ER26-3515-000 · 2026-09-03 · Individual No Affiliation
Motion to Intervene and Protest of Nicholas Max Neal and David Neal, Delaware Standard Offer Service Ratepayers to PJM Interconnection, L.L.C.'s 08/13/2026…
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
Docket No. ER26-3515-000
MOTION TO INTERVENE AND PROTEST OF NICHOLAS MAX NEAL AND
DAVID NEAL, DELAWARE STANDARD OFFER SERVICE RATEPAYERS
Pursuant to Rules 211, 212, and 214 of the Commission's Rules of Practice and Procedure, 18 C.F.R. §§ 385.211, 385.212, 385.214, and the Commission's Combined Notice of Filings #2 issued August 18, 2026 (FR Doc. 2026-16808), Nicholas Max Neal ("the Customer") and David Neal ("Mr. Neal") (together, "Movants") move to intervene in the above-captioned proceeding and protest the August 13, 2026 filing of PJM Interconnection, L.L.C. ("PJM") in Docket No. ER26-3515-000 (Accession No. 20260813-5118) (the "IRAS Filing").
I. INTRODUCTION AND SUMMARY
1. PJM asks the Commission to accept a wholesale rate that has no value and a cost allocation that has no allocator.
2. The rate for Interim Resource Adequacy Service ("IRAS") is not a number. Under proposed Tariff, Attachment DD-4, § X(a), it is any point on a continuum between 50% of the Non-Performance Charge Rate and zero dollars, and which point governs is decided not by this Commission, not by the tariff, and not at the time of filing, but by a retail election made later, in a state forum, under state law. No customer reading PJM's tariff can determine what the rate is. Neither can a State. The Pennsylvania Public Utility Commission has already told the Commission it cannot read the provision, finding "ambiguity due to discrepancies between PJM's
PDF page 2
transmittal letter and the red-lined tariff amendments proposed on this issue of 0-50% compensation."
3. PJM's own cited authority forecloses this. In footnote 315 of its transmittal, PJM invokes Electric District No. 1 v. FERC, 774 F.2d 490, 493 (D.C. Cir. 1985), for the proposition that "[p]urchasers of electricity cannot plan their activities unless they know the cost of what they are receiving," and that "providing the necessary predictability is the whole purpose of the well-established filed rate doctrine," quoting Arkansas Louisiana Gas Co. v. Hall, 453 U.S. 571, 577 (1981). PJM deploys that principle to demand that the Commission prescribe with precision any language the Commission itself revises. The principle does not run in one direction only. A rate that cannot be ascertained from the tariff, and whose value awaits a state proceeding that no one is obliged to open, supplies precisely the predictability the filed rate doctrine exists to guarantee — and PJM has not supplied it.
4. The cost allocation fails for the same reason and more starkly. PJM states that "the entities to be paid the rate and the loads to be charged to support such compensation must be determined at the state level," and then concedes that its "proposal imposes no obligation on any state to do anything." IRAS Filing, transmittal at 104, 106. PJM's framework therefore identifies no charged party in any State that has not acted. In the companion Reliability Backstop Procurement filing, PJM at least proposed a "backup default cost allocation" for that contingency. Here it proposes nothing.
5. Delaware is the proof. The Delaware proceeding that would supply PJM's missing terms — Public Service Commission Docket No. 25-0826 — has been suspended since April 14, 2026, and Delaware has adopted no large-load rate structure of any kind. Delaware is also
PDF page 3
restructured, which by PJM's own footnote 281 is the harder case, in which the Electric Distributor is not the Load Serving Entity — the case PJM identifies and then declines to analyze. Against that, PJM's 132-page transmittal never once mentions Delmarva Power & Light Company, the Electric Distributor on which the entire scheme would operate in Movants' zone. "Delaware" appears a single time, in a footnote listing the thirteen Governors who signed a voluntary pledge.
6. Meanwhile the tariff is precise about one thing. Proposed Attachment DD-4, § X(b)(iii) provides that "any default shall be assessed to the Electric Distributor." PJM has drafted with care to ensure that no uncollected IRAS obligation reaches PJM or its membership. It has drafted nothing to keep that obligation from reaching Delmarva's captive retail customers, who are not New Large Loads, caused none of the shortfall IRAS addresses, receive no IRAS compensation, and are already absorbing a 21.8% increase in Delaware Docket No. 25-1555.
