ER26-3380-001 · 2026-10-29 · Ohio Consumers' Counsel

Request for Rehearing to Protect Consumers from Excessive Transmission Rates by Office of the Ohio Consumers' Counsel

PDF page 1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
)
Docket Nos. ER26-3380-000 and
)
         ER26-3380-001
REQUEST FOR REHEARING
TO PROTECT CONSUMERS FROM EXCESSIVE TRANSMISSION RATES BY

OFFICE OF THE OHIO CONSUMERS’ COUNSEL
Maureen Willis
Consumers’ Counsel
Angela O/Brien
Deputy Consumers’ Counsel
Office of the Ohio Consumers’ Counsel
65 East State Street, Suite 700
Columbus, Ohio 43215
Telephone: (614) 466-9531
angela.obrien@occ.ohio.gov
Denise C. Goulet, Esq.
McCarter & English, LLP
1301 K Street, N.W., Suite 1000 West
Washington, D.C. 20005
(202) 753-3400
dgoulet@mccarter.com
Special Counsel to the Ohio Office of the
Attorney General for the
Office of the Ohio Consumers’ Counsel
October 29, 2026

PDF page 2

Table of Contents
I. INTRODUCTION … 1
II. BACKGROUND … 3
III. SPECIFICATIONS OF ERRORS ON REHEARING … 4
IV. LIST OF ISSUES ON REHEARING … 5
V. REQUEST FOR REHEARING … 8
A. FERC’s approval of the $555/MW-day seller offer cap and the
pay-as-bid clearing mechanism design for the RBP auction fails the
test for reasoned decision-making because these decisions are not
supported by the evidence and do not provide adequate protections
for consumers against seller market power … 8
B. FERC’s approval of the pay-as-bid clearing price mechanism
for the RBP auction is an unexplained and unreasoned departure
from long-held FERC precedent … 13
C. FERC’s approval of the 20% shortage penalty for the RBP
auction fails the test for reasoned decision-making because it is
disproportionate to the risk consumers will incur if large load data
centers do not materialize, and it is allocated to consumers who did
not cause the circumstances leading to the incurrence of the penalty … 16
D. FERC’s approval of the RBP auction structure violates long-
held judicial precedent requiring that costs be allocated to those
causing the costs to be incurred or to those benefitting from them.  It
also does not protect consumers from the unjust and unreasonable
results of RPM auctions held in the past three years that cleared short
because of large data center load demands … 19
VI. CONCLUSION AND PRAYER FOR RELIEF … 22

PDF page 3

1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
)
Docket Nos. ER26-3380-000 and
)
         ER26-3380-001
REQUEST FOR REHEARING
TO PROTECT CONSUMERS FROM EXCESSIVE TRANSMISSION RATES
BY
OFFICE OF THE OHIO CONSUMERS’ COUNSEL
I. INTRODUCTION
The Federal Energy Regulatory Commission’s (“FERC”) September 29, 2026 Orders1 in this case fail to protect consumers in Ohio and elsewhere in PJM Interconnection, L.L.C. (“PJM”) from the risks and costs that will result from general acceptance of PJM’s Reliability Backstop Procurement (“RBP”) proposal in these dockets. That order allows PJM to implement a one-time capacity auction, with “billion-dollar implications for consumers,”2 to procure generating capacity needed to serve forecasted load associated with large data centers and the resulting resource adequacy shortfall in the 2028/2029 Delivery Year capacity auction. But the RBP auction design subjects consumers who are not causing the need for the auction to shoulder the significant risk of paying for those costs, especially if the forecasted loads do not materialize. FERC’s acceptance of this proposal is inconsistent with the stated understandings of several of the commissioners in their concurring opinions.  For example, Commissioner David A. LaCerte states in his concurrence that the “Reliability Backstop

1 PJM Interconnection, L.L.C., 196 FERC ¶ 61,245 (2026) (“September 29 Order”). 2 Id., Chairman Laura V. Swett concurring at P 2.

PDF page 4

2
Procurement is designed to make sure the costs of the large load at issue here are appropriately allocated to that load and not to other consumers”3 Similarly, Commissioner Lindsay S. See stated in her concurrence that:

“customers that drive new costs should bear appropriate responsibility for
them. Existing customers should not be left paying costs attributable to new
demand. That principle is particularly important here where PJM proposes a
backstop procurement specifically to deal with the capacity shortfall that
rapid load growth largely drove.”4
The approved RBP auction design does not comport with these understandings.  Moreover, the FERC-accepted auction design does not contain sufficient and critically needed consumer protections against the exercise of market power. Pursuant to Section 313 of the Federal Power Act (“FPA”), 16 U.S.C. § 825l, and Rule 713 of the FERC’s Rules of Practice and Procedure, 18 C.F.R. § 385.713, the Office of the Ohio Consumers’ Counsel (“OCC”) hereby requests rehearing of the September 29 Orders.

