Auditing your app with an agent security-audit skill
Cloudflare's open-source
security-auditskill turns Claude Code or Codex into a multi-agent source auditor. It is good at the bugs this corpus sees most in vibe-coded apps (missing authorization, SSRF, path traversal, unsafe rendering) and useless for the ones scanners already catch (known CVEs in dependencies). Run it on a scoped target with a budget, read every finding yourself, and pair it with a dependency scanner.
What it is #
cloudflare/security-audit-skill (MIT, created 2026-06-18, about 73,700 stars when read on 2026-11-16) is a ~320 KB bundle of Markdown instructions and two Node validators that a coding agent loads as a skill. Cloudflare published it as the single-repository seed of the internal harness it describes in its post "Build your own vulnerability harness"; the fleet harness itself is not public. The skill runs six phases:
- Reconnaissance: four parallel read-only agents map the stack, principals, entry surfaces and local build paths into
architecture.mdand a deterministiccoverage-ledger.json. - Coverage-led hunting: isolated hunters each take ledger units (surface × trust boundary × attack class) and return structured candidates, never prose.
- Candidate validation: a fresh agent that did not find the candidate tries to refute it from source.
- Structured output:
findings.json, checked againstreport-schema.jsonbyvalidate-findings.cjs; the ledger byvalidate-coverage-ledger.cjs. - Independent record verification: another fresh agent re-checks every retained record.
- Target-neutral reports:
REPORT.md,FINDINGS-DETAIL.md,NEEDS-VALIDATION.md.
Three verdicts only. confirmed needs a complete source trace from a lower-trust entry point to a crossed boundary and a bounded observed result; only confirmed records get a severity. needs_validation is a source-grounded lead blocked by a fact outside the repository (a deployment header, a provider setting) and carries no severity. rejected is a disproved candidate, kept so the next run does not repeat it. A missing best practice with no affected principal is a hardening note, not a finding.
What people report after running it #
- Token cost is the loudest complaint. On the Hacker News thread (2026-09-17, 213 points) one user spent "at least 150k" tokens on "a relatively small FastAPI project" and hit a session limit; another "threw 1M tokens for nothing in a medium codebase". The repeated advice in that thread: "These work best on a targeted section of the code, like a PR."
- A single run is half a run. Cloudflare's own README says one run finds roughly half of what repeated runs find in total, so the skill carries prior ledgers forward and repeated runs are additive.
- It does not find dependency CVEs, by design. A blind test posted as upstream issue #20 (three runs per approach against a seeded target) reported median 90 percent precision and no hits on decoy findings, and 0 percent on a disclosed CVE in a pinned dependency. The same issue reports full recall at the median on the control bug classes only. Overall median recall on the quick profile was 0.467, equal to a plain single-agent review, at a median cost of $29.95 against $2.06. It covers one target, and its author says the comparison tool is their own and calls the result "a measured signal, not a verdict". This repo has not reproduced it.
- The sandbox requirement bites. Target code (tests, builds, fixtures) runs only inside an OS-enforced sandbox with no network, an allowlisted empty environment and resource limits. Without one, the skill stays source-only and every lead that needs execution lands in
NEEDS-VALIDATION.md. That is the correct outcome, not a bug. - Security framing can trip model refusals. One commenter on the same thread reports that prompts framed as security research sometimes draw refusals from frontier models. A reply says the vendor's identity verification reduces them.
- The validators check structure, not exploitability. Every
confirmedrecord still needs a human to read the trace.
When to run it on a vibe-coded app #
Run it when the agent that wrote your app also wrote your authorization logic, which is most of the time. The classes it is built for are the ones in auditing a vibe-coded repo: BOLA and IDOR in API routes, Supabase RPCs that skip Row-Level Security, SSRF in server-side fetches, file uploads that trust a path, CORS that trusts any origin, and rendering of untrusted HTML. It will not replace osv-scanner, Socket, npm audit or pip-audit for known-vulnerable dependencies, and it will not tell you about a header your host sets.
Good scope: one subsystem, one pull request, or the auth/, api/ and server/ directories of a generated app. Bad scope: a whole monorepo on a weekend token budget.
How to run it #
# install into the agent you use (Claude Code, Codex, Cursor and Copilot are listed by the skills CLI)
npx skills add https://github.com/cloudflare/security-audit-skill --skill security-audit
# then, inside the project, with an explicit profile, scope and budget:
# "security audit ./src/api with the quick profile and a budget of 12 agents, output to ~/audits/<app>"
The skill defines quick for small targets, re-runs and a first look, standard as the default, and deep for high-stakes or large targets. Start with quick. Set a budget in agent invocations; the skill reserves critics and verifiers before it spends on hunters and reports an incomplete run instead of silently thinning evidence. Keep the output directory outside the repository, or in a directory your .gitignore covers, and never commit agents/*/scratch/.
Read the output in this order: REPORT.md for the posture summary and the confirmed table, FINDINGS-DETAIL.md for each confirmed record's trace and smallest fix, then NEEDS-VALIDATION.md as a to-do list of facts only you can observe (your hosting provider's headers, your branch protection, your database policies). Do not ship a fix you cannot connect to a line in the trace.
What it found here #
This repository does not run the skill on a schedule. Its policy is in SECURITY.md: a scoped quick run when the code that turns text into published HTML changes, and otherwise twice a year.
One run was started on the build pipeline on 2026-11-06 and did not finish. It left one lead: the site's Markdown renderer passed raw HTML through to a public site whose content is written partly by an automated agent that reads untrusted web pages. That is the shape the agent sandboxing guide describes, untrusted content plus a publishing path. Reading the code confirmed it, and the renderer now escapes raw HTML and a test rejects active HTML in built pages. The lesson for your own app: an unfinished run can still point at the right file, and a person has to confirm the finding.
Related #
- Auditing a vibe-coded repo: the 15-point manual list this skill automates part of.
- Agent sandboxing: the OS-enforced sandbox the skill requires for any execution.
- Package vetting checklist: the dependency half that this skill does not cover.