ER26-3650-000 · 2026-09-18 · CMTC et al.

Joint Comments, Request for Clarification and Limited Protest of Coalition of MISO Transmission Customers et al. to Midcontinent Independent System…

PDF page 1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
Midcontinent Independent System Operator, Inc.
) Docket No.ER26-3650-000
JOINT COMMENTS,
REQUEST FOR CLARIFICATION,
AND
LIMITED PROTEST OF THE LARGE ENERGY USERS
Pursuant to the Federal Energy Regulatory Commission's ("Commission" or "FERC") August 31, 2026 Combined Notice of Filings #1 and Rule 211 of the Commission's Rules of Practice and Procedure,' the Coalition of MISO Transmission Customers iCMTC), the Illinois Industrial Energy Consumers ("IIEC), the Association of Businesses Advocating Tariff Equity ("ABATE®), the NIPSCO Large Customer Group ("NLCG), the Louisiana Energy Users Group ("LEUG"), and the Texas Industrial Energy Consumers ("TIEC") (collectively, "the Large Energy Users') submit these Joint Comments, Request for Clarification, and Limited Protest, to the Midcontinent Independent System Operator, Inc. ("MISO) filing proposing revisions to its Open Access Transmission, Energy and Operating Reserve Markets Tariff ("Tariff"), to establish certain Interconnection Reliability Requirements for Large Loads (the "IRR Proposal"). The Large Energy Users appreciate MISO's work and responsiveness during the stakeholder process, but submit these Comments and Limited Protest to ensure that the proposed Tariff language is consistent with the underlying interconnection reliability objectives and to ensure that matters that significantly affect rates are appropriately delineated in the Tariff and not reserved for future development in business practice manuals.

1 18 CFR § 385.211.

PDF page 2

RELEVANT BACKGROUND
On August 28, 2026, MISO submitted a Federal Power Action Section 205 rate filing proposing revisions to its Tariff in response to the Commission's Order Instituting Proceeding Under Section 206 of the Federal Power Act? On August 31, 2026, the Commission issued Combined Notice of Filings #1, which set the deadline for interested parties to file Comments by September 18, 2026. CMTC, MLEC, and ABATE filed motions to intervene in the above- captioned matter on August 31, 2026, September 2, 2026, and September 15, 2026, respectively. TEC and the Louisiana Energy Users Group both filed a motion to intervene in the above-captioned matter on September 14, 2026. TIEC filed a doc-less intervention on September 17, 2026. NLCG plans to file a doc-less intervention on September 18, 2026.

The Large Energy Users are a collection of ad hoc associations of large industrial and institutional end-users of electricity that consume substantial amounts of electricity at various facilities throughout the MISO footprint. Members operate one or more manufacturing or large, energy-intensive facilities in the MISO region and purchase electric delivery service or bundled electric service from at least one MISO transmission owner. The Large Energy Users will be directly affected by the outcome of this proceeding and have been active stakeholders contributing to the Large Load Working Group, which informed MISO's development of the Tariff proposals. The Large Energy Users greatly appreciate MISO's efforts to incorporate multiple stakeholder perspectives into the proposed Tariff revisions. Stakeholder feedback has significantly influenced the revised Tariff language and supports overall system reliability. While great strides have been made towards consensus, under significant time and resource constraints, the Large 2 Midcontinent Independent System Operator, Inc., Order Instituting Proceeding Under Section 206 of the Federal Power Act, 195 FERC 1 61,212 (2026) (#Show Cause Order).

2

PDF page 3

Energy Users file these brief Comments requesting clarification, and file a Limited Protest requesting revised Tariff language.

EXECUTIVE SUMMARY
The Large Energy Users appreciate the collaboration resulting from the Large Load
Working Group and MISO's willingness to listen to stakeholder concerns. These Comments focus on two topics where the Large Energy Users submit that clarifications are necessary to ensure just and reasonable practices affecting rates and to avoid adverse economic consequences and unnecessary regulatory burdens to large loads, especially existing manufacturing and institutional loads that have not triggered the regulatory and legislative efforts responding to concerns associated with high-impact, large computational loads. First, the proposed tariff language in Section 37A II.2(a) lacks an explicit exemption for existing loads in service that experience incremental growth of less than 25 MW in total. Second, the proposed tariff language in Section 37A.4 is ambiguous and, if not clarified, creates the possibility of burdensome real-time forecasting requirements for all Large Loads including conforming or non-computational loads' where the terms of such real-time forecasting requirements are not specified in the tariff, contrary to the Commission's Rule of Reason requiring that practices that significantly affect rates must be clearly delineated in the legally binding tariff on file with the Commission and not left to implement through non-binding guidance at MISO's discretion (i.e., business practice manuals). The Large Energy Users emphasize that, because current reliability efforts undertaken by the North American Electric Reliability Corporation ("NERC") and federal legislation in the Ratepayer Protection Act focus on addressing 3 Similar to SPP's approved Tariff definitions and different reliability forecast requirements between Conforming Load that is reasonably predictable and Non-Conforming Load that does not follow a predictable pattern, MISO's proposed Tariff changes are to be applied differently depending on whether the Large Load consists of Computational Load or instead is a traditional non-computational load, where the former is less predictable and presents a greater risk to reliability that the National Electric Reliability Corporation is creating standards to address. 4 See https://www.nerc.com/standards/reliability-standards-under-development/2026-02-computational-loads (last accessed Sep. 17, 2026).

3

PDF page 4

large computational loads, the Commission must avoid approving unnecessary new regulations and requirements for traditional manufacturing loads and non-computational loads.

II. _ COMMENTS AND LIMITED PROTEST®
A. The Commission Should Require MISO to Clarify Exemption Scenarios in
Section 37A I1.2 - Fully Exempt Large Load.
MISO's proposed Tariff language includes transition provisions which exempt certain Large Loads. Section 37A II.2, subsection (a) states, "A Large Load that has a Service Commencement Date on or prior to December 4, 2026, shall be exempt from all requirements set forth in this Section 37A with respect to the portion of the Large Load that has procured Transmission Service as of the Service Commencement Date. Any modification or series of modifications to a Load that meets the MTEP/EPR Condition, which results in a cumulative increase of 25 MW or more in Transmission Service for such Load and with a Service Commencement Date after December 4, 2026, shall be subject to subsection (2)(b) belowi Consistent with the feedback and MISO tariff drafts during the discussion of this issue through the Large Load Working Group, it was represented by MISO and understood by the Large Energy Users that existing loads in service were to be exempt from the new requirements until an existing load grew by 25 MW or more, at which point the incremental amount of the Large Load would be subject to the applicable requirements provided the resulting total load of the customer is 50 MW or more. Based on the proposed Tariff language, the Large Energy Users request that either MISO agree to clarify the proposed Tariff language or that FERC direct MISO to clarify the 5 See Exhibit A (federal legislation proposing a new federal standard for large loads that require electric energy Ạprimarily to operate information technology infrastructure and related systems pertaining to data storage and computational applications and servicesẠi).

• The Large Energy Users are generally supportive of MISO's filing, but have discrete substantive concerns, thus necessitating requests for clarification and a Limited Protest, especially given our request for revised tariff language. 7 Midcontinent Independent System Operator, Inc.'s Interconnection Reliability Requirements for Large Loads, Tab A, Docket No. ER26-3650-000 (August 28, 2026).

4

PDF page 5

proposed Tariff language to ensure that growth from existing loads is exempt from the new proposed requirements, regardless of the timing of the increase, until such growth reaches 25 MW by specifically including the exemption condition of increases less than 25 MW. To accomplish this objective, the Large Energy Users propose the following additional redlined language:

(2) A Transmission Customer taking Transmission Service on behalf of a Large Load shall ensure that all Large Load shall be subject to all the requirements as set forth in this Section 37A, provided that:

Fully Exempt Large Load:
A Large Load that has a Service Commencement Date on or prior to
December 4, 2026, shall be exempt from all requirements set forth in this
Section 37A with respect to the portion of the Large Load that has procured Transmission Service as of the Service Commencement Date, and shall also

be exempt from these requirements for modifications that result in a
cumulative increase in the Load of less than 25 MW after December 4,
2026. Any modification or series of modifications to a Load that meets the
MTEP/EPR Condition, which results in a cumulative increase of 25 MW or
more in Transmission Service for such Load and with a Service
Commencement Date after December 4, 2026, shall be subject to subsection
(2)(b) below. Any modification or series of modifications to a Load that
does not meet the MTEP/EPR Condition, which results in a cumulative
increase of 25 MW or more in Transmission Service for such Load and with
a Service Commencement Date after December 4, 2026, shall be subject to
subsection (2)(c) below.
If the above Tariff language is clarified, we respectfully submit that those proposed Tariff provisions would then be just and reasonable. Accordingly, the Large Energy Users ask FERC to direct MISO to clarify this language. Such directed clarification could occur through the issuance of a deficiency notice rather than outright rejection of the entire filing without prejudice.

