DORIS Giuliani · research example
Harding memo
there are approximately 35,000 potential plaintiffs...and it is estimate that 10,000 would file a claim
Each example is built on the MCP. The panel names the tools behind it, the command that reproduces it and the recorded response.
DORIS Giuliani · research example
there are approximately 35,000 potential plaintiffs...and it is estimate that 10,000 would file a claim
DEP Hard Copies (68 Boxes) · research example
we would not use the word 'risk' in any letters as it would defeat the purpose of creating public confidence
DEP Hard Copies (68 Boxes) · research example
Asbestos Present: Yes
Excerpt; an ellipsis marks omitted words.
Searches the 4,173 folder labels in the saved catalog capture, in your browser. Nothing is sent to the City.
Read as 15 JOHN STREET · catalog captured 2026-09-11
| Folder label | Documents | Printed on the label | First document |
|---|---|---|---|
| 15 JOHN STREET 1001217, 79/14DEP Hard Copies (68 Boxes) · DEP Box 01 | 81 | BIN 1001217, block 79, lot 14 | NYC-WTC_000094197 |
Recorded output of building_lookup {"address": "15 John Street"}. Full response ↗
Read as 345 CHAMBERS STREET · catalog captured 2026-09-11
| Folder label | Documents | Printed on the label | First document |
|---|---|---|---|
| 345 CHAMBERS STREET; Block: 16; Stuyvesant HSDEP Hard Copies (68 Boxes) · DEP Box 37 | 5 | block 16 | NYC-WTC_000106763 |
| 345 CHAMBERS STREET; 16/1DEP Hard Copies (68 Boxes) · DEP Box 37 | 4 | block 16, lot 1 | NYC-WTC_000106409 |
| 345 CHAMBERS ST.DEP Hard Copies (68 Boxes) · DEP Box 51 | 2 | no identifiers | NYC-WTC_000126990 |
Recorded output of building_lookup {"address": "345 Chambers Street"}. Full response ↗
Read as 120 BROADWAY · catalog captured 2026-09-11
| Folder label | Documents | Printed on the label | First document |
|---|---|---|---|
| 120 BROADWAY Block: 47 Lot: 7501 BIN: 1001026 70-84 CEDAR ST. 15-25 NASSAU ST. 2-16 PINE STDEP Hard Copies (68 Boxes) · DEP Box 50 | 3 | BIN 1001026, block 47, lot 7501 | NYC-WTC_000123774 |
| 120 BROADWAY 1001026, 47/7501DEP Hard Copies (68 Boxes) · DEP Box 49 | 2 | BIN 1001026, block 47, lot 7501 | NYC-WTC_000122511 |
Recorded output of building_lookup {"address": "120 Broadway"}. Full response ↗
A label match shows where the City filed paper. A document can concern a building whose address is not on its folder. The lookup does not decide whether an address is inside a program’s exposure zone; each program decides that, and the response quotes its definition.
For another address, run the call beside this panel, or search the folder labels under Find a record.
The City's portal search matches a quoted phrase word for word and loose words anywhere. This builder writes the query; it sends nothing.
"Re-Occupying Stuyvesant High School" extension:pdf
portal_query_draft {"phrase": "Re-Occupying Stuyvesant High School", "box": "DEP Box 37"}
A quoted phrase matches those words in that order. extension:pdf keeps results to the documents themselves.
21,395 documents in saved catalog
DEP hard-copy production. The summary reports 21,395 documents for Environmental Protection, Dept. of across the saved catalog; it is not a one-to-one collection total.
catalog_search {"source": "DEP Hard Copies (68 Boxes)", "count": 10}
Local metadata only. Use a page tool for page text.
3,025 documents in saved catalog
WTC 7 collection label. The summary reports 2,915 documents for Citywide Administrative Services, Dept. of across the saved catalog; it is not a one-to-one collection total.
catalog_search {"source": "WTC 7", "count": 10}
Local metadata only. Use a page tool for page text.
