ER26-3515-000 · 2026-09-03 · East Kentucky Power Cooperative, Inc.

Limited Protest of East Kentucky Power Cooperative, Inc. to PJM Interconnection, L.L.C.’s 08/13/2026 proposed revisions to the Open Access Transmission…

PDF page 1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

)
PJM Interconnection, L.L.C.
)
Docket No. ER26-3515-000

)

LIMITED PROTEST OF
EAST KENTUCKY POWER COOPERATIVE, INC.

Pursuant to Rule 211 of the Commission’s Rules of Practice and Procedure1 and the Commission’s August 13, 2026 “Combined Notice of Filings #2,” East Kentucky Power Cooperative, Inc. (“EKPC”)2 hereby submits this limited protest of the August 13, 2026 filing3 of PJM Interconnection, L.L.C. (“PJM”) proposing revisions to its Open Access Transmission Tariff (“Tariff”) and Reliability Assurance Agreement Among Load Serving Entities (“RAA”) to establish an Interim Resource Adequacy Service (“IRAS”). Under its IRAS Proposal, PJM would be authorized to direct Electric Distributors to implement load curtailments as a new emergency procedure step subject to North American Electric Reliability Corporation (“NERC”) compliance and provide compensation to the load that is curtailed. To support IRAS, PJM is also proposing in the IRAS Proposal new definitions for Large Load, New Large Load, and Eligible New Large Load; the creation of a Large Load Registry; and the exclusion of New Large Loads from the Variable Resource Requirement (“VRR”) curve starting in the 2029/2030 Delivery Year. EKPC shares the concern that PJM is attempting to address through the establishment of an IRAS-type service, and supports the curtailing of data center load that connects without it or its

1 18 C.F.R. § 385.211 (2026).
2 EKPC filed a doc-less motion to intervene in this proceeding on August 18, 2026.
3 PJM Interconnection, L.L.C., Docket No. ER26-3515-000, “Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and a Large Load Registry to Address System Reliability” (filed Aug. 13, 2026) (“PJM IRAS Filing”).

PDF page 2

2
Load Serving Entity (“LSE”) securing sufficient Capacity Resources. However, PJM’s IRAS, as proposed, is not the solution. PJM’s IRAS Proposal includes provisions that are not just and reasonable and could result in the curtailment of load that is supported by capacity resources and therefore not contributing to the resource adequacy concerns that the IRAS Proposal is intended to address. Moreover, PJM requiring other loads in the zone not contributing to the need for IRAS to pay for the IRAS curtailments is not just and reasonable. Finally, PJM’s proposal discriminates between similarly situated load based solely on whether its LSE satisfies its capacity obligation through Reliability Pricing Model (“RPM”) auctions or the Fixed Resource Requirement (“FRR”) alternative; the IRAS Proposal compounds the problem by adopting an additional requirement for FRR Capacity Plans that creates ambiguity and may disadvantage entities that elect FRR in the future.

For these reasons, and as discussed herein, the Commission should reject several elements of PJM’s proposed Tariff and RAA revisions and require appropriate clarifications and revisions to the IRAS Proposal in order to avoid unjust and unreasonable or unduly discriminatory results.

I. Background
A. IRAS Overview
As proposed by PJM, IRAS is a supplemental reliability mechanism that addresses the undisciplined connection of New Large Loads without sufficient capacity being available in the PJM Region. As explained by PJM, IRAS permits New Large Loads to connect to the PJM system while managing the capacity shortfall that confronts the PJM Region through targeted, emergency load reductions and incentives for self-supply of new capacity.4 Fundamentally, as explained by PJM, “IRAS will enable PJM to prioritize load reduction in zones/areas where New Large Loads

4 PJM IRAS Filing at 22.

PDF page 3

3
have not brought their own new capacity or had their capacity needs covered through the Reliability Backstop Procurement (‘RBP’),” and New Large Loads can avoid IRAS “by bringing new capacity to the system.”5 IRAS will “in Delivery Years when RPM Auctions have failed to secure sufficient capacity, under the proposed IRAS framework, [give] the ability to manage real- time operational issues resulting from such shortages through Interim Resource Adequacy Service Action.”6 The PJM IRAS Proposal is being driven by an acute and worsening resource adequacy crisis in the PJM Region, and, as noted by PJM, the IRAS Filing is “is just one part of a multi- pronged, ongoing effort by PJM to respond to the challenges stemming from the influx of Large Loads into the PJM Region.”7

PJM explains that, as part of its IRAS Proposal, it is proposing “three foundational revisions” in the IRAS Filing. First, PJM is proposing a load reduction mechanism, which “clarif[ies] a Load Serving Entity’s (‘LSE’) obligation to bring new capacity in an amount that equals or exceeds its New Large Loads’ peak load or be subject to load reduction requests during Emergencies prior to Pre-Emergency Load Management Response.”8 As PJM notes, this “lays the foundation for the IRAS paradigm in PJM.”9 Second, PJM is proposing to establish a Large Load Registry, which will be “a database of information pertaining to Large Loads that will be established and maintained by PJM.”10 Third, PJM has proposed that certain New Large Loads (defined below) will be excluded from the VRR Curve beginning with the 2029/2030 Delivery

5 PJM IRAS Filing at 1-2.
6 PJM IRAS Filing at 6.
7 PJM IRAS Filing at 12.
8 PJM IRAS Filing at 4.
9 PJM IRAS Filing at 4.
10 PJM IRAS Filing at 5.

PDF page 4

4
Year “to protect residential customers from capacity price.”11 PJM claims that its IRAS Proposal is “consistent with the Statement of Principles Regarding PJM issued on January 16, 2026, by the National Energy Dominance Council (‘NEDC’) and the 13 governors of the PJM states, and the Ratepayer Protection Pledge.”12

1. IRAS Load Reduction Mechanism
IRAS is a load reduction service, which PJM claims is the “foundation” for IRAS, and will be available starting with the 2027/2028 Delivery Year.13 PJM may invoke an IRAS Action when it determines that available economic real-time supply may be insufficient to maintain reserves, meet applicable Reserve Requirements and Interconnection Reliability Operating Limits (“IROLs”), or prevent cascading outages.14 Load reductions under IRAS would be called before Pre-Emergency Load Management Reductions.15 PJM would direct only aggregate MW quantities of load reduction to the relevant Electric Distributor zone or area; PJM would not identify specific end-use customers for curtailment.16 Electric Distributors, in coordination with state authorities and Relevant Electric Retail Regulatory Authorities (“RERRAs”), would determine which retail loads are ultimately reduced, consistent with state-approved curtailment programs.17 As explained by PJM, this framework reflects a cooperative-federalism model designed to respect the

11 PJM IRAS Filing at 5.
12 PJM IRAS Filing at 6.
13 PJM IRAS Filing at 7.
14 PJM IRAS Filing at 2, 75.
15 PJM IRAS Filing at 82, 94-95.
16 PJM IRAS Filing at 86.
17 PJM IRAS Filing at 87.

PDF page 5

5
jurisdictional divide between federal wholesale authority and state retail authority under the Federal Power Act (“FPA”).18

2. Large Load Registry
PJM proposes to establish a centralized registry of Large Loads in the PJM Region, maintained by PJM and updated periodically.19 The registry would collect detailed information including, among other items, peak load quantities, in-service dates, Bring Your Own New Capacity (“BYONC”) quantities, backup generation, points of interconnection, and relevant contracts.20 Information would be available – subject to confidentiality protections under Operating Agreement, section 18.17 – to authorized state public service commissions, Transmission Owners, Electric Distributors, LSEs, the Market Monitoring Unit, and the Commission, with aggregated data posted publicly by zone/area.21 PJM claims that the registry received strong stakeholder support: 82% of 66 respondents in a July 16, 2026 poll agreed that a large-load registration requirement was necessary, and seven of ten stakeholder proposals included a registry concept.22 Notably, however, several stakeholder respondents to the poll indicated that support for a registry concept was framed around imposing the Connect and Manage (now called IRAS) obligation on the LSE, not the use of the registry as PJM has adopted in the IRAS. In the use of a registry that PJM has proposed in IRAS, the obligation is imposed on the Electric

18 PJM IRAS Filing at 86.
19 PJM IRAS Filing at 22.
20 PJM IRAS Filing at 37.
21 PJM IRAS Filing at 37-38.
22 PJM IRAS Filing at 30. EKPC takes issue with PJM’s characterization of support for a large load registry as supporting what PJM proposed in the IRAS Filing. EKPC agrees that there is significant stakeholder support for a registry. But the registry as proposed by PJM is not reflective of the characteristics of the registries included in the other stakeholder proposals. Therefore, PJM is overstating the stakeholder support for the Large Load Registry it has proposed in this proceeding.

PDF page 6

6
Distributor to interpret the registry and or seek guidance from a RERRA to determine which loads it must curtail.23

3. New Large Load Definitions
PJM proposes to define “Large Load” as “end-use customer(s) load that has a cumulative
peak load of 50 megawatts or greater at a single electrical site behind one or more points of interconnection, where for configurations involving multiple affiliated load facilities or multiple points of interconnection with affiliated load facilities behind them, all affiliated load facilities within a one-mile radius will be considered a single electrical site as further described in the PJM Manuals.”24 “New Large Load” is defined separately as “an end-use customer load that is either

(a) a Large Load that goes into service after June 1, 2027, or (b) incremental load in-service after June 1, 2027, that increases the existing end-use customer load at a single electrical site that, prior to such incremental load, did not previously meet the definition of Large Load.”25 Last, “Eligible New Large Load” is defined as “a New Large Load eligible to provide Interim Resource Adequacy Service in accordance with Tariff, Attachment DD-4, section V.”26

23 PJM Interconnection, L.L.C., CIFP – Reliability Backstop Procurement/Connect & Manage Summarized Poll Results, at 33, https://www.pjm.com/-/media/DotCom/committees-groups/cifp-rbp/postings/cifp-poll-results-with- comments.pdf. (Stakeholder respondents noted that “[a] registry is necessary for both the Reliability Backstop Procurement and for the Connect & Manage framework to ensure costs and curtailments are assigned appropriately. Consistent with the Statement of Principles, a registry will ensure that new Large Load customers (cost causers), through the LSEs that serve them, are appropriately assigned the cost of capacity procured through the Reliability Backstop Procurement (RBP) mechanism. Absent a registry, it is unclear how other end-use consumers could be insulated from these costs. . . . Additionally, it is unclear how, absent a registry, a Connect & Manage framework could be implemented in a way that protects other end-use consumers from being curtailed in response to a PJM Connect & Manage event.”).
24 PJM IRAS Filing at 31 (quoting Proposed RAA, Definitions – Large Load).
25 PJM IRAS Filing at 38 (quoting Proposed Tariff, Definitions – New Large Load). 26 See Proposed Tariff, Definitions – Eligible New Large Load.

PDF page 7

7
4. Bring Your Own New Capacity (“BYONC”)
New Large Loads may avoid or reduce their IRAS exposure by contracting with qualifying new capacity. BYONC is defined as new megawatts of Unforced Capacity (“UCAP”) that meet specified “gating criteria” to ensure that the capacity is genuinely new – including new-build generation, qualifying uprates, repowered deactivated resources, qualifying fuel conversions, and certain new demand-side resources.27 To ensure that the capacity benefits are durable, BYONC must participate as a price taker ($0/MW offer) in RPM Auctions for ten consecutive Delivery Years, subject to all capacity market rules.28 A New Large Load’s potential IRAS obligation is inversely proportional to the amount of BYONC and Allocated RBP UCAP MW it has secured.29

5. VRR Curve Exclusion
Beginning with the 2029/2030 Delivery Year, PJM proposes to exclude incremental New Large Loads from the VRR Curve to the extent that they do not have sufficient BYONC or Allocated RBP UCAP MW arrangements.30 Once a New Large Load’s associated BYONC is offered into the applicable RPM Auction, the corresponding load would be reflected in the demand curve.31 This measure is intended to protect residential customers from capacity price increases attributable to large-load additions that have not secured their own capacity.32 It also has the effect of limiting BYONC to only those resources that clear simultaneously with the New Large Load.

27 PJM IRAS Filing at 53-54.
28 PJM IRAS Filing at 56-57.
29 PJM IRAS Filing at 23.
30 PJM IRAS Filing at 23-24.
31 PJM IRAS Filing at 23-24.
32 PJM IRAS Filing at 5-6. Without the proposed exclusion, demand would be greater, driving up capacity prices.

PDF page 8

8
B. The Stakeholder Process and Joint EDC Proposal
PJM’s IRAS Proposal emerged from several overlapping stakeholder and PJM Board- driven processes. On January 16, 2026, the PJM Board issued a letter outlining a multi-pronged approach to addressing large-load resource adequacy challenges, including a backstop procurement and cost-allocation mechanisms.33 On March 25, 2026, the Board directed formation of the Connect and Manage Senior Task Force to develop a framework for connecting large loads subject to operational controls.34 The PJM Board initiated a Critical Issue Fast Path (“CIFP”) stakeholder process on April 8, 2026, initially focused on the RBP, the scope of which was later expanded to include the IRAS framework, concluding that the “substantive link” between RBP and IRAS warranted a single process.35 The expanded CIFP concluded on June 30, 2026.36 Stakeholders submitted advisory votes on eleven proposals addressing the concepts embodied in IRAS; none achieved the requisite two-thirds support.37

Despite this outcome, the PJM Board concluded that the deteriorating resource adequacy outlook required timely action.38 On July 27, 2026, the Board issued a decisional letter directing PJM to file the IRAS Proposal as presented.39 The IRAS Proposal is therefore a PJM Board- directed filing, not a stakeholder-endorsed compromise.40

33 PJM IRAS Filing at 15.
34 PJM IRAS Filing at 15-16.
35 PJM IRAS Filing at 16. 36 PJM IRAS Filing at 16.
37 PJM IRAS Filing at 16.
38 PJM IRAS Filing at 16-17.
39 PJM IRAS Filing at 16-18.
40 PJM IRAS Filing at 16.

PDF page 9

9
EKPC was a co-sponsor of a Connect & Manage proposal (the “Joint EDC Proposal”) that received 50% stakeholder support.41 The Joint EDC Proposal recognized that “[i]f LSEs take on a retail obligation to supply Large Loads, as defined by the PJM Tariff, without sufficient capacity resources to serve them, they impose risk onto the PJM region. It is appropriate to place rules upon such entities to mitigate that unreasonable risk to others.”42 The Joint EDC Proposal featured some of the same concepts as PJM’s IRAS Proposal, including a large load registry, a definition of “New Large Load,” and BYONC resources and determinations.43 But, how the Joint EDC Proposal proposed to implement these concepts differed in significant ways from PJM’s IRAS Proposal.

