385.212 and 385.2008.2 Community Organizations are Community Collaboration on Climate Change and Michigan Environmental Justice Coalition, which are nonprofit organizations chartered under the laws of Michigan; and Midwest Tribal Energy Resources Association, a nonstock corporation chartered under the laws of Wisconsin.3 Clean Energy Advocates consist of Sierra Club, Natural Resources Defense Council, Sustainable FERC Project, and Fresh Energy which are nonprofit environmental organizations with members throughout MISO territory; and Clean Grid Alliance, a nonprofit corporation chartered under the laws of Minnesota.4 Midcontinent Independent System Operator, Inc.’s Large Load Review, Cost Recovery and Transmission Services Filing, Docket No. ER27-526 (filed November 16, 2026) (submitted to comply with the Commission’s recent Show Cause Order in Docket No. EL26-70. Midcontinent Independent System Operator, Inc., 195 FERC ¶ 61,212 (June 18, 2026)).5 In addition to the reasons stated below, granting this request would also have the additional benefit of aligning the deadlines for MISO’s filing with that of PJM, which has requested a 60-day comment period ending on January 15, 2027. See, e.g., Proposed Tariff Revisions for Large Loads and Additional Compliance with Co-
PDF page 2
2
Community Organizations and Clean Energy Advocates request the
Commission set a comment date of November 19, 2026, on this motion, and render a decision by November 23, 2026, to allow parties to effectively plan their comments on MISO’s filing.
I. GOOD CAUSE EXISTS TO GRANT AN EXTENSION
The Commission may extend filing deadlines for good cause.6 Here, good cause exists for the Commission to grant the Community Organizations’ and Clean Energy Advocates’ request for at least two independent reasons.
First, Congress is actively debating the Bipartisan American Affordability and Jobs Act (“BAAJA”).7 Enactment of that statute would constitute a significant legal change that could directly bear on MISO’s Section 205 filing and FERC’s authority to approve it. For instance, BAAJA Section 2107 contains directives regarding transmission cost allocation that may be inconsistent with MISO’s filing. An extension would allow parties and the Commission time to see whether BAAJA passes and, if so, permits interested parties to comment on how BAAJA’s passage would affect MISO’s pending 205 filing. Indeed, granting an extension may also serve overall efficiency as, if BAAJA passes, utilities themselves may be required, or otherwise seek, to revisit or revise their filings.
Location Order and Request for Extended 60-Day Comment Period, Docket No. ER27-531 (filed November 16, 2026).
6 18 C.F.R. § 385.2008(a).7 H.R. 2347, 119th Cong. (2026).
PDF page 3
3
Declining to grant an extension, by contrast, would only complicate this proceeding. If the extension were granted and BAAJA does not pass, the parties will not have wasted significant time, and indeed, will have time to address the already complex issues presented by the status quo (see below). If, by contrast, BAAJA passes after the currently set 30-day comment period has closed, parties will have to raise issues concerning how BAAJA affects this proceeding on rehearing. Having to address BAAJA on rehearing is not efficient for either parties or the Commission. The significant uncertainty created by the Congress’ active consideration of BAAJA constitutes good cause to extend the comment period on this proceeding beyond the end of the current legislative session (January 3, 2027).8
Second, good cause also exists to extend the deadline because the ordinary comment period is insufficient to allow parties to address the many issues raised by this complex and lengthy proceeding. Even absent the legal uncertainty created by Congress’s consideration of BAAJA, parties would benefit from additional time to consider the filing and prepare their responses. MISO’s section 205 filing follows from a lengthy and complex multi-stage rulemaking process9 initiated by the United States Department of Energy. This complexity is demonstrated by the fact that
8 U.S. Const., 20th Amend. § 1.9 Advanced Notice of Proposed Rulemaking, Accession No. 20251027-4001; Notice Inviting Comments (Oct. 27, 2025), Accession No. 20251027-3056; Letter from Secretary of Energy (Oct. 23, 2025), https://www.energy.gov/sites/default/files/2025- 10/403%20Large%20Loads%20Letter.pdf.
PDF page 4
4
MISO and the MISO Transmission Owners sought,10 and FERC granted,11 a 90-day abeyance of MISO’s response deadline (August 17, 2026) under the Show Cause Order.12
The way in which MISO has structured its response to the Show Cause Order has also introduced additional layers of complexity. Instead of filing a single coherent submission responding to the Commission’s order, MISO has filed at least four piecemeal 205 filings prior to, or simultaneous with, the instant matter: 1) the Zero-Injection Generator Interconnection Agreement proposal;13 2) the Large Load Addition Resource Study Process;14 3) the Large Load Reliability Requirements filing;15 and 4) the Grid Responsive Integration Transmission Service.16 Each of these pending proposals has different requested implementation dates and comment deadlines. The parties require time not only to digest the instant filing, but to understand and respond to how these five filings together address, or fail to address, the Commission’s Show Cause Order.