21 documents in saved catalog
DORIS Giuliani collection label. The summary reports 21 documents for Records and Information Services, Dept. of across the saved catalog; it is not a one-to-one collection total.
catalog_search {"source": "DORIS Giuliani", "count": 10}
Local metadata only. Use a page tool for page text.
portal_changes_since → portal_get_document
Use two accepted local captures. The result can report observed additions, absences, or changed metadata; it does not prove why a record changed or that a City release is complete.
Boundary: This checkout’s published capture is dated 2026-09-11. A current comparison needs a newer accepted capture.
catalog_search → portal_get_document → portal_get_page_text → citations_verify
Find the local catalog entry, open its record, read the specific Bates page, then verify the exact quotation. Page text may be withheld when the PII screen flags it.
Boundary: A located phrase is evidence location, not a finding about exposure, health, liability, or program eligibility.
portal_catalog_stats → portal_browse
This MCP reports its own snapshot, catalog structure, and evidence warnings. Another project can have a later capture or different OCR. Compare source PDF, Bates page, capture date, and stated method.
Boundary: Do not combine counts, map pins, OCR, or tags across projects as if they were one verified dataset.
citations_verify
No. This MCP can verify registered City-portal pages and its registered sources; it does not search or interpret the federal release.
Boundary: Use the National Archives source directly for federal records and identify the record system in every citation.
Public statements and City records about the air, the schools and the City's liability after September 11, 2001, in date order. Each entry quotes a registered claim, located in its captured source by scripts/build_site.py before the site shows it. A date is the date printed on or stated for the source, with its basis; a month or year means the source gives no closer date.
· Public statement · air
EPA press release: there appears to be no significant levels of asbestos dust in the air in New York City
EPA release, 2001-09-13
Date basis: date of the release
· Public statement · air
Mayor's Office press release: air quality has been tested and deemed safe
Mayor’s Office release, 2001-09-16
Date basis: date of the release
· Public statement · air
EPA press release: their air is safe to breath
EPA release, 2001-09-18
The spelling follows the published text.
Date basis: date of the release
· Public statement · air
EPA press release: are not being exposed to contaminants such as asbestos, radiation, mercury and other metals
EPA release, 2001-09-21
Date basis: date of the release
· City record · liability
Memo to the Deputy Mayor: Health advisories caused individuals either to return to the area too soon
NYC-WTC_000138296 · p.1
Date basis: The memo is undated on its page. The FOIL request describes it as an October 2001 memorandum, and an email filed in the same portal document as another copy was sent on October 16, 2001. NYC-WTC_000136670 · p.58
· City record · air
EPA sampling situation report in the City's files: Exceedances occurred at Sift Location
NYC-WTC_000154488 · p.3
Date basis: the report's own date is not on this page; its results cover sampling from October 16 to 18, and the page's fax line reads Oct 24 2001
· Public statement · air
EPA and OSHA press release: no evidence of significant levels of airborne asbestos or other contaminants beyond the disaster site itself
EPA and OSHA release, 2001-10-03
Date basis: date of the release
· City record · schools
UFT memo in the City's files: 1 sample tested positive for asbestos
NYC-WTC_000106411 · p.2
Date basis: printed on the memo NYC-WTC_000106411 · p.1
· City record · air
EPA-commissioned audit in the City's files: 38% Chrysotile from Ground Zero
NYC-WTC_000130438 · p.22
The audit reports a bulk dust sample collected at Ground Zero on September 19, 2001.