II. Limited Protest
A. Introduction
PJM claims that IRAS is necessary “to mitigate the potential reliability risks associated with resource adequacy” and is a “mechanism to support reliability while allowing New Large Loads to connect even when new capacity supply lags behind load growth.”44 EKPC shares PJM’s concern about resource adequacy and the reliability challenges facing the PJM Region, supports measures that maintain resource adequacy, and recognizes the urgency of PJM’s reliability concerns. EKPC even supports the idea of an IRAS-type service as evidenced by its sponsorship of the Joint EDC Proposal. However, as filed, the PJM IRAS Proposal imposes unreasonable curtailment risk on loads not contributing to the resource adequacy concepts underpinning the

41 In addition to EKPC, the Joint EDCs included: Buckeye Power, Dominion Energy, Duquesne Light Company, Exelon, Old Dominion Electric Cooperative, PPL Electric Utilities Corp., Southern Maryland Electric Cooperative, Duke Energy Ohio, and Duke Energy Kentucky. See PJM Critical Issue Fast Path – Reliability Backstop Procurement / Connect & Manage, Joint EDCs Connect & Manage CIFP Package (June 30, 2026), https://www.pjm.com/- /media/DotCom/committees-groups/committees/mc/2026/20260630-special/item-01f---1-joint-edcs---cm--- executive-summary.pdf (“Joint EDC Proposal Summary”).
42 Id.
43 Id.
44 PJM IRAS Filing at 13-14.

PDF page 10

10
proposal, and establishes unduly discriminatory treatment of similarly situated load. As a result, certain elements of the IRAS Proposal are not consistent with requirements of the FPA. Key elements of the IRAS Proposal are unjust and unreasonable. First, the IRAS Proposal is unjust and unreasonable because it fails to recognize an LSE’s existing supply portfolio in determining whether load will be subject to IRAS. If an RPM Self-Supply LSE has sufficient resources – either owned or secured through bilateral contracts, whether “new” or existing – to meet the demand of its load, that load should not risk being subject to the IRAS requirements, including in particular curtailment. Snapping a line between what is “new” versus “existing” and ignoring certain resources voids the value that loads relying upon those resources otherwise should be able to derive. It unreasonably subjects loads that were not contributing to the need for IRAS to curtailment obligations.

Second, similarly, PJM has proposed that a BYONC resource must be committed in an RPM Auction at the same time the New Large Load is included in the RPM Auction in order to offset IRAS exposure. This requirement creates the potential for disconnects between the commercial operation date of a BYONC resource, the timeline for the conducting of an RPM Auction, and full Delivery Year commitment required by RPM Auctions. These potential disconnects mean that an LSE may have brought real capacity to the system yet the associated load remains exposed to IRAS. As explained in the Affidavit of Marc Montalvo, as a result of PJM’s proposal, resources with similar reliability characteristics may receive different treatment under IRAS.45 This fundamentally undermines the resource adequacy incentives that PJM intends to create with IRAS and penalizes loads that did not contribute to the need for IRAS.

45 Attachment 1, Affidavit of Marc D. Montalvo (“Montalvo Affidavit”).

PDF page 11

11
Third, it is unreasonable to require specific capacity resources to be devoted to the service of specific end-consumer large loads. Yet that is what PJM’s IRAS Proposal does since curtailment exposure may depend on whether UCAP MW from BYONC receives recognition for satisfying the peak load contribution of a specific Large Load and is tagged to that load through the in-service lifespan of that specific Large Load.46 As a result, PJM’s IRAS Proposal ignores prudent portfolio planning and the standard practice of Self-Supply LSEs specifically to develop and manage resources on a system-wide basis (i.e., for the entirety of their load obligation, not matching specific resources to specific loads). Mr. Montalvo explains that the “resource-to-load attribution” required by IRAS is contrary to “longstanding utility planning and operating practice.”47 Fourth, as proposed, the strict BYONC recognition rules create an unreasonable restriction on an LSE’s ability to adjust its portfolio. Under PJM’s proposal, BYONC is non-transferable,48 and a BYONC arrangement with New Large Load is permanent “unless and until the New Large Load is permanently out-of-service.”49 This restriction does not seem to account for the fact that an LSE may serve multiple loads, and an LSE should have the flexibility it needs to adjust its portfolio to cover its load obligation, including transferring BYONC.50

Fifth, PJM has not provided sufficient justification for its broad proposed definition of New Large Load. For example, PJM’s proposed definition of New Large Load “encompass[es] all end- use customer(s) load that meet the [certain] requirements.”51 It thus includes commercial and

46 See Proposed Tariff, Attachment DD-4, sections VII(g) and VII(e). BYONC must remain tied to load until permanently out of service.
47 Montalvo Affidavit at PP 29-30.
48 PJM IRAS Filing at 65.
49 PJM IRAS Filing at 64-65; Proposed Tariff, Attachment DD-4, section VII(e)).
50 See Montalvo Affidavit at P 28.
51 PJM IRAS Filing at 35.

PDF page 12

12
industrial load. However, all of the explanation of the need for IRAS is based on data center load, yet without justification PJM sweeps new industrial and manufacturing consumers into its definition.52

Additionally, EKPC seeks clarification as to how PJM intends to measure the MW quantity it will direct an Electric Distributor to curtail in an IRAS Action. This clarification is necessary to eliminate a potential unjust and unreasonable result. Specifically, EKPC seeks to avoid PJM directing an Electric Distributor to drop a specified amount of MW based on registered peak loads of New Large Loads that exceeds the amount of actual New Large Load demand in real time. Such a directive from PJM would result in the Electric Distributor having to drop existing customer load that is not New Large Load. PJM proposes to determine the zonal allocation of IRAS based on the “total Final RBP Target MW across all zone/areas.”53 Not only does determining the zonal allocation of IRAS pursuant to this proposal fail to account for whether the Large Load included in the forecast used in the RPM Auctions, which formed the basis for PJM’s shortfall calculation setting the RBP Target, actually came to fruition, it also fails to take into consideration whether that load is actually on line in real-time when PJM is making the decision to issues an IRAS curtailment directive. Thus, the directive could be expecting an Electric Distributor to curtail an amount of load that is not only larger than the actual Large Load in the zone but also larger than the amount of Large Load actually taking service at that moment. Such a directive would create a conundrum for an Electric Distributor in which it must abide by the Operating Instruction or face potential NERC compliance consequences. This introduces uncertainty as to whether an Electric Distributor will need to shed other load beyond the Large Load that IRAS was intended to address.

52 Montalvo Affidavit at P 32.
53 PJM IRAS Filing at 68; Proposed Tariff, Attachment DD-4, section IX(a).

PDF page 13

13
PJM has failed to show that compensating IRAS is just and reasonable. PJM has also not sufficiently demonstrated that compensating IRAS curtailment is warranted. PJM has not shown why the IRAS curtailment consequence should be converted into a compensable wholesale service funded by other load.

Certain elements of the IRAS Proposal are unduly discriminatory. Certain aspects of the IRAS Proposal are unduly discriminatory because they create an unjustified distinction among entities that have taken similar resource adequacy actions. As proposed, New Large Loads within an FRR Service Area cannot be Eligible New Large Loads. In contrast, an RPM Capacity Market LSE that has likewise prudently planned to serve its load does not receive comparable treatment under the proposed IRAS framework. As explained in Mr. Montalvo’s Affidavit, this raises comparability concerns54 and results in undue discrimination between similarly situated participants in the PJM market.

Last, the proposal also creates ambiguity for, and potentially disadvantages, entities that may elect FRR in the future because it introduces new restrictions on the use of existing generation in an FRR Capacity Plan. PJM’s proposal fails to account for the fact that IRAS may not be in place in the future, but this restriction on an FRR Capacity Plan would remain. In conclusion, PJM’s IRAS Proposal attempts to address a legitimate resource adequacy need. Key revisions and clarifications, however, are required in order to ensure PJM addresses the resource adequacy need in a just and reasonable and not unduly discriminatory fashion. Therefore, for the reasons discussed herein, the Commission should reject certain provisions of the IRAS Proposal and require appropriate revisions and clarifications to address the proposal elements that would create unjust and unreasonable and unduly discriminatory results.

54 Montalvo Affidavit at PP 40-41.

PDF page 14

14
B. Elements of PJM’s IRAS Proposal Are Not Just and Reasonable.
Under Section 205 of the FPA, 16 U.S.C. § 824d, all rates and charges made by a public
utility for the transmission or wholesale sale of electric energy subject to the Commission’s jurisdiction, and all rules and regulations affecting such rates or charges, “shall be just and reasonable.”55 A rate or charge that is not just and reasonable “is hereby declared to be unlawful.”56 Section 205(b) further prohibits any public utility from making or granting “any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage.”57 The burden of proof is on the filing utility to make an affirmative evidentiary showing that the proposed rates, terms, and conditions satisfy the statutory standard.58 General assertions and policy aspirations are insufficient, and PJM has failed to meet this burden with respect to certain aspects of the  IRAS Proposal.

1. Subjecting LSEs with Sufficient Existing Resources to Cover New Large
Load to IRAS is Unjust and Unreasonable.
PJM’s IRAS Proposal requires all loads satisfying the broad definition of “New Large
Loads” to be subject to IRAS if new capacity resources are not secured for the load-serving obligation associated with the New Large Load.59 As proposed, LSEs serving New Large Loads that have prudently planned their (existing) resource portfolios cannot avoid being subject to IRAS

5516 U.S.C. § 824d(a).
56 16 U.S.C. § 824d(a). 5716 U.S.C. § 824d(b).
58 18 C.F.R. § 35.13 (any public utility filing a rate change must submit detailed data and statements to “sustain the burden of proof under the Federal Power Act of establishing that the rate increase is just and reasonable”). See also 16 U.S.C. § 824d(e) (“[a]t any hearing involving a rate or charge sought to be increased, the burden of proof to show that the increased rate or charge is just and reasonable shall be upon the public utility.”).
59 Proposed RAA, section 7.8 (“Effective June 1, 2027, each LSE that desires to provide Network Transmission Service to support New Large Loads must designate one or more Generation Capacity Resources or Capacity Storage Resources that had not cleared an RPM Auction as Network Resource(s) in a cumulative amount that equals or exceeds the LSE’s New Large Load’s peak load (in MW) as reported in the Large Load Registry pursuant to RAA, Schedule 11 or such New Large Load may be subject to load reduction requests during Emergencies prior to Pre-Emergency Load Management Response.”).

PDF page 15

15
without additional, new capacity resources. PJM does not propose to evaluate whether an LSE’s supply resource portfolio is sufficient to satisfy aggregate load and reliability requirements. As explained by Mr. Montalvo, PJM does not address whether the LSE is causing the resource adequacy concern that IRAS is intended to address.60 However, it is not just and reasonable to subject to IRAS curtailment the load of an LSE that has prudently planned its power supply portfolio to include sufficient resources to meet its load-serving obligations, including for New Large Load.

One foundational point of the IRAS Proposal is that PJM requires that “the capacity must be new”61 to exempt New Large Load from IRAS. As PJM explains, “new” capacity is “capacity added to the system starting with the 2027/2028 BRA,” subject to certain gating criteria. As a result, according to PJM’s IRAS Proposal, “capacity already on the system would not fall within the definition of BYONC.”62 Additionally, PJM restricts from BYONC eligibility any UCAP MW that cleared in an RPM Auction before establishing an arrangement with New Large Load that have been reported to PJM.63 Because of the requirement that only new capacity can be used by a New Large Load to avoid IRAS and that the New Large Load would have entered into contracts before the capacity clears an RPM auction, PJM’s IRAS Proposal essentially ignores the existing supply portfolio of an LSE. PJM fails to recognize the value of existing resources to an LSE participating in the RPM with sufficient existing capacity to cover its aggregate load obligations, including New Large Loads. Ms. Tucker explains the consequence of failing to recognize the value of EKPC’s existing portfolio of resources “To the extent that the load EKPC is obligated to serve

60 Montalvo Affidavit at P 23.
61 PJM IRAS Filing at 52.
62 PJM IRAS Filing at 52.
63 Proposed Tariff, Attachment DD, section VI (a)(iii).

PDF page 16

16
can be satisfied with EKPC’s portfolio of resources, it should not be subject to IRAS curtailment exposure. To do otherwise would ignore the significant investment that such loads have made to securing reliability.”64

Fundamentally, the concern for portfolio-length LSEs is that PJM does not appear to provide an offset for an LSE that has existing or planned portfolio length sufficient to cover some or all of the load growth associated with a New Large Load, unless that capacity satisfies BYONC rules or is reflected through RBP UCAP MW (i.e., both of which are limited to new capacity resources). Allowing such recognition of existing resources would not be “repackaging” of capacity as PJM has characterized it.65 An LSE should retain the economic and reliability benefits of its supply portfolio without having to unnecessarily be subject to curtailment or to procure additional resources that may not be needed just to meet PJM’s definition of “new.” As a result, EKPC is concerned that PJM’s IRAS Proposal may run afoul of Kentucky Public Service Commission precedent and the settlement this Commission approved conditioning EKPC’s integration into PJM.66

Because PJM’s IRAS Proposal fails to recognize the value of prudent planning, disregards the reliability and economic value of an integrated, existing power supply portfolio, and potentially subjects to curtailment load that is not causing the reliability concern that IRAS is intended to address, the IRAS Proposal as filed by PJM is unjust and unreasonable. The Commission should

64 Attachment 2, Affidavit of Julia J. Tucker at P 12 (“Tucker Affidavit”)
65 PJM IRAS Filing at 23.
66 See KRS 278.214 (A utility “shall not curtail or interrupt retail electric service within its certified territory … except for customers who have agreed to receive interruptible service, until after service has been interrupted to all other customers whose interruption may relieve the emergency or other event.”). See also Application of East Kentucky Power Cooperative, Inc. to Transfer Functional Control of Certain Transmission Facilities to PJM Interconnection, LLC, Case No. 2012-00169 (Application Dated May 3, 2012); EKPC Integration Order (Ky. P.S.C. December 20, 2012).

PDF page 17

17
not accept it without changes by PJM to expressly recognize LSEs’ existing supply in their portfolios to serve New Large Load and consequently not be subject to IRAS.

