Petition for Review filed in the U.S. Court of Appeals for the Third Circuit of Vistra Corp. re 12/18/2025, 02/20/2026, 06/18/2026, and 08/20/2026 Orders,
PDF page 1
Wilson Sonsini Goodrich & Rosati
Professional Corporation
1700 K Street NW
Fifth Floor
Washington, D.C. 20006-3817
O: 202.973.8800
F: 866.974.7329
AUSTIN BOSTON BOULDER BRUSSELS HONG KONG LONDON LOS ANGELES NEW YORK PALO ALTO SALT LAKE CITY SAN DIEGO SAN FRANCISCO SEATTLE SHANGHAI WASHINGTON, DC WILMINGTON, DE
NICHOLAS GLADD
Internet: NGLADD@wsgr.com
Direct dial: 617-598-7871
October 21, 2026
Hon. Debbie-Anne Reese, Secretary
Federal Energy Regulatory Commission
888 First Street, N.E., Room 1A
Washington, DC 20426
Re:
Vistra Corp., Docket No. EL25-49 et al., Vistra Corp. Petition for
Review
Dear Secretary Reese:
Pursuant to Rule 2012 of the Commission’s Rule of Practice and Procedure, 18 C.F.R. § 385.2012, and 28 U.S.C. § 2112(a), Vistra Corp. provides as Attachment 1 to this letter a court- stamped copy of its Petition for Review (“Petition”) filed Monday, October 19, 2026, with the United States Court of Appeals for the Third Circuit related to the above-referenced docket. Vistra Corp.’s Petition seeks review of the Commission’s December 18, 2025 Order on Show Cause Proceeding, Directing Compliance Filings, Establishing Paper Hearings, and Granting in Part and Denying in Part Complaint, 193 FERC ¶ 61,217 (2026), made final with the February 20, 2026 Denial of Rehearing By Operation of Law and Providing for Further Consideration, 194 FERC ¶ 62,089 (2026) and the Commission’s June 18, 2026 Order on Rehearing, Clarification, Compliance Filing, and Paper Hearings, PJM Interconnection, L.L.C. et al., 195 FERC ¶ 61,209 (2026), made final with the August 20, 2026 Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration, PJM Interconnection, L.L.C. et al., 196 FERC ¶ 62,089 (2026). The Third Circuit has assigned Vistra Corp.’s Petition Appeal No. 26-3635. Vistra Corp. served its Petition on the official service list shortly after filing with the Third Circuit. Sincerely,
WILSON SONSINI GOODRICH & ROSATI
Professional Corporation
Nicholas Gladd
Counsel for Vistra Corp.
PDF page 2
1
IN THE UNITED STATES COURT OF APPEALS
FOR THE THIRD CIRCUIT
Vistra Corp.
Petitioner,
v. Federal Energy Regulatory Commission,
Respondent.
No. 26-
PETITION FOR REVIEW
Pursuant to Section 313(b) of the Federal Power Act, 16 U.S.C. § 825l(b), and Federal Rule of Appellate Procedure 15(a), Vistra Corp. (“Vistra”) hereby petitions this Court for review of the following orders and notices of the Federal Energy Regulatory Commission (“FERC” or “Commission”):
PJM Interconnection, L.L.C. et al.; Order on Show Cause Proceeding, Directing Compliance Filings, Establishing Paper Hearings, and Granting in Part and Denying in Part Complaint, 193 FERC ¶ 61,217 (December 18, 2025) (Attached as Attachment A).
PJM Interconnection, L.L.C. et al.; Notice of Denial of Rehearing By Operation of Law and Providing for Further Consideration, 194 FERC
¶ 62,089 (Feb. 20, 2026) (Attached as Attachment B).
PJM Interconnection, L.L.C. et al.; Order on Rehearing, Clarification, Compliance Filing, and Paper Hearings, 195 FERC ¶ 61,209 (June 18, 2026) (Attached as Attachment C).
PJM Interconnection, L.L.C. et al.; Notice of Denial of Rehearing By Operation of Law and Providing for Further Consideration, 196 FERC
¶ 62,089 (Aug. 20, 2026) (Attached as Attachment D).
Case: 26-3635 Document: 1-1 Page: 1 Date Filed: 10/19/2026
PDF page 3
2
On December 18, 2025, the Commission issued an order directing PJM Interconnection, L.L.C. to create new transmission services (“December Order”). The December Order also imposed certain compliance obligations on PJM and initiated a paper hearing to determine the rates, terms, and conditions of those new transmission services. Two sets of petitioners filed petitions for review of the December Order (Case Nos. 26-1840 and 26-3122). Vistra filed a notice to intervene in those consolidated cases on May 13, 2026.
On June 18, 2026, the Commission issued a combined Order on Rehearing,
Clarification, Compliance, and Paper Hearings (“June Order”). Vistra timely sought rehearing of the June Order. On August 20, 2026, the Commission issued a notice that denied Vistra’s request for rehearing by operation of law (“Denial Notice”).
Vistra petitions for review of the aforementioned Commission orders on the grounds that they are arbitrary and capricious, reflect a failure to engage in reasoned decision-making, are not supported by substantial evidence, and are otherwise contrary to law.1 This petition for review is timely filed within 60 days of the date on which Vistra’s requests for rehearing were deemed denied under the FPA. See 16 U.S.C. § 825l.
Pursuant to Federal Rule of Appellate Procedure 15(c) and 18 C.F.R. § 385.2012, a copy of this Petition will be served by mail upon the Respondent, Robert H. Solomon, FERC Solicitor, 888 First Street, NE, Washington, DC 20426, and Debbie-Anne Reese, FERC
1 Vistra understands that the Indicated PJM Transmission Owners also filed a petition for review of the June Order and the Denial Notice on October 16, 2026, and suggested that their petition be consolidated with previous petitions regarding the December Order. Vistra supports such consolidation. As sometimes occurs in appeals arising from complex FERC proceedings, Vistra anticipates that, consistent with its intervention in Case Nos. 26-1840 and 26-3122, it will support respondent FERC on certain issues in the consolidated proceedings, and might also support some petitioners on certain other issues, while simultaneously challenging FERC’s orders on certain issues through this petition for review. See, e.g., Clerk’s Order Granting Motions to Intervene, Case No. 12-1232, Document No. 1393137 (D.C. Cir. Sept. 6, 2012) (granting motions to intervene of parties including South Carolina Public Service Authority (petitioner in Case No. 12-1232), Coalition for Fair Transmission Policy (petitioner in Case No. 12-1233), and Sacramento Municipal Utility District (petitioner in Case No. 12-1276), where cases arising from FERC’s Order No. 1000 had been consolidated). Case: 26-3635 Document: 1-1 Page: 2 Date Filed: 10/19/2026
PDF page 4
3
Secretary, 888 First Street, NE, Washington, DC 20426, and by email on each party in the proceeding below (Service List attached as Attachment E).
Respectfully submitted,
________________
Nicholas M. Gladd
Sarah Greenberg
Wilson Sonsini Goodrich & Rosati
1700 K Street NW
Fifth Floor
Washington, DC 20006
(617) 598-7871
ngladd@wsgr.com
sgreenberg@wsgr.com
Counsel for Vistra Corp.
Dated: October 19, 2026
Case: 26-3635 Document: 1-1 Page: 3 Date Filed: 10/19/2026
PDF page 5
4
CERTIFICATE OF SERVICE
I hereby certify that I have this day caused the foregoing Petition for Review to be served by email on the service list in the proceeding below (see Attachment E for list of recipients), and, pursuant to Rule 2012 of the FERC Rules of Practice and Procedure, 18 C.F.R. § 385.2012, have this day caused to be served a date-stamped copy of the foregoing documents on Respondent FERC both by email and by US Mail to the FERC Solicitor, Robert Solomon, 888 First St. NE, Washington, DC 20426, and by US mail to the FERC Secretary, Debbie-Anne Reese, 888 First St. NE, Washington, DC 20426.
Dated at Washington, DC, October 19, 2026.
/s/ Sarah Greenberg
Sarah Greenberg
Wilson Sonsini Goodrich & Rosati
1700 K Street NW
Fifth Floor
Washington, DC 20006
(202) 431-5231
sgreenberg@wsgr.com
Case: 26-3635 Document: 1-1 Page: 4 Date Filed: 10/19/2026
PDF page 6
United States Court of Appeals for the Third Circuit
Corporate Disclosure Statement and
Statement of Financial Interest
No. _________
v. Instructions
Pursuant to Rule 26.1, Federal Rules of Appellate Procedure any nongovernmental
corporate party to a proceeding before this Court must file a statement identifying all of its parent corporations and listing any publicly held company that owns 10% or more of the party’s stock. Third Circuit LAR 26.1(b) requires that every party to an appeal must identify on the Corporate Disclosure Statement required by Rule 26.1, Federal Rules of Appellate Procedure, every publicly owned corporation not a party to the appeal, if any, that has a financial interest in the outcome of the litigation and the nature of that interest. This information need be provided only if a party has something to report under that section of the LAR.
In all bankruptcy appeals counsel for the debtor or trustee of the bankruptcy estate shall provide a list identifying: 1) the debtor if not named in the caption; 2) the members of the creditors’ committee or the top 20 unsecured creditors; and, 3) any entity not named in the caption which is an active participant in the bankruptcy proceedings. If the debtor or the bankruptcy estate is not a party to the proceedings before this Court, the appellant must file this list. LAR 26.1(c).
The purpose of collecting the information in the Corporate Disclosure and Financial
Interest Statements is to provide the judges with information about any conflicts of interest which would prevent them from hearing the case.
The completed Corporate Disclosure Statement and Statement of Financial Interest Form must, if required, must be filed upon the filing of a motion, response, petition or answer in this Court, or upon the filing of the party’s principal brief, whichever occurs first. A copy of the statement must also be included in the party’s principal brief before the table of contents regardless of whether the statement has previously been filed. Rule 26.1(b) and (c), Federal Rules of Appellate Procedure.
If additional space is needed, please attach a new page.
(Page 1 of 2)
26-
Vistra Corp.
Federal Energy Regulatory Commission
Case: 26-3635 Document: 1-1 Page: 5 Date Filed: 10/19/2026
PDF page 7
Pursuant to Rule 26.1 and Third Circuit LAR 26.1,
makes the following disclosure: (Name of Party)
1) For non-governmental corporate parties please list all parent
corporations:
2) For non-governmental corporate parties please list all publicly held
companies that hold 10% or more of the party’s stock:
3) If there is a publicly held corporation which is not a party to the
proceeding before this Court but which has as a financial interest in the outcome of the proceeding, please identify all such parties and specify the nature of the financial interest or interests:
4) In all bankruptcy appeals counsel for the debtor or trustee of the
bankruptcy estate must list: 1) the debtor, if not identified in the case caption; 2) the members of the creditors’ committee or the top 20 unsecured creditors; and, 3) any entity not named in the caption which is active participant in the bankruptcy proceeding. If the debtor or trustee is not participating in the appeal, this information must be provided by appellant.
Dated:
(Signature of Counsel or Party)
rev: 09/2014 (Page 2 of 2) Vistra Corp.
Vistra Corp. is publicly traded on the New York Stock Exchange under the ticker symbol "VST." The Vanguard Group, Inc. and various subsidiaries and affiliated investment companies hold approximately 12 percent of Vistra Corp.'s stock.
Vistra Corp. is not affiliated with any other publicly held corporation with a financial interest in the outcome of the above-captioned cases. However, these cases concern Federal Energy Regulatory Commission ("FERC") proceedings in which numerous parties participated and/or intervened. Such parties and others may have an interest, financial or otherwise, in the outcome of these cases. Vistra Corp. is unable to determine which publicly held companies may have a financial interest in the outcome of these cases or the nature of their interest(s). The service lists maintained by the Secretary of FERC, which are attached to the petitions for review, include the parties and intervenors in the FERC proceedings.
N/A
/s/ Nicholas M. Gladd
10/19/2026
Case: 26-3635 Document: 1-1 Page: 6 Date Filed: 10/19/2026
PDF page 8
ATTACHMENT A
PJM Interconnection, L.L.C. et al.; Order on Show Cause Proceeding, Directing Compliance Filings, Establishing Paper Hearings, and Granting in Part and Denying in Part Complaint, 193 FERC ¶ 61,217 (December 18, 2025).
Case: 26-3635 Document: 1-1 Page: 7 Date Filed: 10/19/2026
PDF page 9
193 FERC ¶ 61,217
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
Before Commissioners: Laura V. Swett, Chairman; David Rosner, Lindsay S. See,
Judy W. Chang, and David LaCerte.
PJM Interconnection, L.L.C.
Allegheny Electric Cooperative, Inc.
American Transmission Systems, Incorporated Atlantic City Electric Company
Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative
PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company
Trans-Allegheny Interstate Line Company Transource West Virginia, LLC
UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company
AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.
AEP West Virginia Transmission Company, Inc. Appalachian Power Company
Indiana Michigan Power Company
Docket Nos. EL25-49-000
EL25-49-001
Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 8 Date Filed: 10/19/2026
PDF page 10
Docket No. EL25-49-000, et al.- 2 -
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Duquesne Light Company
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
Constellation Energy Generation, LLC
v. PJM Interconnection, L.L.C.
AD24-11-000
EL25-20-000
(Consolidated)
ORDER ON SHOW CAUSE PROCEEDING, DIRECTING COMPLIANCE FILINGS,
ESTABLISHING PAPER HEARING, AND GRANTING IN PART AND DENYING
IN PART COMPLAINT
(Issued December 18, 2025)
1. On March 24, 2025, PJM Interconnection, L.L.C. (PJM) and the PJM transmission owners filed answers in Docket No. EL25-49-000, to comply with the Commission’s February 20, 2025 order establishing a show cause proceeding, under section 206 of the Federal Power Act (FPA).1 The Show Cause Order directed PJM and the transmission owners to either: (1) show cause as to why the Open Access Transmission Tariff (OATT), the Amended and Restated Operating Agreement of PJM, and the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region (the Tariff) remains just and reasonable and not unduly discriminatory or preferential without
1 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115 (2025) (Show Cause Order). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 9 Date Filed: 10/19/2026
PDF page 11
Docket No. EL25-49-000, et al.- 3 -
provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Co-Location Arrangements;2 or (2) explain what changes to the Tariff would remedy the identified concerns if the Commission were to determine that the Tariff has in fact become unjust and unreasonable or unduly discriminatory or preferential and, therefore, proceeds to establish a replacement Tariff. The Show Cause Order consolidated the new show cause proceeding with a pending complaint proceeding in Docket No. EL25-20 involving Co-Located Load.3
2. As discussed below, we find that PJM’s Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to generators serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.4 Specifically, we find that PJM’s Tariff is unjust and unreasonable because it does not include types of transmission service that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their use of the transmission system under certain conditions. We direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff to set forth specific terms and conditions that an Interconnection Customer5 in PJM seeking to serve
2 The Show Cause Order defined Co-Location Arrangements as referring to both the Co-Located Load and the associated generator. Id. P 3 & n.4.3 The Show Cause Order defined Co-Located Load as a “configuration [that] refers to end-use customer load that is physically connected to the facilities of an existing or planned Customer Facility on the Interconnection Customer’s side of the Point of Interconnection to the PJM Transmission System.” Id.4 The PJM Tariff defines an Eligible Customer as (1) any electric utility or any person generating electric energy for sale for resale, but with respect to transmission service that the Commission is prohibited from ordering by section 212(h) of the Federal Power Act, such entity is eligible only if the service is provided pursuant to a state requirement that the Transmission Provider or Transmission Owner offer the unbundled transmission service, or pursuant to a voluntary offer of such service by a Transmission Owner or (2) any retail customer taking unbundled transmission service pursuant to a state requirement that the Transmission Provider or a Transmission Owner offer the transmission service, or pursuant to a voluntary offer of such service by a Transmission Owner. PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – E-F (41.0.0). An Eligible Customer may include but is not limited to electric utilities and power marketers.5 PJM defines Interconnection Customer as a Generation Interconnection Customer and/or a Transmission Interconnection Customer. PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – I – J - K (15.0.0) Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 10 Date Filed: 10/19/2026
PDF page 12
Docket No. EL25-49-000, et al.- 4 -
Co-Located Load must follow in order to effectuate a Co-Location Arrangement. We also direct PJM to file, within 30 days of the date of issuance of this order, a compliance filing to revise its Tariff to make clear how Interconnection Customers can make use of provisional interconnection service, the ability to request interconnection service below nameplate capacity, the potential to accelerate the interconnection process under certain circumstances, and surplus interconnection service to interconnect new generating facilities seeking to serve Co-Located Load. In addition, we direct PJM to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of the Co-Located Load takes one of three transmission services: (1) Network Integration Transmission Service (NITS), (2) a new Firm Contract Demand transmission service, or
(3) a new Non-Firm Contract Demand transmission service.6 We establish a paper hearing to determine the just and reasonable rates, terms, and conditions for these new transmission services. We further find that the Behind the Meter Generation (BTMG) rules in PJM’s Tariff are no longer just and reasonable because loads with BTMG are not fully accounted for in resource adequacy planning and shift costs onto other transmission customers contrary to the Commission’s cost causation principles. We therefore direct PJM to revise its Tariff to revise the BTMG rules and to implement a transition process for existing BTMG participants, as described below. We also grant in part and deny in part Constellation Energy Generation, LLC’s (Constellation) complaint against PJM in Docket No. EL25-20-000. Finally, we require PJM to submit an informational report within 30 days of the date of issuance of this order.
I. Background
A. Show Cause Order
3. The Show Cause Order defined Co-Located Load as a “‘configuration [that] refers to end-use customer load that is physically connected to the facilities of an existing or planned Customer Facility on the Interconnection Customer’s side of the Point of Interconnection to the PJM Transmission System.’”7 As the Commission did in the Show
6 Capitalized terms used but not otherwise defined in this order have the meanings ascribed to them in the Tariff. 7 Show Cause Order, 190 FERC ¶ 61,115 at P 3 & n.4. We note that, in the Show Cause Order, the Commission adopted this definition from the Guidance Document that PJM developed on Co-Located Load. See id. As noted below, PJM rescinded this document pending Commission guidance in this docket. PJM March 24 Answer at 33. Prior to PJM’s transition to its new interconnection process, PJM used the terms Interconnection Customer and Generation Interconnection Customer. PJM’s Tariff defines Generation Interconnection Customer as “an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 11 Date Filed: 10/19/2026
PDF page 13
Docket No. EL25-49-000, et al.- 5 -
Cause Order, when referring to both the Co-Located Load and the associated generator, we will use the term Co-Location Arrangement.
4. As explained in the Show Cause Order, Co-Location Arrangements are becoming increasingly common in PJM and, since the issuance of the Show Cause Order, entities continue to raise issues involving Co-Location Arrangements with the Commission.8 The Commission instituted the Show Cause Order to determine whether the Tariff remains just and reasonable and not unduly discriminatory or preferential.9 The Commission set forth, in the Show Cause Order, the principles relating to the Commission’s jurisdiction over the matters relevant to Co-Location Arrangements.10 The Commission also made several preliminary findings about the justness and reasonableness of the Tariff. First, the Commission found that the Tariff appears to be unjust and unreasonable or unduly discriminatory or preferential because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Co-Location Arrangements.11 In addition, the Commission preliminarily found that this System in the PJM Region.” PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – G - H (9.0.1) (defining Generation Interconnection Customer). The Tariff’s new rules for generation interconnection, effective January 3, 2023, utilize the terms Project Developer and Generation Project Developer. PJM’s Tariff defines Generation Project Developer as “an entity that submits a Generation Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region.” PJM, Intra-PJM Tariffs, OATT, § VIII.A 400 Definitions G (0.1.0) (defining Generation Project Developer). For ease of simplicity in this order, and consistent with the Show Cause Order, the Commission will use the term Interconnection Customer to refer to both the PJM Tariff definitions of Generation Interconnection Customer and Generation Project Developer.
8 See, e.g., PJM Interconnection, L.L.C., 191 FERC ¶ 61,112 (2025) (accepting necessary studies agreement). The Show Cause Order consolidated the new show cause proceeding with a pending complaint proceeding in Docket No. EL25-20-000 involving Co-Located Load. We address that complaint below. See discussion infra Part IV.B.7.9 Show Cause Order, 190 FERC ¶ 61,115 at P 2.10 Id. P 66.11 Id. P 74. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 12 Date Filed: 10/19/2026
PDF page 14
Docket No. EL25-49-000, et al.- 6 -
lack of applicable Tariff provisions raises the potential for undue discrimination or preferential treatment.12
5. As to specific concerns raised regarding Co-Location Arrangements, the Commission found that the Tariff may be unjust, unreasonable, unduly discriminatory, or preferential as it does not specify the transmission service that Co-Location Arrangements must take, if any, or otherwise provide a process to ensure that Co- Location Arrangements are paying for the benefits they receive from the transmission system consistent with the cost causation principle, which provides that all Commission- jurisdictional rates and charges must “reflect to some degree the costs actually caused by the customer who must pay for them,” and that costs must be allocated in a manner that is at least roughly commensurate with the benefits that entity receives.13 The Commission also found that the absence of rates, terms, and conditions of interconnection service specific to Co-Location Arrangements, and, especially regarding studies of the impacts of those arrangements, may render the Tariff unjust and unreasonable or unduly discriminatory or preferential.14 Moreover, the Commission found that the absence of rates, terms, and conditions governing the use and sale of ancillary services and black start services by Co-Location Arrangements may render the Tariff unjust and unreasonable or unduly discriminatory or preferential.15
6. The Commission also expressed concern about the reliability and resource adequacy implications of Co-Location Arrangements.16 The Commission stated that it was concerned that the Tariff may be unjust and unreasonable and unduly discriminatory or preferential insofar as it lacks rules necessary to provide PJM with sufficient information to perform appropriate analysis to ensure reliable system operations given the characteristics of Co-Location Arrangements. In response to concerns about the market and price impacts of Co-Location Arrangements, the Commission recognized that these concerns are not necessarily unique to Co-Location Arrangements and that significant load growth more generally may raise many of the same concerns.17 The
12 Id. P 75.13 Id. PP 74-78 (citing Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1368 (D.C. Cir. 2004); Ill. Com. Comm’n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009)).14 Id. P 79.15 Id. P 82.16 Id. P 83.17 Id. PP 84-85. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 13 Date Filed: 10/19/2026
PDF page 15
Docket No. EL25-49-000, et al.- 7 -
Commission stated that, while both Co-Located Load and non-co-located load may have similar resource adequacy impacts, the speed at which Co-Located Load can be added to the grid may pose particular resource adequacy challenges, especially if Co-Location Arrangements are not adequately and transparently reflected in existing resource adequacy planning mechanisms, e.g., the PJM capacity market.18
B. Behind the Meter Generation
7. Regarding PJM’s BTMG rules (which we and commenters sometimes refer to as retail BTMG),19 the Tariff allows load serving entities (LSEs) that provide service to loads with qualifying BTMG to reduce their costs by netting output from BTMG in the calculation of their peak demand for the purpose of determining NITS charges.20 The Commission has previously found that BTMG netting is just and reasonable because it would encourage load response during periods when generation or transmission are in short supply and prices are rising.21 The Commission has also found that “charges for use of PJM’s transmission system should be allocated to network customers based on a network customer’s actual use of PJM’s system, consistent with the principle of cost causation.”22
8. Transmission rates for NITS and Point-to-Point Service (PTPS) are based on transmission formula rates filed by the transmission owners. Transmission formula rates capture utilities’ cost of providing transmission service and include the cost of operating and maintaining the transmission facilities, depreciation expenses, taxes, and a rate of
18 Id. P 85.19 PJM defines BTMG as “a generation unit that delivers energy to load without using the Transmission System or any distribution facilities (unless the entity that owns or leases the distribution facilities has consented to such use of the distribution facilities and such consent has been demonstrated to the satisfaction of the Office of the Interconnection); provided, however, that [BTMG] does not include (i) at any time, any portion of such generating unit’s capacity that is designated as a Generation Capacity Resource; or (ii) in an hour, any portion of the output of such generating unit that is sold to another entity for consumption at another electrical location or into the PJM Interchange Energy Market.” PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – A-B (21.0.0) (defining BTMG).20 See PJM Interconnection, L.L.C., 107 FERC ¶ 61,113, at P 6 (2004); PJM, Intra-PJM Tariffs, OATT, § III.34.2 Netting of Behind the Meter Generation (0.0.0).21 PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at PP 27-28.22 Id. P 28. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 14 Date Filed: 10/19/2026
PDF page 16
Docket No. EL25-49-000, et al.- 8 -
return for the utility. The rates also include the costs of any Network Upgrades needed to ensure ongoing reliability or deliverability of generation to Network Load,23 including planned regional transmission upgrades. Transmission rates are charged based on demand coincident with the annual peak(s) of the zone.24 For loads using BTMG, only the net demand is used for billing, but for loads not relying on BTMG, transmission charges are based on their gross use of the transmission system at the time of the coincident peak.25
9. Recognizing that Co-Location Arrangements may interact with the transmission system in a similar way to BTMG arrangements, the Show Cause Order sought briefing on how any proposed replacement rate adopted in this proceeding would interact with existing BTMG arrangements.26
C. Eligible Customer
10. In Order No. 888 and its progeny, the Commission established specific criteria for potential transmission customers to be eligible to receive non-discriminatory open access transmission service.27 Consistent with the Commission’s findings about who is an
23 PJM defines Network Load as the load that a Network Customer designates for NITS, including all load served by the output of any Network Resources designated by the Network Customer. See PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – L-M-N (51.0.1) (defining Network Load).24 See id. § III.34.1 Monthly Demand Charge (1.0.0). PJM’s 22 transmission zones represent the geographical areas served by individual PJM transmission owners. See id., attach. J (8.0.0).25 See id. § III.34.2 Netting of Behind the Meter Generation (0.0.0).26 Show Cause Order, 190 FERC ¶ 61,115 at P 88, pt. a.iv (“parties may also … consider how any proposed replacement rate would interact with [BTMG] arrangements”).27 See, e.g., Recovery of Stranded Costs by Pub. Utils. and Transmitting Utils., Order No. 888, FERC Stats. & Regs. ¶ 31,036 (1996) (cross-referenced at 75 FERC ¶ 61,080), order on reh’g, Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,214 (modifying definition of Eligible Customer) (cross-referenced at 78 FERC ¶ 61,220), order on reh’g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), order on reh’g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom. Transmission Access Pol’y Study Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000) (TAPS), aff’d sub nom. New York v. FERC, 535 U.S. 1 (2002). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 15 Date Filed: 10/19/2026
PDF page 17
Docket No. EL25-49-000, et al.- 9 -
eligible customer in the pro forma tariff, PJM’s Tariff currently defines an Eligible Customer as:
(i) Any electric utility … or any person generating electric energy for sale for resale … However, with respect to
transmission service that the Commission is prohibited from ordering by Section 212(h) of the Federal Power Act, such
entity is eligible only if the service is provided pursuant to a state requirement that the Transmission Provider or
Transmission Owner offer the unbundled transmission
service, or pursuant to a voluntary offer of such service by a Transmission Owner.
(ii) Any retail customer taking unbundled transmission service pursuant to a state requirement that the Transmission Provider or a Transmission Owner offer the transmission service, or pursuant to a voluntary offer of such service by a Transmission Owner, is an Eligible Customer under the Tariff….28
11. This definition forms the basis for PJM’s existing transmission cost allocation approach, through which each Eligible Customer is billed for the charges associated with the transmission services used to serve its load.
28 PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – E-F (41.0.0) (defining Eligible Customer).
Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 16 Date Filed: 10/19/2026
PDF page 18
Docket No. EL25-49-000, et al.- 10 -
II. PJM’s Answer to Show Cause Order and Responsive Pleadings29
A. PJM’s Options for Co-Location Arrangements
12. PJM states that its existing Tariff remains just and reasonable “although improvements and clarifications may be appropriate based on Commission guidance.”30 As further detailed below, PJM discusses eight pathways to facilitating co-location service, three of which exist in the current Tariff and five of which would be new. PJM supports only five of the eight options and identifies problems with the remaining three. PJM requests that, if “the record supports consideration of additional options,” the Commission issue detailed guiding principles that PJM can operationalize in an FPA section 205 filing.31
13. PJM notes that the options are not mutually exclusive and instead may be used seriatim or concurrently. PJM further clarifies that it does not consider all of the options “equivalent, desirable, or even necessarily workable.”32 For example, PJM argues that state law may limit the availability of various options. PJM also notes that six of its options are premised on large Co-Located Load being Network Load, where the large Co-Located Load would realize significant benefits. PJM also argues that Co-Location Arrangements implicate several different, interrelated study frameworks and cost allocation constructs. PJM further notes that there is a resource adequacy dimension to Co-Location Arrangements and explains that three of its potential new options relate to adding additional supply and operational flexibility.
14. Turning to the eight options, first, PJM states that new loads may interconnect as traditional Network Load that takes NITS in accordance with traditional load
29 The appendix lists the entities who intervened and filed responsive pleadings in Docket No. EL25-49-000, along with short names. On March 21, 2025, then-Chairman Christie responded individually to comments filed with the Commission by Pennsylvania Governor Josh Shapiro of Pennsylvania on October 4, 2024, and by Virginia Governor Glenn Youngkin on November 1, 2024, respectively, on data centers and Co-Located Load. On April 2, 2025, then-Chairman Christie responded to a letter filed on February 19, 2025, by United States Senators Chris Van Hollen, Cory A. Booker, Mark Kelly, and Tim Kaine inquiring about a technical conference addressing data centers and other large new loads.30 PJM March 24 Response at 4.31 Id.32 Id. at 5. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 17 Date Filed: 10/19/2026
PDF page 19
Docket No. EL25-49-000, et al.- 11 -
interconnection processes (PJM option 1).33 PJM states that the load uses and pays for NITS, energy, ancillary services, and capacity. PJM explains that the load has a separate point of interconnection with the grid and thus need not be at the same site as the generator. PJM supports this option.
15. Second, PJM explains that load could co-locate with generation behind the same point of interconnection (PJM option 2).34 PJM states that, in this configuration, the load is Network Load and the generator is a Capacity Resource, each separately metered, with no change to the generator’s Capacity Interconnection Rights. PJM states that the load uses and pays for NITS, energy, ancillary services, and capacity. PJM also explains that the large load is studied and could be connected to the grid under existing load interconnection processes. PJM supports this option.
16. Third, PJM states that a Network Load could co-locate with generation and then use PJM’s BTMG rules under which the load would be charged for its net use of the grid, after deducting BTMG (PJM option 3).35 PJM states that the load uses NITS, energy, ancillary services, and capacity and pays for these services based on the net peak withdrawal quantity. PJM does not support this option, explaining that historically, BTMG has supported relatively small loads, not on the scale of large data centers. PJM further states that charging load for its net use of the grid under the BTMG rules may not capture the costs caused by co-located data center arrangements because such arrangements could avoid all costs by netting to zero if the entire data center load is supplied by the associated generator.36
17. Fourth, turning to new options not currently in the existing Tariff, PJM explains that a possible Co-Located Load configuration could include a load located behind a generator, with system protection facilities in place to prevent the delivery of system energy to serve the load (PJM option 4). PJM states that “in this configuration, load is not Network Load unless designated by the customer subject to applicable state law.”37 PJM explains that the load is located behind the Point of Change of Ownership between the transmission owner and generator, and system protection facilities are installed to prevent delivery of system energy from the grid if the generator goes offline. PJM clarifies that this configuration should not be considered “fully” or “wholly” isolated,
33 Id. at 10.34 Id. at 11.35 Id. at 12-13.36 Id. at 36.37 Id. at 14. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 18 Date Filed: 10/19/2026
PDF page 20
Docket No. EL25-49-000, et al.- 12 -
arguing that it is inconsistent with engineering and economic principles.38 PJM argues that the configuration relies on and takes grid services (e.g., ancillary services) and should pay its fair share of those charges. PJM does not support this option, raising concerns that this configuration carries operational risk because it depends on a protection system to support reliability, and, if the protection system fails, the large load would instantly take significant energy from the system. PJM argues that, though a few such configurations may seem tolerable, the risk increases with large quantities of such configurations.
18. Fifth, PJM identifies a new option that is the same configuration as PJM option 4, but the load can receive back-up service from the grid with PJM’s advanced authorization (PJM option 5).39 PJM clarifies that this option requires real-time, bespoke operational decision-making to determine if load can continue to be served. PJM explains that approval for back-up service is subject to condition, including withdrawing or withholding authorization if needed to protect grid reliability or integrity. PJM does not support this option, because, like PJM option 4, the load is not designated as Network Load, which concerns PJM because of the dependence on protection schemes.40
19. Sixth, PJM discusses a new option that would allow new large Network Load additions to bring additional generation that could serve as a Capacity Resource (PJM option 6).41 The additional generation, PJM clarifies, could take different forms, such as new incremental generation, generation that has or is scheduled to deactivate, or existing generation so long as the generator is available to PJM as a Capacity Resource if it clears in the capacity market. PJM indicates that incentives could be explored to offer faster processing of generation that enters the queue under this option, such as (1) accelerating interconnection studies of new generation, (2) enhancing existing provisional interconnection service options at discrete study points to accelerate in a non-discriminatory manner the ability of new generation to achieve commercial operation, and (3) states assuming cost responsibility for transmission upgrades in the Regional Transmission Expansion Plan pursuant to the State Agreement Approach to promote state policies to encourage large load development. PJM clarifies that a physical co-location configuration can be used, but the new generation may additionally enter a bilateral agreement with the load for financial or contractual purposes. PJM states that
38 Id.39 Id. at 15.40 Id. at 39.41 Id. at 16-17. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 19 Date Filed: 10/19/2026
PDF page 21
Docket No. EL25-49-000, et al.- 13 -
this option would involve an interconnection study for the new generation resource. PJM supports this option.
20. Seventh, PJM discusses a new option that would allow a new large load to become Network Load at a potentially faster pace subject to the load electing a new transitional non-capacity backed service offering (PJM option 7).42 PJM states that large loads would have the option to be classified as a non-capacity backed load for a transitional period until any resource adequacy supply/demand imbalances associated with this load addition are addressed. Then, PJM explains, the load could assume full Network Load status. PJM states that, under this offering, the load would avoid capacity costs during the transition period in return for its willingness to curtail. PJM indicates that variations of this option could be explored to enhance resource adequacy and allow large loads to efficiently connect to the system through incentives to be flexible. PJM states that a physical co-location configuration can be used but all load would be in front of the meter. PJM supports this option.
21. Eighth, PJM discusses a new option where Co-Located Load that is Network Load may be able to participate in the PJM wholesale markets as a Demand Response resource (PJM option 8).43 PJM explains that this option already exists in PJM but there could be an additional review of Demand Response rules or review of emissions restrictions on back-up generation to enhance this option, potentially requiring Tariff revisions. PJM states that back-up generation provides a way to serve the Co-Located Load when asked to curtail for Demand Response. PJM contends that this option may enhance resource adequacy under tight system conditions in the short term. PJM supports this option.
B. General
1. PJM’s March 24 Response
22. PJM argues that the Tariff remains just and reasonable.44 PJM argues that its Tariff is not unjust and unreasonable merely because it does not provide alternative pathways to accommodate a business goal. However, as noted, PJM discusses eight pathways, acknowledging that “clarifications and enhancements could well be in order given this is an evolving area and Tariff provisions did not contemplate the type of arrangements at issue in this docket or their implications.”45 PJM notes that it rescinded
42 Id. at 18-19.43 Id. at 20.44 Id. at 32-34.45 Id. at 32. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 20 Date Filed: 10/19/2026
PDF page 22
Docket No. EL25-49-000, et al.- 14 -
its Guidance Document46 pending Commission guidance in this docket about a Commission-approved path forward.
