PJM Interconnection, L.L.C. submits Supplemental Informational Report with additional detail regarding the timeline and process for developing the revisions…
PDF page 1
PJM Interconnection, L.L.C.
2750 Monroe Blvd
Audubon, PA 19403
Daniel Vinnik
Counsel
T: (267) 858-9451
Daniel.Vinnik@pjm.com
February 23, 2026
Honorable Debbie-Anne A. Reese
Secretary
Federal Energy Regulatory Commission
888 First Street, N.E. Room 1A
Washington, D.C. 20426
Re:
PJM Interconnection L.L.C., Docket Nos. EL25-49-000 and -001
Supplemental Informational Report
Dear Secretary Reese:
As referenced in the January 20, 2026 informational report,1 PJM Interconnection, L.L.C. (“PJM”) submits this supplemental informational filing with additional detail regarding the timeline and process for developing the revisions to the backstop procurement tariff construct and the timing of commencing the revised backstop procurement process to the Federal Energy Regulatory Commission (“Commission”).
I. INFORMATIONAL FILING
PJM and stakeholders have commenced the process for developing the reliability backstop procurement construct at the February 6, 2026 Reliability Backstop Procurement Workshop.2 Under the current timeline, PJM is targeting implementation of a reliability backstop procurement
1 PJM Interconnection, L.L.C., Informational Report at 5, Docket No. EL25-49-000 (Jan. 20, 2026).2 PJM Interconnection, L.L.C., Reliability Backstop Procurement Workshop, Discussion Around Goals, Principles and Elements of a Reliability Backstop Procurement (Feb. 6, 2026) https://www.pjm.com/- /media/DotCom/committees-groups/workshops/rbpw/2026/20260206/20260206-item-02---goals-principles-and- elements.pdf; PJM Interconnection, L.L.C., Reliability Backstop Procurement Workshop, Overview of Reliability Backstop Workshops (Feb. 6, 2026) https://www.pjm.com/-/media/DotCom/committees- groups/workshops/rbpw/2026/20260206/20260206-item-01---overview-of-reliability-backstop-workshops.pdf.
PDF page 2
Honorable Debbie-Anne A. Reese, Secretary
February 23, 2026
Page 2 of 3
2
prior to the December 2026 Base Residual Auction for the 2029/2030 Delivery Year, with a specific target (subject to potential revision) of running such an auction in September 2026.3 Consistent with the above targets, PJM would plan to make a filing to meet the above planned auction timeline. In order to provide for stakeholder input while balancing the need for timely presentation of a proposed auction design to the Commission, PJM is planning several workshops through mid-March.4 PJM and stakeholders are therefore already actively in the process of developing the forthcoming revised backstop procurement process, as evidenced by the several proposals already submitted for consideration.5 Specifically, at the February 17, 2026 workshop, stakeholders presented various initial proposals, and, on the next day, PJM discussed its initial thoughts and design of a reliability backstop construct with stakeholders. Additionally, stakeholder meetings on the reliability backstop process are currently scheduled for February 24, 2026, February 25, 2026, March 4, 2026, and March 5, 2026. Additional meetings to discuss the reliability backstop construct will be scheduled as needed with the goal of ultimately implementing
3 See Department of Energy, Statement of Principles Regarding PJM (Jan. 16, 2026),
https://www.energy.gov/documents/statement-principles-regarding-pjm; PJM Interconnection, L.L.C., Reliability Backstop Procurement Workshop, Next Steps (Feb. 6, 2026) https://www.pjm.com/-/media/DotCom/committees- groups/workshops/rbpw/2026/20260206/20260206-item-03---next-steps.pdf.
4 Meeting details and materials for the Reliability Backstop Procurement Workshop can be found at https://www.pjm.com/committees-and-groups/workshops/rbpw.5 See Constellation Energy Corporation, LLC, et al., Joint Stakeholder Proposal for Reliability Backstop Auction (Feb. 17, 2026), https://www.pjm.com/-/media/DotCom/committees- groups/workshops/rbpw/2026/20260217/20260217-item-02a---joint-stakeholder-proposal---constellation-vistra- alphagen-earthrise---presentation.pdf; Cross-Sector Reliability Coalition, PJM Presentation to RBA Workshop (Feb. 17, 2026), https://www.pjm.com/-/media/DotCom/committees-groups/workshops/rbpw/2026/20260217/20260217- item-02b---cross-sector-reliability-coalition---talen-amazon-cpv---presentation.pdf; Independent Market Monitor for PJM, Proposed backstop auction design (Feb. 10, 2026), https://www.pjm.com/-/media/DotCom/committees- groups/workshops/rbpw/2026/20260217/20260217-item-02c---backstop-auction-design-proposal---imm--- presentation.pdf; Maryland Office of People’s Counsel, et al., Reliability Backstop Mechanism (Feb. 17, 2026), https://www.pjm.com/-/media/DotCom/committees-groups/workshops/rbpw/2026/20260217/20260217-item-02d--- reliability-backstop-mechanism-goals-principles-elements---md-pa-de-consumer-advocates---presentation.pdf.
PDF page 3
Honorable Debbie-Anne A. Reese, Secretary
February 23, 2026
Page 3 of 3
3
such a backstop procurement prior to the December 2026 Base Residual Auction for the 2029/2030 Delivery Year.
II. CONCLUSION
PJM pledges to keep the Commission informed of the timeline for submission of a filing to the Commission if changes to the current timeline become necessary. PJM appreciates the Commission and stakeholders’ dedication and understanding given the tight timelines and tasks ahead.
Respectfully submitted,
/s/ Daniel Vinnik
Craig Glazer
Vice President – Federal Government Policy
PJM Interconnection, L.L.C.
1200 G Street, N.W.
Suite 600
Washington, D.C. 20005
(202) 423-4743
Craig.Glazer@pjm.com
Daniel Vinnik
Counsel
PJM Interconnection, L.L.C.
2750 Monroe Boulevard
Audubon, PA* 19403
*(Licensed in the District of
Columbia and Illinois)
(267) 858-9451
Daniel.Vinnik@pjm.com
On behalf of
PJM Interconnection, L.L.C.
PDF page 4
CERTIFICATE OF SERVICE
I hereby certify that I have this 23rd day of February, 2026 caused a copy of the foregoing document to be served upon each person designated on the official service lists compiled by the Secretary in this proceeding.
/s/ Daniel Vinnik
Daniel Vinnik
Counsel
PJM Interconnection, L.L.C.
2750 Monroe Boulevard
Audubon, PA 19403
(267) 858-9451
Daniel.Vinnik@pjm.com