Motion to Intervene and Comments of Appalachian Voices in support of PJM Interconnection, L.L.C.’s proposed revisions to Reliability Assurance Agreement…
PDF page 1
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
)
Docket No. ER26-3515-000
MOTION TO INTERVENE AND COMMENTS
OF APPALACHIAN VOICES
Pursuant to Rules 212 and 214 of the Federal Energy Regulatory Commission’s (the Commission) Rules of Practice and Procedure,1 Appalachian Voices submits this motion to intervene and comments supporting PJM Interconnection, L.L.C.’s (PJM) proposed revisions to its Reliability Assurance Agreement Among Load Serving Entities and the PJM Open Access Transmission Tariff to establish Interim Resource Adequacy Service (IRAS), filed on August 13, 2026, in the above-captioned proceeding (IRAS Proposal).2
PJM’s IRAS Proposal is an ambitious, yet narrowly tailored solution to address the primary issue facing the region: the outsized and unprecedent development of large loads and the unsustainable bill impacts they have created for residential ratepayers. Appalachian Voices joined the Limited Protest of Public Interest Organizations—which supports PJM’s proposal with four modifications—yet writes separately to highlight the IRAS Proposal’s impact on Virginia, the birthplace of the data center boom, and address associated legal issues under the Federal Power Act. By applying only to Load Serving Entities serving New Large Loads, whose size and operational attributes create unique concerns for the bulk transmission system and resource adequacy, PJM’s IRAS Proposal does not unduly discriminate. Nor does it inappropriately cross jurisdictional lines, but will instead complement efforts already underway to address large load integration in Virginia.
1 18 C.F.R. §§ 385.212, 385.214 (2025).2 PJM Interconnection, L.L.C., Proposal to Establish Interim Resource Adequacy Service and a Large Load Registry to Address System Reliability (filed Aug. 13, 2026) (IRAS Proposal).
PDF page 2
2
I. MOTION TO INTERVENE
Appalachian Voices moves to intervene in this proceeding. Appalachian Voices is a non- profit organization dedicated to bringing people together to protect the land, air, and water of Central and Southern Appalachia and advance a just transition to an equitable clean energy economy. Appalachian Voices strives to shift to clean, 21st-century energy sources, including energy efficiency and low-emitting power sources, and stand up to monopoly utility practices that put profits over people. Its ultimate goal is to establish economic solutions that create community wealth and sustain Appalachia’s mountains, forests, and waters.
Appalachian Voices has a substantial number of dues-paying members living in the PJM footprint, primarily in Virginia and North Carolina. The outcome of this proceeding will impact the reliability of PJM’s system during constrained periods, the procurement of generation to supply large loads, and capacity costs that feed into retail rates. Accordingly, Appalachian Voices has a substantial interest in this proceeding that cannot be adequately represented by any other party. Further, by virtue of its organizational mission, Appalachian Voices’ participation in this proceeding is in the public interest. Pursuant to Rule 214 of the Commission’s Rules of Practice and Procedure,3 Appalachian Voices respectfully requests that the Commission grant it full rights associated with party status in this proceeding.
II. COMMENTS
A. The Commission Should Accept PJM’s IRAS Proposal to Help Ensure that New
Large Loads Pay their Fair Share of Capacity Costs and Bear Appropriate
Reliability Burdens.
1. The IRAS Proposal Can Enable More Equitable Cost Allocation for Virginia
Ratepayers.
3 18 C.F.R. § 385.214.
PDF page 3
3
Virginia originated the data center boom and remains its epicenter. As of late 2024, it was home to thirteen percent of global data center capacity and twenty-five percent of data center capacity in the Americas.4 This trend only projects to accelerate.5 The heavy concentration of data center load in the state places significant demand on its electric grid. Dominion Energy Virginia (Dominion), a vertically integrated utility and PJM Transmission Owner, has asserted that “no other utility in the country has the magnitude of high load demand that Virginia is facing.”6 The utility has argued that the “scale, density of data center development, and load that [Dominion] must support significantly outpace[s]” other markets, making it a “uniquely concentrated and capital-intensive environment.”7 State and federal policies are only just now starting to catch up to the drastic changes that data centers have imposed on the state’s electric power system.