2. PJM Has Created an Unjust and Unreasonable Timing Issue by
Restricting BYONC to Capacity that Has Cleared an RPM Capacity
Market Auction.
As proposed by PJM, for BYONC to “address the capacity needs of New Large Loads,” it must be a Capacity Resource.67 A BYONC resource must have participated in an RPM Capacity Auction before the BYONC value may reduce IRAS exposure.68 PJM justifies this requirement by stating that it is necessary to make sure that the capacity benefits of BYONC are “real and lasting,” and to make sure that all entities are aware of “the rules and obligations that accompany arrangements between the UCAP of their resource and New Large Loads.”69 PJM justifies the requirement that BYONC participate as a Capacity Resource on the ground that it will ensure that the LSE will not sell capacity attributes outside of the PJM market.70

EKPC does not take issue with requiring resources that offset an IRAS obligation to take on obligations similar to those of an RPM committed capacity resource. However, explicitly tying the BYONC eligibility to RPM commitment goes further than necessary. In many instances, the timing of the RPM Base Residual Auction (“BRA”) or Incremental Auction (“IA”) will be sufficient to allow a resource to receive an RPM Capacity Auction commitment. However, the requirement that the BYONC resource must be committed in an RPM Capacity Auction in order to be BYONC and thereby reduce IRAS curtailment risk is unreasonably restrictive. Specifically, there can be a mismatch between the infrequent conduct of the IA and the in-service date of

67 PJM IRAS Filing at 55.
68 PJM IRAS Filing at 55.
69 PJM IRAS Filing at 55-56.
70 PJM IRAS Filing at 56.

PDF page 18

18
planned resources. And resources have Commercial Operation Dates (“COD”) mid-Delivery Year, which would make them ineligible for RPM commitment the Delivery Year in which they come on-line and provide operational reliability services to the PJM Region. Mr. Montalvo observed, “A resource may therefore enter service, contribute to reliability, and support load without receiving BYONC recognition if its commercial operation date does not align with PJM’s qualification and auction schedule.”71

The Joint EDC Proposal addressed this timing concern by allowing resources whose COD would not have enabled them to participate in the 3rd IA of the Delivery Year associated with the new Large Load ramping or achieving full operation to still be considered BYONC until its first opportunity to participate in a BRA and obtain an RPM commitment.72 Under the Joint EDC Proposal, to be eligible, the resource would have had to meet several criteria including: (1) it must be online, (2) it must not take on capacity obligations outside of the PJM Region, and (3) it must offer into the Day Ahead energy market commensurate with the Large Load’s schedule for ramping and achieving full operation.73 This approach would have effectively made the BYONC resource comparable to an RPM committed Capacity Resource. PJM could have adopted such an approach.

The impact of PJM’s restrictive approach on Self-Supply LSEs like EKPC is particularly noteworthy.74 Self-Supply LSEs have committed capital, incurred development costs, and

71 Montalvo Affidavit at P 25.
72 See Joint EDC Proposal Summary.
73 See id.
74 Self-Supply is defined in the PJM Tariff as “Capacity Resources secured by a [LSE], by ownership or contract, outside a Reliability Pricing Model Auction, and used to meet obligations under this Attachment or the [RAA] through submission in a Base Residual Auction or an Incremental Auction of a Sell Offer indicating such Market Seller’s intent that such Capacity Resource be Self-Supply. Self-Supply may be either committed regardless of clearing price or submitted as a Sell Offer with a price bid. A [LSE’s] Sell Offer with a price bid for an owned or contracted Capacity

PDF page 19

19
assumed development risk to develop new resources to serve existing and New Large Load. Yet, under PJM’s IRAS Proposal, if any such resource does not meet the RPM Capacity Auction timing requirement, or otherwise comes on-line mid-Delivery Year, an LSE would not get recognition for bringing a resource to the system that is contributing to reliability and resource adequacy.75 In fact, instead of receiving a benefit for bringing a new resource to the PJM system, a Self-Supply LSE would continue to face a curtailment risk in addition to having to incur the cost of the resource.76 And worse, other loads served by such a Self-Supply LSE may be asked to pay for those curtailments pursuant to PJM’s proposed IRAS compensation structure. This result cannot be just and reasonable.

If a resource reaches commercial operation after the relevant RPM opportunity, or cannot align with a full Delivery Year commitment, an LSE may have brought real capacity to the system while the associated load remains exposed to IRAS. As explained by Mr. Montalvo, resources with similar reliability characteristics may receive different treatment under IRAS. A resource that satisfies RPM qualification requirements and secures a capacity commitment may qualify as BYONC and reduce or eliminate IRAS exposure.77 However, a resource that enters service shortly after the applicable milestone may receive no BYONC recognition during that Delivery Year despite providing comparable reliability benefits.78 Associated load may therefore “remain subject to curtailment because of PJM's administrative qualification and recognition timeline rather than

Resource shall not be deemed “Self-Supply,” unless it is designated as Self-Supply and used by the LSE to meet obligations under this Attachment or the [RAA].” PJM Tariff, Definitions – Self-Supply.

75 See Montalvo Affidavit at PP 26-27 in which Mr. Montalvo provides the example of EKPC’s Liberty RICE project, which has an expected COD of mid-delivery year and had not advanced sufficiently through the interconnection process to qualify as a Planned Capacity Resource for 2027/2028 or 2028/2029 Delivery Years. See also Tucker Affidavit at PP 13-16 in which Ms. Tucker describes the status of the Cooper CCGT and Liberty RICE projects.
76 Montalvo Affidavit at P 27.
77 Montalvo Affidavit at P 25.
78 Montalvo Affidavit at P 27.

PDF page 20

20
a shortage of available capacity.”79 PJM says that the objective is to “incent” new capacity. But, as proposed, the revised Tariff would fail to recognize new capacity that is real, available, and not committed outside PJM merely because RPM timing does not line up with the resource’s COD or the New Large Load’s ramp schedule. As a result, IRAS penalizes load not causing the reliability concern IRAS seeks to address. This result cannot be just and reasonable. Therefore, the Commission should not accept PJM’s IRAS Proposal unless it is revised to ensure that the timing commitments associated with becoming a capacity resource do not unreasonably restrict the ability of a new resource to offset IRAS exposure.

3. PJM’s IRAS Proposal Unreasonably Requires Specific Capacity
Resources to be Devoted to Specific End-Consumer Large Loads.
The fundamental structure of PJM’s IRAS Proposal pushes Large Loads and their LSEs toward tagging specific resources to specific end consumer loads rather than utilizing portfolio planning, which has characterized utility planning for over 100 years. IRAS is framed as a service for New Large Loads that are not in arrangements with new capacity additions. PJM is requiring information about “BYONC quantity (MW) and ramp schedule” “related to each Large Load served” by the LSE.80 Only New Large Loads that have no (or insufficient) offsetting BYONC or Allocated RBP UCAP MW are subject to IRAS. Each New Large Load’s registered peak load is reduced by recognized BYONC and Allocated RBP UCAP MW which reduces its IRAS curtailment obligation.81 Similarly, an LSE seeking Network Integration Transmission Service to support New Large Loads is required to designate new resources in an amount equal to or greater than the New Large Load’s peak load, or face IRAS exposure.82 The

79 Montalvo Affidavit at P 27.
80 Proposed RAA Sch.11, B.1(a).
81 PJM IRAS Filing at 69, n.183 (citing Proposed Tariff, Attachment DD-4, section V(b)).
82 PJM IRAS Filing at 49; Proposed RAA, section 7.8.

PDF page 21

21
result is that a New Large Load can avoid or reduce IRAS exposure only to the extent PJM
recognizes specific capacity coverage for individual retail loads.
As proposed, IRAS exposure may rely on whether there is specific resource-to-Load
attribution rather than portfolio sufficiency. This is unduly restrictive on Self-Supply LSEs, like EKPC, that are subject to state regulation and integrated resource planning (“IRP”) requirements. In many instances, LSEs like EKPC do not enter into bilateral contracts with generation supply that identify the specific end consumer they are intended to serve. For example, PJM’s proposal subjects any incremental growth that causes a load to exceed 50 MW to IRAS which could result in industrial and manufacturing load growth becoming subject to IRAS. An LSE like EKPC plans for such growth using a portfolio of supplies and does not devote a new generation resource or bilateral contract to individual end consumers.83 To the extent a bilateral contract were to provide the new capacity, PJM’s IRAS Proposal also has the potential consequence of restricting

commercial contracting, which is generally something the Commission will avoid,84 because
contracts will have to link resources to specific end-use consumers.85 Certainly PJM should not intend through IRAS to upend portfolio planning, regulatory processes and commercial

contracting.

83 Similarly, EKPC’s Data Center Tariff allows EKPC to use its portfolio planning approach to satisfy data center load sized under 250 MW; larger data centers are required to have designated resources. Even there the requirement does not restrict the larger data centers to be tagged to specific resources with restrictions on the ability to replace designated resources. See Tucker Affidavit at PP 17-18.
84 See e.g., Morgan Stanley Capital Grp. Inc. v. Pub. Util. Dist. No. 1, 554 U.S. 527, 578 (2008) (“[The Commission] may abrogate a valid contract only if it harms the public interest”); Sw. Power Pool, Inc., 144 FERC ¶ 61,059, P 128 (2013) (“[A]ll such provisions in bilateral power sales contracts freely negotiated at arm's length between sophisticated parties generally would establish contract rates and would come within the [Mobile-Sierra] presumption”).
85 See Tucker Affidavit at PP 17-18 in which she describes EKPC’s Data Center Tariff and how the requirement for larger data centers to have designated resources does not “tie” the resource to a particular load as IRAS contemplates.

PDF page 22

22
Taking a “portfolio-based approach reflects longstanding utility planning and operating practice.”86 As Mr. Montalvo explains, “Resource adequacy studies, integrated resource plans, reserve margin analyses, and reliability assessments evaluate whether aggregate resource capability can satisfy aggregate load obligations. RPM applies a similar framework. Reserve margin requirements, capacity obligations, and resource adequacy assessments do not require permanent assignments between individual resources and individual customers.”87 The relevant inquiry is whether aggregate resources satisfy aggregate reliability requirements. For example, with respect to EKPC specifically:

As a state-regulated generation and transmission cooperative and self-
supply LSE, EKPC develops and manages resources to satisfy aggregate
load obligations and reliability requirements. When evaluating load growth, including growth from Large Loads, EKPC assesses effects on demand

forecasts, reserve margin requirements, operational requirements, reliability objectives, and long-term resource plans. Resource development decisions

address system requirements rather than the needs of a specific customer or load increment. EKPC evaluates generation additions based on their

contribution to resource adequacy, reliability performance, operational
flexibility, fuel diversity, production costs, and other planning objectives. A single resource may support load growth of multiple customers across

customer classes, maintain reserve margins, replace aging resources,
improve operational flexibility, reduce reliability risk, and strengthen
portfolio diversity. EKPC therefore evaluates resource additions based on their contribution to the overall portfolio.88

In order to meet its load serving obligation, EKPC “actively plans its supply portfolio.”89 As Ms. Tucker notes, “EKPC builds out its portfolio of resources to satisfy the aggregate of its forecasted

86 Montalvo Affidavit at P 30.
87 Montalvo Affidavit at P 30.
88 Montalvo Affidavit at P 28.
89 Tucker Affidavit at P 13.

PDF page 23

23
load needs. EKPC does not tie specific resources in its portfolio to specific Owner Members or to any individual end-consumers served by its Owner Members.”90

Moreover, the implication of PJM requiring BYONC to be devoted to specific loads while also not accommodating BYONC replacement could leave a load subject to curtailment risk should the initially designated BYONC cease to be able to satisfy the full BYONC 10-year commitment. It is unclear whether the New Large Load is fully excused in such circumstances or whether the load becomes subject to IRAS curtailment obligations again.91

Restricting an LSE’s ability to prudently plan to serve its aggregate load obligation with a portfolio of resources potentially unjustifiably subjects its load to curtailment risk by virtue of being unable to tag specific resources to specific load. This unreasonably restrictive approach should be rejected by the Commission.

4. It Is Unjust and Unreasonable to Strictly Restrict the Transferability of BYONC.

PJM has proposed that “once the subject of an arrangement BYONC cannot change to a different New Large Load – i.e., BYONC is non-transferable.”92 According to PJM, the restriction that the BYONC arrangement is permanent is “necessary and consistent with PJM’s overall scheme.”93 And, “BYONC that is in an arrangement with a New Large Load must remain in such an arrangement with that New Large Load unless and until the New Large Load is permanently out-of-service.”94 What PJM’s IRAS Proposal does not seem to account for is that an LSE may

90 Tucker Affidavit at P 12.
91 Proposed Tariff, Attachment DD-4, V(c) (“For purposes of removing its eligibility to provide Interim Resource Adequacy Service, a New Large Load may enter into arrangements with BYONC . . . .” The Tariff is silent on treatment if a BYONC resource becomes unavailable.
92 PJM IRAS Filing at 64.
93 PJM IRAS Filing at 65.
94 PJM IRAS Filing at 64-65; Proposed Tariff, Attachment DD-4, section VII(e)).

PDF page 24

24
serve multiple loads, and an LSE should have the flexibility it needs to adjust its portfolio to cover its aggregate load obligation. One Large Load not growing to the size initially anticipated should not restrict the ability of an LSE to apply BYONC to offset the IRAS curtailment obligation of another New Large Load. To do otherwise penalizes an LSE that secures a portfolio of resources to serve its aggregate load obligation. As proposed, PJM’s transferability restriction on BYONC is unjust and unreasonable and therefore should be rejected.

PJM indicates that BYONC is UCAP and is comprised of MW, not physical resources.95 PJM explains that this is reasonable because “[t]his is consistent with how Capacity Resources under PJM’s capacity market design are also MW and not the underlying physical resource that supports a Capacity Resource. RPM Auctions clear MW of UCAP; that is the traded product. Thus, in the same vein, BYONC is designed to offset the capacity needed presented by the New Large Load.”96 Because PJM defines BYONC as UCAP MW rather than as an indivisible physical resource, the Tariff already contemplates some fungibility. On this same basis, UCAP MW not needed to supply one New Large Load should be allowed to offset the BYONC of another New Large Load.

Additionally, PJM accommodates flexibility for BYONC resources to parse their UCAP MW across multiple New Large Loads. And PJM allows New Large Loads to oversize their BYONC.97 PJM explains, “New Large Load that has plans for expanding in the future may go ahead and lock in BYONC for such planned growth before the growth occurs.”98 However, should a New Large Load not need some of the UCAP MW, the New Large Load (or its LSE) has no

95 PJM IRAS Filing at 51.
96 PJM IRAS Filing at 51 (internal citations omitted).
97 PJM IRAS Filing at 64.
98 PJM IRAS Filing at 64.

PDF page 25

25
ability to transfer it to another load that remains subject to IRAS. This is particularly problematic for an LSE that would have paid for the resource but is unable to utilize it to avoid the need to curtail other load it serves. LSEs use a portfolio of resources to satisfy load obligations. LSEs should be permitted to adjust allocations and assignments as necessary from year to year. Furthermore, should the LSE not need the resource, it should not be forced to continue to incur costs that it otherwise could offset by transferring the resource to another LSE who might need it. Such LSEs would be punished for acting prudently to get ahead of load growth and not leaning on the PJM Region to meet its load obligations.

PJM offers no justification for this mismatch where a New Large Load (or its LSE) can oversize its BYONC commitment but unused UCAP MW cannot be transferred as BYONC from one New Large Load (or LSE) to another, should it not be needed. This aspect of PJM’s proposal is unduly restrictive and therefore not just and reasonable.

