Request for Rehearing to Promote Transparency for Ohio Consumers
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C.
)
Docket Nos. ER26-3515-000
REQUEST FOR REHEARING
TO PROMOTE TRANSPARENCY FOR OHIO CONSUMERS BY
OFFICE OF THE OHIO CONSUMERS’ COUNSEL Maureen Willis
Consumers’ Counsel
Angela O/Brien
Deputy Consumers’ Counsel
Office of the Ohio Consumers’ Counsel 65 East State Street, Suite 700
Columbus, Ohio 43215
Telephone: (614) 466-9531
angela.obrien@occ.ohio.gov
Denise C. Goulet, Esq.
McCarter & English, LLP
1301 K Street, N.W., Suite 1000 West Washington, D.C. 20005
(202) 753-3400
dgoulet@mccarter.com
Special Counsel to the Ohio Office of the Attorney General for the
Office of the Ohio Consumers’ Counsel November 9, 2026
PDF page 2
TABLE OF CONTENTS
I. INTRODUCTION … 1
II. BACKGROUND … 4
III. SPECIFICATIONS OF ERRORS ON REHEARING … 6
IV. ISSUES ON REHEARING … 7
V. REQUEST FOR REHEARING … 8
A. FERC’s failure to allow state consumer advocate offices access to the
Large Load Registry confidential information fails the test for reasoned
decision-making because FERC never addressed OCC’s concerns … 8
B. FERC’s exclusion of state consumer advocate offices from the
confidential information in the Large Load Registry unduly discriminates
against these statutorily mandated consumer representatives … 13
C. FERC’s ruling is an unlawful unexplained departure from its rulings in the
RTO show cause proceedings recognizing the need to provide critical
transmission planning and cost allocation information to state regulatory
commissions and state consumer advocate offices … 15
VI. CONCLUSION AND PRAYER FOR RELIEF … 17
PDF page 3
1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
)
Docket Nos. ER26-3515-000
REQUEST FOR REHEARING
TO PROMOTE TRANSPARENCY FOR OHIO CONSUMERS
BY
OFFICE OF THE OHIO CONSUMERS’ COUNSEL
I. INTRODUCTION
The Federal Energy Regulatory Commission’s (“FERC”) October 9, 2026 Order1 in this case fails to protect consumers in Ohio and elsewhere in PJM Interconnection, L.L.C. (“PJM”) from the risks and costs that will result from acceptance of PJM’s Large Load Registry proposal in these dockets. In particular, that order allows PJM to exclude state consumer advocate offices from the list of entities entitled to access confidential information to be collected and maintained in the Large Load Registry.
This decision will prevent state agencies directly charged with representing consumers from being able to access critical information related to large load data centers with “billion- dollar implications for consumers.”2 Consumer advocates have a statutory responsibility to protect residential and other utility consumers from unjust and unreasonable rates. That
1PJM Interconnection, L.L.C., 197 FERC ¶ 61,019 (2026) (“October 9 Order”).2PJM Interconnection, L.L.C., 196 FERC ¶ 61,245 (2026), Chairman Laura V. Swett concurring at P 2 (order accepting in part and rejecting in part PJM’s companion filing to establish a Reliability Backstop Procurement auction to secured sufficient generating capacity needed to serve forecasted load associated with large data centers).
PDF page 4
2
responsibility differs from the responsibility of state regulatory commissions that generally balance the interests of consumers against the interests of other participants, including utilities and data centers. Responsibility for advocating for consumer interests cannot be meaningfully discharged without access to information concerning the magnitude, location, and anticipated growth of large load. Such information is essential to evaluating whether transmission investments, resource adequacy costs, and other infrastructure expenses driven by large load customers are being improperly shifted to consumers who neither caused nor benefit proportionally from those costs.
