Pre-filed Statement of Susan Bruce, Counsel for PJM Industrial Customer Coalition, for the PJM Governance and Stakeholder Reforms Technical Conference
PDF page 1
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
PJM Governance and Stakeholder Reforms
:
Docket No. AD26-7-000
PRE-FILED STATEMENT OF SUSAN BRUCE, COUNSEL TO
PJM INDUSTRIAL CUSTOMER COALITION
On behalf of PJM Industrial Customer Coalition (PJMICC), I am privileged to offer this Pre-Filed Statement on PJM Governance and Stakeholder Reforms. As discussed in more detail below, PJMICC is an ad-hoc coalition of a broad cross-section of energy-intensive manufacturers (e.g., steel, cement, consumer products, pharmaceuticals, and paper) and institutional customers (e.g., hospitals and universities) doing business in PJM Interconnection, L.L.C. (“PJM”). PJMICC members represent major employers in the PJM region and support the regional and national economy. Thank you for the opportunity to address the Commission on these important issues.
On behalf of PJMICC, my colleagues at McNees and I have directly participated in the PJM stakeholder process for more than 25 years and have witnessed the evolution of PJM’s governance, including both formal processes and informal practices. PJMICC members' businesses depend on a reliable energy supply, competitive energy costs, and options to manage their energy cost exposure through various demand response tools. For that reason, members of PJMICC were the original participants of the PJM End-Use Customer Sector because they recognized that, for energy-intensive manufacturers and institutional customers, wholesale energy costs account for the majority of their retail electric costs. Reliable, competitive pricing is essential to PJMICC members' ability to remain economically viable in the PJM region, especially as other areas of the country, if not the world, use energy as an economic development tool.
For context on PJMICC’s interests in the PJM stakeholder process, PJMICC engages in the PJM stakeholder process in an effort to support “just and reasonable rates” by addressing:
Concerns regarding PJM administrative interventions that affect energy prices; Approaches to ensure system reliability at the lowest possible reasonable cost; The importance of following the principles of cost causation;
The need to address the potential for market power exercise;
The value of independent planning; and
Demand response as a tool for energy-intensive customers to manage their energy costs.
PDF page 2
2
PJMICC has strongly supported PJM, even when it may have disagreed with aspects of PJM markets, operations, and planning, because of the value that PJMICC members derive from a broad and diverse market with shared reserves.
In this Pre-Filed Statement, I set forth PJMICC’s view on the governance challenges within PJM and offer five targeted reforms: retail-impact accountability in PJM’s mission and decision- making, enhanced Board independence and transparency, lower-committee voting discipline, CBIR process discipline, and more useful tools for time-sensitive issues.
I. Background
While PJM's markets, operations, and planning function at the wholesale level, PJM’s governance structure must appropriately recognize that end-use customers are the ultimate beneficiaries of the energy, transmission, and reliability services offered within the PJM region. Retail customers bear the ultimate cost of the construct, either directly or indirectly. Industrial and commercial end-use customers represent roughly half of all market activity in the PJM region and have invested billions of dollars in the region in reliance on stable, well-functioning markets. Electricity is an essential service marked by endemic market power concerns, which is precisely why a sound, balanced governance structure matters.
Let me state PJMICC’s overarching position plainly: we support fundamental aspects of PJM’s existing governance structure, especially its sector-weighted voting foundation. PJM’s framers instituted important checks and balances that, when properly implemented, strive toward consensus-building and compromise and, when necessary, independent PJM Board action. Widespread stakeholder support for PJM’s market rules—including by retail customers— minimizes litigation before this Commission and the courts, builds market confidence and stability, and supports the prospect for legally durable outcomes.
That is not to suggest that the PJM governance structure and stakeholder process are perfect; they are not. Important reforms are necessary to improve the effectiveness of PJM governance and the stakeholder process itself, which has become unduly time- and resource- intensive without yielding commensurate benefits. However, constructive reform of the existing framework must maintain the benefits of a broad regional market and a liquid, functional energy market. From the vantage point of PJMICC, it is important to focus first on reforms that improve confidence in PJM’s independence and accountability: both public confidence in PJM market outcomes and investor confidence in the value of investing in the PJM footprint, whether in terms of necessary resource infrastructure or energy-intensive customers’ investment in the region.
Since PJM’s inception—and in small measure due to the success of FERC’s and states’ policies promoting open access and competition—there has been a marked change in the energy
PDF page 3
3
landscape, with retail customers now able to control how they produce and purchase energy, including through competitive suppliers. Working through wholesale Curtailment Service Providers, PJMICC members and others have offered demand response capability to the PJM capacity, energy, and ancillary service markets. Energy-intensive customers may elect behind-the- meter applications to help manage their energy costs. Fuel cells and batteries have become part of industrial customers’ plans. Many energy-intensive customers have entered into bilateral agreements to support renewable energy development to reach their own corporate sustainability goals. Even residential customers have become linked to PJM wholesale markets through rooftop solar and other similar applications, where they may receive LMP energy payments under state programs. FERC’s Order No. 2222 has continued to push for distributed energy resource engagement.1 As a result, the 21st-century modern grid looks very different from the wholesale grid when PJM became a Regional Transmission Organization (“RTO”). Even before the “new” large computation loads – which dwarf most, if not all, industrial applications – the lines were becoming blurry between retail and wholesale jurisdiction.