5. PJM’s Definitions of Large Load and New Large Load Are Unreasonably
Broad.
PJM has proposed to define Large Load as “end-use customer(s) load that has a cumulative peak load of 50 [MW] or greater at a single electrical site behind one or more points of interconnection, where for configurations involving multiple affiliated load facilities or multiple points of interconnection with affiliated load facilities behind them, all affiliated load facilities within a one-mile radius will be considered a single electrical site as further described in the PJM Manuals.”99 And New Large Load is defined, in part, as “end-use customer load that is either (a) a Large Load that goes into service after June 1, 2027, or (b) incremental load in-service after June 1, 2027, that increases the existing end-use customer load at a single electrical site that, prior to

99 PJM IRAS Filing at 31; Proposed RAA, Definitions – Large Load.

PDF page 26

26
such incremental load, did not previously meet the definition of Large Load.”100 A manufacturing facility in Kentucky that is less than 50 MW today may become subject to IRAS if its incremental load growth increases its size beyond 50 MW.101 The entire incremental growth, not just that which exceeded 50 MW, apparently is subject to IRAS.102 PJM’s proposed definitions, however, go beyond the scope of PJM’s purported driver of its IRAS Proposal.103 Even PJM in its transmittal letter recognizes that the resource adequacy concerns motivating IRAS are “due to a confluence of various factors, particularly the ‘unprecedented surge in data center load’ at a faster pace than new supply can come online.”104

But despite all of the explanation of the need for IRAS being driven by data center load, without sufficient justification PJM sweeps incremental growth and new economic development from industrial and manufacturing consumers into its definition of Large Load and New Large Load.105 But manufacturing and industrial expansions do not present the same timing,

concentration, or operational risks as data centers. Such broad definitions of Large Load and New Large Load – and the concomitant consequence of potentially subjecting the load to curtailment –

100 Proposed RAA, Definitions – New Large Load.
101 See Montalvo Affidavit at P 32.
102 See PJM Interconnection, L.L.C., CIFP Framework for Service During Period of Insufficient Resource Adequacy
– PJM Proposal, Executive Summary, (July 31, 2026), https://www.pjm.com/-/media/DotCom/committees- groups/cifp-rbp/2026/20260731/20260731-item-02b---cifp-framework-for-service-during-periods-of-insufficient- resource-adequacy---executive-summary---redline.pdf (“This includes incremental load that causes an existing load to meet the Large Load definition when it had not previously met this threshold (e.g., if a 30 MW load ramps to become a 60 MW load, then the 30 MW of new load would be considered new Large Load megawatt)”).

103 See PJM IRAS Filing at 31 (citing PJM Interconnection, L.L.C., “Order to Show Cause,” 195 FERC ¶ 61,211, P 58 (2026)).
104 PJM IRAS Filing at 21 (citing 2027/2028 Base Residual Auction Reserve Target Shortfall Report, PJM Interconnection, L.L.C., 1 (Feb. 9, 2026), https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction- info/2027-2028/2027-2028-bra-reserve-target-shortfall-report.pdf [https://perma.cc/TA3Y-95AX]). See, e.g., PJM Interconnection, L.L.C., Board Decisional Letter on Critical Issue Fast Path – Large Load Additions (Aug. 5, 2025) (“Recent increases in large load additions, mainly from data centers, present both opportunities and challenges for the regional grid.”).
105 See PJM IRAS Filing at 35.

PDF page 27

27
may divert economic development away from Kentucky and other PJM states, and that could result in diverting jobs from the PJM region. PJM has not adequately supported applying the same extraordinary curtailment and compensation framework to every form of qualifying large-load growth. Therefore, PJM’s proposed definitions of Large Load and New Large Load are not just and reasonable and the Commission should not accept them unless and until they are revised.

6. PJM’s Determination of Zonal IRAS Allocation May Unreasonably
Subject Non-IRAS Loads to Curtailment.
PJM proposes to determine a zone’s final allocation of IRAS based on the “total Final RBP Target MW across all zone/areas.”106 This proposal raises several concerns that must be addressed in order to avoid an unjust and unreasonable result. First, allocating IRAS based on the “total Final RBP Target MW across all zones/areas” fails to account for whether the Large Load, which was assumed in the forecast that was used in the RPM Auctions that formed the basis for PJM’s shortfall calculation that set the RBP Target, came to fruition. Second, PJM’s proposal does not take into consideration whether the Large Load assumed in the forecast is actually online in the real-time space in which PJM is making the decision to issue an IRAS curtailment directive. Thus, PJM’s IRAS Action could be a direction to an Electric Distributor to curtail an amount of load that is larger than the actual Large Load in the zone or an amount larger than the actual Large Load on- line in real time. An Electric Distributor must abide by the Operating Instruction or face potential NERC compliance consequences. This could result in an Electric Distributor being required to shed other load beyond the load for which IRAS was intended to target.107

As Mr. Montalvo explains,

106 PJM IRAS Filing at 68.
107 Mr. Montalvo also addresses a related concern in that PJM’s proposal does not clearly establish how it will evaluate compliance with an IRAS Action directive.  See Montalvo Affidavit at P 16.

PDF page 28

28
an Electric Distributor may need to exercise judgment when PJM
directs a load reduction that exceeds the amount of Eligible New
Large Load available for curtailment. Because PJM characterizes an
IRAS Action as a NERC Operating Instruction (Proposed Tariff,
Attachment DD-4, Section III(a)), an Electric Distributor may be
expected to comply even when the sufficient IRAS-targeted load
unavailable. In those circumstances, the Electric Distributor could
face a choice between failing to satisfy PJM’s instruction or
extending curtailments beyond the loads that the IRAS framework
is intended to address. If the requested reduction exceeds the amount
of IRAS-curtailable New Large Load that is online and available,
firm end-use customers that are not taking IRAS service may
nonetheless be curtailed. This ambiguity creates implementation
risk and may result in curtailment impacts that extend beyond the
scope of the underlying IRAS obligation.108

Clearly, this cannot be the result that PJM would desire. Moreover, it is a result that does not provide PJM operations with an accurate understanding of how real-time actions would aid in alleviating emergency conditions. Thus, EKPC requests that PJM provide clarification and appropriate revisions to its proposal to address this potentially unjust and unreasonable result.

7. SPP’s CHILL Precedent Is Materially Different from IRAS.
PJM justifies the IRAS Proposal, in part, by pointing to the Commission’s approval of the Southwest Power Pool, Inc. (“SPP”) Conditional High Impact Large Load Service (“CHILLS”) construct.109 However, PJM’s IRAS Proposal is materially different. The Commission accepted SPP’s CHILL as a non-firm transmission service that allows certain large loads accelerated access for a limited period while preserving curtailment authority until sufficient designated resources or network upgrades are in place.110 IRAS is not simply a distinct conditional transmission product; it is an integrated load-reduction, compensation, BYONC and RBP Offset recognition, and VRR Curve adjustment mechanism. The Commission’s acceptance of CHILLS, which is time-limited

108 Montalvo Affidavit at P 14.
109 PRM IRAS Filing at 97.
110 Sw. Power Pool, 195 FERC ¶ 61,196 (2026).

PDF page 29

29
conditional transmission service, does not establish that PJM’s broader IRAS design is just and reasonable.111 CHILLS does not create curtailment risk for entities that did not contribute to the resource adequacy problem facing the region (as IRAS creates for entities in the PJM region). Nor did CHILLS create an unduly discriminatory treatment between similarly situated load.

C. PJM Has Failed to Demonstrate that Compensating IRAS Curtailment Is
Warranted.
Under PJM’s IRAS Proposal, load reductions provided under IRAS will be compensated at a rate equal to 50% of the applicable Non-Performance Charge Rate.112 Specifically, PJM proposes to “extend the rate applicable for Pre-Emergency Load Response nonperformance (and conversely for bonus payments) – 50% of the Non-Performance Charge Rate – as the maximum rate for IRAS performance.”113 PJM’s justification for this approach is based in part on the fact that the Commission recently accepted this rate.114 However, the Commission’s acceptance of a 50 percent Non-Performance Charge Rate for demand-response performance or non-performance does not by itself justify paying New Large Loads for IRAS curtailment. Demand response compensation generally rests on a defined resource obligation and wholesale market impact. IRAS curtailment, by contrast, is triggered by PJM’s conclusion that a class of load lacks recognized capacity coverage. PJM must justify IRAS compensation on its own terms, and PJM has failed to do so.

As explained by Mr. Montalvo
IRAS applies to New Large Loads that have not secured qualifying
BYONC resources or sufficient [RBP] capacity. Exposure to
curtailment therefore reflects the absence of qualifying capacity

111 Indeed, PJM states that IRAS will remain in the Tariff even if the current capacity shortfall driven by data center growth is resolved. See PJM IRAS Filing at 93. In that regard, it is not time limited.
112 PJM IRAS Filing at 102.
113 Id.
114 Id.

PDF page 30

30
support. Under those circumstances, curtailment does not constitute
a distinct reliability service. Instead, curtailment reflects the
reliability consequences associated with receiving service without
obtaining the resources needed to support firm resource adequacy
treatment.115

Therefore, curtailment is a “condition of service rather than a compensable reliability product.”116 On this point, Mr. Montalvo compares IRAS compensation with the compensation structure for firm and non-firm transmission service. As Mr. Montalvo explains, “Both classes of customers receive transmission service, but non-firm customers accept interruption during periods of system constraint rather than pay for transmission upgrades. Transmission providers generally do not compensate non-firm transmission customers when interrupted because curtailment is an inherent characteristic of the service being provided.”117 The same should be the case with the curtailment service PJM is proposed through IRAS.

Mr. Montalvo additionally observes that the compensation level proposed would be at a level “broadly comparable to recent capacity-market prices, and potentially higher than revenues received by Demand Response resources committed through the RPM Capacity Market to take on an obligation to curtail…”118 As such, the compensation “may reduce the economic consequence of remaining subject to IRAS and thereby weaken the incentive for New Large Loads to secure qualifying capacity resources.”119 Moreover, PJM’s proposal to not include New Large Load in the Variable Resource Requirement yet require such loads to be included in the zonal allocation of RPM costs may “lessen the apparent capacity-cost impact on other customers without

115 Montalvo Affidavit at P 42.
116 Montalvo Affidavit at P 42.
117 Montalvo Affidavit at P 43. 118 Montalvo Affidavit at P 15.
119 Montalvo Affidavit at P 15.

PDF page 31

31
strengthening the incentive to develop or procure the resources needed to serve that New Large Load reliably.”120

As Mr. Montalvo notes, “[r]esource adequacy frameworks generally function most effectively when market participants bear the costs associated with the reliability risks they create.”121 That is not the scenario PJM is creating with its IRAS Proposal. As discussed above, requiring the other load of LSEs, like EKPC, to pay for curtailments that otherwise would have been avoided if PJM were to (1) recognize the existing length in a supply portfolio, and (2) correct the potential timing mismatch in new generation COD and the start of a Delivery Year, is overly punitive. It also is not aligned with the intended incentives underlying IRAS – to encourage prudent resource planning. PJM has effectively weakened the incentives to develop, procure, or contract for qualifying capacity resources because compensation for IRAS curtailments “reduce[s] the economic consequence of remaining subject to IRAS.”122

Moreover, PJM requiring the other load in the zone to fund the compensation penalizes such loads that are not contributing to the resource adequacy insufficiency that PJM is proposing to address with IRAS. Granting an opportunity for New Large Loads to waive the compensation does not address the underlying inequity in the proposal. It is seemingly inconsistent with the Commission’s jurisdiction that a RERRA could determine the applicability of a PJM Tariff provision and decide that the other load does not need to make the payment PJM proposed to compensate New Large Loads that are curtailed by an Electric Distributor upon PJM’s direction. Furthermore, this required compensation runs afoul of Kentucky Public Service Commission precedent and the settlement conditions approved by this Commission upon which

120 Montalvo Affidavit at P 18.
121 Montalvo Affidavit at P 49.
122 Montalvo Affidavit at P 46.

PDF page 32

32
EKPC (and the other Kentucky utilities) integrated into PJM.  The Kentucky Public Service Commission specifically reserved jurisdiction over all demand-side management programs

involving retail loads, such as demand response programs, and, as a condition of the integrations of Kentucky’s three utilities that are members of PJM, required PJM to consent to this

reservation.123 As a result, PJM may not offer load interruption programs to retail consumers without the utilities’ consent, which in turn requires the approval of the Kentucky Public Service Commission.124 To go a step further, the Kentucky Public Service Commission conditioned the original integration approval order upon this Commission’s acknowledgement of the reservation of jurisdiction over demand-side management programs in Kentucky and this Commission

acknowledged the reservation.125 When energy efficiency resource aggregators sought to
aggregate load in Kentucky to bid into PJM’s capacity market, the Kentucky Public Service Commission issued an order that such actions violated its jurisdiction,126 which this Commission acknowledged.127

123 In the Matter of the Application of Kentucky Power Company d/b/a American Electric Power, for Approval, to the Extent Necessary, to Transfer Functional Control of Transmission Facilities Located in Kentucky to PJM Interconnection, L.LC. Pursuant to KRS 278.218, Order, Case No. 2002-00475, (Ky. P.S.C. May 19, 2004); In the Matter of the Application of Duke Energy Kentucky, Inc. for Approval to Transfer Functional Control of its Transmission Assets from the Midwest Independent System Operator to the PJM Interconnection Regional Transmission Organization and Request for Expedited Treatment, Order, Case No. 2010-00203, (Ky. P.S.C. Dec. 22, 2010); Letter from Terry Boston to Jeff Derouen, Case No. 2010-00203, Post-Case Correspondence File (Ky. P.S.C. Jan. 11, 2011); Application of East Kentucky Power Cooperative, Inc. to Transfer Functional Control of Certain Transmission Facilities to PJM Interconnection, LLC, Order, Case No. 2012-00169 (Ky. P.S.C. Dec. 20, 2012).
124 As a “load reduction service” in which load is curtailed and, according to PJM’s proposal, compensated, IRAS would be a load interruption program subject in Kentucky to the Kentucky Public Service Commission’s jurisdiction. Section 278.285 of the Kentucky statutes grants the Kentucky Commission authority to “determine the reasonableness of demand-side management plans proposed by any utility under its jurisdiction.”  And Section 278.010 of the Kentucky statutes defines “demand-side management” as “any conservation, load management, or other utility activity intended to influence the level or pattern of customer usage or demand, including home energy assistance programs” (emphasis added).
125 In the Matter of New PJM Companies and PJM Interconnection, LLC, 107 FERC ¶ 61,272, P 4 (2004).
126 In the Matter of the Application of East Kentucky Power Cooperative, Inc. for a Declaratory Order Confirming the Effect of Kentucky Law and Commission Precedent on Retail Electric Customers’ Participation in Wholesale Electric Markets, Order, Case No. 2017-00129 (Ky. P.S.C June 6, 2017).
127 Advanced Energy Economy, 161 FERC ¶ 61,245, PP 66-69 (2017).