The Order provides no reasoned decision for excluding state consumer advocate offices from access to this critical information, or for treating these offices in an unduly discriminatory manner as compared to similar entities such as state regulatory commissions that are allowed access to this critical information. The Commission’s exclusion of consumer advocates creates an unjustified informational imbalance. It allows utilities and other market participants access to information critical to planning and cost allocation while denying that same information to those charged with representing consumers’ interests. Legitimate confidentiality and security concerns can be addressed through protective measures rather than categorical exclusion. The Commission’s exclusion of consumer advocates from the Large Load Registry
conflicts with its express recognition in the PJM and Southwest Power Pool, Inc. Show Cause proceedings in Docket Nos. EL26-67-000 and EL26-68-000 of their important role in protecting consumers from unjust and unreasonable rates, including costs associated with large load
PDF page 5
3
growth.3 Denying advocates access to critical planning information undermines their ability to evaluate whether large-load costs are improperly shifted to those they represent -- consumers. Under Section 313 of the Federal Power Act (“FPA”), 16 U.S.C. § 825l, and Rule 713 of the FERC’s Rules of Practice and Procedure, 18 C.F.R. § 385.713, the Office of the Ohio Consumers’ Counsel (“OCC”) requests rehearing of the October 9 Order. OCC is the statutory representative of millions of Ohio residential utility consumers, per Ohio R.C. Chapter 4911. OCC actively advocates for Ohioans in numerous state and federal regulatory proceedings, including proceedings before FERC. OCC timely intervened in this case on September 3, 2026,4 and submitted a Protest of the filing that same day.5
Ohio residential consumers are adversely affected by FERC’s October 9 Order in this case because they are at risk of paying the costs for the capacity to be acquired by the Reliability Backstop Procurement (“RBP”) auction authorized in a companion docket.6 Ohio consumers are also at risk of being curtailed because of the significant new loads brought by these large load data centers. Ohio residential consumers did not cause the need for the RBP auction, nor did they cause the need for the curtailments that could result from interconnecting these large load data centers to the grid. Still, under the RBP order, they will pay the related capacity costs (and
3PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 at PP 66, 71 (2026) (finding that greater transparency is needed related to transmission planning and cost allocations related to large load data centers, and encouraging state regulatory commissions and state consumer advocates to identify whether additional, more granular transmission cost information is needed to inform proper state-jurisdictional cost allocation); see also Sw. Power Pool, Inc., 195 FERC ¶ 61,213 at P 51 (2026). 4Doc-less Motion to Intervene in PJM Interconnection, L.L.C., Docket No. ER26-3515-000, filed by Office of the Ohio Consumers’ Counsel, available on FERC’s e-library website as Accession Document No. 20260903-5029.5Protest by Office of the Ohio Consumers’ Counsel (Aug. 21, 2026), Docket No. ER26-3515-000, available on FERC’s e-Library website as Accessions Document No. 20260903-5189 (“OCC Protest”).6PJM Interconnection, L.L.C., 196 FERC ¶ 61,245 (2026).
PDF page 6
4
likely other unknown costs). And under the October 9 Order at issue here, they may suffer related curtailments due to resource inadequacy.
Yet under the October 9 Order, consumers’ statutory representatives, like OCC, will not have access to the confidential information they need to fully represent their interests, and to understand and challenge the costs these large load data centers may shift onto them. The FERC Order fails consumers who deserve full transparency when it comes to rates they are paying for the extraordinary load associated with data center deployment.
II. BACKGROUND
PJM proposed in this case to implement an Interim Resource Adequacy Service
(“IRAS”), effective with the June 1, 2027 Reliability Pricing Model (“RPM”) Delivery Year. That proposed service would interrupt, or curtail service to New Large Loads that fail to bring sufficient capacity to satisfy their capacity obligations.7 PJM represented in the filing that it “hosts the largest concentration of data center load in the world,”8 and its load forecast “predicts peak load growth of 32 gigawatts [(“GW”)] from 2024 to 2030, 30 GW of which is projected to be from data centers.”9 PJM explained that the 2027/2028 RPM base residual auction cleared over 6,600 MW short of the region’s reliability requirement, and that the 2028/2029 RPM capacity auction cleared over 6,800 MW short of that requirement.10 In other words, PJM represented that the addition of new supply has not kept pace with rapid large load demand
7PJM Interconnection, L.L.C., Docket No. ER26-3515-000, Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and A Large Load Registry to Address System Reliability at 7, 22 (Aug. 13, 2026) (“IRAS Transmittal Letter”). 8Id. at 13. 9Id. 10Id. at 14.
PDF page 7
5
growth, thus giving rise to the significant tightening of the capacity market in recent years and subsequent resource adequacy shortfalls.11 (This in turn has caused upward pressure on capacity and energy prices. According to PJM’s Independent Market Monitor, data center growth has driven $29 billion in additional capacity costs over the last four Base Residual Auctions,12 underscoring the substantial financial consequences for consumers and the critical need for consumer advocates to access large-load planning information.)