Traditional approaches to wholesale and retail cost allocation have had the effect of socializing the cost of procuring capacity for large loads across the broader customer base. As a vertically integrated utility subject to state integrated resource planning requirements, Dominion owns or contracts for the majority of the generating capacity needed to meet its native load requirements, including New Large Load customers.8 It procures the remaining increment that it
4 Joint Legislative Audit and Review Commission, Report to the Governor and the General Assembly of Virginia Data Centers in Virginia, at 1 (2024), https://rga.lis.virginia.gov/Published/2025/RD206/PDF.5 PJM Interconnection, L.L.C., Total Demand Request for Large Load Adjustment, “2026 DEMAND Requests” Tab at cells E36, I36, https://www.pjm.com/-/media/DotCom/committees- groups/subcommittees/las/2025/20250916/20250916-post-meeting---informational-only---large-load-adjustment- requests.xlsx (showing requested large load adjustments to PJM load forecast of Load Serving Entities in the DOM Zone of 7,219.6 MW for 2026, which more than doubles to 14,604.4 MW for 2030); PJM Interconnection, L.L.C., 2026 PJM Load Forecast Report, at 34 (Jan. 14, 2026), https://www.pjm.com/-/media/DotCom/library/reports- notices/load-forecast/2026-load-report.pdf (showing updated load forecast for DOM zone through 2045).6 Rebuttal Testimony of J. Scott Gaskill, Va. State Corp. Comm’n, Case No. PUR-2025-00058, at 17:3-4 (filed Sept. 10, 2025), https://www.scc.virginia.gov/docketsearch/DOCS/88v001!.PDF.7 Rebuttal Testimony of Stan Blackwell, Va. State Corp. Comm’n, Case No. PUR-2025-00058, at 24:6-10 (filed Sept. 11, 2025), https://www.scc.virginia.gov/docketsearch/DOCS/88v301!.PDF.8 Direct Testimony of William A. Coyle, Va. State Corp. Comm’n, Case No. PUR-2025-00058, at 4:5-12 (filed Mar. 31, 2025), https://www.scc.virginia.gov/docketsearch/DOCS/84s901!.PDF (Coyle Test.).
PDF page 4
4
cannot self-supply from PJM’s Base Residual Auction (BRA).9 While this arrangement may act as a hedge against BRA clearing prices for most of Dominion’s capacity requirements, Dominion’s retail customers still must cover the capital costs of Dominion’s generation holdings through base retail rates. And as Dominion pursues significant buildout of new generating capacity to meet its burgeoning large load growth,10 residential customers will necessarily bear the cost burden of those new facilities. Further, as described below, BRA clearing prices have skyrocketed in recent years due to large load growth, particularly in the DOM zone that covers Dominion’s territory.11 When Dominion does not have sufficient self-supply capacity to serve its native load, that load must pay the BRA prices associated with covering the shortfall.12 The IRAS Proposal could help to alleviate these cost burdens on Virginia ratepayers in at least three ways.
First, by requiring Load Serving Entities to “bring new capacity in an amount that equals or exceeds its New Large Loads’ peak load or be subject to load reduction requests,”13 the IRAS Proposal dictates that Dominion procure capacity dedicated to serving discrete New Large Loads. Absent explicit matching of this new capacity with one or more New Large Loads, Dominion’s load will face curtailment exposure. This connect-the-dots requirement will enable the Virginia State Corporation Commission (SCC) to identify generation capacity costs caused by New Large Loads and allocate those costs accordingly. In other words, the IRAS Proposal should prevent Dominion from continuing to commingle capacity costs caused by New Large
9 See id.10 See Shannon Heckt, “Dominion long-range projections show major energy growth, what it takes to fully comply with VCEA,” Virginia Mercury, (Oct. 22, 2025), https://virginiamercury.com/2025/10/22/dominion-long-range- projections-show-major-energy-growth-what-it-takes-to-fully-comply-with-vcea/.11 See Coyle Test. at 7:16-8:8:9 (describing BRA clearing prices in DOM zone before application of price collar, Dominion’s then net-short capacity status, and an expected $202 million in BRA capacity costs to customers for the 2025/2026 delivery year).12 See id. 13 IRAS Proposal, Transmittal at 3-4.