7. Under section 205 of the Federal Power Act, the burden of proving that this rate is just and reasonable rests on PJM and on no one else. 16 U.S.C. § 824d(e). PJM has not carried it. The Commission should not accept proposed Tariff, Attachment DD-4, § X as filed.
II. MOTION TO INTERVENE
A. Timeliness
8. This motion is timely. The Commission's Combined Notice of Filings #2 established a comment date of 5:00 p.m. ET on September 3, 2026. On September 2, 2026, the Commission denied the Organization of PJM States, Inc.'s ("OPSI") motion for an extension of time and confirmed that "[t]he deadline to submit interventions, protests, and comments in the above- referenced proceeding remains 5pm ET September 3, 2026." Notice Denying Extension of Time,
PDF page 4
Docket No. ER26-3515-000 (Sept. 2, 2026) (Accession No. 20260902-3019). This filing is submitted within that deadline.
B. Identity of Movants
9. The Customer is a retail electric customer of Delmarva Power & Light Company ("DPL") taking service in the State of Delaware, within the DPL transmission zone of the PJM Region, under DPL Service Classification MGS-S (Medium General Service — Secondary). The Customer has not selected a competitive electricity supplier and therefore receives Standard Offer Service ("SOS") from DPL. Under DPL's Delaware retail tariff, MGS-S constitutes its own Fixed Price SOS Customer Group. See DPL, P.S.C. Del. No. 8 — Electric, Rider "SOS" § A.
10. Mr. Neal was the DPL customer of record for the same premises, under the same Service Classification MGS-S and likewise taking Standard Offer Service, until approximately August 2025. Mr. Neal is obligated, under a written contract with the Customer, to reimburse the Customer for the electric charges billed at that premises, and therefore bears the economic burden of the charges described below.
11. Movants appear on their own behalf and are not represented by counsel.
12. Movants are parties to the companion proceeding in Docket No. ER26-3380-000, where they filed a timely motion to intervene and protest on August 20, 2026 (Accession No. 20260820-5015), to which no answer in opposition was filed. Movants are also complainants before the Delaware Public Service Commission in Complaint Docket No. 26-0847, in which Delmarva's answer is due September 14, 2026.
C. Movants' Interest
PDF page 5
13. Rule 214(b)(2) requires a movant to show an "interest which may be directly affected by the outcome of the proceeding," or that participation "is in the public interest." 18 C.F.R. § 385.214(b)(2)(ii), (iii). Movants satisfy both.
14. The tariff names the entity that will bill them. Proposed Attachment DD-4, § X(b)(iii) assigns any IRAS billing default to "the Electric Distributor." The Electric Distributor in Movants' zone is Delmarva. An obligation assessed to Delmarva at wholesale is an obligation Delmarva will seek to recover in Delaware retail rates, where Movants are captive. The chain is not inferential; it runs from a tariff provision to a named utility to Movants' bill.
15. The proposed VRR Curve exclusion moves the price Movants pay. PJM would
exclude specified New Large Load MW from the Variable Resource Requirement Curve beginning with the 2029/2030 Delivery Year, "regardless of whether PJM is experiencing a shortfall that triggers IRAS in the relevant Delivery Year." IRAS Filing, transmittal at 110. Altering the demand curve alters the capacity clearing price for every load in the zone. The Customer's supply is procured and repriced annually, and DPL's Rider "SOS" § B provides that the SOS Rate "will include the costs for energy, capacity and ancillary services as reflected in the awarded electric supply prices for specific services in each year." The Delaware Public Service Commission's own consultant has confirmed the mechanism: "[b]idders use $/MW-day capacity auction prices to create a capacity component (in $/MWh) of their SOS bid prices," and "[l]ower load factor customer classes . . . feel a greater impact from capacity prices than high load factor . . . customers since they have fewer MWh over which to spread their demand-based capacity charges."
