Tab B - IRR Tariff Clean.pdf
Read topic-matched comments in ER26-3650
Topics in the text: Reliability and curtailment · Cost allocation · Credit and exit
Responses and related views
No section-specific public response is linked for this document.
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Reliability and curtailment
Commercial Operation Date: Shall have the meaning set forth in Attachment X of this Tariff.Read this passage Filed comments: Cost allocation
I. Applicability of Large Load Reliability Requirements
printed heading
Applicability of Large Load Reliability Requirements The Transmission Customer taking Transmission Service on behalf of a Large Load shall be responsible for complying with each of the requirements of this Section 37A applicable to each Large Load it represents.Read this passage
II. Transition Provisions
printed heading
The process by which Transmission Provider will make such a determination and which, if any, of the requirements of this Section 37A are to be applied shall be as set forth in the Business Practices Manual for Large Load.Read this passage