OCC is the statutory representative of millions of Ohio residential utility consumers, per R.C. Chapter 4911. OCC actively advocates for Ohioans in numerous state and federal regulatory proceedings, including proceedings before FERC. OCC timely intervened in this case on August 14, 2026,5 and submitted a Protest of the filing on August 21, 2026.6  Ohio residential consumers are adversely affected by FERC’s September 29 Order in this case because they are at risk of paying the costs for the capacity to be acquired by the auction even though they did not cause that capacity to be procured.  They are also at risk of paying an excessive capacity clearing

3 Id., Commissioner LaCerte concurring at P 1.
4 Id., Commissioner See concurring at P 2. 5 Doc-less Motion to Intervene in PJM Interconnection, L.L.C., Docket No. ER26-3380-000, filed by Office of the Ohio Consumers’ Counsel, available on FERC’s e-library website as Accession Document No. 20260814-5066. 6 Protest and Request for Rejection of Filing, or in the Alternative, for Evidentiary Hearings and/or Settlement Proceedings by Office of the Ohio Consumers’ Counsel (Aug. 21, 2026), Docket No. ER26-3380-000, available on FERC’s e-Library website as Accessions Document No. 20260821-5281 (“OCC Protest”).

PDF page 5

3
price for that auction because the auction design does not contain crucially needed seller market power mitigation measures.

II. BACKGROUND
FERC generally accepted (subject to refund and paper hearing) PJM’s proposal to establish the RBP, a one-time auction to procure 6,831 MW of new generating capacity and cure the capacity shortage that occurred in the Reliability Pricing Model (“RPM”) capacity base residual auction for the 2028/2029 Delivery Year.7 Although the September 29 Order generally accepted the RBP proposal subject to refund and paper hearing, it postponed that auction for five months, until February 28, 2027.8 This delay appears intended to give PJM time to modify the proposal to correct certain deficiencies identified by FERC in the Order.9

The overall RBP auction design accepted in the September 29 Order (subject to refund and paper hearing) requires all loads in the transmission zones affected by the capacity shortages from the 2028/2029 Delivery Year RPM auction to participate in the RBP auction.10 FERC’s ruling accepts (a) the must-offer requirement for capacity sellers;11 (b) the $555/MW-day market seller offer cap;12 (c) the pay-as-bid auction clearing mechanism proposal;13 (d) the shortage penalty of 20% of the seller’s cleared bid times the shortage amount;14 (e) the lack of a locational

7 September 29 Order at P 1. 8 Id.
9 Id. at PP 2-3.
10 Id. at PP 12, 16.
11 Id. at P 53.
12 Id. at P 74.
13 Id. at P 75.
14 Id. at P 84.

PDF page 6

4
requirement for new generation;15 and the opt-out provision for Fixed Resource Requirement entities.16

FERC found that the following elements of the RBP proposal may be unjust and unreasonable, and set these issues for further paper hearings and additional comments:  (a) allocation of costs to Electric Distributor zones and then among Load Serving Entities (“LSEs”) located in those zones using a snapshot-in-time approach that does not make adjustments for changes in load over time;17 (b) the proposal to allow municipal and cooperative utilities to opt out of allocated shares of the cost of capacity acquired through the RBP auction;18 (c) the proposed rules for exit fees associated with a Transmission Owner leaving PJM that would allocate the exit fees to Transmission Owners rather than LSEs;19 and (d) the LSE collateral requirements.20 The September 29 Order also establishes a process for the paper hearing, but states that FERC might be willing to delay that paper hearing process if PJM submits a filing within 30 days of the date of the order to correct the deficiencies identified above.21

III. SPECIFICATIONS OF ERRORS ON REHEARING
1. FERC erred by acting in an arbitrary and capricious manner in approving the excessive $555/MW-day market seller offer cap and the pay-as-bid clearing mechanism design for the RBP auctions.  There is no evidence in the record to support this offer cap, and there is no evidence to support the pay-as-bid clearing mechanism design.  The excessive cap and pay-as-

15 Id. at P 97.
16 Id.at P 151.
17 Id. at PP 154-156.
18 Id. at P 152. 19 Id. at PP 178-179.
20 Id. at PP 204-205.
21 Id. at PP 2-3, 24.

PDF page 7

5
bid design will neither mitigate market power of sellers in the auction nor protect consumers in Ohio and elsewhere in PJM from paying excessive, unjust and unreasonable capacity prices.

2. FERC erred in approving the pay-as-bid clearing mechanism design in the RBP because this ruling departs from long-held precedent regarding the need for a single clearing price auction structure in capacity auctions to mitigate seller market power.

3. FERC erred by acting in an arbitrary and capricious manner in approving the proposed insufficient shortage penalty.  That penalty is significantly less stringent than warranted given the high risk associated with purchasing generating capacity through the RBP auction well in advance of the forecasted new large data center loads materializing on the system.  This ruling is also inconsistent with FERC precedent establishing more stringent penalties for RPM capacity resource non-performance, and inconsistent with judicial precedent requiring FERC to address the critical issues raised before it.

4. FERC erred by acting in an arbitrary and capricious manner in approving an RBP auction design that does not allocate the costs of the auction to the large load data centers causing the need for the auction and thus placing residential consumers in Ohio and elsewhere in PJM that did not cause these costs to be incurred at risk of paying these costs.

