EL26-67-000 · 2026-07-15 · Relentless Energy Systems LLC

SPECIFICATION.pdf

Read the parent filing

Read topic-matched comments in EL26-67

Responses and related views

No section-specific public response is linked for this document.

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Pages 1 to 4

page range

1 UNITED STATES PATENT AND TRADEMARK OFFICE TITLE OF INVENTION: PHASE-ISOLATED LCFVR ENERGY MANIFOLD WITH GEOMETRIC PHASE ISOLATION (GPI) INVENTOR(S): Benjamin Donovan Blackketter, Zanesville, Ohio CROSS-REFERENCE TO RELATED APPLICATIONS This application claims the benefit of priority to U.S.
Read this passage

Pages 5 to 8

page range

5 • Flux Hindrance: A generalized load-coupling mechanism representing any process, device, structure, or environment that extracts real power from either/both the inductive branch and/or capacitive branch.
Read this passage

Pages 9 to 12

page range

9 • Scaling Law: The invention is scale-invariant under proportional adjustment of inductance (L), capacitance (C), frequency (F), voltage (V), and resistance (R).
Read this passage

Pages 13 to 16

page range

This must match p_ind to satisfy the Conservation of Energy (proving no laws of physics are broken). • p_ind: AVG(V(pi)).
Read this passage

Pages 17 to 20

page range

Definition: The exact timestamp when the voltage waveform crosses zero.
Read this passage

Page 21

page range

21 [0040] ABSTRACT OF THE DISCLOSURE A Phase-Isolated LCFVR Energy Manifold is disclosed.
Read this passage