ER27-508-000 · 2026-11-19 · Constellation Energy Generation, LLC

Expedited Motion for a Nine-Day Extension of Comment Deadline of Constellation Energy Generation, LLC

PDF page 1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
Pacific Gas and Electric Company

)

Docket No. ER27-513-000

Southern California Edison Company

)

Docket No. ER27-508-000

San Diego Gas & Electric Company

)

Docket No. ER27-521-000

(not consolidated)

EXPEDITED MOTION FOR A NINE-DAY EXTENSION OF TIME OF
CONSTELLATION ENERGY GENERATION, LLC

Constellation Energy Generation, LLC (“Constellation”) respectfully requests a short nine-day extension of the December 7, 2026 comment deadline in the above-captioned dockets. On November 16, 2026, Pacific Gas and Electric Company (“PG&E”), Southern

California Edison Company (“SCE”), and San Diego Gas & Electric Company (“SDG&E”) submitted filings under section 205 of the Federal Power Act in the above-captioned dockets in response to the Commission’s June 18, 2026 order instituting a section 206 proceeding (“Show Cause Proceeding”) requiring a response from the California Independent System Operator Corp. (“CAISO”) and numerous transmission-owning utilities in the CAISO region.1  CAISO also made a section 205 filing on November 16, 2026 in response to the same Commission order in Docket No. ER27-508-000.  The Show Cause Proceeding addresses RTO/ISO and transmission utility tariff provisions relating to large load integration.

The PG&E, SCE, and SDG&E filings currently have been assigned a comment date of December 7, 2026, while the CAISO filing has a comment date of December 15, 2026.  All of these filings involve important issues that are highly interrelated.  As such, Constellation

1 California Independent System Operator Corp., 195 FERC ¶ 61,214 (2026).

PDF page 2

2

respectfully requests a short nine-day extension of time to respond to the PG&E, SCE, and SDG&E filings.  Constellation submits that a nine-day extension to align response deadlines will facilitate more efficient and effective briefing of the issues presented in these interrelated dockets.  Additionally, a short extension would also be beneficial given the impacts of the Thanksgiving holiday falling during the comment period.

Given the timing of the upcoming holiday and short nature of this extension request, Constellation requests that the Commission grant this Motion summarily and issue a notice extending the deadline by November 23, 2026.  Granting the requested relief to extend the comment deadline to December 16, 2026, will not affect or interfere with the proposed effective dates for tariff changes requested in the CAISO filing, nor in the PG&E, SCE, and SDG&E filings.

Respectfully submitted,
    /s/ Yena Lee
Todd L. Brecher
Vice President and Managing Counsel
Constellation Energy Generation, LLC
250 Massachusetts Avenue NW Ste. 700
Washington, D.C. 20001
202-969-1324
todd.brecher@constellation.com

Christopher A. Wilson
Vice President, Federal Regulatory Affairs
Constellation Energy Generation, LLC
250 Massachusetts Ave. NW, Suite 760
Washington, D.C. 20001
202-347-7500
FERCe-filings1@constellation.com

Yena Lee
Assistant General Counsel
Constellation Energy Generation, LLC
250 Massachusetts Ave. NW, Suite 760
Washington, D.C. 20001
202-320-3335
yena.lee@constellation.com

Seth T. Lucia
Assistant General Counsel
Constellation Energy Generation, LLC
250 Massachusetts Avenue NW, Suite 760
Washington, D.C. 20001
703-399-9803
seth.lucia@constellation.com

Counsel for Constellation Energy Generation, LLC
November 19, 2026

PDF page 3

CERTIFICATE OF SERVICE

I hereby certify that I have on this 19th day of November 2026, caused to be served a copy of the foregoing upon all parties on the service lists in these proceedings in accordance with the requirements of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.2010.

/s/ Sara Gordon
Constellation Energy Generation, LLC