2. Transmission Owners’ March 24 Responses47
23. Generally, Indicated Transmission Owners contend that no Tariff changes are needed.48 Indicated Transmission Owners argue that the Tariff addresses and encompasses Co-Location Arrangements. According to Indicated Transmission Owners, all load in PJM must be designated as Network Load and served by a Network Customer (or take PTPS), thereby ensuring this load pays its fair share of transmission costs. AES Ohio also argues that the PJM Tariff is just and reasonable regarding service to Co-Located Load taken under NITS or Firm PTPS, but acknowledges there may also be alternative reasonable transmission service arrangements.49
3. Reply Comments
24. Some parties agree with PJM and transmission owners that the Tariff remains just and reasonable, arguing, for example, that it ensures visibility into Co-Located Loads, that Co-Located Load pays its fair share of costs, and that the grid can continue to rely on existing generation resources.50 However, a number of parties disagree with PJM and transmission owners, arguing that PJM’s Tariff is unjust, unreasonable, and unduly discriminatory and preferential as to Co-Located Load because the Tariff lacks clarity and does not provide for rates, terms, and conditions applicable to Co-Location
46 PJM developed a Guidance Document on Co-Located Load, first posted in 2024, which includes non-binding guidance for generators and loads seeking to enter into Co-Location Arrangements in PJM. PJM, PJM Guidance on Co-Located Load (Mar. 22, 2024) (updated Apr. 17, 2024), https://www.pjm.com/-/media/DotCom/markets- ops/rpm/rpm-auction-info/pjm-guidance-on-co-located-load.pdf.47 Apart from the arguments summarized below, several transmission owners submitted responses that took no position on the issues raised in the Show Cause Order, specifically Allegheny Electric Cooperative, Inc., NextEra Energy Transmission MidAtlantic, Inc., and Silver Run Electric, LLC.48 Indicated Transmission Owners March 24 Response, attach. A at 2-3.49 AES Ohio March 24 Response at 1.50 See Buckeye April 23 Reply Comments at 3, 5; Glatz/Silverman April 23 Reply Comments at 4; NOVEC April 23 Reply Comments at 8, 10; NREMC April 23 Reply Comments at 4-6. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 21 Date Filed: 10/19/2026
PDF page 23
Docket No. EL25-49-000, et al.- 15 -
Arrangements.51 Other parties allege the Tariff is unclear and/or urge the Commission to provide guidance on Co-Location Arrangements.52 Indicated Transmission Owners argue no party has shown the existing Tariff is unjust and unreasonable, and recent events indicate that existing types of service can be used.53
C. Jurisdiction
1. PJM’s March 24 Response
25. PJM contends that different state laws may impact the permissibility of certain potential Co-Location Arrangements.54 PJM explains that states in the PJM region assessed several decades ago whether to introduce competition for retail service. As to states that did not pursue deregulation, PJM argues that the state’s exclusive retail franchise territory law may restrict non-franchised suppliers from serving Co-Located Load. PJM further asserts that state laws in deregulated states may or may not impose limitations on Co-Located Load suppliers, such as requiring load to be designated as Network Load or take a specific transmission service.
26. PJM argues that the Show Cause Order did not capture some nuance regarding the Commission’s jurisdiction.55 PJM asserts that, due to both federal- and state-level deregulation, there could be regulatory gaps with respect to Co-Location Arrangements. PJM cautions against overgeneralizing when characterizing what states may or may not regulate regarding Co-Location Arrangements. PJM asserts that state law does not
51 See SEIA April 23 Reply Comments at 2, 5-6; CATF April 25 Reply Comments at 6; Constellation April 23 Reply Comments at 13-14; Antora April 23 Reply Comment at 2; EPSA/P3 April 23 Reply Comments at 9-12; Enchanted Rock April 23 Reply Comments at 2; Mainspring April 23 Reply Comments at 2, 4; AEU April 23 Reply Comments at 10. See also Joint Parties’ April 22 Motion to Stay at 3.52 See Market Monitor April 23 Reply Comments at 2; BrightNight April 23 Reply Comments at 3; Bloom April 23 Reply Comments at 2; DCC April 23 Reply Comments at 7; Industrials April 23 Reply Comments at 14. See also National Security Experts April 22 Reply Comments at 1.53 Indicated Transmission Owners June 3 Answer at 3; Indicated Transmission Owners June 27 Answer at 2-3 (noting Talen’s announcement that the co-location arrangement between Talen and Amazon will transition to a front-of-the-meter arrangement).54 PJM March 24 Response at 23, 26-27.55 Id. at 21, 27-29. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 22 Date Filed: 10/19/2026
PDF page 24
Docket No. EL25-49-000, et al.- 16 -
necessarily regulate companies making end-use sales, for example, in the case of industrial customers’ self-supply of electricity in Indiana. Moreover, PJM contends that, based on its understanding of Pennsylvania law, a company agreeing to sell electricity to a data center may not be subject to public utility regulation in that state. PJM alleges that New Jersey has similarly declined to exercise its authority to regulate retail sales to large end users.
27. PJM presents several arguments that the Commission has authority over Co-Location Arrangements pursuant to its jurisdiction under the FPA over transmission in interstate commerce.56 PJM states that, to adequately support a finding based on interstate transmission jurisdiction, one can show that a utility’s lines are indirectly connected to the interstate grid. PJM argues that the Commission has jurisdiction regarding the transmission service associated with the ancillary services that Co-Location Arrangements use because the data center in the arrangement will be interconnected to the grid. PJM separately argues that the Commission’s transmission jurisdiction is implicated because the Commission has authority over interconnections to the grid, including modifications by the generator to add load. With respect to the Commission’s jurisdiction over wholesale sales in interstate commerce, PJM argues that it is increasingly complicated to analyze such sales due to the interconnectivity of the grid, technological advancements, and industry deregulation, but suggests that some Co-Location Arrangements may involve Commission-jurisdictional sales for resale.
2. Transmission Owners’ March 24 Responses
28. Indicated Transmission Owners state that they generally agree with the jurisdictional principles outlined in the Show Cause Order.57 Indicated Transmission Owners argue that the Commission can set a transmission rate that Network Customers serving all Network Load must pay for services and associated charges, but how a state chooses to assign and allocate the recovery of the cost of that charge between individual retail customers or among classes of end-use load may vary, as long as there is no cost-trapping. Indicated Transmission Owners state they would welcome the Commission reaffirming that PJM generation interconnection procedures apply to the interconnection of and service to generation, including generation with Co-Located Load, but not to the load itself, which interconnects under state jurisdiction.
29. AES Ohio argues that no changes are necessary to ensure clarity regarding the aspects of service to Co-Location Arrangements that may be administered through the
56 Id. at 30-31.57 Indicated Transmission Owners March 24 Response, attach. A at 1-2; AES Ohio March 24 Response at 1. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 23 Date Filed: 10/19/2026
PDF page 25
Docket No. EL25-49-000, et al.- 17 -
Tariff versus state jurisdictional retail tariffs.58 Indicated Transmission Owners state that the Commission could clarify that generation interconnection agreements do not “confer the right to serve end-use retail load or the right of new load to take retail service at a specific point or under particular rates” as those rights are regulated under state law.59 AES Ohio and Indicated Transmission Owners state that, in general, the continued obligation, if any, of generation to serve classes of end-use customers to pay for that generation is a matter of state jurisdiction and concern.60
3. Reply Comments
a. Requests to Clarify the Scope of Federal Jurisdiction
30. Several parties contest that there is shared responsibility between states and the Commission with respect to service to Co-Located Load and generation61 and request that the Commission clarify the scope of its jurisdiction. OPSI, NRDC, and Pennsylvania Commission request that the Commission affirm that the sale between a Co-Located Load and a generator is a retail sale subject to state jurisdiction and that states also have power to regulate wholesale sales not in interstate commerce, as well as facilities used for the generation and distribution of electricity.62 ELCON and Talen request that the Commission use this proceeding to clarify that the Commission generally has jurisdiction over the types of large-scale Co-Location Arrangements discussed in PJM’s Answer to the Show Cause Order.63 Talen also requests that the Commission clarify that the basis of the Commission’s jurisdiction will vary based on the specifics of the Co-Location Arrangement and confirm that the Commission’s limited role is to ensure that the Co-Location Arrangement does not impair overall system reliability; that interconnections between generators and the grid are safe and reliable; and that the rate
58 AES Ohio March 24 Response at 12.59 Indicated Transmission Owners March 24 Response, attach. A at 20-21.60 Id., attach. A at 21-22; AES Ohio March 24 Response at 13.61 See AEU April 23 Reply Comments at 8; Talen April 23 Reply Comments at 9 (citing New York v. FERC, 535 U.S. at 20-24).62 OPSI April 23 Reply Comments at 6; NRDC April 23 Reply Comment at 2; Pennsylvania Commission April 22 Reply Comments at 2-3 (citing Nat’l Ass’n of Regul. Util. Comm’rs v. FERC, 964 F.3d 1177, 1187 (D.C. Cir. 2020)).63 ELCON April 23 Reply Comments at 4-5; Talen April 23 Reply Comments at 3. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 24 Date Filed: 10/19/2026
PDF page 26
Docket No. EL25-49-000, et al.- 18 -
for any service is reasonable.64 Talen argues that the Commission cannot favor one type of Co-Location Arrangement or configuration over another.
31. Many parties commented on the scope of the Commission’s authority over Co-Location Arrangements, but several disagree on the components that are subject to Commission oversight. California Utilities, EPSA/P3, AEU, and Talen agree with PJM that the Commission has jurisdiction over the allocation of transmission, ancillary services, and other related costs between customers using or benefiting from the transmission system, but clarify that state or local regulators may choose to reallocate such costs in retail rates.65 EPSA/P3 qualifies its comments by noting that in states with retail choice, there is no nexus between state regulation and the transmission rates established by the Commission, such that only the Commission-approved transmission rate and interconnection procedures govern.66
b. Areas of Commission Jurisdiction
32. Several parties support the Commission’s exercise of jurisdiction over the taking of transmission service.67 Market Monitor and UCS argue that Co-Location Arrangements are interconnected to the transmission grid and receive jurisdictional service from jurisdictional transmission facilities.68 CATF argues that the Commission has jurisdiction to require transmission tariff provisions for Co-Located Load because all co-located configurations receive essential services from the transmission grid, and therefore, all rates, practices, and procedures involving such facilities must be just, reasonable, and not unduly discriminatory.69
33. Talen contends that if the load is not using any transmission network, point-to-point, or ancillary services, then the basis of Commission jurisdiction is not that
64 Talen April 23 Reply Comments at 3, 9-10 (citing 16 U.S.C. § 824d).65 California Utilities April 23 Reply Comments at 3-4.66 EPSA/P3 April 23 Reply Comments at 6-8.67 NOVEC April 23 Reply Comments at 8.68 Market Monitor April 23 Reply Comments at 13; UCS April 11 Reply Comments at 16 (citing Show Cause Order, 190 FERC ¶ 61,115 at P 76 (“The Commission has defined transmission service as the provision of ‘electric transmission, network or point-to-point service, ancillary services or other methods of electric transmission, or the interconnection with jurisdictional transmission facilities.’”)).69 CATF April 25 Reply Comments at 5. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 25 Date Filed: 10/19/2026
PDF page 27
Docket No. EL25-49-000, et al.- 19 -
the Co-Located Load itself takes a Commission-jurisdictional form of transmission service but that the Interconnection Service Agreement (ISA) governing the Co-Location Arrangement is jurisdictional.70 Talen contends that there may be situations in which Co-Located Load takes Commission-jurisdictional transmission service.
34. Talen also agrees with PJM that “the Commission’s jurisdiction over transmission service in interstate commerce” is “necessarily implicated in matters relating to co-located load arrangements where generator interconnections are being modified,” or where a generator’s ISA contemplates a Co-Location Arrangement.71 California Utilities disagree, arguing that the Commission has jurisdiction only over the wholesale generator interconnection and cannot “bootstrap such jurisdiction to dictate the terms and conditions of service to retail load.”72 Talen asserts that Co-Location Arrangements may also create different (or supplementary) bases for Commission jurisdiction either because sales are interstate sales or when they constitute sales for resale.73 Talen concludes that when the load has no grid connection, there can be no jurisdictional service.
35. Talen argues, however, that the Commission should not condition its assertion of jurisdiction on the assumption that Co-Located Loads always take
Commission-jurisdictional services from the transmission system. Talen contends that the specifics of Susquehanna’s Co-Location Arrangement, in which the Co-Located Load is not a network customer and has no right to take transmission service or backup from the grid, make clear why it would be a mistake for the Commission to assert blanket jurisdiction over Co-Location Arrangements based on that load’s supposed receipt of jurisdictional transmission service or ancillary services. Talen contends that the practical effect of such an assertion would be to improperly federalize the entire electric system.
36. PPL argues that the Commission has the jurisdictional authority to ensure that Co-Location Arrangements do not impact the safety or reliability of the bulk electric system and do not create conditions for improper subsidization of Co-Located Loads by
70 Talen April 23 Reply Comments at 4-5.71 Id. at 5.72 Id. at 2; California Utilities April 23 Reply Comments at 4; EPSA/P3 April 23 Reply Comments at 6; AEU April 23 Reply Comments at 8.73 Talen April 23 Reply Comments at 4-8. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 26 Date Filed: 10/19/2026
PDF page 28
Docket No. EL25-49-000, et al.- 20 -
network customers.74 Chevron states that the Commission has the right to clarify rules relating to the ongoing sales of essential reliability services by the generator.75 c. Areas of Exclusive State Jurisdiction
37. Many parties note that states retain sole jurisdiction over distribution and retail rates and sales, non-bypassable charges, and interconnection of load at distribution voltage levels, whereas the Commission has jurisdiction over the interaction of generators with the PJM markets.76 Among other retail charges, PIOs argue that states retain authority over whether consumption by a Co-Located Load should count for purposes of allocating transmission and distribution system charges to retail customers.77 Indicated Transmission Owners note that state-jurisdictional special contracts or rates can provide other financial benefits to the Co-Located Load.78 Constellation and Talen state that the Commission has no authority to prohibit a generator from selling directly to Co-Located Load.79 Talen adds that the Commission cannot compel participation in federally regulated energy or capacity markets.80
d. Potential Jurisdictional Gap
38. Commenters disagree on whether the FPA’s division of jurisdictional authority leaves a regulatory gap with respect to Co-Location Arrangements. PPL agrees with PJM
74 PPL April 23 Reply Comments at 7.75 Chevron April 23 Reply Comments at 4.76 See Constellation April 23 Reply Comments at 68, 70; EDFR April 23 Reply Comments at 7; Joint Consumer Advocates April 23 Reply Comments at 8; NOVEC April 23 Reply Comments at 8. EPSA/P3 April 23 Reply Comments at 6; AEU April 23 Reply Comments at 8; Talen April 23 Reply Comments at 2; PPL April 23 Reply Comments at 1; Indicated Transmission Owners April 23 Reply Comments at 2; California Utilities April 23 Reply Comments at 2.77 PIOs April 23 Reply Comments at 42.78 Indicated Transmission Owners April 23 Reply Comments at 14.79 Constellation April 23 Reply Comments at 72; Talen April 23 Reply Comments at 10.80 Talen April 23 Reply Comments at 10. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 27 Date Filed: 10/19/2026
PDF page 29
Docket No. EL25-49-000, et al.- 21 -
that there is a potential jurisdictional gap.81 PPL states that under prevailing Pennsylvania law, a single generator providing service to a single customer is not a public utility and is not subject to the retail jurisdiction of the Pennsylvania Commission, nor are the terms of that retail sale subject to federal oversight. Pennsylvania Commission rejects this view, however.82 Pennsylvania Commission argues that when Co-Located Load receives services from the grid, the respective Commission that regulates that portion of the grid has jurisdiction over those services.83 OPSI also argues that there is no regulatory gap, explaining that sales of electricity from a generator to an end use customer in intrastate commerce are subject to state jurisdiction.84 OPSI disagrees with PJM’s assertion that jurisdiction across the PJM region is unclear, emphasizing that OPSI’s member states have processes by which jurisdictional issues can be resolved. Constellation states that differing treatment of direct sales by states is not indicative of a regulatory gap, but a deliberate policy choice.85
e. Jurisdiction over Large Load Interconnection
39. Commenters also disagree on whether the Commission should assert jurisdiction over the interconnection of large loads. California Utilities state that the Commission cannot exercise jurisdiction over the interconnection of a Co-Located Load to the transmission system as an element of transmission service in interstate commerce where the purpose of the arrangement is to facilitate a retail sale.86 PIOs argue, however, that the Commission should assert jurisdiction over Co-Location Arrangements on PJM’s transmission system and must not disclaim jurisdiction over interconnection of large loads.87 PIOs note that the introduction of large loads has potential to disrupt transmission system reliability. PIOs state that the Commission has not historically exercised jurisdiction over “any and all transmission-level interconnections of retail
81 PPL April 23 Reply Comments at 7.82 Pennsylvania Commission April 22 Reply Comments at 3-4 (citing 66 Pa.C.S. § 102; Drexelbrook Assocs. v. Penn. Pub. Util. Comm’n, 212 A.2d 237, 240 (Pa. 1965); Borough of Ambridge v. Pub. Serv. Comm’n of Penn., 165 A. 47, 49 (Pa. Super. Ct. 1933)).83 Id. at 5.84 OPSI April 23 Reply Comments at 5-6.85 Constellation April 23 Reply Comments at 73.86 California Utilities April 23 Reply Comments at 5.87 PIOs April 23 Reply Comments at 34-35, 37. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 28 Date Filed: 10/19/2026
PDF page 30
Docket No. EL25-49-000, et al.- 22 -
load.”88 PIOs interpret “any and all” to mean the Commission has not exercised plenary authority over every transmission-level load interconnection, although there are cases where the Commission and its regulated entities have sought to control interconnections of load. PIOs assert that “the Commission’s statutory mandate to ensure that transmission users, owners, or operators satisfy reliability criteria provides ample support for regulating the interconnections of large loads that . . . have usage characteristics that can cause unacceptable disruption to the bulk power system.”89 PIOs argue that the Commission must plan for wholesale sales at co-located facilities.
40. Talen asserts that interconnection service is a form of Commission-jurisdictional service, and a generator’s interconnection to the interstate transmission system does not stop being Commission-jurisdictional merely because there is Co-Located Load behind the point of interconnection.90 Talen argues that for that reason, the Commission has for decades approved amendments to ISAs designed to accommodate Co-Located Load, and notes that Order No. 2003 rejected the idea that the Commission loses jurisdiction over interconnections if the generator makes behind-the-meter sales. Talen states that the presence of non-jurisdictional facilities behind the meter does not divest the Commission of jurisdiction over the generator’s interconnection, because non-jurisdictional facilities (including the generator itself) always exist behind the meter. Talen contends that the argument that the Commission does not have jurisdiction over the interconnection of end-use load is undermined by the Supreme Court’s decision in EPSA, which confirmed that the Commission can exercise jurisdiction over matters the FPA charges it with administering, even if the exercise of jurisdiction indirectly affects the states’ regulatory powers, so long as Commission’s action does not “target” the states’ domain.91 f. Need for Flexible PJM Tariff Provisions
41. AEU, NOVEC, and PIOs argue that any tariff changes put forward by PJM must be flexible enough to accommodate states’ different regulatory frameworks and
88 Id. at 34 (citing Show Cause Order, 190 FERC ¶ 61,115 at P 72).89 Id. at 36.90 Talen April 23 Reply Comments at 8-9.91 Id. at 9 (citing Standardization of Generator Interconnection Agreements & Procs., Order No. 2003, 104 FERC ¶ 61,103, at PP 813-14 (2003), order on reh’g, Order No. 2003-A, 106 FERC ¶ 61,220, order on reh’g, Order No. 2003-B, 109 FERC ¶ 61,287 (2004), order on reh’g, Order No. 2003-C, 111 FERC ¶ 61,401 (2005), aff’d sub nom. Nat’l Ass’n of Regul. Util. Comm’rs v. FERC, 475 F.3d 1277 (D.C. Cir. 2007) (NARUC)). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 29 Date Filed: 10/19/2026
PDF page 31
Docket No. EL25-49-000, et al.- 23 -
acknowledge that not all Co-Location Arrangements will be available in all states.92 AEU argues that such flexibility will allow states to decide whether changes to state law are needed to either expand or constrain access to Co-Location Arrangements, according to state-specific circumstances and policy goals. NOVEC explains that, under its understanding of relevant state law, the Co-Location Arrangements sought by Constellation in Docket No. EL25-20 would not be permissible in Virginia unless the supplier to the Co-Located Load is authorized under state law to be a retail supplier in the geographic area in which the Co-Located Load is located.93
42. NOVEC submits that the Commission should not create a novel contractual arrangement in the PJM Tariff that allows Co-Location Arrangements to bypass transmission service, local distribution utilities, and the capacity market.94 If it does, NOVEC contends that the Commission risks creating an uneven patchwork of co-location rules across PJM as some jurisdictions permit it and others do not. PIOs argue that PJM must not limit states’ authority over the co-located generation mix.95 PIOs add that the PJM Tariff should treat Co-Located Load as any other consumption.
43. Constellation argues that requiring Co-Located Loads to take NITS unduly limits state jurisdiction and flexibility.96 Constellation asserts that requiring large loads to take wholesale service, rather than taking service directly from a generator, and requiring the generator to only make wholesale sales, rather than providing service directly to a Co-Located Load, effectively precludes states from regulating transactions that fall squarely within their jurisdiction.
D. Cost Allocation
1. PJM’s March 24 Response
44. PJM states that Co-Location Arrangements should pay the costs of any grid services they consume.97 PJM states that it believes the load and generator must be completely isolated and physically disconnected from the grid to ensure the load never
92 AEU April 23 Reply Comments at 8; NOVEC April 23 Reply Comments at 8.93 NOVEC April 23 Reply Comments at 8.94 Id.95 PIOs April 23 Reply Comments at 40-43.96 Constellation April 23 Reply Comments at 26-28, 73-74.97 PJM March 24 Response at 4, 42-45. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 30 Date Filed: 10/19/2026
PDF page 32
Docket No. EL25-49-000, et al.- 24 -
takes any form of transmission service. PJM maintains that it is always possible that any protection system in an isolated (but not islanded) Co-Location Arrangement could mis-operate, be disabled, or degrade, and that, in the few instances where such schemes exist on the PJM system, PJM has observed these schemes fail, and the load has taken grid service. Other challenges, PJM notes, include unplanned generator run-backs or reductions in output, generator megawatt (MW) oscillations, and Co-Located Load utilization fluctuations. PJM argues that, when these conditions occur, they result in brief, but routine, imbalances between the load and the generation that would need to rely on the grid to balance.
45. PJM explains that proposed Co-Located Loads are not “wholly isolated from the grid” because the load and generator are connected to and synchronized with the multi-state bulk power system.98 PJM avers that there are obligations to ensure power to nuclear plants to ensure safe shutdown. PJM explains that synchronized to the grid means the generator matches the voltage, frequency, and phase of the entire grid before connecting to the grid to facilitate safe, stable power transfer. PJM also asserts that Co-Located Load is connected to and synchronized with the multi-state bulk power system and, at minimum, benefits from ancillary services.
46. PJM states that it prefers that Co-Location Arrangements be designated as Network Load in front of the meter.99 In support of its preference, PJM argues the Network Load designation means: (1) more reliable service for these critical loads;
(2) more comprehensive and holistic system planning based on Network Load status;
(3) enhanced ability to manage load curtailment priority in emergency conditions; (4) less operating complexity and reduced dependence on protective schemes, which can mis-operate and are designed to address N-1 conditions; (5) greater access to potential Demand Response capabilities of large Co-Located Loads; and (6) fewer negative implications for resource adequacy if accompanied by some of the optional offerings (i.e., Demand Response, incentives to bring generation, or use of a new non-capacity-backed service). PJM suggests that it may be an open question what level of NITS charges, if any, should be assessed to certain Co-Location Arrangements in accordance with cost causation principles.
47. PJM recognizes that Co-Location Arrangements involving large data centers may appear similar to the BTMG configuration in PJM’s Tariff but that the rules were not designed for large loads and are not a good fit.100 PJM explains that its BTMG Tariff provisions were developed in 2004 and that BTMG netting is only available to entities
98 Id. at 42-43.99 Id. at 38-40.100 Id. at 34-36. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 31 Date Filed: 10/19/2026
PDF page 33
Docket No. EL25-49-000, et al.- 25 -
taking NITS. PJM states that BTMG netting was justified at the time it was proposed because certain market participants “rely to a lesser degree on the PJM integrated transmission system to serve load.”101 However, PJM cautions that “20-years later cost causation principles may dictate a different outcome for co-located data center loads that appear to have different customer profile and load characteristics.”102 PJM contends that co-located data center configurations use the transmission grid to receive service because they “appear to require certain ancillary services (load following) and black start service” and ancillary services “pass through transmission lines, not the air.”103 PJM asserts that “simple netting may not capture the costs ‘caused’ by co-located data center arrangements” because they would always net to zero where the generator serves the entire data center load.104 PJM notes that BTMG does not carry reserves, and that PJM’s planning and resource adequacy will not account for loads in this configuration. PJM suggests that the record “raise[s] questions about the status” of the BTMG rules.105
2. Transmission Owners’ March 24 Responses
48. Indicated Transmission Owners and AES Ohio argue that Co-Located Load interconnected to the transmission system is using and benefiting from the transmission system, causes changing flows from second to second, and should pay its costs of essential grid services.106 Indicated Transmission Owners state that Co-Located Load that is connected to the grid has the potential to draw real or reactive power from the grid at any time and relies on and benefits from its connection to the transmission system at all times. Indicated Transmission Owners state that the presence of on-site backup generation does not exempt load from paying the costs of transmission service because it still benefits from the transmission system.
101 Id. at 36 (citing PJM Interconnection, L.L.C., 107 FERC ¶ 61,113 at P 7).102 Id. (citing Cities of Bethany v. FERC, 727 F.2d 1131, 1138 (D.C. Cir. 1984) (recognizing different rates could be charged to different customer groups); Ala. Elec. Coop., Inc. v. FERC, 684 F.2d 20, 27-28 (D.C. Cir. 1982) (explaining undue discrimination)).103 Id.104 Id.105 Id.106 Indicated Transmission Owners March 24 Response at 5, 7, 14; id., attach. A at 5, 19-20; AES Ohio March 24 Response at 2. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 32 Date Filed: 10/19/2026
PDF page 34
Docket No. EL25-49-000, et al.- 26 -
49. Indicated Transmission Owners state that the only arrangement where the end-use load does not need to take some form of transmission service is one in which the load is completely islanded and does not connect to, take service from, or rely on the transmission or distribution system in any way, for any grid service, at any time.107 Indicated Transmission Owners note that such an arrangement would not be within the Commission’s jurisdiction. Indicated Transmission Owners further contend that “[e]ven if operational protection and control technologies, such as relay switches, are used with Co-Located Load and generation, the load still benefits from and utilizes grid services when 1) the load and generator are both connected to the system, and 2) the load is connected and the generator is disconnected from the system, even if the load is connected momentarily before it trips.” Further, Indicated Transmission Owners argue that, regardless of Co-Located Load using grid services, Co-Location Arrangements rely on the grid and grid facilities without which the generator could not operate and the arrangement could not exist.
50. Indicated Transmission Owners argue that load cannot be “fully isolated” if it remains connected to the transmission and/or distribution grid, even through protection systems.108 Indicated Transmission Owners note that the definition of a Co-Location Arrangement that the Commission adopted in the Show Cause Order “obscures the engineering and economic truth that the load relies upon the functioning grid and grid services whichever side of the meter it is located on.”109 Indicated Transmission Owners state that PJM’s pro forma tariffs and interconnection agreements require that all interconnection customers be synchronized to the grid as a condition of service and explain that this is necessary to preserve voltage stability and reliability.110
51. Indicated Transmission Owners argue that the transmission system must be planned and built to support any load able to be served by the transmission system to ensure compliance with state requirements that end-use load must be served.111 Indicated
107 Indicated Transmission Owners March 24 Response, attach. A at 9-10.108 Id. at 7, 9.109 Id. at 7, n.17.110 Id. attach. A at 9 (citing e.g., PJM, Intra-PJM Tariffs, OATT, attach. O app. 2, § 1.4 Initial Operation)).111 Id. at 5, 8, 16, attach. A at 6 (citing PJM, Intra-PJM Tariffs, OATT, § 28.2 Transmission Provider Responsibilities (stating, “[t]he Transmission Provider shall include the Network Customer’s Network Load in the Transmission System planning and the Transmission Owners shall, consistent with the terms and conditions of the Tariff, the Operating Agreement, and Good Utility Practice, endeavor to construct and place into service sufficient transfer capability to deliver the Network Customer’s Network Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 33 Date Filed: 10/19/2026
PDF page 35
Docket No. EL25-49-000, et al.- 27 -
Transmission Owners explain that the fact that the load is not constant does not reduce the capital investment or operational and maintenance costs incurred to ensure the system is available to the customer if the customer has the ability to serve their full load from the transmission system.
52. Indicated Transmission Owners argue that Co-Located Load fits within the current Tariff construct and should receive either NITS or PTPS.112 Indicated Transmission Owners argue that this will ensure Co-Located Loads are appropriately studied, charged, and factored in operationally by PJM and transmission owners. Indicated Transmission Owners therefore conclude that the PJM Tariff is just and reasonable and there is no basis for the Commission to act under FPA section 206. Indicated Transmission Owners clarify that no party has alleged that the current Tariff, which requires load to take either NITS or PTPS, has impaired any load’s ability to secure service safely, reliably, and at reasonable cost, or that service had been unobtainable. Indicated Transmission Owners argue that there have been, instead, allegations that efforts to request service outside of the PJM Tariff provisions have been thwarted, but that such allegations do not impact the Tariff. AES Ohio generally agrees, but notes that different configurations of Co-Located Load may result in different forms of service and there may be new approaches that are just and reasonable and incentivize Co-Located Load to provide reliability benefits and cost savings.113
53. Indicated Transmission Owners suggest that adding a definition of Co-Located Load to the PJM Tariff specifying that co-located must be either Network Load or served by PTPS and does not meet the definition of BTMG may clarify expectations and obligations associated with such load.114 Indicated Transmission Owners argue that allowing Co-Located Load to evade existing Tariff charges for grid usage by carving out this load from NITS or PTPS would violate cost causation principles.115
54. Indicated Transmission Owners further contend that if Co-Located Loads are not designated as Network Load, it would undercut reliability and exacerbate affordability Resources to serve its Network Load on a basis comparable to the delivery of each Transmission Owner’s own generating and purchased resources to its Native Load Customers”)).
112 Id. at 2-3, 13; id., attach. A at 7, 21.113 AES Ohio March 24 Response at 2, 5.114 Indicated Transmission Owners March 24 Response, attach. A at 2, 9, 18.115 Id. at 18 (citing Pub. Serv. Elec. & Gas Co. v. FERC, 989 F.3d 10, 13 (D.C. Cir. 2021) (quoting Midwest ISO Transmission Owners v. FERC, 373 F.3d at 1368–69)). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 34 Date Filed: 10/19/2026
PDF page 36
Docket No. EL25-49-000, et al.- 28 -
concerns because it would allow Co-Located Load to avoid “wires charges,” including the fixed costs of the poles, wires, transformers, and substations that comprise the transmission and distribution network that would then be subsidized by other customers.116 Indicated Transmission Owners allege that “carving a 480 MW Co-Located Load in the Commonwealth Edison territory (which hosts multiple nuclear units) out from Network Service would avoid approximately $121 million in annual charges, leading to a 1.53% increase in representative residential customer bills, or about $25.57 annually, compared to a similar load customer who paid its share of the costs of the grid.”117
55. Indicated Transmission Owners explain that transmission owners are allowed to recover the embedded costs of the transmission grid from network customers on a postage stamp basis without consideration of the distance between load and generation.118 Indicated Transmission Owners argue the idea that load is responsible for the embedded costs of the transmission grid based on fairness predates Order No. 888.119 Indicated Transmission Owners state that the Commission’s pro forma definition of Network Load does not allow a Network Customer to designate only part of the load at a discrete Point of Delivery as Network Load unless arrangements for PTPS are made. Indicated Transmission Owners explain the Commission found in Order No. 888-A that “all potential transmission customers, including those with generation behind the meter, must choose between [NITS] or [PTPS].”120
56. Indicated Transmission Owners argue that the PJM RAA provides that a Load Serving Entity (LSE) is defined as “any entity (or the duly designated agent of such an entity), including a load aggregator or power marketer, (i) serving end-users within the PJM Region and (ii) that has been granted the authority or has an obligation pursuant to state or local law, regulation or franchise to sell electric energy to end-users located
116 Id. at 3, 18.117 Id. at 18-19.118 Id. at 10-12, 17-18. 119 Id. at 10-11 (citing Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,707; Fla. Mun. Power Agency v. Fla. Power & Light Co., 67 FERC ¶ 61,167, at 61,482 (1994)). 120 Id. at 11-12 (citing Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260). Indicated Transmission Owners argue the Commission has recently rejected requests that some load should be treated as “special third categories.” Id. at 17-18 (citing e.g., Nat’l R.R. Passenger Corp. v. PPL Elec. Utils. Corp., 171 FERC ¶ 61,237, order on reh’g, 173 FERC ¶ 61,043 (2020) (Amtrak)). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 35 Date Filed: 10/19/2026
PDF page 37
Docket No. EL25-49-000, et al.- 29 -
within the PJM Region.”121 According to Indicated Transmission Owners, the RAA further requires that LSEs shall “provide or arrange for Network Transmission Service or Firm Point-to-Point Transmission Service for service to the projected load of the Party.…”122 Indicated Transmission Owners contend that, together, these provisions mean that any entity serving an end-use load, including a Co-Located Load, must become an LSE and is responsible for ensuring that its load is taking either NITS or PTPS.
57. Indicated Transmission Owners state that the BTMG rules do not apply to Co-Located Load that is Network Load because such arrangements must deliver energy to load without using the transmission system.123 Further, Indicated Transmission Owners explain, BTMG adjustments are only available to Network Customers and would not be available to Co-Located Loads served by a contractual intermediary, rather than the generator directly, as the generator would only be an upstream supplier.
58. PSE&G states that transmission charges, if imposed, must apply cost causation principles that are based on a party’s actual usage of the transmission system, which PSE&G argues should include netting consistent with BTMG rules.124 PSE&G and AES Ohio state that both Co-Located Load and BTMG employ similar configurations and should pay for transmission services based on their actual system usage, i.e., net use.125 PSE&G argues that Co-Located Load is not using or impacting the transmission system any differently than BTMG customers and urges the Commission to ensure that there is no undue discrimination in the treatment of Co-Location Arrangements.126 PSE&G adds that any replacement rate must not adversely impact existing customers with BTMG.
59. The transmission owners also argue that Co-Located Load that is physically interconnected with and synchronized to the grid uses ancillary services and black start
121 Id. at 15-16 (citing PJM, Intra-PJM Tariffs, RAA, ARTICLE 1 - DEFINITIONS (53.0.0) (Definition of Load Serving Entity)). 122 Id. (citing PJM, Intra-PJM Tariffs, RAA, Article 9 Sec 1 - Overall Coordination (2.0.0)).123 Id., attach. A at 4.124 PSE&G March 24 Response at 5-6, 11-13.125 Id. at 15; AES Ohio March 24 Response at 4.126 PSE&G March 24 Response at 2, 13-14, 18. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 36 Date Filed: 10/19/2026
PDF page 38
Docket No. EL25-49-000, et al.- 30 -
service.127 Indicated Transmission Owners state that Co-Located Load that is connected to the grid has the potential to draw real or reactive power from the grid and change power flows at any time, even if connected to the distribution system.128 Indicated Transmission Owners note load co-located with nuclear units depends on the grid for load following, voltage support, black start, and other ancillary services. PSE&G argues that the Commission should establish ancillary services charges for Co-Located Load configurations based on actual use consistent with cost causation principles.129
3. Reply Comments
a. General
60. Several commenters urge the Commission to ensure any cost allocation to Co-Location Arrangements is consistent with the Commission’s cost causation and beneficiary pays principes.130 California Utilities argue that cost allocation will depend on whether a state or local regulator allows a generator to serve Co-Located Load and whether the regulator requires the Co-Located Load to pay for retail transmission service.131 Data Center Coalition argues that large loads, particularly data center operators, must retain the ability to pursue behind-the-meter and other innovative configurations.132 United States Senators argue that the Show Cause Order is an important start to address a crisis affecting ratepayers, and the Commission should ensure
127 Indicated Transmission Owners March 24 Response, attach. A at 5; AES Ohio March 24 Response at 7-8.128 Indicated Transmission Owners March 24 Response, attach. A at 5.129 PSE&G March 24 Response at 9-13.130 See AEU April 23 Reply Comments at 17-19; ACEG April 23 Reply Comments at 2; BrightNight April 23 Reply Comments at 7; Consumers’ Research April 23 Reply Comments at 1-2; EEI April 23 Reply Comments at 7; ELCON April 23 Reply Comments at 6-7; PIOs April 23 Reply Comments at 25-26; Vistra April 23 Reply Comments at 24 (citing Midwest ISO Transmission Owners v. FERC, 373 F.3d at 1368; Ill. Com. Comm’n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009) (ICC v. FERC I)).131 California Utilities April 23 Reply Comments at 2, 8.132 Data Center Coalition April 23 Reply Comments at 4. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 37 Date Filed: 10/19/2026
PDF page 39
Docket No. EL25-49-000, et al.- 31 -
that data center owners and operators do not burden households with more than their fair share of power infrastructure costs.133
61. Several commenters argue that Co-Located Load should be assessed charges based on services it uses.134 OPSI states that the Commission must determine the extent to which Co-Location Arrangements rely on the bulk power system and impact rates for other customers in determining cost allocation.135 Several commenters argue that Co-Located Load uses and benefits from its connection to the transmission system.136 NREMC states that the intermittent nature of Co-Located Load does not lessen the need for ongoing investment in infrastructure or the operational costs to ensure reliability.137 CATF similarly argues that Co-Located Load creates the need for additional new investment in transmission infrastructure and grid services. Pennsylvania Commission states that the grid must be planned to accommodate the Co-Located Load should any protection schemes fail. Several parties warn of potential cost shifts to consumers if costs are not appropriately allocated to Co-Located Load.138 NOVEC argues that co-location proposals that exempt Co-Located Load from the costs of transmission service effectively give them free use of the transmission system and cause other load to subsidize that use.
