AD26-7-000 · 2026-08-21 · PJM Industrial Customer Coalition

Post-Technical Conference Comments of The PJM Industrial Customer Coalition in response to FERC's 07/30/2026 supplemental notice re PJM Governance and…

PDF page 1

1
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

PJM Governance and Stakeholder Reforms :
Docket No. AD26-7-000

POST-TECHNICAL CONFERENCE COMMENTS OF THE
PJM INDUSTRIAL CUSTOMER COALITION
The PJM Industrial Customer Coalition (“PJMICC” or “the Coalition”) respectfully submits these post-technical conference comments in response to the Supplemental Notice issued by the Federal Energy Regulatory Commission (“Commission” or “FERC”) on July 30, 2026, in the above-captioned proceeding. PJMICC is a coalition of energy-intensive industrial and institutional customers and is active in the governance and stakeholder process of PJM Interconnection, L.L.C. ("PJM"). PJMICC members have invested billions of dollars in their manufacturing and other energy-intensive operations and are directly affected by the cost and reliability consequences of PJM’s decisions.

PJMICC submits these Post-Technical Conference comments following the July 23, 2026, technical conference and in anticipation of the upcoming Alternative Dispute Resolution (“ADR”) process at the Commission and potential future Commission action with respect to PJM.1 PJMICC is considering PJM’s initial mediation term sheet and the proposed Memorandum of Understanding (“MOU”) Framework with the states, which were publicly posted in anticipation of the PJM Members Committee meeting on August 19, 2026.2 PJMICC approaches the upcoming

1 PJMICC's counsel, Susan Bruce, participated in the Technical Conference and filed a Pre-filed Statement.  PJMICC will not reiterate those positions in these Post-Technical Conference Comments, but offers these comments as a constructive response to the Technical Conference and PJM’s recent proposed term sheets offered in advance of the upcoming ADR. 2 See 20260819-item-08---1-ferc-mediation-term-sheet.pdf and https://www.pjm.com/-/media/DotCom/committees- groups/committees/mc/2026/20260819/20260819-item-08---2-memorandum-of-understanding-framework-between- pjm-and-states.pdf (last visited Aug. 21, 2026).

PDF page 2

2
mediation in good faith and recognizes the constructive engagement of PJM, the PJM states, and PJM Members to date.

To that end, PJMICC highlights the PJM Members Committee's August 19 action to approve, by a substantial margin, modifications to the PJM Operating Agreement clarifying that the PJM Board’s primary responsibilities include “designing and operating markets that benefit customers.”3 This modification, if filed and accepted by the Commission, aligns closely with PJMICC’s recommended change to the PJM Operating Agreement outlined in its Pre-filed Statement and represents a constructive step toward grounding the Board’s future decision-making in that responsibility.4

Given the important role PJM plays in the region’s economy and daily life, PJMICC’s objective is to advance governance reforms that enhance PJM’s accountability and independence, improve the efficiency of the stakeholder process, reduce siloed consideration of related issues, advance innovation, and ensure that diverse viewpoints inform the region’s response to this period of foundational change. In these comments, PJMICC identifies areas of alignment with PJM's initial position set forth at the July 23 technical conference, as well as areas of focus to build understanding in advance of the ADR process.

PJMICC respectfully submits that any governance reform package should preserve the existing balance between PJM’s independent role and the Members Committee’s sector-weighted approval of Section 205 filings. PJM retains a path to seek Commission action when Members do

3 https://www.pjm.com/-/media/DotCom/committees-groups/committees/mc/2026/20260819/20260819-item-01--- vistra--exelon-alternate-motion-to-arrc-user-group-oa-sec-7.pdf; https://www.pjm.com/- /media/DotCom/committees-groups/committees/mc/2026/20260819/20260819-mc-voting-results--agenda-item- 1b.pdf (last visited Aug. 21, 2026).
4 Pre-Filed Statement of Susan Bruce, Counsel to PJM Industrial Customer Coalition, PJM Governance and Stakeholder Reforms, Docket No. AD26-7-000, at 4 (July 14, 2026).

PDF page 3

3
not agree; as discussed below, Section 206 provides the appropriate framework in that circumstance. The Coalition’s focus is therefore on reforms that improve stakeholder efficiency and pair any expansion of PJM’s authority with transparent safeguards, while respecting Board independence.

