ER26-3380-000 · 2026-09-21 · Constellation Energy Generation, LLC

Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C.…

PDF page 1

1
UNITED STATES OF AMERICA

BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

)
PJM Interconnection, L.L.C.

)

Docket No. ER26-3380-000

)

MOTION FOR LEAVE TO ANSWER
AND ANSWER OF CONSTELLATION ENERGY GENERATION, LLC
Pursuant to Rules 212 and 213 of the Federal Energy Regulatory Commission’s (“FERC”
or the “Commission”) Rules of Practice and Procedure,1 Constellation Energy Generation, LLC (“Constellation”) respectfully moves for leave to answer and answers the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. (“PJM”).2  Constellation seeks to provide

additional information and context that will assist the Commission in its decision-making process.3
I. BACKGROUND
On July 31, 2026, PJM Interconnection, L.L.C. (“PJM”) submitted revisions to the PJM
Open Access Transmission Tariff (“Tariff”) and the Reliability Assurance Agreement Among
Load Serving Entities (“RAA”) to establish the Reliability Backstop Procurement (“RBP”).4

1  18 C.F.R. §§ 385.212, 385.213.
2 PJM Interconnection, L.L.C., Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C., Docket No. ER26-3380-000 (filed Sept. 10, 2026) (“PJM Answer”).
3 Although the Commission’s Rules of Practice and Procedure do not generally permit answers to answers unless otherwise ordered by the decisional authority, the Commission has made exceptions where an answer provides useful and relevant information that will assist the Commission in its decision-making process, corrects factual inaccuracies and clarifies the issues, or assures a complete record in the proceeding. See, e.g., Pioneer Transmission, LLC v. N. Ind. Pub. Serv. Co., 140 FERC ¶ 61,057, at P 94 (2012) (accepting answers that “provided information that assisted us in our decision-making process”); Entergy Servs., Inc., 126 FERC ¶ 61,227, at P 76, order on clarification & reh’g, 127 FERC ¶ 61,225 (2009); New Power Co. v. PJM Interconnection LLC, 98 FERC ¶ 61,208, at p. 61,756 (2002) (answer accepted to provide new factual and legal material to assist the Commission in decision-making process).
4 PJM Interconnection, L.L.C., Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large Loads, Docket No. ER26-3380-000 (filed July 31, 2026) (“PJM Proposal”).  Capitalized terms used but not otherwise defined herein have the meaning as defined in the Tariff, the RAA, or the PJM Proposal, as applicable.

PDF page 2

2

Numerous parties filed comments and protests addressing the proposal, including Constellation.5 In response, PJM filed the PJM Answer on September 10, 2026.  The PJM Answer addressed certain issues raised by Constellation in its Limited Protest and Answer.  Constellation submits this answer to briefly respond to the PJM Answer and provide clarification that will assist the Commission in its decision in this proceeding.

II. ANSWER
A. Eddystone and Similarly Situated Energy Resources Should Qualify as RBP
Resources and Resources Eligible to Supply Qualifying RBP Offset UCAP
MW
On September 11, 2026, the D.C. Circuit issued a unanimous ruling vacating the
Department of Energy’s (“DOE”) order issued under section 202(c) Federal Power Act (“FPA”) requiring Consumers Energy to continue operating the J.H. Campbell power plant (the “Campbell Order”).6  The Campbell Order could have implications for other electric generators currently operating pursuant to the Secretary’s authority under section 202(c), including Constellation’s Eddystone Units 3 & 4 (“Eddystone”).  The court rejected the DOE’s interpretation of section 202(c), finding that no “emergency” existed to warrant a section 202(c) order.7  Legal challenges to other DOE orders under section 202(c), including with respect to Eddystone, remain pending. In light of this development and its implications, Constellation provides additional clarification regarding its earlier request to modify the criteria for resources eligible to provide Qualifying RBP Offset UCAP MW and RBP Sell Offers.8

5 See PJM Interconnection, L.L.C., Limited Protest of Constellation Energy Generation, LLC, Docket No. ER26- 3380-000 (filed Aug. 21, 2026) (“Limited Protest”); PJM Interconnection, L.L.C., Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC, Docket No. ER26-3380-000 (filed Sept. 8, 2026) (“Answer”).
6 People of the State of Michigan v. U.S. Department of Energy, No. 25-1159 (D.C. Cir. Sept. 11, 2026).
7 Id.
8 Limited Protest at 13–14; Answer at 2–3.