62. Several parties argue Co-Located Load cannot be fully isolated because Co-Located Load and generators are physically interconnected to and rely on the
133 United States Senators November 25 Letter at 2.134 See SEIA April 23 Reply Comments at 3-4; EDFR April 23 Reply Comments at 10; Glatz/Silverman April 23 Reply Comments at 5; AEU April 23 Reply Comments at 18; EPSA/P3 April 23 Reply Comments at 13; BrightNight April 23 Reply Comments at 7; Ohio FEA April 23 Reply Comments at 5.135 OPSI April 23 Reply Comments at 4.136 See CATF April 25 Reply Comments at 4; NREMC April 23 Reply Comments at 7; NOVEC April 23 Reply Comments at 10; Pennsylvania Commission April 22 Reply Comments at 4-5; UCS April 11 Reply Comments at 1-2.137 NREMC April 23 Reply Comments at 7.138 See id. at 5-6; CATF April 25 Reply Comments at 12; Consumers’ Research April 23 Reply Comment at 1-2; ELCON April 23 Reply Comments at 7; PIOs April 23 Reply Comments at 26-28; ACEG April 23 Reply Comments at 2; Market Monitor April 23 Reply Comments at 4, 7; NOVEC April 23 Reply Comments at 11; Pennsylvania Commission April 22 Reply Comments at 4. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 38 Date Filed: 10/19/2026
PDF page 40
Docket No. EL25-49-000, et al.- 32 -
transmission system.139 CATF states Co-Location Arrangements routinely include unplanned generator run-backs, MW output oscillations, and load utilization fluctuations, resulting in brief imbalances that rely on the grid for support. Parties also argue that protection systems could fail and the generator may go offline.140 NOVEC contends that “fully isolated” Co-Located Load is not fully isolated if there is any physical tie to the transmission system. NOVEC asserts that the benefits of, and the need for, the transmission system is why Co-Located Loads do not seek islanded arrangements. California Utilities similarly argue for Co-Located Load to be fully isolated, neither the generator nor the load may be electrically connected to the transmission system. UCS argues that the Co-Located Load would require system generation reserves and transmission capacity when the output of the generator does not match their consumption and may impact load ramp rates.141 OPSI discourages the Commission from accepting the premise that load can be wholly isolated from the grid without a comprehensive showing that it is impossible for the load to ever receive grid services or impact transmission rates for existing customers.142
63. ELCON states that large loads that do not take any grid services should not be allocated any grid costs unless there is a demonstration that such configuration has a direct cost impact on other grid consumers.143
b. Network Service
64. Several commenters argue that Co-Location Arrangements should be required to take either NITS or PTPS.144 NOVEC notes that PJM charges transmission customers on
139 See CATF April 25 Reply Comments at 4; Pennsylvania Commission April 22 Reply Comments at 4; Joint Consumer Advocates at 5; UCS April 11 Reply Comments at 4-5; PIOs April 23 Reply Comments at 25; Buckeye April 23 Reply Comments at 8; NOVEC April 23 Reply Comments at 9; California Utilities April 23 Reply Comments at 8.140 UCS April 11 Reply Comments at 4-5; Buckeye April 23 Reply Comments at 8.141 UCS April 11 Reply Comments at 4-5, 8-9.142 OPSI April 23 Reply Comments at 4-5.143 ELCON April 23 Reply Comments at 7.144 UCS April 11 Reply Comments at 16; NREMC April 23 Reply Comments at 4; NOVEC April 23 Reply Comments at 9-10; AMP April 23 Reply Comments at 3; PIOs April 23 Reply Comments at 8 (Network Load); CATF April 25 Reply Comments at 4; Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 39 Date Filed: 10/19/2026
PDF page 41
Docket No. EL25-49-000, et al.- 33 -
a formulary basis without regard for the distance between load and generation and thus distance does not relieve one of the need to procure transmission service. Pennsylvania Commission states that if a retail customer is served by a generator connected to the transmission system that is prima facie evidence the Co-Located Load is Network Load. Buckeye notes non-Network Load, “behind-the-generator” Co-Location Arrangements may not be permissible in all states and argues that treating Co-Located Load as Network Load respects state laws while providing for consistent application of the Tariff across the PJM footprint. AMP states that it is important that Co-Located Load should take NITS or PTPS to avoid unjust and unreasonable cost-shifting and to promote reliable transmission planning and resource adequacy. PIOs argue that it would violate cost causation and beneficiary pays principles to allow Co-Location Arrangements that rely on ancillary services to avoid paying transmission rates because transmission service is required to receive these services.145
65. Buckeye states that ensuring Co-Located Load is Network Load will ensure visibility to the grid operator, allow PJM to conduct appropriate planning to ensure grid reliability, ensure the load pays for its share of grid costs, and ensure generation resources remain available for the entire grid.146 Buckeye states that, conversely, co-located large load arrangements where the load is behind the meter of the generator, and is not Network Load, may create significant impacts to the grid, increase costs, and decrease reliability for those that rely on the grid for affordable and reliable electricity. Buckeye states that, while certain parties have advocated that these “fully isolated” arrangements will avoid transmission investments, those potential cost savings are outweighed by significant concerns about impacts to reliability, resource adequacy, and just and reasonable rates.
66. Other commenters disagree that Co-Located Load should be required to take NITS or PTPS.147 Industrials state that requiring all Co-Located Load be Network Load would be a departure from precedent that actual use of the transmission system is the appropriate way to measure cost causation. Constellation states that Co-Located Load should not be required to pay for transmission service where there are physical protections to prevent the delivery of system energy from the grid. EDFR asserts that Buckeye April 23 Reply Comments at 5, 7-8; Pennsylvania Commission April 22 Reply Comments at 5.
145 PIOs April 23 Reply Comments at 26.146 Buckeye April 23 Reply Comments at 5-6.147 Industrials April 23 Reply Comments at 3; Constellation April 23 Reply Comments at 82-83; EDFR April 23 Reply Comments at 11, 13; EPSA/P3 April 23 Reply Comment at 13. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 40 Date Filed: 10/19/2026
PDF page 42
Docket No. EL25-49-000, et al.- 34 -
Co-Located Load that places minimum demands on the transmission system should pay less in grid costs. EPSA/P3 argues that Co-Located Load that is behind the meter does not require full Network Services for gross load. SEIA urges the Commission not to mandate one approach.148
67. Data Center Coalition argues that requiring all load to be classified as Network Load risks undermining commercial arrangements, misaligning cost allocation, and chilling innovation.149 BrightNight states that Co-Located Load should not have to subsidize other customers.150 Constellation asserts that requiring all large Co-Located Loads to take NITS is unjust and unreasonable because it: (1) would delay service to data centers due to system studies and the need for new upgrades; (2) would impose unnecessary transmission upgrade costs on all existing customers; (3) does not respect state jurisdictional authority; and (4) violates fundamental ratemaking principles and is unduly discriminatory by imposing a one-size-fits-all solution on loads that are not similarly situated.151 Constellation states that the expected integration cost of a 1,000 MW large load is about $126 million, which would be socialized across all transmission customers under a NITS-only approach. Antora argues that requiring Co-Located Load to be Network Load would overcharge both the interconnecting load customer and other customers on the system for transmission service or upgrades to the extent PJM assumes it must serve the customer’s full peak demand even if the load is flexible or curtailable.152
68. ELCON states that the Commission should ensure that there are no regulatory barriers to islanded configurations with no connection to the larger grid if allowed by state law.153 ELCON states that forcing all large loads into either NITS or PTPS and limiting flexibility risks driving significant increased overall system costs and limits the ability of customers, state regulators, and utilities to find creative and cost-effective solutions based on individual needs and circumstances.
148 SEIA April 23 Reply Comments at 4.149 Data Center Coalition April 23 Reply Comments at 7.150 BrightNight April 23 Reply Comments at 7.151 Constellation April 23 Reply Comments at 15, 20.152 Antora April 23 Reply Comments at 11.153 ELCON April 23 Reply Comments at 6. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 41 Date Filed: 10/19/2026
PDF page 43
Docket No. EL25-49-000, et al.- 35 -
c. Netting
69. Several commenters argue that Co-Located Load should be charged for any wholesale services it uses on a net demand basis.154 Industrials state that a gross load metering approach is analogous to the gross load outcome that the Commission rejected in prior cases.155 Industrials assert that this approach would cause significant rate increases and disincentivize customers from taking steps to manage use of the grid which could otherwise lead to the avoidance of network upgrades.
70. Constellation argues that requiring Co-Located Loads to be charged NITS on a gross basis is unduly discriminatory because it would charge the same rates to customers who impose different costs on the system.156 Constellation states that Co-Located Load should have the choice to be Network Load and pay gross NITS or to pay net NITS if the portion of the generator serving the load delists and PJM procures capacity for the load based on net load during the coincident peaks. Constellation states that since Co-Located Load is unlikely to be withdrawing energy during coincident peak hours, it is appropriate to charge the higher of NITS or a ‘standby charge’ to reflect that the system must be built to a certain extent to serve the load on a firm basis.
71. Constellation further argues that charging all large Co-Located Loads NITS based on gross demand would be unduly discriminatory because it is inconsistent with treatment of BTMG.157 Constellation argues that there are no physical, technical, or economic reasons why netting rules applied to existing retail BTMG customers should not apply to co-located. Constellation states that size is not a rationale for discriminatory rate treatment. In response to concerns that PJM is not required to carry reserves for BTMG, Constellation states that BTMG rules could be modified to require the Co-Located Load to carry or pay for reserves and ancillary services or, if needed, a minimum demand charge for NITS for any non-volumetric costs the BTMG load imposes on the system.
72. On the other hand, Indicated Transmission Owners argue that to afford Co-Located Load similar treatment to BTMG load would be to grant an undue preference
154 Vistra April 23 Reply Comments at 25; Constellation April 23 Reply Comments at 31; Industrials April 23 Reply Comments at 4.155 Industrials April 23 Reply Comments at 4-5 (citing Occidental Chem. Corp. v. PJM Interconnection, L.L.C., 102 FERC ¶ 61,275 (2003)).156 Constellation April 23 Reply Comments at 31-33, 40-41.157 Id. at 32-33, 39, 41-45, 77, 80-81. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 42 Date Filed: 10/19/2026
PDF page 44
Docket No. EL25-49-000, et al.- 36 -
to such configurations over others that also rely upon Network Service.158 Indicated Transmission Owners and AMP argue that because Co-Location Arrangements use the transmission system, they cannot qualify as BTMG. PPL states that behind-the-meter generation at an existing load differs both in kind and degree from load appearing behind the meter of an existing generator. Indicated Transmission Owners and NREMC argue that allowing large Co-Located Load to utilize the BTMG model of netting generation against load could allow these facilities to avoid most, if not all, costs, unfairly shifting costs to other grid users since Co-Located Loads rely on and benefit from the grid.
73. AMP and NREMC agree with PJM that BTMG was not designed to accommodate large loads.159 NOVEC argues that BTMG loads had or developed generation to supply the load, but Co-Located Load as contemplated in this record would instead repurpose existing generation from the supply stack.160 NOVEC contends that the additional generation provides greater flexibility to customers and PJM, not less, and that Co-Located Loads are on a significantly larger scale than existing BTMG and may have larger impacts on the PJM system. NREMC argues that large Co-Located Loads paired with BTMG present significantly greater operational risks than traditional BTMG arrangements because they lack adequate reserves.161
74. AMP states that regardless of what the Commission decides with respect to Co-Located Load, the Commission should preserve the current BTMG netting provisions in the PJM Tariff.162 AMP contends that PJM does not provide any citations to discussion in the record regarding PJM’s BTMG rules that call the existing netting provisions into question, nor does it identify any reason why the practice of netting loads served by BTMG might no longer be consistent with cost causation principles. AMP states that the longstanding nature of the netting provisions is a reason to retain, not
158 Indicated Transmission Owners April 23 Reply Comments at 6-7 (citing 16 U.S.C. § 824d(b)). See also AMP April 23 Reply Comments at 12 (citing PSE&G March 24 Response at 15); PPL April 23 Reply Comments at 8; NREMC April 23 Reply Comments at 5.159 NREMC April 23 Reply Comments at 5; AMP April 23 Reply Comments at 11-12 (citing PJM March 24 Response at 35).160 NOVEC April 23 Reply Comments at 18.161 NREMC April 23 Reply Comments at 5.162 AMP April 23 Reply Comments at 13. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 43 Date Filed: 10/19/2026
PDF page 45
Docket No. EL25-49-000, et al.- 37 -
revisit them, given the reliance interests of PJM market participants in the existing rules.163
d. Replacement Rates
i. PJM Options
75. AEU contends that all eight PJM co-location options should be accommodated, although each also requires additional development.164 Vistra argues that if PJM option 3 (BTMG where load is Network Load) left the BTMG rules unchanged, it would be unduly discriminatory to prohibit behind-the-meter loads from engaging in the same type of netting.165 Vistra also argues that PJM option 4 configurations (Co-Located Load connected to the grid with protection facilities) would use the transmission system less than a retail BTMG configuration because protective systems ensure that the load never draws energy from the grid, whereas retail BTMG arrangements may do so. Antora argues that PJM option 4 is the only pathway that allows for the fully coordinated study of co-located generation and load.166 Antora states that the risks PJM identifies with this option would be mitigated for low-load factor loads that only charge when energy is abundant and low cost.
76. Vistra argues that when option 5 configurations (Co-Located Load connected to the grid with protection facilities, but with back-up service from the grid) draw power from the grid, PJM should apply netting provisions consistent with the BTMG program.167 Vistra states that, during those periods when the configuration is drawing power from the grid, it may make sense to require such configurations to pay for PTPS, NITS, or a new conditional, non-firm transmission service. PPL states that under this option, PJM must modify its Tariff to facilitate the type of “real-time, bespoke operational decision-making to determine whether load can continue to be served” that
163 Id. at 10-11 (citing Dep’t of Homeland Sec. v. Regents of the Univ. of Cal., 591 U.S. 1, 30 (2020)).164 AEU April 23 Reply Comments at 11-17.165 Vistra April 23 Reply Comments at 14.166 Antora April 23 Reply Comments at 6, 13-14-15.167 Vistra April 23 Reply Comments at 8, 28. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 44 Date Filed: 10/19/2026
PDF page 46
Docket No. EL25-49-000, et al.- 38 -
PJM contemplates.168 PPL notes that under Pennsylvania law, PPL cannot deny backup service properly requested under its General Tariff.169
77. Antora argues that the Commission should direct PJM to build out option 7 by developing a new non-capacity backed service offering that is available on both a permanent and transitional basis (as PJM’s option 7 is only transitional) to facilitate the integration of highly flexible, low load factor Co-Located Loads.170 Antora argues that offering non-capacity backed transmission service on a permanent basis would allow PJM to capture the benefits of co-located facilities, serving the same amount of total load at lower cost, with less transmission infrastructure and fewer capacity resources.
78. Constellation states it supports an interruptible transmission service assessed on net load to promote a more efficient use of the system’s existing headroom, resource adequacy benefits, and lower costs for customers.171 Constellation argues that allowing load to temporarily curtail consumption during peak periods would limit needed upgrades, arguing a study showed that a new load curtailment rate of just 0.5% annually would result in nearly 18 GW of potential new load integration in PJM without capacity expansion. Constellation states that an interruptible service should cease to be available once the upgrades are complete—not based on PJM’s assessment of resource adequacy as PJM suggests. NRDC states that it has concerns that the proposed no-capacity backup service could lead to unduly preferential results and argues it would be preferable to use existing demand products than invent new ones.172 Indicated Transmission Owners argue that if Co-Located Load wishes to be compensated for being interruptible, at the transmission level, such load must show why that outcome is the correct rate design and
168 PPL April 23 Reply Comments at 11.169 Id. (citing PPL Electric Utilities Corporation General Tariff, Rule 6, https://www.pplelectric.com/-/media/PPLElectric/At-Your-Service/Docs/Current- Electric-Tariff/rule6.pdf (providing for “[s]ervice to customers who have another source of power which can be substituted for Company’s service for any of customer's operations”); PPL Electric Utilities Corporation General Tariff, Rule 7, https://www.pplelectric.com/-/media/PPLElectric/At-Your-Service/Docs/Current- Electric-Tariff/rule7.pdf (providing for “[t]emporary service . . . for less than one year or for a year or more when Company must install facilities that will be used solely for a service that is known to be limited in duration.”)).170 Antora April 23 Reply Comments at 6-7, 13, 16-18.171 Constellation April 23 Reply Comments at 23-26, 56-57.172 NRDC April 23 Reply Comments at 5-6. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 45 Date Filed: 10/19/2026
PDF page 47
Docket No. EL25-49-000, et al.- 39 -
why the current demand response rules fail to adequately compensate load appropriately.173
ii. Other
79. Vistra states that it would be reasonable to create a penalty regime to address any unintended grid use by Co-Located Loads with protective schemes.174 Vistra explains that such a penalty would be conceptually similar to the unreserved use penalties that the Commission created in Order No. 890 that subject transmission customers to penalties for using transmission service that they did not reserve. Buckeye raises concerns with an annual single coincident peak (1 CP) transmission cost allocation, arguing that reduction in the load during a single hour after building the transmission infrastructure to serve that load will not reduce overall costs.175 Buckeye suggests a potential mechanism that should be considered to help mitigate unreasonable cost shifts is changing the 1 CP billing determinant to 12 coincident peaks (12 CP) or to one or more non-coincident peaks (NCP). Buckeye argues that moving to 12 CP may make it more difficult for large loads to shift costs to other wholesale customers and their retail members, but notes this would not address stranded costs.
80. Glatz and Silverman recommend the Commission explore the potential to develop a new level of non-firm or interruptible transmission service that prioritizes connection of new flexible loads, regardless of whether they are co-located with generation.176 Enchanted Rock supports a transitional non-firm service where the load relies on PJM to provide energy, but where the load is under a commitment to dispatch co-located generation during PJM curtailments.177 Under this option, Enchanted Rock maintains that the co-located facilities could be quickly interconnected and would only require curtailment in a small number of hours of a year, allowing more efficient use of generation resources and transmission capacity, lowering costs to customers, and buying time for new infrastructure to be built.
81. Constellation states Co-Located Loads should have three options: (1) a firm NITS option with the load paying based on either gross load or net load, depending on its configuration; (2) a generator-contingent option where Co-Located Load does not pay
173 Indicated Transmission Owners April 23 Reply Comments at 12.174 Vistra April 23 Reply Comments at 13, 25-26.175 Buckeye April 23 Reply Comments at 12.176 Glatz/Silverman April 23 Reply Comments at 12-13.177 Enchanted Rock April 23 Comments at 10-12. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 46 Date Filed: 10/19/2026
PDF page 48
Docket No. EL25-49-000, et al.- 40 -
NITS but pays for any necessary upgrades and could pay a discounted transmission charge for as-available energy purchases, if any; and (3) an interruptible transmission option—lasting until network upgrades are completed—where Co-Located Load pays a discounted transmission charge reflecting its inferior service.178 Constellation proposes that, regarding the generator-contingent option, it would be reasonable to provide as-available energy at the locational marginal price plus a discounted transmission charge because, while energy would be drawn from the grid, it would only be “as-available” when it is not adding any burden to the transmission system and the load would not need to be planned for reliability or resource adequacy.
82. Indicated Transmission Owners oppose Constellation’s proposal, arguing that a discounted transmission rate for Co-Located Load only taking energy from the transmission system on an as-available basis would be unduly discriminatory because transmission rates are charged to all other customers based on full embedded costs, regardless of whether they take energy during peak times.179 Indicated Transmission Owners also argue that allowing certain customers with bundled load and generation to choose their own level of transmission service outside of NITS would be a departure from NERC Reliability Standards FAC-002-2 and TPL-001-5. Finally, Indicated Transmission Owners’ affiant argues a flexible bundled interconnection framework is a new concept. Constellation opposes Indicated Transmission Owners’ claims about NERC violations and Constellation emphasizes that it does not oppose studies of Co-Located Load, consistent with Reliability Standard FAC-002-2.180
83. California Utilities state that, if PJM permits netting of load for transmission service, one option for cost allocation would be to require the Co-Located Load to pay for retail stand-by transmission service.181 Joint Consumer Advocates argue that forms of service tailored to specific Co-Located Load will lead to litigation that will further muddy the regulatory waters.182 Invenergy asserts that while new comprehensive rules are developed, PJM should implement a transition process so that large loads customers can move forward with Co-Location Arrangements in the short-term.183 Specifically,
178 Constellation April 23 Reply Comments at 37-38, 51.179 Indicated Transmission Owners June 3 Answer at 20-21 (citing Powers Declaration at PP 7, 25-29). 180 Constellation June 12 Answer at 6.181 California Utilities April 23 Reply Comments at 9.182 Joint Consumer Advocates April 23 Reply Comments at 7.183 Invenergy April 23 Reply Comments at 7. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 47 Date Filed: 10/19/2026
PDF page 49
Docket No. EL25-49-000, et al.- 41 -
Invenergy suggests that large-load customers should be allowed to pursue behind-the-meter configurations with new generating facilities without being considered Network Load.
e. Ancillary Services
84. Several parties argue that any ancillary services charges assessed to Co-Located Load must be based on the extent to which Co-Located Loads use ancillary services.184 Market Monitor argues that co-location allows large loads to avoid ancillary service charges.185 Several commenters argue that Co-Located Load configurations either benefit from the provision of or contribute to the need for certain ancillary services and other services, including load balancing, reactive compensation, frequency response, voltage control, regulation, and black start service.186
85. NREMC argues that Co-Located Load benefits from the full range of ancillary services since both transmission and distribution operators depend on ancillary services to maintain grid reliability, stability, and power quality.187 California Utilities argue that generators synchronized to the grid serving Co-Located Load should pay ancillary service costs because they are not fully isolated, use ancillary services, and benefit from reliability and recovery services such as spinning reserve.188 UCS states that load variability from data centers can create imbalances more quickly than generators can correct them, resulting in voltage disturbances, thermal overloads, and stability issues,
184 See OPSI April 23 Reply Comments at 4; Pennsylvania Commission April 22 Reply Comments at 5; Talen April 23 Reply Comments at 13; ACEG April 23 Reply Comments at 2.185 Market Monitor April 23 Reply Comments at 4.186 See Pennsylvania Commission April 22 Reply Comments at 4-5; California Utilities Reply Comments at 8-9; UCS April 11 Reply Comments at 14, 15 n.42 (citing Kyle Hannah of Dominion Energy Inc., Pre-Conference Statement, Docket No. AD24-11-000 (filed Nov. 1, 2024)); ENGIE April 23 Reply Comments at 7; NREMC April 23 Reply Comments at 7; NOVEC April 23 Reply Comments at 9-10; PIOs April 23 Reply Comments at 25; ACEG April 23 Reply Comments at 2; California Utilities April 23 Reply Comments at 8-9; Buckeye April 23 Reply Comments at 8; AEU April 23 Reply Comments at 19; ELCON April 23 Reply Comments at 7.187 NREMC April 23 Reply Comments at 7.188 California Utilities April 23 Reply Comments at 8. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 48 Date Filed: 10/19/2026
PDF page 50
Docket No. EL25-49-000, et al.- 42 -
which can be mitigated by ancillary services.189 UCS states that Co-Location Arrangements benefit from essential reliability services including short-circuit fault current and system inertia. ACEG contends that if Co-Located Loads avoid their share of system costs while relying on that system in emergencies, or even just for stability, such reliance would undermine cost causation principles and unfairly shift costs onto other ratepayers.190 Mainspring argues that black start and ancillary service cost allocation will vary by technology type as some generators can provide ancillary services others cannot.191
86. NOVEC argues that the grid necessarily responds to all power-quality issues, including but not limited to frequency response, reactive needs, transient issues, and voltage control.192 NOVEC contends that Co-Located Load is akin to “parasitic load” because the transmission grid cannot differentiate between energy that is injected into the market and energy that is injected to serve Co-Located Load. Additionally, NOVEC argues that nuclear powered generation units are not operated as flexible or partially loaded assets but instead operate at full load between fueling cycles to maximize the value of their fuel rods and therefore, nuclear powered generation assets depend upon other generators on the grid to provide all ancillary service and other power-quality needs.
87. California Utilities argue it is up to the generator to decide how or whether to pass ancillary and black start service costs onto Co-Located Load.193 Talen states that while it continues to believe Co-Located Load should not pay for services it is not using, in the interest of compromise, Talen supports the load paying for certain ancillary services.194
88. Constellation argues that, while there may be some benefit to Co-Located Load for some ancillary services provided to the interconnected generator, a universal requirement for every Co-Located Load to pay for all ancillary services is unjust and unreasonable and unduly discriminatory and preferential.195 Constellation acknowledges, for example,
189 UCS April 11 Reply Comments at 13-15.190 ACEG April 23 Reply Comments at 2.191 Mainspring April 23 Reply Comments at 9.192 NOVEC April 23 Reply Comments at 9-10.193 California Utilities April 23 Reply Comments at 8-9.194 Talen April 23 Reply Comments at 13.195 Constellation April 23 Reply Comments at 34, 48, 85-86. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 49 Date Filed: 10/19/2026
PDF page 51
Docket No. EL25-49-000, et al.- 43 -
that Co-Location Arrangements drawing energy from the system benefit from ancillary services and black start, but argues the generator relies on the service, not the load, and current Commission policy does not support charging generators for ancillary services.
89. Vistra requests that the Commission create a new rate design to ensure that Co-Located Load that is not Network Load pays only for ancillary services that they use.196 However, Vistra argues that PJM has not provided analysis of which ancillary services benefit Co-Located Load. As an example, Vistra offers that variances in the Co-Located Load could be viewed as related to the need for regulation service.
90. Vistra argues that ongoing charges for reactive power supply and black start service should not be assessed to Co-Located Load, however.197 Vistra argues that “the ability to isolate large loads so they cannot draw power from the system would act to sectionalize the grid and make black start more manageable.”198 AEU argues Co-Located Loads should be compensated for any ancillary services their connections provide.199
E. Interconnection Procedures and Cost Allocation
1. PJM’s March 24 Response
91. PJM states that the necessary study process is among several studies it may employ to evaluate Co-Location Arrangements, depending upon the type of co-location arrangement.200 PJM explains that it does not have a tariffed study process for non-Network Load located behind a generator’s point of interconnection. PJM explains that its necessary studies process is designed to evaluate the potential reliability impact of a proposed addition or reduction of a Co-Located Load configuration on the PJM Transmission System.201 PJM explains that the scope of the study addresses generation deliverability, N-1 and N-1-1 thermal and voltage studies, special protection systems review, baseline stability, and, if applicable, a nuclear plant interface requirements voltage analysis.
196 Vistra April 23 Reply Comments at 8, 26-27.197 Id. at 27-28.198 Id. at 28 (quoting Shanker Aff. ¶ 66).199 AEU April 23 Reply Comments at 19.200 PJM March 24 Response at 47-49.201 Id. at 48-50. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 50 Date Filed: 10/19/2026
PDF page 52
Docket No. EL25-49-000, et al.- 44 -
92. PJM explains that load studies currently are performed only through the traditional retail load integration processes. PJM commits, however, to exploring opportunities to enhance the visibility of the necessary study process and results where Co-Located Load is not Network Load. PJM notes that a deactivation study, unlike the necessary study, would not be appropriate for Co-Location Arrangements because deactivation studies are designed for the complete cessation of operations by a generator.
93. PJM states that its current necessary study process allows a co-location arrangement to demonstrate its capability to flexibly adjust its withdrawals from or injections to the transmission system.202 PJM clarifies that Co-Located Load configurations usually are modeled as if they never take power from the grid -that this “always on” load is modeled as offsetting the net output of a generator. PJM adds that if the result of this study indicates a thermal or voltage violation, the generator must mitigate the violation before the load can be added.
94. PJM states that, under certain Co-Location Arrangements, it is possible that the generation owner could propose a special protection scheme or Remedial Action Scheme to reduce the load under certain conditions.203 PJM states that, if such a configuration were permitted by the Commission, PJM would require language similar to the protection facilities language proposed in the most-recently filed Susquehanna ISA. PJM asserts that, if and where such facilities might misoperate, additional new language should be developed to require the generator to take immediate steps to stop the flow of energy from the grid to any co-located load or risk breach and non-compliance (given the absence of contractual privity between and among PJM, the Transmission Owner, and the Co-Located Load in certain situations).
95. PJM states that it conducts dynamic studies for Co-Located Load projects, which evaluate all applicable NERC, PJM, and transmission owner-specific contingencies and criteria.204 PJM notes that it also assesses the impact of the ramping behaviors of large loads, generally, and the stability impact of large Co-Located Loads, specifically.
96. PJM states that it would not support creating an additional interconnection queue for Co-Located Load because the necessary study process is capable of incorporating and evaluating the impact of Co-Location Arrangements.205202 Id. at 51-52.203 Id. at 52.204 Id. at 53.205 Id. at 56. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 51 Date Filed: 10/19/2026
PDF page 53
Docket No. EL25-49-000, et al.- 45 -
2. Transmission Owners’ March 24 Responses
97. Indicated Transmission Owners state that the necessary study process, together with other studies, including the individual transmission owners’ studies, “are designed to ensure appropriate evaluation of, among other things, generator interconnections, modifications, and retirements and load additions.”206 Indicated Transmission Owners explain that these studies are typically compatible with retail load addition studies and can be coordinated. Indicated Transmission Owners argue that these studies are collectively sufficient and that a separate study process for Co-Located Load is not necessary or appropriate.
98. Indicated Transmission Owners explain that it would not be appropriate for the necessary study process to include a “flexibility” analysis because whether a Co-Location Arrangement is capable of being flexible does not guarantee how the end-use load or generator will operate in real time.207 Indicated Transmission Owners state that, “[i]n the absence of a state law or retail tariff allowing for a more durable commitment, any contractual commitment by end-use load to interrupt its operations or its use of retail electric service will at best be limited to the current contracting party.”208 However, Indicated Transmission Owners note, known flexibility should be captured in PJM’s large load forecast.
99. Indicated Transmission Owners state that the existing queue process is sufficient to study the interconnection of generation and that all load and generation seeking to interconnect should go through the established processes, as they can operate independently.209206 Indicated Transmission Owners March 24 Response, attach. A at 12-13.207 Id.208 Id.209 Id., attach. A at 16. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 52 Date Filed: 10/19/2026
PDF page 54
Docket No. EL25-49-000, et al.- 46 -
3. Reply Comments
a. Interconnection Procedures
i. Expedited Process & Joint Queue
100.
Several parties generally support creating a separate process in PJM for expediting the interconnection of new generation to serve Co-Located Load,210 such as a joint review process for large load and generation.211 ENGIE and Enchanted Rock note challenges with having different studies for generation and load, including potential mismatching of the time when the load and the generation come online, mismatches in the lifetime of the load versus the lifetime of the generation, and variances of operational characteristics.212 Enchanted Rock also argues that generation interconnection study processes and queues do not adequately recognize the benefits Co-Location Arrangements can provide.213 BrightNight, Invenergy, EDFR, and ENGIE recommend that the Commission and PJM explore studying Co-Location Arrangements based on the net impact on the grid.214 101.
Invenergy proposes studying large loads over 50 MW or interconnecting to facilities at voltages greater than 115 kV along with generation and argues that this would more efficiently use the transmission system, decrease ratepayer costs, promote transparency, ensure that network upgrades reflect the expected topology of the system, and address a number of concerns raised in the Show Cause Order.215210 See SEIA April 23 Reply Comments at 2; BrightNight April 23 Reply Comments at 9; Chevron April 23 Reply Comments at 7; AEU April 23 Reply Comments at 19-21.211 See ENGIE April 23 Reply Comments 8; Invenergy April 23 Reply Comments at 3; EDFR April 23 Reply Comments at 7.212 ENGIE April 23 Reply Comments at 8; Enchanted Rock April 23 Reply Comments at 14.213 Enchanted Rock April 23 Reply Comments at 15.214 See ENGIE April 23 Reply Comments at 8; BrightNight April 23 Reply Comments at 9; Invenergy April 23 Reply Comments at 5-6; EDFR April 23 Reply Comments at 7, 9.215 Invenergy April 23 Reply Comments at 3-5. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 53 Date Filed: 10/19/2026
PDF page 55
Docket No. EL25-49-000, et al.- 47 -
102.
BrightNight states that an expedited process for generation serving Co-Located Load would incentivize Co-Located Load to bring its own generation.216 BrightNight suggests using the surplus interconnection process to screen for material impacts and, if found, shifting the request into the normal interconnection process. Chevron argues that a separate expedited interconnection process for Co-Located Load is required to support AI data centers as part of the declared emergency processes and national security policy of the United States.217 Consumers’ Research states that if Co-Located Load uses dispatchable fossil fuels, it should be moved ahead in the interconnection queue because it can increase grid reliability.218 EDFR states that the Commission should encourage PJM and other Independent System Operators to develop an expedited process for controllable load to interconnect and economically dispatch in the wholesale market, or to participate as voluntary load shed resources.
103.
Several parties support PJM’s option 6 specifically.219 Market Monitor states that it supports an expedited interconnection process for load and matching new generation that is consistent with PJM’s queue process so long as the load is connected to the grid directly and the new generation resource becomes a Capacity Resource. Ohio FEA explains this could mitigate both local grid impacts and regional resource adequacy concerns. AEU argues that allowing large loads to bring their own new generation would address the root causes of co-location while reducing the new load’s impact on resource adequacy.
104.
PPL generally supports PJM’s option 6, but notes that the option appears to be independent from questions around Co-Located Load.220 Enchanted Rock argues that, to the extent that the Commission directs PJM to implement option 6, load co-located with dispatchable generation projects should also be permitted to participate.221 SEIA asks the Commission to direct PJM to modify option 6 to implement an expedited co-located interconnection process, separate from the queue, to determine whether the
216 BrightNight April 23 Reply Comments at 9.217 Chevron April 23 Reply Comments at 7.218 Consumers’ Research April 23 Reply Comment at 4.219 See Mainspring April 23 Reply Comments at 11; Market Monitor April 23 Reply Comments at 11; PPL April 23 Reply Comments at 13; Buckeye April 23 Reply Comments at 9; Ohio FEA April 23 Reply Comments at 4-5; Exus May 15 Reply Comments at 1; AEU April 23 Reply Comments at 14.220 PPL April 23 Reply Comments at 13.221 Enchanted Rock April 23 Comments at 15. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 54 Date Filed: 10/19/2026
PDF page 56
Docket No. EL25-49-000, et al.- 48 -
interconnection request for the co-located generation would require new network upgrades.222 SEIA suggests that this process would be analogous to surplus interconnection service and that there would be no queue jumping because the co-located resources would not be competing for network upgrades. SEIA argues that such service is beneficial as it may help prevent transmission system overbuild and would help address issues of supply and demand.
