ER26-3380-000 · 2026-08-21 · Tract Holding Company I, LLC

Motion to Intervene and Request for Clarification, or in the Alternative, Limited Protest of Tract Holding Company I, LLC re PJM Interconnection, L.L.C.’s…

PDF page 1

1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

PJM Interconnection, L.L.C.
)
Docket No. ER26-3380-000
MOTION TO INTERVENE AND REQUEST FOR CLARIFICATION,
OR IN THE ALTERNATIVE, LIMITED PROTEST OF
TRACT HOLDING COMPANY I, LLC
Pursuant to Rules 211, 212, and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (“FERC” or “Commission”),1 Tract Holding Company I, LLC (“Tract”) hereby submits this motion to intervene and request for clarification of, or in the alternative, limited protest to, PJM Interconnection, L.L.C.’s (“PJM”) proposed Reliability Backstop Procurement (“RBP”) framework, filed in the above-captioned proceeding on July 31, 2026,2 pursuant to Section 205 of the Federal Power Act (“FPA”).3

For the reasons set forth below, Tract respectfully requests that PJM clarify the scope of “executed electric service agreement[s] or transmission service agreement[s]” that new load may present as evidence of Qualifying RBP Offset UCAP MW.4 Absent such clarification, the Commission should find that PJM has failed to satisfy its burden under Section 205 of the FPA and should sever and reject the relevant portion of PJM’s proposed tariff revisions as unduly discriminatory or preferential, and direct modifications consistent with the Commission’s authority under NRG Power Marketing, LLC v. FERC, 862 F.3d 108 (D.C. Cir. 2017).5

1 18 C.F.R. §§ 385.211, 385.212, 385.214. 2 PJM Interconnection, L.L.C., Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large Loads, Docket No. ER26-3380-000 (filed July 31, 2026) (“PJM RBP Filing”).
3 16 U.S.C. § 824d.
4 PJM RBP Filing at 39-40; Proposed PJM Tariff, Attachment DD, §§ 18.2(c)(i)-(iii).
5 NRG Power Mktg., LLC v. FERC, 862 F.3d 108 (D.C. Cir. 2017). Whereas here, PJM has consented to any modifications to the RBP filing, the D.C. Circuit “has held that . . . the Commission has ‘authority to propose

PDF page 2

2

I. MOTION TO INTERVENE
Tract respectfully moves to intervene in this proceeding.6 Tract, through its affiliates, acquires land and develops shovel-ready development sites for data centers in the PJM region— pre-positioning power, fiber, zoning and entitlements, and will be directly subject to PJM’s RBP process should the Commission accept PJM’s filing. Tract therefore has a substantial and direct interest in the outcome of this proceeding that cannot be adequately represented by any other party. Accordingly, Tract requests that the Commission grant this motion, consistent with the public interest.

II. COMMUNICATIONS
Please address all notices and communications regarding this proceeding to the following persons who are also designated for service in this proceeding.

Orijit Ghoshal
Vice President, Government and
Regulatory Affairs
Allison Girvin
Vice President and Corporate Counsel
3200 E Cherry Creek South Drive
Suite 700
Denver, CO 80209
Tel: 406-202-4519
orijit.ghoshal@tract.com
allison.girvin@tractcapital.com
Tyler O’Connor
Kathy Lowrey
Crowell & Moring LLP
600 Fifth St NW
Washington, D.C. 20001
Tel: 202-624-2704
klowrey@crowell.com
toconnor@crowell.com

III. BACKGROUND
The instant proceeding concerns proposed revisions to the PJM Tariff and Reliability Assurance Agreement to institute the RBP, a “one-time, supplementary mechanism to procure

modifications to a utility’s [FPA section 205] proposal.’” See, e.g., N.Y. Indep. Sys. Operator, Inc., 188 FERC ¶ 61,051, at P 22 n.36 (2024) (alteration in original) (citing NRG Power Mktg., 862 F.3d at 114-15); see Midcontinent Indep. Sys. Operator, Inc., 180 FERC ¶ 61,141, at P 26 n.29 (2022), order on reh’g, 182 FERC ¶ 61,096 (2023); ISO New Eng. Inc., 175 FERC ¶ 61,172, at P 16 n.20 (2021).