Notwithstanding PJM’s role as a FERC-jurisdictional utility, even putting aside the latest issues with Large Load integration, PJM’s interface with states has been growing. Now, states that may have been willing to defer certain responsibilities to PJM may be unwilling to continue to do so. However, neither PJM nor individual states can succeed on their own. And each state has interests that may diverge from those of others. Put simply, the region is experiencing a living, breathing exercise in cooperative federalism. Yet, the current framework is limited. For many reasons, including murky jurisdictional boundaries, the current framework for engagement has not facilitated the robust coordination required between PJM and the states. Even more concerning, it lacks open, transparent discussions with all affected stakeholders about these challenges, which could lead to real problem-solving.
PJM Members have entrusted the PJM Board with the authority to act independently to operate markets, plan the system, and perform other functions. But success requires genuine independence. It requires independence from the PJM Transmission Owners that “gave birth” to PJM; it requires independence from the generators of the energy that is forecasted to be in short supply in the face of unprecedented load growth; it requires independence from customers who are concerned that the price tag to do what may need to be done to support abundant energy supply is too much for customers of any size or type to bear.
Building on those themes, PJMICC recommends five focused changes to PJM’s
governance and stakeholder process.
1 Participation of Distributed Energy Res. Aggregations in Mkts. Operated by Reg’l Transmission Orgs. & Indep. Sys. Operators, Order No. 2222, 172 FERC ¶ 61,247 (2020), order on reh’g, Order No. 2222-A, 174 FERC ¶ 61,197, order on reh’g, Order No. 2222-B, 175 FERC ¶ 61,227 (2021).
PDF page 4
4
First, PJM should modify its Operating Agreement (“PJM OA”) to require express
consideration of the retail-customer impacts of PJM’s wholesale markets, planning, and operations. This consideration should include cost modeling and cost-benefit analysis, including the cost implications of administrative interventions into PJM markets, and should account for impacts on existing bilateral arrangements between suppliers and retail customers. This change would signal that PJM’s responsibilities must be understood through the practical effects of its wholesale actions on retail customers, particularly in a modern grid where demand response, distributed resources, and shared responsibility for resource adequacy have blurred traditional jurisdictional lines.
To facilitate this analysis of impacts on retail customers, PJMICC also supports the PJM Board qualifications and experience set forth in the OA be expanded to include a Board Member with experience in managing significant energy budgets as a consumer, in addition to currently- established qualifications and experience.2 This change should be memorialized within the PJM OA.
These changes to the OA would complement any action to incorporate states into the PJM governance or stakeholder process in an enhanced way. Without more information about states’ preferred role, PJMICC does not take a specific position at this point on the appropriate rights each state, or the states collectively, should have in PJM governance. At a minimum, however, if a clearer role for states in PJM governance is being considered, it should be provided along with additional guidance on the distinct roles of FERC and the states under the Federal Power Act. Given today's pressing problems, a clear and common understanding of who represents the state's interests, how to give each state a unique voice in the process, and when to relay state perspectives to the Board is vital.
Second, PJM should enhance Board independence and transparency. It is not
surprising that PJM Members struggle to reach consensus on significant “pocketbook” and cost- allocation issues. In these circumstances, the Board is entrusted to act independently. In so doing, given the stakes of these decisions, PJM Members, States, and all stakeholders must have confidence that the PJM Board has all relevant information and is making the hard decisions. The Board should not make decisions out of fear influenced by the threat that their decisions may affect their tenure in Board service. At the same time, there must be mechanisms to ensure both PJM accountability in general and Board accountability in particular.
2 “Of the nine Board Members, four shall have expertise and experience in the areas of corporate leadership at the senior management or board of directors level, or in the professional disciplines of finance or accounting, engineering, or utility laws and regulation, one shall have expertise and experience in the operation or concerns of transmission dependent utilities, one shall have expertise and experience in the operation or planning of transmission systems, and one shall have expertise and experience in the area of commercial markets and trading and associated risk management.” PJM OA, Section 7.2.
PDF page 5
5
The PJM Board’s decisions directly affect energy-intensive businesses' ability to compete within the United States and globally. While different stakeholder communities may not always agree with the Board’s decision, they must trust that the Board had all available facts, without varnish, and affected stakeholders must understand the basis for the Board’s independent actions. As such, we support requiring the Board to issue formal written justifications for its decisions, especially those that exceed certain monetary or risk thresholds. Such written justifications should include: (i) identification of the specific problem or need the decision addresses; (ii) explanation of the alternatives considered and the rationale for selecting the chosen approach; (iii) quantified cost-impact analysis, including the impact on retail markets and their customers; (iv) the success metrics by which the decision’s effectiveness will be evaluated; and (v) a commitment to post- implementation review at a defined interval. Open Board meetings may be a solution, as may enhanced transparency into PJM's corporate goals and the drivers of PJM staff compensation.
Third, PJM should address lower-committee voting practices that can hinder
innovation and defer customer concerns until too late in the process. Affiliate voting at lower- level committees can allow incumbent interests to shape the agenda before proposals receive sector-weighted review, which weakens early consideration of new technologies, new entrants, and customer impacts.
PJMICC supports leveling the playing field from the outset of the stakeholder process. As such, we propose that PJM and its Members reconsider the role of affiliate voting on lower-level committees and task forces. New technologies and entrants’ ideas struggle to secure the necessary support to advance their issues in the stakeholder process. Simply put, new entrants with few affiliates have little chance of making real progress in bringing their ideas to the Senior PJM Committees for sector-weighted consideration if their innovations affect incumbent market participants' revenue opportunities.