105.
Other parties oppose PJM’s option 6.223 Bloom argues that PJM’s proposal to offer incentives for faster interconnection when the load is Network Load is too narrow. Bloom also asserts that a requirement that a generator with Co-Located Load be a Capacity Resource appears to mandate that the generator enter into a financial contract with Co-Located Load and may undermine resource adequacy goals by disincentivizing load seeking only physical arrangements. Bloom proposes an alternative to PJM’s option 6 to adopt reforms to interconnect generation and Co-Located Load (both new) as a composite facility called an “energy park,” instead of studying the load in one process and the generation in another.224
106.
Constellation asserts that PJM’s option 6 is discriminatory against existing generation because it is functionally equivalent to an out-of-market payment or subsidy that depresses market economics for all other resources.225 Glatz and Silverman also question why PJM’s option 6 should provide a preference to large load customers over customers aiming to meet other objectives, like clean energy commitments.226 Invenergy asserts that Co-Location Arrangements should not get priority access to available transmission system headroom, or deprive PJM of the resources needed to process the interconnection queue, in keeping with the Commission’s long-standing policy against queue jumping.227 Constellation also argues it will lead to reduced new entry outside of the large load contract path and restrict the right to integrate with the system to only those
222 SEIA April 23 Reply Comments at 10-11. 223 See e.g., Bloom April 23 Reply Comments at 8; Constellation April 23 Reply Comments at 52; NRDC April 23 Reply Comments at 3-4.224 Bloom April 23 Reply Comments at 2, 10.225 Constellation April 23 Reply Comments at 52 (citing Patterson Aff. ¶ 40).226 Glatz/Silverman April 23 Reply Comments at 8-9.227 Invenergy April 23 Reply Comments at 6. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 55 Date Filed: 10/19/2026
PDF page 57
Docket No. EL25-49-000, et al.- 49 -
loads that bring their own generation. In addition, Constellation states that this option may create perverse incentives for existing generators to retire.228 107.
CATF states that the Commission must require large loads with co-located generation (such as data centers) to follow the same interconnection requirements of Order No. 2023 and Order No. 1920.229 PIOs argue that the Commission should reject proposals to allow generators seeking Co-Location Arrangements to access special, expedited interconnection pathways, because this would run counter to Order No. 2023 and Commission precedent, offer unduly preferential terms and conditions to a select set of entities, and come at the expense of the significantly backlogged interconnection process.230 NRDC states that PJM’s proposal could erode open access principles as this would be dividing what types of load can get this qualified access.231 Glatz and Silverman argue it is unclear whether option 6 would interconnect generation faster than the current interconnection queue.232 United States Senators argue that the Commission should not support arguments that large fossil fuel generators can jump the interconnection queue because of data center demand projections.233
ii. Study Processes
108.
Some parties argue that PJM’s necessary study process remains just and reasonable. Constellation asserts that the necessary study process evaluates system-wide reinforcements and provides transparency and predictability into the development of Co-Location Arrangements. 234 Constellation and Vistra support adding clarifying
228 Glatz/Silverman April 23 Reply Comments at 8-9. 229 CATF April 25 Reply Comments at 16.230 PIOs April 23 Reply Comments at 28-30 (citing Midcontinent Indep. Sys. Operator, Inc., 186 FERC ¶ 61,054, at P 17 (2024); Order No. 2003, 104 FERC 61,103 at P 12; Improvements to Generator Interconnection Procs. & Agreements, Order No. 2023, 184 FERC ¶ 61,054, at PP 4, 5, 177, order on reh’g, 185 FERC ¶ 61,063 (2023), order on reh’g, Order No. 2023-A, 186 FERC ¶ 61,199, errata notice, 188 FERC ¶ 61,134 (2024)).231 NRDC April 23 Reply Comments at 3-4.232 Glatz/Silverman April 23 Reply Comments at 8.233 United States Senators November 25 Letter at 2. 234 Constellation April 23 Reply Comments at 47, 62-63, 94-95. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 56 Date Filed: 10/19/2026
PDF page 58
Docket No. EL25-49-000, et al.- 50 -
language to the Tariff of the obligation of transmission owners to cooperate and provide timely feedback on the necessary studies.235
109.
On the other hand, several parties express concern that the necessary study process is not adequate or appropriate to study Co-Location Arrangements.236 Antora argues that studying co-location using PJM’s necessary study process offers a significant efficiency advantage over studying load separately from the co-located generation, as it assesses the electrical impacts of proposed new generation and load in a single interconnection process. However, Antora argues that the existing process is inadequate, because the Tariff’s study procedures lack the necessary detail to inform customers such as Antora how their charging loads will be studied and confirm that the loads’ flexibility will be accounted for. PIOs argue that the necessary study “may not be fully capturing the transmission system impacts of co-locating load,” and thus could result in Co-Location Arrangements with already-operational generators, “not paying the costs of network upgrades that would be caused by the co-location.”237 Similarly, Market Monitor also argues that necessary study agreements miss the most fundamental issues associated with co-location. PIOs argue that the necessary studies process was designed for studying potential impacts from more minor, routine changes to the electrical characteristics of existing generating units previously studied by PJM and is a poor fit for the more significant nature of an existing generator entering into a Co-Location Arrangement for all or most of its energy production. PIOs argue that PJM has not allowed the addition of battery storage to existing generation to go through the necessary study process, in large part because batteries can act as load. PIOs argue that PJM offers no explanation for why Co-Located Load is thus offered preferential treatment.
110.
PIOs state that PJM defends the necessary study process for studying co-location with an existing generator by explaining that other study processes are also used; however, PIOs argue that each of the other studies that PJM identifies pass costs to broader sections of load, not the large load customer(s) causing the need for the upgrades.238 PIOs argue that the necessary study process is the only process that PJM uses to identify the direct interconnection-related cost responsibility of co-locating large
235 Id. at 89; Vistra April 23 Reply Comments at 33-34.236 Glatz/Silverman April 23 Reply Comments at 7; PIOs April 23 Reply Comments at 9-10, 14; OPSI April 23 Reply Comments at 3; RMI April 23 Reply Comments at 3-4; Market Monitor April 23 Reply Comments at 9; Antora April 23 Reply Comments at 7-8.237 PIOs April 23 Reply Comments at 9 (citing Show Cause Order, 190 FERC ¶ 61,115 at P 79).238 Id. at 10-11. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 57 Date Filed: 10/19/2026
PDF page 59
Docket No. EL25-49-000, et al.- 51 -
load with an existing generator, and it fails to do so with appropriate accuracy. RMI states that PJM’s necessary study process is not adequate because it does not assess the protection system that would prevent the load from using the transmission system.239 111.
Glatz and Silverman argue that a generator’s reduction in Capacity
Interconnection Rights (CIR) is effectively a partial deactivation and that evaluating such changes without a deactivation study appears to be a means to avoid review by the Market Monitor, as such CIR reductions can affect market outcomes.240 Glatz and Silverman also maintain that, when CIRs are removed from the system, the existing load must still be served and the generation to serve that load may require new network upgrades. Glatz and Silverman also charge that any system capacity potentially available due to a reduction in CIRs becomes unavailable if studied in concert with a behind-the-meter load addition.
112.
Ohio FEA also notes that Co-Location Arrangements that propose to take existing generation off the system have broad implications because they would change the power flow across the transmission system and affect the mix of resources available to participate in PJM’s energy and capacity markets and should be subject to a robust analysis before they are allowed to proceed.241
113.
Several parties argue that the necessary study process lacks transparency.242 OPSI emphasizes that modifications are privately negotiated and under non-disclosure agreements.243 OPSI also states that these arrangements avoid a comprehensive reliability analysis because the necessary study process was developed to study modifications to existing generating units, not the addition of large Co-Located Loads that are sometimes as large as metropolitan areas. PIOs argue the opaque process prevents ratepayer advocates from effectively challenging the prudence of transmission investments and cost allocation at either the federal or the state level. 114.
Pennsylvania Commission states that PJM’s necessary study process must be revised to provide more information to regulators at the initial stage of the generation
239 RMI April 24 Reply Comments at 3-4.240 Glatz/Silverman April 23 Reply Comments at 8.241 Ohio FEA April 23 Reply Comments at 4.242 Glatz/Silverman April 23 Reply Comments at 7; OPSI April 23 Reply Comments at 3; PIOs April 23 Reply Comments at 9, 14; Pennsylvania Commission April 22 Reply Comments at 7.243 OPSI April 23 Reply Comments at 3; PIOs April 23 Comments at 11, 15. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 58 Date Filed: 10/19/2026
PDF page 60
Docket No. EL25-49-000, et al.- 52 -
interconnection process because, sometimes when Co-Located Load comes online, the first time a state regulator hears about it is when the arrangement is filed with the Commission, unlike with generation retirement, even though they can have the same effects.244 Glatz and Silverman note that Indicated Transmission Owners mentioned that the necessary study process is conducted “together with other studies and analysis” but these other studies and analyses are not spelled out, nor is there transparency for consumers.245
115.
Several parties ask the Commission for further clarity on how Co-Location Arrangements will be studied and how those studies will be evaluated.246 AEU contends there must be a level of uniformity and detail outlining study requirements to ensure regulatory certainty for large loads and new generation and storage resources seeking to serve large loads.247 Glatz and Silverman recommend the Commission adopt a principle of “comparability” to ensure that new Co-Location Arrangements go through a study process comparable in terms of timing and cost responsibility to a new load locating in front of the meter.248
116.
Regarding PJM’s current load interconnection process, Invenergy asserts that Attachment M-3 was designed for supplemental transmission projects, not load interconnection, and is not suitable for large load interconnection.249 EDFR asks the Commission to provide guidance to PJM and other Regional Transmission Organization or Independent System Operator (RTO/ISO) and non-RTO/ISO regions for developing a standardized and transparent load interconnection process at the federal level.250 117.
Vistra explains that transmission owner load integration studies “live in a regulatory gap,” because the studies, processes, and facilities associated with those interconnections are not currently subject to Commission regulation or oversight, despite
244 Pennsylvania Commission April 22 Reply Comments at 7.245 Glatz/Silverman April 23 Reply Comments at 7 (citing Indicated Transmission Owners March 24 Response, attach. A at 12).246 AEU April 23 Reply Comments at 19; Glatz/Silverman April 23 Reply Comments at 6.247 AEU April 23 Reply Comments at 19.248 Glatz/Silverman April 23 Reply Comments at 6.249 Invenergy April 23 Reply Comments at 3-4.250 EDFR April 23 Reply Comments at 6. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 59 Date Filed: 10/19/2026
PDF page 61
Docket No. EL25-49-000, et al.- 53 -
the fact that these configurations involve interconnections directly to the transmission system.251 Vistra argues that the Commission has jurisdiction to close this regulatory gap because the Commission has jurisdiction when load interconnects to the transmission system in interstate commerce based on its exclusive authority over interstate transmission, just as the Commission regulates the terms of generation interconnections to the transmission system. Vistra states that the Commission should consider commencing a separate proceeding to explore the issue of front-of-the-meter load interconnection practices. Vistra argues that the Commission should exercise its authority over load interconnection to the transmission system to prevent undue discrimination and ensure that interconnection service is provided in a just and reasonable manner, perhaps by issuing a notice of inquiry on this issue.
118.
Data Center Coalition recommends that the Commission direct PJM to enhance visibility into the relationship between new large loads and the transmission upgrades that support them by requiring: (1) disclosure of load linkages for Supplemental Projects, and
(2) confirmation that loads driving Supplemental Projects have already been incorporated into PJM’s load forecast.252
119.
Market Monitor argues for complete transparency in PJM’s planning on the load side.253 Market Monitor requests that the PJM planning process be modified to integrate transmission planning with markets planning to eliminate major gaps. Market Monitor argues that PJM must have the authority to plan to meet large load additions as it does for generation additions.
iii. Changes to Pro Forma Interconnection Procedures
120.
Several parties request that the Commission modify the pro forma generator interconnection procedures and ISA. BrightNight states that at a minimum the pro forma process and agreement should allow for three configurations: (1) load and generation fully islanded from the electric grid, with no services from the grid; (2) flexible loads or demand response loads; and (3) loads that require backup service (e.g., behind-the-meter generation).254 Glatz and Silverman propose a new pro forma process for co-location.255 Vistra requests that the Commission modify the pro forma ISA to include a co-location
251 Vistra April 23 Reply Comments at 14-15, 36-39.252 Data Center Coalition April 23 Reply Comments at 11-12.253 Market Monitor April 23 Reply Comments at 7-9.254 BrightNight April 23 Reply Comments at 7.255 Glatz/Silverman April 23 Reply Comments at 9. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 60 Date Filed: 10/19/2026
PDF page 62
Docket No. EL25-49-000, et al.- 54 -
section that will govern the applicable data exchange and coordination requirements and formalize any requirements regarding applicable protective schemes.256 Vistra argues that, in addition to the items highlighted by PJM in its response, the pro forma ISA must include (1) details about coordinating the use of a secondary backup generator and (2) a process relating to the treatment of the generator’s CIRs.
b. Cost Allocation
121.
Center refers to a Harvard Law School report stating that utilities are socializing the costs of data center booms by: (1) entering into special contracts; (2) taking advantage of discrepancies between federal and state regulations over cost allocation; and
(3) relying on co-location agreements.257 Center points out that quick moves to accommodate this load growth may result in residential customers shouldering infrastructure costs that are not ultimately needed. ELCON states that the Commission should ensure that regulatory authorities consider the long-term impacts of new large load projects in allocating network upgrade costs to protect non-large load ratepayers from paying the generation and transmission costs to serve large load even after initial electric service agreement terms expire.258
122.
Glatz and Silverman argue that the Commission should address the risk of stranded transmission investment associated with co-location where load does not materialize, particularly as all of PJM’s proposed solutions socialize transmission costs, often spreading costs over multiple jurisdictions.259 Glatz and Silverman urge the Commission to ensure that any tariff changes account for the potential that data center load does not materialize and collaborate with states to manage this risk. Glatz and Silverman suggest that the Commission consider imposing “take-or-pay” structures for new large loads triggering transmission upgrades and backed by financial security postings.260 Consumers’ Research states that retail customers should not bear any of the
256 Vistra April 23 Reply Comments at 8, 29.257 Center April 23 Reply Comments at 22 (citing Eliza Martin and Ari Peskoe, Extracting Profits from the Public: How Utility Ratepayers Are paying for Big Tech’s Power, Environmental & Energy Law Program, Harvard Law School, (Mar. 2025), https://eelp.law.harvard.edu/extracting-profits-from-the-public-how-utility-ratepayers- are-paying-for-big-techspower); id. at 25-26.258 ELCON April 23 Reply Comments at 7.259 Glatz/Silverman April 23 Reply Comments at 11-12.260 Id. (indicating such structures are comparable to those debated in a proceeding before the Ohio Public Utilities Commission). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 61 Date Filed: 10/19/2026
PDF page 63
Docket No. EL25-49-000, et al.- 55 -
risks of co-location, e.g., the costs for the infrastructure not being recovered or the ability to access reliable power, and suggest long-term financial commitments, take-or-pay clauses, and paying for the development of additional reliable generation as a way to mitigate this risk.261 Consumers’ Research also states that Co-Location Arrangements should be transparent to the public to protect and inform customers.
123.
Buckeye argues that the Commission should consider requiring the LSE that is driving the transmission investment (i.e., the LSE in whose service territory the retail large load is locating) to be responsible for any cost-shifting caused by large loads that do not show up as expected, thereby covering the costs of transmission investments caused by their retail load.262 Buckeye states that the LSE with the large new load should be the entity that receives this price signal, because it has a retail relationship with the large load that creates the potential for stranded transmission investment and is therefore able to pass the stranded cost responsibility to that retail load. Buckeye argues that any costs collected under such retail arrangements should be credited to the wholesale transmission revenue requirement to ensure that any stranded transmission costs associated with such large loads are not shifted to other LSEs in the zone.
124.
Parties advocate that costs assigned for network upgrades required to
accommodate Co-Located Load should be consistent with cost causation principles.263 For example, ELCON states that, according to cost causation, if a large consumer in any co-location configuration impacts electricity flows on the grid either through adding to congestion, creating voltage or frequency instability, or impacting access to generation, and such impacts require upgrades to the distribution or transmission system, those costs should be allocated to that large consumer.264 Vistra requests that the Commission ensure that Co-Location Arrangements pay their fair share, including by allocating the costs of upgrades identified in the necessary study process to the generator.265 Consumers’
261 Consumers’ Research April 23 Reply Comments at 2-3, 5.262 Buckeye April 23 Reply Comments at 12.263 Data Center Coalition April 23 Reply Comments at 4; ELCON April 23 Reply Comments at 7; Vistra April 23 Reply Comments at 8; PIOs April 23 Reply Comments at 12.264 ELCON April 23 Reply Comments at 7.265 Vistra April 23 Reply Comments at 8. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 62 Date Filed: 10/19/2026
PDF page 64
Docket No. EL25-49-000, et al.- 56 -
Research states that to avoid improper subsidization the direct and indirect costs of Co-Located Load need to be considered, including any needed infrastructure upgrades.266 125.
Pennsylvania Commission states that PJM should revisit the potential direct cost allocation of transmission network upgrade costs for large load and should consider how zonal disparities in congestion and resource adequacy impact network upgrade costs.267 PIOs similarly argue that PJM’s existing Tariff fails to ensure that Co-Location Arrangements pay their fair share of upgrade costs, which is unjust and unreasonable.268 PIOs note that when a Transmission Owner Load Integration Study identifies Supplemental Projects that resolve local transmission reliability needs, the costs are allocated not just to the large load customer that triggered the local transmission reliability need, but to the transmission owner’s entire local utility footprint in that zone. PIOs argue that despite this cost allocation, there is no guarantee that these projects provide greater system benefits. PIOs argue that the transmission upgrades required to reliably integrate Co-Location Arrangements are differently situated from transmission upgrades required to reliably deactivate uneconomic generation (the costs of which are also socialized to load) and thus should be treated differently. PIOs state that while only the remaining load—not the deactivating generator—would utilize the transmission upgrades associated with retirements, Co-Located Load will continue to rely on, and benefit greatly from, such upgrades. PIOs argue that many early examples of transmission upgrades driven by data center loads have not led to system benefits, but rather, only provide the benefit of allowing the large load to operate—disproportionately benefiting the Co-Location Arrangement.
F. PJM Capacity Market, Reliability, and Resource Adequacy
1. PJM’s March 24 Response
126.
PJM states that it does not believe that any changes to capacity market rules are necessary to accommodate Co-Location Arrangements.269 PJM explains that three of its proposed co-location options (PJM options 6, 7, and 8) address resource adequacy considerations. PJM adds that it is exploring with regulators and generators opportunities
266 Consumers’ Research April 23 Reply Comments at 2.267 For example, Pennsylvania Commission notes that the retirement of a generation resource to serve a single co-located customer may necessitate vastly different transmission upgrade plans with significant cost implications for customers to whom those costs may be allocated.268 PIOs April 23 Reply Comments at 8, 12-13.269 PJM March 24 Response at 57, 62-63. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 63 Date Filed: 10/19/2026
PDF page 65
Docket No. EL25-49-000, et al.- 57 -
to leverage at least 50 hours (or more) of diesel back-up generator service to enhance the available demand response portfolio. PJM also points to other ongoing efforts, including the transition to a new interconnection process and implementation of the Reliability Resource Initiative.
127.
PJM notes that, to the extent resources request removal from Capacity Resource status to serve non-PJM load, such requests will only be granted if Market Monitor approves it and PJM agrees, or if the Commission issues an order as such.270 PJM adds that, to the extent PJM determines that a Co-Location Arrangement would result in transmission reliability issues, upgrades would have to be funded and constructed. 128.
PJM states that there may be opportunities to clarify or enhance existing planning processes.271 PJM states that one such opportunity includes addressing risks that arise based on the existing load forecasting process since, given the potential size of these large load additions in the forecasts, uncertainty with respect to whether the large loads are actually added to the system could cause either overbuild or under-build to occur based on a single customer addition. PJM states that if Co-Located Load is not Network Load, questions arise as to how requirements for visibility and control of the Co-Located Load configuration are applied since the third-party load would not be a signatory to interconnection agreements. PJM states that the ISA and other governing documents may need to be revised to ensure that the overall system will continue to operate reliably as designed or as imposed by any temporary operational conditions on the system, including, for example, the non-conforming provisions included in the Susquehanna ISA.
2. Transmission Owners’ March 24 Responses
129.
Indicated Transmission Owners state that if Co-Located Load is required to take either NITS or PTPS, no changes to the capacity market rules, energy market rules, or planning and load forecasting processes are necessary.272 Indicated Transmission Owners note that if a Co-Located Load is not metered, it can create an emergency if it appears on the system unexpectedly. AES Ohio urges PJM to consider whether the forecast frequency and load addition certainty are adequate given the pace of large load additions.273 AES Ohio argues that PJM should be required to advise stakeholders if it
270 Id. at 58-59, 63-65.271 Id. at 60-62, 65-66.272 Indicated Transmission Owners March 24 Response, attach. A at 17-19; see also AES Ohio March 24 Response at 12-13.273 AES Ohio March 24 Response at 13. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 64 Date Filed: 10/19/2026
PDF page 66
Docket No. EL25-49-000, et al.- 58 -
reasonably expects to serve all load, including Co-Located Load, reliably, particularly in periods of rapid load growth.
3. Reply Comments
130.
Market Monitor argues that there should be no artificial incentives or changes to fundamental capacity market rules that allow preferential treatment of large loads.274 OPSI states that Capacity Resources cannot prioritize serving non-PJM load, even as backup, without undermining system reliability and that sellers should not be allowed to choose between fulfilling PJM obligations or facing penalties.275 Vistra similarly states that resources that are committed to providing primary service to a Co-Located Load should not also sell that same capacity to PJM.276 NOVEC states that the lack of supply arising from congestion in the interconnection queue, failures to act on existing interconnection approvals, and retiring thermal generation are the collective impetus for the interest in Co-Located Load, but those supply problems affect all load, and it is discriminatory to afford some load a lifeboat in the form of co-location while the remaining load must address the consequences made worse by that lifeboat.277 131.
Pennsylvania Commission states that PJM’s Tariff may not provide sufficient visibility into Co-Located Load’s potential impacts on reliability and resource adequacy when generation is removed from the grid.278 Delaware Commission states that the existing Tariff will likely not maintain resource adequacy and reliability.279 Delaware Commission adds that the failure to adequately plan for and address resource adequacy shortages will result in system load curtailments and extreme shortage prices. 132.
Some parties argue that Co-Located Load should be Network Load to ensure reliability and resource adequacy.280 Indicated Transmission Owners contend that when
274 Market Monitor April 23 Reply Comments at 6-7.275 OPSI April 23 Reply Comments at 3.276 Vistra April 23 Reply Comments at 30.277 NOVEC April 23 Reply Comments at 14.278 Pennsylvania Commission April 22 Reply Comments at 6.279 Delaware Commission April 23 Reply Comments at 1-2, 5.280 See Buckeye April 23 Reply Comments at 6 (citing PJM March 24 Response at 16-20); Indicated Transmission Owners April 23 Reply Comments at 13; Joint Consumer Advocates April 23 Reply Comments at 3. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 65 Date Filed: 10/19/2026
PDF page 67
Docket No. EL25-49-000, et al.- 59 -
Co-Located Load is hidden and not appropriately accounted for, there is not only a cost allocation problem, but the study process is undermined and, consequently, PJM may be unable to adequately procure enough capacity to serve the load because the full load will not be accounted for in the capacity market, transmission planning, or operations processes and protocols. Buckeye states that Co-Located Load as Network Load provides significant reliability benefits by avoiding reliance on protective relays and enhances PJM’s visibility and control over the Co-Located Load. Buckeye asserts that, “[i]f these large loads have the potential to appear on the system, even for a short time, this could have a significant impact on the grid.”281
133.
Constellation argues that interruptible Co-Located Load and co-location configurations with protection schemes to prevent energy withdrawals should not be assessed capacity charges.282 Vistra also argues that special protection schemes are commonly used and reliable technologies, also referred to as “remedial action schemes,” and that a NERC standard governs these technologies.283 On the other hand, NRDC states that if Co-Located Load is not Network Load, existing rules would not allocate the load any capacity costs if the on-site generation was running during PJM’s peak hours, which would shift capacity costs to other customers.284 California Utilities argue that traditional customers could be forced to subsidize Co-Located Load or suffer impaired reliability without proper cost allocation of reliability services and resource adequacy costs.285 California Utilities acknowledge that the Commission cannot prevent a generator from making retail sales, even if those sales erode reliability, but argues the Commission can require wholesale customers to procure adequate capacity. California Utilities argue that the entity directly selling at retail to the Co-Located Load should pay its capacity costs because the Co-Located Load can impact grid reliability, but notes that how such costs are passed on to the load is a retail issue.
134.
Vistra requests that the Commission clarify that a secondary generator that provides occasional, interruptible backup service to a Co-Located Load can also serve as a Capacity Resource because the generator will be available to PJM when needed.286 Vistra notes that existing retail BTMG provisions allow a generator that designates a
281 Buckeye April 23 Reply Comments at 8.282 Constellation April 23 Reply Comments at 66.283 Vistra April 23 Reply Comments at 18-19.284 NRDC April 23 Reply Comments at 7-8.285 California Utilities April 23 Reply Comments at 2, 6-7.286 Vistra April 23 Reply Comments at 8, 30-31. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 66 Date Filed: 10/19/2026
PDF page 68
Docket No. EL25-49-000, et al.- 60 -
portion of its resource as BTMG to sell the rest of its resource as a Capacity Resource. Vistra argues that allowing secondary backup resources to participate in the capacity market ensures that the market gets the greatest reliability benefit from these resources because ratepayers would enjoy access to additional capacity that would otherwise be underutilized, while the generation resource’s owner would put its resource to use and increase its contribution to the market. Comparing these secondary units to reliability must run (RMR) units, Vistra notes that the Commission currently allows RMR resources to participate in the capacity market because they “can be reasonably expected to perform” and argues that a secondary unit that occasionally serves Co-Located Load on an interruptible basis can also be expected to perform when needed because PJM can recall it. Vistra states that these secondary units also could be held subject to capacity market non-performance penalties and do not distort dynamic efficiency in the capacity market. Vistra adds that, if PJM deems it necessary, it could also create a mechanism to address how the secondary unit complies with its capacity must offer obligation when it is serving the Co-Located Load.
135.
Several commenters argue that existing generators moving to Co-Located Load configurations could threaten grid reliability and worsen the affordability crisis.287 Joint Consumer Advocates note this shift may degrade resource adequacy at an accelerated pace relative to connecting such load in traditional ways. Buckeye states that, although the balance of demand and supply is arguably the same regardless of whether the load is co-located with the generation, a non-Network Load Co-Location Arrangement has the potential to accelerate the pace with which the incremental demand arrives on the system, potentially without sufficient additional incremental supply, thereby exacerbating resource adequacy concerns. Glatz and Silverman suggest requiring PJM to manage the rate at which co-location is allowed to ensure reliability and affordability and avoid shortage conditions. Buckeye states that removing generation that is associated with a “fully isolated” Co-Location Arrangement from the rest of the grid is inconsistent with the grid’s planning and operational foundations and thus threatens to alter flows in a manner that could require additional transmission upgrades and impair the operational flexibility that is essential to reliability.288
136.
NERC states that co-location of large loads with generation facilities can have substantial reliability impacts due to interconnection timelines and loss of load incidents, while also presenting unique challenges and opportunities for grid transformation that
287 See Glatz/Silverman April 23 Reply Comments at 10-11; Joint Consumer Advocates April 23 Reply Comments at 5; NOVEC April 23 Reply Comments at 14; Buckeye April 23 Reply Comments at 6-7.288 Buckeye April 23 Reply Comments at 7. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 67 Date Filed: 10/19/2026
PDF page 69
Docket No. EL25-49-000, et al.- 61 -
require special consideration.289 NOVEC argues Co-Located Loads can impact reliability and resource adequacy since, for example, protection systems may fail and place the full burden of the Co-Located Load onto the grid.290 PPL similarly states that because the Commission denied the amended Susquehanna ISA on unrelated grounds, the PJM Tariff does not include sufficient protections against this reliability risk.291 On the other hand, Constellation argues that it would be discriminatory to suggest that protective relaying cannot be used in the context of Co-Location Arrangements or that Co-Located Load must be designed to a different standard. 292 Constellation states that each element of the protective scheme is redundant, and the system is not planned for nor does PJM require upgrades to address subsequent “third contingency events.”293
137.
Glatz and Silverman also express concern that, when load directly connects to another customer’s facilities, the connection may not be subject to PJM’s Consolidated Transmission Owners Agreement, which ensures not only that each PJM Transmission Owner maintain its system reliably, but also any connections to other systems, including load customers and other transmission systems as well.294 UCS states new variability in load resulting from data centers may require new Transmission Reliability Margin levels in some or all of PJM.295
138.
On the other hand, Vistra states that the development of Co-Located Load configurations “provides ample time for the PJM capacity market to calibrate to respond to changes in the balance of supply and demand.”296 Vistra concludes that neither resource adequacy nor reliability concerns justify the failure to accommodate behind-the-meter Co-Located Load. Constellation argues that new load is no different than existing load with respect to resource adequacy planning, and the Commission should determine whether there are additional tools to address near-term capacity needs
289 NERC April 23 Reply Comments at 3.290 NOVEC April 23 Reply Comments at 11-12.291 PPL April 23 Reply Comments at 10-11. 292 Constellation April 23 Reply Comments at 49.293 Id.294 Glatz/Silverman April 23 Reply Comments at 13-14.295 UCS April 11 Reply Comments at 16-17.296 Vistra April 23 Reply Comments at 17-18. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 68 Date Filed: 10/19/2026
PDF page 70
Docket No. EL25-49-000, et al.- 62 -
in separate proceedings.297 Antora also contends that if properly incorporated into PJM’s operations, fully flexible load need not impose any new resource adequacy burden.298 139.
Some commenters argue that Co-Location Arrangements can provide reliability benefits.299 ENGIE contends that Co-Location Arrangements can offer improved grid reliability and stability. Data Center Coalition states that flexible, efficient service arrangements like co-location can help alleviate pressure on the broader system, which can serve both reliability and affordability objectives. Constellation argues that co-location provides reliability benefits by minimizing grid operational risks because fewer grid infrastructure facilities and potential failure points are implicated in serving the load.
140.
Several commenters recommend enhancements, such as additional clarity and transparency, to PJM’s resource adequacy planning to account for the addition of large Co-Located Loads.300 Glatz and Silverman express concern that neither PJM’s nor Indicated Transmission Owners’ studies would evaluate resource adequacy, and contend that requiring such a study would ensure system reliability. Pennsylvania Commission states that the Tariff must be revised to require PJM to conduct long-term scenario analysis on the potential reliability and cost impacts of Co-Location Arrangements. 141.
Several parties urge reforms to PJM’s load forecasting process.301 PIOs, AEU, and ELCON argue for standard, transparent terminology and comparable parameters across planners, operators, and users. Data Center Coalition and PIOs argue that PJM’s
297 Constellation April 23 Reply Comments at 11, 60-61 (citing Patterson Aff. ¶ 15).298 Antora April 23 Reply Comments at 12.299 See ENGIE April 23 Reply Comments at 7; Data Center Coalition April 23 Reply Comments at 5; Constellation April 23 Reply Comments at 22-23 (citing Kormos Aff. ¶ 4).300 See CATF April 25 Reply Comments at 7, 8; California Utilities April 23 Reply Comments at 2; Glatz/Silverman April 23 Reply Comments at 10; NRDC April 23 Reply Comments at 8-9; PIOs April 23 Reply Comments at 22; Pennsylvania Commission April 22 Reply Comments at 7; OPSI April 23 Reply Comments at 3.301 ELCON April 23 Reply Comments at 9; PIOs April 23 Reply Comments at 16-18, 20, 23; AEU April 23 Reply Comments at 22; Data Center Coalition April 23 Reply Comments at 9-10; Ohio FEA April 23 Reply Comments at 4; Constellation April 23 Reply Comments at 47; ACEG April 23 Reply Comments at 5, 7; Buckeye April 23 Reply Comments at 11. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 69 Date Filed: 10/19/2026
PDF page 71
Docket No. EL25-49-000, et al.- 63 -
current load forecasting methodology often reflects inconsistent assumptions. Ohio FEA states that installing large off-system loads behind existing generators adds complexity, including that the load would not be captured in the annual load forecasting and planning processes conducted by LSEs and PJM. Constellation and Data Center Coalition support increased transparency in forecasting. PIOs, Data Center Coalition, and ACEG argue for reforms to the load forecasting process to ensure that forecasted data center load is commitment-backed. PIOs state that PJM’s load forecasting process does not include sufficient controls or standards to prevent speculative additions of large load from entering PJM’s load forecast. ELCON, PIOs, and Buckeye argue that overestimating load growth could lead to substantial overbuilding of infrastructure, which increases costs for consumers. PIOs also argue that inaccurate load forecasting can artificially inflate the reserve margin in PJM’s capacity market, which could result in unnecessary price increases.
142.
At the same time, ELCON states that underestimating load growth could cause reliability challenges.302 ELCON states that enhanced transparency regarding both front-of-the-meter and behind-the-meter loads is necessary to enable operators to ascertain real-time load behavior, including the potential for excess power injection and reliance on back-up services during on-site interruptions.
143.
PIOs argue that consistent with the Commission’s Rule of Reason doctrine, PJM’s Large Load Forecast Process should be in its Tariff.303 ELCON states that the Commission should convene a dialogue addressing load forecasting methodologies and how to facilitate communication among state and federal regulators, transmission operators, generators, and customers to ensure all parties are positioned to serve all customers reliably and affordably.304 United States Senators maintain that the Commission should consider broader proceedings that would standardize load forecasting and other practices relevant to addressing data center demand growth.305 144.
In its response to then-Chairman Rosner’s letter to the RTOs/ISOs asking about large load forecasting, PJM explains that it currently relies on Electric Distribution Companies (EDCs) and LSEs within the PJM footprint to provide relevant data on large load requests because PJM does not presently have a load interconnection process.306302 ELCON April 23 Reply Comments at 9.303 PIOs April 23 Reply Comments at 19.304 ELCON April 23 Reply Comments at 8.305 United States Senators November 25 Letter at 3.306 PJM Response to Then-Chairman Rosner at 4. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 70 Date Filed: 10/19/2026
PDF page 72
Docket No. EL25-49-000, et al.- 64 -
PJM states that load interconnection processes are generally administered through retail tariffs. PJM states that, based on its survey of certain EDCs and LSEs, there are a wide range of approaches to load adjustment processes, from requiring financial commitments based on a minimum demand to using less stringent approaches. PJM also discusses how it recently enhanced transparency in its load adjustment request submission process by publishing the Load Adjustment Request Implementation Document that addresses load forecasting methods and PJM’s need for certain information from forecast submitters.307 PJM explains that it relies on historical data when available for forecasting purposes, but when utilities have no historical data, utilities rely on milestone tracking and customer representations about expected demand.308 Lastly, PJM notes that utilities share best practices on load adjustment at the Load Analysis Subcommittee.309
G. Other Arguments
145.
Several commenters highlight the importance of data centers and AI to national security, particularly defense operations.310 Several commenters also urge the Commission to act quickly, given that data centers seeking to connect and take service from the grid may face delays of seven to ten years before they can receive power. Several commenters argue that certainty is critical to foster national security goals associated with AI development. Indicated Transmission Owners contend that any attempt to change the PJM Tariff would likely stymie data-center development, as new terms would require development through the PJM stakeholder process, followed by Commission consideration and acceptance.
146.