I. Background
On July 23, 2026, the Commission convened a Chairman and Commissioner-led technical conference to examine PJM’s governance structure and stakeholder processes, addressing Board independence, Section 205 filing rights, stakeholder process reform, and state participation. The Commission invited post-conference comments on or before August 21, 2026, and indicated that an Alternative Dispute Resolution process will commence on September 1, 2026. Through its counsel, PJMICC participated in the July 23 technical conference, emphasizing support for PJM’s existing governance framework and sector-weighted voting; advocating targeted reform rather than wholesale restructuring, including reforms that would facilitate new resources and investment in the PJM grid; and identifying the need for customer cost-impact assessments and after-the-fact review mechanisms.

Subsequently, PJM circulated its mediation term sheet proposing eight reform measures, including proposing to assume from PJM Members additional Section 205 filing authority, making the Members Committee advisory to the RTO on all matters, extending Board terms to nine years, and creating state “jump ball” Section 205 filing rights regarding resource adequacy. PJM also proposed an MOU Framework with the states that addresses resource adequacy, large-load management, and transmission planning.

PDF page 4

4
II. Areas of Common Ground
PJMICC supports PJM’s willingness to streamline committee structures and create expedited processes, provided that the process continues to solicit and consider diverse viewpoints. These proposals are directionally consistent with PJMICC’s longstanding concerns about siloed treatment of related issues and the cost of engagement in the stakeholder process for those with limited resources. The proposed elimination of the Markets and Reliability Committee, coupled with the proposed shift in voting at lower-level committees to sector-weighted voting, represents a reasonable balance. Taken together, eliminating duplicative committee-layer changes could improve efficiency while preserving meaningful stakeholder input and the sector-weighted framework. This would allow stakeholders to focus on consequential issues.

PJMICC also supports Board independence as a foundational element of PJM governance. PJM’s proposal for open Board sessions—with public statements and recorded votes—generally aligns with PJMICC’s transparency goals, while warranting careful implementation to preserve the Board’s independence. Extended Board terms, if paired with meaningful accountability measures, could promote institutional stability, although a nine-year term may be longer than necessary and could discourage interest in Board service.  Board members for the other RTOs and ISOs across the country have three-year terms.  Board terms of five or six years are still longer than those of other RTOs/ISOs.

III. Areas of Divergence
While acknowledging this common ground, PJMICC also identifies areas of divergence that warrant attention in developing a durable solution. Of particular importance is the relationship between PJM’s proposed Section 205 filing rights and the stakeholder checks that currently govern those rights.

PDF page 5

5
PJM’s mediation term sheet proposes removing PJM Members’ Section 205 filing authority over the energy and ancillary services markets, as well as transmission planning. The term sheet also proposes making the Members Committee advisory on RTO functions, extending Board terms to nine years, and providing that PJM-sponsored packages advance “on equal footing” with stakeholder alternatives. PJM currently holds Section 205 rights regarding resource adequacy and the capacity construct.  The areas of concern with the PJM capacity construct are well documented in proceedings before this Commission.

PJM’s proposals, taken together, raise significant concerns. As explained in PJMICC’s Pre- filed Statement at this docket, the distinction between Section 205 and Section 206 review is not merely procedural—it reflects a deliberate allocation of regulatory burdens that incentivizes collaborative development of market rules.5 The question presented is not whether PJM can act when Members do not agree—it can, through Section 206—but rather which review standard should apply, and what safeguards should attend the expansion of unilateral filing authority. As outlined in PJMICC’s Pre-filed Statement, the D.C. Circuit has recognized that Sections 205 and 206, while both requiring just and reasonable rates, “enforce that mandate differently” and impose distinct burdens on proponents of rate changes.6 The lighter Section 205 burden is appropriately reserved for proposals that command broad stakeholder support and provide evidence of balanced consideration of competing interests. Where that support is absent, Section 206 supplies the appropriate review framework—not as a bar on PJM action, but as a check commensurate with the significance of unilateral change that could directly affect the regional economy.