PJM proposed the IRAS mechanism as one element of a larger process to protect
consumers not causing the need for new capacity from possible curtailments associated with the resource adequacy shortfall. The IRAS program included a proposal to establish a Large Load Registry that would incorporate information on all Large Loads in the region, including information that identifies the entities, their peak loads, their locations and Electric Distributor zones, their in-service dates, peak load shaving capability, if any, ramp rates, back-up generation if any, and other related information.13PJM proposed to define Large Load as “end-use customer(s) load that has a cumulative peak load of 50 megawatts or greater at a single electrical site behind one or more points of interconnection . . . .”14 PJM further proposed that for configurations involving multiple affiliated load facilities or multiple points of interconnection with affiliated load facilities behind them, “all affiliated load facilities within a one-mile radius will be considered a single electrical site as further described in the PJM Manuals.”15 PJM 11Id. at 13.
12Monitoring Analytics, LLC, Analysis of the 2028/2029 RPM Base Residual Auction- Part A, at Table 1 (Oct. 30, 2026), IMM Report. 13Id. at 28-29, and 37. 14Id. at 31. 15Id.
PDF page 8
6
represented that it will provide access to that information on a confidential basis to authorized state commissions, Transmission Owners, the Independent Market Monitor for PJM, Electric Distributors, FERC and Load Serving Entities.16 PJM further represented that the purpose of the Registry is to provide transparency and “key information” for state and retail entities.17 The Large Load Registry will contain substantially more detailed information than the aggregated data made publicly available. Aggregated data cannot substitute for access to the underlying information needed to independently evaluate load forecasts, infrastructure costs, and the risk of shifting costs attributable to large-load customers onto other customers, including residential consumers. But under PJM’s proposal, independent state consumer advocates are not permitted access to the confidential registry.
The October 9 Order accepts PJM’s Large Load Registry proposal, including the definition of Large Loads and the provision that excludes state consumer advocate offices from access to the confidential information collected and maintained in the Registry.18 The October 9 Order rejected all other elements of the IRAS proposal.19
III. SPECIFICATIONS OF ERRORS ON REHEARING
1. FERC erred by acting in an arbitrary and capricious manner in approving PJM’s Large Load Registry proposal without ensuring that state consumer advocate offices have access to the confidential information that will be collected and maintained in that Registry. FERC 16Id. at 28.
17Id. at 29, 37-38.
18October 9 Order at PP 27, 48-49. 19Id. at P 52.
PDF page 9
7
never explains why state consumer advocate offices should be excluded from access to this information despite the demonstrated need for such access.
2. FERC also acted arbitrarily in failing to address OCC’s concern that excluding state consumer advocate offices from the confidential information in the Large Load Registry is unduly discriminatory since others with a similar need for that information are granted such access.
3. FERC’s ruling excluding state consumer advocate offices from the confidential information in the Large Load Registry is inconsistent with its recent decisions in the Show Cause proceedings initiated for Regional Transmission Organizations (“RTOs”) like PJM and Southwest Power Pool, Inc., that require greater transparency for state regulatory commissions and state consumer advocate offices with respect to the effects of large load customers on transmission planning, transmission cost allocation, and the need for transmission Network Upgrades.
IV. ISSUES ON REHEARING
1. Whether FERC’s failure to allow state consumer advocate offices to be included in the subset of entities that will be allowed to access the Large Load Registry confidential information is arbitrary and capricious, without reasoned decision, in violation of the Administrative Procedure Act’s “arbitrary and capricious” standard, 5 U.S.C. § 706(2)(A), Sithe/Indep. Power Partners, L.P. v. FERC, 165 F.3d 944, 948 (D.C. Cir. 1999) (“Sithe/Indep. Power Partners”); FERC v. Elec. Power Supply Ass’n, 136 S. Ct. 760, 782 (2016) (“EPSA”) (quoting Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43 (1983)); and Neighborhood TV Co. v. FCC, 742 F.2d 629, 639 (D.C. Cir. 1984) (“Neighborhood TV Co.”) (the court must be able to “discern a reasoned path from the facts and considerations before the
PDF page 10
8
[agency] to the decision it reached”) because it did not address the concerns raised by OCC (and others) related to the need for access to that information?