IV. LIST OF ISSUES ON REHEARING
1. Whether FERC’s approval of the $555/MW-day seller offer cap for the RBP
auctions and the pay-as-bid clearing mechanism design are contrary to the Administrative Procedure Act’s “arbitrary and capricious” standard, 5 U.S.C. § 706(2)(A), Sithe/Indep. Power Partners, L.P. v. FERC, 165 F.3d 944, 948 (D.C. Cir. 1999) (“Sithe/Indep. Power Partners”); FERC v. Elec. Power Supply Ass’n, 136 S. Ct. 760, 782 (2016) (“EPSA”) (quoting Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43 (1983)); and Neighborhood TV Co. v. FCC, 742 F.2d 629, 639 (D.C. Cir. 1984) (“Neighborhood TV Co.”) (the court must be

PDF page 8

6
able to “discern a reasoned path from the facts and considerations before the [agency] to the decision it reached”) because the excessive offer cap in conjunction with the pay-as-bid clearing mechanism will not sufficiently constrain market power in the RBP auction?

2. Whether FERC’s approval of the pay-as-bid clearing mechanism in the RBP
proposal is arbitrary and capricious in violation of the Administrative Procedure Act’s “arbitrary and capricious” standard, 5 U.S.C. § 706(2)(A), Sithe/Indep. Power Partners, L.P. v. FERC, 165 F.3d 944, 948 (D.C. Cir. 1999) (“Sithe/Indep. Power Partners”); FERC v. Elec. Power Supply Ass’n, 136 S. Ct. 760, 782 (2016) (“EPSA”) (quoting Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43 (1983)); and Neighborhood TV Co. v. FCC, 742 F.2d 629, 639 (D.C. Cir. 1984) (“Neighborhood TV Co.”) (the court must be able to “discern a reasoned path from the facts and considerations before the [agency] to the decision it reached.”) because that auction clearing mechanism design is an unwarranted and unexplained departure from precedent, contrary to the requirements of Williams Gas Processing-Gulf Coast Co. v. FERC, 475 F.3d 319, 326 (D.C. Cir. 2006) (“Williams Gas Processing”) (citing Brusco Tug & Barge Co. v. NLRB, 247 F.3d 273, 278 (D.C. Cir. 2001) (“[I]t is ‘axiomatic that [agency action] must either be consistent with prior [action] or offer a reasoned basis for its departure from precedent’”)?

3. Whether FERC’s approval of the shortage penalty proposal is arbitrary and capricious in violation of the Administrative Procedure Act’s “arbitrary and capricious” standard, 5 U.S.C. § 706(2)(A), Sithe/Indep. Power Partners, L.P. v. FERC, 165 F.3d 944, 948 (D.C. Cir. 1999) (“Sithe/Indep. Power Partners”), FERC v. Elec. Power Supply Ass’n, 136 S. Ct. 760, 782 (2016) (“EPSA”) (quoting Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43 (1983)); and Neighborhood TV Co. v. FCC, 742 F.2d 629, 639 (D.C. Cir. 1984)

PDF page 9

7
(“Neighborhood TV Co.”) (the court must be able to “discern a reasoned path from the facts and considerations before the [agency] to the decision it reached.”) because the penalty is disproportionate to the risk that residential consumers will bear if the large data center loads do not materialize, is allocated to loads that did not cause the circumstances leading to the imposition of the penalty, is inconsistent with judicial precedent requiring FERC to address the critical issues raised before it, and is inconsistent with FERC precedent establishing more stringent penalties for RPM capacity resource non-performance, contrary to the requirements of Williams Gas Processing-Gulf Coast Co. v. FERC, 475 F.3d 319, 326 (D.C. Cir. 2006) (“Williams Gas Processing”) (citing Brusco Tug & Barge Co. v. NLRB, 247 F.3d 273, 278 (D.C. Cir. 2001)?

4. Whether FERC’s failure to allocate the RBP costs that will be incurred to serve large data center loads to those loads is arbitrary and capricious in violation of the Administrative Procedure Act’s “arbitrary and capricious” standard, 5 U.S.C. § 706(2)(A), Sithe/Indep. Power Partners, L.P. v. FERC, 165 F.3d 944, 948 (D.C. Cir. 1999) (“Sithe/Indep. Power Partners”), FERC v. Elec. Power Supply Ass’n, 136 S. Ct. 760, 782 (2016) (“EPSA”) (quoting Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43 (1983)), and Neighborhood TV Co. v. FCC, 742 F.2d 629, 639 (D.C. Cir. 1984) (“Neighborhood TV Co.”) (the court must be able to “discern a reasoned path from the facts and considerations before the [agency] to the decision it reached.”) because it violates long-held judicial principles that require allocation of costs to those causing the costs to be incurred or benefiting from the projects?

PDF page 10

8
V. REQUEST FOR REHEARING
A. FERC’s approval of the $555/MW-day seller offer cap and the pay-as-bid clearing mechanism design for the RBP auction fails the test for reasoned decision-making because these decisions are not supported by the evidence and do not provide adequate protections for consumers against seller market power.

FERC failed to provide a reasoned explanation for its acceptance of the $555/MW-day proposed market seller offer cap and the pay-as-bid clearing mechanism for the RBP auction design.  This design will not protect consumers in Ohio or elsewhere in PJM from the exercise of seller market power.  In his Protest to the filing, the Independent Market Monitor for PJM (“IMM”) demonstrates the critical flaw in PJM’s proposal, i.e., that PJM explicitly decided not to use “market power screening or mitigation measures” in the design of the auction parameters.22 As the IMM argues, “[i]t should be unacceptable that PJM, at a time of severe supply shortage, would propose to not use the standard market power screening that is used in all PJM capacity auctions.”23 This is especially concerning given that the overall market design is premised on  an excessive seller offer cap and a pay-as-bid clearing mechanism, neither of which will constrain seller market power in an auction where scarcity is a known condition.