Moreover, customers’ voices in lower-level discussions are diluted, and as a result, customer concerns are rarely considered until discussion reaches upper-level committees. At this point, any customer concerns are wrongly viewed as a veto when, in fact, they should have been helping to shape solutions as the issues progressed through the committee structure.
Fourth, PJM should improve implementation of its consensus-based issue resolution (“CBIR”) process. CBIR remains a useful framework, but in practice the process too often becomes slowed by extended disputes over problem statements, issue charges, scope, and procedural gates before stakeholders can engage the merits.
For example, PJM, PJM Members, and stakeholders spend significant time following the CBIR process by identifying their respective interests with respect to an approved issue charge, but there is little consideration of cross-checking any proposals developed pursuant to the issue
PDF page 6
6
charge against those identified interests at the end of the process. This results in a decay in accountability. Also, given the siloed work efforts developed through CBIR, there is little opportunity to find common ground across market segments to address the “problem statement.” There is a risk of unintended consequences when stakeholders cannot consider the integrated energy system as a whole when numerous issues are “off limits.”
Fifth, PJM should use better tools to give the Board actionable information on time- sensitive issues. The Critical Issue Fast Path (“CIFP”) process has been open and transparent, but its votes on numerous divergent proposals often provide less useful guidance than targeted polling, written submissions, or structured Board questions designed to identify the most material areas of agreement and dispute.
In summary, PJMICC recommends five meaningful but incremental reforms that preserve
the stability of the PJM market platform while improving independence, accountability, transparency, and stakeholder efficiency. Energy investors, energy-intensive customers, including data centers, manufacturers, and institutional consumers, all depend on a stable market platform to make long-term commitments with confidence; accordingly, PJMICC urges the Commission to preserve market stability as a foundational value even as the region adapts to today’s resource adequacy challenges.
II. Response to Commission Questions
A. PJM Governance Mechanics – Board Authority, States’ Role, Filing Rights,
and Document Architecture
1. PJM Board Role
In responding to this question, PJMICC emphasizes the importance of the PJM Board being independent and having the right to submit to FERC any changes to PJM’s market and transmission planning rules that it believes are necessary, which the Board has the right to do, under Section 205 or 206 of the Federal Power Act, as appropriate.3 The PJM OA’s requirement that the Members Committee approve any change to the Operating Agreement in order for PJM to modify the PJM OA under Section 205 of the Federal Power Act does not detract from the Board’s essential role.43 See PJM OA, Section 7.7.4 “Except as provided by law or otherwise set forth herein, this Agreement, including any Schedule hereto, may be amended, or a new Schedule may be created, only upon: (i) submission of the proposed amendment to the PJM Board for its review and comments; (ii) approval of the amendment or new Schedule by the Members Committee, after consideration of the comments of the PJM Board, in accordance with Operating Agreement, section 8.4, or written agreement to an amendment of all Members not in default at the time the amendment is agreed upon; and (iii) approval and/or acceptance for filing of the amendment by FERC and any other regulatory body with jurisdiction thereof as may be required by law. If and as necessary, the Members Committee may file with FERC or other regulatory body of competent jurisdiction any amendment to this Agreement or to its Schedules or a new Schedule not filed by the Office of the Interconnection.” See OA, Section 18.6; see also PJM OA, Section 8.4.
PDF page 7
7
For the reasons explained below, PJMICC does not support the PJM Board's assumption of additional Section 205 rights. Fundamentally, Section 205 rights are about PJM’s burden of proof before this Commission when it files changes to PJM’s operative document. PJMICC’s position is that where there is no broad consensus from within PJM, heightened review by this Commission pursuant to Section 206 is appropriate.
Today, the PJM Board has unilateral Section 205 filing rights only with respect to its Reliability Assurance Agreement, which governs the PJM capacity construct, and certain aspects of the Open Access Transmission Tariff (“Tariff”) not otherwise reserved by the Transmission Owners.5 PJM does not possess Section 205 filing authority over the PJM OA, which governs the energy market, or transmission planning under the Tariff. Only upon PJM Members’ super- majority sector-weighted approval, does PJM have Section 205 rights over the PJM OA and Tariff (with respect to those sections for which the Transmission Owners have not reserved certain rights). Otherwise, PJM must submit any PJM OA or eligible Tariff change under Section 206 of the Federal Power Act.