Date basis: printed on the cover NYC-WTC_000130438 · p.1
· City record · air
Letter from the Health Commissioner: disseminated by Ms. Cate Jenkins publicly criticizing
NYC-WTC_000151604 · p.1
Date basis: dated on the letter
· City record · air
Memo from a mayoral advisor: real health risks in lower Manhattan
NYC-WTC_000147320 · p.2
Date basis: printed on the memo's first page NYC-WTC_000147320 · p.1
· City record · cleanup
Handwritten note in the City's files: we would not use the word 'risk' in any letters as it would defeat the purpose of creating public confidence
NYC-WTC_000153130 · p.1
Date basis: the note's header reads 5/16/02
· City record · schools
Parents' association release, faxed through DEP: asbestos levels of as much as 2.5 million structures per square centimeter were found in one sample
NYC-WTC_000144518 · p.2
A parents' group statement found in DEP's files; the figure is the group's report of a consultant's test.
Date basis: printed on the release
· Later review · air
EPA Office of Inspector General report: the Agency did not have sufficient data and analyses to make the statement
EPA OIG report 2003-P-00012
Date basis: date of the report
· Later review · oversight
City Council Resolution 560-A: An analysis of the contrast between the knowledge mayoral administrations possessed on these toxins and the information the administrations conveyed to the public
Res. 560-A
Date basis: date the Council adopted the resolution
Boundary: Placing a statement beside a record is not a finding about what any official knew or intended. Council Resolution 560-A gives that analysis to the Department of Investigation.
Sampling results printed in located City records, transcribed with the value, unit, medium and location as the document prints them. Each row quotes a registered claim at its Bates page. Units are not converted: percent asbestos in bulk dust, structures per square millimetre on an air filter and parts per billion of a gas measure different things.
| Result as printed | Location as printed | Sampled | Source |
|---|---|---|---|
| 4.5 %asbestos (chrysotile), bulk dust | Murray Street and West Side Highway | September 11, 2001stated in the audit text | The highest result, 4.5% Chrysotile, was reported from a sample collected at Murray Street and West Side HighwayNYC-WTC_000130438 · p.22Special Investigative Audit #14, November 20, 2001; IT Corporation for EPAThe audit calls this the highest of 59 Lower Manhattan bulk dust results. |
| 38 %asbestos (chrysotile), bulk dust | Ground Zero | September 19, 2001stated in the audit text | 38% Chrysotile from Ground ZeroNYC-WTC_000130438 · p.22Special Investigative Audit #14, November 20, 2001; IT Corporation for EPA |
| 88 to 128 S/mm2asbestos (TEM), air filter (TEM analysis) | Fresh Kills Landfill, Screening Operations (Locations 09-A and 09-B) and Location 12-A | October 2001audit text: between October 8 and October 31 | were measured at the Screening OperationsNYC-WTC_000130438 · p.21Special Investigative Audit #14, November 20, 2001; IT Corporation for EPAThe audit compares these with 70 S/mm2, the screening level it uses for TEM results. |
| 180,000 ppbbenzene, VOC sample; the quoted sentence does not name the medium | WTC North Tower Center (the sentence continues on p.8) | November 8, 2001stated in the audit text | The recent high value for benzene of 180,000 ppb on November 8thNYC-WTC_000130438 · p.7Special Investigative Audit #14, November 20, 2001; IT Corporation for EPAThe audit says VOC concentrations outside the WTC sites were much lower or undetected. |
| 97.78 S/mm2asbestos (TEM), air (fixed ambient sampling) | Sift Location 9C | Not statedthe result is printed without a sampling date; the report resubmits results from the October 17/18 situation report | Exceedances occurred at Sift LocationNYC-WTC_000154488 · p.3EPA sampling situation report, October 2001; EPAThe report records 2 of 19 samples above the TEM AHERA standard; the text layer misreads some characters. |
| 1 of 3 samples positive (greater than 1%)asbestos, bulk debris | Stuyvesant High School, southeast roof | Not statedthe memo of October 9, 2001 does not state the sample date | 1 sample tested positive for asbestosNYC-WTC_000106411 · p.2UFT memo, Re-Occupying Stuyvesant High School, October 9, 2001; UFT |
| 1 %asbestos (chrysotile), bulk sample | 15 John Street, west facade ledge | July 13, 2002'Date Collected: 07/13/02' on the report | Asbestos Present: YesNYC-WTC_000094256 · p.1DEP Asbestos Control Program laboratory report; DEP laboratory |
| as much as 2.5 million structures per square centimeterasbestos, dust (ultrasonication test, as described) | Stuyvesant High School, one sample | Not statedthe release of August 7, 2002 describes the testing as recent and gives no collection date | asbestos levels of as much as 2.5 million structures per square centimeter were found in one sampleNYC-WTC_000144518 · p.2Concerned Stuyvesant Parents release, August 7, 2002; Parents' association consultant, as reported by the parents' group |
Boundary: This short list holds the results located so far. A full sampling dataset would hold every result. The list makes no health finding and no comparison with any standard beyond what the document itself states.