PDF page 6
16. No one else in this docket represents this interest. Movants are end-use Standard Offer Service customers in the zone of the Electric Distributor PJM's tariff makes the residual obligor. "Delmarva" appears zero times in PJM's transmittal. No participant in this proceeding has placed a single Delaware fact before the Commission. Granting intervention will not delay this proceeding or burden any party.
17. The Commission should grant this motion and accord each Movant party status.
III. THE FILING
18. On August 13, 2026, PJM submitted a filing under section 205 of the Federal Power Act proposing to establish IRAS and a Large Load Registry, requesting an effective date of October 12, 2026. IRAS Filing, transmittal at 8.
19. IRAS is a load-reduction service. When PJM lacks sufficient available economic real- time supply to maintain reserves or remain within Interconnection Reliability Operating Limits, it may direct load reductions by New Large Loads that have neither entered into "bring your own new capacity" ("BYONC") arrangements nor received Allocated RBP UCAP MW. PJM may call on IRAS reductions "prior to calling on Pre-Emergency Load Management Reductions Actions" — that is, ahead of resources that bid into a market and hold a capacity obligation. Id. at 28. "New Large Load" means "an end-use customer load that is either (a) a Large Load that goes into service after June 1, 2027, or (b) incremental load in-service after June 1, 2027, that increases the existing end-use customer load at a single electrical site that, prior to such incremental load, did not previously meet the definition of Large Load." Proposed Tariff, Definitions — New Large Load.
PDF page 7
20. PJM has severed this filing from its Reliability Backstop Procurement ("RBP") filing in Docket No. ER26-3380-000, stating that "the two filings are independent of each other" and that "IRAS can and should be accepted and made effective as requested." IRAS Filing, transmittal at 2 n.3. PJM must therefore defend this filing on its own terms, without borrowing support from a proceeding it has disclaimed.
IV. PROTEST
A. PJM has not filed a rate. It has filed a range and deferred its value to a proceeding that may never occur.
21. PJM proposes a rate "equal to 50% of the Non-Performance Charge Rate." IRAS Filing, transmittal at 102. The tariff does not stop there. The rate drops below 50% "if the Eligible New Large Load accepts in its retail rate a sum less than 50% of the Non-Performance Charge Rate," and "a rate of zero dollars for IRAS would apply where Eligible New Large Loads waive in their retail rates receipt of compensation." Id. The proposed tariff makes the wholesale rate follow the retail election: it "shall reflect the accepted sum less than 50% of the Non- Performance Charge Rate or if compensation is waived entirely, the rate shall be zero dollars." Proposed Tariff, Attachment DD-4, § X(a).
22. The filed wholesale rate is therefore every value between zero and 50% of the Non- Performance Charge Rate. Which value governs depends on a retail election, made in a state forum, under state law, at a time no one can specify — and, in a State with no proceeding in which to make it, never made at all.
23. This is not a drafting quibble raised by lay customers. The Pennsylvania Public Utility Commission, a State commission with a standing energy bar, told this Commission on September 1, 2026 that it finds "some ambiguity due to discrepancies between PJM's transmittal
PDF page 8
letter and the red-lined tariff amendments proposed on this issue of 0-50% compensation," and that while PJM's redlines "identify EDC compensation obligations and collection thereof from jurisdictional customers," the "tariff does not expressly recognize state authority to prohibit, approve, or modify such compensation and jurisdictional recovery." Answer of the Pennsylvania Public Utility Commission to Motion for Extension of Time, Docket No. ER26-3515-000, at 2–3 (Sept. 1, 2026) (Accession No. 20260901-5028). When the regulator of PJM's largest state cannot determine what the tariff does, the tariff has not given notice.
24. PJM has told the Commission the governing standard, in its own transmittal. Footnote 315 quotes Electric District No. 1: "[P]urchasers of electricity cannot plan their activities unless they know the cost of what they are receiving, 'providing the necessary predictability is the whole purpose of the well-established filed rate doctrine.'" 774 F.2d at 493 (quoting Ark. La. Gas Co. v. Hall, 453 U.S. 571, 577 (1981)). PJM adds that "mere 'direction' without 'sufficient detail on each element [of the replacement rate] that [customers/market participants] could determine when their transactions would be subject to [the new rule]'" would "violate the filed rate doctrine." PJM invokes this to constrain the Commission. It applies with at least equal force to PJM's own submission: a tariff that states a range and locates the operative number in an unscheduled state proceeding gives market participants no way to "determine when their transactions would be subject to" what rate.