PDF page 33

33
Because PJM has failed to provide sufficient justification for treating IRAS as a reliability service rather than a condition of service, and failed to justify why other loads not contributing to the need for IRAS curtailments should pay for the curtailments, PJM’s proposed IRAS compensation has not been shown to be just and reasonable and should be rejected.

D. PJM’s Proposed Treatment of New Large Loads Served by FRR Entities Is
Preferential and Unduly Discriminatory; And PJM has Not Sufficiently
Supported the Blanket Exception from IRAS for Load Served by FRR Entities.
PJM’s IRAS Proposal’s treatment of FRR entities and its allowance for the use of an FRR entity’s portfolio of resources to demonstrate resource adequacy raises comparability concerns and unduly discriminates against RPM Capacity Market LSEs. As proposed, no new large loads in FRR Service Areas are “Eligible New Large Loads.”128 Therefore, the New Large Loads in FRR Service Areas are not eligible for IRAS. PJM’s rationale is that an FRR Entity is responsible for securing new generation to supply new large load.129 However, it is possible for an FRR Entity to have an insufficient FRR Plan. PJM is not proposing any restrictions on such an entity; rather it is proposing a blanket exception from IRAS for FRR loads. It is unduly discriminatory to allow an FRR Entity that potentially could have an insufficient FRR Plan to avoid IRAS while load of a Self-Supply Entity participating in the RPM Capacity Market would be subject to IRAS. The Joint EDC Proposal addressed this concern by including the caveat that “Load that is part of a [FRR] Alternative Capacity Plan is excluded from Connect and Manage [i.e., now IRAS] only to the extent the FRR plan is sufficient.”130 PJM could have adopted a similar caveat to its FRR exclusion in its IRAS Proposal as well.

128 PJM IRAS Filing at 73 (quoting Proposed Tariff, Attachment DD-4, section V(a)) (“New Large Loads that are located within an FRR Service Area cannot be Eligible New Large Loads.”)).
129 PJM IRAS Filing at 73.
130 See Joint EDC Proposal at 3.

PDF page 34

34
As explained by Mr. Montalvo, although FRR Entities and Self-Supply Entities “pursu[e] the same reliability objective,”131 PJM’s IRAS Proposal nevertheless subjects FRR Entities and Self-Supply Entities to different requirements “based solely on the framework through which PJM recognizes resource adequacy.”132 The IRAS Proposal fails to “explain why a portfolio-based demonstration suffices within the FRR construct but not within the self-supply construct. Given the similarities in the planning, procurement, and portfolio management functions performed by these entities, the record provides little basis for this distinction.”133 Effectively an FRR Entity is able to use its portfolio of supply to cover all its load, including shifting the supply in its portfolio to cover the capacity needs of other loads without the same restrictions that PJM has proposed with respect to BYONC. LSEs participating in RPM cannot do so. Such disparate treatment of similarly situated entities is unduly discriminatory.

An FRR entity may use a portfolio of resources to satisfy its FRR Capacity Plan requirements with no requirement to tie the resources to specific loads or restrictions on replacing capacity resources or transferring capacity resources. By contrast, an RPM LSE that has prudently developed, retained, or contracted for sufficient resources to serve all or part of its incremental load would not receive comparable treatment. If PJM recognizes resource adequacy actions taken under the FRR construct for purposes of avoiding IRAS exposure, principles of comparability require that it similarly recognize owned resources, bilateral contracts, and comparable resource commitments maintained by RPM LSEs when determining IRAS curtailment. PJM offers no explanation as to why LSEs that similarly have existing resources paid for by the load they serve should be exposed to curtailment under IRAS.

131 Montalvo Affidavit at P 40.
132 Montalvo Affidavit at P 40.
133 Montalvo Affidavit at P 40.

PDF page 35

35
Moreover, although PJM imposes a restriction on an FRR Entity’s inclusion of Existing
Generation Capacity Resources in its FRR Capacity Plan,134 it does not require the FRR Capacity Plan to be sufficient. There are no conditions on the IRAS exception. PJM has not provided any support for the reasonableness of the blanket exception for FRR load.

RPM Capacity Market LSEs that have sufficient capacity, whether owned or contracted
for, are similarly situated to FRR entities. Yet as proposed, only RPM Capacity Market LSEs have exposure under IRAS. And FRR Entities that do not have sufficient FRR Capacity Plans would be exempt from IRAS. These distinctions, without justification, are unduly discriminatory.135

Therefore, the Commission should not accept PJM’s IRAS Proposal unless it is revised to confirm that FRR Entities are only exempt from IRAS to the extent the FRR plan is sufficient.

E. PJM’s Proposed Revisions to FRR Rules Creates Ambiguity and Disadvantage
Entities that May Elect FRR in the Future.
PJM has proposed an additional requirement be placed on FRR Capacity Plans. PJM is
proposing that “[a]n FRR Entity may not include in its FRR Capacity Plan any MW quantity of
Existing Generation Capacity Resource in excess of what such FRR Entity owned or contracted
by such FRR Entity Prior to June 1, 2027, to serve New Large Loads.”136 EKPC supports
constraining the FRR Capacity Plans’ reliance on existing capacity resources to the extent that the

134 RAA Schedule 8.1, Section D.
135 City of Anaheim, Opinion No. 483, 113 FERC ¶ 61,091, P 130 (2005) (“Discrimination is undue when there is a difference in rates or services among similarly situated customers that is not justified by some legitimate factor.”); PacifiCorp Elec. Operations, 54 FERC ¶ 61,296, 61,855 (“undue discrimination can occur only when two similarly situated customers are treated differently, and there is no justification for the differing treatment”); Puget Sound Energy, Inc. v. All Jurisdictional Sellers of Energy, Opinion No. 537, 151 FERC ¶ 61,173, P 43, n.105 (quoting Energy Transfer, 120 FERC ¶ 61,086, P 169), rev’d on other grounds, 157 FERC ¶ 61,026 (2016) (“It is well established that a finding of undue discrimination requires a showing that ‘(1) two classes of customers are treated differently; and (2) the two classes of customers are similarly situated.’”); Midwest Indep. Transmission Sys. Operator, Inc., 155 FERC ¶ 61,082, P 31 (2016) (“there is no undue discrimination or preference because we have identified appropriate reasons for it”).
136 Proposed RAA, Schedule 8.1, D (1.1).

PDF page 36

36
FRR entity would be pulling resources from RPM while the IRAS rules are in effect. However, to the extent that IRAS is not needed, this language unduly restricts an FRR Capacity Plan. Such a restriction not only limits cost-effective options for load subject to FRR, but it also unnecessarily eliminates a financial option for capacity resources because they cannot be used by an FRR entity to satisfy an FRR Capacity Plan. PJM’s proposed language is broader than necessary to address the narrow reliability issue it intends to resolve. As drafted, PJM’s new restrictions create ambiguity for current FRR Entities and disadvantage any entity that may decide to elect FRR in the future. Therefore, this broad language is not just and reasonable and the Commission should not accept it unless the IRAS Proposal is revised to address these concerns.

III. Conclusion
Wherefore, East Kentucky Power Cooperative, Inc. respectfully requests, as detailed above, that the Commission reject certain elements of PJM’s IRAS Proposal as unjust and unreasonable or unduly discriminatory and require appropriate revisions or clarifications to those elements in order to avoid unjust and unreasonable or unduly discriminatory results.

PDF page 37

37

Respectfully submitted,

Denise R. Foster Cronin
Chief Compliance Officer and Senior Vice President

East Kentucky Power Cooperative, Inc. 4775 Lexington Road, P.O. Box 707

Winchester, KY 40392-0707
Tel.: 859-745-9615
Email: denise.cronin@ekpc.coop

On Behalf of
East Kentucky Power Cooperative, Inc.

/s/ Daniel E. Frank

Daniel E. Frank
Allison E. S. Salvia
Kelly A. Cuthbertson
Adriana J. Santana
Eversheds Sutherland (US) LLP
700 Sixth St., N.W., Suite 700
Washington, DC 20001-3980
Tel.: 202-383-0100
Email: danielfrank@eversheds-sutherland.com allisonsalvia@eversheds-sutherland.com kellycuthbertson@eversheds-sutherland.com anasantana@eversheds-sutherland.com

Counsel for
East Kentucky Power Cooperative, Inc.

Dated: September 3, 2026

PDF page 38

Attachment 1
Affidavit of Marc Montalvo

PDF page 39

1

AFFIDAVIT OF MARC D. MONTALVO
ON BEHALF OF
EAST KENTUCY POWER COOPERATIVE, INC.

Introduction
1. My name is Marc D. Montalvo. I am President and Managing Principal of Daymark Energy Advisors (“Daymark”). My business address is 370 Main Street, Worcester, Massachusetts 01608. Daymark is a consultancy that provides transmission planning, economic analysis, and strategic advisory services to the electric power industry. Daymark is part of the Xodus Group.

2. I work with industry and policymakers to design regulatory and market structures that enable the efficient development and deployment of energy infrastructure. My principal practice areas are competitive power markets, strategic planning, risk management, and capital budgeting and investment analysis. I have worked on capacity market design issues on behalf of clients in PJM Interconnection, L.L.C. (“PJM”), New York Independent System Operator, Inc. (“NYISO”), ISO-New England, Inc. (“ISO-NE”), and Midcontinent Independent System Operator (“MISO”). My clients include developers, utilities, and government agencies across North America, and I have appeared as an expert before the Federal Energy Regulatory Commission (“FERC” or the “Commission”), Canadian provincial regulators, and state regulatory agencies. Prior to joining Daymark, I worked ten years at ISO-NE where I held the positions of Director of Market Development, Director of Internal Market Monitoring: Investigation and Market Assessment, and Director of Enterprise Risk Management. Prior to ISO-NE, I was a managing consultant with La Capra Associates. I began my career at New England Power Co. I taught courses in finance and business analytics at Clark University’s School of Management from 2016 to 2020.

PDF page 40

2

3. I advised East Kentucky Power Cooperative, Inc. (“EKPC”) on the development of workable reliability backstop and connect and manage mechanisms during the PJM stakeholder process that culminated in PJM’s filings in docket nos. ER26-3380-000 and ER26-3515-000. In this docket, I have been asked by EKPC to evaluate PJM’s proposed Interim Resource Adequacy Service (“IRAS”) framework, including proposed Tariff, Attachment DD-4 and related revisions to the Reliability Assurance Agreement (“RAA”), and its implications for utilities developing and maintaining resources to serve growing electric demand, including Large Loads.

4. My findings are based upon my review of the PJM IRAS proposal, the Joint Electric Distribution Company (“EDC Joint”) proposal, which I helped develop and was submitted into the PJM stakeholder process, project development information provided by EKPC, and my professional experience evaluating electric utility planning, generation investment decisions, resource adequacy frameworks, and capacity market design.

Summary of findings
5. My findings are as follows:
a. IRAS may require customer curtailments even when sufficient resources are available to serve load because PJM’s eligibility determination is governed by administrative gates rather than actual resource in-service dates and operational availability. Consequently, customers may be curtailed despite the resolution of the underlying reliability concern. b. IRAS may assign curtailment obligations to Load Serving Entities (“LSEs”) whose loads do not contribute to the resource adequacy deficiency because PJM will propose to link specific resources to specific large loads rather than assess the adequacy of an LSE’s

PDF page 41

3

overall resource portfolio. Consequently, LSEs with sufficient aggregate capacity positions may nevertheless face curtailment risk.

c. IRAS applies different standards to similarly situated LSEs by permitting FRR entities to demonstrate resource adequacy on a portfolio basis while imposing resource-specific qualification and resource-specific requirements on self-supplying RPM participants. Consequently, loads served by self-supply LSEs may face curtailment exposure that comparable FRR-served LSEs do not.

d. PJM’s proposal to compensate large loads curtailed under IRAS may weaken incentives to develop, retain, or procure qualifying resources – particularly demand response -- and may shift costs onto end-use customers. Consequently, the proposal risks increasing reliance on curtailment while doing little to improve the long-term resource adequacy challenges it is intended to address.

Background
6. As a preliminary matter, it is important to distinguish amongst the various entities and customers referenced in this affidavit. LSEs provide electric supply service to end-use customers. Under the RAA, LSEs are Customers of PJM and take service under PJM’s Open Access Transmission Tariff (“OATT”). By contrast, Large Loads are customers of LSEs and, unless they independently qualify and register as an LSE, are not Customers of PJM. Electric Distribution Companies (“EDCs”) provide distribution service to end-use customers and are likewise not Customers of PJM. Some EDCs also serve as Electric Distributors, which as described in PJM manuals, perform certain administrative functions, including meter reading for the determination of LSE Peak Load Contributions used in Reliability Pricing Model (“RPM”) settlements, as well as the collection and reporting of load forecast data.

PDF page 42

4

Throughout this affidavit, I use these terms with care. The term “Customer,” when capitalized and used independently, refers to an LSE that is a PJM Customer. The term “customer,” when not capitalized, or when used in conjunction with terms such as “load customer” or “end-use customer,” refers to a retail supply customer of an LSE or a distribution customer of an EDC.

7. On August 13, 2026, PJM filed revisions to its Open Access Transmission Tariff and Reliability Assurance Agreement that would establish an IRAS framework and related provisions governing New Large Loads.1 The proposal would take effect in the 2027/2028 Delivery Year. It addresses large load registration, capacity coverage requirements, emergency load reduction procedures, and the treatment of incremental large loads within PJM’s resource adequacy framework and capacity market, including proposed Tariff, Attachment DD-4 and proposed RAA section 7.8.2

8. IRAS is a load-reduction framework available during specified reliability conditions. PJM describes IRAS in its proposed tariff as a “load reduction service” and in its transmittal letter characterizes IRAS as a “new supplemental capacity product” through which New Large Loads provide load reduction capability to help PJM manage resource adequacy shortfalls.3

9. IRAS would allow PJM to direct zonal load reductions before Pre-Emergency Load Management when PJM determines that available economic real-time supply may be insufficient to satisfy reserve requirements, maintain Interconnection Reliability Operating

1 PJM Interconnection, L.L.C., Proposal to Establish Interim Resource Adequacy Service and a Large Load Registry to Address System Reliability,  Docket No. ER26-3515-000 (filed Aug. 13, 2026). 2 PJM Interconnection, L.L.C., Proposed Reliability Assurance Agreement § 7.8, Docket No. ER26-3515-000 (filed Aug. 13, 2026).
3 PJM Interconnection, L.L.C., Proposal to Establish Interim Resource Adequacy Service and a Large Load Registry to Address System Reliability, Docket No. ER26-3515-000, at 22 (filed Aug. 13, 2026).

PDF page 43

5

Limits (“IROLs”), or prevent cascading outages.4 PJM proposes to deploy IRAS before Pre- Emergency Load Management actions, generally during Energy Emergency Alert Level 1 (“EEA1”) conditions, while retaining discretion to implement other emergency actions necessary to maintain reliability.