The September 29 Order’s primary reasoning for the offer cap amount is that the $555/MW-day represents the “maximum willingness to pay and process for selecting RBP resources in the RBP auction.”24 But the order points to no evidence justifying that $555/MW- day is the maximum willingness to pay in the RBP auction. Instead, FERC states that “PJM

22 Protest of the Independent Market Montior for PJM at 12 (citing RBP Application at 32), Docket No. ER26-3380- 000, available on the FERC e-library website as Accession Document No. 20260821-5317 (“IMM  Protest”).
23 Id.
24 September 29 Order at P 74.

PDF page 11

9
needs to expeditiously cure the capacity shortage and a high price cap will encourage new entrants.”25

FERC also notes that “in establishing the value for the maximum willingness to pay in the RBP, PJM reasonably relied on the value of the RPM price cap that the Commission accepted in January and reaffirmed in July” in the RPM quadrennial review of the RPM auction parameters.”26 But that too fails to explain why the $555/MW-day cap is appropriate for an auction with known scarcity conditions and no market power mitigation provisions. In the RPM quadrennial review proceeding that established $555/MW-day as the upper bound for procuring capacity in RPM base residual auctions, there are other established measures in place to mitigate seller market power. As the IMM demonstrates in his Protest, those seller market power mitigation measures will not exist in the RBP auction.  Neither PJM nor FERC explain why they assume load has a maximum willingness to pay $555/MW-day for capacity to be procured in the RBP auction where scarcity is highly likely given that the 2028/2029 auction cleared short by over 6,800 MW.  PJM argued in the RBP Application27 that its proposed “maximum willingness-to-pay cap” will provide “a direct limit on procurement costs even in the absence of offer mitigation,”28 claiming that “competitive dynamics are expected to encourage suppliers to submit competitive offers that more closely reflect their willingness to provide service.”29 But there is no evidence that competitive dynamics are likely to exist in

25 Id.
26 Id.
27 Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large Loads (Jul. 31, 2026), filed by PJM Interconnection, L.L.C. in Docket No. ER26-338-000 (“RBP Application”), available on FERC’s e-library website at Accession Document No. 20260731-5214. 28 RBP Application at 68.
29 Id. at 69.

PDF page 12

10
the RBP auction. FERC acknowledges that the pay-as-bid nature of the RBP auction is a “theoretical drawback” to ensuring competitive outcomes, but dismisses this flaw, stating that this “is acceptable in the context of the proposed $555/MW-day average-price cap and the Charles River Associates Survey Results indicating strong seller interest in the RBP auction.”30 It is mere speculation that new capacity will show up in the RBP auction in sufficient quantities to mitigate the known scarcity from the 2028/2029 RPM auction.

Regardless of the Study results, neither FERC nor PJM explain how the offer cap will mitigate seller market power when structural market power has long been endemic to the PJM capacity auctions. The IMM has consistently reported that “[s]tructural market power is endemic to the capacity market.” 31  In the 2026 State of the Market Report, the IMM states that “[i]n a good market design and a competitive market structure, market participants are constrained to behave competitively,” but that “[i]n a market with endemic structural market power like the PJM Capacity Market, effective market power mitigation rules are required in order to constrain market participants to behave competitively.”32 Suppliers know they will be paid their offer price given the pay-as-bid RBP auction design, but there are no rules to mitigate structural seller market power in that auction.

The $555/MW-day offer cap FERC accepted in the September 29 Order is more than $200/MW-day higher than the current collared price cap applied in the 2028/2029 RPM base residual auction.  And while it may make sense that something higher than the cap in the 2028/2029 auction is needed to cure the capacity shortage stemming from that auction, there is no

30 September 29 Order at P 75. 31 2026 State of the Markets Report, Section 5 Capacity Market at 382, 390, prepared by the Independent Market Monitor for PJM (“2026 State of the Market Report”), available on the internet at https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2026/2026q2-som-pjm-sec5.pdf.
32 2026 State of the Market Report at 390.

PDF page 13

11
justification for why $555/MW-day is the right price point for preventing seller market power in an auction with known endemic market power, a known shortage to be procured, and a known lack of market power mitigation measures.  The fact that the accepted auction design will pay each seller whose offer clears the auction its offer bid price for a period of up to 15 years only encourages rather than discourages offers above competitive levels.  While one might argue that a cap above the clearing price in the last short auction might be needed to encourage new entry, neither PJM nor FERC explain why $555/MW-day is the right number.

The obvious goal of a seller offer cap is to mitigate seller market power in the RPM auctions. FERC has routinely used market seller offer caps in conjunction with an auction structure that encourages new entrants to bid their marginal cost of new supply into the auctions.33 FERC found that “a competitive market with a single, market-clearing price creates incentives for sellers to minimize their costs, because cost-reductions increase a seller’s profits.”34 FERC further explained that “when many sellers work to minimize their costs, competition among them keeps prices as low as possible.”35 FERC continued, reasoning that “[w]hile an efficient seller may, at times, receive revenues that are above its average total costs, the revenues to an inefficient seller may be below its average total costs and it may be driven out of business,” and “[t]his market result benefits customers, because over time it results in an industry with more efficient sellers and lower prices.”36 In Commonwealth Edison Co. FERC explained that “under this model, the generator has the proper incentive to bid the lowest price

33 PJM Interconnection, L.L.C., 117 FERC ¶ 61,331 at P 141 (2006).
34 Id.
35 Id.
36 Id.

PDF page 14

12
that covers its marginal cost, knowing that if the market produces a higher price it will receive the market price.”37

PJM argued that a single clearing price is inappropriate for the RBP auction design because that approach would “transfer inframarginal rents to every seller priced below the most expensive accepted offer.”38 But that concern simply demonstrates the unjustness and unreasonableness of the excessive offer cap rather than supports a departure from long-held precedent.  It is also inconsistent with FERC’s long-held rulings related to the use of a single clearing price auction structure for PJM capacity markets.