2. Whether FERC’s ruling excluding state consumer advocate offices from the
confidential information in the Large Load Registry unduly discriminates against state consumer advocate offices as compared to other entities entitled to access that information, contrary to the statutory requirements in Federal Power Act sections 205 and 206, 16 U.S.C. §§ 824d and 824e, prohibiting undue discrimination?
3. Whether FERC’s ruling excluding state consumer advocate offices from the
confidential information in the Large Load Registry is inconsistent with its rulings in the Show Cause proceedings initiated against PJM, Southwest Power Pool and other RTOs in Docket Nos. EL26-67-000, EL26-68-000, EL26-69-000, EL26-70-000, EL26-71-000 and EL26-72-000 (collectively “Show Cause” proceedings) that require greater transparency related to large load data center information for certain stakeholders, including state consumer advocate offices, contrary to Williams Gas Processing-Gulf Coast Co. v. FERC, 475 F.3d 319, 326 (D.C. Cir. 2006) (“Williams Gas Processing”) (citing Brusco Tug & Barge Co. v. NLRB, 247 F.3d 273, 278 (D.C. Cir. 2001) (“[I]t is ‘axiomatic that [agency action] must either be consistent with prior [action] or offer a reasoned basis for its departure from precedent’”)?
V. REQUEST FOR REHEARING
A. FERC’s failure to allow state consumer advocate offices access to the Large Load Registry confidential information fails the test for reasoned decision- making because FERC never addressed OCC’s concerns.
OCC seeks rehearing of FERC’s failure to direct PJM to allow state consumer advocates access to the Large Load Registry confidential information. FERC’s Order relies on PJM’s explanation that “the Large Load Registry will be available only to entities that already have access to this sort of information and consistent with existing confidentiality rules, i.e., PJM
PDF page 11
9
proposes to follow its existing, Commission-approved rules, rules that currently do not allow state consumer advocates or similar entities to have access to this type of information.”20 These statements are not a reasoned explanation for rejecting OCC’s arguments.
OCC demonstrated in its Protest that PJM’s reasoning for providing access to the confidential information in the Large Load Registry for state regulatory commissions is the same as the reason OCC and other state consumer advocate offices need access to that information. PJM argued that “[s]tates may leverage the Large Load Registry to inform the implementation of retail constructs including load reduction priorities and cost allocation at the retail level to appropriate end-use customers.”21 PJM further explained that “[t]he Large Load Registry will assist states in administering their respective programs at the retail level while allowing each state to retain the flexibility to administer those programs, including the flexibility to determine when and whether Large Loads and Existing Large Loads have demonstrated that their loads are matched with new capacity that they have procured to serve their needs.”22 In accepting PJM’s claims, FERC accepted these reasons for including state regulatory commissions, Electric Distributors and Load Serving Entities in the group of those provided access to the confidential information.
The October 9 Order recounts PJM’s argument that the confidential information in the Registry must be available only to “‘as small a universe of entities as possible,’ while still making sure it is available to those who require access to implement their responsibilities, as well
20October 9 Order at P 49.21IRAS Transmittal Letter at 29. 22Id.
PDF page 12
10
as operational and planning needs.”23 FERC found that “PJM’s proposal includes reasonable safeguards for confidential information.”24 But the Order does not explain why the list of entities able to access the confidential information should exclude state consumer advocate offices. This is especially concerning given that statutorily mandated state consumer advocate offices also require access to this information to implement their responsibilities to represent consumers – 67 million in the PJM region who pay the ultimate bill for capacity and energy.
As OCC explained in its Protest, state consumer advocate offices such as OCC, are statutorily mandated to protect the interests of retail consumers in their respective states.25 OCC demonstrated that “just as authorized state commissions need to access confidential Registry information to assess the impact of Large Loads in their states and to ensure just and reasonable cost and curtailment allocations for their retail customers, state consumer advocates need access to that information.”26 FERC never addresses this concern. It simply ignores it. Simply repeating PJM’s reasoning that some limit needs to be placed on who can access confidential information does not explain why state consumer advocate offices should be excluded from access when they have the same need for that information as do others included on the list. OCC’s request for access to the confidential information does not extend to a broad array of entities or to the public at large. It extends only to the statutorily-created state consumer advocate offices, each of whom has significant expertise and experience in maintaining the confidentiality of materials received under regulatory tariffs or orders. Expanding the list of
23October 9 Order at P 42, citing the IRAS Transmittal Letter at 11. 24Id.25OCC Protest at 22. 26Id.