25. In Delaware today, the wholesale IRAS rate is unknowable. It is not zero — zero is what results from an affirmative waiver election that Delaware provides no forum to make. It is undetermined, and PJM asks the Commission to accept it in that condition.
B. PJM concedes that its framework cannot function without state action, and supplies no default when that action does not come.
PDF page 9
26. PJM's transmittal states the concession plainly:
"That said, PJM's proposal imposes no obligation on any state to do anything. States are free to design retail rate regimes that facilitate the recovery and allocation of wholesale IRAS rates through generally applicable retail rate tariffs. Alternatively, if states decline to act generically, they could negotiate specific retail filed rates with affected entities. Further still, if states decline to act, Eligible New Large Loads could initiate regulatory proceedings to develop retail pathways to recover wholesale IRAS rates. Or, if states decline to act and Eligible New Large Loads decline to initiate regulatory proceedings to recover through retail rates the wholesale IRAS rate, they would effectively waive a right to
compensation."
IRAS Filing, transmittal at 106–07.
27. PJM presents this as flexibility. It is an admission that the filing is incomplete. The passage answers one question — who gets paid when no State acts — and leaves three that belong to this Commission because they concern the operation of a federal tariff:
(a) The service is still compelled. Nothing conditions PJM's authority to direct IRAS load reductions on the existence of a state-approved compensation mechanism. PJM takes the reliability benefit in a non-acting State on identical terms.
(b) The Electric Distributor's obligations still attach. Under the proposed tariff the Electric Distributor administers the program, identifies the beneficiaries, and absorbs the billing default
— in a State that has adopted no plan enabling it to do the first two.
(c) The tariff supplies no charged party. PJM's answer that compensation may be "effectively waive[d]" addresses only payment. It says nothing about who is charged, and it leaves § X(b)(iii)'s default assignment fully operative.
PDF page 10
28. PJM knows how to solve this, because it did so in the companion docket. There PJM proposed a "backup default cost allocation" governing precisely the case in which a Relevant Electric Retail Regulatory Authority ("RERRA") declines to act. Here PJM proposes none, while relying on the same assumption of state action.
29. The regulators on whom that assumption rests have told the Commission they do not yet understand it. OPSI sought additional time so that "the retail regulators in the PJM region" could "consider the interaction between the rights and responsibilities of PJM, Electric Distributors, and retail regulators related to the implementation of Interim Resource Adequacy Service and the associated compensation mechanism." Notice Denying Extension of Time at 1. Google LLC, the Pennsylvania Public Utility Commission, and East Kentucky Power Cooperative supported that request; no party opposed it. PJM's response to the fact that the region's retail regulators have not worked out the handoff is to ask that the framework be accepted anyway, effective October 12, 2026.
C. Delaware refutes PJM's premise.
30. PJM tells the Commission that some States "have begun proceedings to evaluate how to best facilitate coordination with PJM on implementing IRAS," and that "PJM welcomes all such efforts." Delaware began one. It stopped.
31. On October 14, 2025, the Delaware Public Service Commission opened Docket No. 25-0826 to establish a large load tariff, to ensure that "large load facilities, like data centers, do not shift costs to other ratepayers." That is the proceeding in which Delaware would adopt the "state-approved load reduction plans and other state-approved programs, rates, and rules" on which PJM's framework depends. IRAS Filing, transmittal at 104.
PDF page 11
32. On April 14, 2026, by Order No. 10998, the Hearing Examiner suspended the procedural schedule in Docket No. 25-0826. No Hearing Examiner's Report issued on the scheduled date. No Commission deliberation occurred on the scheduled date. Nearly five months later the docket remains suspended, and Delaware has adopted no large-load rate structure. There is no state-approved load reduction plan in Delaware, and no state-approved program, rate, or rule under which Delmarva could identify either the beneficiaries of an IRAS reduction or the loads to be charged for it. PJM's framework, applied to Delaware on October 12, 2026, would operate with both terms blank.