FERC does not explain why the goal of RPM, which is to encourage bids reflecting marginal costs (which addresses market power concerns), is not also needed for the RBP auction.  FERC states only that it recognizes the flaw in pay-as-bid because it does not encourage marginal cost based bids, but shrugs off that flaw with the argument that the excessive offer cap and a study indicating strong interest in RBP auction will cure the problem.39  FERC would not need an excessive offer cap if it was not departing from precedent with the pay-as-bid approach. It appears that FERC’s hope is that new or more sellers will show up for an auction to be run just a few months after the 2028/2029 Delivery Year RPM auction which cleared short by more than 6,800 MW.  This hope is mere speculation, poses a significant risk of high clearing prices for consumers, and does not satisfy the judicial  requirement for reasoned decision-making. Instead of developing a market design consistent with sound economic and FERC policy, the IMM notes that “PJM’s [RBP] proposals abandon single clearing price logic.”40 As the IMM

37 Commonwealth Edison Co., 113 FERC ¶ 61,278 at P 43 (2005), citing to New York Independent System Operator, Inc., order on reh'g, 110 FERC ¶ 61,244 at P 65 n. 76 (2005).
38 RBP Application at 66.
39 September 29 Order at P 75.
40 2026 State of the Market Report at 382.

PDF page 15

13
explains, “[b]y proposing a pay as bid auction design with no market power screening, RBP market sellers have a strong incentive to offer above their costs.”41 There is nothing in that structure that will prevent sellers from just bidding at the $555/MW-day offer cap regardless of the sellers’ actual marginal costs. The high offer cap will do nothing to curb seller incentives to bid above their marginal costs.

The RBP auction design does not replicate how sellers in competitive markets would bid. FERC should reconsider its approval of the $555/MW-day offer cap and the pay-as-bid clearing price auction design because these components of the RBP are unsupported by the evidence and fail to mitigate seller market power. The September 29 Order fails to explain how the excessive offer cap in conjunction with a pay-as-bid clearing price design will mitigate seller market power in the wake of known structural market power that is endemic to the capacity markets, known capacity shortages in recent auctions, and a lack of market power mitigation measures.

B. FERC’s approval of the pay-as-bid clearing price mechanism for the RBP auction is an unexplained and unreasoned departure from long-held FERC precedent.

FERC also failed to provide a reasoned explanation for its departure from its long-held policy of requiring a single clearing price auction design for capacity markets. The September 29 Order attempts to distinguish between the RPM capacity auction design and that approved for RBP by arguing that pay-as-bid is appropriate when the product to be procured is not uniform.42 But the product to be procured in RBP is just as uniform as it is in the RPM auctions.  In the three-year forward RPM auctions, new capacity participating in the auctions can consist of both existing and planned generation, as well as demand response resources.43 Similarly, the RBP

41 IMM Protest at 12.
42 September 29 Order at P 75.
43 Reliability Resource Agreement Among Load Serving Entities in PJM, Article I, Definitions, Capacity Resources; see  also PJM Tariff, Attachment DD, section 5.5A(a).

PDF page 16

14
auction design approved by FERC allows both existing and planned generating resources and demand response resources to participate, subject to certain limitations.44 RBP sellers’ capacity must never have cleared an RPM auction and must have an expected in service date of June 1, 2032.45 While that date is a limitation on sellers that can bid into RBP, the three-year ahead RPM capacity auctions have a similar start date limitation in that the planned capacity being bid into the RPM auction must have an in-service date of three years, i.e., by the time the Delivery Year commences.

FERC appears to focus on the fact that RBP resources will provide a 15-year
commitment to remain in the market.46  RPM resources have no similar commitment. But that difference does not mean that the RBP auction design does not seek to procure a uniform product. The fact remains that bidders into both the RBP and RPM auctions must be available within the period defined in the respective rules.  And while RPM sellers do not have to make more than a one-year commitment to the market, they nevertheless must offer their capacity into subsequent auctions unless they satisfy one of four very limited criteria for an exception.47 In other words, they too have restrictions mandating their participation in the PJM capacity auctions year-after-year unless they qualify for one of four limited exceptions.  That obligation makes their resources similar to the resources subject to the 15-year participation commitment in the RBP rules.

The September 29 Order provides no clear explanation for how FERC decided that RPM procures a uniform product while RBP does not. FERC describes the uniform product as

44 PJM RBP Application at 36, 51. 45 Id., see also September 29 Order at P 32.
46 September 29 Order at 32.
47 PJM Tariff, Attachment DD, section 6.6(a) and (g).