PDF page 5
5
Loads in the same rate base that underlies residential customer rates, thereby protecting those customers from bearing such costs.
Second, the IRAS Proposal creates a Large Load Registry that will provide the SCC and other regulatory entities greater visibility into the New Large Loads seeking service in a given Electric Distributor footprint.14 The Large Load Registry will identify, among other things, the specific Bring Your Own New Capacity associated with the New Large Load.15 This will similarly provide the transparency needed to appropriately allocate capacity costs in retail rates and effectuate the Ratepayer Protection Pledge signed by Dominion and most data center developers.16 It also mirrors the obligation and intended effect of the Commission’s Show Cause directive that PJM identify network upgrade costs caused by large loads so that state regulators may account for that information when allocating costs at the retail level.17 Third, by excluding New Large Load that does not bring its own capacity from the Variable Resource Requirement curve in future Reliability Pricing Model (RPM) auctions,18 the IRAS Proposal will protect Virginia residential customers from excessive PJM-derived capacity costs going forward. This will impact both (1) Dominion customers who must cover the RPM costs for the increment of capacity obligations that Dominion does not self-supply, and
(2) customers of the state’s electric cooperatives, which rely more heavily on RPM auctions for their capacity needs.
14 See id. at 5.15 See id. at 37.16 See Ratepayer Protection Pledge, The White House (Mar. 4, 2026), https://www.whitehouse.gov/releases/2026/03/ratepayer-protection-pledge/; President Trump’s Ratepayer Protection Pledge Secures American AI Dominance, Protects Consumers, The White House (July 23, 2026), https://www.whitehouse.gov/releases/2026/07/president-trumpsratepayer- protection-pledge-secures-american-ai-dominance-protects-consumers/; Data centers pay their way. Ratepayers pay theirs., The White House, https://www.whitehouse.gov/ratepayer-protection-pledge/.17 See PJM Interconnection, L.L.C., 195 FERC ¶ 61,211, at PP 71, 73 (2026).18 See IRAS Proposal, Transmittal at 23-24.
PDF page 6
6
Together, these aspects of the IRAS Proposal better enable the SCC and the state’s cooperative utilities to quarantine capacity costs needed to serve New Large Load growth from the bills of residential retail customers.
2. PJM’s Solution Is Narrowly Tailored to Maintain Reliability and Ensure that New Large Loads Pay their Fair Share of Capacity Costs.
Without appropriate protective measures, large loads will continue to jeopardize reliability and affordability in the PJM region. PJM’s RPM, the mechanism created to enable the delivery of reliable capacity to PJM’s system, has failed to procure enough capacity to meet PJM’s reliability requirement two years in a row. The BRA for the 2027/2028 Delivery Year cleared 6,623 MW short of the PJM Region Reliability Requirement and at the price cap of $333.44/MW-day.19 The BRA for the 2028/2029 Delivery Year, held this summer, cleared 6,831.3 MW short and also hit the market price cap of $325/MW-day.20 Large load development is the principal cause for PJM’s market clearing short and reaching the price cap.21 Subjecting Load Serving Entities that serve New Large Loads and have not arranged for their required capacity to IRAS appropriately balances two competing concerns. On one hand, the IRAS Proposal appropriately protects regular ratepayers from reliability and cost impacts caused by New Large Loads. As the primary drivers of the capacity shortfall, large loads and the Load Serving Entities that procure capacity on their behalf should be responsible for securing and paying for sufficient capacity to meet their demand. To the extent New Large Loads and/or their Load Serving Entities are unable to bring sufficient capacity online in time to meet their demand, it is just and reasonable to keep those New Large Loads out of the capacity market and
19 See id. at 14.20 See id.21 Monitoring Analytics, LLC, State of the Market Report for PJM, Volume 2: Detailed Analysis, at 43 (Mar. 12, 2026) (“The current conditions are not the result of organic load growth. The current conditions in the capacity market are almost entirely the result of large load additions from data centers, both historical and forecast.”).