PDF page 3

3

On December 1, 2023, Constellation announced its plans to retire Eddystone.  The day prior to the scheduled deactivation, on May 30, 2025, the Secretary declared that the operational availability and economic dispatch of Eddystone was necessary to meet an emergency on the system and directed Constellation to keep the units online.  The Secretary has extended its 202(c) order for Eddystone continuously since, most recently on August 21, 2026.9  Notably, those DOE orders direct that the Eddystone units “shall not be considered capacity resources.”10  As a result, Constellation requested, and the Commission granted, a request for waiver to remove Eddystone Units 3 and 4 from Capacity Resource status and transferred the Capacity Interconnection Rights (“CIRs”) from Eddystone to Crane Clean Energy Center earlier this year.11  Eddystone is now an energy-only resource with no capacity rights.

Once Eddystone is no longer subject to a DOE 202(c) order, it could proceed with deactivation as planned.  Or, if commercially practicable, it could request to become a new capacity resource.  To be clear, from a PJM perspective the path to becoming a new capacity resource for Eddystone would look no different from that of a new build resource or an uprate to an existing capacity resource:  it would require entry into the interconnection queue and payment to upgrade the transmission system as necessary.  Network upgrade costs are uncertain but could be significant—potentially in the tens of millions or even hundreds of millions of dollars. While uncertainty remains, Eddystone’s ability to qualify as an RBP Resource and/or Qualifying RBP Offset UCAP MW could provide a viable economic path forward for keeping its

9 Dep’t of Energy, Order No. 202-26-40 (Aug. 21, 2026); Dep’t of Energy, Order No. 202-26-24 (May 21, 2026); Dep’t of Energy, Order No. 202-26-17 (Feb. 23, 2026) (“Feb. 2026 Eddystone Order”); Dep’t of Energy, Order No. 202-25-10 (Nov. 25, 2025); Dep’t of Energy, Order No. 202-25-8 (Aug. 28, 2025); Dep’t of Energy, Order No. 202- 25-4 (May 30, 2025).

10 Feb. 2026 Eddystone Order at 10, Ordering Para. G (emphasis added).
11 See Constellation Energy Generation, LLC, 195 FERC ¶ 61,162 (2026).

PDF page 4

4

units online rather than proceeding with deactivation as planned.  The RBP as currently proposed, however, does not appear to contemplate an admittedly unusual scenario like Eddystone’s:  an energy-only resource that is considering adding new capacity to the grid by acquiring new Capacity Interconnection Rights and new Installed Capacity.12

In the PJM Answer, PJM dismissed Constellation’s requests with little explanation.13  We respectfully submit that PJM is overlooking one of the better opportunities to unlock new capacity quickly. The Eddystone units are already fully permitted and constructed, with fuel supply in place, and do not face the significant land acquisition, construction, permitting, supply chain and other issues that new generation inevitably face.  Eddystone would need to seek new CIRs through an Interconnection Request, and, accordingly, bear its share of any required Network Upgrades, but Eddystone is otherwise uniquely positioned to provide new capacity to the grid. Accordingly, Constellation maintains its prior requests for relief with the additional clarity and context provided herein.  As previously discussed,14 minor changes to the PJM Proposal would make clear that an energy-only resource obtaining new capacity rights would qualify for RBP (whether as a RBP Seller or as Qualifying RBP Offset UCAP MW).  This clarification to the eligibility rules would be consistent with the overall framework of PJM’s RBP and PJM’s stated intent of procuring new capacity to address the region’s capacity shortfall.

B. PJM Mischaracterizes the Commission’s Treatment of Price Taker
Requirements in Prior Proceedings
The PJM Answer claimed that the Commission should disregard the concerns raised in Constellation’s Limited Protest regarding the RBP’s price taker requirement because the

12 PJM Answer at 41.
13 Id.
14 Limited Protest at 13–14; Answer at 2–3.

PDF page 5

5

Commission has found in other proceedings, particularly in the context of Reliability Must Run (“RMR”) resources, that offering resources into the PJM Reliability Pricing Model (“RPM”) as price takers is just and reasonable.15  This comparison is misguided.  The Commission should not rely on its limited RMR precedent to guide its decision here for the following reasons:

• PJM Ignores the Commission’s Balancing Analysis in its RMR Proceeding.  In its RMR proceedings (and other proceedings considering the impact of price taker offers by resources with out-of-market support), the Commission engages in a balancing analysis to determine whether it is just and reasonable to require out-of-market resources to offer as price takers, wherein it balances market and resource adequacy impacts and cost impacts to determine whether a proposal is just and reasonable.16  This balancing analysis is fact specific, and the RMR proceedings considered, among other things, the unique nature of RMR units, the nature of the service provided, and the magnitude and duration of such service.  Here, PJM has not engaged in any meaningful balancing that considers the impact of RBP resources offering as price takers on markets, resource adequacy or costs, let alone provided evidence that the specific facts applicable to RBP resource (including, the uncertainty as to when or if the associated load will materialize, the duration and magnitude of the RBP service, etc.) justify PJM’s proposed result.  As described below, the Commission should find that the balancing analysis here, unlike in the RMR proceedings, weighs against finding that PJM’s price taker requirement is just and reasonable.