6 18 C.F.R. § 385.214.

PDF page 3

3

additional supply to meet the resource adequacy needs of the PJM Region.”7 Following the 2027/2028 base residual auction clearing 5.6% short of PJM’s target reserve margin, on January 16, 2026, the PJM Board initiated a Critical Issue Fast Path Process (“CIFP”) to address PJM’s resource adequacy challenges.8

Following the conclusion of the CIFP, on July 31, 2026, PJM submitted the instant filing to establish what it characterizes as a “critical safety net designed to address current resource adequacy shortfalls” observed in the base residual auctions for the 2028/2029 delivery year.9 According to PJM, the RBP “will only procure the capacity necessary to cover any remaining shortfall from the 2028/2029 BRA after PJM has accounted for new capacity being brought by new load or that otherwise qualify for a limited opt-out from the RBP.”10 Tract generally supports and commends PJM addressing the BRA shortfall by requiring loads to either curtail, bring their own capacity, or enter the RBP.

Under PJM’s proposal, “new capacity voluntarily brought on to the PJM system by new load” that satisfies the criteria set forth in proposed tariff section 18.2 may be credited as Qualifying RBP Offset UCAP MW, thereby reducing the Initial RBP Target.11 In addition, new load that participates as Annual Demand Resources or DER Capacity Aggregation Resources may also reduce the Initial RBP Target.12 These new capacity and curtailment offset options are required under the Statement of Principles Regarding PJM issued on January 16, 2026, by the

7 PJM RBP Filing at 7.
8 David E. Mills, PJM Board Chair, Board Decisional Letter on Critical Issue Fast Path - Large Load Additions, PJM Board (Jan. 16, 2026), https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public- disclosures/2026/20260116-pjm-board-letter-re-results-of-the-cifp-process-large-load-additions.pdf.
9 PJM RBP Filing at 26.
10 Id.
11 See id. at 35, 39.
12 Id. at 40.

PDF page 4

4

National Energy Dominance Council (“NEDC”) and the 13 governors of the PJM states.13 However, proposed section 18.2(c) requires that new load present an “executed electric service agreement or transmission service agreement” demonstrating that such load will achieve commercial operation within the applicable delivery year in order for the Qualifying RBP Offset UCAP MW or Annual Demand Resources or DER Capacity Aggregation Resources to decrement the Initial RBP Target.14 This evidentiary requirement warrants clarification.

IV. REQUEST FOR CLARIFICATION
A. PJM Should Clarify the Scope of Agreements Load Can Provide As Evidence
of Qualifying RBP Offset UCAP MW and Annual Demand Resources or
DER Capacity Aggregation Resources.
Tract respectfully requests that PJM clarify that the undefined terms “electric service agreement and transmission service agreement” encompass executed agreements with load serving entities or transmission owners that evidence a binding commitment by new load to achieve commercial operation by or during the relevant delivery year. As currently drafted, the proposed tariff language is not clear whether functionally equivalent agreements that serve the same evidentiary purpose as electric and transmission service agreements would satisfy the Qualifying RBP Offset UCAP MW or Annual Demand Resources or DER Capacity Aggregation Resources eligibility requirements set forth in section 18.2(c). Absent such clarification, PJM risks understating the volume of legitimately committed new load that will achieve commercial operation by or during the relevant delivery year and that satisfies the requirements for Qualifying RBP Offset UCAP MWs or Annual Demand Resources or DER Capacity Aggregation Resources, thereby inflating the Final RBP Target beyond that necessary to address any actual resource

13 Statement of Principles Regarding PJM, National Energy Dominance Council, 1 (Jan. 16, 2026), https://www.energy.gov/documents/statement-principles-regarding-pjm (urging PJM to allow loads to not be allocated RBP costs if they “self-procured new capacity or agreed to be curtailable”).
14 PJM RBP Filing at 39-40; Proposed PJM Tariff, Attachment DD, §§ 18.2(c)(i)-(iii).

PDF page 5

5

adequacy shortfall. This result would be inconsistent with the NEDC’s and Governors’ Principles and outside the control of the load who may be subject to EDC tariffs and rules that do not contemplate the named agreements.