PDF page 7
7
subject their Load Serving Entity to IRAS. Doing so will insulate regular customers from load shed events that would not likely to occur but for the addition of power-hungry New Large Loads. On the other hand, New Large Loads seek speed to power. PJM’s IRAS Proposal offers a viable path for New Large Loads to come online faster than the generation needed to meet their demand and will only subject those New Large Loads to load reduction requests during Emergencies prior to Pre-Emergency Load Management Response.22 This properly places the responsibility for resolving challenges related to the capacity market shortfalls with New Large Loads and their Load Serving Entities without imposing undue burden on those entities.
B. The IRAS Proposal Reflects an Appropriate Exercise of Jurisdiction under the Federal Power Act and Will Complement Virginia’s Efforts to Integrate Large
Loads.
PJM’s proposal also respects jurisdictional boundaries and initiatives underway in the states seeking to address the challenges that large load integration presents. The Federal Power Act grants the Commission jurisdiction over “the transmission of electric energy in interstate commerce and the sale of electric energy at wholesale in interstate commerce[.]”23 The states maintain jurisdiction over “facilities used for the generation of electric energy or over facilities used in local distribution[.]”24 The Federal Power Act also reserves for the states jurisdiction over retail sales, i.e., sales to end-use customers.25
The IRAS Proposal represents a proper exercise of the Commission’s authority over the interstate transmission system. Order No. 2000 establishes Regional Transmission Organizations’ (RTO) authority over transmission operations, which obligates RTOs like PJM to
22 IRAS Proposal, Transmittal at 4. 23 16 U.S.C. § 825 (b)(1). 24 Id.25 Id. (“The provisions of this subchapter . . . shall not apply to any other sale of electric energy[.]”).
PDF page 8
8
operate as security coordinator for the region.26 PJM’s role as security coordinator requires it to monitor real-time system conditions and to “direct[] actions to maintain reliability, including firm load shedding.”27 PJM’s proposal to direct Electric Distributors to shed load falls squarely within PJM’s authority to operate the transmission system and coordinate relief procedures. Nor does PJM’s IRAS Proposal tread on state authority over retail sales. Although PJM proposes to issue load reduction directives to Electric Distributors, PJM defers to the Electric Distributors and the relevant states to resolve how to prioritize load reductions in their service territories.28 PJM’s IRAS Proposal neither mandates nor prohibits load shed of specific end-use customers, but rather mandates that Electric Distributors shed an aggregate number of megawatts that matches the capacity of Eligible New Large Loads.29 That Electric Distributors should direct curtailment of New Large Loads is an expectation, not a PJM requirement. Ultimately, the Electric Distributor, working in conjunction with the relevant state regulator, must develop and execute the appropriate retail load curtailment protocols. Tying the megawatt quantity to be shed to New Large Loads is matter of reliability and cost causation. New Large Loads have caused the capacity shortfall in PJM; it would be unjust and unreasonable to shed residential load due to insufficient capacity to meet New Large Load demand.
The Commission also has authority over generation facilities to the extent those facilities are needed to ensure transmission system reliability.30 As an operator of the bulk-power system, which includes “electric energy from generation facilities needed to maintain transmission system reliability[,]”31 PJM has an obligation to comply with reliability standards set pursuant to
26 Regional Transmission Organizations, Order No. 2000, 89 FERC ¶ 61,285, at 278 (1999).27 Id.28 See IRAS Proposal, Transmittal at 82.29 See id. at 6.30 16 U.S.C. § 824o. 31 16 U.S.C. § 824o (a)(1)(B), (b)(1).
PDF page 9
9
section 215 of the Federal Power Act. Combined with PJM’s authority as security coordinator for the region, the responsibility to maintain system reliability enables PJM to condition transmission service during times of system stress on either the New Large Load or the Load Serving Entity that serves it securing sufficient capacity to meet the large load’s demand. If PJM were to require that the New Large Load or Load Serving Entity select a certain resource type to cover the New Large Load’s demand, that would intrude on state authority, but that is not what PJM has proposed.