B. The Commission Must Not Impose Unreasonably Onerous Real Time
Forecasts in Section 37A.4 for Non-Computational Loads
& "FERC may accept or reject the proposal. But as this Court has held, Section 205 does not authorize FERC to impose a new rate scheme of its own making without the consent of the utility or Regional Transmission Organization that made the original proposal." NRG Power Mktg., LLC v. FERC, 862 F.3d 108, 114 (D.C. Cir. 2017). However, FERC may issue a deficiency notice signaling that a Section 205 filing may be acceptable if certain deficiencies, such as tariff language issues, are addressed and cured. See Midcontinent Indep. Sys., 196 FERC 1 61,134 at PP. 56-58, 104- 106 (2026).

5

PDF page 6

1. A five-minute real-time forecasting requirement, as applied to non-
computational Large Loads, is unnecessary to ensure system reliability and
has not been demonstrated to be just and reasonable given such a
requirement would inflict unjustified significant burdens? and costs on end
users and manufacturers.
Section 37A.4 of the Proposed Tariff includes Large Load Forecast Data Requirements as follows, "Prior to the later of the Service Commencement Date of a Large Load or September 1, 2027, a Transmission Customer taking Transmission Service on behalf of a Large Load must provide day(s) ahead and real-time Load Forecasts for a Large Load directly to the Transmission Provider to support the Reliability Assessment Commitment (RAC) and Security Constrained Economic Dispatch (SCED) processes, along with other reliability studies. The Load Forecasts shall be updated to reflect the most current information on the expected Demand, in accordance with the Business Practices Manual for Large Loadại

This section appears to require a real-time forecast to support SCED, which implies a real- time forecast updated every five minutes although this time interval requirement is not explicitly stated in the proposed Tariff language. Requiring real-time five-minute interval forecasts for a six- hour basis, updated every five-minutes'", would impose a substantial continuous operational, analytical, and costly burden for Large Loads to provide without clear evidence that it will improve the risks of inaccuracies within MISO's Reliability Assessment Commitment, Look Ahead ° In defining a significant burden for the proposed real-time forecast, end users would need to acquire/assign staff with technical expertise to a new function to compute and submit data to MISO, or to the MISO Transmission Customer, every five minutes twenty-four hours a day on a going forward basis with unknown methods to potentially automate this work at additional expense. End user staff would need to forecast their operations and resultant load values for not just a single day but compute a breakdown of this into 12 five-minute intervals per hour of granularity, for each and every future hour, and submit this electronically with updates of the forward 72 five- This detail of this real-time forecast requirements has been proposed in Section 3.2.1 of MISO's Business Practices Manual #25 at the 8/25/26 Large Load Working Group meeting, available via the link below. https://cdn.misoenergy.org/20260827%20LLWG%20Item%2011%200perational%20Forecasting%20BPM-025- r14%20Draft 20(LLWG-2026-4A)771225.pdf

PDF page 7

Commitment, or real time Security Constrained Economic Dispatch processes when compared to MISO's current method of forecasting existing non-computational loads for these processes. The FERC Show Cause Order included a concern that the reliability of the transmission system could be at risk without greater visibility of Large Load additions; however, the Show Cause Order did not specify the real-time forecast requirement in the manner currently proposed by MISO in the proposed Tariff languageại Such real-time forecasting for all load, especially non-computational load, is significantly burdensome and unnecessary, and MISO has not met its burden under Section 205 of the Federal Power Act to justify the need for this requirement. The Large Energy Users submitted further Joint Comments regarding this concern in the context of the Large Load Working Group, which is attached hereto as Exhibit B.

2. Specific details regarding the real-time forecasting requirement are
inappropriately delegated to the Business Practices Manual.
The proposed language of Section 37A.4 of the Tariff imprecisely requires the forecasts to "be updated to reflect the most current information" but does not include enough clarity for affected market participants (and ultimately affected end users) to understand the significance of the requirements and fails to explicitly indicate that MISO intends to impose not just an hourly real-time load forecast requirement on non-computational and computational Large Loads, but also a five-minute interval real-time load forecast requirement. Instead, MISO has deferred development of the specific requirements to the non-binding Business Practices Manual. Such a deferral is inappropriate when a requirement has the ability to inflict significant burdens and costs on a market participant (which are then imposed on the end-user).

" Show Cause Order at P 64 noted a concern that "MISO's Tariff does not require transmission customers to provide MISO hourly forecasts, telemetry data, and other data to ensure sufficient visibility..ạồi Emphasis added on hourly as the Commission concern did not require consideration of more granular five-minute forecasts nor the consideration of benefits versus the costs of providing such.

7

PDF page 8

In City of Cleveland v. FERC, 249 U.S. App. D.C. 162, 773 F.2d 1368 (D.C. Cir. 1985), the D.C. Circuit Court of Appeals held that utilities must file, "only those practices that affect rates and service significantly, that are realistically susceptible of specification, and that are not so generally understood in any contractual arrangement as to render recitation superfluous."12 This doctrine, known as the Rule of Reason, requires utilities to file with FERC practices that significantly affect rates and service, and are easily reduced to writing. While the Rule of Reason recognizes that there is an infinitude of practices affecting rates and services, 13 and affords the Commission ample discretion to apply the rule as it sees fit, this discretion is not unlimited. In Keyspan-Ravenswood, LLC V. FERC, the D.C. Circuit Court of Appeals found that The New York Independent System Operator's ("NYISO) method for translating installed capacity into unforced capacity should have been filed with FERC because the translation methodology reduced the internal reserve margin by nearly a third which significantly affected its compliance with reliability rules set by the New York State Reliability Council. 4

As discussed herein, a five-minute interval real time forecasting requirement is a costly and burdensome proposal that would substantially affect rates and services and specifically the operational costs of manufacturers across the Midwest. Similarly to NYISO's conversion methodology at issue in Keyspan-Ravenswood, LLC v. FERC, the real time forecasting specifics proposed in MISO's Tariff should be filed with FERC. As such, the details regarding the real time forecasting requirement should be detailed in the Tariff, not in the Business Practices Manual. And when the details are filed with FERC, new forecasting requirements must be just and reasonable practices affecting rates. Taken together with undue burden that would be imposed on

12 City of Cleveland v. FERC, 249 U.S. App. D.C. 162, 773 F.2d 1368, 1376 (D.C. Cir. 1985). 13 Id. 14 Keyspan-Ravenswood, LLC v. FERC, 474 F.3d 804 (2007).

PDF page 9

non-computational Large Loads by a five-minute interval real-time load forecast requirement, FERC should clarify that any approval of MISO's proposed real-time load forecast requirement in this proceeding is limited to requiring an hourly load forecast. If MISO wishes to purse a five- minute real-time load forecast requirement, it must do so in a separate new filing with the Commission explicitly requesting such a requirement - it may not impose such an additional requirement through its Business Practice Manuals alone.

TV. CONCLUSION
WHEREFORE, the Coalition of MISO Transmission Customers, the Illinois Industrial Energy Consumers, Association of Businesses Advocating Tariff Equity, the NIPSCO Large Customer Group, the Louisiana Energy Users Group, and the Texas Industrial Energy Consumers respectfully request that the Commission consider these Comments and direct MISO to clarify the proposed tariff language, or, in the alternative, issue a Deficiency Notice directing MISO to provide clarification regarding the issues discussed above.