As drafted, the requirement for load to provide an executed electric or transmission service agreement serves an evidentiary function: to “indicat[e] that the load will be coming online” in the relevant delivery year.15 The requirement screens out speculative load and ensures that only load that has assumed binding obligations sufficient to demonstrate it will achieve commercial operation within the applicable timeframe may be credited as Qualifying RBP Offset UCAP MW or Annual Demand Resources or DER Capacity Aggregation Resources. While electric service and transmission service agreements satisfy that standard, other executed agreements—including transmission security agreements and construction letters of authorization—impose binding commitments equally probative of genuine load commitment. That some EDCs either do not utilize those agreements or do not require loads coming online in the 2028/2029 delivery year to execute them so far in advance does not make such loads any less likely to reach commercial operation. Of course, such loads must demonstrate some evidence of commitment to come online, and the Commission should find that transmission security agreements and construction letters of authorization suffice.

The Commission has recently accepted executed transmission security agreements filed by Commonwealth Edison Company (“ComEd”) and PECO Energy Company (“PECO”), two

transmission owners in PJM.16 ComEd and PECO utilize these agreements to govern the terms

15 PJM RBP Filing at 39-40; Proposed PJM Tariff, Attachment DD, §§ 18.2(c)(i)-(ii).
16 See, e.g., Commonwealth Edison Company, 196 FERC ¶ 61,040 (2026); Commonwealth Edison Company, 196 FERC ¶ 61,042 (2026); PECO Energy Company, 195 FERC ¶ 61,074 (2026); PECO Energy Company, 193 FERC ¶ 61,148 (2025).

PDF page 6

6

under which they provide retail electric delivery services to large load customers that will not take transmission service under PJM’s tariff.17 As the Commission explained in its order accepting ComEd’s executed transmission security agreement with Tract’s affiliate, Grundy County Power NR I, LLC (“GCP”), the agreement imposes binding financial commitments designed to ensure the data center achieves commercial operation on schedule:

ComEd states that the Transmission Security Agreement establishes protections in the event of GCP’s failure to timely construct the Data Center and related facilities, failure of such facilities to reach commercial operation by the commercial operation date,

failure
to
remain
in
operation
throughout
the
term
of
the Transmission Security Agreement, or failure to operate in conformance with the agreed upon load phasing schedule (Load and Phasing Schedule) for a given year.18

Similarly, the construction letter of authorization that Tract’s other affiliate has executed with Virginia Electric and Power Company (“Dominion”), authorizes Dominion to commence engineering, procurement, and installation of the facilities and associated equipment required to provide electrical service to its forthcoming data center project and imposes binding obligations on the executing party including equipment deposits and payments owed for delay or project cancellation. That neither ComEd nor Dominion have tendered electric service agreements or transmission service agreements for these two projects that are otherwise contractually committed to achieve commercial operation during the 2028/2029 delivery year should not preclude the projects from securing their own capacity and thereby satisfying the evidentiary requirements for Qualifying RBP Offset UCAP MW and Annual Demand Resources or DER Capacity Aggregation Resources. Even those electric distribution companies that execute electric service agreements

17 PECO Energy Company, 193 FERC ¶ 61,148 at P 2 (2025).
18 Commonwealth Edison Company, 194 FERC ¶ 61,181 at P 3 (2026).

PDF page 7

7

with large loads often do not tender them until 12 months in advance of energization.19 Requiring large loads to demonstrate evidence of such agreements now—rather than transmission security agreements or construction letters of authorization agreements—would functionally prevent large loads with commercial operation dates in the 2028/2029 delivery year from meeting the requirements for Qualifying RBP Offset UCAP MW or Annual Demand Resources or DER

Capacity Aggregation Resources, in violation of the NEDC’s and Governors’ Principle to allow loads that procure their own capacity or agree to curtail to avoid being double-counted in the auction.

