| Bahrain | AWS Bahrain (me-south-1)DAMAGED Manama | Unknown | Operational | Not disclosed | Confirmed | AWS | |
| Bahrain | Batelco × Qareeb DC Manama | Unknown | Planned | Not disclosed | Reported | BatelcoQareeb | |
| Israel | AWS Israel (il-central-1) Tel Aviv | Unknown | Operational | Not disclosed | Confirmed | AWS | |
| Israel | Google Cloud Israel (me-west1) Tel Aviv | Unknown | Operational | Hundreds of millions | Reported | Google Cloud | |
| Israel | Azure Israel Central Tel Aviv | Unknown | Planned | Not disclosed | Confirmed | Microsoft | |
| Israel | Oracle Cloud Israel Tel Aviv | Unknown | Operational | Not disclosed | Confirmed | Oracle | |
| Kuwait | Google Cloud Kuwait Kuwait City | Unknown | Planned | Hundreds of millions | Confirmed | Google Cloud | |
| Kuwait | Omniva 1 GW DC Kuwait City | 1.0 GW | Planned | Not disclosed | Reported | Omniva | |
| Oman | Equinix × Omantel SN1 Salalah | Unknown | Planned | Not disclosed | Reported | EquinixOmantel | |
| Qatar | Azure Qatar Central Doha | Unknown | Operational | Not disclosed | Confirmed | Microsoft | |
| Qatar | Google Cloud Qatar (me-central1) Doha | Unknown | Operational | Hundreds of millions | Reported | Google Cloud | |
| Saudi Arabia | Humain — Riyadh Campus Riyadh | 100 MW | Under construction | $23B tech partnerships; $5.3B AWS | Confirmed | Humain (PIF)NvidiaAMD+1 | |
| Saudi Arabia | Humain — Dammam Campus Dammam | 100 MW | Under construction | $10B AMD JV | Confirmed | Humain (PIF)NvidiaAMD+1 | |
| Saudi Arabia | Humain × Nvidia AI Factory Riyadh/Dammam | 500 MW | Under construction | ~$10B implied | Reported | HumainNvidiaxAI+1 | |
| Saudi Arabia | AWS Saudi Arabia AI Zone Riyadh | Unknown | Planned | $5.3B | Confirmed | AWSHumain | |
| Saudi Arabia | Azure Saudi Arabia East Dammam | Unknown | Operational | $2.1B | Confirmed | MicrosoftMCIT | |
| Saudi Arabia | Google Cloud × Humain AI Hub Dammam | Unknown | Under construction | $10B | Confirmed | Google CloudHumain (PIF) | |
| Saudi Arabia | Oracle Cloud — Jeddah Jeddah | Unknown | Operational | $14B (10-yr KSA total) | Reported | Oracle | |
| Saudi Arabia | Oracle Cloud — Riyadh Riyadh | Unknown | Operational | Incl. in $14B | Reported | Oracle | |
| Saudi Arabia | Desert Dragon (ICS Arabia/CMI/LMT) Riyadh/Jeddah | 187 MW | Under construction | $1.9B | Confirmed | ICS ArabiaChina Mobile IntlLumaotong | |
| Saudi Arabia | DataVolt × NEOM Oxagon AI Factory NEOM/Oxagon | 1.5 GW | Planned | $5B | Confirmed | DataVoltNEOM | |
| Saudi Arabia | Groq × Aramco Digital Dammam | Unknown | Under construction | $1.5B | Confirmed | GroqAramco Digital | |
| Saudi Arabia | NEOM Oxagon — Oracle DC NEOM/Oxagon | 12 MW | Planned | Not disclosed | Reported | NEOMOracle | |
| Saudi Arabia | Alibaba Cloud × STC (×2) Riyadh | Unknown | Operational | Not disclosed | Confirmed | Alibaba CloudSTC | |
| Saudi Arabia | Tencent Cloud Riyadh | Unknown | Planned | $150M | Confirmed | Tencent Cloud | |
| Saudi Arabia | KKR × Gulf Data Hub Riyadh/GCC | Unknown | Planned | $5B+ | Reported | KKRGulf Data Hub | |
| UAE | Stargate UAE Abu Dhabi | 1.0 GW | Under construction | $30B (campus); $100B 5-yr | Reported | G42OpenAIOracle+3 | |
| UAE | Azure UAE North + 200 MW expansion Dubai/Abu Dhabi | 200 MW | Operational | $15.2B (2023–2029 UAE total) | Confirmed | MicrosoftG42 (Khazna) | |
| UAE | Azure UAE Central Abu Dhabi | Unknown | Operational | Incl. in $15.2B | Confirmed | Microsoft | |
| UAE | AWS UAE (me-central-1)DAMAGED Dubai/Abu Dhabi | Unknown | Operational | Not disclosed | Confirmed | AWS | |
| UAE | Google Cloud UAE Dubai | Unknown | Planned | Not disclosed | Reported | Google Cloud | |
| UAE | Oracle Cloud UAE — Dubai Dubai | Unknown | Operational | Not disclosed | Confirmed | Oraclee& | |
| UAE | Oracle Cloud UAE — Abu Dhabi Abu Dhabi | Unknown | Operational | Not disclosed | Confirmed | Oracle | |
| UAE | Khazna AI Campus — Ajman Ajman | 100 MW | Operational | Not disclosed | Confirmed | Khazna (G42)MGXSilver Lake | |
| UAE | Khazna new campuses (×2) UAE | 60 MW | Under construction | Not disclosed | Confirmed | Khazna (G42) | |