DORIS Giuliani · Folder 140
NYC-WTC_000138296 p.1 City of New York, September 11th Document Portal, DORIS Giuliani, Folder 140, NYC-WTC_000138296, PDF page 1 (page stamp NYC-WTC 000138296), https://sept11documents.cityofnewyork.us/apps/content/September11_MD/NYC-WTC_000138296.pdf#page=1; catalog captured 2026-09-11. [NYC-WTC_000138296 p.1](https://sept11documents.cityofnewyork.us/apps/content/September11_MD/NYC-WTC_000138296.pdf#page=1) The Bates stamp printed on this page was read from the captured page text.
Recorded output of citations_format {"bates": "NYC-WTC_000138296", "page": 1}. Full response ↗
DEP Hard Copies (68 Boxes) · DEP Box 09
NYC-WTC_000147320 p.2 City of New York, September 11th Document Portal, DEP Hard Copies (68 Boxes), DEP Box 09, NYC-WTC_000147320, PDF page 2 (page stamp NYC-WTC 000147321), https://sept11documents.cityofnewyork.us/apps/content/September11_MD/NYC-WTC_000147320.pdf#page=2; catalog captured 2026-09-11. [NYC-WTC_000147320 p.2](https://sept11documents.cityofnewyork.us/apps/content/September11_MD/NYC-WTC_000147320.pdf#page=2) The Bates stamp printed on this page was read from the captured page text.
Recorded output of citations_format {"bates": "NYC-WTC_000147320", "page": 2}. Full response ↗
DEP Hard Copies (68 Boxes) · DEP Box 01 · 15 JOHN STREET 1001217, 79/14
NYC-WTC_000094256 p.1 City of New York, September 11th Document Portal, DEP Hard Copies (68 Boxes), DEP Box 01, 15 JOHN STREET 1001217, 79/14, NYC-WTC_000094256, PDF page 1, https://sept11documents.cityofnewyork.us/apps/content/September11_MD/NYC-WTC_000094256.pdf#page=1; catalog captured 2026-09-11. [NYC-WTC_000094256 p.1](https://sept11documents.cityofnewyork.us/apps/content/September11_MD/NYC-WTC_000094256.pdf#page=1) The page text was not read, so the printed stamp was not checked.
Recorded output of citations_format {"bates": "NYC-WTC_000094256", "page": 1}. Full response ↗
10 of 10 requested documents found in the catalog captured 2026-09-11.