5 Pre-Filed Statement of Susan Bruce, Counsel to PJM Industrial Customer Coalition, PJM Governance and Stakeholder Reforms, Docket No. AD26-7-000, at 7-8 (July 14, 2026).
6 Md. Office of People's Couns. v. FERC, 164 F.4th 920, 923 (D.C. Cir. 2026).

PDF page 6

6
PJM’s proposal to make the Members Committee advisory on RTO functions would represent a significant shift from the current framework.  PJMICC views the Members Committee's approval as an important check on PJM management and Board actions. If stakeholders were limited to a consultative role while PJM’s unilateral authority expanded, the reform package would reduce a meaningful source of accountability. For example, there can be an inherent tension in RTO governance when staff or management advance positions that may diverge from the broader public interest the Board is charged with serving. That tension is compounded by the specialized operational and technical expertise of RTO staff, which independent Board members—despite their experience and best efforts—may not fully share. PJMICC respectfully suggests that maintaining a meaningful role for the Members Committee would preserve a diversity of sector perspectives at a point when the Board may benefit most from them.  These areas of divergence underscore the need to examine the accountability framework that would accompany any expansion of PJM’s authority.

IV. Accountability Considerations
A central concern animating these comments is what may be viewed as an “accountability gap” in PJM’s reform proposals. PJM has explained that expanded Section 205 filing rights would help it act decisively when the stakeholder process does not produce timely outcomes.  At the same time, the term sheet does not include comparable mechanisms for evaluating the consequences of PJM’s decisions, such as customer cost-impact assessments, structured after-the-fact reviews, or sunset provisions. Unlike a conventional utility, PJM generally does not internalize the financial consequences of its market-design decisions; PJM Members, states, and customers bear the effects. While PJMICC does not support PJM securing additional Section 205 rights, PJMICC does see value in implementing additional accountability safeguards that make performance and customer

PDF page 7

7
impacts visible and provide a basis for corrective action. The governance literature identifies this risk allocation as presenting a structural asymmetry.7

These observations underscore additional authority, to the extent directed by the Commission or otherwise, should be accompanied by transparent projections, defined success metrics, and a structured opportunity to adjust course when results differ from expectations.  PJM’s own proposed reforms—longer Board terms, an advisory role for the Members Committee, and expanded filing authority—would increase the Board’s independence while reducing certain traditional stakeholder checks. That combination warrants careful design: the governance literature identifies structural incentive considerations that may affect independent Boards.8 The need for a constructive accountability framework is particularly important given the PJM region’s unprecedented challenges—large load growth, manufacturing reshoring, data center development, and electrification mandates. Decisions made now will shape the cost landscape for decades. PJMICC therefore supports objective, transparent accountability measures that complement—not compromise—Board independence, including Board evaluations tied to customer outcomes, affordability, and the cost consequences of PJM’s decisions.

V. Proposed Accountability Safeguards
To address the considerations identified above, PJMICC respectfully proposes the following measures to complement any governance reform package.  They are designed to operate consistently with Board independence while providing transparent, objective methods for evaluating the effects of any expanded authority on retail customers and the public interest.

7 See Dworkin & Goldwasser, Governance of RTOs, 28 ENERGY L.J. 543, 580–81 (2007).
8 See id. at 562; James et al., How the RTO Stakeholder Process Affects Market Efficiency, R STREET POLICY STUDY No. 112, at 11, 17–18 (2017).

PDF page 8

8
Board Composition. The Coalition recommends that PJM’s Board include members with direct experience managing large energy budgets or overseeing industrial and commercial energy consumers, ensuring that demand-side perspectives inform Board deliberations. This perspective would supplement, not displace, Board independence by bringing relevant customer experience into informed deliberations.

