EL26-108: the filed comments
These passages match a topic and a request or argument in the same sentence. A filing can quote another party. Read its page before attributing a position.
Reliability and curtailment
EL26-108-000 · 2026-10-20
Utilizing the Joint Intervenors' proposed technology-specific adjustments to reduce baseline peak load projections provides state commissions with the necessary operational information to accurately evaluate and support local resource adequacy alongside PJM. PDF p. 6