The D.C. Circuit has called Sections 205 and 206 of the Federal Power Act "related but distinct."6 Whether rates are changed through Section 205 or Section 206, both "require that the rates charged by utilities subject to FERC's jurisdiction be just and reasonable."7 But, as the D.C. Circuit said recently, "they enforce that mandate differently.”8
Proceedings initiated under Section 206 have a heavier burden to meet than those initiated under Section 205. As explained by the courts, "In a section 205 proceeding, the utility is not required to show that a previous rate was unlawful."9 Rather, "FERC has construed its Section 205 authority as 'limited to an inquiry into whether the [proposed] rates ... are reasonable,' without regard to whether the rates are ‘more or less reasonable’ than other possible rate designs."10 The D.C. Circuit also stated, "We have described FERC's role under Section 205 as 'essentially passive and reactive'; so long as a utility's rates fit within the zone of reasonableness, FERC is obligated to approve them."115 Under PJM Tariff Section 9.1, Transmission Owners have exclusive, unilateral Section 205 rights with respect to transmission revenue requirements, transmission rate design, and Tariff provisions governing recovery of transmission-related costs. Individual Transmission Owners may file their own zonal revenue requirements. Transmission Owners must vote under the Combined Transmission Owners Agreement (“CTOA”) Section 8.5.1 to approve region-wide rate design changes.6 Md. Office of People's Couns. v. FERC, 164 F.4th 920, 923 (D.C. Cir. 2026) (citing FirstEnergy Serv. Co. v. FERC, 758 F.3d 346, 348 (D.C. Cir. 2014)).7 Id.8 Id.9 Emera Maine v. FERC, 854 F.3d 9, 21 (D.C. Cir. 2017).10 New York State Pub. Serv. Comm'n v. FERC, 104 F.4th 886, 894 (D.C. Cir. 2024) (quoting City of Bethany v. FERC, 727 F.2d 1131, 1136 (D.C. Cir. 1984)).11 Id. at 891 (citing Atl. City Elec. Co. v. FERC, 295 F.3d 1, 9–10 (D.C. Cir. 2002) (quoting City of Winnfield v. FERC, 744 F.2d 871, 876 (D.C. Cir. 1984) (Scalia, J.))).
PDF page 8
8
In contrast, under Section 206, FERC must "determine whether an existing rate is 'unjust, unreasonable, unduly discriminatory or preferential....'"12 "Only after having made the determination that the utility’s existing rate fails that test may FERC exercise its section 206 authority to impose a new rate."13 While Section 205 and Section 206 must both result in just and reasonable rates, courts have made clear that Section 206 has a higher burden, with its two-part analysis.
This statutory framework has direct implications for how Section 205 filing rights should be allocated within PJM's governance structure. Because Section 205 relieves the proponent of any burden to justify the unreasonableness of the status quo, the lighter burden is properly reserved for changes that already command broad support within the PJM Membership. In PJMICC’s view, broad stakeholder support serves as evidence that a proposed rule reflects a balanced consideration of competing interests and is more likely to produce durable, workable market outcomes. Where a rule change lacks such support, the heightened scrutiny of Section 206 is the appropriate check.
PJM's right to file under Section 205 of the FPA is a privilege. For this reasons, the privilege of filing under Section 205 should continue to require the moderating influence of sector- weighted supermajority support as evidence of a balanced proposal. If PJM Members do not widely support a rule change, enhanced FERC scrutiny under Section 206 of the Federal Power Act is appropriate, especially given the impacts on customers. The impact, however, transcends cost and includes whether the proposed changes are reasonably targeted to achieve the desired objective, whether they involve changes in market behavior or investment.
The practical consequences of unilateral Section 205 authority are evident in PJM's capacity construct—the one area where the Board already possesses such authority. The PJM capacity construct has generated sustained, recurring stakeholder concern and dissatisfaction. That observation suggests the challenges facing PJM’s governance may be more cultural and operational than structural or documentary. Notably, the non-capacity aspects of PJM's markets, where Section 205 rights require supermajority support, have not experienced comparable rule- revision churn.
PJMICC urges the Commission to preserve the existing balance rather than expand the Board's unilateral filing authority. If the PJM Board believes strongly that a proposed change is just and reasonable, it should have the confidence to pursue that change through the customary process, including filing such changes under Section 206 of the Federal Power Act, rather than seeking expanded unilateral filing rights.
12 Emera Maine at 21 (D.C. Cir. 2017) (quoting 16 U.S.C. § 824e(a)).13 Id. (citing Atl. City Elec. Co. v. FERC, 295 F.3d 1, 10 (D.C. Cir. 2002); Cities of Bethany v. FERC, 727 F.2d 1131, 1143 (D.C. Cir. 1984)) (emphasis in original).
PDF page 9
9
2. States’ and OPSI’s Interface with the Board
In PJMICC’s view, the states' role in PJM's governance is best exercised through structured consultation with the Board and the PJM Membership, rather than through an expanded or decisional role in PJM's stakeholder-driven, sector-weighted governance structure.
States' perspectives on PJM's markets and operations are necessarily informed by considerations that extend beyond wholesale market outcomes, including retail policy objectives and states' regulatory relationships with the utilities they oversee. PJMICC believes those considerations are best channeled through existing consultative mechanisms. OPSI already has the opportunity to meet privately with the PJM Board at OPSI’s annual meeting, and OPSI provides a standing report at each PJM Members Committee meeting. These existing channels offer a meaningful venue for candid dialogue between the states and the Board, reflect a sound foundation on which to build further engagement and can be built upon without any need for rule changes.
Should the Commission or PJM consider affording states a greater voice in governance, PJMICC would favor a framework centered on state public utility commissions and organized around consultation rather than a decisional role in PJM's governance process. In addition to OPSI’s current engagement (which is a strong base upon which to build), it is worth noting that state consumer advocate offices often exercise voting rights in the PJM End-Use Customer Sector. While not direct extensions of state authority, state consumer advocate offices are, in many cases, appointed and, in at least some cases, confirmed by instruments of the state. This is another vehicle in which states’ interests have been represented directly in PJM governance and stakeholder process.