Mandatory Ex Post Reviews. Any significant market or transmission rule change should be subject to mandatory after-the-fact review to assess whether it delivered its intended results, including actual cost impacts on customers. Where a rule change fails to deliver its intended benefits or produces cost impacts that materially exceed projections, the reform package should include defined corrective measures, which may include a sunset or reversion. Corporate Transparency. PJM should disclose greater information regarding corporate goals and executive compensation structures, including public performance metrics tied to customer outcomes and cost management. Transparency into institutional incentives would enable stakeholders and the Commission to evaluate whether those incentives appropriately balance reliability, customer cost, competition, and responsible cost management.  This level of transparency is especially necessary to the extent that PJM were to be afforded Section 205 rights. Customer Cost-Impact Assessments. Customer cost-impact statements, including robust stress testing, should be required for any significant Section 205 (and Section 206) filing by PJM. Analogous to regulatory impact analyses, these assessments would identify expected effects on end-use customers and the assumptions underlying the proposal. Making that information available would help the Commission and affected customers evaluate the proposal’s likely consequences and support informed review.

PDF page 9

9
Together, these safeguards—Demand-Side Board expertise, ex post reviews, corporate transparency, and cost-impact assessments—would help to ensure PJM’s expanded authority is exercised accountably and in the public interest.

PDF page 10

10
VI. Conclusion
PJMICC supports meaningful governance reform and appreciates the Commission’s leadership and the constructive engagement of PJM, the PJM states, and PJM Members. Particularly at this inflection point, the need for clear-eyed focus on the reforms necessary to support cost-effective investment in the PJM grid, PJMICC’s principal recommendation is to preserve the existing distinction between Section 205 and Section 206 and the associated regulatory rigor, with additional transparent, objective accountability safeguards. PJMICC respectfully urges the Commission to consider the safeguards described above— including transparent cost assessments, defined success metrics, ex post review with appropriate corrective measures, demand-side Board expertise, and corporate transparency—into any final governance package. These measures would support durable reform, protect meaningful stakeholder participation, and help ensure that PJM’s governance serves the public interest while respecting Board independence.

Respectfully submitted,
By:
/s/ Susan E. Bruce

Susan E. Bruce
Kenneth R. Stark
Matthew L. Garber
McNees Wallace & Nurick LLC
100 Pine Street
Harrisburg, PA  17101
Tel:  717-232-8000
Fax:  717-237-5300
E-mail: sbruce@mcneeslaw.com

 kstark@mcneeslaw.com

 mgarber@mcneeslaw.com

Counsel to the PJM Industrial Customer Coalition

Dated: August 21, 2026

PDF page 11

Docket No. AD26-7-000

1

APPENDIX

PJM Industrial Customer Coalition (“PJMICC”) has actively participated in the PJM stakeholder process since its inception as an independent system operator (“ISO”).  Eight of PJMICC’s approximately 30 members are part of the End-Use Customer sector to participate in the PJM governance process.  A subset of these PJMICC PJM Members have also become PJM Members to support their own business activities, such as demand response, load-serving approaches, and, as retail customers with behind-the-meter generation, to sell excess power produced by their cogeneration facilities.  PJMICC’s membership also includes a PJM Member in the Generation Owner sector because its on- site generation in the PJM footprint exceeds its load.

  Questions/Comments
Yes
No
1) Should Board members’ terms be extended to five or more years? X

Comments: Board member terms of five to six years would be appropriate for building deeper institutional knowledge, strengthening relationships, and supporting continuity.  Terms of much longer than that risk entrenchment and reduce opportunities for accountability.

2) Should there be a maximum number of years that a Board
member may serve (e.g., 10 years)?
X

Comments: In good board governance, term limits are a best practice to prevent stagnation and bring in new ideas.  Given the complexity of RTOs, it may be appropriate to have longer terms than conventional corporate boards, but the principle still holds.

3) Should the Board member qualification rules be revised to provide a preference for some Board members that reside in the PJM

region?
X

Comments:  Yes, provided that conflict of interest considerations are also honored.

4) Should the conflict-of-interest rules be revised to reduce the cooling-off period for Board members from two years to one

year?
X

Comments: For RTO independence, the conflict of interest rules are vital, but there is no meaningful difference between one and two years of a cooling-off period for appropriate Board candidates.

PDF page 12

Docket No. AD26-7-000

2

  Questions/Comments
Yes
No
5) Should restrictions on Board communications be relaxed to enable more communication between the Board and stakeholders?

X

Comments:  There are currently ample opportunities for communication between the PJM Board and stakeholders; relaxing the restrictions risks the perceptions of “back door dealings” among powerful interests.

6) In order to increase transparency, should Board votes be made public or the Board be required to explain its reasoning?