10. PJM proposes to create and administer a Large Load Registry.5 The registry would contain information on Large Loads, including location, in-service date, peak demand, load-growth schedule, telemetry specifications, backup generation, interconnection status, and capacity arrangements. PJM would use the registry to identify New Large Loads, determine available IRAS curtailment amounts, track Large Load specific capacity arrangements (not LSE arrangements), and calculate IRAS obligations by Electric Distributor zone or area. With IRAS PJM puts the load serving obligation on LSEs but requires the Bring Your Own New Capacity (“BYONC”) arrangements to be tied to specific load customers. The proposal defines a Large Load as an end-use customer load with a cumulative peak demand of at least 50 MW at a single electrical site, including certain affiliated facilities located within a one- mile radius.

11. The proposal would establish a BYONC framework under Tariff, Attachment DD-4 sections VI through VIII. Qualifying BYONC capacity would offset a New Large Load’s capacity requirement and reduce potential IRAS exposure. Eligible resources include specified generation, storage, incremental capacity additions, repowered resources, and demand-side resources. The proposal establishes reporting, validation, and maintenance requirements for

4 PJM Interconnection, L.L.C., Proposed Tariff, Attachment DD-4 § I, Docket No. ER26-3515-000 (filed Aug. 13, 2026).
5 PJM Interconnection, L.L.C., Proposed Reliability Assurance Agreement, Schedule 11 § B, Docket No. ER26- 3515-000 (filed Aug. 13, 2026).

PDF page 44

6

BYONC arrangements and requires BYONC resources to clear as Capacity Resources in the RPM. PJM does not permit replacement of BYONC generation or storage resources but does allow Demand Response and DER Aggregations to replace their BYONC commitments.

12. The proposed Tariff, Attachment DD-4 sections IV and V establish procedures for determining and allocating IRAS obligations. For each Delivery Year, PJM would determine if a capacity shortfall exists and then calculate the load-reductions required to address that shortfall. New Large Loads are subject to curtailment under IRAS if qualifying BYONC arrangements or allocated Reliability Backstop Procurement (“RBP”) Unforced Capacity (“UCAP”) do not offset their registered peak load.6

13. The proposal excludes New Large Loads located in Fixed Resource Requirement (“FRR”) service areas from IRAS.7 FRR entities would instead satisfy resource adequacy requirements through their FRR Capacity Plans. Nonetheless, while FRR entities remain exempt from IRAS, PJM recognizes that large load growth raises resource adequacy considerations that warrant incremental capacity support.8

14. PJM does not propose to identify individual load customers for curtailment. Instead, PJM would determine a zonal or area-wide megawatt reduction and issue a curtailment directive to the applicable Electric Distributor. The proposal relies on forecasted load-growth allocations to establish zonal responsibilities and on Electric Distributor and state processes

6 PJM Interconnection, L.L.C., Proposed Tariff, Attachment DD-4 § IX, Docket No. ER26-3515-000 (filed Aug. 13, 2026). See PJM Interconnection, L.L.C., Protest of East Kentucky Power Cooperative, Inc., Docket No. ER26-3380- 000, at 19 (filed Aug. 21, 2026) (noting uncertainty regarding how load growth between Delivery Years over the 15- year RBP horizon will be handled and how LSE obligations may change from Delivery Year to Delivery Year, creating uncertainty regarding the amount of load that may remain exposed to IRAS curtailment).
7 PJM Interconnection, L.L.C., Proposed Tariff, Attachment DD-4 § V, Docket No. ER26-3515-000 (filed Aug. 13, 2026).
8 PJM Interconnection, L.L.C., Proposed Reliability Assurance Agreement, Schedule 8.1 § D.1.1, Docket No. ER26- 3515-000 (filed Aug. 13, 2026).

PDF page 45

7

to implement curtailments at the end-use customer level. However, the proposal does not clearly explain how a zone-level curtailment obligation should be implemented during an actual IRAS event. As a result, an Electric Distributor may need to exercise judgment when PJM directs a load reduction that exceeds the amount of Eligible New Large Load available for curtailment. Because PJM characterizes an IRAS Action as a NERC Operating Instruction (Proposed Tariff, Attachment DD-4, Section III(a)), an Electric Distributor may be expected to comply even when sufficient IRAS-targeted load is unavailable. In those circumstances, the Electric Distributor could face a choice between failing to satisfy PJM’s instruction or extending curtailments beyond the loads that the IRAS framework is intended to address. If the requested reduction exceeds the amount of IRAS-curtailable New Large Load that is online and available, firm end-use customers that are not taking IRAS service may nonetheless be curtailed. This ambiguity creates implementation risk and may result in curtailment impacts that extend beyond the scope of the underlying IRAS obligation.

15. PJM proposes compensating New Large Loads curtailed under IRAS (see Tariff, Attachment DD-4 section X) at a rate equal to 50 percent of the applicable Non-Performance Charge Rate, subject to modification or waiver through retail arrangements. Given PJM’s proposed compensation formula and the CONE values reflected in PJM’s proposed tariff revisions, the IRAS compensation rate could be approximately $307/MW-day on an RTO-wide basis.9 While the precise rate will vary depending on the final tariff calculation and applicable

9 This estimate is an RTO-wide approximation based on values in PJM’s filing. The estimate is calculated as follows: PJM's proposed 2028/2029 and subsequent Delivery Year CONE values are $218,000/MW-year for CONE Area 1, $222,000/MW-year for CONE Area 2, $215,000/MW-year for CONE Area 3, $216,000/MW-year for CONE Area 4, and $248,000/MW-year for CONE Area 5. The simple average is $223,800/MW-year. Dividing by 365 produces approximately $613.15/MW-day, and applying PJM's proposed 50 percent IRAS compensation factor produces approximately $306.58/MW-day, rounded to $307/MW-day.

PDF page 46

8

location, the likely compensation level is substantial and contrary to reason. A New Large Load that does not secure qualifying BYONC or sufficient RBP capacity takes IRAS service to gain conditional market access. Under PJM’s proposal, that same load could receive compensation broadly comparable to recent capacity-market prices, and potentially higher than revenues available to Demand Response resources committed through the RPM Capacity Market to take on the obligation to curtail in response to PJM emergency directives. This compensation scheme may reduce the economic consequence of remaining subject to IRAS and thereby weaken the incentive for New Large Loads to secure qualifying capacity resources.

16. The proposal does not clearly establish how PJM will evaluate compliance with an IRAS Action after issuing a zonal or area-wide curtailment directive to an Electric Distributor. Under this construct, PJM may evaluate compliance based on whether the Electric Distributor achieved the aggregate megawatt reduction specified in the directive, rather than on whether specific New Large Loads subject to IRAS were curtailed. If compliance is measured solely by reference to the aggregate load reduction achieved, the proposal does not ensure that curtailment responsibility remains aligned with the New Large Loads or LSEs whose insufficient capacity position gave rise to the IRAS obligation. As a result, non- IRAS loads could be curtailed while PJM nevertheless deems the Electric Distributor’s response compliant. By contrast, the EDC Joint Proposal would have evaluated obligations on an LSE- specific or load-specific basis, preserving a clearer connection among the load creating the reliability need, the entity responsible for that load, and the operational consequences imposed when sufficient capacity is not provided.

PDF page 47

9

17. The proposal would revise the RPM Variable Resource Requirement (“VRR”) Curve beginning with the 2029/2030 Delivery Year. Incremental New Large Loads not supported by qualifying BYONC arrangements or allocated RBP capacity would be excluded from RPM demand. Once a New Large Load secures qualifying BYONC resources or allocated RBP capacity, both the load and the associated resource would appear in RPM demand and supply curves. The proposal also establishes procedures governing excluded load quantities and their incorporation into VRR calculations and auction parameters.

18. Although the proposal does not directly address cost allocation, New Large Loads subject to IRAS may affect RPM cost-allocation outcomes. These loads remain part of zonal load responsibility even as portions of the RPM demand construct exclude them. To the extent that excluding IRAS-exposed New Large Load from RPM demand reduces RPM charges for other customers in the zone, that effect is merely a short-term cost-allocation consequence. It does not address whether the proposal creates appropriate incentives for the New Large Load or its serving LSE to secure qualifying capacity. If a New Large Load remains outside the RPM demand construct while receiving service and curtailment compensation, the proposal may lessen the apparent capacity-cost impact on other customers without strengthening the incentive to develop or procure the resources needed to serve that New Large Load reliably. As a result, the proposal risks weakening, rather than reinforcing, the long-term resource adequacy signals that RPM is intended to provide.

19. The proposal conditions BYONC recognition on specified RPM qualification, participation, and compliance requirements. The proposal also evaluates resource adequacy by associating specific capacity resources and their accredited UCAP values with individual Large Loads. Under this framework, BYONC treatment depends on whether a resource satisfies the

PDF page 48

10

proposal’s RPM-related requirements and can be attributed to a particular Large Load. Because those requirements operate within PJM’s existing RPM framework, the timing of commercial operation, qualification, auction participation, and capacity recognition may affect when a resource is recognized for BYONC purposes. As a result, the determination of whether a Large Load is subject to IRAS depends on both the status of the associated resource within the RPM construct and the resource-to-load associations established under the proposal.

Discussion
Resource adequacy is a forward-looking investment and planning function
20. Resource adequacy planning ensures that sufficient resources will be available to serve forecast load and maintain reliability standards. Because generation resources often require years to permit, finance, construct and interconnect, utilities and other load-serving entities make resource development and procurement decisions well before a resource enters service. Reliability outcomes depend on investment decisions, contractual commitments, and development activities that occur years before commercial operation.

21. Utilities routinely commit capital and organizational resources to projects long before those projects satisfy market qualification requirements. Site acquisition, permitting, equipment procurement, financing, engineering, construction, and interconnection activities all occur during the development process. These actions represent material commitments that determine whether a resource ultimately reaches commercial operation. As a result, resource commitment and market qualification represent distinct milestones. Resource commitment reflects a decision to develop or procure a resource to meet future system needs, whereas market qualification determines whether PJM recognizes that resource under its tariff for

PDF page 49

11

participation in a particular PJM-administered market. The requirements for market qualification vary across PJM markets and are distinct from the decision to commit a resource. For example, a resource may enter service during a Delivery Year and provide energy and ancillary services to the grid, yet not have cleared as a capacity resource in an RPM auction for that Delivery Year.

22. Practically, resource adequacy is enhanced when investment and development decisions result in resources entering service and becoming available to support system reliability. Under the proposed IRAS framework, New Large Loads remain subject to curtailment until PJM recognizes associated BYONC resources. However, rather than linking BYONC recognition to a resource’s operational in-service date and its contribution to resource adequacy, PJM conditions recognition on compliance with specified RPM qualification and participation requirements. As a result, differences between RPM administrative timelines and resource in-service schedules may directly affect whether a New Large Load remains subject to curtailment under IRAS during a Delivery Year.

IRAS can expose load to curtailment because BYONC eligibility depends on RPM commitment timing rather than an assessment of an LSE’s overall resource position

23. Under the proposed IRAS framework evaluates resource adequacy through the association of specific capacity resources with specific New Large Loads and does not assess whether an LSE’s overall resource portfolio is sufficient to satisfy its aggregate load and reliability obligations. In particular, the proposal does not evaluate whether an LSE has existing or committed portfolio resources exceeding its projected obligations that are available to support incremental load growth. Nor does it assess whether the LSE’s load growth materially contributes to the resource adequacy concern that IRAS is intended to address.

PDF page 50

12

Instead, a New Large Load served by an RPM-participating LSE remains subject to IRAS curtailment unless sufficient BYONC resources are specifically attributed to that load. As a result, a New Large Load may remain subject to IRAS even when the serving LSE has adequate portfolio resources to support the associated load and reliability requirements.

24. LSEs, particularly self-supply entities, typically make resource investment and procurement decisions on a portfolio basis. Through integrated resource planning and related planning processes, they evaluate forecast demand, reserve margin requirements, resource retirements, portfolio performance, fuel diversity, and long-term reliability needs. Those decisions often occur before individual load additions fully materialize and are intended to ensure that sufficient resources are available to serve aggregate load. As a result, a self-supply LSE may maintain existing or committed portfolio length that is available to support new load growth even though PJM’s proposal would not recognize that capacity for IRAS purposes unless it qualifies through the specific BYONC or RBP pathways and is attributed to a particular New Large Load. Consequently, an LSE may face IRAS curtailment exposure despite maintaining sufficient resources to support its overall load obligations and resource adequacy requirements.

IRAS can expose load to curtailment because BYONC eligibility depends on RPM commitments rather than resource availability

25. Under the proposal, a New Large Load’s exposure to IRAS depends in significant part on whether supporting resources receive BYONC recognition. A resource must obtain an RPM capacity commitment to qualify as BYONC and reduce or eliminate IRAS exposure Proposed Tariff, Attachment DD-4, section VIII requires BYONC to be committed in an

PDF page 51

13

RPM auction to be a Capacity Resource.10 A resource may therefore enter service, contribute to reliability, and support load without receiving BYONC recognition if its commercial

operation date does not align with PJM’s qualification and auction schedule.
26. EKPC’s Liberty RICE project illustrates the interaction between resource development schedules and RPM qualification requirements. The project could not participate in the

applicable capacity auction for either of the 2027/28 or 2028/29 Delivery Years because it had not advanced sufficiently through the interconnection process to qualify as a Planned Capacity Resource. Its projected December 2028 in-service date further illustrates the

mismatch between resource development schedules and PJM’s Delivery Year construct. As a result, the project may be online, producing energy, and supporting reliability during the 2028/2029 Delivery Year while remaining ineligible for BYONC recognition and unable to

offset IRAS curtailment exposure.
27. PJM’s publicly posted queue information underscores that the Liberty RICE timing issue is not unique. PJM’s Service Request Status materials identify generation projects with

projected commercial operation and in-service dates throughout the calendar year, rather than uniformly on June 1, the start of a PJM Delivery Year.11 This outcome is not surprising. Generation projects reach commercial operation based on permitting, financing, engineering, equipment delivery, construction, testing, interconnection, and operational-readiness

10 PJM Interconnection, L.L.C., Proposed Tariff, Attachment DD-4 § VI- VIII, Docket No. ER26-3515-000 (filed Aug. 13, 2026).
11 See PJM Interconnection, L.L.C., Service Requests, https://www.pjm.com/planning/service-requests (providing public service-request status information for generation interconnection requests and projects under construction/in service); PJM Interconnection, L.L.C., PJM Announces Application Deadline for First Cycle of New Interconnection Process (Aug. 22, 2025) (stating that approximately 46 GW of interconnection projects had signed agreements to connect to the grid and identifying permitting, siting, and supply-chain challenges as factors affecting project development).