33. The loads are already at the door. Order No. 10998 records that Delmarva is "working with seven developers on large load projects seeking a total of 2,455 MW," that five of the seven are data centers "seeking 82% of the total load request," and that one proposed project is 1.2 GW against a Delaware summer peak load of 2.7 GW. These are the very loads that would qualify as New Large Loads, in the very zone where no retail mechanism exists.
34. Delaware is also the case PJM identified and then abandoned. Footnote 281 states: "PJM understands that in traditional, non-restructured states, the Electric Distributor also doubles as the LSE for the New Large Load, while in restructured states, the LSE may be an independent entity, not affiliated with the Electric Distributor." IRAS Filing, transmittal at 105 n.281. Delaware is restructured. Delmarva is the Electric Distributor and is not the LSE for a competitively supplied large load. PJM assigns administration, identification, and default risk to an entity whose compensation obligations run through LSEs it does not control, notes the problem in a footnote, and never returns to it.
PDF page 12
35. The absence is not confined to analysis. "Delmarva" appears zero times in PJM's 132-page transmittal letter. "DPL" appears zero times. "Delaware" appears once — in a footnote listing the thirteen Governors who signed the Statement of Principles Regarding PJM of January 16, 2026. "RERRA" appears twenty-three times. PJM has built a framework that operates through Electric Distributors and RERRAs without examining what happens at the one it never names, in the State it mentions only as a signature on a voluntary pledge that binds no one and that no order of this Commission can enforce.
D. Section X(b)(iii) shifts uncollected wholesale obligations onto Delmarva's captive customers.
36. PJM drafted protection for itself with precision. The indemnification language exists "to make clear that neither PJM nor the PJM membership, generally, is financially responsible for any potential defaults that may arise in association with the billing of this compensation." IRAS Filing, transmittal at 108. If "a LSE does not pay as required . . ., the default will not pass to the PJM membership." Id. Where PJM bills at the Electric Distributor's request, "such billing will be viewed as a bilateral transaction between the Electric Distributor and the other party and any default shall be assessed to the Electric Distributor." Id. at 109; proposed Tariff, Attachment DD-4, § X(b)(iii).
37. The provision fixes where a default lands and is silent on who ultimately pays it. In a restructured State with no state-approved allocation mechanism, that silence has an obvious answer: the Electric Distributor's captive retail customers.
38. Delmarva is at this moment seeking a distribution base rate increase before the Delaware Public Service Commission in Docket No. 25-1555 that includes a 21.8% increase for the MGS-S class — the Customer's class — with interim rates already in effect and collecting
PDF page 13
subject to refund. A wholesale default assessed to Delmarva under § X(b)(iii) is an amount Delmarva will seek from that same customer base: customers who are not New Large Loads, did not cause the shortfall IRAS addresses, and receive no IRAS compensation.
39. A provision is not just and reasonable merely because it protects the PJM membership. PJM has shown where the cost stops being its problem. It has not shown that the place it comes to rest is lawful.
E. The Large Load Registry cannot perform the function PJM assigns it.
40. Every allocation in this framework depends on knowing which loads are New Large Loads and when they entered service. PJM would maintain that information in the Large Load Registry and rely on States and Electric Distributors to act on it. A State cannot allocate costs to loads it cannot identify, and an Electric Distributor cannot bill them.
41. A State commission that supports PJM has told the Commission the predicate fails. The Illinois Commerce Commission stated that "expecting the states to make such determinations for PJM and the Commission may be unreasonable," and that "PJM would seem to be in a better position and have access to the appropriate data to make an assessment of the cost causers and even beneficiaries." Comments of the Illinois Commerce Commission, Docket No. ER26-3380-000, at 6 (Aug. 19, 2026) (Accession No. 20260819-5134). On the Registry itself, the ICC warned that "[s]tates have different rules that can limit their access to confidential data," that the ICC "would not be in a position to sign the pro forma non-disclosure agreements to access confidential data from PJM as it reads at this time," and that it "is crucial that any large load registry be accessible to ICC staff in order to fulfill any state's cost allocation obligations." Id. at 7.
PDF page 14
42. That is the assessment of an engaged, supportive State commission with resources and an active docket. PJM's framework fares worse, not better, in a State whose large-load proceeding is suspended.