PDF page 13
11
those entitled to access the Large Load Registry confidential information to include only one additional type of entity, i.e., state consumer advocate offices with statutorily-mandated obligations to protect retail consumers, is not the unlimited disclosure PJM feared in establishing the limited access requirement. FERC never explained why state consumer advocate offices should be excluded from the access group. In fact, transparency of large load data center locations, projected loads and needs for network upgrades is most important for the 67 million consumers in PJM who are paying the bills created by the policies adopted by FERC. As OCC explained in its Protest, state consumer advocates have no other means to obtain the confidential Large Load Registry information.27 They will find their efforts to obtain that information in state proceedings stymied by the confidentiality provisions in the Large Load Registry tariff.28 Without a federal rule providing for Registry access, state consumer advocates will be denied access to this essential information in the state proceedings, and their ability to advocate for their statutorily-mandated constituency stymied.29
FERC precedent supports granting access to confidential information to those willing to sign a protective agreement and to keep that information confidential.30 In West Deptford Energy, LLC, FERC stated that “[i]n crafting a protective order the goal is to issue the least restrictive order that will accomplish the purpose of protecting against the harm of disclosure.”31 In rejecting West Deptford’s effort to restrict access to its confidential information to only the 27Id.
28Id.
29Id.
30See, e.g., West Deptford Energy, LLC, 134 FERC ¶ 61,189 at P 27 (2011) (“West Deptford”); see also Duke Energy Carolinas, LLC et al., 127 FERC ¶ 61,281 at P (2009) (“Duke Energy”).31West Deptford at P 28 (emphasis added).
PDF page 14
12
Commission, PJM and the Independent Market Monitor for PJM, FERC stated that the company had not shown why the normal procedure of requiring a protective agreement was not “an appropriate balancing of” the competing concerns of need for access to the information and need for protection from broad disclosure of confidential information.32 FERC further found that “a party claiming that confidential material should be withheld entirely will be expected to show that a protective order will not adequately safeguard its interests and that this concern outweighs the need for the material to develop the record.”33
In the instant case, PJM never explained why a protective order signed by state consumer advocate offices would not adequately safeguard its interest in maintaining the confidentiality of the large load data centers. And FERC never balanced the competing concerns of the state consumer advocate offices need for that information and the need to protect that information from broad disclosure.
While West Deptford involved an adjudicatory proceeding, the requirement for an appropriate balancing of interests is no less important here, where PJM could amend the confidentiality provisions of its Tariff to include state consumer advocate offices to allow access to the Large Load Registry. Neither PJM nor FERC reasonably explain why state consumer advocate offices should be excluded from the list of those with access to the Large Load Registry. Consumer Advocates need access to ensure that rates charged to consumers for Large Load interconnections and any curtailments treat consumers in a just and reasonable manner. 32Id. at P 27, citing Mojave Pipeline Co., 38 FERC ¶ 61,249 (1987).
33Id. at 61,842 (emphasis in original).
PDF page 15
13
FERC’s failure to address this issue is contrary to judicial requirements that FERC consider important aspects of the problem.34
B. FERC’s exclusion of state consumer advocate offices from the confidential
information in the Large Load Registry unduly discriminates against these
statutorily mandated consumer representatives.
In Duke Energy, FERC found that it is unreasonable to limit access to confidential information and Critical Energy Infrastructure Information (“CEII”) in the transmission planning process only to certain entities that obtained authorization from the Commission to access CEII contained in Form 715 reports.35 FERC stated that “these limitations unreasonably restrict the ability of affected stakeholders to participate fully in transmission planning meetings and that transmission providers may develop mechanisms, such as confidentiality agreements and password-protected access to information, in order to manage confidentiality and CEII concerns.”36
Notably, the confidentiality concerns in Duke Energy did not involve an adjudicatory proceeding, but rather involved access to confidential information in a transmission planning process. That process is not unlike the situation here, where state consumer advocate offices need access to confidential information that will affect generation and transmission planning, rates and curtailments for retail consumers, including the 67 million consumers who ultimately pay the rates under discussion.