10 Motion of the Midcontinent Independent System Operator, Inc. and the MISO Transmission Owners to Hold Proceeding in Abeyance, Accession No. 20260803- 5249 (Aug. 3, 2026).11 Letter order granting MISO’s Abeyance Motion, 196 FERC ¶ 61,133 (Aug. 14, 2026).12 Midcontinent Indep. Sys. Operator, Inc., Order Instituting Proceeding Under Section 206 of the Federal Power Act, 95 FERC ¶ 61,212 (June 18, 2026).13 Midcontinent Independent System Operator, Inc.’s Zero Injection Generator Interconnection Agreement, Docket No. ER26-3552 (filed August 18, 2026).14 Midcontinent Independent System Operator, Inc.’s Large Load Addition Resource Study Process, Docket No. ER27-25 (filed October 2, 2026).15 Midcontinent Independent System Operator, Inc.’s Large Load Reliability Requirements, Docket No. ER26-3650 (filed August 28, 2026).16 Midcontinent Independent System Operator, Inc.’s Grid Responsive Integration Transmission Service, Docket No. ER27-527, (filed November 16, 2026).
PDF page 5
5
Accordingly, additional time is warranted to review MISO’s filing, evaluate the issues presented, consult with relevant technical and legal personnel, and prepare meaningful comments for the Commission’s consideration.
II. REQUEST FOR ACTION BY NOVEMBER 23, 2026
Community Organizations and Clean Energy Advocates respectfully request that the Commission act on this request for extension of time by November 23, 2026. Action by that date is important so that the parties can best structure their comments on MISO’s filing and provide as detailed and thorough comments as possible.
III. CONCLUSION
For the reasons given above, Community Organizations and Clean Energy Advocates request that the Commission issue an order no later than November 23, 2026, GRANTING the requested extension of time, until January 15, 2027, to comment on MISO’s filing.
Dated: November 17, 2026
Respectfully Submitted,
/s/ Aaron Stemplewicz
Aaron Stemplewicz
Sameer H. Doshi
Christine Powell
Aaliyah Adkins
Ada Statler
Earthjustice
1617 John F. Kennedy Blvd., Suite 2020
Philadelphia, PA 19103
astemplewicz@earthjustice.org
sdoshi@earthjustice.org
cpowell@earthjustice.org
aadkins@earthjustice.org
astatler@earthjustice.org
PDF page 6
6
Attorneys for Michigan Environmental
Justice Coalition and Community
Collaboration on Climate Change
Kareem Scales
Co-Chair
Community Collaboration on Climate
Change
Grand Rapids, MI
kareem@c4gr.org
Wesley Watson
Policy Associate
Michigan Environmental Justice Coalition
1401 W. Fort St., P.O. Box 44080
Detroit, MI 48233
wesley@michiganej.org
/s/ Daniel Wiggins Jr.
Daniel Wiggins Jr.
Executive Director
Midwest Tribal Energy Resources
Association
3136 W. Kilbourn Ave., Suite 200
Milwaukee, WI 53208
daniel.wiggins@mtera.org
/s/ Natalie McIntire
Natalie McIntire
Senior Advocate
Sustainable FERC Project
20 North Wacker Drive, Suite 1600
Chicago, IL 60606
(312) 995-5907
nmcintire@nrdc.org
/s/ Anna Markowski
Anna Markowski
Director, Midwest
Climate and Clean Energy
Natural Resources Defense Council
20 North Wacker Drive, Suite 1600
Chicago, IL 60606
PDF page 7
7
312-651-7927
amarkowski@nrdc.org
/s/ Beth Soholt
Beth Soholt
Executive Director
Clean Grid Alliance
3433 Broadway St. NE, Suite 240
Minneapolis, MN 55413
bsoholt@cleangridalliance.org
/s/ Mike Schowalter
Managing Director, Transmission Policy
Fresh Energy
408 Saint Peter Street, Suite 350
Saint Paul, MN 55102
(612) 433-3648
schowalter@fresh-energy.org
/s/ Justin Vickers
Justin Vickers
Senior Attorney
Sierra Club
Chicago, IL
224.420.0614
justin.vickers@sierraclub.org
PDF page 8
8
CERTIFICATE OF SERVICE
I hereby certify that the foregoing has been served in accordance with 18 C.F.R. § 385.2010 upon each party designated on the official service list in this proceeding by email.
Dated: November 17, 2026