PDF page 17

15
capacity that “may differ based on commercial operation dates and other factors.”48 But there are limits on commercial operation dates in both the RBP and RPM auctions, as discussed above. The evidence does not support FERC’s findings.  In neither the RBP nor the RPM auction design is the product to be procured “uniform” as FERC describes that word in the September 29 Order.

The approved RBP pay-as-bid auction design dramatically departs from FERC’s prior preference for a single auction clearing price structure in order to ensure that market outcomes are consistent with competitive market conditions. This is inconsistent with Commissioner LaCerte’s guidance in his concurrence, directing that PJM, in preparing a revised filing, should “not deviate from the principles of ratepayer protection.”49 Commissioner David Rosner likewise directed that PJM and its stakeholders must return to market fundamentals so that “[l]oad and supply should have strong incentives to hedge, manage their risks, and procure the capacity they rely upon.”50

FERC never reasonably explained its departure from long-held judicial precedent with respect to the preference for single clearing price capacity auctions. That unexplained departure from precedent violates long-held juridical precedent in Williams Gas Processing-Gulf Coast Co.

v. FERC, 475 F.3d 319, 326 (D.C. Cir. 2006) (“Williams Gas Processing”) (citing Brusco Tug & Barge Co. v. NLRB, 247 F.3d 273, 278 (D.C. Cir. 2001) (“[I]t is ‘axiomatic that [agency action] must either be consistent with prior [action] or offer a reasoned basis for its departure from precedent’”).  This failure to explain its departure requires rehearing or reconsideration by FERC of this ruling.

48 September 29 Order at P 75.
49 Id., LaCerte concurrence at P 6.
50 Id., Rosner concurrence at P 4.

PDF page 18

16
C. FERC’s approval of the 20% shortage penalty for the RBP auction fails the test for reasoned decision-making because it is disproportionate to the risk consumers will incur if large load data centers do not materialize, and it is allocated to consumers who did not cause the circumstances leading to the incurrence of the penalty. FERC did not explain why the shortage penalty, set at 20% of the price bid by the seller times the cleared capacity, was appropriate.  PJM proposed that the shortfall charge would “be equal to the product of the RBP Resource’s committed . . . MW shortfall and 20% of the RBP price.”51  In approving this proposal, the September 29 Order states only that the proposed penalty is appropriate because it will work in conjunction with the high pay-as-bid RBP clearing price and the “promise” of up to 15 years of revenue certainty, which “will incentivize developers of RBP Resources to deliver” on their commitment.52  But FERC does not explain how a penalty set at only 20% of the clearing price, without additional restrictions, will encourage developers to meet their commitments.

Under existing RPM rules, the non-performance penalty is set at the clearing price plus 20% of that price.53  Those non-performing resources face additional penalties for not meeting commitments during performance assessment hours. In contrast, FERC accepted a proposal to limit the proposed shortage penalty to only 1/5th of the capacity sell offer, which seriously undervalues the reliance load places on resource adequacy.

As the IMM explained in his Protest, “the RBP Filing is inconsistent with the capacity market approach to penalties for performance” because “[t]he proposed [RBP] Tariff language unnecessarily restricts the applicability of charges to a narrow, specific reason, is vague about the timing of the charges, limits the charges to three years, and shifts the risk from resource owners to

51 September 29 Order at P 79.
52 Id. at P 84.
53 PJM Tariff, Attachment DD, sections 7 and 8.2.

PDF page 19

17
customers.”54 The IMM demonstrates that “[d]eficiency charges in the current RPM rules are assessed due to a failure to satisfy a commitment ‘for any reason,’ such as derates and retirements.”55  In contrast, “the proposed RBP Shortfall Charge would only apply for a specific reason, “due to not achieving commercial operation.”56 Moreover, the RBP shortfall charges are limited to a three-year period.57 In contrast, the new resources must be available for a 15-year period.  FERC never addressed the IMM’s concerns that there is nothing to protect consumers from shortfall in capacity that could occur in years four through fifteen.  FERCs failure to address serious challenges to the insufficiency of the proposed shortage penalty violates judicial precedent requiring that FERC address critical issues raised before it.58

FERC also ignores that under PJM’s proposal, it is consumers who may pay the shortage penalties. PJM states in its RBP Application that “[s]hortfall charges assessed to RBP Resources will be allocated to load.”59 It is unclear what PJM means by this statement, but it appears that PJM is proposing that consumers rather than those bidding the resources into the RBP auctions will pay the shortage penalties. Although OCC protested this element of the RBP proposal, FERC never addressed that concern. It simply is not just and reasonable to impose these shortage penalties on consumers when it is the suppliers that FERC seeks to encourage to comply with

54 IMM Protest at 15.
55 Id.
56 Id. at 15-16, citing proposed Tariff, Attachment DD, section 8.1
57 RBP Application at 61; see also IMM Protest at 17.
58 Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43 (1983) (FERC’s orders are arbitrary and capricious if it “relied on factors which Congress has not intended it to consider, entirely failed to consider an important aspect of the problem, offered an explanation for its decision that runs counter to the evidence before the agency, or is so implausible that it could not be ascribed to a difference in view or the product of agency expertise.”); see also Friends of Buckingham v. State Air Pollution Control Bd., 947 F.3d 68, 80 (4th Cir. 2020); Appalachian Voices v. State Water Control Bd., 912 F.3d 746, 753 (4th Cir. 2019).
59 RBP Application at 61.