NOVEC and Market Monitor argue that national security is broader than AI and that other customers are vital to national security, such as existing large industrial customers and commercial and residential load.311 Market Monitor also argues that any national security issues relate not to co-location but to serving data center load. NOVEC also notes the Commission should consider whether the price increases that Co-Located
307 Id. at 2, 6.308 Id. at 6.309 Id. at 7.310 See National Security Experts April 22 Reply Comments at 1; Constellation April 23 Reply Comments at 15-17; AEU April 23 Reply Comments at 25; PSE&G March 24 Response at 1, 20; BCSE April 23 Reply Comments at 2.311 NOVEC April 23 Reply Comments at 19; Market Monitor April 23 Reply Comments at 7. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 71 Date Filed: 10/19/2026
PDF page 73
Docket No. EL25-49-000, et al.- 65 -
Load could cause may threaten national security by harming existing data centers and the general prosperity of the United States.
147.
Parties argue that co-location offers a number of benefits to the grid that lower costs for customers. Several parties argue that Co-Location Arrangements can make efficient use of existing transmission infrastructure and forestall the need for new infrastructure investments.312 For example, California Utilities and Constellation argue that Co-Location Arrangements decrease line losses. In addition, Constellation argues that the benefits of co-location include speed to market, increased interconnection availability, and extended facility utilization. ENGIE contends Co-Location Arrangements can offer environmental benefits by encouraging the use of renewable energy sources and energy-efficient technologies.313 ENGIE also argues Co-Location Arrangements that provide benefits to the grid such as back-up service should be compensated for those benefits.314 Enchanted Rock argues that in regions with centralized transmission, but insufficient local generation, co-location can help reduce congestion and backfill any required transmission contingencies in the short-term.315 Indicated Transmission Owners note that the addition of end-use load typically benefits other customers with respect to transmission costs because it spreads the shared costs more broadly.316 However, Indicated Transmission Owners also argue that many loads provide benefits to the grid but are still required to pay their share of grid services.317 148.
Several parties argue that Co-Location Arrangements may encourage the development of new generating resources that can contribute to increased capacity and grid reliability.318 CATF states Co-Located Loads can provide demand response, access
312 ENGIE April 23 Reply Comments at 7; Constellation April 23 Reply Comments at 100-103; EDFR April 23 Reply Comments at 7; Enchanted Rock April 23 Reply Comments at 17-18; PSE&G March 24 Response at 7, 20; AES Ohio March 24 Response at 14; Enchanted Rock April 23 Reply Comments at 17; CATF April 25 Reply Comments at 12; California Utilities April 23 Reply Comments at 2.313 ENGIE April 23 Reply Comments at 7.314 Id.315 Enchanted Rock April 23 Reply Comments at 12.316 Indicated Transmission Owners March 24 Response, attach. A at 22.317 Indicated Transmission Owners June 3 Reply Comments at 11.318 ENGIE April 23 Reply Comments at 7; Chevron April 23 Reply Comments at 6. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 72 Date Filed: 10/19/2026
PDF page 74
Docket No. EL25-49-000, et al.- 66 -
to lower cost power, or black start and other ancillary services, and can help states to meet their clean energy obligations.319 EDFR states that large loads can also benefit:
(1) existing generators by locating in areas with surplus energy that would otherwise be curtailed; (2) American industries looking for access to affordable, carbon-free energy; and (3) local communities through tax revenue, construction jobs, and employment.320 149.
Constellation states that consumers bear no risk related to owning and operating merchant generating resources originally paid for in base rates.321 Further, Constellation argues that consumers only paid for service, not for assets. On the other hand, NOVEC argues that given the historical cost-of-service arrangements for nuclear power plants that now, in part, make them attractive for these bilateral contracts, it would be unfair to dedicate such legacy generation to a single private customer after customers at large paid for such facilities and took the risks of construction since the time such resources were built.322 NOVEC urges the Commission to consider the legacy costs that retail customers bore before allowing private parties to dedicate the remaining benefits of existing generation to Co-Located Load and argues that the Commission should not permit any co-location paradigm that removes nuclear generation from the capacity market. NOVEC contends that nuclear units serve an important role in PJM’s energy and capacity market, and notes that Market Monitor has described them as “baseload power.” Although NOVEC agrees in principle that owners of generation assets should be able to seek to maximize the beneficial ownership of those assets, NOVEC argues that the Commission has the responsibility to reject proposals that are not just and reasonable because the Federal Power Act is a consumer protection statute.323 NOVEC notes that the Commission has periodically observed how the legacy of the pre-restructuring period has created inequities and the possibility of unjust and unreasonable results.324319 CATF April 25 Reply Comments at 12.320 EDFR April 23 Reply Comments at 8.321 Constellation April 23 Reply Comments at 107-108.322 NOVEC April 23 Reply Comments at 7, 15-17.323 Id. at 16 (citing Xcel Energy Services, Inc. v. FERC, 815 F.3d 947, 952 (D.C. Cir. 2016) (“It is long-established that the ‘primary aim [of the FPA] is the protection of consumers from excessive rates and charges.’” (quoting Mun. Light Bds. of Reading & Wakefield v. FPC, 450 F.2d 1341, 1348 (D.C. Cir. 1971))).324 Id. at 17. For example, NOVEC states that in Opinion No. 494, the Commission found that the costs of legacy transmission facilities which were built to serve the transmission systems of individual companies and their customers could not be allocated to the entire PJM region under the Commission’s cost causation principles. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 73 Date Filed: 10/19/2026
PDF page 75
Docket No. EL25-49-000, et al.- 67 -
150.
A number of parties urge that any Commission action in this proceeding provide flexibility for different regions325 and/or different co-location configurations.326 California Utilities request that the Commission recognize that approaches to co-located facilities must be tailored to account for different state regulators, self-regulated non-jurisdictional entities, and regions.327 ENGIE contends that flexibility can enhance system reliability as configuration design can provide multiple pathways for power delivery.328
151.
Enchanted Rock and CATF oppose PJM’s suggestion in option 8 to ease air pollution standards for co-located generation.329 Relatedly, Center argues that the Commission should consider the environmental implications of rules that encourage the growth of data centers or other large load facilities, including the climate change threats they pose, and should encourage renewable power to these facilities.330
III. Notice of Show Cause Proceeding and Responsive Pleadings
152.
Notice of the Show Cause Order was published in the Federal Register, 90 Fed. Reg. 10818 (Feb. 27, 2025), with interventions due on or before March 13, 2025. The Appendix identifies entities that submitted notices of intervention and motions to intervene, as well as abbreviations for those entities. Numerous entities submitted comments and protests, as summarized in this order. Answers were submitted by Constellation, Vistra, Buckeye, PSE&G, PPL, and Indicated Transmission Owners. NOVEC explains that the instant situation is the inverse, but claims that it implicates the same principle. Id. (citing PJM Interconnection, L.L.C., Opinion No. 494, 119 FERC ¶ 61,063, at P 42 (2007)).
325 EDFR April 23 Reply Comments at 7.326 Data Center Coalition April 23 Reply Comments at 4; ENGIE April 23 Reply Comments at 5-6; EDFR April 23 Reply Comments at 9; AEU April 23 Reply Comments at 10.327 California Utilities April 23 Reply Comments at 9.328 ENGIE April 23 Reply Comments at 6.329 CATF April 25 Reply Comments at 13, 14; Enchanted Rock April 23 Comments at 16-17.330 Center April 23 Reply Comments at 3-20. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 74 Date Filed: 10/19/2026
PDF page 76
Docket No. EL25-49-000, et al.- 68 -
153.
On April 4, 2025, Vistra filed a motion for clarification and request for expedited treatment.331 On April 9, 2025, Talen filed an answer to Vistra’s motion. On April 22, 2025, EPSA, P3, Calpine, Cogentrix, Constellation, and LS Power (together, Joint Parties), pursuant to Rules 212 and 603 of the Commission’s Rules of Practice and Procedure, filed Joint Comments, a Motion to Stay Proceedings, and a Request to Establish Settlement Judge Procedures (Motion to Stay).332 AMP, Indicated Transmission Owners, PJM, NREMC, NOVEC, and Talen filed answers to the Motion to Stay.
154.
On September 19, 2025, a letter from then-Chairman Rosner to PJM was filed in this proceeding; then-Chairman Rosner’s letter requests information on load forecasting. On October 20, 2025, PJM’s response to then-Chairman Rosner’s letter was filed in this proceeding.
155.
On November 21, 2025, Constellation filed a motion for expedited action. Constellation contends that the Secretary of Energy’s October 23, 2025 proposal to the Commission of an Advanced Notice of Proposed Rulemaking (ANOPR) on large load interconnection to the transmission system underscores the urgent need for clarity regarding Co-Location Arrangements.333 PJM timely answered and AEP, Exelon, Indicated Transmission Owners, ODEC, and Virginia Commission filed late answers to or comments on Constellation’s motion for expedited action. Indicated Transmission Owners, ODEC, PJM, and Virginia Commission argue that Constellation’s motion asks the Commission to prejudge issues raised in the ANOPR proceeding. PJM alleges that granting the motion would not only preempt the PJM stakeholder process concerning the integration of large loads, but also violate the principle that agencies should defer taking
331 Vistra requests clarification regarding the Commission’s interpretation of the November 1, 2024 Order in Docket No. ER24-2172 regarding whether it: (1) prejudged the permissibility of any particular co-location configuration; (2) indicated that the Commission generally opposes fully isolated behind the meter co-located load; or
(3) prohibits parties from following the currently effective tariff rules and negotiating the terms of non-conforming ISAs pursuant to existing tariff provisions while this proceeding is underway.
332 Joint Parties request that the Commission stay the show cause proceeding for a limited period of 90 days and establish settlement judge proceedings as expeditiously as possible to allow the parties to develop a new replacement rate.333 Motion at 3-4 (citing U.S. Department of Energy, Secretary of Energy, Direction that the Commission Initiate Rulemaking Procedures and Proposal Regarding the Interconnection of Large Loads Pursuant to the Secretary’s Authority Under Section 403 of the Department of Energy Organization Act (Oct. 23, 2025)). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 75 Date Filed: 10/19/2026
PDF page 77
Docket No. EL25-49-000, et al.- 69 -
action in specific adjudicatory matters where such action would supplant ongoing generic rulemakings.334 The Indicated Transmission Owners contend that granting the motion would cause confusion and unwarranted expense if it modified the PJM Tariff on an interim basis before addressing issues nationwide in the ANOPR proceeding.335 The Indicated Transmission Owners further allege that granting the motion would result in a premature, improper jurisdictional determination in this proceeding.336
IV. Discussion
A. Procedural Matters
156.
Pursuant to Rule 214 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.214 (2025), the notices of intervention and timely, unopposed motions to intervene serve to make the entities that filed them parties to this proceeding. 157.
Pursuant to Rule 214(d) of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.214(d), we grant the late-filed motions to intervene given these entities’ interests in the proceeding, the early stage of the proceeding, and the absence of undue prejudice or delay.
158.
Rule 213(a)(2) of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.213(a)(2), prohibits an answer to a protest or answer unless otherwise ordered by the decisional authority. We accept the answers because they have provided information that assisted us in our decision-making process.
B. Substantive Matters
159.
As discussed further below, we find that the PJM Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load. We find that the absence of such provisions leaves entities unable to determine what steps they must take to effectuate Co-Location Arrangements, which creates uncertainty that has resulted in disparate treatment in PJM, where transmission owners have taken different approaches to performing the necessary steps that apply to Interconnection Customers seeking to serve Co-Located Load through a Co-Location
334 PJM Answer at 2 (citing Cities of Anaheim v. FERC, 723 F.2d 656, 659 (9th Cir. 1984).335 Indicated Transmission Owners Answer at 3.336 Id. at 5. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 76 Date Filed: 10/19/2026
PDF page 78
Docket No. EL25-49-000, et al.- 70 -
Arrangement, leading to no consistent understanding of entities’ responsibilities with respect to their planned Co-Location Arrangements. We also find that PJM’s Tariff is unjust and unreasonable because it does not include transmission services that reflect an Eligible Customer taking service on behalf of a Co-Located Load that is willing and able to limit its energy withdrawals from the transmission system under certain conditions. Further, we find that PJM’s Tariff is unjust and unreasonable because it does not address charges related to Co-Located Loads’ use of regulation and black start services, which introduces the risk that Co-Located Loads may benefit from regulation and black start services without contributing to cost recovery for such services and, thereby, the risk that costs may be allocated entirely to other transmission customers and passed through to residential customers, among others.
160.
As a replacement rate, we direct PJM to revise its Tariff to require that an Interconnection Customer who will use its generating facility to serve Co-Located Load specify an Eligible Customer who will take transmission service on behalf of the Co- Located Load. We also direct PJM to establish three new transmission services that reflect that Eligible Customers taking service on behalf of Co-Located Load are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Specifically, we direct PJM to revise its Tariff to allow Eligible Customers seeking to take NITS on behalf of Co-Located Load to, at their option, take a new interim, non-firm transmission service until all Network Upgrades necessary to provide NITS are complete. We further direct PJM to offer two other new transmission services—a Firm Contract Demand transmission service and a Non-Firm Contract Demand transmission service—that an Eligible Customer can choose to take on behalf of a Co-Located Load instead of taking NITS. These new transmission service options reflect a Co-Located Load’s ability to limit withdrawals from the transmission system and potentially avoid costly and inefficient transmission system buildout that may not be necessary. Eligible Customers serving Co-Located Load that seek to rely on the transmission system to the same extent as Network Load customers will continue to be eligible to take NITS, billed on a gross demand basis. All Eligible Customers taking NITS or one of the new transmission services on behalf of Co-Located Load must be assessed charges for regulation and black start services on a gross demand basis, regardless of which transmission service they select, to ensure Co-Located Load contributes to cost recovery for such services. As noted below, a Co-Location Arrangement is synchronized to the transmission system.337 We also seek briefing as to whether the rate paid by an Eligible Customer on behalf of a Co-Located Load taking only the new Non-Firm Contract Demand transmission service that elects to not reserve any amount of that service for a period of time (e.g., one month) reflect not only charges
337 See also PJM March 24 Response at 42-43. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 77 Date Filed: 10/19/2026
PDF page 79
Docket No. EL25-49-000, et al.- 71 -
for regulation and black start services, but also an additional charge given that regulation and black start services could not be provided without the transmission system. 161.
Next, we direct PJM to clarify its interconnection procedures and agreements to ensure that it is clear to both new and existing Interconnection Customers how to interconnect in a Co-Location Arrangement. Specifically, we direct PJM to revise its Tariff to make clear how Interconnection Customers can make use of provisional interconnection service, the ability to request interconnection service below nameplate capacity, the potential to accelerate the interconnection process under certain circumstances (e.g., where the request has no Network Upgrade costs and does not require further studies), and Surplus Interconnection Service to interconnect new generating facilities seeking to serve Co-Located Load. We also direct PJM to revise its Tariff to clarify the procedures for the study necessary to determine any modifications to interconnection facilities or Network Upgrades to the transmission system PJM finds are needed to maintain transmission system reliability as a result of the Interconnection Customer’s request to modify its interconnection service level for an existing generating facility to serve Co-Located Load. These clarifications also require existing Interconnection Customers to pay the full cost of any such modifications to interconnection facilities or Network Upgrades to the transmission system and specify that an existing generating facility cannot withdraw its capacity from the system to begin serving a Co-Located Load until all such modifications and Network Upgrades necessary to maintain reliability for existing customers are in service.
162.
In furtherance of the Commission’s mandate to ensure just and reasonable rates for consumers, the replacement rate will ensure that Eligible Customers on behalf of Co-Located Load take transmission service and incur transmission costs in a way that is at least roughly commensurate with their derived benefits. The replacement rate will also ensure that Eligible Customers on behalf of Co-Located Load are able to take transmission services that reflect their actual impact on the transmission system, which in many cases may be more limited relative to conventional front-of-meter load and generation. Collectively, the replacement rate provides pathways that recognize Co-Located Loads that limit their energy withdrawals from the transmission system, which may require fewer Network Upgrades, and therefore may result in lower Network Upgrade costs as compared to requiring all Eligible Customers taking service on behalf of Co-Located Load to take NITS.
163.
The remainder of this determination is organized as follows. Part IV.B.1 establishes the definition of Co-Located Load and directs PJM to incorporate this definition into its Tariff. Part IV.B.2 addresses the Commission’s and the states’ jurisdiction over Co-Location Arrangements. Part IV.B.3 explains why PJM’s Tariff is not just and reasonable absent provisions addressing the rates, terms, and conditions of service that apply to Interconnection Customers seeking to serve Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load. Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 78 Date Filed: 10/19/2026
PDF page 80
Docket No. EL25-49-000, et al.- 72 -
Part IV.B.4 directs a replacement rate that establishes just and reasonable rates, terms, and conditions of service for Eligible Customers taking transmission service on behalf of Co-Located Load and for Interconnection Customers that serve Co-Located Load. Part IV.B.4 also establishes paper hearing procedures to gather additional record evidence to set the appropriate replacement rate. The remaining sections address other issues raised in the record.
1. Definition
164.
The Show Cause Order used the following definition of Co-Located Load: a “‘configuration [that] refers to end-use customer load that is physically connected to the facilities of an existing or planned Customer Facility on the Interconnection Customer’s side of the Point of Interconnection to the PJM Transmission System.’”338 We adopt that definition in this order as well. Indicated Transmission Owners object to this definition, arguing that this definition obscures that Co-Located Loads rely on the transmission system to receive service.339 We disagree. This definition reflects the fact that the Co-Location Arrangement is physically connected to and synchronized to the transmission system. This relationship, and specifically the interconnection of the generator to the transmission system, is critical to the determinations we make below. We thus direct PJM to incorporate this definition into its Tariff on compliance as part of the replacement rate detailed below.
2. Jurisdiction
165.
As the Commission explained at length in the Show Cause Order, the issues presented in this proceeding implicate both federal and state interests, and their resolution will require the involvement of both federal and state actors, including the Commission, state public utility commissions, and other state and local entities.340 Recognizing the careful balance that the FPA strikes between federal and state regulation, we make several findings below, including that: (1) states retain exclusive authority over the specific terms of retail sales, generator siting, the generation mix, and transmissions in intrastate commerce; (2) the Commission retains the authority to oversee the terms and conditions of generator interconnection to any Commission-jurisdictional distribution facility or transmission facility,341 including for generators that serve or plan to serve 338 Show Cause Order, 190 FERC ¶ 61,115 at P 3 & n.4 (citation omitted).
339 Indicated Transmission Owners March 24 Response at 7 n.17.340 See Show Cause Order, 190 FERC ¶ 61,115 at P 66.341 See infra P 172. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 79 Date Filed: 10/19/2026
PDF page 81
Docket No. EL25-49-000, et al.- 73 -
Co-Located Load; and (3) the Commission has the authority to ensure that the rates for transmission service in interstate commerce are just and reasonable.
166.
Because the Commission is a creature of statute, it has jurisdiction only over those matters that Congress has given it the authority to regulate.342 Section 201(b)(1) of the FPA gives the Commission jurisdiction over the transmission of electric energy in interstate commerce, the sale of electric energy at wholesale in interstate commerce, and all facilities for such transmission or sale of electric energy.343 The FPA reserves to the states authority over any matters not expressly conveyed to the Commission,344 which includes retail sales and wholesale sales not in interstate commerce, as well as the facilities used for the generation and distribution of electricity, except as where otherwise provided.345 The Supreme Court has long held regulation of these matters to be within the states’ historical police powers,346 and the Court has observed that the FPA’s jurisdictional divide “was drawn with meticulous regard for the continued exercise of state power, not to handicap or dilute it in any way.”347 We adhere to those principles here.
a. Areas of Exclusive State Authority
167.
We find that several aspects of Co-Location Arrangements fall squarely within the jurisdiction of the states. First, states retain exclusive authority over the specific terms of retail sales and retail rate design, including how the costs of interstate wholesale sales and transmission of electricity assigned to a wholesale customer are allocated among that wholesale customer’s retail customers. Although “a State may not conclude in setting
342 Atl. City Elec. Co. v. FERC, 295 F.3d 1, 8 (D.C. Cir. 2002).343 16 U.S.C. § 824(b)(1).344 Nat’l Ass’n of Regul. Util. Comm’rs v. FERC, 964 F.3d at 1187 (citing N. Nat. Gas Co. v. State Corp. Comm’n of the State of Kan., 372 U.S. 84, 91-93 (1963)).345 16 U.S.C. § 824(b)(1); see Dayton Power & Light Co. v. FERC, 126 F.4th 1107, 1129 (6th Cir. 2025).346 See, e.g., Munn v. People of State of Ill., 94 U.S. 113 (1876).347 Oneok, Inc. v. Learjet, Inc., 575 U.S. 373, 384-85 (2015) (discussing the analogous provisions in the Natural Gas Act) (quoting Panhandle E. Pipe Line Co. v. Pub. Serv. Comm’n of Ind., 332 U.S. 507, 517-18 (1947)); see also Nw. Cent. Pipeline Corp. v. State Corp. Comm’n of Kan., 489 U.S. 493, 511 (1989)). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 80 Date Filed: 10/19/2026
PDF page 82
Docket No. EL25-49-000, et al.- 74 -
retail rates that the FERC-approved wholesale rates are unreasonable,”348 it is within a state’s exclusive jurisdiction to determine how those FERC-approved rates are collected among the relevant retail consumers, including retail consumers that are Co-Located Load.349 Therefore, states have exclusive jurisdiction over how the costs assigned to Eligible Customers on behalf of Co-Located Load taking Commission-jurisdictional transmission services — including the new transmission services directed below — are allocated to individual retail consumers that are Co-Located Load, just as states have exclusive jurisdiction over how to allocate the costs of all Commission-jurisdictional rates (including for energy, capacity, and transmission) among retail customers, including allocating costs among different classes of retail customers.350 Regulation of wholesale sales that are not in interstate commerce also falls to the states; we agree with commenters who note this distinction.351 We disagree with some parties’ claim that there could be a regulatory gap under state law,352 as Co-Located Load that is not served by an islanded generator353 may receive some services from the distribution and transmission systems. We also agree with Pennsylvania Commission and OPSI that the commission that regulates each portion of the respective systems has jurisdiction over those services.354
168.
Second, we affirm the Commission’s statement from the Show Cause Order that states retain the exclusive authority through state franchise laws to regulate which entities may make retail sales within their borders, and thus the states determine which entities 348 Nantahala Power & Light Co. v. Thornburg, 476 U.S. 953, 966 (1986).
349 See, e.g., PIOs April 23 Reply Comments at 42.350 Order to Show Cause, 190 FERC ¶ 61,115 at P 68.351 See, e.g., OPSI April 23 Reply Comments at 5.352 Those parties specifically note concerns where, for example, a single generator provides service to a single customer or one large industrial end-use customer sells electricity to another large industrial end-user within the same complex. See PJM March 24 Response at 27; PPL April 23 Reply Comments at 7.353 A fully islanded generator is one that is engaged in a self-sufficient arrangement with its load where the load and generation together are both fully electrically isolated from the transmission system. See Farhan Noor et al., Unintentional Islanding and Comparison of Prevention Techniques at 90 (2005), https://ieeexplore.ieee.org/stamp/stamp.jsp?arnumber=1560507&tag=1.354 See Pennsylvania Commission April 22 Reply Comments at 4-5; OPSI April 23 Reply Comments at 5-6. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 81 Date Filed: 10/19/2026
PDF page 83
Docket No. EL25-49-000, et al.- 75 -
are legally permitted to provide electricity to retail customers in Co-Location Arrangements.355 Nothing in this order changes who may provide, and bill for, retail service to a Co-Located Load. Furthermore, as OPSI explains, that parties seeking clarification of the extent to which a generator’s retail sale of energy to Co-Located Load is state jurisdictional may file a petition for declaratory order with the relevant state commission.356
169.
Third, we confirm that states have authority over their generation resource mix, including through their siting authority.357 This authority means that which generating facilities are sited and allowed to serve Co-Located Load is also a question of state law.358 That is true notwithstanding the fact that PJM’s markets might indirectly influence the resource mix through, for example, capacity market price signals that affect resource entry and exit.359
170.
Finally, we decline in this proceeding to comprehensively address jurisdictional matters regarding the interconnection of retail loads served through a Co-Location Arrangement to the interstate transmission system. As discussed below, we conclude that the Commission has jurisdiction to oversee the interconnection of generating facilities, including the generators that are used to serve Co-Located Load, to the interstate transmission system, as well as jurisdiction over the provision of transmission service in interstate commerce used by an Eligible Customer to serve Co-Located Load. We find that these determinations are sufficient to resolve the issues in this proceeding. Therefore, we establish requirements below that apply to Interconnection Customers
355 Show Cause Order, 190 FERC ¶ 61,115 at PP 68-69.356 OPSI April 23 Reply Comments at 5-6.357 See, e.g., Citizens Action Coal. of Ind., Inc. v. FERC, 125 F.4th 229, 238 (D.C. Cir. 2025) (citing 16 U.S.C. § 824(b)(1)).358 See FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 267 (2016) (EPSA) (“the Commission may not regulate . . . retail sales of electricity (i.e., sales directly to users)”); Show Cause Order, 190 FERC ¶ 61,115 at P 69 (“under the FPA, the states get to determine which entities are legally permitted to provide electricity to retail customers in co-location arrangements”).359 Accord EPSA, 577 U.S. at 281 (“It is a fact of economic life that the wholesale and retail markets in electricity, as in every other known product, are not hermetically sealed from each other. To the contrary, transactions that occur on the wholesale market have natural consequences at the retail level. And so too, of necessity, will FERC’s regulation of those wholesale matters.”). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 82 Date Filed: 10/19/2026
PDF page 84
Docket No. EL25-49-000, et al.- 76 -
seeking to serve Co-Located Load as well as Eligible Customers taking interstate transmission service on behalf of Co-Located Load.
b. The Commission Has Jurisdiction over Generation
Interconnection
171.
The Commission retains exclusive jurisdictional authority to ensure that the rates, charges, and classifications for the interstate wholesale sale and transmission of electricity, as well as the practices directly affecting such sale and transmission of electricity, are just and reasonable and not unduly discriminatory or preferential.360 We agree with commenters that a generator’s interconnection to the interstate transmission system does not fall outside of the Commission’s jurisdiction merely because there is Co-Located Load behind the generator’s point of interconnection.361 The Commission retains exclusive jurisdiction to oversee the interconnection of generating facilities to the interstate transmission system, including where generators serve Co-Located Load. 172.
Regarding generation interconnection, the Commission retains exclusive authority to regulate the procedures and agreements that apply to the interconnection of a generator that will make wholesale sales, both where the generator interconnects directly to the interstate transmission system and where a generator interconnects to dual-use distribution facilities.362 The standard interconnection procedures and agreements first adopted in Order No. 2003 apply when an interconnection customer “that plans to engage in a sale for resale in interstate commerce or to transmit electric energy in interstate commerce”363 requests interconnection to the facilities of a public utility’s transmission system or distribution system “that, at the time the interconnection is requested, may be used either to transmit electric energy in interstate commerce or to sell electric energy at wholesale in interstate commerce pursuant to a Commission-filed Open Access
360 16 U.S.C. §§ 824d, 824e; see EPSA, 577 U.S. at 278 (2016) (approving “a common-sense construction of the FPA’s language, limiting the Commission’s ‘affecting’ jurisdiction to rules or practices that ‘directly affect the wholesale rate’” (cleaned up)).361 See Talen April 23 Reply Comments at 8.362 See NARUC, 475 F.3d at 1282 (FERC’s exercise of jurisdiction “only over ‘interconnections to a ‘distribution’ facility when the facility is included in a public utility’s Commission-filed OATT and the interconnection is for the purpose of facilitating a jurisdictional wholesale sale of electric energy’” is permissible and not an example of jurisdictional “boot-strapping”).363 Order No. 2003, 104 FERC ¶ 61,103 at P 804. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 83 Date Filed: 10/19/2026
PDF page 85
Docket No. EL25-49-000, et al.- 77 -
Transmission Tariff (OATT).”364 In particular as to distribution-level interconnections, Order Nos. 2003 and 2006 established what is sometimes referred to as the “first use” test, under which the first interconnection to a distribution facility for the purpose of making wholesale sales is not typically Commission-jurisdictional because the facility is not at the time of the request used to transmit electric energy in interstate commerce or subject to wholesale open access under an OATT.365 This jurisdictional application has been found to be consistent with the FPA.366 Furthermore, once the generator has interconnected, the Commission retains authority over the generator’s wholesale sales in interstate commerce.
c. The Commission Has Jurisdiction to Ensure that Eligible
Customers Taking Service on Behalf of Co-Located Loads
Are Allocated Costs for Transmission Service
173.
We affirm that the Commission has exclusive jurisdiction over the provision of transmission service used by an Eligible Customer to serve Co-Located Load, again
364 Id.; see also Standardization of Small Generator Interconnection Agreements & Procs., Order No. 2006, 111 FERC ¶ 61,220, at P 5, order on reh’g, Order No. 2006-A, 113 FERC ¶ 61,195 (2005), order granting clarification, Order No. 2006-B, 116 FERC ¶ 61,046 (2006) (“this Final Rule applies only to interconnections with facilities that are already subject to the Transmission Provider’s OATT at the time the Interconnection Request is made”).365 See Order No. 2003, 104 FERC ¶ 61,103 at P 804; Order No. 2006, 111 FERC ¶ 61,220 at P 481 (explaining that “only facilities that already are subject to the Transmission Provider’s OATT are covered by this rule [and that] the Commission is not encroaching on the States’ jurisdiction”). The interconnection of a second generator to the same distribution facility for the purpose of engaging in wholesale sales is jurisdictional, however, because the facilities are already being used to facilitate wholesale transactions and are subject to wholesale open access, meaning that it and any subsequent wholesale generators must utilize the Commission-jurisdictional generator interconnection procedures and agreements. Participation of Distributed Energy Res. Aggregations in Mkts. Operated by Reg’l Transmission Orgs. & Indep. Sys. Operators, Order No. 2222, 172 FERC ¶ 61,247, at P 93 (2020), order on reh’g, Order No. 2222-A, 174 FERC ¶ 61,197, order on reh’g, Order No. 2222-B, 175 FERC ¶ 61,227 (2021).366 See NARUC, 475 F.3d at 1280-82 (“By establishing standard agreements FERC has exercised its jurisdiction over the terms of those relationships.”) (citing TAPS, 225 F.3d at 696 (“FPA § 201 makes clear that all aspects of wholesale sales are subject to federal regulation, regardless of the facilities used.”)). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 84 Date Filed: 10/19/2026
PDF page 86
Docket No. EL25-49-000, et al.- 78 -
provided that transmission of electricity is in interstate commerce.367 As part of its transmission authority, the Commission has exercised jurisdiction over the terms of certain interconnections to the transmission system as “an essential element of [t]ransmission [s]ervice”368 and we agree with commenters who note the same.369 The Commission also “may exercise jurisdiction over generation facilities to the extent necessary to regulate interstate transmission”370 and may require “physical changes” to those facilities as long as the changes “bear a close enough relation to [the Commission’s] exercise of jurisdiction over jurisdictional transactions.”371 Similarly,
367 See supra P 171. The Supreme Court has held that transmission facilities connected to the interstate grid operate in interstate commerce, but the presumption that transmission is in interstate commerce will not necessarily hold if transmission-level facilities are not connected to that interstate grid. See New York v. FERC, 535 U.S. at 16 (citing FPC v. Fla. Power & Light Co., 404 U.S. 453, 466-67 (1972) (Florida Power)); see also Florida Power, 404 U.S. at 462-63 (“[The Commission’s] alternative assertion that energy commingles in a bus is, in our opinion, sufficient to sustain [the Commission’s] jurisdiction.”). See also Market Monitor April 23 Reply Comments at 13.368 Order No. 2003-A, 106 FERC ¶ 61,220 at P 698; see NARUC, 475 F.3d at 1280 (affirming Order No. 2003 and observing that “interconnections appear to be relationships between parties with respect to electricity flowing over facilities. . . . By establishing standard agreements [the Commission] has exercised its jurisdiction over the terms of those relationships.”). The Commission has reiterated this finding repeatedly. Pac. Gas & Elec. Co., 115 FERC ¶ 61,193, at P 36 (2006) (“[I]nterconnection is part and parcel of transmission of electric energy in interstate commerce, and thus interconnection service is part and parcel of jurisdictional transmission service.”); see also id. P 36 n.52 (citing Tenn. Power Co., 90 FERC ¶ 61,238, at 61,761, reh’g dismissed, 91 FERC ¶ 61,271 (2000)).369 See, e.g., Talen April 23 Reply Comments at 4-5 (explaining that the basis of the Commission’s authority is that the ISA governing a generator serving Co-Located Load is Commission-jurisdictional).370 TAPS, 225 F.3d at 718; NextEra Energy Res., LLC v. FERC, 118 F.4th 361, 369 (D.C. Cir. 2024) (holding that an upgrade to a generator’s equipment directly affects the transmission of electricity in interstate commerce and is therefore within the Commission’s jurisdiction).371 NARUC, 475 F.3d at 1282. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 85 Date Filed: 10/19/2026
PDF page 87
Docket No. EL25-49-000, et al.- 79 -
“FERC may regulate electric generating facilities so long as it is addressing a practice affecting wholesale rates.”372
174.
We acknowledge, as the Supreme Court has recognized, that the boundaries between federal and state jurisdiction are not hermetically sealed.373 The application of the principles outlined in this order to Co-Location Arrangements depends on the specific facts and circumstances presented in particular situations. We find, however, that the changes to the PJM Tariff that the Commission directs in this order properly draw on the Commission’s authority under the FPA without infringing on states’ authority.
3. Show Cause Findings
a. Overview
175.
We find that PJM’s Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.374 As the Commission explained in the Show Cause Order, the absence of such provisions leaves entities unable to determine what steps they must take to effectuate Co-Location Arrangements of various configurations. Furthermore, this absence creates uncertainty that has resulted in disparate treatment in PJM, where transmission owners have taken different approaches to performing the necessary steps that apply to Interconnection Customers seeking to serve Co-Located Load through a Co-Location Arrangement, leading to no consistent understanding of entities’ responsibilities with respect to their planned Co-Location Arrangements.375 The absence of such provisions also introduces the risk that Co-Located Load may benefit from regulation and black start services
372 Nat’l Ass’n of Regul. Util. Comm’rs, 964 F.3d at 1186 n.5; accord La. Pub. Serv. Comm’n v. FERC, 522 F.3d 378, 390 (D.C. Cir. 2008) (explaining that “the generating facility exception of Section 201(b)(1)” conferring authority over generation facilities to States “does not apply where jurisdiction is specifically provided for in certain specified sections of the [Federal Power] Act, including Sections 201 and 206.”).373 EPSA, 577 U.S. at 281.374 See, e.g., EPSA/P3 April 23 Reply Comments at 10.375 See, e.g., Constellation, Complaint, Docket No. EL25-20-000 (filed Nov. 22, 2024); Baltimore Gas & Electric Company and PECO Energy Company, Petition for Declaratory Order, Docket No. EL24-149-000 (filed Sept. 30, 2024); Constellation April 23 Reply Comments at 4 n.4 (stating that “PJM is uniquely situated” in having an unjust and unreasonable tariff absent co-location rules). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 86 Date Filed: 10/19/2026
PDF page 88
Docket No. EL25-49-000, et al.- 80 -
without contributing to cost recovery for such services. Many parties to this proceeding filed comments supporting the Commission’s preliminary finding that PJM’s Tariff lacks sufficient clarity or consistency as to the rules for Co-Location Arrangements.376 We are not persuaded by PJM’s argument that its Tariff remains just and reasonable, because while PJM asserts that its existing Tariff permits Co-Location Arrangements, PJM recognizes that there is a lack of clarity and consistency in the Tariff regarding the rules for Co-Location Arrangements.377
176.
