Motion for Leave to Answer and Answer of Geronimo Power, LLC in response to the reply briefs filed by PJM Interconnection, L.L.C. et al
PDF page 1
1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
Interconnection of Large Loads to the
Interstate Transmission System
Constellation Energy Generation, LLC
v. PJM Interconnection, L.L.C.
)
)
)
)
)
)
)
)
)
)
)
Docket Nos. EL25-49-000
EL25-49-001
Docket No. AD24-11-000
Docket No. EL25-20-000
(Consolidated)
MOTION FOR LEAVE TO ANSWER AND ANSWER OF
GERONIMO POWER, LLC
Pursuant to Rules 212 and 213 of the Federal Energy Regulatory Commission’s (“FERC”
or “Commission”) Rules of Practice and Procedure,1 Geronimo Power, LLC (“Geronimo Power”)
hereby files this answer2 in response to the reply briefs filed by PJM Interconnection, L.L.C. (“PJM”)3 and the PJM Transmission Owners4 in the above-captioned proceedings.
1 18 C.F.R. §§ 385.212 and 385.213.2 Rule 213(a)(3) allows for an answer to be submitted to “any pleading, if not prohibited under paragraph (a)(2) of this section.” 18 C.F.R. § 385.213(a)(3). Paragraph (a)(2) does not prohibit answers to briefs or reply briefs. Nevertheless, out of an abundance of caution, Geronimo Power moves for leave to file this answer. The Commission has accepted answers in the past when they have (i) assisted the Commission in understanding the issues presented,
(ii) provided additional information for the Commission’s decision-making process, and (iii) helped ensure an accurate record. See, e.g., PJM Interconnection, L.L.C., 181 FERC ¶ 61,162, at P 29 (2022); Canal Generating LLC, 181 FERC ¶ 61,157, at P 14 (2022); Equitrans, L.P., 134 FERC ¶ 61,250, at P 6 (2011); Cal. Indep. Sys. Operator Corp., 132 FERC ¶ 61,023, at P 16 (2010). In this proceeding, Geronimo Power’s answer will help the Commission understand the issues presented in this proceeding and provide further information to inform the Commission’s decision-making process. Geronimo Power therefore respectfully requests leave to file this answer to the extent the Commission deems such leave is necessary and requests that the Commission consider this answer in its deliberations in this proceeding.
3 PJM Interconnection, L.L.C., et al., Docket Nos. EL25-49-000, et al., Reply Brief of PJM Interconnection, L.L.C. (April 24, 2026) (“PJM Reply”).4 PJM Interconnection, L.L.C., et al., Docket Nos. EL25-49-000, et al., Reply Brief of the Indicated PJM Transmission Owners (April 24, 2026) (“PJM TO Reply”).
PDF page 2
2
I. ANSWER
At the heart of the Commission’s Show Cause Order5 lies a recognition that the current paradigm for serving large loads in PJM is not sufficiently flexible to accommodate the growth of hyperscale data centers and other large load customers that are essential for the nation’s economic prosperity, national security, and global competitiveness. As the Show Cause Order explained, the current framework for serving large loads within PJM requires that large loads that “are willing and able to limit their energy withdrawals from the transmission system” nevertheless pay for “costly and inefficient transmission system buildout that may not be necessary” to serve them.6 And because, as stated by Commissioner Rosner in his concurrence to the Show Cause Order, it “has become persistently difficult and increasingly expensive to build new grid infrastructure in this country,”7 large loads are simply unable to timely obtain service even if they are willing to pay for transmission system upgrades.
The Commission sought to remedy this situation by ordering PJM to adopt three new transmission services—Interim Network Integration Transmission Service (“NITS”), Firm Contact Demand, and Non-Firm Contract Demand—that would reflect that certain large loads which co-locate with generation resources are able and willing to limit their reliance on the PJM transmission system.8 But the positions taken by PJM and the PJM Transmission Owners in their briefs filed in this proceeding regarding how these new transmission services will be implemented
5 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (“Show Cause Order”).6 Show Cause Order at P 177. See also id. at P 199 (“Requiring this could necessitate inefficient and costly transmission buildout and costs paid by transmission customers that may not be necessary if Eligible Customers taking transmission service on behalf of Co-Located Loads are willing to limit their energy withdrawals and take a transmission service that requires fewer Network Upgrades to provide.”). 7 Id. (Comm’r Rosner, concurring at P 3).8 Id. at P 177 (“[W]e also find that PJM’s Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.”).