| Bates | Collection, box, folder | Pages | PDF size |
|---|---|---|---|
| NYC-WTC_000138296 | DORIS Giuliani · Folder 140 | 2 | 0.1 MB |
| NYC-WTC_000147320 | DEP Hard Copies (68 Boxes) · DEP Box 09 | 2 | 0.1 MB |
| NYC-WTC_000153130 | DEP Hard Copies (68 Boxes) · DEP Box 26 | 1 | 0.0 MB |
| NYC-WTC_000130438 | DEP Hard Copies (68 Boxes) · DEP Box 53 · E-Mail 1/2/02 | 78 | 53.6 MB |
| NYC-WTC_000154488 | DEP Hard Copies (68 Boxes) · DEP Box 26 · DEP OEM Reports to Commissioner | 8 | 0.7 MB |
| NYC-WTC_000094256 | DEP Hard Copies (68 Boxes) · DEP Box 01 · 15 JOHN STREET 1001217, 79/14 | 1 | 0.0 MB |
| NYC-WTC_000144518 | DEP Hard Copies (68 Boxes) · DEP Box 08 · SCHOOLS | 4 | 0.3 MB |
| NYC-WTC_000106411 | DEP Hard Copies (68 Boxes) · DEP Box 37 · 345 CHAMBERS STREET; 16/1 | 7 | 0.4 MB |
| NYC-WTC_000148621 | DEP Hard Copies (68 Boxes) · DEP Box 10 · DEP - BEC ACTIVITIES WTC | 120 | 22.4 MB |
| NYC-WTC_000151604 | DEP Hard Copies (68 Boxes) · DEP Box 11 · WTC DC TO RC LETTERS CALLEHAN WHITMAN ETC. WARD DOCTOROFF KENNY | 3 | 0.3 MB |
Recorded output of records_manifest {"bates": ["NYC-WTC_000138296", "NYC-WTC_000147320", "NYC-WTC_000153130", "NYC-WTC_000130438", "NYC-WTC_000154488", "NYC-WTC_000094256", "NYC-WTC_000144518", "NYC-WTC_000106411", "NYC-WTC_000148621", "NYC-WTC_000151604"]}. Full response ↗
Centers for Disease Control and Prevention (NIOSH), federal
medical monitoring and treatment for WTC-related conditionsCDC, about the Program
There is no deadline to enroll.CDC, about the Program
between September 11, 2001 and July 31, 2002CDC, supporting documentation Survivors: lived, worked, or attended school, daycare or adult daycare in the NYC Disaster Area
Is a separate 9/11 assistance program from the September 11th Victim Compensation Fund (VCF).CDC, about the Program
must show your full name and the time period for your covered activityCDC, supporting documentation
Incomplete or insufficient supporting documentation is the top reason for application processing delays.CDC, supporting documentation
Letter from your employer or union stating your activities, location, days, and hours performing 9/11-related activitiesCDC, supporting documentation responders
A pay stub if it shows your work location between September 11, 2001 and July 31, 2002CDC, supporting documentation survivors
Police memo book(including a copy of the cover page) that shows the days, times, and hours worked at a 9/11-related site.CDC, supporting documentation responders
A lease or utility bill with your name showing your residence between September 11, 2001 and July 31, 2002CDC, supporting documentation survivors
A School Transcript from the Fall 2001 or Spring 2002 semester (or both)CDC, supporting documentation survivors
you can submit a letter written by someone who can confirm your eligibility detailsCDC, supporting documentation (the CDC page calls this a third-party attestation)
Official pages: Supporting documentation · Eligible groups and the NYC Disaster Area · About the Program
U.S. Department of Justice
submit your complete claim no later than October 1, 2090VCF Policies and Procedures Registration has its own
deadline applicable to your individual circumstancesVCF Policies and Procedures
between September 11, 2001, and May 30, 2002VCF Policies and Procedures The World Trade Center site or the NYC Exposure Zone
runs south of Canal Street, river to river, and from the Hudson River to the intersection of Canal Street and East BroadwayVCF Policies and Procedures
north on East Broadway to Clinton Street, and east on Clinton Street to the East RiverVCF Policies and Procedures
The routes of debris removal apply only to those individuals who loaded, unloaded, or drove the trucks containing WTC debrisVCF Policies and Procedures Map ↗
Enrollment in the WTC Health Program does not automatically register you with the VCFVCF Policies and Procedures
Registration is not the same as filing a claim.VCF Policies and Procedures
There are no requirements for the minimum amount of time an individual needed to be at a siteVCF Policies and Procedures
to the VCF from the employer or other third party, with specific dates and locations, is often sufficient to verify presenceVCF Policies and Procedures