F. The VRR Curve exclusion raises capacity prices for every customer in the zone, and rests on a pledge no one can enforce.
43. Beginning with the 2029/2030 Delivery Year, PJM would exclude from the VRR Curve the MW of New Large Loads that have not entered BYONC arrangements and hold no Allocated RBP UCAP MW, above the level in the 2028/2029 load forecast — and would do so "regardless of whether PJM is experiencing a shortfall that triggers IRAS in the relevant Delivery Year." IRAS Filing, transmittal at 110. Removing load from the demand curve raises the capacity clearing price for every load in the zone, including residential and MGS-S Standard Offer Service customers who are nowhere near the New Large Load threshold and receive no IRAS compensation.
44. PJM's justification is the Ratepayer Protection Pledge — a voluntary commitment that appears in no tariff, binds no signatory, and cannot be enforced by this Commission or by any party. A demand curve is a price-formation instrument. PJM has offered no tariff consequence if the pledge on which the modification rests goes unhonored.
V. RELIEF REQUESTED
45. The Commission should reject proposed Tariff, Attachment DD-4, § X as filed. PJM bears the burden under FPA section 205 and has not carried it as to either the rate or its allocation.
PDF page 15
46. In the alternative, the Commission should accept the IRAS compensation framework only as conditioned on the following, each of which PJM has consented in advance to have the Commission prescribe. PJM asks that the Commission "expressly prescribe the revised rate or rule in its order," and confirms that "the proposal put forth here is not a stakeholder compromise package," so no bargain is disturbed. IRAS Filing, transmittal at 122–23.
47. First, PJM must state on the face of Attachment DD-4, § X the wholesale IRAS rate and the responsible collecting entity that apply in an Electric Distributor zone where the RERRA has not established a mechanism identifying the entities to be paid and the loads to be charged. PJM proposed exactly such a backstop in the companion RBP filing. A federal filed rate must be ascertainable from the tariff in every zone to which it applies.
48. Second, the Commission should condition acceptance of § X(b)(iii) so that a default assessed to an Electric Distributor may not be recovered, directly or indirectly, from retail customer classes containing no Eligible New Large Loads and receiving no IRAS compensation.
49. Third, PJM must make the Large Load Registry information necessary to identify New Large Loads within a zone — at minimum identity, location, in-service date, and cumulative peak load quantity — available to the RERRA and the Electric Distributor for that zone on terms each is legally able to accept, so that the allocation function PJM assigns to the States can actually be performed.
50. Fourth, the Commission should not permit the VRR Curve exclusion to take effect without a tariff provision specifying the consequence if the Ratepayer Protection Pledge commitments on which it rests are not performed.
PDF page 16
51. Any modification the Commission adopts should be expressly prescribed in its order, as PJM has requested. IRAS Filing, transmittal at 122.
VI. CONCLUSION
52. PJM asks the Commission to approve a rate no one can compute and an allocation no one is required to make, and to make both effective on October 12, 2026. Its answer to the State that has not acted is that compensation is waived — an answer that resolves nothing about who is charged, and leaves a tariff provision routing every uncollected dollar to the Electric Distributor and from there to captive retail customers. Delaware has been in that position since April 14, 2026, and appears in PJM's 132-page filing exactly once, as one of thirteen signatures on a pledge that binds no one. The Commission should require the tariff to answer, in its own text, what PJM has left to a forum that may never convene: in a zone where the State has not acted, what is the rate, who is charged, and who bears the default.
53. For the foregoing reasons, Movants respectfully request that the Commission grant this motion to intervene and the relief requested herein.
Respectfully submitted,
/s/ Nicholas Max Neal /s/ David Neal
_______________________________ _______________________________
Nicholas Max Neal David Neal
111 Centrenest Lane 111 Centrenest Lane
Wilmington, Delaware 19807 Wilmington, Delaware 19807
(845) 263-0012 (646) 509-3146
max@nicholasneal.com shaun@shaunneal.com
Pro se Pro se
Dated: September 2, 2026
PDF page 17
CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding, in accordance with Rule 2010 of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.2010. Dated at Wilmington, Delaware, this 2nd day of September, 2026.
/s/ David Neal
_______________________________
David Neal