Respectfully submitted,
s/ Kenneth R. Stark
Kenneth R. Stark
Victoria A. Geddis
Rebecca Kimmel
McNees Wallace & Nurick LLC
100 Pine Street
Harrisburg, PA 17101
Telephone: (717) 237-8000
kstark(@mcneeslaw.com
vgeddis@mcneeslaw.com
rkimmel(@mcneeslaw.com
Counsel to the Coalition
Transmission Customers
/s/ Katherine L. Coleman
Katherine L. Coleman
John Russ Hubbard
O'Melveny & Meyers LLP
303 Colorado St., Suite 2750
Austin, TX 78701
Phone: (737) 261-8600
kcoleman@omm.com
jhubbard@omm.com
Attorneys for Texas Industrial Energy
Consumers
of MISO

PDF page 10

/s/ Edward Fitzhenry
Edward Fitzhenry
Attorney at Law
edfitzhenrylaw@gmail.com
(314) 707-1212
Counsel to the Illinois Industrial Energy Consumers

s/ Benjamin J. Holwerda
Benjamin J. Holwerda (P82110)
Clark Hill PLC
215 South Washington Square, Suite 200 Lansing, MI 48933

Phone: (517) 318-3012
bholwerda@clarkhill.com
Counsel to the Association of Businesses Advocating for Tariff Equity

Date: September 18, 2026
/s/ Randy Young
Randy Young (#21958)
Carrie R. Tournillon (#30093)
Gordon D. Polozola (#23900)
KEAN MILLER LLP
Post Office Box 3513
Baton Rouge, LA 70821
Phone: (225) 387-0999
randy.young@keanmiller.com
carrie.tournillon@keanmiller.com
gordon.polozola@keanmiller.com
Attorneys for Louisiana Energy Users Group /s/ Joseph P. Rompala

Joseph P. Rompala, Ind. Atty. No. 25078-49 LEWIS & KAPPES, P.C.

One American Square, Suite 2500
Indianapolis, Indiana 46282-0003
Telephone: (317) 639-1210
JRompala(@Lewis-Kappes.com
Counsel to NIPSCO Large Customer Group 10

PDF page 11

CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding. Dated this 18th day of September 2026.

Is/ Victoria A. Geddis
Counsel to the Coalition of MISO
Transmission Customers
11

PDF page 12

Exhibit A

PDF page 13

H5656
Kamlager-Dove
Kaptur
Keating
Kelly (IL)
Kennedy (NY)
Khanna
Krishnamoorthi
Landsman
LẺrsen (WA)
Larson (CT)
Latimer
Lee (NV)
Lee (PA)
Leger Fernandez
Levin
Liccardo
ІЛен
Lofgren
Lynch
Magaziner
Mannion
Matsui
MeBath
McBride
McClain Delaney
McClellan
McCollum
McDonald Rivet
McGarvey
McGovern
McIver
Meeks
Mejia
Menefee
Menendez
Meng
Mfume
Min
Moore (WI)
Morelle
Morrison
Moskowitz
Moulton
Mrvan
Mullin
Nadler
Neal
Neguse
Norcrosa
Norman
Ocasio-Cortes
Olszewski
Omar
Pallone
Panetta
Pappas
Pelosi
Peters
Pettersen
Pingree
Pocan
Pou
Pressley
Quigley
Kamirez
Randall
Raskin
Riley (NY)
Rivas
Kuiz
Donalds
Dunn (FL)
Garamendi
Salinas
Sanchez
Seanlon
Schakowsky
Schneider
Scholten
Schrier
Scott (VA)
NOT VOTING 8
Hoyle (OR)
Mills
Roy
Sewell
Sherman
Simon
Sorensen
Soto
Stansbury
Stanton
Stevens
Strickland
Subramanyam
Suozzi
Sykes
Takano
Thanedar
Thompson (CA)
Thompson (MS)
Titus
Tlaib
Tokuda
Tonko
Torres (CA)
Torres (NY)
Trahan
Tran
Underwood
Vargas
Vasquez
Veasey
Velâzquez
Vindman
Wahab
Walkinshaw
Wasserman
Schultz
Waters
Watson Coleman
Whitesides
WIlliams (GA)
Wilson (FL)
Smith (WA)
Tiffany
ANNOUNCEMENT BY THE SPEAKER PRO TEMPORE The SPEAKER pro tempore (during

the vote). There are 2 minutes remain- ing.

• 1727
So the resolution was agreed to.
The result of the vote was announced
as above recorded.
A motion to reconsider was laid on
RECOGNIZING MEGAN BEL MILLER
(Mr. SCALISE asked and was given
permission to address the House for 1
Mr. SCALISE. Mr. Speaker, I rise
leadership, service, and friendship have meant so much to me, Team Scalise,

and the people of southeast Louisiana. I am talking about my chief of staff

and senior leadership adviser, Megan
Megan has been part of my team
from the very beginning. In fact, when I was first elected to Congress, she was the very first person that I hired.

As my then-legislative director and
longtime Energy and Commerce Com-
mittee staffer, Megan helped lead our
work on some of the biggest issues fac- ing not only our district but the Na-

tion, including energy and healthcare. After the Deepwater Horizon

aster, she played a critical role in
drafting and passing the RESTORE Act
to help Louisiana communities recover
When Megan first left our office in
2013, I stood right here on this House CONGRESSIONAL RECORD - HOUSE

September 15, 2026
floor to recognize her service and said (H.R. 9340) to amend the Public Utility she was leaving foriạibigger and better Regulatory Policies Act of 1978 to es- thingsạẠại

tablish a Federal standard relating to
• 1730
Luckily for me, those bigger end bet-
ter things eventually led Megan back
to Capitol Hill, this time as the chief of staff for my personal office in 2017.

Just months later, when I was shot, I
came to rely on Megan in ways that
none of us could have imagined.
Through it all, Megan's leadership
and friendship never wavered, and Jen- nifer and I will always be grateful for the way she helped my family and our

team make it through that challenging
the recovery of the full, incremental
costs of upgrades that serve large-load customers, and for other purposes, as

amended
The Clerk read the title of the bill.
The text of the bill is as follows:
H.R. 9340
Be it enacted by the Senate and House of Rep- resentatives of the United States of America in Congress 1ssembled,

SECTION 1. SHORT TITLE.
This Act may be cited as the "Ratepayer Pro- Over the years, Megan has also been

someone I have relied on for her exper- tise on policy and knowledge of this in- stitution. She has become known for

her deep knowledge of policy and proc- ess, her strong relationships on both

sides of the aisle, and her ability to bring people together.

She played a key role in helping se-
cure a provision in the working fami-
lies tax cut that increases the amount of revenue-sharing dollars that Lou-

isiana and other Gulf Coast States re- ceive each year from offshore drilling. Megan has always been someone I

could count on for good aavice, sound
judgment, and an unwavering commit-
ment to the people we serve.
the "Geaux Getter be-
cause no matter what the problem is
that we have to solve, Megan just finds a way to get it done. Her impact can be seen not only in the policies that she shaped, but in the countless constitu- ents she helped and staff members that she mentored along the way.

Mr. Speaker, I can't thank Megan
enough for everything she has done for me, our office, and the American peo-

LARGE-LOAD CUSTOMERS.
(a) FEDERAL STANDARD RELATING TO LARGE- LOAD CUSTOMERS.-Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C 2621(d)) is amended by adding at the end the STANDARDS FOR LARGE-LOAD CUS-

"(A) RECOVERY OF FULL, INCREMENTAL COST OF UPGRADES.—A rate charged, or entered into, by an electric utility for providing electric serv- ice to a lorge-load customer shall be designed to recover from the large-load customer the full, in- cremental cost of any generation, transmission. or distribution upgrade necessary to serve the load of such large-load customer, including in the event of such large-load customer termi- nating a contract or other agreement with the electric utility pertaining to the sale of electric energy, or otherwise ceasing the purchase of electric energy from the electric utility. *(B) FINANCIAL ASSURANCES AND CONTRIBU- TIONS.-Before making any generation, trans mission, or distribution upgrade that is nec essary to serve the load of a large-load cus- tomer, an electric utility shall require the large- load customer provide to the electric utility fi- nancial assurances or contributions to cover the C) LARGE-LOAD CUSTOMER DEFINED.

paragraph, the term 'large-load customer' means a non-residential electric consumer that, on or after the date of the enactment of this para- graph, requests to enter into, or enters into, a Thirteen years ago, I stood on this

contract or other agreement pertaining to the floor, and I said I would miss her, as sale of electric energy for one or more facilities she went on

bigger and better
things. Today, I find myself saying it again. It has been a privilege to work alongside her all of these years and an greater privilege to call her a

Jennifer and I wish Megan, Joel,
Parker, and Caroline all the best in
Megan and all of her friends and family ANNOUNCEMENT BY THE SPEAKER

PRO TEMPORE
The SPEAKER pro tempore (Mr.
HARRIS of North Carolina). Pursuant to clause 8 of rule XX, the Chair will post- pone further proceedings today on mo-

tions to suspend the rules on which a
recorded vote or the yeas and nays are ordered, or votes objected to under

clause 6 of rule XX.
The House will resume proceedings
on postponed questions at a later time. RATEPAYER PROTECTION ACT

Mr. GUTHRIE. Mr. Speaker, 1 mov
to suspend the rules and pass the bil
"(i) require electric energy primarily to oper- ate information technology infrastructure and related systems pertaining to data storage and computational applications and services; and ẠạẠii) have, in the aggregate, a peak electric demand of 100 megawatts or more at a single site or campus.".