At the same time, PJMICC recognizes that greater state engagement may yield meaningful benefits, particularly to the extent it strengthens states’ ability to help craft constructive, durable outcomes, especially given the cooperative federalism model. PJMICC would support formalizing OPSI's existing consultative access and expanding it to include individual states —for example, by establishing a recognized opportunity for states to address the Members Committee or the broader PJM membership in advance of a vote on matters of particular interest to states. Such consultative access should also include adequate time to address the Board on relevant issues being addressed in a CIFP-like stakeholder process. PJMICC views this approach as a constructive means of enhancing states' voice within PJM's governance structure while preserving the sector- weighted, stakeholder-driven framework that has long supported the effective functioning of PJM's markets.
PDF page 10
10
3. Governance Reforms for Accountability and Responsiveness
Especially during this time of unprecedented stress on PJM as the RTO, PJMICC supports building meaningful and enforceable accountability into PJM's governance. As discussed in the Introduction, PJMICC recommends that PJM engage in a comprehensive customer cost-impact assessment at the outset of any significant rule change and a clear statement of what the change is expected to cost or save customers, consistent with the PJM OA amendment PJMICC proposed above. Second, each significant rule change should include defined, measurable success metrics— articulated at the proposal stage—against which the rule’s performance can be objectively evaluated. Third, a structured after-the-fact review of whether the rule delivered its intended result, including with respect to its cost impact, should be required within a defined period (e.g., 18 to 24 months following implementation). If the results did not yield the intended results, PJM should be required to report publicly on the variance, identify contributing factors, and propose corrective action for stakeholder consideration.
Recent changes to the PJM capacity construct illustrate the risk of proceeding without such accountability. By way of a hypothetical example, if a change is represented by PJM as having minimal impact yet proves substantially more consequential once implemented, there should be accountability for that initial change and a willingness by PJM to address the inconsistency. For that reason, PJMICC would support building accountability mechanisms directly into any significant or fast-tracked rule changes — potentially including sunset or reversion features — so that a change in rules or market design failing to deliver its represented outcome within a defined period results in a defined consequence or a path back, rather than becoming permanently entrenched irrespective of its actual results.
4. Division of Section 205 Filing Rights
Through PJMICC’s members who are also members of PJM, PJMICC has valued having
a seat at the governance table through the Members Committee’s role in the PJM Section 205 approval process. To be clear, the End-Use Customer Sector, while representing customers that are ultimately responsible for all of the costs of the PJM market, only has 20% of the overall vote in sector-weighted voting. While a reasonable case could be made that customers should have more of a voice in sector-weighted voting, PJMICC supports maintaining the status quo and the balanced voting framework. As noted above, PJMICC does not support expanding PJM’s unilateral Section 205 filing authority—particularly absent any requirement that PJM consider customer rate impacts as part of its mission. We acknowledge that PJM Transmission Owners separately hold the exclusive right to file changes to their own transmission rates under Section 205.
PDF page 11
11
While the results of the PJM Board having Section 205 rights may be swifter, the attendant risks of such action are greater. As a threshold matter, PJM’s markets are undeniably complex, and PJM lacks visibility into how changes to those markets may affect, for example, load-serving entities and their customers. PJM rule changes directly impact the region’s energy-intensive manufacturers and may have far-reaching implications for their operations, opportunities to manage their energy costs through demand response, and reliability. In that same vein, PJM lacks visibility into LSEs’ contractual arrangements with their retail customers. Most retail supply contracts contain Change in Law provisions, allowing LSEs to pass through the impacts of FERC- approved rule changes. If End-Use Customers’ voice in the stakeholder process is muted by reduced voting rights, there is a risk that this important customer voice may be ignored.
Separately, any discussion of filing rights or PJM’s independence should be paired with commitments from Transmission Owners not to leverage threats of withdrawal from PJM as negotiating leverage. Recent appellate-level attention to RTO independence in the context of a PJM TO proposal to empower PJM with Section 205 rights stressed the importance of PJM independence.14
5. Governing Document Provisions That Impede Timely Decision-
Making
In our experience, as discussed above, the primary source of delay is less about the text of PJM’s governing documents and more about how PJM’s consensus-based issue resolution process (“CBIR”), which is set forth in Manual 34, is implemented. The CBIR process consumes enormous stakeholder time and resources. In this respect, all PJM stakeholders, including PJM Members, other stakeholders, and PJM itself, share responsibility for a constructive process. For example, the problem statement and issue charge process, which is a key part of the CBIR process, while well-intentioned and meant to define the scope of any stakeholder work effort, has become bloated and, at times, used to delay rather than advance substantive engagement. It also warrants emphasizing that the complexity of PJM’s market rules means that many issues implicate provisions across multiple governing documents, requiring significant education efforts before work efforts can meaningfully begin. This dynamic itself complicates and slows the pursuit of otherwise well-supported reforms.
14 See, e.g., PJM Transmission Owners v. Federal Energy Regulatory Commission, No. 25-1064 (D.C. Cir. June 5, 2026)(finding that “FERC reasonably determined that this provision is unjust and unreasonable because it gives the Transmission Owners undue influence over Tariff modifications. As an RTO, PJM must adopt ‘a decision making process that is independent of control by any market participant or class of participants.’ … FERC found that Sec. 7.0 would give the Transmission Owners ‘an exclusive opportunity to affect FPA section 205 filings PJM submits.’ … FERC’s determination was well supported by the record and Commission precedents, and therefore was not arbitrary and capricious.”).