must demonstrate that he/she sought to obtain presence information from the listedVCF Policies and Procedures (before the VCF relies on witness statements)
documents, whether from the list below or otherwise, are requiredVCF Policies and Procedures
Official personnel roster.VCF Policies and Procedures
Police memo book submitted with the front cover including supervisory signature and opening and closing datesVCF Policies and Procedures
The documents listed below are not sufficient on their own, but will be reviewed in conjunction with other documentsVCF Policies and Procedures
If you submit a certified transcript or school record as explained below, you do not need to submit any additional proof of presenceVCF Policies and Procedures
Alumni of Stuyvesant or any area school in the NYC Exposure Zone may emailVCF Policies and Procedures info@stuyhealth.org
minimum of two peopleVCF Policies and Procedures
be from an individual who is not related to you or to the Personal Representative or GuardianVCF Policies and Procedures
Effective February 1, 2023, the VCF will no longer accept affidavits as proof of presence.VCF Policies and Procedures
Official pages: Eligibility criteria and deadlines (Policies and Procedures, section 1) · How to prove presence (Interactive Presence Guide) · NYC Exposure Zone map
| Applicant | Issuer | Basis and status |
|---|---|---|
| Current and former City employees | Department of Citywide Administrative Services (DCAS) | designating personnel at the Department of Citywide Administrative ServicesStipulation and Order, p.3 partially observedAnnounced in the settlement and the Mayor’s release. No contact path had been published as of September 11, 2026: the DCAS home page, captured that day, does not mention September 11, the programs or an exposure zone. |
| People who attended New York City public schools | New York City Public Schools (the settlement names the Department of Education) | to assist City employees and individuals who attended the New York City Public SchoolsStipulation and Order, p.3 Former students must print and fill out the Student Records Request FormNYC Public Schools When a student is 18 or older, the DOE will only honor transcript requests from the student.NYC Public Schools If your former high school has closed, another school now has your transcript and can provide you with a copy.NYC Public Schools partially observedThe settlement’s designated personnel are announced; no contact path had been published as of September 11, 2026. The standing route is the school itself: NYC Public Schools’ records request page (quoted here). |
| City employees whose payroll records the Comptroller holds | Office of the New York City Comptroller | The VCF gets the information directly from the Office of the New York City Comptroller.VCF Policies and ProceduresListed by the VCF as an entity it obtains presence information from directly. |
| Alumni of Stuyvesant or any area school in the NYC Exposure Zone | StuyHealth (an alumni organization) | Alumni of Stuyvesant or any area school in the NYC Exposure Zone may emailVCF Policies and Procedures info@stuyhealth.orgNamed on the VCF’s policy page for help acquiring proof of attendance. It is a private organization, without a City role. |
The Mayor’s Office release says the administration will appoint dedicated personnel at the Department of Citywide Administrative Services (DCAS) and New York City Public Schools (NYCPS) to coordinate the retrieval of records
. Mayor’s Office release
This directory quotes official rules with their sources. It does not decide eligibility, calculate a deadline or file anything. Rules change; read the linked official page before acting. Not legal advice.
FY 2027 · announced commitment
$34.2 million
Portal creation, maintenance and Law Department document review.
Mayor’s budget announcement ↗fiscal period unresolved · announced commitment
$4 million
Funding for DOI to complete and release its report on 9/11 environmental toxins, which the Council announced on September 3, 2026.
Council announcement ↗The Council release does not allocate the $4 million between fiscal years. DOI’s own page says the City allocated $3.81 million over fiscal years 2026 and 2027; DOI’s June 29, 2026 letter says it requested $4 million over two fiscal years. The figures are listed beside each other; none is substituted for another.
