ER26-3650-000 · 2026-09-18 · CENTRAL MINNESOTA MUNICIPAL POWER AGENCYIndiana Municipal Power AgencyMissouri Joint Municipal Electric Utility Commission ,WPPI Energy ,

Motion to Intervene and Comments of Central Municipal Power Agency/Services et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filing

Read topic-matched comments in ER26-3650

Topics in the text: Registry access

Responses and related views

No section-specific public response is linked for this document.

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

At the same time, addressing these complex challenges must be done in a way consistent with the Show Cause Order the Commission issued to MISO5 and that avoids unintended adverse consequences.
Read this passage

I. Motion to Intervene

PDF bookmark

MOTION TO INTERVENE Each Midwest TDU (described in Attachment A hereto) moves to intervene with full rights as parties to this proceeding.
Read this passage

II. Comments

PDF bookmark

II.
Read this passage

A. Midwest TDUs seek confirmation that the proposed requirements apply only to those Large Loads directly connected to the MISO Transmission System.

PDF bookmark · Topic match: Registry access

Specifically, we find that it is within the Commission’s exclusive authority to ensure that transmission provider and/or transmission owner tariffs include sufficiently clear and consistent provisions governing how transmission service to Eligible Customers on behalf of large loads interconnecting…
Read this passage

B. MISO’s new requirements must be implemented in a way that does not unduly burden Transmission Customers and advances their reliability purpose.

PDF bookmark · Topic match: Registry access

MISO’s new requirements must be implemented in a way that does not unduly burden Transmission Customers and advances their reliability purpose.
Read this passage

CONCLUSION

printed heading

CONCLUSION For the reasons discussed above, the Commission should (1) grant CMPAS, IMPA, MJMEUC, and WPPI intervention in this proceeding; and (2) ensure that the issues above are adequately clarified by MISO and order further Tariff revisions to the extent that MISO’s proposed language is not…
Read this passage

ATTACHMENT A

printed heading

ATTACHMENT A A-1
Read this passage

ATTACHMENT A: DESCRIPTION OF MIDWEST TDUS

printed heading

ATTACHMENT A: DESCRIPTION OF MIDWEST TDUS Central Minnesota Municipal Power Agency d/b/a Central Municipal Power Agency/Services (“CMPAS”) is a public power joint action agency organized under Minnesota law.
Read this passage

Attachment A

printed heading

Access to the JTS transmission facilities is administered by MISO pursuant to its tariff.
Read this passage

Attachment A

printed heading

Attachment A A-3 with a 2024 summer peak load of 58 MW, titled the Southwest Missouri Public Energy Pool (“SWMPEP”).
Read this passage

CERTIFICATE OF SERVICE

printed heading

Dated on this 18th day of September, 2026. /s/ Jeffrey M.