EL26-71-000 · 2026-08-03 · Six Cities CA

Conditional Motion for Abeyance on Behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California,

PDF page 1

- 1 -
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

California Independent System Operator
Corporation
Citizen S-Line Transmission LLC
Citizens Sunrise Transmission LLC
Citizens Sycamore-Penasquitos
Transmission LLC
City of Anaheim, California
City of Azusa, California
City of Banning, California
City of Colton, California
City of Pasadena, California
City of Riverside, California
DCR Transmission, L.L.C.
DesertLink, LLC
GridLiance West LLC
Horizon West Transmission, LLC
LS Power Grid California, LLC
Morongo Transmission LLC
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Startrans IO, L.L.C.
SunZia Transmission, LLC
Trans Bay Cable LLC
Valley Electric Association, Inc.
Viridon Path 15, LLC
Western Area Power Administration
Docket No. EL26-71-000

CONDITIONAL MOTION FOR ABEYANCE
ON BEHALF OF THE CITIES OF ANAHEIM, AZUSA, BANNING, COLTON,
PASADENA, AND RIVERSIDE, CALIFORNIA

Pursuant to Rule 212 of the Commission’s Rules of Practice and Procedure,1 the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California (collectively, the “Six

1 18 C.F.R. § 385.212 (2026).

PDF page 2

- 2 -
Cities”) hereby submit this conditional motion to hold in abeyance the 60-day deadline to respond to the show cause order issued by the Commission in the above-referenced proceeding.2 This motion is conditional because the Six Cities have filed a motion to rescind the Show Cause Order,3 and, if that Motion to Rescind is granted, the Cities’ abeyance request will be moot.

I. MOTION FOR ABEYANCE
On June 18, 2026, the Commission issued the Show Cause Order, thereby initiating a proceeding under Section 206 of the Federal Power Act.  The Show Cause Order found that the Open Access Transmission Tariff of the California Independent System Operator Corporation (“CAISO”) and/or the Transmission Owner (“TO”) Tariffs of each of the CAISO Participating TOs appear to be unjust, unreasonable, or unduly discriminatory or preferential to the extent that they do not include provisions establishing the rates, terms, and conditions for the interconnection of and service to certain large and co-located loads.4  The Show Cause Order therefore directed the CAISO and its Participating TOs to either explain how their respective tariffs remain just and reasonable without specific provisions for the interconnection of large and co-located loads or to develop such provisions.5

As explained in the Motion to Rescind, each of the Six Cities is a non-public utility that is exempt from the Commission’s jurisdiction pursuant to Section 201(f) of the Federal Power Act (“FPA”).6  In the Show Cause Order, the Commission acknowledged that some of the

2 Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214 (2026) (the “Show Cause Order”).
3 Motion to Rescind Show Cause Order on behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, Cal., Cal. Indep. Sys. Operator Corp., Docket No. EL26-71-000 (filed July 31, 2026) (“Motion to Rescind”).
4 Show Cause Order at P 3.
5 Id.
6 16 U.S.C. 824(f) (2024), City of Anaheim, Cal., 171 FERC ¶ 61,263, at PP 19-22 (2020) (cited in Show Cause Order at P 3, n.9).

PDF page 3

- 3 -
Participating TOs in the CAISO are not subject to the Commission’s jurisdiction and explained that it would “rescind the show cause order” against such entities at their request, provided that the CAISO “respond[s] to this order regarding the non-public utility’s CAISO Tariff provisions on file with the Commission.”7  Accordingly, the Motion to Rescind requested that the Commission rescind the Show Cause Order against each of the Six Cities.  The Motion to Rescind, which is supported by the CAISO, is pending at this time.