PDF page 20

18
promised in-service dates and it is suppliers that have the power to remedy the problem.  FERC’s failure to address this issue also violates judicial precedent.60

FERC’s ruling accepting the proposal to impose the shortage penalty on loads might have been just and reasonable if the auction design made the cost causers (large data center loads)  pay the costs associated with the RBP auctions. But under the RBP auction design accepted by FERC, it is all consumers in the Electric Distributor zones that are short that will pay the incentive for seller performance.61 This is unjust and unreasonable.

If the RBP capacity developers fail to abide by their commitment to bring capacity to PJM by June 2032, consumers will bear the risk of that capacity not materializing through curtailments of energy deliveries.  This is especially true given FERC’s recent rejection of PJM’s companion filing to the RBP Application, i.e., the Interim Resource Adequacy Service (“IRAS”) proposal.62 That proposal would have targeted curtailments to the zones that are short on capacity.63 In the absence of that proposal, PJM curtailments could affect all consumers across the grid. Thus, all consumers grid-wide could be saddled with both energy curtailments and the excessive costs of the unmitigated seller market power stemming from the RBP auction. These consumers should not also bear the shortage penalties incurred by capacity sellers unable or unwilling to abide by their commitments.

FERC should have found the shortage charge provisions of the RBP proposal unjust and unreasonable, and required further briefing or a modified filing to ensure that the shortage penalty was sufficiently stringent to incent capacity developer performance. FERC also should

60 See n.58, supra.
61 RBP Application at 61.
62 PJM Interconnection, L.L.C., 197 FERC ¶ 61,019 (2026) (rejecting the curtailment provisions in PJM’s companion to the RBP filing).
63 Id. at P 53.

PDF page 21

19
have made clear that such penalties would be allocated to the developers defaulting on their commitments. The combination of a more stringent shortage penalty with a structure that allocated such costs either to the developers or the load causing the costs to be incurred would be fair, follow cost causation principles and protect all other consumers in Ohio and elsewhere in PJM.

D. FERC’s approval of the RBP auction structure violates long-held judicial precedent requiring that costs be allocated to those causing the costs to be incurred or to those benefitting from them.  It also does not protect consumers from the unjust and unreasonable results of RPM auctions held in the past three years that cleared short because of large data center load demands.

FERC never addressed OCC’s main concern that the RBP auction model is
inappropriate, unjust and unreasonable because it does not target procurement and allocation of the resulting auction costs to the large data center loads causing the shortage in the 2028/2029 and earlier RPM Delivery Years.  PJM and FERC both recognize that the need for the RBP auction is the direct result of the sudden addition of more than 6,000 MW of large load data centers to the PJM resource adequacy forecasts.  As FERC recognizes in the September 29 Order, the courts have long required that “Commission-jurisdictional rates and charges must ‘reflect to some degree the costs actually caused by the customer who must pay for them,’ and costs must be allocated in a manner that is at least roughly commensurate with benefits.”64 FERC further recognized that “[c]ompliance with this principle is evaluated by ‘comparing the costs assessed against a party to the burdens imposed or benefits drawn by that party’.”65 OCC demonstrated that PJM’s proposal would not ensure allocation of costs associated with the RBP auction to those entities causing those costs to be incurred and benefitting from

64 September 29 Order at P 150, citing KN Energy Inc. v. FERC, 968 F.2d 1295, 1300 (D.C. Cir. 1992);  Ky. Pub. Serv. Comm’n v. Am. Elec. Power Serv. Corp., 193 FERC ¶ 61,110 (2025). 65 Id., citing Ill. Com. Comm’n v. FERC, 576 F.3d 470, 477 (7th Cir. 2009).

PDF page 22

20
that auction.66 Nowhere in the record is there any evidence that parties other than large load data centers caused the need for the RBP auction.  Indeed, the name of PJM’s Application for the RBP framework is “Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large Loads” (emphasis added). FERC should have rejected the RBP auction proposal and directed PJM to meet again with stakeholders to consider a model that would provide appropriate allocations of costs, while also providing critically needed consumer protections against market power in an auction structure that is likely to face supply scarcity. The IMM also criticized PJM’s RBP proposal for its failure to properly allocate costs to cost causers. As OCC explained in its Protest, the IMM stated that “[t]he most important criterion for evaluating proposals to address how to reliably serve new data center load is the assignment of the costs and risks associated with LSEs serving data center load.”67 The IMM further explained that “the failure to exclude new data center load from the BRAs [RPM base residual auctions], as PJM proposes, would by definition impose significant costs on other customers and therefore violate the basic principle that data center costs should not be imposed on other customers.”68

Commissioner LaCerte emphasized the importance of allocating the costs of the RBP auction to those causing the costs to be incurred, i.e., the large load data centers.  He stated that The vital nature of the large load integration issue to all Americans is

highlighted by the very existence of the January 2026 Statement of
Principles Regarding PJM in which the White House National Energy
Dominance Council and the governors of all 13 PJM states joined together
to address these large load issues as well as the March 2026, White House
66 OCC Protest at 12-15.
67 OCC Protest at 16, citing Monitoring Analytics, Critical Issue Fast Path Proposed Reliability Backstop Auction Proposal at 1 (Jun. 30, 2026), available at https://www.monitoringanalytics.com/reports/Presentations/2026/IMM%20Backstop%20auction%20design%20pro posal%20-%20V6%202026.06.19.pdf (“IMM RBP Proposal”).
68 Id.

