ER26-3537-000 · 2026-08-17 · PJM Transmission Owners

PJM Transmission Owners' partial compliance filing implementing the Interim NITS rate

PDF page 1

Suite 500 East
1301 K Street NW
Washington, D.C.  20005-3317

August 17, 2026

Honorable Debbie-Anne A. Reese
Secretary
Federal Energy Regulatory Commission
888 First Street, N.E.
Washington, D.C. 20426

Re:
Exelon Corporation

PJM Interconnection, L.L.C

Docket No. ER26-__________

PJM Transmission Owners’ Partial Compliance Filing

Dear Secretary Reese:

In partial compliance with the Commission’s June 18, 2026 order in Docket Nos. EL25-
49, et al.,1 the PJM Transmission Owners, acting through the Consolidated Transmission Owners Agreement,2 submit this filing.  As required under the June 18 Order, the PJM Transmission Owners are submitting new and revised tariff records to the PJM Open Access Transmission Tariff (“PJM Tariff”) necessary to implement the rate for Interim Network Integration Transmission Service (“Interim NITS”).3

I. DESCRIPTION OF COMPLIANCE FILING

In the June 18 Order in response to the record developed in the paper hearing, the
Commission established as just and reasonable certain rates, terms, and conditions for the new transmission services directed in its December 18, 2025 order.4  The new transmission services are: Interim NITS, firm contract demand transmission service, and non-firm contract demand transmission service.

1 PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026) (“June 18 Order”).  The PJM Transmission Owners note that the Commission’s directives being complied with herein are under challenge before the Commission and through petitions for review, such that the tendered tariff sheet revisions herein may be subject to a subsequent termination filing.

2 Consolidated Transmission Owners Agreement, FERC Rate Schedule No. 42, § 7.3.  As the Commission has noted, the transmission owners in PJM have exclusive and unilateral rights regarding the cost allocation provisions of Schedule 12 of the PJM Tariff.  Neptune Regional Transmission System, LLC and Long Island Power Auth. v. PJM Interconnection, L.L.C., 175 FERC ¶ 61,247, at P 47 (2021).  See also PJM Tariff, Part I, Section 9.1(a).
3 Pursuant to Order No. 714, this filing is being submitted by PJM Interconnection, L.L.C. ("PJM") on behalf of the PJM Transmission Owners as part of an XML filing package that conforms with the Commission's regulations. PJM has agreed to make all filings on behalf of the PJM Transmission Owners in order to retain administrative control over the PJM Tariff.  Thus, the PJM Transmission Owners requested that PJM submit the revisions to the PJM Tariff in the eTariff system as part of PJM's electronic Intra PJM Tariff.
4 Id. at P 9 (citing PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025)).

PDF page 2

2

In order to implement the new transmission services, the Commission directed PJM and the PJM Transmission Owners to file, within 60 days of the date of issuance of the June 18 Order, a compliance filing to revise the PJM Tariff.  On July 28, 2026, PJM and certain of the PJM Transmission Owners filed motions requesting that the Commission extend the compliance deadline in this proceeding for 90 days, until November 16, 2026, so that it aligns with the deadline by which PJM and certain PJM Transmission Owners have requested to submit filings in response to the Commission’s overlapping show cause order in Docket No. EL26-67-000.  On August 14, 2026, the Commission granted these extension requests.

Notwithstanding its request for extension, PJM committed to submit a compliance filing on August 17, 2026, addressing several compliance directives, including those related to Interim NITS.5  In order to align with PJM’s commitment to address Interim NITS by August 17, 2026, the PJM Transmission Owners are submitting this partial compliance filing to establish the rate for Interim NITS.  Accordingly, attached to this filing are new and revised tariff records for the PJM Tariff necessary to implement the rate for Interim NITS.

Specifically, attached are:

(i) New Sections 706 and 706.1 of Subpart A of new Part XI of the PJM Tariff.  New Part XI concerns Transmission Services Available for Eligible Customers Taking Service on Behalf of Co-Located Loads.  New Sections 706 and 706.1 specify the Interim NITS rate.

(ii) Revisions to Section 1 of Part I of the PJM Tariff (Definitions) adding two new definitions for “Responsible Customer” and “Co-Located Gross Demand.”

(iii) Revisions to Section (b)(viii) of Schedule 12 of the PJM Tariff (FERC Filing) replacing extraneous language with the newly defined term “Responsible

Customer.”

II. EFFECTIVE DATE

The PJM Transmission Owners request that the revisions submitted with this partial compliance filing become effective on July 1, 2028.  It is the PJM Transmission Owners’ understanding that July 1, 2028 is the effective date that PJM will request for its related compliance filing concerning Interim NITS.

III. ADDITIONAL INFORMATION

A. Communications

Communications regarding this filing should be addressed to the following individuals, whose names should be entered on the official service list maintained by the Secretary for this proceeding.

5 PJM Extension Motion at 1-2.

PDF page 3

3
Pulin Shah
Vice President of Transmission
Development
Exelon Corporation
2301 Market Street
Philadelphia, PA 19355
pulin.shah@exeloncorp.com
Chair of the Transmission Owners
Agreement Administrative Committee

Gary E. Guy
Assistant General Counsel
Exelon Corporation
701 Ninth Street, N.W., Ste 9426
Washington, DC 20068
gary.guy@exeloncorp.com
Michael Kunselman
Richard P. Sparling
Nicholas J. Cicale

Davis Wright Tremaine LLP
1301 K Street NW
Suite 500 East
Washington, DC 20005
michaelkunselman@dwt.com
ricksparling@dwt.com
nicholascicale@dwt.com

B. List of Documents Submitted with Filing

In addition to this transmittal letter, this filing includes the following attachments:

• Attachment A: Clean Tariff Records for the PJM Tariff
• Attachment B: Redlined Tariff Records for the PJM Tariff

C. Service

PJM has served a copy of this filing on all PJM Members and on all state utility regulatory commissions in the PJM Region by posting this filing electronically.  In accordance with the Commission’s regulations,6 PJM will post a copy of this filing to the FERC filings section of its internet site, located at the following link: http://www.pjm.com/documents/ferc-manuals/ferc- filings.aspx with a specific link to the newly-filed document, and will send an e-mail on the same date as this filing to all PJM Members and all state utility regulatory commissions in the PJM Region7 alerting them that this filing has been made by PJM and is available by following such link.  If the document is not immediately available by using the referenced link, the document will be available through the referenced link within 24 hours of the filing.  Also, a copy of this filing will be available on the Commission’s eLibrary website located at the following link: http://www.ferc.gov/docs-filing/elibrary.asp in accordance with the Commission’s regulations and Order No. 714.

6 See 18 C.F.R §§ 35.2(e) and 385.2010(f)(3).
7 PJM already maintains, updates, and regularly uses e-mail lists for all PJM members and affected state commissions.

PDF page 4

4
IV. CONCLUSION

For the reasons stated herein, the PJM Transmission Owners respectfully request that the Commission accept this partial compliance filing without hearing, modification or condition.

Respectfully submitted,

/s/ Michael Kunselman
Michael Kunselman
Richard P. Sparling
Nicholas J. Cicale
Davis Wright Tremaine LLP
1301 K Street NW
Suite 500 East
Washington, DC 20005

Attorneys for The FirstEnergy

 Transmission Companies

On behalf of the PJM Transmission Owners