Indeed, PJM’s IRAS Proposal enables effective cooperative federalism by
complementing efforts in Virginia to ensure orderly integration of large loads. The SCC has approved tariff changes proposed by Dominion and Appalachian Power Company to address large loads, both of which define large loads and require collateral, minimum contract terms, and minimum demand charges.32 These tariff changes operate within the state’s jurisdiction over retail sales and aim to ensure that large loads pay for stranded costs associated with generation, transmission, and distribution costs should the large load not materialize. PJM’s IRAS Proposal, by contrast, operates within the Commission’s jurisdiction over transmission service and bulk power system reliability33 to provide for interim service to the extent that New Large Loads and their Load Serving Entities in Virginia cannot secure sufficient capacity to meet their need by the desired in-service date. It does so without jeopardizing transmission system reliability or saddling regular ratepayers with the costs of securing capacity to integrate New Large Loads.
32 Application of Virginia Electric and Power Company, Final Order, Va. State Corp. Comm’n, Case No. PUR-2025- 00058, at 24-26 (Nov. 25, 2025); Petition of Appalachian Power Company, Final Order, Va. State Corp. Comm’n, Case No. PUR-2025-00057, at 2 (June 1, 2026).33 PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 at PP 85-87 (requiring PJM to extend new transmission services to eligible customers taking service on behalf of large loads or show cause as to why the tariff is just and reasonable without such a provision).
PDF page 10
10
C. The IRAS Proposal Does Not Unduly Discriminate.
PJM’s IRAS Proposal is not unduly discriminatory because any such differentiation among capacity buyers is warranted by the size, operational characteristics, and grid impacts caused by New Large Load. The United States Court of Appeals for the District of Columbia Circuit (D.C. Circuit) has held that discrimination is undue only if differently treated entities are “similarly situated,”34 such that “there is no reason for the difference.”35 There is no undue discrimination where the Commission articulates relevant, significant facts to provide a rational basis for treating two entities differently,36 and the Commission has “wide discretion . . . to determine what constitute[s]” undue discrimination.37
The D.C. Circuit has specifically held that utilities may discriminate between two entities due to capacity constraints. In Complex Consolidated Edison Company v. FERC, the Commission upheld differential treatment of two natural gas pipeline customers on this basis. The Commission found in the underlying order that, without the pipeline company’s disparate treatment of two different customers, one customer “could pull enough gas off the system to leave inadequate quantities available to meet other customers’” needs.38 The D.C. Circuit affirmed the Commission’s decision, stating that “the Commission gave an adequate explanation of how it reached its conclusion that there was no undue discrimination[.]”39 Further, the court found that “a rational, non-discriminatory basis existed for the difference in situation, namely operational constraints.”40
34 State Corp. Comm’n v. FERC, 876 F.3d 332, 335 (D.C. Cir. 2017).
35 Transmission Access Policy Study Grp. v. FERC, 225 F.3d 667, 721 (D.C. Cir. 2000).36 Complex Consol. Edison Co. of N.Y., Inc. v. FERC, 165 F.3d 992, 1013 (D.C. Cir. 1999) (citations omitted).37 Transmission Access Policy Study Grp., 225 F.3d at 721.38 Tenn. Gas Pipeline Co., 76 FERC ¶ 61,022, at 61,138 (1996). 39 Complex Consol. Edison Co. of N.Y., 165 F.3d at 1013.40 Id.
PDF page 11
11
A similar principle underlies the treatment at issue here. PJM expects to experience 29.7 gigawatts of load growth between 2025 and 2030.41 According to the Independent Market Monitor for PJM, “[d]ata center load growth is the primary reason for recent and expected capacity market conditions, including total forecast load growth, the tight supply and demand balance, and high prices[.]”42 Accordingly, it is reasonable to assume that any requirement to meet 100 percent of data center demand 100 percent of the time would jeopardize PJM’s ability to meet the demand of existing residential customers, given the current capacity constraints. For this reason, a policy that requires only Load Serving Entities serving New Large Loads to match this demand with sufficient capacity or for the New Large Loads themselves to bring their own new capacity or be subject to IRAS, is not undue discrimination. Here, the distinction between New Large Loads and existing load is based on legitimate operational constraints in PJM created by a sudden and unprecedented influx of large load demand. Managing these operational constraints therefore provides a rational basis for differential treatment between Load Serving Entities serving New Large Loads relative to all other load.