(b) CONFORMING AMENDMENTS.
(1) OBLIGATIONS
TO CONSIDER AND DETER-
MINE.-
-Section 112 of the Public Utility Regu- latory Policies Act of 1978 (16 U.S.C. 2622) is amended

(A) in subsection (b), by adding at the end the following:

ẠỗẠạ9)(A) Not later than 1 year after the date of enactment of this paragraph, each State regu- latory authority (with respect to each electric utility for which the State has ratemaking au- thority) and each nonregulated electric utility shall commence consideration under section 111 or set a hearing date for consideration, with re- spect to the standard established by paragraph

(22) of section 111(d).
ẠỊB) Not later than 2 years after the date of enactment of this paragraph, each State regu- latory authority (with respect to each electric utility for which the State has ratemaking au- thority) and each nonregulated electric utility shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d.).iạị:

PDF page 14

September 15, 2026
(i) by striking subsection (b)(2) and insert- ing "subsection (b)i; and

(ii) by insertingẠạIn the case of the standord established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22)." after 'paragraph (21)."; and (C) by odding at the end the following: CONGRESSIONAL RECORD - HOUSE

that we need it to develop here at home Big Tech and other data center owners and not in China. H.R. 9340 takes ac-

for the energy use and de-
tion on behalf of our constituents so we that they create. The bill re-

may keep costs low while ensuring the
quires State utility regulators to con- U.S. leads in the next-generation econ- dating that the electricity prices that If we cede the race for AI dominance

data centers pay fully account for all
to China, then China will set the stand- their costs that they impose on the

ards for future technology. This bill
grid. This includes new and upgraded
strikes the right balance of providing a high-voltage

sections (b) and (c) shall not apply to the stand- ard established by paragraph (22) of section modest but important level of account-

mission lines, and local power lines.
111(d) in the case of any electric utility in a ability as we continue to support this

State if, before the date of enactment of this vital industry.

Mr. Speaker, I thank my friend from
We can all agree that data centers
must pay their fair share and that the
"(1) the State has implemented for the electric utility the standard (or a comparable standard); "(2) the State regulatory authority for the Stute or the relevant nonreguloted electric util- ity has conducted a proceeding to consider im- plementation of the standard (or a comparable standard) for the electric utility; or

"(3) the State legislature has voted on the im- plementation of the standard (or a comparable standard) for the electric utility.".

(2) PRIOR AND PENDING PROCEEDINGS.-Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by adding at the end the following:ẠIn the case of the stand- ard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this

deemed to be a reference to the date of enact- ment of that paragraph (22).".

The SPEAKER pro tempore. Pursu-
ant to the rule, the gentleman from
Kentucky (Mr. GUTHRIE) and the gen-
tleman from New Jersey (Mr. PALLONE)
each will control 20 minutes.
The Chair recognizes the gentleman
from Kentucky.
Colorado again for his tireless bipar-
tisan leadership on this issue. He is
together both sides of the
aisle on a critical issue. I would say, we were home, working in our districts in

August. We listened to our constitu-
ents, and we are here today based on
what we heard, taking action here in
Washington, D.C. That is how our sys-
agree, but this bill, I do believe, is one small step in that direction.

The bill, as I said, isn't perfect. It
also only addresses one small part of
the puzzle. It does not change how
wholesale generation or transmission
costs are allocated at the Federal level. It doesn't push for the transparency

tem is supposed to work
Mr. Speaker, I urge my colleagues to
support this legislation, and I reserve State regulators need to ensure that

data centers actually are paying their
the balance of my time.
Mr. PALLONE. Mr. Speaker, I yield
myself such time as I may consume.
I rise in support of H.R. 9340, the
Ratepayer Protection Act. Everyone
knows that data centers are helping
drive electricity prices to record highs this year. Just in the mid-Atlantic

over the past few years, data centers
have increased electric bills by over $30 Data centers must bring their own

clean electricity generation capacity
onto the grid and be willing to get cur- tailed first when there are grid reli-

ability issues.
Now, Representative LANDSMAN from
Ohio has a bill that would kick FERC
into gear to start studying some of
those issues. It passed the Energy and
billion. By and large, it has not been
the data centers that have been footing nearly 2 months ago, but unfortu-

the bill. It has been our constituents. Mr. GUTHRIE. Mr. Speaker, I ask

This problem is happening across the
nately, House Republican leadership
did not include that bill on the floor
unanimous consent that all Members
Nation, from Texas to California, from
may have 5 legislative days to revise
Florida to Washington State. It doesn't Regardless of what happens with this

and extend their remarks and include
matter if you are in a red State or a
bill in the Senate, I will make a com-
extraneous material on H.R. 9340.
blue State. Your prices have gone up.
The SPEAKER pro tempore. Is there
Americans, Mr. Speaker,
mitment to the American people, Mr.
Speaker. Americans across the country
objection to the request of the gen-
cerned about what data centers and Big
are furious about the unchecked devel-
tleman from Kentucky?
Tech's push for more AI means for
opment of data centers and artificial
There was no objection.
their communities, jobs, property val-
intelligence. They
Mr. GUTHRIE. Mr. Speaker, I yield
ues, and the future. Dlectricity prices what it means for their communities,

myself such time as I may consume.
are skyrocketing. The electric grid is
for their jobs, or even for their lives. I Mr. Speaker, I rise in support of H.R.

strained. Our clean air and water are
9340, the Ratepayer Protection Act,
being polluted. Noise is wearing on our promise that this bill is not the end of sponsored by my colleague and friend

communities' health and patience.
our focus on these issues. It is only the from Colorado, Congressman EVANS.

People, frankly, are sick and tired of
I have repeatedly said that we need
This bill encourages States to pro-
strong guardrails on data centers and
tect our neighbors and small businesses billionaires taking over their

the impact they have on our commu-
from footing the bill for infrastructure neighborhoods and threatening their

nities, our environment, and our bills. investments needed for the Al race,

utility bills, air, water, and property. If we can't establish

those strong
while protecting existing
Unfortunately, these very real con-
guardrails, then it is my belief that we thorities. The evidence is clear: When

cerns are repeatedly swept to the side- will need to establish a moratorium on

States have the proper processes in
large-load data
households, centers
lines, minimized, or ridiculed by Presi- Trump and Republican congres-

constructing new data centers.
This bill by itself, or even in com-
sional leaders.
bination with a number of other bills
have positive benefits for the commu-
Last month, Trump posted on social
we are considering this week, is simply nities in which they reside.

media that communities that opposed
not enough, but it is a start.
Data center growth can be a catalyst
data centers must want to end up being
Mr. Speaker, I urge my colleagues to
investment in
backward and poor. The President, in
support the bill, and I reserve the bal- strengthening the tax base to fund es-

my opinion, is out of touch on this
ance of my time.
sential public services and anchor ten- issue, and the American people are de-

Mr. GUTHRIE. Mr. Speaker, I yield 1
ants for utilities that lower rates for manding action. That is the reality we

minute to the gentleman from Lou-
everyone else.
are living in right now, where Presi-
isiana (Mr. SCALISE), the distinguished Electricity demand is growing at a

dent Trump wants to continue to give
majority leader and my good friend
pace not seen since World War II, and
Big Tech free rein to build data cen-
Mr. SCALISE. Mr. Speaker, I thank
are rightly concerned
ters, with no Federal guardrails.
my friend and the chairman of the
about what this might mean for their
This bill is a start in addressing the
House Energy and Commerce
impact that data centers have on our
mittee (Mr. GUTHRIE) for yielding.
As this industry continues to de-
power bills, but this particular bill
Mr. Speaker, I rise in support of this
velop, I want to be absolutely clear
does not go far enough to ensure that really important bill by my friend Mr.