Like electric and transmission service agreements, both transmission security agreements and construction letters of authorization impose binding commitments on developers and EDCs20 to bring a project online within a defined timeframe and impose material financial consequences on a developer that fails to satisfy its obligations. PJM should therefore afford sufficient flexibility in evaluating the agreements that new load may present as evidence of Qualifying RBP Offset UCAP MW or Annual Demand Resources or DER Capacity Aggregation Resources—including

transmission security agreements, construction letters of authorization, and functionally equivalent instruments—to ensure that the RBP process accurately accounts for all genuinely committed new load that is properly matched with new supply. The Commission has accepted proposals that afford precisely such flexibility in other contexts.21

19 Application of Virginia Electric and Power Company for Approval of its Large-Load Connection Queue Process Standards, Case No. PUR-2026-00011, at 74 (Va. State Corp. Comm’n Apr. 15, 2026) (explaining the Dominion “offers Electric Service Agreements to customers approximately one year before energization of service”). 20 For instance, Dominion’s construction letter of authorization authorizes Dominion to install the facilities necessary to provide electric service.
21 Midcontinent Independent System Operator, Inc., 192 FERC ¶ 61,064 at P 208 (2025) (accepting MISO’s proposal to allow applicants to provide “other agreements” to satisfy a showing of an executed agreement with load and explaining it “provides considerable flexibility . . . to satisfy this requirement”).

PDF page 8

8

Absent clarification from PJM, a narrow interpretation of “electric service agreement and transmission service agreement” risks producing the very outcome PJM sought to avoid: load paying to procure capacity in the RBP that could otherwise be served by its own capacity or through curtailment.22 Such a result would directly contravene the stated purpose of the RBP—to institute “a one-time mechanism that will only procure the capacity necessary to cover any remaining shortfall from the 2028/2029 BRA after PJM has accounted for new capacity being brought by new load or that otherwise qualify for a limited opt-out from the RBP.”23

V. LIMITED PROTEST
A. To The Extent Not Clarified As Argued Above, PJM’s RBP Filing Is Unduly
Discriminatory Because It Excludes Similarly Situated New Loads From
Eligibility For Qualifying RBP Offset UCAP MW and Annual Demand
Resources or DER Capacity Aggregation Resources.
The Commission has long held that a rate, term, or condition is unduly discriminatory where it treats similarly situated customers differently absent a legitimate basis for doing so.24 Should PJM decline to provide the requested clarification, the Commission should reject the RBP filing as unduly discriminatory or preferential under Section 205 of the FPA.25 By restricting the types of executed agreements new loads may present to obtain eligibility for Qualifying RBP Offset UCAP MW and Annual Demand Resources or DER Capacity Aggregation Resources, PJM’s proposal draws an impermissible distinction among similarly

22 PJM RBP Filing at 37-38.
23 Id. at 26 (emphasis added).
24 See El Paso Nat. Gas Co. Aera Energy, LLC, 104 FERC ¶ 61,045 at P 115 (2003), reh’g denied, 106 FERC ¶ 61,233 (2004) (“Discrimination is undue when there is a difference in rates or services among similarly situated customers that is not justified by some legitimate factor.”).
25 See 16 U.S.C. § 824d(b); See Sw. Power Pool, Inc., 193 FERC ¶ 61,171 at P 91 (2025) (the applicant “bear[s] the burden of demonstrating that proposed tariff revisions are . . . not unduly discriminatory or preferential.”).

PDF page 9

9

situated customers.26 As explained above, new load customers that have executed transmission security agreements, construction letters of authorization, or similar agreements have undertaken binding contractual and financial commitments functionally equivalent to those assumed under standard electric service or transmission service agreements. In each case, the customer has demonstrated a genuine, non-speculative commitment to achieve commercial operation within a defined timeframe; the sole relevant distinction lies in the particular contractual instrument through which that commitment has been formalized. PJM’s proposal permits the latter category of customers to qualify for RBP offset eligibility while denying the former any opportunity to do so, without any reasoned justification for the disparate treatment.27

This discrimination is particularly impactful in this instance because large load customers, such as data centers, by virtue of their scale and operational characteristics, are often subject to non-standard contractual instruments before being tendered electric or transmission service agreements. As explained above, electric distribution companies are increasingly requiring data centers to execute bespoke instruments—such as transmission security agreements and construction letters of authorization—which impose substantial financial commitments at least as probative of genuine load commitment as a standard electric or transmission service agreement. PJM’s proposal thus creates a discriminatory preference for customers whose agreements bear a

26 See Transmission Agency of N. Cal. v. FERC, 628 F.3d 538, 551 (D.C. Cir. 2010) (explaining that the Commission cannot treat similarly situated entities differently (citing Sacramento Mun. Util. Dist. v. FERC, 474 F.3d 797, 802 (D.C. Cir. 2007)).
27 See, e.g., id.; N.Y. Indep. Sys. Operator, Inc., 162 FERC ¶ 61,124, at P 10 (2018) (“To say that entities are similarly situated does not mean that there are no differences between them; rather, it means that there are no differences that are material to the inquiry at hand.”).