PDF page 3
3
will, if adopted, have the effect of preserving the status quo in PJM. More specifically, certain rates, terms, and conditions proposed by PJM and the PJM Transmission Owners associated with these new transmission services will effectively limit the ability of large load customers to take transmission service that reflects their actual grid usage, disincentivize large loads from entering into flexible co-location arrangements that minimize their impact on the grid, delay the timeline for large loads to obtain the service they require, and lead to inefficient transmission build out. Geronimo Power urges the Commission to reject any rates, terms, and conditions proposed by PJM or the PJM Transmission Owners that unnecessarily limit the flexibility of large loads to co-locate and take transmission service based on their actual use of the grid consistent with the Show Cause Order. Geronimo Power files this answer to highlight the positions of PJM and the PJM Transmission Owners that are inconsistent with the flexibility the Show Cause Order envisioned and, if adopted, would be most detrimental to the Commission’s efforts to ensure that large loads can be served efficiently, reliably, and on a timeline that ensures the U.S. does not fall behind in the industries of the future.
A. The Commission Should Reject PJM’s And The PJM Transmission Owners’
Proposals To Restrict Non-Firm Contract Demand Transmission Service To
Outages
In its Reply, PJM doubles down on its view that Non-Firm Contract Demand transmission service should be limited to when a generation facility is on “outage or temporary derate conditions…”9 The PJM Transmission Owners take this one step further by saying that Non-Firm Contract Demand transmission service should only be available “when a generator is offline due to a breakdown or maintenance issues” and should “not cover other instances when a generator is not operating, such as when intermittent generation resources are unable to produce; when a co-
9 PJM Reply at 7.
PDF page 4
4
located battery has depleted its available energy; or when a natural gas generator is unable to secure fuel.”10 These proposed restrictions on Non-Firm Contract Demand transmission service are inconsistent with the requirements of the Show Cause Order, will unnecessarily restrict the ability of large loads to co-locate, and should be rejected by the Commission.
As an initial matter, restricting Non-Firm Contract Demand transmission service to when a co-located generation facility is on outage is inconsistent with the requirements of the Show Cause Order. In the Show Cause Order, the Commission explained that “not all Co-Located Loads will necessarily plan to withdraw energy from the transmission system on a regular basis” and thus Non-Firm Contract Demand transmission service should be available for when such loads “seek to withdraw energy from the transmission system from time to time when transmission capacity is available and not needed by firm customers.”11 Moreover, the Commission indicated that Non- Firm Contract Demand transmission service should “be available only when there is available transmission capacity, similar to existing non-firm transmission service options in the Tariff … for terms ranging from one hour to one month…”12 The Commission in no way suggested that it would be appropriate to limit the availability of Non-Firm Contract Demand transmission service to times when co-located resources are on outage.
PJM’s and the PJM Transmission’s Owners’ proposals to restrict Non-Firm Contract Demand transmission service to when a co-located resource is on outage ignores the requirements for this service outlined in the Show Cause Order. Rather than making Non-Firm Contract Demand transmission service available for co-located loads at any time when transmission capacity is available, PJM has proposed unnecessary restrictions that will limit co-located load
10 PJM TO Reply at 6.11 Show Cause Order at P 214. 12 Id. at P 215.
PDF page 5
5
from relying on the grid even when excess grid capacity is available to serve them. This is not the flexibility that the Show Cause Order envisioned that Non-Firm Contract Demand transmission service would provide.
The restrictions imposed by PJM and the PJM Transmission Owners on Non-Firm Contract Demand transmission service would fundamentally undermine a key benefit of co-location. Specifically, a primary reason that large loads are considering co-location is so that they can reduce their impact on the grid and, in turn, obtain speed to power on a timeline that traditional utilities are increasingly proving unable to accommodate. Large loads’ efforts to reduce their impact on the grid through co-location may take on a variety of forms, including the use of intermittent resources paired with natural gas or battery energy storage or reducing their load (i.e., curtailing) at times of high demand when non-firm service is unavailable.