PDF page 15

CONGRESSIONAL RECORD - HOUSE
September 15, 2026
EVANS from Colorado who led on this but the data center is still being built. all one party, either Republican or ei- It is up to about $50 billion in private ther Democrat. The States that have Mr. Speaker, we are talking about

funding that is being built in little all unified Democratic Party control in the latest advancement in technology. those States actually have higher elec- If you think about the history of this As they are building that data cen- tricity costs than States that have all great Nation as we celebrate 250 years ter, because of all of the increased sales America, one of the things

collections
to Richland Parish,
The Institute for Energy Research
America has been so successful at has they were able to give a bonus. I am did the study. You can go find it on- been always being on the frontier of not talking about the base salary of line. It shows you State by State the new innovations. In fact, in the last 150 schoolteachers. They

kilowatt-per-hour cost. The reason it is years, America has led the world in ad- bonus to every schoolteacher in Rich- rising is because a lot of those States vancements in technology.

land Parish because of the building of that have unifed Democratic govern- Today is no different. In fact, today, that data center.

ment are also States that are losing America is at the heart of the domina- Mr. Speaker, do you know how much

population. Some hundreds of thou-
tion of technology all around
every schoolteacher in Richland Parish sands to nearly millions of people have world. If you think about some of the received a few months ago because of fled those States. As those States lose simplest things we are able to do in our the data center? They received a bonus population because of bad policies, Mr lives, that give us the ability to have of $50,000 per teacher because of the Speaker, their baseload capacity is the more free time, or the things you can data center.

same. The cost to run their grid is the do on a cell phone that would have

Those are the stories that you are
same. It is spread amongst fewer people taken a supercomputer 30 years ago to seeing in communities that have em- because their bad policies are running do, that is because of advancements in braced it, where they worked with the hundreds of thousands or a million-plus local community. It is not a burden on people out of the State.

Artificial intelligence and data cen- that community. It is actually a tre- The States that are growing, that

ters are no different. It is another ad- mendous benefit.

Not only teachers
vancement in technology. As we are
will benefit, but small businesses are that are attracting people and jobs, advancing in technology, we have to do those States have lower kilowatt-per- it the right way, Mr. Speaker, in a Loudoun County in Virginia,

hour costs for their consumers because smart and thoughtful way. If you look Speaker, is another community

the same grid has the same fixed costs, at communities that have embraced

made the decision for themselves. It is but there is more people to spread the data centers, some communities said it not a Washington choice. It is a local cost around so those people pay less. is not for me, and that is a choice com- community choice, and I think every- That is what actually is happening in munities make.

body would agree with that. If there this country. Look at all the States The Federal Government is not the

are local communities that don't want Go look at the Institute for Energy Re- one making that decision.

it, believe me there are other commu- search study, Mr. Speaker, because it have always said, and what President nities that will take those benefits. shows you what is really happening out Trump took the leadership in doing, is Loudoun County in Virginia got the

meeting with all of the Big Tech com- benefits of their data centers to the There is a revolution

panies building these massive data cen- tune of a 30 percent reduction in prop- China is competing, and America is

ters and said just make sure as you are taxes for every homeowner in

competing. We surely do not want
making these big investments in com- Loudoun County, Virginia. They are

China to win this war. America is stay- munities, you won't aad to the cost of benefiting from that still to this day, ing at the forefront. I want us to stay a local community's ratepayer elec- as well as the jobs that come along at the forefront. Let locals make the with it. They are benefiting from the choice and let consumers reap the ben- The President got a commitment to

investment, the buildings that come efits. That is what is happening right do that. We are not fully codifying along, and the small business growth now, and this bill, by my friend Con- that. It is, in essence, a step in that di- that we are seeing.

gressman EVANS, ensures that we con- rection what this bill is doing. But as There has been this assertion, Mr.

tinue to see that growth continue.
the President did that, you saw compa- Speaker, some of it funded by China, Mr. Speaker, I urge adoption.

nies going and making massive multi- that data centers are driving up utility billion-dollar investments in some of prices. There was a study done. In fact, communities and helping those

the Institute for Energy Research did a Mr. PALLONE. Mr. Speaker, I yield

communities
along the
State-by-State study in all 50 States of such time as she may consume to the this country and they looked at energy gentlewoman from Florida (Ms. CAS-

That story does not get told. Frank- the kilowatt-per-hour cost in

TOR), who is the ranking member of our ly, I think that story needs to get told Subcommittee on Energy.

more. I have seen massive data centers Some States have data centers. Some Ms. CASTOR of Florida. Mr. Speaker, in my home State of Louisiana. In fact, States don't. The study is titled: ẠạHave I thank the ranking member for yield- if you go to little Richland Parish, a Data Centers Driven Up Electricity

rural part of north Louisiana that not a lot of people live in, not a lot of op- Their conclusion was clearly no, they portunities for wealth in that parish, do not. There was no disparity in kilo- Mr. Speaker, but then Meta decided to watt hours per customer in States that build a data center, and that data cen- have data centers and States that

ter grew and grew as the community
Mr. Speaker, I rise in support of my bill, the Ratepayer Protection Act. I am proud to lead this bipartisan bill with Congressman EVANS to protect

my neighbors from unfairly paying for the energy needs of large AI data cen- embraced it.

Again, a lot of that is because Presi- They worked with the community.

dent Trump made all of the data cen- They are building their own natural ters, the companies that build them. gas facilities. It is actually going to those pledges that they will not

help the grid in that community be- have a negative impact on the rate- cause they are going to be paying their own way and anything extra they have What they did find, Mr. Speaker, was is going to be off-loaded to the grid so quite interesting, and that was a dis- the neighbors in that community will that does exist in electricity

Mr. Speaker, all across America,
families, farmers, and small business owners fear the arrival of their electric bill every month. Too many are strug- gling under the weight of soul-crushing energy bills, and it comes at a time es- pecially where everything costs more your groceries, gas, diesel, nealthcare, actually get lower utility rates.

prices between States. It is not all Do you know what else happened, Mr. Speaker? This is another part of the What they ultimately looked at is

story that is not getting told enough, States that have a unified government, Many of my neighbors back in the

Tampa Bay area show me their electric bills. They are exorbitant, and it is

PDF page 16

September 15, 2026
gut-wrenching. They are not alone be- cause across the country, electricity prices are up on average 15 percent, but much higher in many places.

But now there is a new stressor: mas- sive hyperscale data centers are

necting to the grid. These are energy descriptors know no end.

When a data center or other large
load comes online, it can trigger mas- upgrades new

transmission
formers and typically those costs are passed along to ratepayers, and that is not fair. Our neighbors should not be stuck paying for the energy infrastruc- ture of the wealthiest countries in the world. The Ratepayer Protection Act says that the data center pays for its own upgrades, not the rest of us.

centers can span hundreds of thousands of square feet. They host thousands of servers, computer storage, networks, and then they have these giant cooling systems that also

amounts of energy as well.
Massive hyperscale data centers can continuously

megawatts, with the largest facilities consuming over 650 megawatts. That is comparable to the energy use of tens of thousands or hundreds of thousands of According to the U.S. Department of Energy, right now data centers con- sume about 4.4 percent of all elec- tricity in America, but they predict that that will go up to 12 percent of the total electricity consumption in Amer- Mr. Speaker, hyperscale data centers are being constructed by the wealthiest Big Tech corporations on the planet. As hardworking Americans are just

meet, they
shouldn't carry Big Tech's data center load as well. That is why we hammered out the bipartisan Ratepayer Protec- tion Act, to ensure that data centers pay the full cost of their energy de- mand and upgrades.

It says that if a company wants to build a data center, they should pay for the power and grid upgrades they need, This bill will require those data cen- ters to cover all the costs. It is an im- portant first step. I know some people not enough.

enough. It is not enough, but it does provide some first steps.

Congress has to do more. We should set stricter requirements for States to report their progress to Congress so we can ensure the bill is enforced. We should incentivize data centers to be empowered

by
clean
energy
prioritize projects that can reduce de- mand during peak hours.

But notably,
this bill does allow
States to do some of those things. The States now can set additional specific guardrails. For example, States can re- quire that data centers are powered by clean energy and don't damage local water supplies. They can require in- CONGRESSIONAL RECORD - HOUSE

grid-enhancing
nologies or virtual power plants. States can even require that data centers fund weatherization initiatives

ment of energy-saving batteries, roof- top solar, and heat pumps.

For example, Virginia is requiring data centers to cover new transmission and distribution capacity costs. Min- nesota requires data centers to pay into an energy conservation and weath- erization fund to benefit working-class neighbors. Kansas incentivized data centers to participate in demand re- sponse programs to reduce peak de- This bill also empowers local commu- nities to make decisions on the siting and building of data centers. It allows for robust community input, not NDAs, nondisclosure agreements, where they try to sneak in.