PDF page 10

10

particular label, while penalizing those who have undertaken equivalent binding commitments to demonstrate their load is real, committed, and coming online within the relevant delivery years.28 Given that PJM has acknowledged the requirements of Section 18.2(c) are intended to demonstrate that interconnecting load will achieve commercial operation within the applicable delivery year, the Commission should condition acceptance of the RBP filing on PJM’s submission of revised tariff language permitting PJM to evaluate whether any executed agreement evidences a genuine, binding commitment to achieve commercial operation within the applicable delivery year.29 For example, PJM could adopt the following revisions, shown in red, to proposed tariff section 18.2(c)(i)-(iii):

(i) Signed bilateral contracts for Qualifying RBP Offset UCAP MW for at least five Delivery Years with a commercial operation date prior to the start of the 2032/2033 Delivery Year, and matched with load that has an executed electric service agreement, or transmission service agreement or any other binding agreement, indicating that the load will be coming online in the 2027/2028 or 2028/2029 Delivery Year;

(ii) Self-Supply generation that is in a Relevant Electric Retail Regulatory Authority (“RERRA”)-approved or accepted integrated resource plan with either associated generation in the PJM interconnection queue or signed bilateral contracts for Qualifying RBP Offset UCAP MW for at least five Delivery Years with a commercial operation date prior to the start of the 2032/2033 Delivery Year, and matched with load that has an executed electric service agreement, or transmission service agreement or any other binding agreement, indicating that the load will be coming online in the 2027/2028 or 2028/2029 Delivery Year; or

(iii) Signed commitment between a Curtailment Service Provider or DER Aggregator and new load(s) that has an executed electric service agreement, or transmission service agreement or any other binding agreement, indicating that the new load(s) will, in a MW quantity equal to MW quantity of the new load(s), either (a) participate as Annual Demand Resources or DER Capacity Aggregation Resources starting in the 2028/2029 Delivery Year Second Incremental Auction and continuing through the 2032/2033 Delivery Year, or (b) purchase replacement Qualifying RBP Offset UCAP MW that are eligible generation or storage resources.

28 See PacifiCorp, 171 FERC ¶ 61,112 at PP 100-102 (2020) (rejecting a proposal where similarly situated customers were required to make different showings of commercial readiness).
29 Commission may take such action because PJM has consented to the Commission’s exercise of authority to modify or sever elements of the RBP filing. See NRG Power Mktg., LLC v. FERC, 862 F.3d 108 (D.C. Cir. 2017).

PDF page 11

11

Absent such modification, PJM’s proposal will arbitrarily foreclose Qualifying RBP Offset UCAP MW and Annual Demand Resources or DER Capacity Aggregation Resources eligibility for an entire class of similarly situated new load customers—a result that is neither just nor reasonable, nor consistent with the prohibition against undue discrimination under the FPA.

VI. CONCLUSION
For the foregoing reasons, Tract respectfully requests that PJM provide the clarification requested herein, or, in the alternative, that the Commission sever and reject the relevant portion of PJM’s RBP filing as unduly discriminatory and direct PJM to submit revised tariff language on compliance consistent with this filing.

Respectfully submitted,

August 21, 2026
/s/ Tyler O’Connor_
Tyler O’Connor
Kathryn Douglass
Kathy Lowrey
Crowell & Moring LLP
600 Fifth St NW
Washington, D.C. 20001
202-624-2500
toconnor@crowell.com

Counsel for Tract Holding Company I,
LLC

PDF page 12

12

CERTIFICATE OF SERVICE

I hereby certify that on this 21st day of August, 2026, a copy of the foregoing document has been electronically served upon each person designated on the official service list in this proceeding.

/s/ Kathy Lowrey_
Kathy Lowrey