34 Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto. Ins. Co., 463 U.S. at 43 (FERC’s orders are arbitrary and capricious if it “relied on factors which Congress has not intended it to consider, entirely failed to consider an important aspect of the problem, offered an explanation for its decision that runs counter to the evidence before the agency, or is so implausible that it could not be ascribed to a difference in view or the product of agency expertise.”); see also Friends of Buckingham v. State Air Pollution Control Bd., 947 F.3d 68, 80 (4th Cir. 2020); Appalachian Voices v. State Water Control Bd., 912 F.3d 746, 753 (4th Cir. 2019).35Duke Energy at P 22. 36Id.
PDF page 16
14
That lack of transparency for consumers is egregious, unjust and unreasonable. By
excluding authorized state consumer advocates from the Registry, PJM’s proposal unduly discriminates against consumer representatives in violation of sections 205 and 206 of the Federal Power Act (“FPA”), 16 U.S.C. §§ 824d and 824e, and in violation of long-held judicial precedent prohibiting such undue discrimination.37
In Cal. Independent Sys. Operator, Inc, FERC found that the FPA does not prohibit all discrimination, only “undue discrimination.”38 FERC stated that “[d]iscrimination is undue when similarly situated customers are treated differently.”39 In Calpine Corp., FERC found that “[w]hether a rate or practice is unduly discriminatory depends on whether it provides different treatment to different classes of entities and turns on whether those classes of entities are similarly situated.”40 FERC explained that “[d]ifferential treatment does not necessarily amount to undue preference where the difference in treatment can be explained by some factor deemed acceptable to regulators (and the courts),”41
Here, neither PJM nor FERC provides a reasoned explanation for excluding OCC and
other PJM state consumer advocates from access to the confidential information in the Large Load Registry where their need for such information is identical to the reasons state regulatory
37 See, e.g., Cal. Independent System Operator, Inc., 193 FERC ¶ 61,117 at P 33 (2025) (“CAISO”); see also New England Power Gen. Ass’n. v. FERC, 881 F.3d 202, 211 (D.C. Cir. 2018) (citing BP Energy Co. v. FERC, 828 F.3d 959, 968 (D.C. Cir. 2016) (“vacating finding of no undue discrimination where Commission identified differences between two natural-gas companies but failed to adequately explain why they provide a rational basis for the difference in treatment”)).38CAISO at P 33, citing Calpine Corp. v. PJM Interconnection, L.L.C., 171 FERC ¶ 61,035, at P 318 (2020) (“As the Commission has previously explained, the FPA forbids ‘undue’ preferences, advantages, and prejudices.”). (“Calpine Corp.”) 39Id.40Calpine Corp. at P 318, citing Town of Norwood v. FERC, 202 F.3d 392, 402 (1st Cir. 2000) 41Id. (emphasis in original); see also Cities of Newark v. FERC, 763 F.2d 533, 546 (3d Cir. 1985)
PDF page 17
15
commissions were given access to that information. The regulations imposing confidentiality obligations on the state regulatory commissions could be extended to state consumer advocate offices as well.
C. FERC’s ruling is an unlawful unexplained departure from its rulings in the
RTO show cause proceedings recognizing the need to provide critical
transmission planning and cost allocation information to state regulatory
commissions and state consumer advocate offices.
As noted previously, FERC recently issued Show Cause orders against the six RTOs in
the nation. These orders find that the existing tariffs of these RTOs are unjust and unreasonable because they provide insufficient transparency for state regulatory commissions and state consumer advocate offices regarding the effects of large load data centers on transmission planning and allocation of transmission costs.42
FERC specifically noted in PJM’s Show Cause Order that “the lack of centralized
information on the associated transmission costs in PJM hamper the ability of the Commission and stakeholders (including transmission customers and state regulators) to understand and accurately assess the relationship between the addition of large loads to the transmission system and wholesale transmission costs.”43 Citing the “speculative nature” of requests for transmission service for large data center loads, FERC found that “[t]he speed and scale with which Eligible Customers are seeking transmission service on behalf of large loads makes it difficult for interested parties, including transmission customers and state regulators, to accurately assess
42See, e.g., PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 at P 73 (“The speed and scale with which Eligible Customers are seeking transmission service on behalf of large loads makes it difficult for interested parties, including transmission customers and state regulators, to accurately assess which transmission costs are driven by requests for transmission service by Eligible Customers to serve large loads.”); see also Sw. Power Pool, Inc., 195 FERC ¶ 61,213 at P 51 (finding that additional transparency obligations are necessary to “give state public utility commissions and other state regulators the information necessary to allow them to understand which transmission costs are caused by which transmission customers, so that they can sub-allocate these costs to the appropriate retail customers.”43 PJM Interconnection, L.L.C., 195 FERC ¶61,211 at P 73.