For example, a solar and battery hybrid facility or natural gas generator may have the ability to meet the needs of co-located load in all but a limited set of hours during a year (e.g., due to unexpected natural gas supply interruptions). Non-Firm Contract Demand transmission service was intended to provide such a customer the option to obtain transmission service on an as- available basis to meet its load during those limited instances where the onsite generation resource is unavailable to meet its demand (subject to an obligation to curtail if transmission service is unavailable).
Yet, under PJM and the PJM Transmission Owner’s proposal, co-located load effectively would have no alternative to taking NITS or Firm Contract Demand transmission service for its entire demand to ensure that it is able to obtain service during the limited handful of hours when the generation resource is unavailable for reasons other than a “breakdown or maintenance
PDF page 6
6
issues.”13 In effect, PJM and the PJM Transmission Owners’ proposal would force a co-located load that is able to meet its own demand in all but a handful of hours to be studied as if it is planning to rely exclusively on the grid to serve its needs. Inevitably, these studies will lead to the conclusion that accommodating these loads requires the construction of costly new transmission upgrades—upgrades that would be avoided if the customer is given the flexibility to take non-firm service during the limited periods when the onsite generation is unavailable.
PJM and the PJM Transmission Owners’ primary rationale for imposing this restriction appears to be that making Non-Firm Contract Demand transmission service more broadly available poses reliability concerns since the PJM system has not been planned to accommodate this load.14 But this misses the entire point of this service. In the Show Cause Order the Commission made clear that Non-Firm Contract Demand transmission service “would be available only when there is available transmission capacity” and that co-located loads using such service “would not be considered for resource adequacy planning purposes.”15 When transmission capacity is not available, large loads relying on Non-Firm Contract Demand transmission service will be curtailed.16 PJM thus does not need to expand its transmission system or otherwise change its operations to accommodate this load; it merely needs to allow such load to take transmission service when it is available, as PJM itself acknowledges.17 If transmission service is unavailable
13 PJM TO Reply at 6.14 Id. at 9-10; PJM TO Reply at 4-5 (“Limiting the use of Non-Firm Contract Demand Service is also necessary to ensure the reliable operation of the PJM transmission system, especially because PJM and the PJM Transmission Owners will be relying on increased uses of Special Protection Schemes (‘SPS’), Remedial Action Schemes (‘RAS’), and other control technologies and protective systems to ensure that on-site load that is not being planned from a transmission expansion or capacity standpoint can be operated reliably.”).15 Show Cause Order at PP 215, 218.16 Id. at P 215 (“We find that the new Non-Firm Contract Demand transmission service must be available during normal operations and curtailed during emergency operations (i.e., it will be curtailed before existing firm transmission services and the new Firm Contract Demand Transmission Service).”).17 PJM Reply at 10 (“The ability of the system to accommodate this service will depend on the system conditions at the time of the request and any constraints that may arise regarding energy and reliability. For energy,
PDF page 7
7
during particular periods, then the customer will be forced to curtail. If the system conditions that impose reliability risks arise, PJM can refuse to accommodate requests for this non-firm service. And to the extent that accommodating this service would require PJM to make changes to its markets and operations systems as PJM claims,18 that should not be a barrier to providing co- located loads the flexibility the Commission required of PJM in the Show Cause Order. The effect of PJM and PJM Transmission Owners’ proposal will be to severely limit co- location opportunities in PJM. Large loads will either need to co-locate with a resource that can be called upon at all times (other than when on outage) even when there is excess grid capacity to serve them or take NITS or Firm Contract Demand transmission service that will result in the same inefficient, timely, and costly grid build out that undermines speed to power efforts that the Show Cause Order sought to avoid. The Commission should not allow PJM and the PJM Transmission Owners to prolong the status quo in PJM by depriving large loads of the flexibility the Show Cause Order was clearly intended to afford.