The D.C. Circuit has also found that public utilities may discriminate between two entities based on different customer characteristics. In Cities of Bethany, et al. v. FERC, the D.C. Circuit upheld the Commission’s approval of separate customer categories where two entities “have different customer profiles and load characteristics[.]”43 PJM’s IRAS Proposal likewise applies differential treatment to Load Serving Entities serving New Large Loads compared to all other load based on different customer profiles and load characteristics. As
41 John D. Wilson, et al., Grid Strategies, Power Demand Forecasts Revised Up for Third Year Running, Led by Data Centers, at 33 (Nov. 2025), https://gridstrategiesllc.com/wp-content/uploads/Grid-Strategies-National-Load-Growth- Report-2025.pdf.
42 The Independent Market Monitor for PJM, Analysis of 2026/2027 RPM Base Residual Auction Part A, at 1 (Oct. 1, 2025).
43 Cities of Bethany, et al. v. FERC, 727 F.2d 1131, 1138 (D.C. Cir. 1984).
PDF page 12
12
compared to existing residential and commercial customers, large loads have significantly higher demand requirements. PJM’s IRAS Proposal classifies New Large Loads as those requiring 50 MW or more,44 but large loads can require several hundred or even a thousand megawatts.45 Moreover, many large loads have high load factors that far exceed the average load factor of residential customers. As such, large loads both demand significant amounts of power and run constantly, which differs markedly from traditional load profiles. As the Commission has acknowledged, “integrating large loads poses specific challenges to transmission system operation given their size, operational behavior, and unique potential to impact the transmission system.”46 Therefore, categorizing and treating Load Serving Entities that serve New Large Loads separately from existing load is not unduly discriminatory.
In fact, imposing a single rate regime covering service to both traditional load and New Large Loads may itself be unduly discriminatory. In Alabama Electric Co-op., Inc. v. FERC, the D.C. Circuit held that a single rate design that places on one group of customers “charges which are higher than necessary to recover the costs of servicing that group” may be unlawfully discriminatory.47 The court explained that a reasonable rate scheme “should produce revenues from each class of customers which match, as closely as practicable, the cost to serve each class or individual customer.”48 The rapid influx of large load demand is the principal driver of the generation capacity shortfall and price spikes in the PJM region,49 causing residential and commercial customers to pay more than the costs required to service their own needs. To ameliorate this unduly discriminatory rate regime, PJM has appropriately proposed differential
44 See IRAS Proposal, Transmittal at 32.45 Congressional Research Service, Data Centers and Their Energy Consumption: Frequently Asked Questions, at 3 (May 12, 2026), https://www.congress.gov/crs_external_products/R/PDF/R48646/R48646.8.pdf.46 PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 at P 58.47 Ala. Elec. Co-op., Inc. v. FERC, 684 F.2d 20, 27-28 (D.C. Cir. 1982).48 Id. at 29.49 Id.
PDF page 13
13
treatment for Load Serving Entities serving New Large Loads to help ensure that existing customers are not shouldering Commission-jurisdictional costs to serve New Large Loads.
III. CONCLUSION
For the foregoing reasons, Appalachian Voices respectfully requests that the Commission approve PJM’s IRAS Proposal.
Respectfully submitted,
/s/ Nicholas J. Guidi
Nicholas J. Guidi
Senior Attorney
nguidi@selc.org
/s/ Katherine L. Rogers
Katherine L. Rogers
Associate Attorney
krogers@selc.org
Southern Environmental Law Center
500 New Jersey Ave. NW, Suite 600
Washington, DC 20001
Counsel for Appalachian Voices
Dated: September 3, 2026
PDF page 14
CERTIFICATE OF SERVICE
Pursuant to Rule 2010 of the Commission’s Rules of Practice and Procedure, I hereby certify that I have this day served a copy of the foregoing on all persons designated on the official service list compiled by the Secretary in this proceeding.
Dated this 3rd day of September 2026.