Because the Commission has yet to act on the Motion to Rescind, the Six Cities conditionally request a 90-day abeyance of the 60-day deadline to respond to the Show Cause Order.  In the Show Cause Order, the Commission explained that it would consider requests “to hold, for up to 90 days, all or certain aspects of this FPA section 206 proceeding in abeyance, including the deadline to respond to this order.”8  The purpose of the abeyance, according to the Commission, is to allow sufficient time for the CAISO and Participating TOs to develop FPA section 205 filings proposing revisions to their respective TO Tariffs to address the issues in the Show Cause Order.9

Good cause exists for the Commission to grant the Six Cities’ conditional request for abeyance.  As an initial matter, this abeyance request will be moot in the event the Commission grants the Motion to Rescind.  Recission is appropriate because each of the Six Cities is a non- public utility exempt from the Commission’s jurisdiction pursuant to Section 201(f) of the FPA.10

7 Show Cause Order at P 3, n.9.
8 Id. at P 35.
9 Id.
10 Motion to Rescind at 3, n.5 (citing inter alia 16 U.S.C. 824(f) ).  As explained in the Motion to Rescind, the Six Cities will coordinate and cooperate with the CAISO in responding to the Show Cause Order with respect to the provisions of the Cities’ TO Tariffs that are relevant to the issues in the Show Cause Order.

PDF page 4

- 4 -
If the Motion to Rescind is not granted, the Six Cities will need an additional 90 days to prepare responses to the Show Cause Order, develop potential revisions to each of their TO Tariffs to address any modifications that are determined to be needed, and coordinate both their responses to the Show Cause Order and proposed tariff revisions with the CAISO (which has advised that it intends to conduct a stakeholder proceeding to develop responsive policies and tariff changes) and the other Participating TOs.  Moreover, the Six Cities’ facilities and Entitlements in the CAISO generally represent either shares of jointly-owned facilities with, in some cases, entities that are not CAISO Participating TOs and/or are also not Commission- jurisdictional, or contractual rights to transmission service on other parties’ systems governed by those parties’ tariffs and/or bilateral agreements.11  Therefore, the Six Cities may potentially need to coordinate their responses to the Show Cause Order with these parties as well.  Finally, each City will need to evaluate whether proposed revisions to their TO Tariffs to address the Show Cause Order require review and approval by the City’s Public Utility Board or the City Council (or both) and obtain any necessary authorizations from those regulatory authorities. Given that the issues raised in the Show Cause Order are both important and novel, it is critical that the Cities have adequate time to fully consider and prepare responsive filings if the Show Cause Order is not rescinded.  For these reasons and in light of the circumstances described above, the Six Cities conditionally seek a 90-day abeyance of the 60-day response deadline if and to the extent that the Commission does not grant the Six Cities’ pending Motion to Rescind.

11 Motion to Rescind at 2-3.

PDF page 5

- 5 -
II. CONCLUSION
WHEREFORE, for the foregoing reasons, the Six Cities respectfully request that the Commission grant the Six Cities’ request to hold the 60-day deadline to respond to the Show Cause Order in abeyance for an additional 90 days.  As explained above, in the event that the Commission grants the Six Cities’ currently-pending Motion to Rescind the Show Cause Order, this motion is moot.

Respectfully submitted,

/s/ Margaret E. McNaul

Margaret E. McNaul

Rebecca L. Shelton

Jenna E. Cliatt

Attorneys for the Cities of Anaheim, Azusa,
Banning, Colton, Pasadena, and Riverside,
California

Law Offices of:

Thompson Coburn LLP

1909 K Street, N.W., Suite 600

Washington, D.C. 20006-1167

202.585.6900

202.585.6969 (facsimile)

August 3, 2026

PDF page 6

CERTIFICATE OF SERVICE
I hereby certify that I have on this 3rd day of August, 2026, caused a copy of the foregoing document to be sent to all parties on the list compiled by the Secretary of the Commission in this proceeding, by electronic mail or such other means as may have been specified by such party, pursuant to Commission Rule 2010.

/s/ Margaret E. McNaul

Margaret E. McNaul

Attorney for the Cities of Anaheim, Azusa,
Banning, Colton, Pasadena, and Riverside,
California

Law Offices of:

Thompson Coburn LLP

1909 K Street, N.W., Suite 600

Washington, D.C. 20006-1167

202.585.6900

202.585.6969 (facsimile)