PDF page 52

14

milestones, none of which necessarily align with PJM’s annual capacity-market schedule or Delivery Year construct. By conditioning BYONC recognition under IRAS on RPM qualification, commitment, and administrative timing requirements, the proposal may not recognize resources that are online and contributing to reliability during a Delivery Year solely because their in-service dates do not align with the RPM calendar. As a result, curtailment exposure may continue even after the underlying resource adequacy concern has been addressed. The associated load may remain subject to curtailment because of PJM’s administrative qualification and recognition timeline rather than a shortage of available capacity. This outcome is difficult to reconcile with PJM’s stated objective of encouraging new capacity additions because it places continued curtailment risk on an LSE that has invested in and developed resources that are available to support reliability but do not align with PJM’s auction and qualification schedule.

IRAS relies on resource-to-Load attribution rather than portfolio sufficiency
28. As a state-regulated generation and transmission cooperative and self-supply LSE, EKPC develops and manages resources to satisfy aggregate load obligations and reliability requirements. When evaluating load growth, including growth from large loads, EKPC assesses effects on demand forecasts, reserve margin requirements, operational requirements, reliability objectives, and long-term resource plans. Resource development decisions address system requirements rather than the needs of a specific customer or load increment. EKPC evaluates generation additions based on their contribution to resource adequacy, reliability performance, operational flexibility, fuel diversity, production costs, and other planning objectives. A single resource may support load growth of multiple customers across customer classes, maintain reserve margins, replace aging resources, improve operational flexibility,

PDF page 53

15

reduce reliability risk, and strengthen portfolio diversity. The resource adequacy value of that resource does not disappear because PJM’s IRAS proposal recognizes only capacity fitting specified BYONC or RBP pathways.

29. The same principle governs electric service. Customers receive service from an integrated resource portfolio. Reliability depends on portfolio adequacy even when planning or contractual arrangements associate specific resources with specific customers, resource adequacy depends on the capability and sufficiency of the overall portfolio.

30. This portfolio-based approach reflects longstanding utility planning and operating practice. Resource adequacy studies, integrated resource plans, reserve margin analyses, and reliability assessments evaluate whether aggregate resource capability can satisfy the aggregate load obligations. RPM implicitly applies a similar framework. Reserve margin requirements, capacity obligations, and resource adequacy assessments do not require permanent assignments between individual resources and individual customers.

31. IRAS, however, requires one-to-one linking of resources and large loads. Under proposed Tariff, Attachment DD-4 section V, curtailment exposure turns on whether a New Large Load’s registered peak load is offset by recognized BYONC arrangements or allocated RBP UCAP MW. Under sections VI through IX, that recognition depends on PJM’s prescribed resource-specific pathways rather than a broader demonstration of portfolio sufficiency. This distinction is particularly important for self-supply entities as resource additions often advance multiple planning objectives simultaneously and strengthen the overall portfolio. The IRAS framework does not recognize this planning reality.

PDF page 54

16

32. This issue is not limited to data-center load. PJM’s proposed Large Load definition could also apply to new industrial or manufacturing loads that exceed the proposed 50 MW threshold, even when those loads are planned for and served through an LSE’s existing resource portfolio rather than a dedicated resource. For example, EKPC’s retail tariff requires datacenter loads greater than 250 MW to provide dedicated generation, while smaller datacenter and manufacturing loads generally will be served from EKPC’s portfolio resources. The IRAS framework therefore risks treating ordinary portfolio-supported load growth as though it lacks capacity support because the resources serving that load are not linked to a specific large-load customer through the BYONC construct.

33. Because IRAS does not evaluate whether an LSE possesses sufficient aggregate resources to satisfy its capacity obligation, the proposal may classify load as creating a resource adequacy deficiency even when the LSE’s portfolio contains adequate capacity. Consequently, LSEs whose load is supported by sufficient resources may improperly receive curtailment instructions.

A Portfolio-Based Alternative Was Available Through the EDC Joint Proposal
34. The EDC Joint Proposal adopted a different framework.12 It allowed portfolios of resources to support portfolios of Large Loads. That approach reflects how self-supply entities plan for and satisfy resource adequacy obligations. Utilities typically meet those obligations through integrated portfolios rather than direct assignments between individual resources and

12 Joint Proposal of the PJM Electric Distribution Companies, including Buckeye Power, Dominion Energy, Duquesne Light Company, East Kentucky Power Cooperative, Exelon, Old Dominion Electric Cooperative, PPL Electric Utilities Corp., Southern Maryland Electric Cooperative, Duke Energy Ohio, Duke Energy Kentucky (“EDC Joint Proposal”); see PJM Critical Issue Fast Path – Reliability Backstop Procurement / Connect & Manage, Joint EDCs & Data Center Coalition Reliability Backstop Procurement Package (June 30, 2026), https://www.pjm.com/-/media/DotCom/committees-groups/cifp-rbp/2026/20260630/20260630-item-02f---joint- edcs-and-data-center-coalition---rbp---executive-summary.pdf.

PDF page 55

17

individual customers. It also avoids treating prudent portfolio length as irrelevant simply because the capacity was not newly assigned to a particular end-use customer under PJM’s BYONC construct.

35. Resource-to-load attribution may simplify IRAS administration. However, to the extent PJM does not recognize an LSE’s actual portfolio position, the proposal may impose curtailment risk on load that is not contributing to the asserted resource adequacy concern. In those circumstances, the proposal may weaken the connection between responsibility for the reliability need and the operational consequences imposed under the IRAS framework. Inconsistency between portfolio treatment of FRR entities and self-supply LSEs; preferential treatment of load subject to FRR

36. The proposed treatment of New Large Load in FRR service areas differs from the treatment applied to similarly situated load served by self-supply LSEs participating in RPM. Under proposed Tariff, Attachment DD-4, section V(a), New Large Loads located within an FRR Service Area do not qualify as Eligible New Large Loads and therefore are not subject to IRAS. The FRR entity instead must satisfy the resource adequacy requirements associated with that load through its FRR Capacity Plan and supporting resource portfolio, consistent with proposed RAA Schedule 8.1, section D.1.1. Resource adequacy therefore rests on a portfolio-level demonstration within the FRR construct. The Joint EDC Proposal followed a similar approach by allowing portfolios of resources to support portfolios of Large Loads.

37. FRR entities and self-supplying LSEs share the same resource adequacy objective. Both must maintain sufficient resources to serve forecast load and satisfy applicable reliability requirements. Although the administrative frameworks differ, both approaches rely on

PDF page 56

18

planning, acquiring, and managing resource portfolios that support aggregate load obligations.

38. The proposal nevertheless applies different standards for demonstrating resource adequacy. An FRR entity may support load growth through a portfolio-level demonstration reflected in its FRR Capacity Plan. A self-supplying LSE participating in RPM, by contrast, must satisfy resource-specific BYONC qualification requirements and assign qualifying resources to specific New Large Loads. As a result, an FRR entity may demonstrate resource adequacy through the sufficiency of its overall portfolio, while a self-supplying LSE must establish compliance on a resource-by-resource basis even when its portfolio contains adequate capacity to serve the new load.

39. No difference in resource adequacy outcomes supports this distinction. FRR entities and self- supply LSEs face the same obligation to maintain adequate resources and ensure reliable service. The distinction instead reflects the way PJM recognizes resource adequacy. In that respect, the proposal creates disparate treatment. First, PJM accepts a portfolio-level demonstration of resource adequacy for FRR entities while requiring self-supplying RPM participants to satisfy qualification and attribution requirements for individual resources. Second, PJM excludes FRR load from IRAS without requiring a demonstration that the applicable FRR Capacity Plan contains sufficient capacity to support the associated New Large Load. Contrarywise, the Joint EDC Proposal addressed this issue by conditioning the exclusion on a demonstration that the FRR Capacity Plan contained adequate capacity to serve the load. That approach maintained a direct connection between the exemption and the underlying resource adequacy objective.

PDF page 57

19

40. The proposal therefore applies different requirements to entities pursuing the same reliability objective based solely on the framework through which PJM recognizes resource adequacy. The filing does not explain why a portfolio-based demonstration suffices within the FRR construct but not within the self-supply construct. Given the similarities in the planning, procurement, and portfolio management functions performed by these entities, the record provides little basis for this distinction.

41. As a practical matter, the proposal permits FRR-served load growth to avoid IRAS exposure through a portfolio-based demonstration of adequacy while subjecting comparable load served by self-supplying RPM participants to curtailment risk unless PJM’s resource-specific attribution requirements are satisfied. The result is disparate curtailment exposure for customers whose loads are supported by similarly adequate resource portfolios. PJM does not demonstrate that compensating IRAS curtailments is warranted

42. PJM proposes to compensate load reductions provided under IRAS at a rate equal to 50% of the applicable Non-Performance Charge Rate under proposed Tariff, Attachment DD-4 section X. IRAS applies to New Large Loads that have not secured qualifying BYONC resources or sufficient RBP capacity. PJM characterizes IRAS curtailments as a reliability service and proposes compensation on that basis. However, the filing does not establish that IRAS curtailments provide a reliability service comparable to other compensated reliability resources.

43. The proposal can be understood as permitting New Large Loads to receive service prior to securing sufficient recognized capacity support, in which case curtailment represents a condition associated with that available-system-capacity-contingent service arrangement. Indeed, PJM seems to acknowledge the purpose of IRAS in the proposed RAA revisions:

PDF page 58

20

“load reductions requested by the Office of Interconnection to maintain system reliability for the purpose of supporting the integration of New Large Load to the PJM Region that have not entered into an arrangement with new capacity additions to the PJM Region. [RAA, Schedule 11, B (3)]” This treatment is analogous to the distinction between firm and non- firm transmission service. Both classes of customers receive transmission service, but non- firm customers accept interruption during periods of system constraint rather than pay for transmission upgrades. Transmission providers generally do not compensate non-firm transmission customers when interrupted because curtailment is an inherent characteristic of the service being provided. A similar construct logically applies to New Large Loads that have not secured qualifying capacity resources. Such loads receive service subject to interruption during specified reliability conditions without creating a separate entitlement to compensation. Curtailment under those circumstances is more appropriately viewed as a condition of service rather than a compensable reliability product.

44. The proposed compensation mechanism may also affect incentives. Based on PJM’s proposed compensation formula and the CONE values reflected in PJM’s proposed tariff revisions, the IRAS compensation rate could be approximately $307/MW-day on an indicative RTO-wide basis. 13 While the precise applicable rate may vary depending on the final tariff calculation and applicable location, the estimate demonstrates that the proposed compensation level is substantial.

45. The proposed compensation creates a potential perverse incentive. A New Large Load that has not secured qualifying BYONC or sufficient RBP capacity remains subject to IRAS

13 See supra note 9.

PDF page 59

21

because it has not demonstrated recognized capacity support. Yet that same load could receive compensation for curtailments at a level broadly comparable to recent capacity- market prices and, in some circumstances, greater than revenues earned by resources that undertake direct resource adequacy obligations. The filing does not explain why load that has not secured recognized capacity support should receive compensation comparable to resources that commit capacity and assume associated performance obligations. Absent such a distinction, the proposal may reduce the relative advantage of securing qualifying capacity, weaken incentives for timely resource development or procurement, and increase reliance on curtailment as a substitute for capacity solutions. Compensation at that level may reduce the economic consequence of remaining subject to IRAS and thereby weaken incentives for New Large Loads or their serving LSEs to secure qualifying capacity resources.

46. Additional concerns arise from the interaction between IRAS and RPM. New Large Loads that remain subject to IRAS are excluded from the RPM demand curve unless they secure qualifying BYONC resources or allocated RBP capacity. As a result, those loads do not contribute to the RPM demand signal that would otherwise support additional capacity procurement. At the same time, the proposal would permit an IRAS-exposed New Large Load to receive compensation when curtailed even though the load remains outside the RPM demand construct. The filing does not explain why that outcome is necessary to maintain reliability or promote efficient resource adequacy outcomes. The proposal therefore relies on BYONC development, RBP allocations, and curtailment exposure rather than RPM procurement to address the resource adequacy implications of New Large Load growth. The filing provides limited discussion of how this treatment affects investment incentives, cost

PDF page 60

22

causation, and the relationship between resource adequacy beneficiaries and resource procurement obligations.

47. The proposal also creates an unusual disparity when compared to RPM Demand Response. Demand Response participates in RPM as a capacity resource. Curtailment Service Providers aggregate customer load-reduction capability, offer that capability into the capacity market, assume capacity-performance obligations, and manage customer curtailments in exchange for RPM revenues. By contrast, a New Large Load subject to IRAS has not secured qualifying BYONC or sufficient RBP capacity and has not undertaken an RPM capacity obligation. Nevertheless, PJM’s proposal could provide compensation at levels comparable to, or potentially greater than, the revenues earned by some Demand Response resources that have assumed those obligations. The filing does not explain why load that remains subject to IRAS should receive compensation comparable to resources that actively participate in RPM and bear resource adequacy responsibilities. That disparity may distort incentives between market participants, diminish the value of assuming RPM obligations, and discourage participation through mechanisms designed to procure and maintain capacity resources.

48. By allowing a New Large Load to continue receiving service while remaining subject to compensated curtailment, the proposal reduces the relative benefit of obtaining qualifying capacity support. To the extent market participants view compensated curtailment as an acceptable alternative to resource procurement, the proposal may encourage reliance on load reductions rather than investment in the resources needed to address long-term resource adequacy needs.

49. The compensation structure also raises cost-causation concerns. If PJM recovers IRAS compensation through charges assessed to other load in the affected zone or area, customers

PDF page 61

23

that did not contribute to the underlying resource adequacy concern may fund payments to load that remained subject to IRAS because it lacked recognized capacity support. That result is difficult to reconcile with a resource adequacy framework intended to assign responsibility to the load additions driving the need for the mechanism. Resource adequacy frameworks generally function most effectively when market participants bear the costs associated with the reliability risks they create. PJM states that compensation may be waived or modified through retail arrangements, but the proposed tariff nevertheless establishes a default federal compensation rate. The filing does not explain why, absent such a waiver or alternative retail treatment, other customers should fund these payments or how that outcome is consistent with principles of cost causation and the stated objective of protecting existing ratepayers from costs associated with New Large Load growth. If those costs are shifted to other customers, the proposal could socialize costs associated with New Large Load development, weaken accountability for capacity procurement decisions, and undermine the cost-allocation principles that IRAS purports to advance.

Conclusion
50. The proposed IRAS framework may result in load curtailments even when sufficient resources are available to support reliability because PJM conditions BYONC recognition on qualification and timing requirements rather than actual resource availability.

51. The proposal evaluates resource adequacy through resource-to-load attribution instead of assessing the sufficiency of an LSE’s overall resource portfolio. As a result, customers supported by adequate portfolios may nevertheless face curtailment exposure.

PDF page 62

24

52. The proposal applies different standards to FRR entities and self-supplying RPM participants even though both pursue the same resource adequacy objective through portfolio planning and resource procurement.

53. By compensating curtailments associated with insufficient recognized capacity support, the proposal may weaken incentives to develop or procure qualifying resources, shift costs to other customers, and increase reliance on curtailment as a substitute for capacity solutions.