PDF page 12
12
In addition, issues tend to be worked in a siloed fashion under the current process, which limits stakeholders’ ability to develop cross-cutting packages or compromises—the kind of horse- trading across related issues that used to occur more naturally. Stakeholders have previously reached a compromise across related but technically distinct issues — for example, agreeing to support one proposal in exchange for progress on a complementary reform. The current siloed structure of the PJM stakeholder process makes this kind of cross-issue accommodation far more difficult to achieve. The siloed approach also makes it harder to determine whether the stakeholder process is meant to build consensus, to generate information for PJM’s independent decision- making, or both.
PJMICC recommends that PJM, in consultation with its Members and stakeholders, strengthen the structure and discipline of the CBIR process to ensure discussions remain focused and productive. This would include creating a defined metric for success, and a mechanism for after-the-fact accountability. At the same time, the process should allow more flexibility to consider related issues together where appropriate. In PJMICC’s experience, this provides more opportunity to create mutual gains, an important underpinning of the CBIR process.
Also, as discussed below, delays may be attributable to the practice that lower-level committees allow affiliate voting, whereas the senior committees (i.e., the Markets and Reliability Committee and Members Committee) use sector-weighted voting. There is a structural inefficiency in the lower-level committees' setup: a vote that is generally doomed to fail when a more balanced voting approach is used, which better reflects the votes of wholesale and retail customers. This dynamic can be resolved and more durable outcomes developed if the lower-level committees were to model the same voting approach as the senior committees, even if on an advisory basis to help discern whether proposals may garner supermajority, sector-weighted support.
PJMICC's observations here apply equally to the stakeholder-process-specific questions addressed in Panel 2 below.
6. Lessons from Other RTO/ISO Governance Structures
PJM’s stakeholder process provides arguably the most extensive customer participation of any RTO or ISO. That is a distinction worth preserving, not diminishing. PJMICC has participated in PJM governance for roughly 30 years; PJMICC has long understood the need for a seat at the table to protect the interests of energy-intensive customers.
PJMICC is cautious about wholesale importation of other regions’ governance models, particularly proposals that would reduce RTO independence or dilute member and stakeholder checks on the Board. PJMICC would rather see PJM build on its own comparatively strong record
PDF page 13
13
of multi-sector engagement than adopt structures from regions with less robust customer participation.
B. PJM Stakeholder Process – Design, Transparency, and Decision-making
1. Sector-Weighted Voting and Voting Thresholds
PJMICC’s answer is: yes, sector-weighted voting strikes the right balance—but the implementation is imperfect. Sector-weighted voting works because it requires broad buy-in from both supply and demand interests before a proposal receives the requisite support to enable PJM to file a change to the PJM OA or to certain provisions of the Tariff under Section 205. It is not an unanimity requirement, but it demands meaningful support from each market segment. Most proposals pass by broad acclamation. Generally speaking, only the most contentious proposals do not receive super-majority support. It is in precisely these instances that Section 206’s more searching review is warranted. The structure also protects PJM’s markets and reliability against perceived or real favoritism.
Because customer purchases account for roughly half of all market activity in the PJM region, and customers have invested billions of dollars in the region, customers must continue to have a strong voice in voting outcomes. Any effort to unravel sector-weighted voting would be viewed by PJMICC as an unacceptable effort to disenfranchise customers.
In PJMICC’s view, the existing voting thresholds do not preclude timely action. PJM has tools at its disposal, including the CIFP process, to accelerate issues when needed. PJM can bring forward its own problem statements/issue charges to initiate a stakeholder discussion. Issue Charges require only majority support to advance, and most Issue Charges do, in fact, generally move forward.15 PJM also plays a significant role in setting the stakeholder meeting calendar, which can be used to prioritize pressing issues. If PJM communicates a pressing reliability need to the Members or stakeholder community, our experience is that the stakeholder community will rally to support the necessary effort.
The need for timely action has grown, given the pace of new large-load interconnection requests. This issue has proven difficult for stakeholders to resolve by consensus, despite substantial investment of time and resources by stakeholders in PJM’s two most recent CIFP processes on this topic, both of which have been focused on resource adequacy-related Tariff changes where the PJM Board already has Section 205 rights. Even if PJM Members were to reach consensus on issues falling within the PJM Tariff and the super-majority sector-weighted threshold were exceeded, the PJM Members' votes have been advisory only. As such, the voting threshold is not directly relevant to PJM’s decision about what to bring forward to the Commission.
15 PJM Manual 34: PJM Stakeholder Process Revision: 22, Sections 6.2.1 and 6.2.2 (Effective Date: September 25, 2025), available at: https://www.pjm.com/-/media/DotCom/documents/manuals/m34.pdf.
PDF page 14
14
Regardless, such CIFP issues are generally precisely the kind of complex, high-stakes issues that warrant rigorous Commission review.
That said, as a general matter, as explained previously, there is inefficiency in the PJM committee process due to affiliate voting in the lower-level committees. Affiliate voting can allow proposals to advance to the Members Committee without adequate vetting of customer concerns, leading to surprise and false expectations when customers raise objections at the sector-weighted vote. This dynamic traces to the 2010-era compromise that created affiliate voting, alongside a lingering—and, in our view, inaccurate—perception that load interests hold an effective veto over proposals favored through affiliate voting.
