If an MCP server you installed was malicious
Scope: any MCP (Model Context Protocol) server you connected to Claude Code, Cursor, Codex, Windsurf, Gemini CLI, or any other agent that turns out to be backdoored.
Canonical example: postmark-mcp backdoor. Class-wide reference: Systemic MCP stdio RCE.
Authoritative references #
- Model Context Protocol — Security Best Practices — the official spec.
- Anthropic — Claude Code Security docs — MCP section.
- Network Intelligence — MCP Security Checklist — practical 2026 checklist.
- Towards Data Science — The MCP Security Survival Guide.
- SentinelOne — MCP Security: Complete Guide.
Do this first (60 seconds) #
# 1. Find and remove the MCP server from every config
grep -r "<bad-mcp-name>" \
~/.cursor/ ~/.windsurf/ ~/.codeium/ \
~/.config/claude/ ~/Library/Application\ Support/Claude/ \
2>/dev/null
# Delete the entry from each mcp.json / settings file.
# 2. Kill any running MCP process
pkill -9 -f "<bad-mcp-name>"
# 3. Restart your agent (Cursor / Claude Code / Windsurf) to drop the connection.
Triage #
What could the MCP do? #
MCP servers run as subprocesses with your user's privileges and act on behalf of the AI agent. Per the MCP spec, they should be treated as untrusted dependencies with root-equivalent permissions. Blast radius depends on what the MCP claimed to do:
- Email MCP (postmark, gmail): BCC every sent email, read inbox, send on your behalf. (postmark-mcp pattern.)
- DB MCP (supabase, postgres, doris, alibaba RDS, pinot): read every row, write rows, drop tables — RLS bypass if it uses a service key. (Supabase lethal trifecta, May 2026 DB MCPs.)
- Filesystem MCP: read every file the agent had access to, including
~/.ssh/,~/.aws/,~/.config/. - GitHub MCP: any action your authenticated
ghcould take. - Shell-execution MCP: arbitrary code execution as your user.
- Browser MCP: read cookies, session tokens, autofill data.
Assume the MCP did everything its declared scope allowed, plus everything its process privileges allowed.
What did the MCP have access to? #
Audit which credentials and services were configured:
# Look at the MCP server's package source to see what it imported and called
# (You should always do this BEFORE installing — see prevention/mcp-hygiene.md)
npm view <bad-mcp> repository.url
# Or for git-installed MCPs, find the source dir
find ~/.npm ~/.cache -name "<bad-mcp-name>" -type d 2>/dev/null
What domains did it contact? #
# macOS: check Little Snitch / pf logs if running
# Linux: check journalctl, ufw logs
# Or check known IOC domains from the relevant advisory
# (e.g., postmark-mcp → phan@giftshop[.]club)
Rotate #
Based on what the MCP had access to:
| MCP type | Rotate |
|---|---|
| Email (Postmark, Gmail, SendGrid) | API key for the email service. Also any other credentials ever sent through email by the agent (password resets, API key delivery, MFA codes). |
| Database (Supabase, Postgres, etc.) | DB password / service-role key. Audit row contents for unexpected writes. |
| GitHub | → if-your-github-pat-leaked.md |
| Cloud (AWS/GCP/Azure) | → rotating-cloud-credentials.md |
| Filesystem | Full machine compromise — all on-disk creds. → if-you-installed-a-bad-npm-package.md |
| Shell execution | Full machine compromise. Consider reimaging. |
Audit data exfiltration #
The hardest part of an MCP compromise is figuring out what was sent out:
- Email logs. For email MCPs: pull "sent" log from the provider; look for unexpected BCC fields, forwards, or recipients.
- Database access logs. For DB MCPs: pull query logs (Supabase has these); look for unusual
SELECT *patterns from the agent's IP/user. - API service logs. Vendor dashboards show request volume — spikes during the malicious window indicate exfiltration.
- GitHub repos. Search for any new public repos containing your data:
gh search repos "<unique-string-from-your-data>".
Replace with a vetted MCP #
Don't reinstall the same MCP just because the bad version got pulled. Get the official version from the vendor's domain or GitHub org. Verify publisher. Pin a specific commit/version. Run the vetting checklist before reconnecting:
→ prevention/mcp-hygiene.md — vetting checklist + the lethal-trifecta framing.
Document #
Add to issues.md:
- MCP name, version, install date, removal date
- Which credentials it had access to
- What you rotated + audit findings
- Whether you found evidence of exfiltration
Also: open an issue on the official vendor's repo (if it's a typo-squat of a real product) so they can warn other users. See how Postmark handled it: Postmark — Security Alert: Malicious 'postmark-mcp' npm Package Impersonating Postmark.
Prevention going forward #
- → prevention/mcp-hygiene.md — vetting, config hygiene, OAuth 2.1 + PKCE,
127.0.0.1binding, session-scoped auth. - → prevention/agent-sandboxing.md — run agents (and their MCPs) inside a devcontainer so blast radius is contained.
- Quarterly: cull MCPs you don't actively use. Every active MCP is attack surface.