For example, in Florida, at least 20 counties and municipalities passed or discussed very strict guardrails on data Hillsborough County, many say that is not the appropriate place for a data center because we don't have the water resources and we don't have the elec- tricity yet to do that. There are places in America that don't want them.

We need to keep working on this, but this is a very important first step. These are the wealthiest corporations in America. There is no reason why the should be sub-

sidizing their electricity upgrades and I am eager to keep advancing bipar- tisan, real solutions to invest in our U.S. power grid, which is reaching the end of its useful life, which is also rals- ing costs on Americans. We have just got to remain clear-eyed that right now our neighbors are suffering an af- fordability squeeze. They deserve so much better than what they are get- ting right now.

This Ratepayer Protection Act is a good first start, but it is a modest first start. It is about fairness on this one. Mr. Speaker,

I urge passage of the
Mr. PALLONE. Mr. Speaker, I re-
serve the balance of my time.
Mr. GUTHRIE. Mr. Speaker, I yield 2 minutes to the gentleman from Ohio (Mr. LATTA), the chair of the Sub- committee on Energy

Mr. LATTA. Mr. Speaker, I thank
the gentleman, the chairman of the full Committee on Energy and Commerce,

Mr. Speaker, I rise in support of H.R. 9340, the Ratepayer Protection Act, led from Colorado's

Eighth Congressional District.
This legislation passed out of our En- ergy and Commerce Committee with a Mr. Speaker, the goal here is very simple: Data centers should pay their own way. That is why this legislation is so important. We must ensure that nesses are protected from electricity price increases caused by large loads like data centers.

The increase in data center develop- ment raises important questions about how these facilities will affect local electric grids in nearby communities. H.R. 9340 encourages States to estab- lish a standard that requires large data centers to cover the full costs nec- essary to service their loads.

Over the last 5 years, electricity rates have steadily

increased across
the country.
While data center demand growth is exploding, at the same time, record amounts of baseload generation are prematurely leaving our grids. This is a problem that must be addressed.

H.R. 9340 ensures that States can
hold AI companies responsible for their own costs and that hardworking Amer- ican families aren't on the hook for the Mr. Speaker, I urge the House to pass the Ratepayer Protection Act.

Mr. GUTHRIE. Mr. Speaker, I reserve the balance of my time.

Mr. PALLONE. Mr. Speaker, I re-
serve the balance of my time. I have no Mr. GUTHRIE. Mr. Speaker, I yield 2 minutes to the gentleman from Ohio BALDERSON), a member of the

Committee on Energy and Commerce.
Mr. BALDERSON. Mr. Speaker, I rise today in support of H.R. 9340, the Rate- payer Protection Act.

This bill codifies the principles of the Pledge, ensuring that Ohio families and small businesses aren't left on the hook to pay the costs associated with generation and energy infrastructure needed to power large data centers. As demand for electricity continues to rise across Ohio and the Nation, it is critical that Congress takes action to constituents from in-

creased electric bills.
Ohio has already taken strong steps to make sure large electricity users contribute appropriately to the costs they impose on the grid

The Ratepayer Protection Act builds on that commonsense approach by di- recting States to adopt standards that ensure these facilities pay their fair Importantly, this bill does not in- fringe on local control over the siting and permitting of these projects.

Mr. Speaker, I thank Congressman
EVANS for leading this bipartisan legis- lation and urge my colleagues to sup- port the bill.

Mr. PALLONE. Mr. Speaker, I re-
serve the balance of my time.
Mr. GUTHRIE. Mr. Speaker, I yield 2 minutes to the gentleman from Colo- rado (Mr. EVANS), a member of the En- ergy and Commerce Committee and

sponsor of the legislation.
Mr. EVANS of Colorado. Mr. Speak-
er, I thank the chairman for yielding Mr. Speaker, I rise today in support of my bipartisan bill with Representa- tive CASTOR, the Ratepayer Protection

PDF page 17

CONGRESSIONAL RECORD - HOUSE
America is in a period of incredible nologies like streaming services. At growth. Manufacturing jobs are return- the same time, they consume massive ing to our shores. We are investing in amounts of power and place increasing American energy again. We are leading strain on our electric grid while threat- the charge for technological innova- ening to increase costs for families. tion. With that growth, our demand for energy is also skyrocketing, and some choose to have data centers in their people have very understandable res- ervations and questions about data The future, however, is binary: Ei- ther we build out our power systems to meet that demand, or we become de- pendent on other countries, like Com- munist China, for our daily needs, to infrastructure

stores Americans' consumer data, fi- nancial data, nealthcare data, and per- higher electric bills as a result. In- stead, these costs should be borne di- rectly by the data center developers, the primary catalysts of this increased demand for energy.

We have a responsibility to ensure that our constituents are not picking up the tab for data centers, and this legislation will do exactly that.

I am proud to be a cosponsor of the Ratepayer Protection Act, and I urge all of my colleagues to support its pas- Hardworking Coloradans in my dis-

trict do want economic growth, and they do not want the Chinese Com-

munist Party handling their sensitive information. They want responsible de- velopment practices, but they see the need for massive investments in our systems and wonder who

going to pay for it. This bill answers that question very clearly.

Large-load data centers must cover the full costs of any system upgrades they require, not families or

businesses. We cannot accelerate this growth on the backs of Americans who are working hard to pay their electric bills at the end of the month.

The Ratepayer Protection Act also
gives States and local communities a voice to implement these principles and protect community members from Mr. PALLONE. Madam Speaker, I re-

serve the balance of my time.
GUTHRIE. Madam Speaker, I
yield 2 minutes to the gentlewoman from Colorado (Ms. BOEBERT).

America is in a race for the future, and that future is artificial intelligence. We need to build data centers that will power American AI. We need to create jobs, grow our economy, and make sure that the next generation of technology is built right here in the United States.

But there is one principle that we families should not be forced to pay for someone else's data center. That is ex- actly what the Ratepayer Protection September 15, 2026

applaud my colleague from Colorado (Mr. EVANS) for leading on this issue Mr. PALLONE. Madam Speaker, I re-

serve the balance of my time.
GUTHRIE.
Madam Speaker, I
yield 2 minutes to the gentleman from New York (Mr. LAWLER), my good

Mr. LAWLER. Madam Speaker, I
thank the chairman for yielding me Madam Speaker, I rise today in sup- port of H.R. 9340, the Ratepayer Protec- New York families and businesses

face some of the highest electricity costs in the country. In February, the average residential electricity price in New York reached about 70 percent

higher than the national average, and it is up 58 percent in the last 6 years. At the same time, data centers seek- ing to connect to New York's electric grid are reportedly

of additional
electricity. Years of failed energy poli- cies out of Albany, including shutting down nuclear, banning natural gas, blocking pipelines, and other crazy ideas, have already driven up costs for New Yorkers. We

cannot afford to
make the problem worse
As we work to bring new investments and jobs to New York and, indeed,

America, we need to make sure that the costs of growth do not fall on the families and small businesses already struggling to pay their utility bills. That is why I support the Ratepayer This legislation simply establishes a This bill passed unanimously in the If a massive data center wants to

Energy and Commerce Committee. It is come in and consume

hundreds of
common sense. It keeps costs low for megawatts of electricity, it should pay Americans and helps us build the en- the full incremental costs of providing ergy backbone required to compete and that power, not the families struggling win in the AI race and to keep Ameri- to pay their electric bills and not the cans' digital information here in the small businesses trying to keep their United States, not in China.

doors open. The companies creating the Madam Speaker, I am grateful it is demand should pay for the demand.

being considered today. I urge my col- This is not antibusiness. It is not leagues to support this bill.

anti-AI. It is certainly not antigrowth. Mr. PALLONE. Madam Speaker, I re-

It is common sense.
serve the balance of my time.
In fact, when we get this right, the GUTHRIE. Madam Speaker,

I data centers can actually strengthen vield 2 minutes to the gentleman from communities. Georgia Power was able Virginia (Mr. WITTMAN).

to freeze residential rates for 3 years as Mr. WITTMAN. Madam Speaker,

large-load growth expanded.
rise today in strong support of H.R. In Virginia, data centers took on a 9310, the Ratepayer Protection Act. dramatically larger share of trans- This legislation will require State mission costs while residential cus- utility regulators to examine standards tomers saw their share decline.

to ensure that data centers pay all the Loudoun County alone, data centers costs associated with their power gen- have generated $1.1 billion in tax rev- eration, transmission lines,

upgrades needed to serve their facili- basic principle of fairness. It is about making sure that the companies driv- ing new demand for electricity are re- sponsible for the costs associated with that demand.