B. The PJM Transmission Owners Have Not Demonstrated That Charging The
Same Rate For Non-Firm Contract Demand Transmission Service As Firm
Transmission Service Is Just And Reasonable
No party in this proceeding disputes that Non-Firm Contract Demand transmission service is a lesser service than NITS or Firm Contract Demand transmission service. Non-Firm Contract Demand transmission service can be taken only on an as-available basis and is subject to curtailment before NITS or Firm Contract Demand transmission service. Yet despite the fact that Non-Firm Contact Demand transmission service is indisputably an inferior service, the PJM
the Co-Located Generating Facility’s outage may coincide with high demand conditions on the Transmission System or where system conditions otherwise (e.g., seasonal outages) may not allow such transmission service or energy to be offered reliably.”).
18 Id. (“In Essence, Non-Firm Contract Demand Transmission Service is intended to provide whatever level of service the Transmission System can reliably accommodate at that snapshot in time without any advanced planning for transmission or capacity.”).
PDF page 8
8
Transmission Owners have proposed to apply the same rate they charge for NITS and Firm Contract Demand transmission service to Non-Firm Contract Demand transmission service. The PJM Transmission Owners’ proposal is unjust and unreasonable, will disincentivize co-located loads from relying on Non-Firm Contract Demand transmission service, and lead to less efficient use of the transmission system.
Neither the PJM Transmission Owners nor any other party to this proceeding have provided a reasonable basis for the Commission to conclude that it is just and reasonable to apply the same NITS or Firm Contract Demand transmission service rate to Non-Firm Contract Demand transmission service. The PJM Transmission Owners have instead simply restated their flawed initial rationales for charging the same rate for an inferior service. For example, the PJM Transmission Owners explain that it would be inappropriate for them to apply the non-firm point- to-point transmission rate to Non-Firm Contract Demand transmission service because such service is “demonstrably superior” to non-firm point-to-point transmission service.19 But as Geronimo Power explained in its Response,20 the question before the Commission is not whether the PJM Transmission Owners should charge the non-firm point-to-point transmission rate for Non-Firm Contract Demand transmission service. The question is what is a just and reasonable rate for Non-Firm Contract Demand transmission service. The PJM Transmission Owners have offered no meaningful response to this question.
The PJM Transmission Owners also reiterate that Commission policy allows them to charge up to the same rate they charge for firm transmission service and that such rate is justified until they “gather data on how Non-Firm Contract Demand Service customers are utilizing the
19 Id. at 19.20 PJM Interconnection, L.L.C., Docket Nos. EL25-49-000, et al., Response Brief of Geronimo Power, LLC at 7 (Mar. 25, 2026) (“Geronimo Response”).
PDF page 9
9
service, taking into account the intended purpose of the service, and the effect of that utilization on the system.”21 But, as Geronimo Power noted in its Response,22 the mere fact that Commission policy allows the PJM Transmission Owners to charge up to the firm rate in some cases, does not mean that doing so here is just and reasonable. And the Commission itself has acknowledged that rates for non-firm service generally should be lower than the rates for firm service.23 The PJM Transmission Owners have provided no independent basis for the Commission to conclude it is just and reasonable to charge the same rate for Non-Firm Contract Demand transmission service as they charge for NITS and Firm Contract Demand transmission service.