To be clear, PJMICC is not seeking to disenfranchise those with affiliate votes. PJMICC will abide by affiliate voting as part of the compromise that formed PJM’s current governance structure. PJMICC simply asks that lower-committee discussions to be conducted with an eye toward the ultimate sector-weighted vote. This would produce more durable, well-vetted outcomes and reduce wasted effort. And PJMICC respectfully requests that those with affiliate votes respect customers’ right to be heard when load interests raise concerns at the Markets and Reliability or Members Committees, the two PJM senior committees, which both utilize sector-weighted voting.
2. Transparency Reforms
PJMICC believes that transparency reforms are necessary to improve the quality of PJM’s stakeholder process and increase stakeholder confidence in its decision-making, especially when the Board takes unilateral action. As a threshold matter, especially as the effects of PJM’s markets are becoming broader and even more impactful, PJM customers have consistently requested more detail on the practical implications of proposed changes, to help all stakeholders better understand the impact of PJM’s rules and changes thereto. More stakeholders that are not PJM Members, such as states, new data center customers, manufacturers, other energy-intensive customers, developers, are making unprecedented investments in doing business in PJM. They depend on PJM’s markets. As market rules evolve, there needs to be clear communications as to their impact to avoid such investments becoming stranded. Complexity of information is a real barrier to meaningful stakeholder engagement, particularly for parties without large in-house technical staff. Clear, plain-language communication about the impacts of proposed rule changes would be a significant improvement.
PJMICC also supports improvements to the accessibility and organization of information PJM makes available, including on its website, which stakeholders have found difficult to navigate. At the front end, cost-benefit studies should be a more regular, expected component of any significant rule-change proposal, including those of stakeholders. Stakeholders cannot meaningfully evaluate proposals they cannot fully understand. Similarly, while PJM is responsible for the functioning of its wholesale markets, there should be careful and public consideration of
PDF page 15
15
the impacts of action (or inaction) on retail markets and retail customers alike. To the extent that PJM Staff cannot support Members' or stakeholders’ alternate proposals, PJM should plainly explain the specific reasons for its decision.
More transparency about the basis for PJM Board decisions would also increase stakeholder confidence in its decision-making. It is understandable that certain aspects of PJM Staff and Board interactions may need to occur without transparency, but, as discussed above, there should be transparency regarding corporate goals to build stakeholder understanding. Additionally, the Board should commit to publishing, within a defined period following any significant independent action, a summary report that includes the projected outcomes and success metrics underlying its decision, and the Board should affirmatively commit to convening a stakeholder review session at a specified interval (e.g., 18 to 24 months post-implementation) to assess whether the rule is achieving its intended objectives.
3. Structured Opportunities for State Participation
As noted under Panel 1, PJMICC supports continuing and formalizing OPSI’s existing consultative access to PJM’s Board and membership, including the existing practice of private OPSI-Board meetings at OPSI’s annual meeting and OPSI’s standing report-out opportunity at Members Committee meetings. PJMICC would also support a defined opportunity for states to address the membership before a vote on matters of particular interest to states.
PJMICC believes consultative engagement is the appropriate role for states within PJM’s governance structure. This preserves PJM’s independence while giving states a structured channel to be heard on issues that affect their ratepayers.
4. Impediments to Stakeholder Decision-Making
Especially with the current large-load/resource-adequacy discussions, a significant impediment to stakeholder decision-making is the lack of clarity about jurisdictional limits between state and federal authority in the 21st-century modern grid. Moreover, state jurisdiction may vary under state law. From a stakeholder perspective, it is also not always clear who is empowered to speak for a state. In a very real way, the lack of clear jurisdiction to address certain identified problems is an impediment to decision-making.
Another impediment that is worth underscoring is that stakeholder discussions on many of these complex proposals are siloed. Although PJMICC understands that PJM staff may be having holistic discussions, PJM stakeholder discussions occur on a more discrete basis, preventing a full understanding of proposed solutions to complex problems.
PDF page 16
16
5. Reforms to Help PJM Meet the Region’s Challenges
In response to this question, PJMICC must underscore its importance: the region’s challenges must be met; the economic and human consequences of failing to do so are simply too great. Such an effort requires coordinated efforts at all levels of government as well as with and within the PJM stakeholder community. Meeting these challenges is a shared imperative for PJM, its Members, and the region's states. As we consider governance changes, such reforms are not a “cure-all” for the pressing problems facing the region today and should not distract from addressing them.
As the Commission considers the need for timely action to enable PJM to help meet the region’s challenges, PJMICC encourages the Commission to recognize a tension in capital- intensive industries like energy between action and stability. Energy investors require stability to support the investments that are necessary for the region to meet today’s resource adequacy challenges. Energy-intensive customers, including not only data centers but also manufacturers and institutional customers, require a stable platform to make their investments, too. Volatility comes with risk, and risk is often ultimately borne by retail customers. Acknowledging that certain changes will be necessary for the region to meet today’s challenges, PJMICC encourages keeping an eye on stability to enable capital to be deployed with some measure of confidence.
Four reforms would meaningfully improve PJM’s ability to meet regional challenges. First, building meaningful accountability into the stakeholder process: clear success metrics identified at the problem statement stage, and after-the-fact review of whether implemented changes achieved their stated goals, including cost impacts.
Second, allowing stakeholders to evaluate related issues as packages rather than only in narrow, siloed work efforts. The ability to build cross-issue compromises—to say, ‘we will accept this change if that complementary reform also moves forward’—has been lost in recent years. Restoring that flexibility would produce more durable outcomes and better serve the region.