We are already seeing communities
and policymakers grappling with how to manage the rapid growth of large- scale data centers and the demands that they place on our energy infra- structure. This is something that the Federal Government needs to work to- gether on to create regulations and protect the people because we need a better approach.

We need one that respects the role of local communities while ensuring that companies driving new demand are re- sponsible for the costs that they cre- ate. We need a policy that looks ahead. builds the infrastructure we need, and protects ratepayers at the same time. I will continue working to ensure

that New Yorkers have access to reli- The Commonwealth of Virginia is

home to approximately 13 percent of all data centers in the world. Some of these data centers are located in the district that I represent.

While data centers create economic Madam Speaker, let's build. Let's

compete. Let's win the AI race. Let's also protect the people who keep this country running.

The Ratepayer Pro-
tection Act gives States a practical tool to make sure that massive new electricity users pay their fair share while preserving State authority over able and affordable energy while mak- ing sure that large energy users pay their fair share.

Madam Speaker, I urge all of my col- leagues to support this legislation. Mr. PALLONE. Madam Speaker, I re-

serve the balance of my time.
Madam Speaker, I
yield 2 minutes to the gentleman from they also come with enormous chal- America can lead the world in AI

Pennsylvania (Mr. MACKENZIE).
Mr. MACKENZIE. Madam Speaker,
health, mobile banking for American foot the bill. That is not a radical idea. communities throughout the Nation

small businesses, and everyday tech- That is responsible leadership, and I are seeing unprecedented growth ir

PDF page 18

September 15, 2026
electricity demand, driven in large
part by data centers and other energy- That growing demand is already hav-

ing a direct impact on communities
like those that I represent in the Le- high Valley and the Poconos, where,

after 4 years of severe inflation under President Biden, residents are being put in a position where they could end up footing the energy bill for new data centers. The rapid growth of these fa- cilities requires unprecedented new in- vestments in our electric grid.

While the grid capacity will catch up the short-term costs

those investments must not be passed on to families, seniors, and small busi- nesses, many of whom don't want data centers in their communities in the

That is why I am proud to cosponsor
the bipartisan Ratepayer Protection
Act, because large energy consumers
who create the demand for new energy inirastructure should pay

We can maintain local control of de- velopment activities while also pro- tecting existing ratepayers, and that is exactly what this legislation does.

I thank Representative EVANS for his partnership on this legislation, and I urge all of my colleagues to support PALLONE. Madam

yield myself the balance of my time to close. I do believe that this legislation is a first step, and therefore, I support it and would ask my colleagues to vote for it. I yield back the balance of my Mr. GUTHRIE. Madam Speaker, I

yield myself the balance of my time to I agree, this is important. We

have to beat China. We have to win the war on AI. If we don't, they are going to set the standards for technology

around the world. It needs to be with To do that, we have to have the data centers. It needs to be locally decided where they go, and ratepayers need to be protected from it. That is what I heard all of August. I think most of us home working heard about it.

This is an example where people are
going home, both sides of the aisle, lis- and coming back here and

doing something about the concerns for the people they represent.

I encourage support of this bill. I en- courage for its passage, and I yield back the balance of my time.

The SPEAKER pro
tempore (Mrs.
MILLER of Illinois). The question is on the motion offered by the gentleman

from Kentucky (Mr. GUTHRIE) that the House suspend the rules and pass the bill, H.R. 9340, as amended.

The question was taken
The SPEAKER pro tempore. In the
opinion of the Chair, two-thirds being in the affirmative, the ayes have it. GUTHRIE. Madam Speaker, on

that I demand the yeas and nays.
CONGRESSIONAL RECORD - HOUSE
The yeas and nays were ordered.
Madam Speaker, I encourage my col-
The SPEAKER pro tempore. Pursu- leagues to support this bill, and I re- ant to clause 8 of rule XX, further pro- serve the balance of my time

ceedings on this motion will be post- APPLICATION

MEMBERS
ARMED FORCES TO MEMBERS OF
THE PUBLIC HEALTH SERVICE
Mr. GUTHRIE. Madam Speaker,
move to suspend the rules and pass the bill (H.R. 2846) to amend title II of the Public Health Service Act to include as an additional right or privilege of com- missioned officers of the Public Health Service (and their beneficiaries)

leave provided under title 10,
United States Code to commissioned
officers of the Army (or their bene- The Clerk read the title of the bill. The text of the bill is as follows:

Be it enacted by the Senate and House of Rep- resentatives of the United States of America in Congress assembled,

SECTION 1. APPLICATION OF LEAVE PROVISIONS FORCES TO MEMBERS OF THE PUB-

lic Health Service Act (42 U.S.C. 213a(a)) is amended by adding at the end the following: -Section 219 of

the Public Health Service Act (42 U.S.C. 210-
1) is repealed.
The SPEAKER pro tempore. Pursu-
ant to the rule, the gentleman from
Kentucky (Mr. GUTHRIE) and the gen-
tleman from New Jersey (Mr. PALLONE) each will control 20 minutes.

The Chair recognizes the gentleman
from Kentucky.
GENERAL LEAVE
Mr. GUTHRIE. Madam Speaker, I ask
unanimous consent that all Members
may have 5 legislative days to revise and extend their remarks and include extraneous material on H.R. 2846.

The SPEAKER pro tempore. Is there
objection to the request of the gen- There was no objection.

yield myself such time as I may con- Madam Speaker,

strong support of H.R. 2846 led by the gentlewoman from Pennsylvania (Ms.

yield myself such time as I may con- I rise in support of H.R. 2846, legisla- tion that would extend expanded leave benefits to members of the U.S. Public Health Service Corps.

The U.S. Public Health Service Corps is one of eight uniformed services in the United States. There are more than 6,000 officers who serve as physicians, nurses, and scientists across agencies to advance public health. Right now, these officers are not guaranteed the same 12-week leave benefit as members of the military are entitled to under Federal law nor are they eligible for the 12 weeks of leave that all Federal Government employees are entitled to Leave Act. This bill fixes this by ex- tending leave benefits to Public Health Service officers, and this leave includes expanded parental leave, emergency

leave of absence, and leave for rest and recuperation.

I thank Representative HOULAHAN for
her leadership on this legislation and my colleagues on the Energy and Com- merce Committee for working with us

to bring this bill to the floor. I encour- age all my colleagues to vote "yes." Before I reserve the balance of my

time, I do want to take an opportunity to thank Una Lee, who is right here, for her more than 11 years here at the Committee,

most of those years serving as chief counsel for the Health Subcommittee. Una has played a critical role in

every major healthcare bill that has been signed into law during that time. Una has been a trusted adviser, and she will be missed. I don't want her to

leave, but what can I do.
I wish her nothing but the best in her future endeavors and congratulate her for her tremendous work, truly tre-

mendous work of making healthcare
affordable and accessible for
Madam Speaker, I reserve the bal-
ance of my time.
Mr. GUTHRIE. Madam Speaker, I
yield myself such time as I may con- I just want to speak briefly. I have no further speakers, so I will be prepared Una Lee, but I didn't get to speak ear- The U.S. Public Health Service Com-

lier in the subcommittee today. We get missioned Corps is one of eight uni- to work with fantastic people here, and formed services in the U.S. It is first in I know Una is one of them. We get to to defend

our Nation's public
see, on the opposite sides of the table health against any threat. This bill sometimes, but I know we are always

closes the gap in benefits between Pub- working to try to improve our country lic Health Service officers and other ci- I thank her for her service. We will uniformed public servants by

miss seeing her around the Energy and aligning their leave policies with those room. I am prepared to

of other uniformed services.
close, and I reserve the balance of my The dedicated men and women of the

Public Health Service Corps have my
respect and gratitude, and they deserve the same benefits and protections af- forded to their fellow uniformed serv- PALLONE. Madam Speaker, I

yield such time as she may consume to the gentlewoman from Pennsylvania

(MS. HOULAHAN), the sponsor of the leg-

PDF page 19

Exhibit B

PDF page 20

Comments of the
Association of Businesses Advocating Tariff Equity (ABATE*),
Illinois Industrial Energy Consumers ("IIEC"),
Louisiana Energy Users Group ("LEUG"),
Texas Industrial Energy Consumers ('TIEC'),
Coalition of MISO Transmission Customers ("CMTC"),
Midwest Large Energy Consumers (IMLECI),
lowa Business Energy Coalition (*'IBEC")
and
NIPSCO Large Customer Group ("NLCG").
Regarding
LLWG: Large Load Operational Forecast Requirements (LLWG-2026-4A)
September 10, 2026
ABATE, IIEC, LEUG, TIEC, CMTC, and MLEC as representatives of the End-Use Customer Sector, and IBEC and NLCG as representatives of organizations advocating for large end-users, appreciate this opportunity to provide these comments to MISO.