First, we find the PJM Tariff unjust and unreasonable because there is a lack of sufficient clarity or consistency as to the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load. As such, Interconnection Customers seeking to use their generating facilities to serve Co-Located Load have no means of knowing the appropriate mechanism for setting forth the terms and conditions of Co-Location Arrangements. Moreover, without an Eligible Customer designated to
376 See Constellation May 8 Answer at 9 (“In sum, the record in this proceeding unequivocally supports the Commission’s preliminary finding that the PJM Tariff lacks clear co-location rules and is unjust and unreasonable.”); see also AEU April 23 Reply Comments at 19 (“Loads and generators pursuing [C]o-[L]ocation [A]rrangements need clarity as to how these arrangements will be studied, and how those studies will be evaluated. There must be a level of uniformity and detail outlining study requirements to ensure regulatory certainty for large loads and new generation and storage resources seeking to serve large loads. This level of uniformity is currently lacking in PJM’s interconnection procedures and cost allocation methodology . . . .”); EPSA/P3 April 23 Reply Comments at 2 (“EPSA and P3 agree with the Commission that PJM needs to establish tariff provisions and rules to accommodate the array of [C]o-[L]ocated [L]oad arrangements that will facilitate the timely and effective integration of large loads locating in the region.”); DCC April 23 Reply Comments at 7 (“. . . [T]he Commission should direct PJM to develop clear, enforceable tariff language that affirms the permissibility of multiple co-location configurations, including those where load is served directly from a generation resource located on or near the same site. Tariff clarity is essential to reduce unnecessary disputes, avoid case-by-case confusion, and enable transmission providers to process interconnection and load addition requests efficiently and predictably.”).377 PJM March 24 Response at 32 (“Nevertheless, clarifications and enhancements could well be in order given that this is an evolving area and Tariff provisions did not contemplate the type of arrangements at issue in this docket or their implications.”); id. at 35 (“The extent to which netting [rules under the PJM Tariff] could or should apply to co-located data center load is not clear at this time.”); see also Vistra April 23 Reply Comments at 11 (arguing that PJM has “effectively conceded” that the PJM Tariff does not contain sufficient clarity). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 87 Date Filed: 10/19/2026
PDF page 89
Docket No. EL25-49-000, et al.- 81 -
take transmission service on behalf of a Co-Located Load, there is no mechanism for PJM to address situations in which a Co-Located Load withdraws energy from the transmission system. As described in Part IV.B.4.a, we therefore direct PJM to file, as the first part of the replacement rate, revisions to the generation interconnection procedures of the Tariff, including to require an Interconnection Customer who will use its generating facility to serve Co-Located Load to specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load. We also direct PJM to file Tariff changes specifying that an Interconnection Customer seeking to serve Co-Located Load using an existing generating facility must bear the costs of all Network Upgrades that PJM finds are necessary to preserve transmission system reliability for existing transmission customers, and that an existing generating facility cannot begin service to a Co-Located Load until all required Network Upgrades are in service. This requirement will protect existing transmission customers from transmission reliability risks and from bearing the cost of Network Upgrades required for an Interconnection Customer to begin serving Co-Located Load. Furthermore, as described in Part IV.B.4.d, we direct PJM to revise its Tariff to clarify that an Interconnection Customer seeking to serve a Co-Located Load with a newly interconnecting generating facility may: (1) request interconnection service at a level below its maximum facility output; (2) use existing procedures in the PJM Tariff to accelerate the study of the interconnection service request if the request has no cost allocation for Network Upgrades and does not require further studies; (3) request provisional interconnection service; and (4) request Surplus Interconnection Service.
177.
Second, we also find that PJM’s Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers378 taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. As discussed below, requiring Eligible Customers taking transmission service on behalf of Co-Located Load to take NITS, without the option to instead take the new transmission services set forth in this order, would be inefficient. Specifically, for Eligible Customers taking service on behalf of Co-Located Loads that do not reserve transmission or take energy from the transmission system but which receive only regulation and black start services, or that otherwise are willing and able to limit their energy withdrawals from the transmission system, requiring such Eligible Customers to take NITS on behalf of these Co-Located Loads may in some circumstances result in costly and inefficient transmission system
378 PJM defines Eligible Customer as: “(i) Any electric utility … or any person generating electric energy for sale for resale … (ii) Any retail customer taking unbundled transmission service pursuant to a state requirement that the Transmission Provider or a Transmission Owner offer the transmission service, or pursuant to a voluntary offer of such service by a Transmission Owner, is an Eligible Customer under the Tariff . . . .” PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – E-F (41.0.0). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 88 Date Filed: 10/19/2026
PDF page 90
Docket No. EL25-49-000, et al.- 82 -
buildout that may not be necessary if such Eligible Customers are willing and able to take a transmission service that requires fewer Network Upgrades to provide, and therefore may result in lower Network Upgrade costs, than would NITS. Moreover, we find that PJM’s Tariff is unjust and unreasonable because it does not address charges related to Co-Located Loads’ use of regulation and black start services, which introduces the risk that Co-Located Load may benefit from regulation and black start services without contributing to cost recovery for such services and, thereby, the risk that costs may be allocated entirely to other transmission customers and passed through to residential customers, among others.379 Specifically, the record demonstrates that Co-Located Loads, which are synchronized with the PJM transmission system, use regulation and black start services, as explained below. In addition to regulation and black start services, Co-Located Loads that withdraw energy from the transmission system are taking transmission service.
178.
Therefore, as the second part of the replacement rate, we direct PJM to revise its Tariff to create three new transmission services that reflect that Eligible Customers taking service on behalf of Co-Located Loads are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Specifically, we direct PJM to revise its Tariff to allow Eligible Customers seeking to take NITS on behalf of Co-Located Load to take a new interim, non-firm transmission service until all Network Upgrades necessary to provide the requested NITS are complete. We further direct PJM to offer two other new transmission services—a Firm Contract Demand transmission service and a Non-Firm Contract Demand transmission service380—that an Eligible Customer can choose to take on behalf of a Co-Located Load instead of taking NITS. Specific to these new transmission services, we establish paper hearing procedures to determine the just and reasonable rates, terms, and conditions for such services.
379 While the replacement rate we establish in Part IV.B.4 applies to Eligible Customers taking transmission service on behalf of Co-Located Load, we intentionally refer at times only to Co-Located Load, for example, when explaining in our Show Cause findings how Co-Located Load uses certain services. 380 Under this Non-Firm Contract Demand transmission service, we note that an Eligible Customer on behalf of a Co-Located Load may elect to not reserve any amount of transmission service to the extent that the Eligible Customer will not withdraw any electricity from the transmission system. In such a scenario, as discussed below, the Eligible Customer taking the Non-Firm Contract Demand transmission service on behalf of a Co-Located Load will be charged for regulation and black start services, subject to the paper hearing established below. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 89 Date Filed: 10/19/2026
PDF page 91
Docket No. EL25-49-000, et al.- 83 -
179.
Third, we find the existing BTMG rules in the PJM Tariff to be unjust and unreasonable. As discussed below, under the existing Tariff, loads with BTMG are not fully accounted for in resource adequacy planning. As such, the existing BTMG rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning. Thus, as the third part of the replacement rate, we direct PJM to revise its BTMG rules. Recognizing concerns raised in the record about the potential impacts on existing BTMG customers of the Commission changing PJM’s BTMG rules, however, we direct PJM to maintain the current BTMG rules for customers that fall below a new MW materiality threshold for the amount of load at a particular electrical location that Network Customers may net using BTMG. We also direct PJM to implement a two-part transition process for retail BTMG, as discussed below, including: (1) the establishment of a three-year transition period; and (2) the ability to grandfather certain entities with existing contracts, as described further below. A materiality threshold for all BTMG should reduce the reliability and resource adequacy risks that large or increasing BTMG may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion.
180.
Finally, because certain aspects of PJM’s interconnection procedures do not clearly explain how and where they apply to Interconnection Customers seeking to serve Co-Located Load, we direct several clarifications to PJM’s Tariff regarding interconnection procedures for these customers. In addition, we require PJM to file an informational report on several matters related to PJM’s Critical Issue Fast Path (CIFP) stakeholder process and PJM’s integration of new generation sufficient to serve forecasted large load additions within 30 days of the date of issuance of this order. b. Transmission Service, Regulation and Black Start
181.
The Commission’s cost causation principle requires costs to be allocated to those who cause the costs to be incurred and reap the resulting benefits.381 Courts and the Commission have acknowledged that adherence to the cost causation principle does not require that cost allocation methods balance costs and benefits with “exacting
381 See S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41, 87 (D.C. Cir. 2014) (“[T]he Commission’s adoption of a beneficiary-based cost allocation method is a logical extension of the cost causation principle[;] under that basic tenet, which we have repeatedly embraced, ‘costs are to be allocated to those who cause the costs to be incurred and reap the resulting benefits.’”). See also ICC v. FERC I, 576 F.3d at 476 (“To the extent that a utility benefits from the costs of new facilities, it may be said to have ‘caused’ a part of those costs to be incurred, as without the expectation of its contributions the facilities might not have been built, or might have been delayed.”). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 90 Date Filed: 10/19/2026
PDF page 92
Docket No. EL25-49-000, et al.- 84 -
precision.”382 Ultimately, the requirement is met so long as “all approved rates reflect to some degree the costs actually caused by the customer who must pay them[,]”383 and this apportioning is done by ensuring that costs are “allocated in a manner that is at least roughly commensurate with benefits.”384
182.
There are significant costs to building, operating, and maintaining the transmission system to provide, as relevant here, transmission service, regulation service, and black start service, including fixed costs such as wires, poles, transformers, and substations, as well as ongoing maintenance and upgrades necessary to maintain reliability and serve load.385 Transmission providers undertake substantial planning and make significant investments to minimize disruptions on the transmission system that may impact generators or force generators to go offline.386
183.
There is significant agreement in the record that Co-Located Loads that are synchronized with the PJM transmission system use and benefit from at least some ancillary services and may be reasonably charged for such benefits.387 The Commission
382 Coal. of MISO Transmission Customers v. MISO, 172 FERC ¶ 61,099, at P 83 & n.228 (2020) (quoting Midwest ISO Transmission Owners, 373 F.3d at 1369). 383 Id. P 82 (quoting KN Energy Inc. v. FERC, 968 F.2d 1295, 1300 (D.C. Cir. 1992)).384 Mun. Energy Agency of Neb. v. Pub. Serv. Co. of Colo., 189 FERC ¶ 61,099, at PP 41, 46 (2024) (citation omitted), subsequent history omitted; see also Pub. Serv. Elec. & Gas Co., 989 F.3d at 13 (explaining that “although the Commission need not ‘allocate costs with exacting precision,’ the costs assessed against a party must bear some resemblance ‘to the burdens imposed or benefits drawn by that party’”) (quoting Midwest ISO Transmission Owners, 373 F.3d at 1368-69).385 See, e.g., Indicated Transmission Owners March 24 Response at 3.386 See, e.g., PJM March 24 Response at 42; ITC, Comments, Docket No. AD24-11, at 5 (filed Dec. 9, 2024).387 See Constellation April 23 Reply Comments at 34 (“[I]t may be appropriate to include some ancillary service charges, such as regulation and black start . . . .”); Constellation May 8 Answer at 14 (“To eliminate any debate and move past what always has been a peripheral issue, Constellation would support generator-contingent co-location rules that included ancillary service charges as part of a replacement rate.”); Vistra April 23 Reply Comments at 26 (“Vistra acknowledges that it may be reasonable to charge a co-location configuration for some ancillary services . . . .”); ; Advanced Energy United April 23 Reply Commentsat 19 (“Ultimately, when large co-located loads come online, they will use some ancillary and other wholesale services, and should pay for the Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 91 Date Filed: 10/19/2026
PDF page 93
Docket No. EL25-49-000, et al.- 85 -
has defined ancillary services as part of the costs of transmission services, specifically as those “that must be offered with basic transmission service under an open access transmission tariff … [and] needed to accomplish transmission service while maintaining reliability within and among control areas affected by the transmission service.”388 Also, as PJM notes, ancillary services “pass through transmission lines.”389 184.
Regulation service is necessary to provide for the continuous balancing of resources with load and for maintaining scheduled interconnection frequency at 60 cycles per second (60 Hz).390 The cost of providing regulation service is currently charged or credited to LSEs and wholesale loads based on their pro rata share of the regulation requirements, net of BTMG, for the regulation zone for the hour (but not to be less than zero).391 Regardless of whether a Co-Located Load is drawing energy from the transmission system, Co-Located Loads are unlikely to have a perfect load factor,392 and it will therefore be necessary for PJM to use regulation service to maintain the power balance between the five-minute intervals of the real-time energy market. Depending on the Co-Location Arrangement, variability in the Co-Located Load may be reflected in the generator’s net output to the transmission system. Any moment-to-moment variability in services as any customer would.”); PIOs April 23 Reply Comments at 25 (“. . . [C]o- location arrangements should pay for their share of transmission and ancillary services costs since the transmission system to which co-location arrangements connect deliver blackstart and other critical services to ensure reliability for these co-location arrangements.”).
388 City of Holland, Mich. v. Midwest Indep. Transmission Sys. Operator, Inc., 123 FERC ¶ 61,187, at P 21 (2008) (citing Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,705).389 PJM March 24 Response at 36.390 PJM, Intra-PJM Tariffs, OATT, sched. 3 (6.0.0).391 Id. See also PJM Manual 28. Regulation and Frequency Response Service is accomplished by committing on-line resources whose output is raised or lowered (predominantly through the use of automatic generating control equipment) and by other non-generation resources capable of providing this service as necessary to follow the moment-by-moment changes in load. Each LSE’s share of the regulation requirement is based on its total load net of BTMG for the hour (but not to be less than zero). However, as discussed below, we find PJM’s existing BTMG netting rules unjust and unreasonable.392 Load factor refers to “[t]he ratio of the average load to peak load during a specified time interval.” U.S. Energy Info. Admin. (EIA), Glossary (last visited Dec. 2025), https://www.eia.gov/tools/glossary/index.php?id=L. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 92 Date Filed: 10/19/2026
PDF page 94
Docket No. EL25-49-000, et al.- 86 -
the Co-Located Load within real-time market intervals may be absorbed by the transmission system, meaning that unless an Eligible Customer takes transmission service on behalf of the Co-Located Load, there will be no charges for the benefits that this ancillary service provides. This variability will exist even if the Co-Located Load takes no energy from the transmission system. We therefore find that Eligible Customers taking one of the new transmission services on behalf of Co-Located Load must be assessed for regulation service on a gross demand basis at the existing Tariff rate, consistent with the Commission’s cost causation principles.
185.
Black start service is the ability of generators to start without an outside electric supply or remain operating when disconnected from the transmission system. The revenue requirements of units providing black start service are recovered from transmission customers based on coincident peak load.393 While parties have noted that the generating facilities of some Interconnection Customers serving Co-Located Load may be able to provide black start service,394 many cannot; and even if the generating facility of an Interconnection Customer can provide black start service, as long as it is connected to the transmission system, black start must be coordinated with the system operator to avoid damage to other components of the transmission system.395 Therefore, Co-Located Loads that remain connected to the transmission system through an Interconnection Customer will benefit from black start service in a manner comparable to Network Loads. Further, as parties argue, Co-Located Loads rely on black start service for the restoration of the transmission system.396 We therefore find that Co-Located Loads benefit from black start service even if they have zero net energy withdrawals and Eligible Customers taking one of the new transmission services on behalf of Co-Located Load must be assessed for this service based on gross demand basis at the existing Tariff rate.
393 PJM, Intra-PJM Tariffs, OATT, sched. 6A (16.1.0).394 See, e.g., Mainspring April 23 Reply Comments at 11.395 See, e.g., PJM’s March 24 Response at 42-43.396 See, e.g., Indicated Transmission Owners March 24 Response at 13 n.29. See also PJM March 24 Response at 42 (“The load and generator are connected to and synchronized with the multi-state bulk power system. It is not operating as a micro grid (nor can it if the generating facility is a nuclear unit).”). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 93 Date Filed: 10/19/2026
PDF page 95
Docket No. EL25-49-000, et al.- 87 -
c. BTMG
186.
We find that circumstances have changed since the Commission approved PJM’s retail BTMG rules such that these rules are no longer just and reasonable.397 PJM explains that the BTMG rules were “conceived for, and [have] been implemented for, substantially smaller loads (like a warehouse with solar panels) and not on the scale of large data centers.”398 However, large loads, both existing and in the planning stages with PJM, have proliferated in recent years, and PJM has persuasively explained the problems that could occur if Network Customers with large loads were allowed to use the existing BTMG rules in the Tariff.399 For example, PJM explains that “[a]llowing very large loads like data centers to net is problematic because loads in this configuration do not carry reserves.”400 Such loads must nevertheless be served, however, allowing them to “lean on the PJM system when the co-located generation is on a full or partial outage or if the load exceeds the rating of the co-located generation.”401 Importantly, PJM’s existing BTMG rules do not limit the amount of qualifying load that a Network Customer may net by using BTMG and do not provide any protections against this potential transmission and resource adequacy planning problem or against the costs of maintaining sufficient resources to serve these loads being shifted onto other customers.402 We therefore find that PJM’s BTMG rules are no longer consistent with cost causation principles, because large loads configured in a BTMG arrangement with significant generation will raise cost shifting concerns compared to loads pursuing smaller amounts of netting. We find that PJM’s existing BTMG rules may lead to both reliability and
397 See PJM, 107 FERC ¶ 61,113; ISO New England Inc., 173 FERC ¶ 61,198, at P 68 (2020) (finding new entrant rules unjust and unreasonable based on changed circumstances).398 PJM March 24 Response at 13.399 See, e.g., Docket No. AD24-11-000, Large Loads Co-Located at Generating Facilities Tr. at 9:2-3 (noting that “large data centers [] need these significant new amounts of energy for their business”); PJM Interconnection, L.L.C., 188 FERC ¶ 61,200, at P 5 (2024) (“PJM explains that the [tariff] proposal [to allocate load adjustments] was spurred by the recent proliferation of data centers that are contributing to large additions of forecasted load concentrated within a specific wholesale metering area.”).400 PJM March 24 Response at 36.401 Id. at 13 n.5.402 PJM, Intra-PJM Tariffs, OATT, § III.34.2 Netting of Behind the Meter Generation (0.0.0). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 94 Date Filed: 10/19/2026
PDF page 96
Docket No. EL25-49-000, et al.- 88 -
resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning. We clarify that, while the order is limited to Co-Located Loads, this finding applies to all Network Load.
4. Replacement Rate
a. Generation Interconnection Procedures, pro forma GIA,
and Common Service Provisions
187.
We direct PJM to submit a compliance filing to establish rules for Interconnection Customers serving Co-Located Load. As discussed below, we direct PJM to revise the generation interconnection procedures of the Tariff, the pro forma Generation Interconnection Agreement (GIA),403 and Part I, Common Service Provisions, of the Tariff, and Attachment O, Appendix 2 of the Tariff.
188.
First, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to revise the generation interconnection procedures of the Tariff. In particular, we direct PJM to revise its OATT, VIII, Subpart B, section 403 - Application Rules to add to the list of requirements for a New Service Request that an Interconnection Customer who will use its generating facility to serve Co-Located Load must specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load.404 As part of that compliance filing, we also direct PJM to submit revisions to the generation interconnection procedures to specify any operational procedures or data
403 We note that, as part of reforms to its interconnection process to transition from a serial first-come, first-served study process to a first-ready, first-served cluster study approach, PJM renamed its pro forma ISA to the pro forma GIA. See PJM Interconnection, L.L.C., 181 FERC ¶ 61,162 (2022). The new pro forma GIA applies to interconnection requests subject to the transition period rules and the new rules accepted in the PJM queue reform proceeding. Interconnection Customers who executed interconnection agreements prior to the transition period executed an ISA. Accordingly, we refer to both ISAs and GIAs in this order, where applicable.404 An Eligible Customer could be, for example, any person generating electric energy for resale or any retail customer taking unbundled transmission service under certain conditions. For the full definition of Eligible Customer, see Part I.C. For a discussion of how an Eligible Customer may take transmission service on behalf of Co-Located Load, see infra P 189 n.407. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 95 Date Filed: 10/19/2026
PDF page 97
Docket No. EL25-49-000, et al.- 89 -
exchange requirements that PJM deems necessary for Co-Location Arrangements to remedy our finding that its Tariff lacks sufficient clarity or consistency.405 189.
These Tariff revisions, which will apply to all Interconnection Customers requesting to interconnect their generating facilities to the transmission system and seeking to use those facilities to serve Co-Located Load,406 will establish a requirement in the Tariff for the Eligible Customer to be charged for transmission and ancillary services that the Eligible Customer must take on behalf of the Co-Located Load—either NITS or the new transmission services described below in Part IV.B.4.b.iii.407 To the extent that an Interconnection Customer wishes to serve Co-Located Load using its generating facility but not identify an Eligible Customer, then the Interconnection Customer may take steps to terminate its generating facility’s interconnection to the PJM transmission system and serve the Co-Located Load fully islanded from PJM’s transmission system. 190.
Second, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to revise its pro forma GIA. In particular, we direct revisions to OATT, Part IX, Subpart B GIA to specify that an Interconnection Customer that will use its generating facility to serve Co-Located Load must specify an Eligible Customer that will take transmission service on behalf of the Co-Located Load. We find that this revision will ensure that the charges for transmission and ancillary services taken by Eligible Customers to serve Co-Located Load are appropriately assigned to those Eligible Customers.
191.
Third, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to add a new provision to Part I, Common Service Provisions,
405 For example, PJM explains that “unique operational procedures and data exchange requirements like those proposed in the Susquehanna [Interconnection Service Agreement] should be developed and specified” and that pro forma agreements may require modification to specify, where applicable, the entities that own any Co-Located Load and contact information at the Co-Located Load for use during emergency and non-emergency situations. PJM March 24 Response at 60-62.406 See PJM Interconnection, L.L.C., 189 FERC ¶ 61,078 at P 87 (Susquehanna) (“This [reliance on a generally applicable document for proposed non-conforming provisions] raises questions regarding whether PJM intends to offer these terms to all similarly situated interconnection customers.”).407 There are several ways that an Eligible Customer could take transmission service on behalf of Co-Located Load. For example, subject to applicable state law, the Eligible Customer could create a corporate intermediary to serve the Co-Located Load, or the Co-Located Load, acting as an Eligible Customer, could request service from the relevant transmission owner directly. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 96 Date Filed: 10/19/2026
PDF page 98
Docket No. EL25-49-000, et al.- 90 -
of the Tariff that requires Interconnection Customers with ISAs or GIAs executed, or requested to be filed unexecuted, prior to the effective date of the revised generation interconnection procedures and pro forma GIA directed in this order that wish to add Co-Located Load or are currently serving Co-Located Load to publicly notify PJM of that addition and identify the Eligible Customer that will take transmission service on behalf of that Co-Located Load. As discussed further below, that Eligible Customer must abide by the terms of the Tariff, including terms regarding transmission service. 192.
As a result of these requirements, an Interconnection Customer that requests to interconnect its generating facility to the PJM transmission system, or whose generating facility is already interconnected to the PJM transmission system, and seeks to serve Co-Located Load, or is currently serving Co-Located Load, using its generating facility must specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load, thereby ensuring that the Eligible Customer will be the party responsible for executing a transmission service agreement, which will ensure that the charges for transmission and ancillary services are appropriately assigned. b. Transmission Services
193.
As discussed above, PJM’s Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Eligible Customers taking transmission service on behalf of Co-Located Load. Specifically, as above, we find that PJM’s Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. The following discussion relates to the types of transmission service that an Eligible Customer taking transmission service on behalf of a Co-Located Load must select from when it requests the required transmission service. We look to cost causation principles to determine what constitutes the Eligible Customer’s just and reasonable share of transmission system costs and therefore direct a three-part replacement rate based on the degree to which the Eligible Customer on behalf of Co-Located Load takes transmission and ancillary services. Specifically, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of a Co-Located Load takes one of three transmission services: (1) NITS or a new interim, non-firm transmission service while Network Upgrades to provide full NITS service are constructed, (2) a new Firm Contract Demand transmission service, or (3) a new Non-Firm Contract Demand transmission service. As a part of this compliance obligation, PJM must ensure a transmission service agreement that reflects the rates terms, and conditions of these new transmission service options is available to Eligible Customers.
Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 97 Date Filed: 10/19/2026
PDF page 99
Docket No. EL25-49-000, et al.- 91 -
194.
With respect to the new transmission services that we require, we establish paper hearing procedures to determine the appropriate rates, terms, and conditions of those services. This Tariff requirement, which will apply to any Eligible Customer taking transmission service on behalf of Co-Located Load, incorporates the existing transmission service structure in the Tariff, which imposes rates, terms, and conditions of transmission service on the Eligible Customer. The Tariff requirements that we establish apply to the relevant Interconnection Customer taking interconnection service and the Eligible Customer taking transmission service on behalf of the Co-Located Load. Eligible Customers, on behalf of the Co-Located Loads that they represent, may choose the transmission services that match their preferred use of the transmission system; however, they must choose at least one of the required transmission services, and may take a combination of the new Firm Contract Demand and Non-Firm Contract Demand transmission services that we direct herein.
i. NITS
195.
First, we note that it continues to be just and reasonable for an Eligible Customer taking transmission service on behalf of Co-Located Load to elect, as one of the required transmission services from which the Eligible Customer must choose, to take NITS.408 As discussed further below, NITS provides significant benefits because a NITS customer gains the right to be served from the transmission system at any time, and PJM and the transmission owners incorporate NITS load into their transmission planning. However, as discussed above, we find that the existing Tariff’s BTMG rules are unjust and unreasonable. Thus, Eligible Customers that elect to take NITS on behalf of Co-Located Loads will not be able to use the existing BTMG rules and must instead take NITS on a gross demand basis.409 While we find that NITS charged on a gross demand basis is one just and reasonable transmission service option for Eligible Customers taking transmission service on behalf of Co-Located Loads, it is not the only option. This order establishes new transmission service options that Eligible Customers taking transmission service on behalf of Co-Located Loads may use if they do not wish to take NITS on a gross demand basis.
196.
Consistent with our finding that the existing Tariff’s BTMG rules are unjust and unreasonable, we find that it would be unjust and unreasonable to allow Eligible Customers taking transmission service on behalf of Co-Located Loads to take NITS on a net basis. The Commission has previously found that loads that are able to be served in
408 Eligible Customers taking NITS on behalf of Co-Located Load may not combine NITS with any of the other transmission services discussed herein.409 Eligible Customers taking service on behalf of Co-Located Loads that meet the new criteria discussed below may be able to use the new BTMG rules. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 98 Date Filed: 10/19/2026
PDF page 100
Docket No. EL25-49-000, et al.- 92 -
part through NITS and in part through behind-the-meter generation410 shift costs onto other transmission customers.411 Furthermore, the Commission has rejected cost causation arguments made by network customers that sought to lower their load ratio share based on actual use of the transmission system.412 The Commission has explained that “splitting a discrete load is antithetical to the concept of network service” because “a load at a discrete point of delivery cannot be partially integrated—it is either fully integrated or not integrated.”413 In addition, the Commission found that a split system creates the potential for a customer to evade some or all of its load ratio share cost responsibility for network services by using behind-the-meter generation during monthly peaks to reduce its load ratio share below its actual, typical monthly peak usage (also called peak shaving), resulting in a rate that is subsidized by other network customers.414 Similarly, in Order No. 890,415 the Commission refused to require transmission providers to allow netting of behind the meter generation against network transmission charges. The Commission explained that its existing policy already provides customers with the opportunity to reduce network service costs to the extent a customer is not relying on the transmission system to meet its energy needs (i.e., by taking PTPS instead of NITS).416410 Here we reference behind-the-meter generation more broadly, rather than PJM’s defined BTMG specifically.411 Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,259-61.412 See, e.g., Amtrak, 171 FERC ¶ 61,237 at P 41. See also PJM, 169 FERC ¶ 61,041, at P 60 (2019).413 Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,262.414 Id. at 30,260-61. See also East Ky. Power Coop. Inc. v. Louisville Gas & Elec. Co./Ky. Utils. Co., 154 FERC ¶ 61,144, at P 60 (2016) (“[T]he Commission used the ‘behind-meter-generation’ language as an example of transmission customers subject to the provision but it did not explicitly exclude . . . other transmission customers from this provision.”). 415 Preventing Undue Discrimination and Preference in Transmission Serv., Order No. 890, 118 FERC ¶ 61,119, at P 1619, order on reh’g, Order No. 890-A, 121 FERC ¶ 61,297 (2007), order on reh’g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh’g, Order No. 890-C, 126 FERC ¶ 61,228, order on clarification, Order No. 890-D, 129 FERC ¶ 61,126 (2009).416 Id. The Commission also explained that it would review alternative transmission provider proposals for behind-the-meter generation treatment on a case-by-case basis. Id. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 99 Date Filed: 10/19/2026
PDF page 101
Docket No. EL25-49-000, et al.- 93 -
197.
Regarding Constellation’s argument that it is unduly discriminatory to charge Eligible Customers taking transmission service on behalf of Co-Located Loads for NITS on a gross demand basis to the extent it would charge the same rates to customers who impose different costs on the system,417 we reiterate that while Eligible Customers taking transmission service on behalf of Co-Located Loads must take one of the required transmission services, they may take one of the new transmission services instead of NITS. Therefore, Eligible Customers taking transmission service on behalf of Co-Located Loads that do not wish to be Network Load may seek the alternative transmission services described below. Constellation further argues that charging all Eligible Customers taking transmission service on behalf of large Co-Located Loads for NITS based on a gross demand basis would be unduly discriminatory because it is inconsistent with the treatment of BTMG.418 However, we direct changes to PJM’s existing BTMG rules, as described below. In doing so, we decline to address Constellation’s alternative proposals to modify the BTMG provisions.419 198.
The Network Load that an Eligible Customer designates when taking NITS on behalf of a Co-Located Load will benefit from the transmission system in the same manner as the Network Load of other NITS customers. The Network Load of the Eligible Customer taking NITS on behalf of a Co-Located Load will gain the right to be served from the transmission system at any time. The Network Load of the Eligible Customer taking NITS on behalf of a Co-Located Load, as any other Network Load, would contribute to the need for costs to be incurred for operation and maintenance of the transmission system, as well as new Network Upgrades to keep the transmission system reliable. Moreover, PJM explains, and we agree, that, if Co-Located Load is Network Load, PJM will include the customer’s full load in its models for purposes of procuring capacity and will include Co-Located Load that is Network Load in the load forecast for
417 Constellation April 23 Reply Comments at 31.418 Id. at 32-33, 39.419 See FirstEnergy Serv. Co. v. FERC, 758 F.3d 346, 353 (D.C. Cir. 2014) (“The statutory ‘just and reasonable’ standard is the same under section 205 and section 206.”); ExxonMobil Oil Corp. v. FERC, 487 F.3d 945, 955 (D.C. Cir. 2007) (“Under the arbitrary and capricious test, our standard of review is ‘only reasonableness, not perfection.’ We need not decide whether the Commission has adopted the best possible policy as long as the agency has acted within the scope of its discretion and reasonably explained its actions.”); New England Power Generators Ass’n v. ISO New England Inc., 153 FERC ¶ 61,222, at P 35 (2015) (explaining that, in setting a just and reasonable replacement rate, the Commission could accept a party’s proposal or “implement[] its own solution”). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 100 Date Filed: 10/19/2026
PDF page 102
Docket No. EL25-49-000, et al.- 94 -
purposes of transmission planning.420 Therefore, we find that if an Eligible Customer takes NITS and designates a Co-Located Load as Network Load, the NITS charges an Eligible Customer incurs on behalf of that Co-Located Load will be at least roughly commensurate with the benefits received.
199.
We disagree with parties who argue that Co-Located Loads should only be allowed to take NITS, and that the NITS they must take is on a gross demand basis.421 As discussed further below, we find that the option to take NITS on a gross demand basis is just one part of a just and reasonable replacement rate that also includes the opportunity for Eligible Customers to take on behalf of Co-Located Loads the new Firm or Non-Firm Contract Demand transmission services. As explained below, the record demonstrates that Eligible Customers taking transmission service on behalf of Co-Located Loads are willing and able to limit their energy withdrawals from the transmission system under certain conditions.422 It would be inconsistent with cost causation principles to require Eligible Customers taking transmission service on behalf of Co-Located Loads that limit their energy withdrawals to take NITS on a gross demand basis. Rather, Eligible Customers taking service on behalf of Co-Located Loads should be allowed to choose the transmission service that aligns with their use of the transmission system and therefore aligns the charges for service with the benefits received. Further, we find that requiring an Eligible Customer taking transmission service on behalf of Co-Located Load to take NITS on a gross demand basis would be inefficient. Requiring this could necessitate inefficient and costly transmission buildout and costs paid by transmission customers that may not be necessary if Eligible Customers taking transmission service on behalf of Co-Located Loads are willing to limit their energy withdrawals and take a transmission service that requires fewer Network Upgrades to provide.423420 PJM March 24 Response at 39 n.64.421 See, e.g., NREMC April 23 Reply Comments at 5-6; Indicated Transmission Owners March 24 Response at 16-17; Center April 23 Reply Comments at 27.422 See infra P 204.423 See Antora April 23 Reply Comments at 11-12 (“Where a customer could have instead taken curtailable transmission service that allows PJM and/or the EDC to curtail its load if that service were offered, the failure to provide a service option that incorporates load flexibility will directly lead to costs for the interconnecting customer that do not appropriately reflect its flexibility and resulting ability to avoid using high value energy or grid capacity. And it will lead to increased costs for other customers because PJM’s transmission and interconnection study processes and operating protocols will apply a lack of headroom in its system based on its assumed need to serve the Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 101 Date Filed: 10/19/2026
PDF page 103
Docket No. EL25-49-000, et al.- 95 -
ii. Interim, Non-Firm Transmission Service
200.
Co-Located Loads are concerned with the speed to interconnect to the PJM transmission system and begin operation. As a result, these types of loads have sought to establish Co-Location Arrangements with existing generating facilities that can begin serving new large Co-Located Loads rapidly.424 In response, and to facilitate more rapid interconnection and operation of Co-Located Loads, PJM and other parties discuss the development of a new transitional service that would allow new Co-Located Load to withdraw electricity from the PJM transmission system earlier than may be otherwise achievable if those new Co-Located Loads could only be designated as Network Load and served once all of the Network Upgrades necessary to provide the requested NITS are complete.425 Therefore, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to create a new interim, non-firm transmission service similar, but not identical, to PJM’s proposed option 7. This new interim, non-firm transmission service must allow an Eligible Customer that has requested NITS on behalf of a Co-Located Load to take non-firm transmission service that can be interrupted until the Network Upgrades necessary to provide NITS are complete and the Co-Located Load can be designated as Network Load. We reiterate that this interim, non-firm transmission service should be temporary—only available to Eligible Customers that have requested NITS on behalf of Co-Located Loads that cannot yet be reliably served with NITS—and available only until the necessary Network Upgrades are completed and the Co-Located Load is designated as Network Load. Moreover, this new service would be optional for an Eligible Customer seeking NITS on behalf of a Co-Located Load and would only be available to the extent PJM determines that it can provide some level of interim service reliably. Eligible Customers taking this interim, non-firm transmission service on behalf of Co-Located Loads would pay the NITS rate for the new service, as well as ancillary services charges and charges for black start service, but they would not be charged for generation capacity because, as interruptible entirety of the Network Load at any given moment, despite the fact that the customer is capable of dispatching down pursuant to PJM and/or EDC instructions. This, in turn, will trigger identification of infrastructure upgrades that could have been avoided . . . .”); Constellation April 23 Reply Comments at 20 (“. . . [A] NITS-only approach to serving hyperscale data centers and other large new loads will create a need for massive transmission upgrades and impose billions of dollars of costs on existing customers . . . .”).
424 Show Cause Order, 190 FERC ¶ 61,115 at P 85.425 See PJM March 24 Response at 18-19; Mainspring April 23 Reply Comments at 13; Constellation April 23 Reply Comments at 55-57; Buckeye April 23 Comments at 9. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 102 Date Filed: 10/19/2026
PDF page 104
Docket No. EL25-49-000, et al.- 96 -
loads, capacity will not be procured on their behalf until such time as the Network Upgrades are in place to serve them. Once the required Network Upgrades to serve the full gross demand are in place, the Co-Located Load would be designated as Network Load and the Eligible Customer would pay on behalf of the Co-Located Load all Network Load charges. This transmission service may not be combined with the Firm Contract Demand transmission service or Non-Firm Contract Demand transmission service discussed herein.
201.