X

Comments:  To advance Board independence, PJMICC is concerned about individual Board votes being made public; however, PJMICC supports the Board being required to explain its reasoning and engage meaningfully with minority positions that were adopted.

7) In order to increase transparency, should some Board meetings be open or available to the public?

X

Comments:  A qualified answer:  While PJMICC does not support all Board meetings being public, some additional transparency on the information on which the Board bases its decision would be beneficial.  For example, it would be helpful to know how the Board assesses PJM staff proposals vis-à-vis stakeholder proposals.

8) Should PJM’s governing documents be revised to explicitly state that the responsibility of PJM and its Board is to serve the public interest?

X

Comments:  PJMICC also supports revising the PJM’s governing documents to explicitly state that PJM’s markets and planning should be designed and operated to cost-effectively support the functioning of retail jurisdictions' provision of electric service to consumers.

9) Should state representatives have at least one voting member on the Nominating Committee?

X

Comments:
10) Should PJM adopt public performance metrics and tie
management compensation to their achievement?
X

Comments:

PDF page 13

Docket No. AD26-7-000

3

Section 205 Filing Rights
  Questions/Comments
Yes
No
11) Should the stakeholder process be advisory, i.e., stakeholder votes only inform the Board?

X

Comments:
12) Should PJM have section 205 filing rights over the energy market and ancillary services unencumbered by the requirement to obtain approval of two-thirds of the Members Committee?

X

Comments:
13) Should PJM have section 205 filing rights over Regional Transmission Expansion Planning (RTEP) unencumbered by the requirement to obtain approval of two-thirds of the Members Committee?

X

Comments:
14) Should the Organization of PJM States Inc (OPSI) have “jump ball” rights over resource adequacy and transmission cost allocation filings when a supermajority of OPSI agrees on an alternative proposal? X

Comments:  “Jump ball” filing rights support RTO accountability.

15) Should the Members Committee have “jump ball” filing rights over the portions of the tariff where PJM has 205 filing rights when a supermajority of stakeholders approves an alternative proposal? X

Comments:  Especially if PJM Members were to become advisory only, “jump ball” filing rights are important for RTO accountability.

Stakeholder Process
  Questions/Comments
Yes
No
16) Should the approval threshold in the Members Committee be lowered from two-thirds sector-weighted voting?

X

Comments:  The right to file under Section 205 is a privilege and should be afforded only when there is super majority support for the change.

PDF page 14

Docket No. AD26-7-000

4

  Questions/Comments
Yes
No
17) Should the voting rules barring affiliate votes, which apply to senior standing committees, also apply to lower-level committees?

X

Comments:  Affiliate voting skews the voting outcomes of lower-level committees, favors incumbents, and sets unrealistic expectations for the outcome of a sector-weighted vote.

State Participation

  Questions/Comments
Yes
No
18) In addition to OPSI, should there be a second state representative group consisting of governors’ representatives and/or state legislators’ representatives?

X

Comments: To be clear, PJMICC supports increased state engagement but is concerned about the potential for mixed messages.  If minority positions exist, OPSI should be able to express them.  PJMICC also sees a valuable role for Governors in being more directly engaged in PJM governance to better reflect state economic considerations.

19) Should state representatives have a formal voting role in the stakeholder process (limited to certain topics, such as resource adequacy and regional transmission cost allocation) in addition to the consumer advocate votes?

X

Comments:  On resource adequacy, where PJM already has Section 205 rights, and PJM Members are advisory, a formal vote to signal states’ position would help to advise the PJM Board.

20) Should PJM be required to consult with OPSI prior to making a section 205 filing related to resource adequacy and transmission cost allocation?

X

Comments:

PDF page 15

CERTIFICATE OF SERVICE

I hereby certify that I have this day served, via first-class mail, electronic transmission, or hand-delivery the foregoing upon each person designated on the official service list complied by the Secretary in this proceeding.

Dated this 21st day of August, 2026

/s/ Susan E. Bruce

Susan E. Bruce
McNees Wallace & Nurick LLC
100 Pine Street
Harrisburg, PA  17101
Tel:  717-232-8000
Fax:  717-237-5300
E-mail: sbruce@mcneeslaw.com