Third, PJMICC suggests that alternative facilitation tools be considered to make meeting time, especially for pressing issues of the day, more productive. For example, recent experience has been that PJM Members and stakeholders can often wait for hours to ask clarifying questions and then may not have the opportunity to do so. With advance notice (i.e., not last-minute), PJM could schedule multi-day transparent working sessions with decision-makers from across the PJM community, including federal and state regulators. PJMICC recognizes that any such sessions would need to be carefully structured to respect the Commission’s ex parte requirements and each participating state’s independent decision-making role.
Finally, while these pressing issues are being considered, PJM should consider consolidating its regular cadence of stakeholder meetings, perhaps by deferring non-essential
PDF page 17
17
committee work, until there is adequate room in the stakeholder calendar. The volume and pace of stakeholder work have been unrelenting, and these issues will require considerable thought and effort. We need to make time for it in the stakeholder calendar, even if it means deferring other priorities.
6. Near-Term Reforms to Improve Speed While Preserving Stakeholder
Input
PJMICC supports restoring more robust engagement and compromise-seeking at the lower-committee level, rather than deferring hard conversations to the Markets and Reliability and Members Committees. If lower committees were to develop proposals with an eye toward the ultimate sector-weighted vote—rather than pushing proposals forward on the strength of affiliate votes alone—the results would be more durable, surprises at the Markets and Reliability Committee would diminish, and overall pace would improve. We also support exploring a position-paper process for major issues—allowing parties to submit written positions for consideration in lieu of extended, time-intensive stakeholder meetings.
Given the heavy day-to-day meeting burden the current process places on stakeholders, particularly those with limited resources, a transparent paper-hearing approach could be a meaningful time-saver for well-developed issues without sacrificing the quality of stakeholder input. Additionally, reducing the number of issues under active consideration at any given time would allow more time between stakeholder meetings for offline discussion and deliberation. Reducing the volume of changes to PJM’s governing documents also enhances market rule stability, which is something customers value highly.
7. Committee Structure Elements Contributing to Delay
Delays are frequently attributable to components of the CBIR process becoming extended without meaningful progress, such as through extended consideration of fine-tuning the problem statement and issue charge process and debates over whether issues are in or out of scope, as I have described. Additionally, meeting facilitation and management challenges also can contribute—for example, extended, unfocused discussion by a small number of participants can consume hours without advancing the substantive work.
PJMICC supports streamlining problem statement and issue charge templates and exploring new tools for meeting facilitation to keep discussions focused on the defined scope and success metrics. Education is a key component of any work effort and must continue in a structured manner, with PJM inviting subject matter experts when necessary. Better discipline at the process level would reduce delay more effectively than structural changes to the committee architecture.
PDF page 18
18
8. Fast-Path and Time-Bound Review Procedures
PJMICC sees value in time-bound stakeholder review for genuine emergencies. However, PJMICC is not convinced the current the CIFP process is well-designed to identify and prioritize the right solutions. The issues that PJM has identified for CIFP treatment have been appropriate. However, the process was not designed to handle issues of such breadth and scope, resulting in the Board considering numerous competing proposals, none of which have had the time to develop a critical mass of support.
A gating question may be whether the Board’s objective is to achieve consensus, or instead to generate the most useful information for the Board to exercise its independent judgment. If it is the former, more time should be afforded to allow for such consensus-building to occur, perhaps through small-group facilitation. If it is the latter, it may be more useful to model a paper hearing process with an opportunity for the Board to ask clarifying questions to facilitate their review and make an independent judgment.
9. Lessons from Other RTOs
PJMICC’s principal lesson from other RTOs is caution. PJM should preserve its
comparatively robust customer participation and stakeholder checks while adopting targeted process improvements that strengthen independence, transparency, and efficiency.
III. Conclusion
On behalf of PJMICC, I appreciate the Commission's invitation to participate in this important technical conference. PJM's markets have, for decades, delivered substantial value to the region. This record of success reflects the strength of PJM's existing governance framework, including the checks and balances embedded in its sector-weighted, stakeholder-driven structure. These structures embody the checks and balances necessary for a market in which electricity is an essential service and market power is an ever-present concern.
PJM’s independence, neutrality, and transparency are prerequisites for any workable governance approach—without such commitments by PJM, no governance structure will succeed. The recommendations set forth in this statement are offered in that spirit: as constructive, targeted improvements intended to help PJM and its Members make more effective and efficient use of the stakeholder process and broaden the lens by which PJM views its mission to include the impact of its wholesale market on retail markets and customers.
While PJMICC does not seek fundamental restructuring, PJMICC believes that certain changes are necessary to ensure PJM's stakeholder process can keep pace with the region's
PDF page 19
19
evolving operational and market needs—and that any such changes must preserve, rather than diminish, the voice and representation of end-use customers in PJM's governance. PJMICC seeks concrete, actionable reforms: meaningful and enforceable accountability for the cost impacts of rule changes, including quantified pre-implementation projections, defined success metrics, mandatory post-implementation review, and clear consequences for rules that fail to meet stated objectives; strengthened and disciplined stakeholder processes that permit cross-issue compromise; respect for the sector-weighted vote at every level of the process; and discipline in the use of fast-path procedures. These are achievable improvements that would serve the region well without destabilizing the governance architecture that has supported one of the world's most successful and competitive wholesale electricity markets for decades.
Thank you for the opportunity to present these views. PJMICC looks forward to continued engagement on these important issues.