15 PJM Answer at 47–51.
16 See, e.g., PJM Interconnection, L.L.C., 192 FERC ¶ 61,135, at P 31 (2025) (acknowledging that “treating RMR resources as price takers in the capacity market may affect capacity prices,” but finding “on balance” that such treatment is necessary to avoid customers paying for more capacity than needed).

PDF page 6

6

• Load Served by RMR Resources Already Exists.  Resources subject to RMR agreements are already serving existing load, with such generation operating past planned deactivation dates in response to a well-studied transmission reliability problem.  Such RMR resources continue to operate to ensure transmission reliability for existing load until specific and necessary transmission system upgrades are completed.  On the other hand, the load expected to be served by RBP resources is not yet energized, and as explained in Constellation’s Limited Protest and Answer and Dr. Shanker’s supporting testimony,17 there is risk this load may be delayed or never energized at all.  Others agree this distinction between existing load and new large load is a meaningful concern.  For example, in PJM’s Interim Resource Adequacy Service proceeding,  Southern Maryland Electric Cooperative, Inc. explained that new large loads “are, as a structural matter, disproportionately likely to be projects still working through interconnection, construction, or commissioning, rather than loads already drawing their full expected demand, if any demand at all based upon the state of project development.”18  Thus, the impact on markets, resource adequacy provided by existing resources, and costs overall could be far greater in the RBP context where there is no load certainty than in the RMR context where the load already exists.

• The Magnitude of the Initial RBP Target Far Outweighs that Typical of RMR Resources.  RMR resources in operation in PJM have historically been few in number,

17 Limited Protest at 8–10, Shanker Aff. ¶¶ 13–17.
18 PJM Interconnection, L.L.C., Comments and Limited Protest of Southern Maryland and Electric Cooperative, Inc., Docket No. ER26-3515-000 (filed Sept. 3, 2026); see also PJM Interconnection, L.L.C., Motion for Leave to Answer and Answer of the New Jersey Board of Public Utilities, Docket No. ER26-3515-000 (filed Sept. 18, 2026) (expressing concern that “New Large Loads may not be yet energized, or may have only just begun a ramp or testing period that is below its expected draw”).

PDF page 7

7

averaging a few hundred MWs at any given time over the past twenty plus years.19 Even the all-time high amount of RMRs on the system (i.e., the two RMR resources relevant in the proceeding cited by PJM—Brandon Shores Generating Station Units 1 and 2 and Wagner Generating Station Units 3 and 4) together account for under 2,000 MW.20  On the other hand, the volume of RBP capacity (initially targeting 6,831 MWs) is expected to be significantly more than these typical RMR volumes,  including three times the peak RMR volume considered in the cited PJM RMR proceeding.  The impact of this volume of RBP capacity on market signals, resource adequacy and ultimately costs in the RPM will be far greater than was ever considered in the RMR proceeding.

• RMR Resources Offer As Price Takers for a Relatively Short, Time-Limited Period.  The time period during which RMR resources act as price takers is generally more limited to cover only the brief period of time necessary to address short-term transmission reliability needs, typically under three years.21  Indeed, the RMR resources referenced in the RMR proceeding PJM cites are expected to serve as RMR resources for only a few delivery years.22  In fact, the Commission “has emphasized that RMR agreements should be of a limited duration so as to not perpetuate out-of- market solutions that have the potential, if not undertaken in an open and transparent manner, to undermine price formation.”23  In contrast, RBP resources will offer as

19 Monitoring Analytics, LLC, 2026 Quarterly State of the Market Report for PJM: January through March, at 381 (May 14, 2026),  https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2026/2026q1-som- pjm.pdf (the “Market Monitor Q1 2026 Report”).
20 PJM Interconnection, L.L.C., 193 FERC ¶ 61,234 (2025) (letter order accepting PJM Interconnection, L.L.C.’s 10/24/2025 filing of proposed revisions to its Open Access Transmission Tariff).
21 The Market Monitor Q1 2026 Report at 381, Table 5-34.
22 PJM Interconnection, L.L.C., 193 FERC ¶ 61,234 at P 10.
23 N.Y. Indep. Sys. Operator, Inc., 150 FERC ¶ 61,116, at P 2 (2015), order on reh’g, 155 FERC ¶ 61,076 (2016), clarified by 161 FERC ¶ 61,189 (2017), order on reh’g, 163 FERC ¶ 61,047 (2018)); see also Indep. Power