DOI has requested $3 million in funding in FY27 to hire an outside firmDOI testimony, March 18, 2026, p.5
DOI now estimates that the cost of the overall investigation will total between $4 and $5 millionDOI testimony, March 18, 2026, p.5
a total of over $3 million over two fiscal yearsDOI letter, December 31, 2025, p.2
DOI requested a total of $4 million over the course of two fiscal years to hire a third-party firmDOI letter, June 29, 2026, p.2
has not yet approved DOI’s requestDOI letter, June 29, 2026, p.2
In June 2026, the City allocated $3.81 million over fiscal years 2026 and 2027 to fund this investigative firmDOI investigation page, read 2026-09-11
FY 2027 · announced commitment
$1 million
Free field trips for New York City students, with a focus on eighth graders, and expanded educational programming.
Council announcement ↗Museum Field Trips 611745872 $750,000 DYCDCouncil Fiscal 2027 Schedule C, p.281, p.281
To provide funding support for 8th grade students to visit the museum free of charge.Council Fiscal 2027 Schedule C, p.281, p.281
9/11 Memorial Museum Programming 611745872 $250,000 DYCDCouncil Fiscal 2027 Schedule C, p.280, p.280
Funds will be used to cover the costs of in-person and virtual field tripsCouncil Fiscal 2027 Schedule C, p.280, p.280
Recurring obligations state no dates, so none are added to the calendar. Status is what was observed on public pages when checked, with no legal determination.
Loading the saved capture. Open the source data.
A comparison needs two accepted captures.
Inspect capture and provenance ↗
Dated obligations are under Key dates.
Checked 2026-09-09 · observed
Portal live 2026-09-08; catalog export 2026-09-09: 24,441 documents / 173,299 pages
Source: Settlement recitals; ¶ (1)–(3). Observation only.
Checked 2026-09-09 · partially observed
Documents of Interest previously observed; Harding FAQ answer read in browser September 9. Combined obligation requires independent review.
Source: Settlement ¶ (Harding Memo). Observation only.
Checked 2026-09-09 · not observed on inspected surfaces
FAQ provides examples; complete agreed list not observed in inspected navigation.
Source: Transcript 2026-09-08 (Corporation Counsel Banks). Observation only.
Checked 2026-09-09 · not observed on inspected surfaces
No dedicated navigation item observed; no claim of absence elsewhere.
Source: Settlement ¶ 7. Observation only.
Checked 2026-09-11 · partially observed
Commitment announced 2026-09-08 (settlement p.3; Mayor’s release). No contact path published: DCAS home page captured 2026-09-11 has no mention; the portal’s Programs and Forms page was not re-checked.
Source: Settlement ¶ (b); Mayor's press release. Observation only.
Catalog captured 2026-09-09.
| Collection | Documents | Share of saved catalog |
|---|---|---|
| DEP Hard Copies (68 Boxes) | 21,395 | 87.5% |
| WTC 7 | 3,025 | 12.4% |
| DORIS Giuliani | 21 | 0.1% |
As of 2026-09-21 · 2026-09-11 through 2026-09-21. Recent, source-linked developments around the City release.
2026-09-19 · Independent project
Cleartext Labs says its independent mirror now uses 911records.org, with prior 911records.nyc links redirecting. Its release notes also describe OCR and search changes. Treat its extracted text and tags as research aids; check the City PDF before relying on a result.
911 City Records release notes ↗How to use it: Compare a finding with this toolkit’s locally captured catalog. Differences can reflect capture time, OCR, tagging, or a changed City record.
2026-09-17 · Independent project
The project describes a map, record search, saved case files, exports, and an MCP endpoint. The operator says it is independent and not a City or benefits-program service.
Project announcement ↗How to use it: Useful for discovery and comparison, not proof of exposure, eligibility, illness, liability, or wrongdoing.
2026-09-11 · Federal records
The Public Interest Declassification Board says presidential briefing material and 9/11 Commission interview memoranda were released. These are separate from New York City’s post-attack air-quality portal.
National Archives announcement ↗How to use it: Keep federal pre-attack records separate from City post-attack records when framing a question or citation.
Official programs for care and compensation WTC Health Program · Victim Compensation Fund