54. The proposal also does not adequately address the risk that a real-time IRAS directive could exceed the amount of IRAS load online and available for curtailment within the applicable Electric Distributor zone or area. Nor does the filing justify assigning IRAS compensation costs to load that did not contribute to the resource adequacy concern the mechanism is designed to address. As a result, the proposal may shift the consequences of insufficient recognized capacity support, whether in the form of curtailment obligations, compensation costs, or residual reliability risks, to customers and LSEs that did not create the underlying resource adequacy issue. These implementation, cost-causation, and accountability concerns underscore the disconnect between the parties responsible for the resource adequacy concern and the entities that may bear its consequences.

55. This ends my affidavit.

PDF page 63

VERIFICATION OF AFFIDAVIT

Pursuant to 18 C.F.R. § 385.2005(b)(3), I verify under penalty of perjury that the foregoing Affidavit is true and correct.

Executed September 3, 2026.

By: _____________________________
       Marc D. Montalvo

PDF page 64

Attachment 2

Affidavit of Julie Tucker

PDF page 65

1

AFFIDAVIT OF JULIA J. TUCKER
ON BEHALF OF
EAST KENTUCY POWER COOPERATIVE, INC.

I. Introduction
1. My name is Julia J. Tucker.  I am the Vice President of Power Supply and Planning for East Kentucky Power Cooperative, Inc. (“EKPC”).  My business address is 4775 Lexington Road, Winchester, Kentucky 40391.

2. I have a Bachelor’s degree in Electrical Engineering from the University of Kentucky.  I am a licensed Professional Engineer, Registration Number 15532, in the state of Kentucky. I have worked for EKPC for the past 20 years.

3. I oversee EKPC’s Power Supply Planning, Load Forecasting, Market Operations Center, Fuels Procurement, Demand Side Management, Distributed Energy Resources and development of Renewable Energy Projects.

4. EKPC is a not-for-profit, member-owned generation and transmission cooperative located in Winchester, Kentucky. EKPC provides electricity to 16 owner-member distribution cooperatives (owner-members) with over 570,000 retail consumers (approximately 1.2 million member population) at homes, farms, and businesses in 89 counties in Kentucky and 4 counties in Tennessee. EKPC does not directly serve any retail consumers. Owner members served by EKPC include:

• Big Sandy RECC
• Jackson Energy Cooperative
• Blue Grass Energy Cooperative
• Licking Valley RECC
• Clark Energy Cooperative
• Nolin RECC
• Cumberland Valley Electric
• Owen Electric Cooperative
• Farmers RECC
• Salt River Electric Cooperative
• Fleming-Mason Energy Cooperative
• Shelby Energy Cooperative
• Grayson RECC
• South Kentucky RECC
• Inter-County Energy Cooperative
• Taylor County RECC

II. Purpose
5. The purpose of my affidavit is to explain EKPC’s role as a Load Serving Entity (“LSE”) under the PJM Interconnection, L.L.C. (“PJM”) Reliability Assurance Agreement Among Load Serving Entities (“RAA”) and how EKPC utilizes a portfolio of Self-Supply resources in the Reliability Pricing Model (“RPM”) Capacity Market. Additionally, I will describe the

PDF page 66

2

obligation we will impose on any new data center load we may become obligated to serve pursuant to our Kentucky Public Service Commission approved Data Center Tariff. In doing so, I offer support for the concerns EKPC raised in its Protest of PJM’s proposal to establish an Interim Resource Adequacy Service (“IRAS”). Specifically, I highlight how PJM’s Bring Your Own New Capacity (“BYONC”) eligibility requirements conflict with our long-standing portfolio approach to supplying our Owner Members’ capacity requirements as well as with the obligation we would impose on data centers under our Data Center Tariff.   The result is that PJM would ignore the important reliability contribution of resources within our portfolio, and resources currently under development to be added to our portfolio, to offset any curtailment obligation it would impose under IRAS.  To avoid the curtailment risk, EKPC would need to incur cost in addition to the significant costs we are bearing to support the development of these additional important reliability resources to avoid leaning on the PJM region for power supply.

III. EKPC’s LSE Role and Proactive Planning For and Use of Self-Supply Resources
6. Under the PJM Open Access Transmission Tariff (“PJM Tariff”), Self-Supply means, “Capacity Resources secured by a Load-Serving Entity, by ownership or contract, outside a Reliability Pricing Model Auction, and used to meet obligations under this Attachment or the Reliability Assurance Agreement through submission in a  Base Residual Auction or an Incremental Auction of a Sell Offer. . . .”1

7.  EKPC satisfies the capacity obligation associated with it acting as agent for its 16 owner member distribution cooperatives for purposes of satisfying all Load Serving Entity requirements in PJM.  EKPC has a full-requirements contract with its owner members, obligating it to satisfy their load serving obligations under Kentucky law.  As such, in order to satisfy the load serving obligations of its owner members, EKPC is a signatory to the PJM Operating Agreement, Reliability Assurance Agreement (RAA) and PJM Tariff.

8. Focusing specifically on the resource adequacy requirements associated with serving our owner members’ load, EKPC has elected to satisfy the RAA obligations by participating in the RPM Capacity Market.  EKPC both owns generation capacity resources and has capacity resources under contract, as well as administers demand response programs that are eligible demand response capacity resources in the RPM Capacity Market.

9. EKPC offers all of its owned generation, capacity resources under contract, and demand response products into the RPM Capacity Market. It designates these resources as “Self- Supply”.  In turn, EKPC pays the resulting price from the combination of the BRA and IAs for a Delivery Year.  EKPC offers in sufficient Self-Supply to cover its load obligation.

10. In total, EKPC owns and operates approximately 2,963 MW of net summer generating capacity and 3,265 MW of net winter generating capacity. EKPC owns and operates coal-fired generation at the John S. Cooper Station in Pulaski County, Kentucky (341 MW) and the Hugh L. Spurlock Station (1,346 MW) in Mason County, Kentucky. EKPC also owns and operates natural gas-fired generation at the J. K. Smith Station in Clark County, Kentucky (753 MW (summer)/989 MW (winter)) and the Bluegrass Generating Station in Oldham County, Kentucky (501 MW (summer)/567 MW (winter)), landfill gas-to-energy facilities in Boone

1 PJM Open Access Transmission Tariff, Definitions, Section 1.

PDF page 67

3

County, Greenup County, Hardin County, Pendleton County and Barren County (13.8 MW total), and a Community Solar facility (8.5 MW) in Clark County, Kentucky. Finally, EKPC purchases hydropower from the Southeastern Power Administration at Laurel Dam in Laurel County, Kentucky (70 MW), and the Cumberland River system of dams in Kentucky and Tennessee (100 MW). EKPC also has 200 MWs of interruptible load and approximately 28 MWs in peak reduction mechanisms.

11. EKPC constantly strives to anticipate the challenges it may face over both the near and long- term. As part of this process, EKPC regularly conducts and reviews load and pricing forecasts, prepares for environmental regulation developments, and evaluates the impact various factors may have on the Cooperative’s existing generation portfolio and overall financial stability. Future power supply needs analysis occurs both during and between EKPC’s Integrated Resource Plan (“IRP”) filings with the KY PSC.  EKPC plans for growth in residential, industrial and commercial load. Only with respect to data center load growth does EKPC apply an additional consideration to its power supply planning described below.

12. EKPC builds out its portfolio of resources to satisfy the aggregate of its forecasted load needs. EKPC does not tie specific resources in its portfolio to specific Owner Members or to any individual end-consumers served by its Owner Members. The portfolio includes a range of resource types to meet the energy and capacity needs of the aggregate load. To tie specific resources to individual loads as PJM’s IRAS proposal effectively requires would undermine the efficiency gained by portfolio planning.  Forecasted growth of industrial and manufacturing load is included in the portfolio planning as well. Such loads could grow to a size to be included in PJM’s proposed definition of New Large Load and be subject to IRAS exposure. EKPC would be unable to tie specific resources to individual loads to make a BYONC demonstration. Moreover, EKPC has planned for some measure of load growth in its existing portfolio of resources. To the extent that the load EKPC is obligated to serve can be satisfied with EKPC’s portfolio of resources, it should not be subject to IRAS curtailment exposure.  To do otherwise would ignore the significant investment that such loads have made to securing reliability.

13. In so doing, EKPC actively plans its supply portfolio to manage its load serving obligation.  In response to EKPC’s forecast of changes in its peak load requirements, EKPC filed with, and received approval from, the KY PSC three Certificates of Public Convenience and Necessity (“CPCNs”) in PSC Case Nos. 2024-001291, 2024-003102 and 2024-003703, seeking Commission approval to build new generation assets known as Cooperative Solar Fayette (40 MW), Cooperative Solar Marion (96 MW), Star Hill Farms solar (0.5 MW), Liberty RICE (214 MW) and Cooper CCGT (745 MW), along with the natural gas co-fire conversion of EKPC’s existing coal-fired generating units including Spurlock Units 1 through 4 and Cooper Unit 2.

14. Both the Cooper CCGT and the Liberty RICE are in interconnection queues and currently being studied by PJM for reliable interconnection to the grid.  The Cooper CCGT plant would be capable of producing up to 745 MW on a dependable and dispatchable basis. The plant would have two natural gas fired combustion turbines, two heat recovery steam generators (“HRSG”) and one steam turbine. Its expected Commercial Operation Date (“COD”) is December 2030.  Liberty proposed project is a 217.6 gross MW RICE facility consisting of twelve (12) Engine/Generator Sets (“Gensets”) with each Genset capable of producing eighteen (18.132) gross MW. The total expected net capacity available from the facility is

PDF page 68

4

expected to be 214 net MW.  The Gensets are designed to operate on both natural gas and on ultra-low sulfur diesel as a backup fuel source. EKPC anticipates COD of December 2028 for the Liberty RICE units.

15. The Cooper CCGT had been selected as part of the Reliability Resource Initiative that inserted projects into Transition Cycle #2. PJM’s analysis is not yet complete so the Cooper CCGT does not yet have Generation Interconnection Agreement.  Due to its mid-Delivery Year COD, EKPC will not be able to offer it into the 2030/2031 Delivery Year RPM BRA.  The first Delivery Year in which EKPC could offer the Cooper CCGT to be committed in an RPB BRA would be 2031/32.  Thus, for approximately 6 months, the Cooper CCGT would be on-line and providing reliability benefits to the grid but unable to offset PJM’s IRAS curtailment obligation. PJM’s IRAS proposal requires a BYONC resource to be committed in an RPM Auction to offset the IRAS curtailment obligation. Indeed, consistent with its power supply plan, EKPC would offer the Cooper CCGT into the energy and ancillary service markets at the earliest opportunity despite not having a capacity obligation requiring it to do so yet that contribution to reliability would be ignored until it is formally committed to the region through an RPM Auction.  The Cooper CCGT is an important part of the portfolio of resources EKPC’s Owner Members are investing in to reliably meet their power supply needs and avoid leaning on the PJM market.    Yet, those served by EKPC’s Owner Members would be exposed to curtailment risk despite their significant investment in reliability.

16. The Liberty RICE had not been selected as part of the Reliability Resource Initiative and is not being studied in Transition Cycle #2 along with the Cooper CCGT. Instead, it is being studied in New Cycle #1 that just began in spring of 2026.  Despite Liberty RICE’s expected COD of December 2028, it was not eligible to offer into the 2028/29 Delivery Year BRA both because it had not progressed sufficiently through the interconnection study process and because it has a mid-Delivery Year COD and cannot be committed for a full Delivery Year. The first full Delivery Year in which Liberty RICE would be operational and able to be committed in an RPM Auction would be 2029/2030 Delivery Year.  Thus, for approximately 6 months, the Liberty RICE would be on-line and providing reliability benefits but unable to offset PJM’s IRAS curtailment obligation. As noted above, PJM’s IRAS proposal requires a BYONC resource to be committed in an RPM Auction to offset the IRAS curtailment obligation. Indeed, as noted above, consistent with its power supply plan, EKPC would offer the Liberty RICE into the energy and ancillary service markets at the earliest opportunity despite not having a capacity obligation requiring it to do so.  The Liberty RICE is an important part of the portfolio of resources EKPC’s Owner Members are investing in to reliably meet their power supply needs and not lean on the PJM market.  Yet, those served by EKPC’s Owner Members would be exposed to curtailment risk despite their significant investment in reliability.

IV. EKPC’s Data Center Tariff and Obligation To Adjust Power Supply Plan
17. In October, 2025, the KY PSC approved EKPC’s Data Center Tariff which applies data centers that satisfy two criteria: load size (15 megawatts ("MWs") or greater) and load factor (60% or greater).   The over-arching goal of the Rate DCP Tariff is to minimize - and if possible eliminate - cross-subsidization of data center load and non-data center load.  The proposed Rate DCP Tariff acknowledges that large data center loads could exceed EKPC's existing portfolio of generation resources. Accordingly, the Rate DCP Tariff includes a requirement that EKPC will work with a data center to develop and implement a power supply plan to support

PDF page 69

5

the customer’s load with: “Dedicated Resources” supplied by EKPC or the data center; bilateral power and capacity purchases; or a combination of these resources. For those data center loads exceeding 250 MWs, one or more Dedicated Resources will be required as part of the power supply plan. The Dedicated Resource in EKPC’s data center tariff is an important system resource planning requirement, but the Dedicated Resource is not “tied” to a particular load as IRAS contemplates. At this time, EKPC has not executed a contract to serve a new data center; however, there are several actively negotiating terms and conditions of service utilizing our Data Center Tariff framework. The IRAS proposal filed by PJM has created a significant headwind to data center investments because it fails to give credit to loads for existing resources that are under contract.

18. EKPC’s focus on data centers differs from PJM’s more expansive definition of Large Load that includes industrial and manufacturing loads.  As noted above, EKPC plans for the growth of industrial and manufacturing loads as part of its ongoing forecasting and planning efforts.  To the extent a data center is under 250 MW, EKPC would ensure its load requirements would be satisfied as part of EKPC’s forecasting and portfolio planning efforts. However, data center loads greater than 250 MW would require “Dedicated Resources.”  This not does mean that EKPC deviates from a portfolio approach, but rather that EKPC ensures there are sufficient resources to satisfy the data center load and places additional financial obligations directly on the data centers to ensure that other loads are protected from costs associated with supplying their needs.

V. Conclusion
19. This concludes my affidavit.

PDF page 70

VERIFICATION OF AFFIDAVIT

Pursuant to 18 C.F.R. § 385.2005(b)(3), I verify under penalty of perjury that the foregoing Affidavit is true and correct.

Executed September 3, 2026.

By: _____________________________
       Julia J. Tucker

PDF page 71

Certificate of Service

I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding. Dated at Washington, DC this 3rd day of September, 2026.

/s/ Kelly A. Cuthbertson

Kelly A. Cuthbertson