PDF page 23

21
Ratepayer Protection Pledge which addressed that new large loads will, at
a minimum, “build, bring, or buy the new generation resources and
electricity needed to satisfy their new energy demands, paying the full cost of those resources” and which received broad consensus from utilities,

cooperatives, data center developers, and governors.69
Commissioner See in her concurrence likewise emphasized the need for PJM to get the cost allocation correct in any revised filing.  She stated that “PJM must better ensure that the customers driving new costs bear appropriate responsibility for them and that existing customers are not left paying the bill instead.”70 Commissioner Rosner similarly stated that “[t]he limited set of guidance we give PJM to revise its proposal will enable PJM to assign costs to those responsible (i.e. to the zones with data center growth) for the resource adequacy shortfall, consistent with cost causation principles, and it is my hope that PJM will act on this guidance swiftly so that needed generation may be procured.”71

FERC never addressed OCC’s concern related to the overall auction structure design, and the unjust and unreasonable cost allocations stemming therefrom. FERC also never addressed OCC’s protest related to the failure of the PJM proposal to address the unjust and unreasonable cost allocations resulting from the previous three RPM auctions that all cleared short of PJM’s identified resource adequacy goal.72 OCC demonstrated that data center demand increased capacity costs to other PJM customers by approximately $23.1 billion across the 2025/2026, 2026/2027, 2027/2028 Base Residual Auctions.73 As OCC explained in its Protest, “[t]he $23.1 billion figure is not a mere historical artifact of load growth. It reflects a structural outcome of a

69 September 29 Order, Commissioner LaCerte concurrence at P 4 (footnotes omitted).
70 Id., Commissioner See concurrence at P 6.
71 Id., Commissioner Rosner concurrence at P 2,
72 OCC Protest at 11.
73 Id., citing Market Monitor Report at 1.

PDF page 24

22
capacity market in which extraordinary new demand (data centers) can raise clearing prices across a much larger base of existing capacity (other customers including residential customers). The result is a system-wide cost shift that extends far beyond the incremental load that triggered it.”74

Judicial precedent requires that FERC at a minimum address the arguments before it.75 Just as it did with individual issues set for paper hearing, FERC could have found that both the PJM existing rules and the PJM proposal are unjust and unreasonable to achieve a proper allocation of costs associated with generating capacity procured in the RBP auction.  It then could have sent the matter back to the PJM stakeholder process or set the matter for hearing and settlement procedures.76 As OCC explained in its protest, the reality is that PJM’s auction proposal is not going to cure the shortage in time for the 2028/2029 Delivery Year, thus there is no harm in delaying implementation of a remedy.

Given that even PJM’s proposed RBP auction structure would not procure sufficient new generating capacity in time for the 2028/2029 Delivery Year, FERC should have taken the time to direct PJM to get the auction structure right. A more appropriate auction structure along the lines of that proposed by the IMM would have better addressed OCC’s cost allocation concerns by targeting the costs of the capacity procured in the RBP auction to the loads causing that cost incurrence.

VI. CONCLUSION AND PRAYER FOR RELIEF
WHEREFORE, OCC respectfully requests that FERC reconsider its rulings in the
September 29 Order, and afford consumers in Ohio and elsewhere in PJM the full protections of
74 Id.
75 See n.58 supra.
76 September 29 Order at P 23.

PDF page 25

23
just, reasonable, and not unduly discriminatory and preferential rates by (1) directing PJM to set a lower market seller offer cap for the RBP auction consistent with protests filed by OCC and others on this issue; (2) reject the pay-as-bid proposal in favor of the single auction clearing price format used for RPM auctions and direct PJM to adopt a single clearing price design; (3) reject the 20% shortage penalty and the proposal to allocate related costs to load, and direct PJM to adopt a more stringent proposal that will actually encourage suppliers to timely reach commercial operation; and (4) direct PJM to work with stakeholders to develop an RBP auction design that will properly allocate related costs to the cost causers and develop a remedy for the allocation of costs associated with the past three RPM auctions that cleared short because of the addition of forecasted large data center loads.

Respectfully submitted,
Maureen Willis
Ohio Consumers’ Counsel
/s/ Angela O’Brien
Angela O’Brien
Deputy Consumers’ Counsel
Office of the Ohio Consumers’ Counsel
65 East State Street, Suite 700
Columbus, Ohio 43215
Telephone: (614) 466-9531
angela.obrien@occ.ohio.gov
/s/ Denise C. Goulet

Denise C. Goulet, Esq.
McCarter & English, LLP
1301 K Street, N.W., Suite 1000 West
Washington, D.C. 20005
(202) 753-3400
dgoulet@mccarter.com
Special Counsel for The Office of
Attorney General of Ohio on Behalf of
the Office of the Ohio Consumers’ Counsel
October 29, 2026

PDF page 26

CERTIFICATE OF SERVICE
I hereby certify that I have on this date served a copy of the foregoing document via electronic mail upon all parties of record on the Commission’s official service list in this proceeding. Dated in Washington, D.C., on this 29th day of October, 2026.

/s/ Denise C. Goulet
Denise C. Goulet, Esq.
McCarter & English, LLP
1301 K Street, N.W., Suite 1000 West
Washington, D.C. 20005
(202) 753-3400 – Telephone
dgoulet@mccarter.com