During the June 29, 2026 and August 27, 2026 meetings of the Large Load Working Group ('LLWG'), MISO proposed details of the requirements for the Large Load forecast submissions in hourly and five- minute cadences and notice that it plans to monitor forecast accuracy including the potential for penalties? Specifically, due to concerns that large load additions could add substantial volatile demand that MISO's current weather and calendar driven forecasting cannot capture and that FERC raised within its recent Show Cause order, MISO proposes to require the following of all Large Loads, regardless of whether they are Non-Computational or Computational:

• A forecast of five-minute integrated demand for the next five-minute period and the proceeding 71 five-minute periods, updated every five-minutes; and

• A potential monitoring period to measure Large Load forecast to actual error rates with tolerance bands that could be applied to different types of Large Loads, and the potential to assign torecast-related penalty costs to the Large Load errors that create them. While we understand and agree with the need to address the possibility of large load additions introducing substantial volatile demand that MISO's weather and calendar driven forecasting cannot currently capture, MISO has not demonstrated: (i) a reasonable need for the five-minute integrated demand portion of its proposal for Non-Computational Loads, or (ii) a need to design penalty charges at this time.

PDF page 21

Regarding five-minute interval load forecasts, the following are important considerations:
• MISO has not provided any evidence showing the lack of individual load five-minute demand forecasts for existing 50 MW and larger Non-Computational Loads has resulted in either significant reliability or cost subsidy issues within MISO over the last decades which have included a very large number of 50 MW and larger Non-Computational Loads.

• It is the possibility of additional, very large amounts of new Computational Load not operated at a very high, steady load factor that can be quickly dispatched up or down based on market conditions which introduces a potential significant challenge to MISO's current weather and calendar driven forecasting, not Non-Computational Loads.

• Putting aside demand response participation, that has its own Tariff and Business Practice Manual requirements, MISO currently settles all load in the real-time market on an hourly integrated demand basis, and not on a five-minute integrated demand basis. As a result, there are no market signals that would cause loads that can quickly change their demand, specifically, Computational Loads, to make abrupt five-minute changes in their demand.

• Requiring five-minute forecasts for a six-hour basis, updated every five-minutes, would impose a substantial continuous operational, analytical, and costly burden for Large Loads to provide without clear evidence that it will improve the risks of inaccuracies within MISO's Reliability Assessment Commitment, Look Ahead Commitment, or real time Security Constrained Economic Dispatch processes.

Given the above we urge that hourly forecast data provided day-ahead for Non-Computational Loads, when combined with the newly required real-time telemetry for Large Loads, is sufficient for not only day-ahead needs but also for real-time needs, until proven otherwise with actual data-driven experience. There is no FERC requirement for real-time five-minute forecasts from Large Loads nor has there been a showing of MISO reliability problems given existing Non-Computational Loads that necessitates a new burden for customers. The FERC only noted a concern that "MISO's Tariff does not require transmission customers to provide MISO hourly forecasts, telemetry data, and other data to ensure sufficient visibility...'

As for MISO's proposed creation of incentives/penalties for Large Load forecast errors:
• MISO has not provided any evidence showing that participant submitted load forecast errors have been significant and have resulted in reliability or cost subsidy concerns over the last decades which have included a very large number of 50 MW and larger Non-Computational

• For many Non-Computational Loads, due to the nature of their processes, it is not possible for them to forecast demand within a narrow band of accuracy on an hourly integrated demand basis, never mind a five-minute integrated demand. As such, applying penalties to them for falling outside a narrow band accuracy would not be just and reasonable as any lack of accuracy forecast would not be a behavioral issue but rather related to the nature of the processes associated with these loads.

2

PDF page 22

• Without evidence of actual significant forecast errors in aggregate, as individual errors could balance each other out due to their diversity, causing significant dispatch cost impacts there is no basis for a new allocation of existing commitment, reserve, congestion, and/or shortage pricing to loads based on the theoretical concept of uninstructed deviation or failure to follow dispatch instructions for load as MISO suggests within its August 27, 2026 presentation.

• If penalties were applied to a Transmission Customer for forecast deviations without a mechanism to separate errors from updated forecast deviations, and without mechanisms to allocate charges appropriately between the Transmission Customer(s), Load Balancing Areas, and retail Large Loads, then the resulting charges have the propensity to become a zero sum incentive if they end up blindly being assigned to all load within a Load Balancing Area. Given this, if it were demonstrated forecast inaccuracy for Non-Computational Loads introduced significant reliability or cost subsidy issues that need to be addressed, which MISO has not shown to be the case, the appropriate action would be to first, monitor such deviations and study their reasons, and then secondly explore potential changes to the cost allocation for ancillary services, not the immediate application of penalties to these loads without a full examination of actual occurrences and conditions. Collected data can be monitored for potential impacts and accuracy incentives or penalties considered later, if needed, around tolerance bands that are within the Load's control and based on actual experience. 5

For the foregoing reasons, MISO should limit the application of its proposed real-time five-minute forecast requirement to Computational Loads.

Also for the above reasons, MISO should not pursue forecast deviation incentives or penalties at this time. An actual data-driven and risk-informed framework applied proportionally to demonstrated reliability needs, system conditions, and facility characteristics makes the most sense at this time. Thank you for providing us with an opportunity to submit our comments. The End-Use Customer Sector appreciates the continued constructive dialogue on this issue and looks forward to continuing to work with MISO and other stakeholders to deliver on MISO's commitment to reliability and MISO's Value Proposition.

If it would be of help, we would be glad to discuss the above comments further with MISO and other stakeholders. If you have any questions regarding these comments, please do not hesitate to contact any of the following representatives:

3

PDF page 23

Jim Dauphinais
Brubaker & Associates, Inc.
(Consultants to ABATE, IBEC, IIEC, LEUG, NLCG and TIEC)
(636) 898-6725
jdauphinais@consultbai.com
Scott S. Mallory
Brubaker & Associates, Inc.
(Consultants to ABATE, IBEC, IIEC, LEUG, NLCG and TIEC)
smallory@consultbai.com
Ken Stark
McNees Wallace & Nurick LLC (for CMTC)
(717) 237-5378
kstark@mcneeslaw.com
Kavita Maini
KM Energy Consulting, LLC (Consultant to MLEC)
(262) 646-3981
kmaini@wi.rr.com
1 ABATE, IIEC, LEUG, TIEC, CMTC, and MLEC are all MISO Members in the End-Use Customer Sector. IBEC is a non- MISO Member stakeholder whose members are large end-use customers of Alliant and MidAmerican and among lowa's largest and most energy-intensive employers. NLCG is a non-MISO Member stakeholder whose members include large end-use customers within Indiana that are interruptible and/or have cogeneration facilities and that take service under NIPSCO Rate Schedule 531, which allows limited market purchases through Northern Indiana Public Service Company (NIPSCO).

https://cdn.misoenergy.org/20260629%20LLWG%20ltem%2008b%20Large%20Load%200perational%20Forecast% 20Requirements%20(LLWG-2026-4A)765707.pdf

https://cdn.misoenergy.org/20260827%2OLLWG%20ltem%2011%200perational%20Forecasting%20Requirements %20(LLWG-2026-4a)%20Presentation777222.pdf

3 MISO is also requiring a day ahead forecast of hourly integrated demand for the next hour and the 168 hours beyond the next hour, updated on an hourly basis.

4 EL26-70 6/18/26 Order at page 42, para. 64. Emphasis added on hourly as the FERC concern did not require consideration of more granular five-minute forecasts nor the consideration of benefits versus the costs of providing such.

5 Note that currently proposed Tariff Section 37A.4 does not contain language necessary for MISO to assess a penalty or settlement charge for forecast inaccuracies, thus affording time for an experience backed rate proposal at a later date if proven necessary to address potential inaccuracies. Also, setting tolerance bands and incentives on a theoretical basis without empirical data on forecast deviations and their reasons is not likely to lead to reasonable incentive/penalty rates.

6 ER26-3650 MISO 8/28/26 filing at pp.11-12.
4