Moreover, while the PJM Transmission Owners claim that “it is far from certain what upgrades may be required for Non-Firm Contract Demand Service customers” and thus assert that they cannot yet determine the appropriate discount they should provide to Non-Firm Contract Demand transmission customers,24 there should be little doubt that some form of discount must be applied. This is particularly true given that the Non-Firm Contract Demand transmission service the Show Cause Order contemplates is required to be offered only when the PJM system is capable of accommodating such service. Because Non-Firm Contract Demand transmission service is offered on an as-available basis the extent to which network upgrades are required for Non-Firm Contract Demand transmission service—to the extent any are required at all—should be minimal (assuming that reasonable study assumptions are applied).2521 PJM TO Reply at 20.22 Geronimo Response at 7.23 Id. (citing Transmission Access Policy Study Group v. FERC, 225 F.3d 667, 731 (D.C. Cir. 2000); Northeast Utils. Serv. Co., 57 FERC ¶ 61,340, 62103 (1991) (“A non-firm rate is generally lower than a firm rate to reflect the nature of the interruptible wheeling service.”)).24 PJM TO Reply at 20.25 Geronimo Power recognizes that the extent to which Non-Firm Contract Demand transmission service may be accommodated without network upgrades will likely depend on how the co-located loads taking this service are studied. For instance, there could be scenarios where overly conservative study assumptions result in network
PDF page 10
10
C. The PJM Transmission Owners Have Not Demonstrated That Their Proposed
Grid Reliance Charge Is Just And Reasonable And Consistent With Cost
Causation Requirements
Geronimo Power does not oppose the concept of a Grid Reliance Charge. Indeed, despite
accusations to the contrary by the PJM Transmission Owners,26 Geronimo Power made clear in its Response that “it may be appropriate to impose certain charges on co-located load for
demonstrated costs they cause and benefits that accrue to them” but maintained that any such charge must be based on co-located loads’ actual impact on the grid and the transmission services they receive consistent with the Federal Power Act’s (“FPA”) cost causation requirements.27 The PJM Transmission Owners’ Initial Brief neither demonstrated that a Grid Reliance Charge is
necessary in this case nor that their proposed Grid Reliance Charge accurately reflects co-located loads’ actual grid impact or the transmission service they will receive. And the PJM Transmission Owners’ Reply fairs no better. The PJM Transmission Owners instead simply reiterate two of
their three flawed rationales for applying a Grid Reliance Charge that would currently be 25.8% of a transmission owners’ annual transmission revenue requirement to all co-located load relying on onsite generation.
upgrades being triggered to accommodate a request for Non-Firm Contract Demand transmission service. But such study scenarios would likely be based on unnecessarily conservative study assumptions regarding the level of service requested (e.g., an assumption that a co-located load would take this service 95% of the time) that do not reflect how this type of service is likely to be taken nor align with the level of service directed by the Commission for Non-Firm Contract Demand transmission service. Such conservative study assumptions for Non-Firm Contract Demand transmission service are neither required nor appropriate. Rather, they would result in unnecessary network upgrades and inefficient system planning that would discourage parties from entering into flexible co-location arrangements that rely on Non-Firm Contract Demand transmission service and ultimately undermine the Commission’s goal of providing alternative speed to power options for large loads while mitigating grid impacts. The Commission should require PJM and the PJM Transmission Owners to clearly articulate their approach to studying large loads requesting Non-Firm Contract Demand transmission service so that it can determine whether the network upgrades PJM and the PJM Transmission Owners claim Non-Firm Contract Demand transmission service will cause are not the mere result of unrealistic study assumptions.
26 PJM TO Reply at 22 (“Vistra and Geronimo are the only two parties that suggest no Grid Reliance Charge is necessary.”).27 Geronimo Response at 9-10.
PDF page 11
11
First, the PJM Transmission Owners restate their position that the delivery of black start and regulation services justify their proposed Grid Reliance Charge because these services “provide no value without the ability to access the transmission system to obtain them.”28 But the fact that these services provide no value to load that is not interconnected to the transmission system does not mean that there is a delivery cost associated with the provision of these services. Indeed, as Geronimo Power explained in its Response, neither black start nor regulation service include a delivery component and the PJM Transmission Owners have not sought to impose such delivery charge on other transmission customers.29 The PJM Transmission Owners’ proposal to assess a charge for the delivery of black start and regulation service when other customers are not required to pay a separate delivery charge is unjust, unreasonable, and unduly discriminatory and preferential.
