Errata correcting the caption and footnote 13 of 195 FERC ¶ 61,211 (Allegheny Electric Cooperative, Wabash Valley Power Association)
Word notes use stable document IDs, such as [fn:8], which can differ from printed footnote numbers.
Document text
196 FERC ¶ 61,122 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc. AEP West Virginia Transmission Company, Inc. American Transmission Systems, Incorporated Appalachian Power Company Atlantic City Electric Company Baltimore Gas and Electric Company Commonwealth Edison Company Commonwealth Edison Company of Indiana, Inc. Dayton Power and Light Company Delmarva Power & Light Company Duke Energy Kentucky, Inc. Duke Energy Ohio, Inc. Duquesne Light Company Essential Power Rock Springs, LLC Hudson Transmission Partners, LLC Indiana Michigan Power Company Jersey Central Power & Light Company Kentucky Power Company Keystone Appalachian Transmission Company Kingsport Power Company Linden VFT, LLC Mid-Atlantic Interstate Transmission, LLC Monongahela Power Company Neptune Regional Transmission System, LLC NextEra Energy Transmission MidAtlantic Indiana, Inc. Ohio Power Company Ohio Valley Electric Corporation Old Dominion Electric Cooperative PECO Energy Company PPL Electric Utilities Corporation The Potomac Edison Company Potomac Electric Power Company Public Service Electric and Gas Company Rockland Electric Company Silver Run Electric, LLC Trans-Allegheny Interstate Line Company Transource West Virginia, LLC UGI Utilities, Inc. Virginia Electric and Power Company Wheeling Power Company Docket No. EL26-67-000 ERRATA NOTICE (August 13, 2026) On June 18, 2026, the Commission issued an “Order Instituting Proceeding Under Section 206 of the Federal Power Act” in the above-captioned proceeding. PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 (2026). The caption in the order inadvertently included “Allegheny Electric Cooperative, Inc.” and “Wabash Valley Power Association, Inc.” and footnote 13 inadvertently omitted “Allegheny Electric Cooperative, Inc.” and “Wabash Valley Power Association, Inc.” This errata notice hereby corrects the caption, as shown above, by deleting “Allegheny Electric Cooperative, Inc.” and “Wabash Valley Power Association, Inc.” In addition, this errata notice hereby corrects footnote 13 to add “Allegheny Electric Cooperative, Inc.” and “Wabash Valley Power Association, Inc.,” as follows: Transmission Owners refers to the entities listed in the caption of this order. We recognize that PJM’s transmission owners include entities that are not subject to the Commission’s jurisdiction because they are not public utilities pursuant to section 201(f) of the FPA. See 16 U.S.C. § 824(f); Sw. Power Pool, Inc., 180 FERC ¶ 61,022, at PP 44-45 (2022). Accordingly, the Commission has not included Allegheny Electric Cooperative, Inc.; AMP Transmission, LLC; City of Cleveland, Department of Public Utilities, Division of Cleveland Public Power; City of Hamilton, OH; East Kentucky Power Cooperative, Inc.; Southern Maryland Electric Cooperative, Inc.; and Wabash Valley Power Association, Inc. here as Transmission Owners that must respond to this order to show cause. Nonetheless, the Commission retains the authority to review each entity’s formula rates as a component of PJM’s Tariff in an order to show cause directed towards PJM, and PJM must respond to this order regarding the non-public utilities’ PJM Tariff provisions on file with the Commission. See Sw. Power Pool, Inc., 180 FERC ¶ 61,022 at P 40. Debbie-Anne A. Reese, Secretary. header1 (Word template) CUICUI- 1 - CUI CUI header2 (Word template) CUICUIDocket No. EL26-67-000 - 1 - CUI CUI header3 (Word template) CUCU CU CU