We find that this new interim, non-firm transmission service will facilitate the timely provision of transmission service to Eligible Customers taking transmission service on behalf of Co-Located Loads, while preserving reliability for other transmission customers. As discussed above, the record in this proceeding suggests that a key driver of Co-Location Arrangements is delays in new large loads obtaining service through the traditional front-of-the-meter load interconnection process.426 This interim, non-firm transmission service would help to address such delays by allowing an Eligible Customer that has requested to take NITS on behalf of a Co-Located Load to, through this new transmission service, receive an interruptible transmission service before the Network Upgrades necessary to designate and serve the Co-Located Load as Network Load are complete. Eligible Customers taking the interim, non-firm transmission service on behalf of Co-Located Loads would avoid paying generator capacity costs in return for their willingness to curtail their withdrawals in advance of emergency conditions (i.e., it will be curtailed before existing firm transmission services and the new Firm Contract Demand Transmission Service).427 This willingness to curtail would potentially allow them to obtain service more quickly. As part of the compliance filing ordered above, we seek briefing on an appropriate point in emergency operations at which to curtail Eligible Customers taking this new interim, non-firm transmission service on behalf of Co-Located Loads. We further note that, when curtailed, Eligible Customers taking this transmission service on behalf of Co-Located Loads may be able to continue to take energy from the Interconnection Customer with which they are co-located if PJM’s Tariff otherwise allows.
202.
We note that, unlike in PJM’s proposal in option 7, which would allow Eligible Customers taking transmission service on behalf of Co-Located Loads to receive the transitional service until “any resource adequacy supply/demand imbalances associated with the large load addition could be addressed,”428 we instead direct PJM to limit the transitional period to the time needed to complete any Network Upgrades identified in the
426 Indicated Transmission Owners June 3 Answer, Powers Aff. at 16.427 See infra P 208. 428 PJM March 24 Response at 18-19. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 103 Date Filed: 10/19/2026
PDF page 105
Docket No. EL25-49-000, et al.- 97 -
study process as necessary to provide the requested NITS. PJM’s proposal in option 7 to allow the transitional period to continue until any resource adequacy challenges are addressed is too broad and not sufficiently detailed to direct as a replacement rate. 203.
However, as discussed below, we conclude that additional record evidence is needed to set the appropriate replacement rate, i.e., the terms and conditions for the new interim, non-firm transmission service. Thus, we establish a paper hearing and direct further briefing.
iii. Firm Contract Demand and Non-Firm Contract
Demand Transmission Services
204.
As the record demonstrates, various potential Co-Location Arrangements may use the transmission system to differing extents. Specifically, parties note that some Co-Location Arrangements include system protection facilities that prevent energy withdrawals from the transmission system,429 and parties have demonstrated that some Co-Located Loads are willing and able to control their withdrawals from the transmission system.430 System protection facilities are defined as the equipment, including necessary protection signal communications equipment, required to protect (1) Transmission Provider’s Transmission System from faults or other electrical disturbances occurring at the Generating Facility, and (2) the Generating Facility from faults or other electrical system disturbances occurring on Transmission Provider’s Transmission System or on other delivery systems or other generating systems to which Transmission Provider’s Transmission System is directly connected.431 Instead of system protection facilities, we
429 See, e.g., id. at 13-15.430 See, e.g., SEIA April 23 Reply Comments at 8 (citing Duke University’s Nicholas Institute for Energy, Environment & Sustainability, Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems, https://nicholasinstitute.duke.edu/sites/default/files/publications/rethinking-load- growth.pdf (Duke Study)); id. (“Co-located loads with the ability to curtail or shift demand in coordination with generator output or grid constraints should be treated differently than firm grid-dependent load, as these loads would be capable of reducing their demand on the grid.”); Constellation April 23 Reply Comments at 56 (“The Duke Study identifies the significant benefits to the efficient use of the transmission grid and existing capacity when loads can ‘temporarily reduce (i.e., curtail) its electricity consumption from the grid during [] peak stress periods.’”) (quoting Duke Study at 5); EDFR April 23 Reply Comments at 9.431 Federal Energy Regulatory Commission, Pro forma LGIP, § 1 (Definitions) (Aug. 20, 2024), https://www.ferc.gov/media/pro-forma-lgip. See Reform of Generator Interconnection Procs. & Agreements, Order No. 845, 163 FERC ¶ 61,043, at P 367 Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 104 Date Filed: 10/19/2026
PDF page 106
Docket No. EL25-49-000, et al.- 98 -
will use in this order the term special protection scheme, also known as a remedial action scheme. A special protection scheme is a plan designed to detect abnormal system conditions and to automatically take appropriate corrective action, to maintain system stability, acceptable system voltages, and acceptable facility loading. Corrective actions, as applicable here, may address scenarios such as generator runback or load shedding.432 205.
As such, PJM and other commenters discuss transmission services that are tailored to Co-Located Loads that have protection schemes to limit their energy withdrawals from the system, and that recognize the reduced impact on the transmission system of such Co-Location Arrangements as compared to traditional Network Load.433 Parties argue that these services will not require PJM to plan the transmission system to serve these Co-Located Loads to the same extent as PJM must plan the transmission system to serve Network Load, possibly reducing the need for new Network Upgrades.434 Parties further argue that Co-Located Loads may be able to receive transmission service faster with use of a new, limited transmission service product than they would if they selected NITS, to the extent that providing NITS would require Network Upgrades that the limited transmission service would not.435 We note that, in general, special protection schemes allow Eligible Customers on behalf of Co-Located Load to effectively limit their withdrawals from the transmission system.436 For these reasons, in these instances where (2018), order on reh’g, Order No. 845-A, 166 FERC ¶ 61,137, order on reh’g, Order No. 845-B, 168 FERC ¶ 61,092 (2019) (discussing system protection facilities in the context of a generating facility not injecting energy onto the transmission system above the requested level of service).
432 PJM Manual 07: PJM Protection Standards, Rev. 5 (eff. Sept. 25, 2025) § 17.1. We recognize that PJM’s manual currently does not include excess energy withdrawals as an abnormal system condition.433 See, e.g., PJM March 24 Response at 13-15, 18-19; Glatz and Silverman April 23 Reply Comments at 12-13; Constellation April 23 Reply Comments at 65; Vistra April 23 Reply Comments at 28.434 See Enchanted Rock April 23 Reply Comments at 17.435 See Constellation April 23 Reply Comments at 55-56; EPSA/P3 April 23 Reply Comments at 14.436 See Constellation April 23 Reply Comments, Herling Aff. ¶ 23 (“The protection system, discussed above, is fully redundant and, while it cannot be guaranteed to never fail, it is unreasonable to treat the failure of both primary and secondary relay system facilities following the loss of a generator as anything other than a third contingency. In fact, when I was directing transmission planning for PJM, I cannot think of an instance in which we treated such a situation otherwise. In practice, protection Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 105 Date Filed: 10/19/2026
PDF page 107
Docket No. EL25-49-000, et al.- 99 -
the Co-Location Arrangement includes special protection schemes that limit its energy withdrawals, we find that it is a just and reasonable replacement rate to allow an Eligible Customer taking transmission service on behalf of such load to take and be charged for new types of transmission service that are alternatives, and not equivalent, to NITS. 206.
We therefore direct PJM to develop two new transmission services that must be available to Eligible Customers taking transmission service on behalf of Co-Located Loads: (1) Firm Contract Demand transmission service, and (2) Non-Firm Contract Demand transmission service. These new transmission services will serve as permanent alternatives to existing transmission services, unlike the new interim, non-firm transmission service described above in Part IV.B.4.b.ii, and the new transmission services would not require the Co-Located Load to become Network Load. For the Eligible Customer taking transmission service on behalf of a Co-Located Load to be eligible for these new transmission services, the Co-Located Load must be able and willing to prevent or limit its energy withdrawals and must be separately metered from the associated generator. Eligible Customers taking transmission service on behalf of Co-Located Loads would also be able to take a combination of Firm Contract Demand transmission service and Non-Firm Contract Demand transmission service. Because firm transmission service contemplates a reservation and regular withdrawal of energy, Eligible Customers taking transmission service on behalf of Co-Located Loads that will not withdraw energy from the transmission system must take Non-Firm Contract Demand transmission service at 0 MW.
207.
The record assembled to date does not address the appropriate rates, terms, and conditions for these new Firm Contract Demand and Non-Firm Contract Demand transmission services. Thus, we direct further briefing to enable the Commission to set the appropriate replacement rate for these services, as discussed below. Among other topics with respect to this pair of new transmission services available to Eligible Customers taking transmission service on behalf of Co-Located Loads, the Commission directs further briefing on whether the rate paid by an Eligible Customer on behalf of a Co-Located Load taking only a de minimis amount of the new Firm or Non-Firm schemes are regularly employed on the PJM transmission system, and the successful operation of such protective systems is a common observance within PJM.”). Proper special protection scheme design is also subject to NERC standards to ensure they do not introduce unintentional or unacceptable reliability risks to the system. Remedial Action Schemes Reliability Standard, Order No. 837, 160 FERC ¶ 61,071 (2017) (approving Reliability Standard PRC-012-2).
Also, as discussed below, we clarify that PJM’s necessary study process assesses any special protection scheme that is a part of a Co-Location Arrangement. See infra P 227.
Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 106 Date Filed: 10/19/2026
PDF page 108
Docket No. EL25-49-000, et al.- 100 -
Contract Demand transmission services should reflect not only (i) charges for regulation and black start service and (ii) the transmission service charges for that de minimis amount of service, but also an additional charge reflecting that the Co-Located Arrangement is physically connected and synchronized to the PJM transmission system and, if so, how that additional charge, including a de minimis threshold, should be determined.
(a) Firm Contract Demand Transmission
Service
208.
Under the new Firm Contract Demand transmission service, Eligible Customers will have the right to request transmission service on behalf of a Co-Located Load up to a specified MW quantity, i.e., the contract demand. The Firm Contract Demand transmission service will have the same reservation and curtailment priority as existing firm transmission services, at the level of the contract demand. However, unlike NITS customers, the Eligible Customer taking Firm Contract Demand transmission service on behalf of the Co-Located Load is not permitted to withdraw energy from the PJM transmission system beyond the contract demand level.437
209.
Eligible Customers taking the new Firm Contract Demand transmission service on behalf of Co-Located Loads will be charged for transmission, ancillary services, and capacity based on the contract demand, with the exception of regulation and black start services.438 As explained above, we agree with parties who argue that all Co-Located Loads rely on regulation and black start services to be served regardless of whether they are drawing energy from the transmission system,439 and we therefore find that Eligible
437 We note an Eligible Customer may combine Firm Contract Demand transmission service with Non-Firm Contract Demand transmission service to withdraw, on an as-available basis, more energy than its firm entitlement.438 See, e.g., Constellation April 23 Reply Comments at 66 (“Ancillary services should be charged on a gross or net load basis for firm and interruptible configurations, as required to avoid discrimination. For generator-contingent configurations, some charge for regulation or black start service may be appropriate. Energy charges should be assessed based on a net injection or withdrawal of the co-located load generator and load to the transmission system.”).439 See id. at 34 (“[I]t may be appropriate to include some ancillary service charges, such as regulation and black start . . . .”); Vistra April 23 Reply Comments at 27 (“For example, variances in the co-located load, which are seen by the grid as changes in the co-located generator’s output, could be viewed as related to the need for regulation service. Co-location configurations with high load variation therefore can be considered to use regulation service.”); ACEG April 23 Reply Comments at 2 (“Proposed co-located Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 107 Date Filed: 10/19/2026
PDF page 109
Docket No. EL25-49-000, et al.- 101 -
Customers that take the Firm Contract Demand transmission service on behalf of Co-Located Loads must be charged for regulation and black start services based on a gross demand basis, rather than the contract demand.
210.
PJM will only have an obligation to plan for the Network Upgrades necessary to serve Eligible Customers taking this new Firm Contract Demand transmission service on behalf of Co-Located Loads at their contract demand. Because PJM will procure generation capacity on behalf of the Co-Located Load served by Firm Contract Demand transmission service based on their contract demand, we find it is appropriate to charge the relevant Eligible Customer for generation capacity based on the full amount of the Firm Contract Demand transmission service.440 We direct parties to brief the appropriate rate, terms, and conditions for this new Firm Contract Demand transmission service, including whether it would be just and reasonable to apply the current zonal firm PTPS rates to this new transmission service.441
211.
We note that the new Firm Contract Demand transmission service does not raise similar cost shifting concerns as the split system contemplated in Order No. 888-A.442 Firm Contract Demand transmission service customers will be charged based on their contract demand irrespective of usage and therefore will not be able to reduce their load-ratio cost responsibility. Further, PJM will only plan the transmission system and procure generation capacity for the contract demand—not for load growth, like it does for NITS customers—and PJM will have no obligation to serve the Eligible Customer beyond the contract demand. Therefore, we find that allowing Eligible Customers taking transmission service on behalf of Co-Located Loads to take the new Firm Contract Demand transmission service will not cause a cost shift to other transmission customers load arrangements do not always function as truly islanded micro grids, and they may still rely on services such as frequency regulation, voltage support, and black start capability.”).
440 As noted in Part IV.B.2.a supra, states have exclusive authority over the allocation of Commission-jurisdictional costs to retail customers, including retail customers that are Co-Located Load. Therefore, states have authority over how the costs for Firm Contract Demand transmission service and other services assigned to an Eligible Customer are allocated among individual retail customers.441 See PJM, Intra-PJM Tariffs, OATT, sched. 7 (15.0.1). 442 See Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,259 (“The concept of allowing a ‘split system’ or splitting a discrete load is antithetical to the concept of network service. . . . Furthermore, such a split system creates the potential for a customer to “game the system” thereby evading some or all of its load-ratio cost responsibility for network services.”). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 108 Date Filed: 10/19/2026
PDF page 110
Docket No. EL25-49-000, et al.- 102 -
because these Eligible Customers will not be able to reduce their load-ratio share to avoid paying transmission costs or capacity costs. Rather, these customers will pay only for the contracted demand, aligning the costs for the Firm Contract Demand transmission service that they take with the benefits they receive.
212.
Should the Eligible Customer taking transmission service on behalf of a Co-Located Load withdraw energy from the PJM transmission system in excess of the contract demand, for example, due to a special protection scheme failure, we direct PJM to apply a penalty rate. The Commission has previously found that transmission customers should be subject to unreserved use penalties in circumstances where a transmission customer uses transmission service in excess of its reserved capacity or if it uses transmission service where it does not have a reservation.443 Further, PJM states that it has observed that special protection schemes can fail, which may result in the Eligible Customer taking unreserved service from the transmission system on behalf of the Co-Located Load.444 We direct parties to brief the appropriate penalty charge for a Firm Contract Demand transmission service customer’s unreserved use of the PJM transmission system. We also direct parties to brief the appropriate procedures for PJM to curtail Eligible Customers taking the new Firm Contract Demand transmission service on behalf of Co-Located Loads that withdraw energy in excess of the contract demand and any other remedial action that PJM should take to address withdrawals in excess of the contract demand. We also note that, as discussed in the briefing questions below, PJM will determine the technical and engineering requirements of special protection schemes to help address reliability risks associated with unreserved use of the transmission system.
213.
We find that the new Firm Contract Demand transmission service must have a minimum term of one year, similar to NITS.445 However, generation capacity is typically procured three years in advance in PJM. As such, we find that it is just and reasonable that the terms and conditions for taking the new Firm Contract Demand transmission service must prevent transmission customers from switching between the Firm Contract Demand and Non-Firm Contract Demand transmission services, i.e., must include an anti-toggling mechanism. Otherwise, Eligible Customers taking transmission service on behalf of Co-Located Loads may attempt to switch between the two new transmission services based on expected capacity market conditions. PJM’s capacity market includes anti-toggling measures, including the “must-offer” requirement for existing Capacity Resources and the five-year minimum commitment for loads seeking to procure their
443 Order No. 890, 118 FERC ¶ 61,119 at P 834.444 PJM March 24 Response at 44.445 See PJM, Intra-PJM Tariffs, OATT, § III.29.2 Application Procedures (2.0.0). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 109 Date Filed: 10/19/2026
PDF page 111
Docket No. EL25-49-000, et al.- 103 -
own capacity through the Fixed Resource Requirement alternative. Both measures exist to prevent loads or generators from introducing price volatility or exercising market power by entering and exiting the market from one year to the next based on projected market conditions. We direct parties to brief the appropriate mechanism for such a feature, including the appropriate minimum service period and minimum notice period for discontinuing service for the new Firm Contract Demand and Non-Firm Contract Demand transmission services.
(b) Non-Firm Contract Demand Transmission
Service
214.
As discussed above, we establish a new Non-Firm Contract Demand transmission service to be offered to Eligible Customers taking service on behalf of Co-Located Loads. We recognize that not all Co-Located Loads will necessarily plan to withdraw energy from the transmission system on a regular basis. Eligible Customers taking service on behalf of such loads may, however, still seek to withdraw energy from the transmission system from time to time when transmission capacity is available and not needed by firm customers. For example, an Eligible Customer could seek a transmission reservation for a Co-Located Load in advance for the duration of an expected outage of the associated generator. The new Non-Firm Contract Demand service will provide an option for Eligible Customers seeking to use the transmission system on behalf of a Co-Located Load in this more limited manner, while still charging customers for regulation and black start services, for the reasons discussed above.
215.
We find that the new Non-Firm Contract Demand transmission service must be available during normal operations and curtailed during emergency operations (i.e., it will be curtailed before existing firm transmission services and the new Firm Contract Demand Transmission Service). Under this service, Eligible Customers may reserve transmission service on behalf of a Co-Located Load as needed during normal, non-emergency system operating conditions. Reservations under this service would be available only when there is available transmission capacity, similar to existing non-firm transmission service options in the Tariff. Reservations for this service shall be available for terms ranging from one hour to one month, consistent with the terms available for Non-Firm PTPS in the PJM Tariff.446 As noted above, Eligible Customers may use Non-Firm Contract Demand transmission service to make use of the transmission system above their Firm Contract Demand transmission service level, if transmission capacity is available.
446 See PJM, Intra-PJM Tariffs, OATT, § 14.1 (1.0.0) (“Non-Firm Point-To-Point Transmission Service will be available for periods ranging from one (1) hour to one (1) month”). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 110 Date Filed: 10/19/2026
PDF page 112
Docket No. EL25-49-000, et al.- 104 -
216.
Eligible Customers taking the Non-Firm Contract Demand transmission service on behalf of Co-Located Loads will be charged for transmission and ancillary services on an as-reserved contract demand basis, based on the reserved contract demand amount of transmission service (except as noted below). As with the new Firm Contract Demand transmission service, we find that Eligible Customers that take the Non-Firm Contract Demand transmission service on behalf of Co-Located Loads use and therefore should be charged for regulation and black start services based on a gross demand basis, rather than the reserved amount of transmission service. As discussed below, we direct parties to brief the appropriate rate, terms, and conditions for this new Non-Firm Contract Demand transmission service, including whether it would be just and reasonable to apply the current zonal non-firm PTPS rates to this new service.447
217.
In addition, similar to the Firm Contract Demand transmission service, should the Eligible Customer taking the Non-Firm Contract Demand transmission service on behalf of the Co-Located Load make unreserved use of the transmission system by withdrawing energy in excess of its transmission service reservation,448 PJM must apply a penalty rate in such circumstances. We direct parties to brief the appropriate charge for such a penalty, including whether it should be the same as the unreserved use penalty charge applicable to the new Firm Contract Demand transmission service. We also direct parties to brief the appropriate triggers and procedures for PJM to curtail an Eligible Customer taking the new Non-Firm Contract Demand transmission service on behalf of a Co-Located Load when it makes unreserved use of the transmission system by withdrawing energy in excess of its transmission service reservation. 218.
The new Non-Firm Contract Demand transmission service will not include a charge for generation capacity.449 Because it is non-firm transmission service, PJM will not have an obligation to serve Eligible Customers taking this new Non-Firm Contract Demand transmission service on behalf of Co-Located Loads; thus, unlike Network Load, Co-Located Loads on whose behalf Eligible Customers are taking Non-Firm
447 See PJM, Intra-PJM Tariffs, OATT, sched. 8 (14.0.1).448 As noted above, Non-Firm Contract Demand transmission service will be curtailed during emergency operations and we request briefing on the appropriate procedures to govern the circumstances under which PJM curtails an Eligible Customer taking Non-Firm Contract Demand transmission service on behalf of a Co-Located Load during emergency procedures.449 Regardless, however, we clarify that this option is distinct from Vistra’s proposal to allow a secondary generator that provides occasional, interruptible backup service to a Co-Located Load to also serve as a Capacity Resource. Vistra April 23 Reply Comments at 8, 30. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 111 Date Filed: 10/19/2026
PDF page 113
Docket No. EL25-49-000, et al.- 105 -
Contract Demand transmission service would not be considered for resource adequacy planning purposes. PJM will also have no obligation to include the Co-Located Loads on whose behalf Eligible Customers take such service in its transmission planning.
iv. Paper Hearing on Rates, Terms, and Conditions of
New Transmission Services
219.
As discussed above, additional record evidence is needed to set the appropriate replacement rates, terms, and conditions for the new interim, non-firm transmission service, Firm Contract Demand transmission service, and Non-Firm Contract Demand transmission service. Parties should address the following questions with specificity.
(1) What are the appropriate rates, terms, and conditions for the new Firm Contract Demand transmission service, including whether it would be just and reasonable to apply the current zonal firm PTPS charges to this new service and whether it would be just and reasonable and consistent with cost causation to include charges for any of PJM’s administrative services?
(2) What are the appropriate rates, terms, and conditions for the new Non-Firm Contract Demand transmission service, including whether it would be just and reasonable to apply the current zonal non-firm PTPS charges to this new transmission service and whether it would be just and reasonable and consistent with cost causation to include charges for any of PJM’s administrative services?
(3) As noted above, a Co-Location Arrangement is synchronized to the transmission system.450 Should the rate paid by an Eligible Customer on behalf of a Co-Located Load taking only the new Non-Firm Contract Demand transmission service that elects to not reserve any amount of that service for a period of time (e.g., one month) reflect not only charges for regulation and black start services, but also an additional charge given that regulation and black start services could not be provided without the transmission system? If so, how should that additional charge be determined?
(4) As noted above, a Co-Location Arrangement is synchronized to the transmission system.451 Should the rate paid by an Eligible Customer on behalf of a Co-Located Load taking only a de minimis amount of the new Firm or Non-Firm Contract Demand transmission services reflect not only (i) charges for regulation and black start service and (ii) the transmission service charges
450 See also PJM March 24 Response at 42-43.451 Id. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 112 Date Filed: 10/19/2026
PDF page 114
Docket No. EL25-49-000, et al.- 106 -
for that de minimis amount of service, but also an additional charge reflecting that the Co-Location Arrangement is physically connected and synchronized to the PJM transmission system? If so, how should that additional charge be determined?
(5) What is the appropriate penalty charge or other remedial action that PJM should take to address any unreserved use of the PJM transmission system for an Eligible Customer taking Firm Contract Demand transmission service on behalf of a Co-Located Load?
(6) What is the appropriate penalty charge or other remedial action that PJM should take to address any unreserved use of the PJM transmission system for an Eligible Customer taking Non-Firm Contract Demand transmission service on behalf of a Co-Located Load?
(7) What are the appropriate mechanisms for an anti-toggling feature for the Firm Contract Demand transmission service, including the appropriate minimum service period and minimum notice period for discontinuing or modifying the level of service?
(8) What interconnection requirements and operational practices are necessary for special protection schemes to maintain system reliability (e.g. the need for full redundancy of such schemes) in the event that a Co-Located Load itself or its associated generator trips offline?
(9) What communications, alarm, SCADA452 or other requirements are necessary for PJM to monitor Co-Located Load transmission system demand status; ensure that relay settings are consistent with special protection scheme design; and inform system operator action, in order to limit withdrawals from Eligible Customers on behalf of Co-Located Load that exceed the amount of Firm or Non-Firm Contract Demand transmission services?
(10) What other eligibility requirements, e.g., interconnection requirements or operational practices, are necessary for an Eligible Customer to take Firm Contract Demand or Non-Firm Contract Demand transmission service on behalf of Co-Located Load?
452 Supervisory Control and Data Acquisition (SCADA) is a system of remote control and telemetry used to monitor and control the transmission system. See NERC Glossary of Terms at 42, https://www.nerc.com/globalassets/standards/reliability- standards/glossary_of_terms.pdf.
Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 113 Date Filed: 10/19/2026
PDF page 115
Docket No. EL25-49-000, et al.- 107 -
(11) What are the appropriate procedures to govern the circumstances under which PJM curtails an Eligible Customer taking the interim, non-firm
transmission service, Firm Contract Demand transmission service, or
Non-Firm Contract Demand transmission service on behalf of a Co-Located Load during emergency procedures? In particular, can PJM shed all or a portion of a Co-Located Load on whose behalf an Eligible Customer takes Non-Firm Contract Demand transmission service while continuing to serve all or a portion of a Co-Located Load on whose behalf an Eligible Customer takes Firm Contract Demand transmission service?
220.
PJM must submit its initial brief in Docket No. EL25-49-000 on or before February 16, 2026. The deadline to file responses to PJM’s initial brief will be March 18, 2026, and the deadline to file replies to those responses will be April 17, 2026.
v. Behind the Meter Generation (BTMG)
221.
We next turn to the Tariff’s BTMG rules.453 Based on our finding above that PJM’s BTMG rules are no longer just and reasonable, we direct PJM to revise the Tariff to revise the retail BTMG rules. However, we acknowledge that not all loads using BTMG are large loads that create the reliability and resource adequacy risks described above. We therefore direct PJM, within 60 days of the date of issuance of this order, to propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG. Such a threshold should reduce the reliability and resource adequacy risks discussed above that large loads may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion. We acknowledge that such a materiality threshold will not eliminate the risk identified in this order, but we find that it will ensure that the risk is limited. Parties will have an opportunity to comment on PJM’s proposed threshold before we establish this replacement rate. Although we make no finding in this order on a threshold that would be just and reasonable, we note as points of reference that PJM requires any generator larger than 10 MW to be individually metered454 and that the Commission’s definition of a small generator is 20 MW.455453 We clarify that, consistent with the definition in 159,provided above, supra P 164, BTMG is not Co-Located Load.454 PJM Manual 14G: Generation Interconnection Requests, Rev. 8 (eff. July 26, 2023), § 1.6.2.455 Order No. 2006, 111 FERC ¶ 61,220 at P 1. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 114 Date Filed: 10/19/2026
PDF page 116
Docket No. EL25-49-000, et al.- 108 -
222.
We clarify we do not direct PJM to change its rules for non-retail BTMG.456 Because non-retail BTMG is already capped, the record does not demonstrate a need for further changes at this time.457 We also recognize concerns raised in the record about the potential impacts of the Commission changing PJM’s BTMG rules for existing BTMG customers.458 We thus make several findings and directives about the replacement rate below that are designed to minimize the impact of this transition on existing BTMG customers.
223.
First, we find that it is appropriate to establish a transition period for Network Customers currently using PJM’s existing BTMG rules. We thus direct PJM, within 60 days of the date of issuance of this order, to include in its compliance filing Tariff revisions to allow Network Customers already using the BTMG rules to continue to do so for a transition period of three years, which aligns with the timeline to procure replacement capacity in PJM,459 from the date of issuance of this order. We find that this approach reasonably balances concerns about expediently addressing unjust and unreasonable rates with concerns from parties that have relied on the existing Tariff. 224.
Second, while the record indicates that parties desire the continued use of the existing Tariff BTMG rules,460 we acknowledge the possibility that entities may also have contracted for the specific purpose of effectuating a BTMG arrangement. To the extent an entity is a party to an existing contract for such a purpose, we find that it is
456 PJM defines Non-Retail BTMG as BTMG that is “used by municipal electric systems, electric cooperatives, or electric distribution companies to serve load.” PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – L-M-N (51.0.1) (defining Non-Retail BTMG).457 Indicated Transmission Owners March 24 Response at 28 n.6 (“. . . [T]he total amount of Non-Retail BTMG in the PJM Region is capped in any specific year and sets a maximum ceiling of 3,000 MW . . . .”); PJM, Intra-PJM Tariffs, OATT, § III.34.3 Netting of Non-Retail Behind the Meter Generation (1.0.0).458 See, e.g., AMP April 23 Reply Comments at 10-11; PSE&G May 23 Answer at 7.459 See PJM, Intra-PJM Tariffs, OATT, attach. DD.5, § 5.4(a) Reliability Pricing Model Auctions (10.0.0) (“The Base Residual Auction shall be conducted in the month of May that is three years prior to the start of such Delivery Year.”).460 See, e.g., PSE&G May 23 Answer at 2 (“Second, rules adopted by the Commission should not adversely impact existing customers in PJM who have BTMG and who have long relied upon the netting provisions under the PJM Tariff for purposes of paying wholesale grid services . . . .”). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 115 Date Filed: 10/19/2026
PDF page 117
Docket No. EL25-49-000, et al.- 109 -
appropriate to grandfather such entity so that it may continue using BTMG for the current term remaining under the existing contract.461 We thus direct PJM, within 60 days of the date of issuance of this order, to include in its compliance filing Tariff revisions to grandfather entities with existing contracts for the specific purpose of effectuating a BTMG arrangement for the current term remaining under the existing contract. c. Necessary Study Process462 for Existing Interconnection
Customers
225.
Based on our finding above that the PJM Tariff is unjust and unreasonable because it lacks sufficient clarity and consistency with respect to the rules for Co-Location Arrangements, we direct PJM to revise its Tariff to provide sufficient clarity regarding the responsibilities of existing Interconnection Customers seeking to serve Co-Located Load using their generating facilities.
226.
First, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to revise the Tariff to clarify that an existing Interconnection Customer seeking to modify its ISA or GIA to allow its generating facility to serve Co-Located Load, including to reflect any reduction in its CIRs, must follow the necessary study process to effectuate such Co-Location Arrangement. Vistra argues that the Commission should require transmission owners to cooperate in the necessary study process,463 and Indicated Transmission Owners respond that the Commission cannot require transmission owners to participate in a study process as a prerequisite to interconnecting load.464 Vistra’s request is unnecessary. As part of the replacement rate in this order, we establish a just and reasonable process to accommodate Co-Location Arrangements, including by requiring the designation of an Eligible Customer to take transmission service on behalf of a Co-Located Load, and thereby reduce concerns raised in the Show Cause Order about how transmission owners approach Interconnection
461 Cf. ISO New England Inc., 121 FERC ¶ 61,097 (2007) (accepting subject to condition proposal including an option for certain customers with existing agreements for grandfathered treatment); ISO New England Inc., 124 FERC ¶ 61,297 (2008) (approving settlement agreement to implement proposal including grandfathering option).462 Necessary studies “are essentially generator interconnection modification studies.” PJM March 24 Response at 7. This process is used for changes “that typically have relatively small MW impacts on [the generator’s] ability to deliver less power to the grid than the configuration reflected in an existing service agreement.” PJM March 24 Response at 47.463 Vistra April 23 Reply Comments at 23.464 Indicated Transmission Owners June 3 Answer at 23. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 116 Date Filed: 10/19/2026
PDF page 118
Docket No. EL25-49-000, et al.- 110 -
Customers’ requests to use their generating facilities to serve Co-Located Load.465 We also clarify that the above-directed requirement is on the Interconnection Customer with the interconnected generating facility that is seeking to modify its ISA or GIA to use that generating facility to serve Co-Located Load.
227.
Second, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to add to the Tariff a description of the scope of the analysis that it will perform as part of the necessary study process when an Interconnection Customer seeks to use its existing generating facility to serve Co-Located Load, consistent with PJM’s discussion of how it conducts necessary studies associated with Interconnection Customers seeking to amend their ISAs or GIAs to use existing generating facilities to serve Co-Located Load, including to reflect any reduction in CIRs.466 This should provide additional clarity and transparency regarding the steps that PJM and Interconnection Customers are taking to maintain transmission system reliability before an existing generating facility can serve Co-Located Load. In response to Antora’s concerns,467 we require PJM to describe the information that the Interconnection Customer must provide about the Co-Located Load for purposes of the necessary study. In response to RMI,468 we clarify that PJM’s necessary study process, as reflected in the record, assesses any special protection scheme that is a part of a Co-Location Arrangement.469 We disagree with parties such as PIOs who claim that the necessary study process is inappropriate for generation interconnection modification to serve Co-Located Load. PIOs, for example, claim this process is “a poor fit,”470 but they do not critique PJM’s detailed explanation in its Show Cause Response of the scope of its study. We also believe that the Tariff revisions required as part of this compliance filing address some of the transparency concerns that parties have raised about the use of the
465 Show Cause Order, 190 FERC ¶ 61,115 at P 75 (“As such, the record of proceedings before the Commission appear to suggest that Transmission Owners are taking different approaches to performing the steps necessary to accommodate a co-location arrangement and in the transmission service that they are requiring entities to take.”). 466 See PJM March 24 Response at 49, 51-53.467 Antora April 23 Reply Comments at 8.468 RMI April 23 Reply Comments at 4-5.469 PJM March 24 Response at 49. 470 PIOs April 23 Response at 9. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 117 Date Filed: 10/19/2026
PDF page 119
Docket No. EL25-49-000, et al.- 111 -
necessary study process, including questions about the scope of the analysis471 and how the necessary study process aligns with other studies.472 To the extent that PJM seeks to enhance the necessary study process, including as it gains experience evaluating requests from Interconnection Customers to modify their interconnection to serve Co-Located Load, PJM may submit such enhancements in an FPA section 205 filing.
228.
Third, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to revise the Tariff to indicate that the Interconnection Customer will be responsible for the costs of any modifications or Network Upgrades that are needed as a result of PJM’s study of the change to the ISA or GIA to allow the existing generating facility to serve Co-Located Load, including to reflect any reduction in CIRs, inclusive of all necessary Network Upgrades. This will clarify that costs associated with such Co-Location Arrangements will not be unfairly shifted to other transmission customers. PJM states that it requires Interconnection Customers to complete such upgrades before using their generating facilities to serve Co-Located Load in practice, but this requirement does not appear to be in the Tariff.473 Therefore, as part of this compliance directive, we direct PJM to revise its Tariff to clarify that an existing generator may not commence service to a Co-Located Load until all required Network Upgrades, special protection schemes, and metering are in service.
229.
By directing PJM to revise its Tariff as discussed above, the Tariff will have sufficient clarity and consistency to facilitate Co-Location Arrangements in a just and reasonable and not unduly discriminatory or preferential manner. We note that we are directing a longer compliance timeline for PJM to submit these Tariff revisions related to Interconnection Customers seeking to serve Co-Located Load using existing generating facilities, compared to the compliance timeline described below related to new generating facilities, in order to expeditiously provide Interconnection Customers clarity on the steps that will be needed to bring new generation online to serve Co-Located Loads. 230.
In accordance with the existing rules for removing Capacity Resource status,474 we also clarify that an existing generating facility may not begin serving Co-Located Load
471 OPSI April 23 Reply Comments at 3.472 Glatz/Silverman April 23 Reply Comments at 7.473 PJM March 24 Response at 50 (“Service to the co-located load pursuant to the co-located load configuration may not commence until the necessary PJM interconnection service agreement(s) has been fully executed by the parties, filed with and accepted by the Commission, and all required system reinforcements, system protection facilities, and metering are in place.”) (emphasis added).474 See PJM, Intra-PJM Tariffs, OATT, attach. DD.6, § 6.6 Offer Requirement for Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 118 Date Filed: 10/19/2026
PDF page 120
Docket No. EL25-49-000, et al.- 112 -
that is not Network Load until it has delisted its CIRs for the portion of the generating facility to be designated to serve any Co-Located Load that is not receiving NITS. In order for an existing generator to de-list its CIRs to serve Co-Located Load, the Interconnection Customer must revise its ISA or GIA and bear the cost of all required system upgrades, as noted above.
d. New Generating Facilities Serving Co-Located Load
231.
Next, we discuss several clarifications that we require PJM to make in its Tariff with respect to Interconnection Customers seeking to use new generating facilities to serve Co-Located Load. Such revisions are necessary to clarify the steps such Interconnection Customers must take to effectuate Co-Location Arrangements in a manner that is just and reasonable and not unduly discriminatory or preferential. 232.