PDF page 8

8

price takers in each RPM for up to 15 years—again resulting in outsized impact on
markets, resource adequacy and costs—a duration far greater than what was
contemplated in the RMR proceedings.
• The Commission Must Consider the Cumulative Effect of PJM’s Out-of-Market
Interventions.  Like the RBP, the RMR proposal cited by PJM was an “interim,” “stop- gap” solution “while PJM work[ed] with stakeholders to develop a more fulsome

proposal.”24  Since then, PJM has also enacted other significant out-of-market,
“interim” measures, including price caps and the RBP itself, that affect RPM price
signals.    But these cumulative impacts were not considered in the cases cited by PJM or any analysis it provided.  Rather, as discussed in Constellation’s Limited Protest, PJM itself recognizes what it calls the “credibility trap,” where “high scarcity prices that are economically necessary to signal the need for investment become, in this

environment, the trigger for governmental intervention that undermines the credibility of those same prices . . . . Investors, anticipating further intervention, discount the durability of the price signal. Capital stays on the sidelines; the shortage persists.”25  In its balancing analysis, the Commission must consider the cumulative effect of PJM’s

repeated out-of-market interventions and the long-term impact and find that this aspect of PJM’s proposal is not just and reasonable.

Producers of N.Y. v. N.Y. Indep. Sys. Operator, Inc., 150 FERC ¶ 61,214, at P 69 (2015), order on reh’g & clarification, 170 FERC ¶ 61,118 (2020) (“Unlike the RSSA contracts discussed in the original Complaint that procure adequate capacity to address short-term reliability needs, the Dunkirk repowering agreement appears to procure more capacity than is needed for short-term reliability, and for a much longer term.  We are concerned that if the additional capacity created by the repowering agreement above the amount needed for short-term reliability is allowed to offer into the NYISO capacity market at prices below the cost of repowering, such capacity might deter new entry or displace less-costly existing capacity in NYCA.  As a result, capacity market prices could be artificially suppressed.”).

24 PJM Interconnection, L.L.C., 190 FERC ¶ 61,088, PP 28, 46 (2025).
25 Limited Protest, Shanker Aff. ¶ 4.

PDF page 9

9

C. Constellation Supports PJM’s Suggestion to Sever Credit and Collateral
Issues
Constellation and others raised concerns about the load serving entity (“LSE”) collateral and credit requirements in the PJM Proposal.26  In the PJM Answer, PJM acknowledged that “reasonable minds may differ on the credit approach,” and “consent[ed] to the Commission resolving the applicable buyer-side LSE RBP Credit Rate through additional procedures.”27  Given the complexity and enormity of the potential LSE credit requirements, and given that “the LSE credit rules do not need to be effective for the RBP to be conducted,”28 Constellation appreciates PJM’s openness on these issues and supports, as described in its Answer, severing these credit issues and establishing an expedited paper hearing limited to proposed Tariff section 18.8(b).29

26 See Answer § II.B.
27 PJM Answer at 93. 28 Id.
29 Answer at 9–10.

PDF page 10

10

III. CONCLUSION
In accordance with PJM’s willingness to accept changes under NRG Power Marketing,30
the Commission should (i) accept the RBP subject to the modifications Constellation discussed in its Limited Protest and Answer, as clarified herein, and (ii) sever the LSE credit issue discussed in its Answer for further proceedings and refer that issue to an expedited paper hearing.

Respectfully submitted,

Dated: September 21, 2026

30 See PJM Proposal at 3 (“PJM provides notice that it consents to the Commission’s exercise of authority to modify and/or sever any element of the proposed Tariff and RAA language to the extent necessary and permitted under section 205 of the FPA and NRG Power Marketing, LLC v. FERC, where such modification and/or severance is consistent with PJM’s overarching objectives in this filing”).

/s/
Carrie Hill Allen
Sr. Vice President & Deputy General Counsel
John M. White
Assistant General Counsel
Constellation Energy Generation, LLC
250 Massachusetts Ave. NW, Suite 760
Washington, D.C. 20001
carrie.allen@constellation.com
john.white@constellation.com

Christopher A. Wilson
Vice President, Federal Regulatory Affairs
Constellation Energy Generation, LLC
250 Massachusetts Ave. NW, Suite 760
Washington, D.C. 20001
202-347-7500
FERCe-filings1@constellation.com
Kenneth W. Irvin
Alexandra K. Calabro
Sidley Austin LLP
1501 K Street, N.W.
Washington, DC 20005
Phone: (202) 736-8256
kirvin@sidley.com
alexandra.calabro@sidley.com

Terence T. Healey
Sidley Austin LLP
60 State Street, 37th Floor
Boston, MA 02109
Phone: (617) 223-0306
thealey@sidley.com

Counsel for Constellation Energy Generation,
LLC

PDF page 11

CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in this proceeding. Dated at Washington, D.C. this 21st day of September 2026.

/s/
Alexandra K. Calabro
Sidley Austin LLP
1501 K Street, N.W.
Washington, DC 20005