PDF page 18
16
which transmission costs are driven by requests for transmission service by Eligible Customers to serve large loads.”44 FERC citied to comments from stakeholders that “the opaque nature of requests for transmission service by Eligible Customers on behalf of large loads, and the associated Network Upgrades required to provide that transmission service, prevent wholesale and retail customers, states, and other stakeholders from understanding such costs.”45 FERC then found PJM’s existing tariff unjust and unreasonable because it did not provide sufficient transparency on these matters.46
FERC is still in the process of assessing specific proposals related to the concerns raised in the Show Cause orders. However, the important point here is that the Show Cause orders explicitly recognized the need of state consumer advocate offices, as well as state regulatory commissions, to have greater insight into large load data center impacts on transmission planning, the need for new transmission network upgrades, and the allocation of costs associated with those demands. The same is true of the state consumer advocate offices need to access the confidential information in the Large Load Registry.
The October 9 Order is an unwarranted departure from FERC’s rulings in the RTO Show Cause orders, contrary to Williams Gas Processing, 475 F.3d at 326 (“[I]t is ‘axiomatic that [agency action] must either be consistent with prior [action] or offer a reasoned basis for its departure from precedent’”). In the Show Cause orders, FERC found that state consumer advocate offices, like state regulatory commissions, need access to critical information related to large load data centers in order to effectively represent consumer interests in planning and cost 44Id.
45Id. at P 74.
46 Id. at PP 75-76.
PDF page 19
17
allocation proceedings. The fact that some of the information in the Large Load Registry is confidential is of no import for purposes of determining whether state consumer advocate offices, like state regulatory commissions, should be able to access the information they need to inform their advocacy for consumers. FERC never explained why non-disclosure agreements would work for state regulatory commissions but not for state consumer advocate offices to protect the confidentiality of the Large Load Registry information.
FERC has recognized the importance of sufficient transparency regarding Large Loads, stating that “without sufficient transparency . . . stakeholders may lack information and visibility regarding the costs driven by large load additions.”47 State consumer advocate offices have needs for the confidential information similar to those identified for state regulatory commissions. And state consumer advocates are just as capable of maintaining the confidentiality of that information under regulatory rules and orders. FERC should reverse its ruling on this issue, and direct PJM to extend access to the Large Load Registry confidential information to state consumer advocate offices, subject to confidentiality obligations.
VI. CONCLUSION AND PRAYER FOR RELIEF
WHEREFORE, OCC respectfully requests that FERC reconsider its ruling in the October 9 Order. FERC should afford consumers in Ohio and elsewhere in PJM the full protections of just, reasonable, and not unduly discriminatory and preferential rates. FERC should reject PJM’s Large Load Registry proposal with directions to refile the proposal with a provision that includes state consumer advocate offices in the list of entities entitled to access the confidential information that will be collected, maintained and made available in that Registry.
47 IRAS Application at 48, citing PJM Interconnection, L.L.C., et al., 195 FERC ¶ 61,211 at P 74 (2026).
PDF page 20
18
Respectfully submitted,
Maureen Willis
Ohio Consumers’ Counsel
/s/ Angela O’Brien
Angela O’Brien
Deputy Consumers’ Counsel
Office of the Ohio Consumers’ Counsel 65 East State Street, Suite 700
Columbus, Ohio 43215
Telephone: (614) 466-9531
angela.obrien@occ.ohio.gov
/s/ Denise C. Goulet
Denise C. Goulet, Esq.
McCarter & English, LLP
1301 K Street, N.W., Suite 1000 West Washington, D.C. 20005
(202) 753-3400
dgoulet@mccarter.com
Special Counsel for The Office of Attorney General of Ohio on Behalf of the Office of the Ohio Consumers’ Counsel November 9, 2026
PDF page 21
CERTIFICATE OF SERVICE
I hereby certify that I have on this date served a copy of the foregoing document via electronic mail upon all parties of record on the Commission’s official service list in this proceeding. Dated in Washington, D.C., on this 9th day of November, 2026.
/s/ Denise C. Goulet
Denise C. Goulet, Esq.
McCarter & English, LLP
1301 K Street, N.W., Suite 1000 West
Washington, D.C. 20005
(202) 753-3400 – Telephone
dgoulet@mccarter.com