The Northern Virginia Electric Cooperative, Inc. (“NOVEC”) attempts to justify the PJM Transmission Owners’ proposal by noting that although “the current formula for Black Start Service does not include a delivery component,” that “simply reflects the fact that all load besides Co-Located Load in PJM would otherwise cover the cost of transmission service required for Black Start Service.”30 NOVEC overlooks, however, that co-located loads taking Non-Firm Contract Demand transmission service also will contribute to grid costs through the charges that they pay for this service. Additionally, PJM has proposed to assess co-located load charges for black start and regulation service on a gross basis.31 It is thus unclear why co-located load should
28 PJM TO Reply at 23.29 Geronimo Response at 12-14.30 PJM Interconnection, L.L.C. et al., Docket Nos. EL25-49-000, et al., Reply of Northern Virginia Electric Cooperative, Inc. to Responses to Initial Brief of PJM Interconnection, L.L.C. and to Initial Brief and Joint Responses of the Indicated PJM Transmission Owners to Paper Hearing Questions at 18-19 (April 24, 2026).31 PJM Interconnection, L.L.C., et al., Docket Nos. EL25-49-000, et al., Initial Brief of PJM Interconnection, L.L.C. at 27 (Feb. 23, 2026).
PDF page 12
12
have to pay for black start and regulation service as all other transmission customers do and pay a separate delivery charge for these services that is not assessed to any other customers. Second, the PJM Transmission Owners also reiterate their claim that being connected to the grid provides co-located load with “obvious benefits” which they explain include “frequency support, inertia, voltage stability, fault current capability, ride-through and protections coordination, and providing sufficient short-circuit capability.”32 But the PJM Transmission Owners have not demonstrated that these benefits will accrue to the same degree for co-located load that is being primarily supplied by onsite generation. And there is no evidence in this proceeding that these benefits alone justify applying a charge that is based on the percentage of transmission depreciation and operations and maintenance expense of a transmission owner’s annual transmission revenue requirement (currently 25.8%) to all co-located load relying on onsite generation.33
Applying a Grid Reliance Charge to all co-located loads that bears no relationship to their impact on the grid and the services they receive is not only inconsistent with the FPA, but will discourage co-location arrangements. While large loads are prepared to pay their fair share of grid charges and certain large loads may even be willing to pay more if it can accelerate their timeline to service, imposing a Grid Reliance Charge that is not reflective of the benefits co-located loads receive will disincentivize co-location arrangements. Requiring customers that make significant investments to bring their own co-located resource online to also pay a Grid Reliance Charge that is over a quarter of PJM transmission owners’ annual revenue requirement and for which they do not receive a corresponding benefit could render the co-location calculus uneconomic for many
32 PJM TO Reply at 22.33 Id. at 27-28.
PDF page 13
13
large loads. Indeed, a charge that is divorced from the benefits co-located load receives may incentivize these loads to simply elect NITS or Firm Contract Demand transmission service if there is no cost difference between those services and the Non-Firm Contract Demand option, which, in turn, undermines the goal of supporting the timely interconnection of large loads and will lead to inefficient and unnecessary grid build out. The Commission should decline to allow the PJM Transmission Owners to impose any form of Grid Reliance Charge on co-located load until they demonstrate that such charge is necessary, consistent with the FPA’s cost causation requirements, and will not disincentivize large loads to co-locate.
II. CONCLUSION
Geronimo Power respectfully requests that the Commission issue an order consistent with its filings in these proceedings.
Respectfully submitted,
/s/ Stephen J. Hug
Matthew Morais
Senior Director, Policy
Kurt Rempe
Assistant General Counsel
GERONIMO POWER, LLC
8400 Normandale Lake Blvd., Ste. 1200
Bloomington, MN 55437
mmorais@geronimopower.com
krempe@geronimopowre.com
Stephen J. Hug
Ben N. Reiter
AKIN GUMP STRAUSS HAUER & FELD LLP
2001 K Street, N.W.
Washington, D.C. 20006
Tel: (202) 887-4084
shug@akingump.com
breiter@akingump.com
On behalf of Geronimo Power
Dated: May 21, 2026
PDF page 14
CERTIFICATE OF SERVICE
I hereby certify that I have caused the foregoing document to be served upon the individuals designated on the Commission’s official service list for this proceeding.
Dated at Washington, D.C., this 21st day of May 2026.
/s/ Stephen J. Hug
Stephen J. Hug
AKIN GUMP STRAUSS HAUER & FELD LLP
2001 K Street, N.W.
Washington, D.C. 20006
(202) 887-4084