First, with respect to Interconnection Customers seeking to use new generating facilities to serve Co-Located Load, we direct PJM to submit, within 30 days of the date of issuance of this order, a compliance filing to revise section 404.A.2.a.v of its Tariff to clarify that PJM shall consider requests for interconnection service below the full generating capability of the generating facility, so that an Interconnection Customer may request interconnection service at a level below its maximum facility output to serve Co-Located Load. We direct PJM to revise any other Tariff provisions consistent with this directive.475 Consistent with PJM’s existing Tariff process, an Interconnection Customer seeking to use its generating facility to serve Co-Located Load will be studied at the level of interconnection service requested for the purposes of determining Interconnection Facilities, Network Upgrades, and associated costs, but may be subject to other studies at the full generating capability of the generating facility to ensure the safety and reliability of the transmission system, with the study costs borne by the Interconnection Customer.476 This revision will clarify that an Interconnection Customer seeking to use a new generating facility to serve a Co-Located Load may request only the minimum level of interconnection service it deems necessary to effectuate its Co-Location Arrangement.
233.
Second, we direct PJM to submit, within 30 days of the date of issuance of this order, a compliance filing to revise its Tariff to clarify that Interconnection Customers seeking to use new generating facilities to serve Co-Located Load may use existing procedures to accelerate a new service request if they satisfy the criteria of PJM’s Tariff, Capacity Resources (3.0.0); PJM March 24 Response at 58.
475 See Order No. 845, 163 FERC ¶ 61,043 at P 367.476 PJM, Intra-PJM Tariffs, OATT, § VIII.C.404.A.2.a.v Introduction (1.0.0). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 119 Date Filed: 10/19/2026
PDF page 121
Docket No. EL25-49-000, et al.- 113 -
i.e., the request has no cost allocation for Network Upgrades and does not require further studies.477
234.
Third, we direct PJM to submit, within 30 days of the issuance of this order, a compliance filing to revise the Tariff to clarify that an Interconnection Customer seeking to use a new generating facility to serve Co-Located Load may request provisional interconnection service. As the Commission explained in Order No. 845, Interconnection Customers may seek provisional interconnection service when available studies or additional studies as necessary indicate that there is a level of interconnection service that can occur without any additional Interconnection Facilities and/or Network Upgrades, and the Interconnection Customer wishes to make use of that level of interconnection service while the facilities required for its full interconnection request are completed.478 Consistent with PJM’s existing Tariff process, whether PJM grants a request for provisional interconnection service is at PJM’s discretion based upon its evaluation and the results of available studies.479 This revision will clarify that an Interconnection Customer that requests provisional interconnection service for a new generating facility serving Co-Located Load can enter commercial operation and begin serving the Co-Located Load on an expedited basis, provided such provisional interconnection service is available. We also note that an Interconnection Customer may seek provisional service in combination with a request to interconnect at a level below nameplate capacity. 235.
Fourth, we direct PJM to submit, within 30 days of the date of issuance of this order, a compliance filing to revise section 414 of its Tariff to clarify that an Interconnection Customer seeking to use a new generating facility to serve Co-Located Load at an existing point of interconnection may request Surplus Interconnection Service, if the existing Interconnection Customer at that point of interconnection has made Surplus Interconnection Service available. Consistent with PJM’s Tariff, Surplus Interconnection Service is granted if PJM concludes in its Surplus Interconnection Study that no new Network Upgrades are required to accommodate the new generating facility’s output at the designated point of interconnection.480 This revision will clarify
477 PJM, Intra-PJM Tariffs, 406, OATT Part VIII.C 406 Decision Point I (1.1.0), § 406.A.2 (“Only New Service Requests that have no cost allocation for Network Upgrades and do not require further studies are eligible for acceleration.”); PJM, Intra-PJM Tariffs, 408, OATT Part VIII.C 408 Decision Point II (2.1.0), § 408.A.2.d (stating same).478 Order No. 845, 163 FERC ¶ 61,043 at P 441.479 PJM, Intra-PJM Tariffs, ATTACHMENT O.A2.1.4A, OATT ATTACHMENT O.A2.1.4A Other Interconnection Options (2.1.0), § 1.4A.2.480 PJM, Intra-PJM Tariffs, 414, OATT Part VIII.E 414 Surplus Interconnection Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 120 Date Filed: 10/19/2026
PDF page 122
Docket No. EL25-49-000, et al.- 114 -
that an Interconnection Customer seeking to use a new generating facility to serve Co-Located Load has the same opportunity to use Surplus Interconnection Service that is available to other new Interconnection Customers.
236.
Lastly, we note that PJM requested guidance on its proposed options, including option 6.481 Noting that we direct PJM to clarify its Tariff with respect to Interconnection Customers seeking to use a new generating facility to serve Co-Located Load, PJM and several commenters state that additional Tariff constructs that accelerate interconnection studies for new generation associated with new Co-Located Loads (PJM proposed option 6) may be just and reasonable.482 We believe that such constructs may help address concerns raised in this proceeding that increasing amounts of new Co-Located Load seeking to be served by an Eligible Customer faster than equivalent generation can come online may create resource adequacy problems.483 As PJM notes,484 additional load on the system requires the addition of generators to serve that load reliably, and a process with accelerated interconnection studies for certain generators with Co-Located Load could timely match new load with needed generation.
e. Informational Report
237.
We also are encouraged that, in August 2025, the PJM Board of Managers (PJM Board) initiated the CIFP stakeholder process to address matters that relate to but that are broader than those involving Co-Location Arrangements, and specifically, “to address the development of reliability-focused solutions to ensure large load additions can continue Service (1.0.0), § 414.B.2.
481 See PJM March 24 Response at 5, 33-34, 53. PJM’s option 6 refers to Co-located load that elects to be Network Load and bring its own generation.
482 PJM suggests that one possibility could be to enhance existing provisional interconnection service to accelerate in a non-discriminatory manner the ability of new generation to achieve commercial operation. Id. at 17; see also Bloom April 23 Reply Comments at 2 (arguing that an integrated interconnection approach such as that outlined in the Brattle Report attached to Bloom’s comments, which “shares some traits with the approach PJM calls New Option 6,” could significantly accelerate the interconnection timeline).483 See, e.g., PJM March 24 Response at 16-17; Market Monitor April 23 Reply Comments at 11; BrightNight April 23 Reply Comments at 9; Ohio FEA April 23 Reply Comments at 4-5; AEU April 23 Reply Comments at 14.484 PJM March 24 Response at 62. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 121 Date Filed: 10/19/2026
PDF page 123
Docket No. EL25-49-000, et al.- 115 -
to be integrated rapidly and reliably, without causing resource inadequacy.”485 PJM and stakeholders considered a number of potential reforms designed to accommodate large load additions in an efficient and reliable manner. In PJM’s contemplated expedited interconnection process, for example, generation projects that have a contractual commitment to a new large load, in addition to standalone generation that submits a higher readiness deposit to PJM, would be able to access an expedited interconnection pathway, so long as they seek to be Capacity Resources, meet a substantial size threshold, pay a large, non-refundable study deposit, are supported by a state commitment to expedite permitting, and demonstrate three full years of 100% site control, among other criteria. Other reforms considered, and that we highlight here, included, but were not limited to, modifications to PJM’s reliability backstop mechanism to expedite PJM’s ability to procure generation capacity on a multi-year basis during instances of resource adequacy shortfalls, development of enhanced load forecasting criteria and processes, and rules to enable the more efficient utilization of the transmission system by increasing demand flexibility.
238.
Accordingly, we direct PJM to submit in Docket No. EL25-49-000, within 30 days of the date of issuance of this order, a detailed informational report486 on the status of the proposals considered in the CIFP stakeholder process, including—but not limited to—the status of the expedited interconnection process to enable shovel-ready generation projects to serve PJM more quickly, modifications to PJM’s reliability backstop mechanism to improve PJM’s ability to respond to acute resource adequacy shortfalls, and the development of enhanced load forecasting487 and demand flexibility measures to assist PJM in determining the amount of new capacity that is needed to maintain system reliability. The informational report must include a detailed schedule of key milestones, such as stakeholder or PJM Board votes, that includes the estimated date on which PJM expects to file any such proposals with the Commission. Additionally, as part of this informational report, we direct PJM to identify any problem statements, issue charges, or other ongoing stakeholder processes that aim to increase the pace of adding generating capacity in the PJM region. PJM must provide as detailed a schedule as is feasible on the
485 PJM, Critical Issue Fast Path – Large Load Additions, https://www.pjm.com/committees-and-groups/cifp-lla (last visited Dec. 5, 2025).486 Upon receipt, the Commission will not act on or notice this informational filing.487 We note that, on October 20, 2025, PJM submitted a response to then-Chairman Rosner’s letter on load forecasting. See supra P 154. PJM should expand on its response to then-Chairman Rosner in the informational report that we direct here by explaining, in detail, any changes or updates to its load forecasting processes that it is considering. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 122 Date Filed: 10/19/2026
PDF page 124
Docket No. EL25-49-000, et al.- 116 -
timing of such initiatives, including updates on the stakeholder process and approximate dates of any anticipated filings with the Commission. The informational report also must identify specifically which of these initiatives would support the addition, on an expedited basis, of new generation that is sufficient to serve large loads, like data centers, while meeting PJM’s near-term system resource adequacy needs
239.
Finally, given PJM's currently compressed auction schedule, PJM should explain the proposed effective date of any proposal that it intends to file so that the Commission can understand whether any of those proposals could be in place by the 2028/2029 Base Residual Auction (BRA) and subsequent BRAs to attract sufficient new generation to maintain regional resource adequacy.
5. PJM Capacity Market, Reliability, and Resource Adequacy
240.
There is also insufficient evidence in the record to find that the existing Tariff provisions governing capacity market rules, reliability, and resource adequacy are unjust and unreasonable or unduly discriminatory or preferential. In the Show Cause Order, the Commission stated that the Tariff may be unjust and unreasonable and unduly discriminatory or preferential insofar as it lacks rules necessary to provide PJM with sufficient information to perform appropriate analysis to ensure reliable system operations given the characteristics of Co-Location Arrangements.488 Commenters responded with concerns, including that Co-Located Load served entirely behind-the-meter will not be accounted for in PJM’s planning processes and that Co-Located Load could unexpectedly appear online after being previously invisible to PJM.489
241.
However, as directed herein, Interconnection Customers choosing to serve Co-Located Load using their generating facilities will be required to identify an Eligible Customer who will take transmission service on behalf of that Co-Located Load. We find that this requirement should address concerns that Co-Located Load would not be visible to PJM or its transmission owners. We further note that Co-Located Load that elects to meet this requirement by taking NITS or the new Firm Contract Demand transmission service through an Eligible Customer will be included in transmission planning and the capacity market.490 In addition, the Eligible Customer that elects to instead take the Non-Firm Contract Demand transmission service on behalf of
488 See Show Cause Order, 190 FERC ¶ 61,115 at PP 83-86.489 Indicated Transmission Owners April 23 Reply Comments at 13; PPL April 23 Reply Comments at 10-11; Pennsylvania Commission April 22 Reply Comments at 6.490 See PJM March 24 Response at 39 n.64; Indicated Transmission Owners March 24 Response, attach. A at 17. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 123 Date Filed: 10/19/2026
PDF page 125
Docket No. EL25-49-000, et al.- 117 -
Co-Located Load agrees that it will be curtailed during emergency operations upon PJM’s direction, and thus will not be included in transmission planning or in the capacity market.
242.
Because PJM states that Co-Located Loads that elect to be Network Load may participate as a demand response resource under PJM’s existing Tariff,491 we find that there is not sufficient evidence to conclude that the existing Tariff is not just and reasonable as it relates to the existing demand response rules. We recognize that PJM acknowledges that there could be an additional review of the PJM Demand Response rules in its stakeholder process,492 which may be further addressed through a future FPA section 205 filing. We also note that the Firm Contract Demand transmission service and Non-Firm Contract Demand transmission service we direct in this order will create opportunities for Co-Located Loads that do not elect to be Network Load to benefit from any ability they have to limit their consumption.
243.
Regarding broader resource adequacy and reliability concerns associated with maintaining sufficient generation to serve Co-Located Load, we reiterate that load growth generally involves resource adequacy and reliability considerations, regardless of whether the new load is Co-Located Load.493 Several commenters, including PJM, acknowledge this fact.494 While the Commission found in the Show Cause Order that the speed at which Co-Located Load can be added to the transmission system may pose particular resource adequacy challenges, especially if Co-Location Arrangements are not adequately and transparently reflected in existing resource adequacy planning mechanisms,495 there is not sufficient evidence to conclude that additional Tariff changes regarding Interconnection Customers electing to use their generating facilities to serve Co-Located Load are needed with respect to capacity market rules, reliability, and resource adequacy to ensure that the PJM Tariff remains just and reasonable. We encourage PJM to continue monitoring capacity market, resource adequacy, and reliability issues as they relate to Co-Location Arrangements to evaluate whether additional Tariff changes may be appropriate.
491 PJM March 24 Response at 19-20.492 Id. at 20.493 Show Cause Order 190 FERC ¶ 61,115 at P 85.494 See, e.g., PJM March 24 Response at 57; Constellation April 23 Reply Comments at 11, 60-61 (citing Patterson Aff. ¶ 15).495 Show Cause Order 190 FERC ¶ 61,115 at P 85. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 124 Date Filed: 10/19/2026
PDF page 126
Docket No. EL25-49-000, et al.- 118 -
6. Motions
244.
In response to the Motion to Stay, we reject the Joint Parties’ request to stay the proceeding to allow them to develop through settlement proceedings a new replacement rate that establishes the services an Eligible Customer takes on behalf of Co-Located Load and allocates any costs to such Eligible Customer. Because we have established paper hearing procedures to determine the just and reasonable rates, terms, and conditions for new transmission services, and directed PJM to make related Tariff revisions on compliance, we deny the Motion to Stay.
245.
We note that Vistra moved for clarification in this proceeding regarding the meaning of Susquehanna by April 16, 2025 so that parties could take the Commission’s clarification of that order into account when preparing the comments due in this proceeding on April 23, 2025. The Commission issued the Susquehanna Rehearing Order on April 10, 2025 in Docket No. ER24-2172-002, including ruling on Vistra’s motion in that proceeding seeking clarification of Susquehanna.496 We thus dismiss as unnecessary Vistra’s pending motion in this proceeding.
246.
We partially grant Constellation’s Motion insofar as we adopt the finding in the Show Cause Order that the PJM Tariff is unjust and unreasonable and establish a replacement rate.
247.
We disagree with PJM that acting in this proceeding violates applicable case law. PJM selectively quotes Cities of Anaheim for the proposition that adjudication should not supplant a pending rulemaking proceeding, but PJM points to no actual court decision that holds that an agency has violated the Administrative Procedure Act on that basis. We also disagree with parties who argue that acting in this proceeding would prejudge the issues raised in the ANOPR proceeding or otherwise be improper. The Commission has discretion as to whether to proceed via adjudication or rulemaking,497 and we find that it is an appropriate exercise of discretion to act on the PJM co-location proceeding before taking any action in the ANOPR proceeding.
7. Constellation Complaint
248.
In the Show Cause Order, the Commission consolidated the new show cause proceeding in Docket No. EL25-49-000 with the complaint filed by Constellation against the PJM Tariff in Docket No. EL25-20-000. As summarized in detail in the Show Cause
496 Susquehanna, 191 FERC ¶ 61,025.497 N.L.R.B. v. Bell Aerospace Co. Div. of Textron, Inc., 416 U.S. 267, 294 (1974). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 125 Date Filed: 10/19/2026
PDF page 127
Docket No. EL25-49-000, et al.- 119 -
Order,498 Constellation argued that the Tariff is unjust and unreasonable and unduly discriminatory because it lacks rules for interconnected generators to follow when seeking to serve to end-use load co-located with generation behind the meter in a configuration with system protection facilities to prevent the load from receiving electricity from the transmission system.499 Constellation stated that, in establishing the replacement rate, the Commission should conclude that provisions of the PJM Guidance Document not on file with the Commission (particularly sections 2, 3, 5, and 7) must be incorporated into the Tariff under the rule of reason, which will provide certainty to generators and transmission owners by ensuring that the PJM Guidance Document is applied to all interconnected generators seeking to serve Co-Located Load.500 249.
We grant in part and deny in part the complaint. We grant the complaint insofar as we find, as discussed above, that PJM’s Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load, including generators serving Co-Located Load in a configuration with special protection schemes to prevent the Co-Located Load from taking energy from the transmission system. We deny the complaint insofar as we direct PJM, as discussed above, to revise the Tariff to establish just and reasonable replacement rates, terms, and conditions for Interconnection Customers serving Co-Located Load. The PJM Guidance Document has been rescinded by PJM,501 and it lacked all terms that we find above are just and reasonable for Interconnection Customers serving Co-Located Load. The Commission orders:
(A)
PJM is hereby directed to submit, within 30 days of the date of issuance of this order, revisions to its Tariff as described in Part IV.B.4.d.
(B)
PJM is hereby directed to submit, within 60 days of the date of issuance of this order, revisions to its Tariff as described in Part IV.B.4.a and Part IV.B.4.c. (C)
PJM is hereby directed to submit, within 60 days of the date of issuance of this order, revisions to modify its Tariff to provide that the Eligible Customer taking transmission service on behalf of a Co-Located Load ensure that the Co-Located Load take one of three transmission services: (1) NITS, as modified in the body of this order,
498 See Show Cause Order, 190 FERC ¶ 61,115 at P 50.499 Complaint at 1.500 Id. at 20.501 PJM March 24 Response at 33. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 126 Date Filed: 10/19/2026
PDF page 128
Docket No. EL25-49-000, et al.- 120 -
(2) a new Firm Contract Demand transmission service, or (3) a new Non-Firm Contract Demand transmission service, as discussed in Part IV.B.4.b.
(D)
Paper hearing procedures are established to evaluate the rates, terms, and conditions of the interim, non-firm transmission service, Firm Contract Demand transmission service, and Non-Firm Contract Demand transmission service. (E)
PJM is hereby directed to submit its initial brief in Docket
No. EL25-49-000 on or before February 16, 2026. The deadline to file responses to PJM’s initial brief will be March 18, 2026, and the deadline to file replies to those responses will be April 17, 2026.
(F)
PJM is hereby directed to submit, within 60 days of the date of issuance of this order, revisions to the Tariff to: (1) revise the BTMG rules, as discussed in the body of this order; (2) propose a new MW threshold for the amount of load that Network Customers may net by using BTMG, as discussed in the body of this order; and
(3) establish a transition period for Network Customers already using the BTMG rules, as discussed in the body of this order.
(G)
PJM is directed to submit an informational report within 30 days of the date of issuance of this order, as discussed in the body of this order. (H)
Joint Parties’ motion to stay is hereby denied, as discussed in the body of this order.
(I)
Vistra’s motion for clarification is hereby dismissed, as discussed in the body of this order.
(J)
Constellation’s motion for expedited action is partially granted, as discussed in the body of this order.
Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 127 Date Filed: 10/19/2026
PDF page 129
Docket No. EL25-49-000, et al.- 121 -
(K)
The Constellation complaint in Docket No. EL25-20-000 is hereby granted in part and denied in part, as discussed in the body of this order. By the Commission. Commissioner Rosner is concurring with a separate statement attached.
Commissioner Chang is concurring with a separate statement
attached.
( S E A L )
Debbie-Anne A. Reese,
Secretary.
Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 128 Date Filed: 10/19/2026
PDF page 130
Docket No. EL25-49-000, et al.- 122 -
Appendix
Intervenors
Advanced Energy United (AEU)+
AES Corporation*
Alliant Energy Corporate Services, Inc.
Allegheny Electric Cooperative, Inc.+
Alpha Generation, LLC*
Ameren Companies502
American Clean Power Association
American Council on Renewable Energy (ACORE)*+
American Electric Power Service Corporation (AEP)503
American Municipal Power, Inc. (AMP)+&
American Petroleum Institute*
Americans for a Clean Energy Grid (ACEG)+
AMP Transmission, LLC*
Antora Energy LLC (Antora)*+
Appalachian Voices
Arevon Energy, Inc.
Arkansas Public Service Commission*
Avangrid, Inc.
Bloom Energy Corporation (Bloom)+
Boston Energy Trading and Marketing LLC
BrightNight Power Marketing, LLC (BrightNight)+
Brookfield Renewable Trading and Marketing LP
Buckeye Power, Inc. (Buckeye)+&
Business Council for Sustainable Energy (BCSE)+^
California Department of Water Resources State Water Project California Public Utilities Commission
502 Ameren Services Company, a wholly-owned subsidiary of Ameren Corporation, moves to intervene on behalf of its affiliated public utility operating companies, Ameren Illinois Company, Ameren Transmission Company of Illinois and Union Electric Company d/b/a Ameren Missouri.503 AEP moves to intervene on behalf of its affiliates Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian Transmission Company, Inc., AEP Indiana Michigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and AEP West Virginia Transmission Company, Inc. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 129 Date Filed: 10/19/2026
PDF page 131
Docket No. EL25-49-000, et al.- 123 -
Calpine Corporation (Calpine)
Campbell Energy Advisors, LLC
CEPM Companies504
Center for Biological Diversity (Center)#
Chevron U.S.A. Inc. (Chevron)+
Clean Air Task Force (CATF)#
Clean Energy Buyers Association
Clearway Energy Group LLC*
Consolidated Edison Company of New York, Inc.
Constellation Energy Generation, LLC (Constellation)& Consumers Energy Company
Consumers’ Research+
Cooperative Energy
Cordelio Services LLC*
Crete Energy Venture, LLC
Data Center Coalition+
Delaware Municipal Electric Corporation, Inc.
Delaware Public Service Commission (Delaware Commission)*+ Dominion Energy Services, Inc.
DTE Electric Company
Earthjustice
East Kentucky Power Cooperative, Inc.
East Texas Electric Cooperative, Inc.
EDF Renewables, Inc. (EDFR)*+
Edison Electric Institute (EEI)+
Electric Power Supply Association (EPSA)505+
Electricity Consumers Resource Council (ELCON)+
Enchanted Rock, LLC (Enchanted Rock)+
Enerwise Global Technologies, LLC (CPower)
ENGIE North America Inc.* (ENGIE)+
Environmental Defense Fund*
Eolian, LP*
Exelon Corporation
Exus Renewables North America (Exus)#
504 Hamilton Liberty LLC, Hamilton Patriot LLC, Lakewood Cogeneration, LP, Essential Power OPP, LLC, Essential Power Rock Springs, LLC, and Cogentrix Energy Power Management, LLC (Cogentrix) comprise CEPM Companies. 505 EPSA submitted joint comments with P3 (EPSA/P3). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 130 Date Filed: 10/19/2026
PDF page 132
Docket No. EL25-49-000, et al.- 124 -
FirstEnergy Transmission Companies506
Google Energy LLC
Google LLC
Hamilton Liberty
Idaho Power Company
Illinois Attorney General’s Office
Illinois Citizens Utility Board
Illinois Municipal Electric Agency
Indiana Office of Utility Consumer Counselor*
Indicated Transmission Owners507+&
506 First Energy Service Company moves to intervene as agent for its affiliates American Transmission Systems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission LLC, Keystone Appalachian Transmission Company, The Potomac Edison Company, Monongahela Power Company and Trans-Allegheny Interstate Line Company. 507 Indicated Transmission Owners include: AEP on behalf of Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian Transmission Company, Inc., AEP Indiana Michigan Transmission Company, Inc., AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., and AEP West Virginia Transmission Company, Inc.; AMP Transmission, LLC; City of Cleveland, Department of Public Utilities, Division of Cleveland Public Power; City of Hamilton, OH; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a Dominion Energy Virginia; Duke Energy Corporation on behalf of its affiliates Duke Energy Ohio, Inc., Duke Energy Kentucky, Inc., and Duke Energy Business Services LLC; Duquesne Light Company; East Kentucky Power Cooperative; Exelon Corporation, on behalf of Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company, Commonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company, and Potomac Electric Power Company; FirstEnergy Service Company, as agent for its affiliates American Transmission Systems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission LLC, Keystone Appalachian Transmission Company, The Potomac Edison Company, Monongahela Power Company and Trans-Allegheny Interstate Line Company; Old Dominion Electric Cooperative; PPL Electric Utilities Corporation; Rockland Electric Company; Southern Maryland Electric Cooperative, Inc.; UGI Utilities Inc; and Wabash Valley Power Association, Inc. Dominion Energy Services did not join in the June 3 Answer or the June 27 Answer. Duquesne Light Company did not join in the June 27 Answer. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 131 Date Filed: 10/19/2026
PDF page 133
Docket No. EL25-49-000, et al.- 125 -
Industrial Energy Consumers of America (IECA)508+
Invenergy Renewables LLC and Invenergy Thermal LLC (Invenergy)509+ ITC Companies510
Joint Parties511
Klondike Digital Infrastructure LLC
Large Public Power Council
Lee County Electric Cooperative, Inc.
Lincoln Generating Facility, LLC
LS Power Development, LLC (LS Power)
Mainspring Energy, Inc. (Mainspring)+
Maryland Office of People’s Counsel (together with New Jersey Division of Rate Counsel, Joint Consumer Advocates)*+
Maryland Public Service Commission
Midwest Generation, LLC
Mississippi Public Service Commission
Monitoring Analytics, LLC, acting in its capacity as the Independent Market Monitor for PJM (Market Monitor)+
National Grid
National Grid Renewables Development, LLC
National Hydropower Association
National Rural Electric Cooperative Association
National Security Experts512+
Natural Resources Defense Council (NRDC)+
Nebraska Public Power District
New Jersey Division of Rate Counsel+
New York State Reliability Council, L.L.C.*
Nextera Energy Transmission MidAtlantic, Inc. (NEET)+
508 IECA filed joint comments with the PJM ICC.
509 Invenergy Renewables LLC and Invenergy Thermal LLC comprise Invenergy.
510 International Transmission Company d/b/a ITC Transmission, Michigan Electric Transmission Company, LLC, ITC Midwest LLC and ITC Great Plains, LLC comprise ITC companies.511 Joint Parties is composed of EPSA, P3, Calpine, Cogentrix, Constellation, and LS Power. 512 National Security Experts is composed of John B. Hashem, Robert G. F. Lee, Joseph L. Lengyel, Craig R. McKinley, Benny M. Paulino, Paul Stockton, Chuck Wald, and Darryl D. M. Wong. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 132 Date Filed: 10/19/2026
PDF page 134
Docket No. EL25-49-000, et al.- 126 -
North American Electric Reliability Corporation (NERC)*+
Northeast Texas Electric Cooperative, Inc.
Northeastern Rural Electric Membership Corporation (NREMC)+&
Northern Virginia Electric Cooperative, Inc. (NOVEC)+&
NRG Business Marketing LLC
Office of the Ohio Consumers’ Counsel
Ohio Federal Energy Advocate (Ohio FEA)+
One Power Company*
Orange & Rockland Utilities, Inc.
Organization of PJM States, Inc. (OPSI)513+^
Pacific Gas and Electric Company (PG&E)514+
Pennsylvania Public Utility Commission (Pennsylvania Commission)+^ PJM&
PJM Industrial Customer Coalition (ICC)+
PJM Power Providers Group (P3)
PPL Electric Utilities Corporation (PPL)+
PSE&G Companies (PSE&G)515+&
Public Citizen, Inc.
Public Interest Organizations (PIOs)516+
513 OPSI noted that the following of its members support its comments: Delaware Public Service Commission, Public Service Commission of the District of Columbia, Illinois Commerce Commission, Indiana Utility Regulatory Commission, Kentucky Public Service Commission, Maryland Public Service Commission, Michigan Public Service Commission, New Jersey Board of Public Utilities, Public Utilities Commission of Ohio, Pennsylvania Commission, Tennessee Public Utility Commission, Virginia State Corporation Commission and Public Service Commission of West Virginia. The North Carolina Utilities Commission did not join in these comments.
514 PG&E submitted joint comments with Southern California Edison (together, California Utilities).
515 Public Service Electric and Gas Company, PSE&G Power LLC and PSE&G Energy Resources & Trade LLC comprise the PSE&G Companies. Comments were filed by Public Service Electric and Gas Company.
516 PIOs is composed of Appalachian Voices, CATF, Earthjustice, EDF, PennFuture, and the Sierra Club. Of the PIOs, PennFuture did not move to intervene. Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 133 Date Filed: 10/19/2026
PDF page 135
Docket No. EL25-49-000, et al.- 127 -
Public Systems517
Repsol Energy North America Corporation
Rockland Electric Company
RMI#^
San Diego Gas & Electric Company
Shell Energy North America (US), L.P.
Sierra Club
Silver Run Electric, LLC+
Solar Energy Industries Association (SEIA)+
Southern California Edison Company+
Southern Maryland Electric Cooperative, Inc.*
Sustainable FERC Project
Suzanne Glatz and Abraham Silverman (Glatz and Silverman)+^
Talen Energy Corporation (Talen)+&
The Dayton Power and Light Company (AES Ohio)+
The Retail Energy Supply Association
UGI Utilities Inc.
Union of Concerned Scientists (UCS)+
United States Senators518^
Virginia State Corporation Commission (Virginia Commission)*
Vistra Corp. (Vistra)+&
Vote Solar
Wabash Valley Power Association, Inc.
West Virginia Public Service Commission*
--------------------------------------------------
* moved to intervene out-of-time
+ filed comments or reply comments
# filed comments out-of-time
^ filed comments without a notice of intervention or motion to intervene & filed an answer
517 Connecticut Municipal Electric Energy Cooperative, Massachusetts Municipal Wholesale Electric Company, and Vermont Public Power Supply Authority comprise Public Systems. 518 United States Senators include Senators Edward J. Markey, Chris Van Hollen, Elizabeth Warren, Peter Welch, Raphael Warnock, Richard Blumenthal, and Adam B. Schiff. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 134 Date Filed: 10/19/2026
PDF page 136
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
Allegheny Electric Cooperative, Inc.
American Transmission Systems, Incorporated Atlantic City Electric Company
Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative
PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company
Trans-Allegheny Interstate Line Company Transource West Virginia, LLC
UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company
AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.
AEP West Virginia Transmission Company, Inc. Appalachian Power Company
Indiana Michigan Power Company
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Duquesne Light Company
Docket Nos. EL25-49-000
EL25-49-001
Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 135 Date Filed: 10/19/2026
PDF page 137
Docket No. EL25-49-000, et al.- 2 -
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
Constellation Energy Generation, LLC
v. PJM Interconnection, L.L.C.
AD24-11-000
EL25-20-000
(Consolidated)
(Issued December 18, 2025)
ROSNER, Commissioner, concurring:
1. Today’s order directs reforms that deliver a commonsense outcome: if a new large load wants to connect directly to a power plant and operate in a way that lowers grid costs, we should let it. If the current rules don’t let this work in a way that’s fair for everyone, we must change those rules to deliver the cost savings that consumers so badly need and ensure reliable electricity for all. Saying no to innovation is not a winning strategy—whether we’re trying to win the AI race, bring back American manufacturing, or deliver the reliable and affordable energy on which families and small businesses depend.
2. While today’s outcome is commonsense, like so many Commission policies, the order includes a lot of regulatory jargon, which is necessary for technical precision and legal durability. That being the case, I write separately to explain what we are doing and, importantly, why we are doing it.
3. Let’s begin by explaining the problem that we are trying to solve. We are trying to meet surging demand while upholding two fundamental values that underpin the Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 136 Date Filed: 10/19/2026
PDF page 138
Docket No. EL25-49-000, et al.- 3 -
electric industry in our country: first, that all customers have a right to receive electric service on a timely basis, and second, that electric service should be reliable and affordable for all customers. Given the scale of new large loads putting demand on our grid today, it is clear that fostering both of these values requires intervention. Unfortunately, it has become persistently difficult and increasingly expensive to build new grid infrastructure in this country. Because of this, a business-as-usual approach to load growth—planning for generation and load separately—will not suffice to timely meet growing demand while also keeping prices reasonable.
4. Today’s order helps break the logjam. It directs PJM to establish new pathways for co-location—directly connecting a large load with the power needed to serve it at the same site—and load flexibility that enable large co-located loads to reduce how much they lean on the grid, while ensuring that they pay their fair share. As a result, PJM can avoid constructing unnecessary transmission upgrades for large loads, reduce strain on the grid, and make power bills cheaper for everyone—including for families and small businesses. And co-located large loads and generators can get online faster and easier than would otherwise be the case. Grid operators like PJM should allow and encourage large loads and generators to pursue these time- and cost-saving co-location arrangements. Here’s how we get there.
5. First, today’s order directs PJM to create two new transmission services, which we call Firm and Non-Firm Contract Demand Transmission Service. These services allow a load that is co-located with a generator to contract and pay for service from the grid consistent with the load’s actual net withdrawals, while ensuring that the load cannot take more service than the contracted amount.
6. For example, consider a 1,000 MW data center that co-locates with a new 900 MW generator. Under PJM’s status quo rules, the data center would be required to take the full 1,000 MW of “front-of-meter” transmission service (see Figure 1), despite being directly connected to the co-located generator. Under today’s order, the data center has two new options:
a. The data center may elect to purchase Firm Contract Demand Transmission Service if, for example, it plans to take just 100 MW of firm transmission service from the grid and get the remaining 900 MW of energy it needs from the co- located generator (see Figure 2). In turn, PJM will plan enough transmission and procure enough capacity to serve only that 100 MW.
b. The data center may instead elect to purchase Non-Firm Contract Demand Transmission Service if, for example, it only plans to pull energy from the grid temporarily while its co-located generator is undergoing scheduled maintenance (see Figure 3). When the data center chooses non-firm service, PJM will not plan any additional transmission or purchase any capacity to serve that load. Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 137 Date Filed: 10/19/2026
PDF page 139
Docket No. EL25-49-000, et al.- 4 -
Under either new transmission service, the co-located load must uphold its side of the bargain by bearing the risk of being curtailed if its usage exceeds what it has contracted for in advance. Therefore, regardless of whether a customer takes the new firm service, the new non-firm service, or some combination of the two, PJM will plan less transmission and procure less generating capacity for the data center, which reduces costs for both the new co-located load and for all other PJM customers and creates the opportunity for both the new generator and the new load to get online more quickly.
7. Second, today’s order directs PJM to revise its generator interconnection rules to clarify how both new and existing generators may co-locate with load, with a particular emphasis on accelerating new generation.
8. For new generators, the order directs PJM to clarify that a generator may request a level of service that is consistent with its actual injections to the grid, net of a co-located load. Consider the example above, but in reverse. If a new 1,000 MW generator co- locates with a new 900 MW data center, that generator will be allowed to “reserve” 900 MW to directly serve the data center, and will thus request to inject only 100 MW onto the PJM grid. As a result, new generators with co-located load will need fewer transmission upgrades to access the grid, allowing much-needed electricity to get online more quickly and affordably. Furthermore, the order directs PJM to file these rules for new generator interconnection within 30 days. In sum, these changes will make “bringing your own new generation” co-located with new load cheaper and faster, benefiting the generator, the large load it will serve, and—critically—all other PJM customers.
9. For existing generators, today’s order directs PJM to clarify that a generator cannot remove its capacity from the grid to serve a co-located load until all transmission upgrades needed to maintain reliability are in service, with the costs of those upgrades allocated 100% to the existing generator. This means that generators comprising the keystone of today’s grid cannot abandon existing customers unless and until those generators and their large load customers—not other ratepayers—construct the transmission upgrades and incur the costs necessary to maintain reliable service for everyone. And under any of the new transmission services, the large load will also pay its fair share for any benefits it continues to draw from the grid after the co-location arrangement is set up.
10. Third, today’s order protects existing customers—including families and small businesses—by directing PJM to assign transmission costs to ensure that a co-located load, such as a data center, always pays its fair share. A co-located load that does not withdraw energy from the grid will pay for at least the essential grid services on which it still relies (i.e., regulation and black start services). Meanwhile, a co-located load that has the same right to withdraw energy from the grid as a conventional front-of-meter load will take and pay for the full cost of traditional network transmission service. And for all Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 138 Date Filed: 10/19/2026
PDF page 140
Docket No. EL25-49-000, et al.- 5 -
options in between, a co-located load will pay a fair rate that is commensurate with its actual usage of the grid, protecting other customers from unfair cost shifting and price increases. Unless a load and its generator are completely disconnected from the grid, they will get benefits from the grid—and today’s order ensures that they will pay for those benefits.
11. Fourth, today’s order directs PJM to establish a new interim service (see Figure
4) to provide a bridge while the infrastructure needed to serve a large load with traditional front-of-meter network transmission service is being built. This interim service leverages speed in the near-term and unlocks the benefits of a full grid connection in the long-term. It will allow co-located loads and generators seeking front-of-meter service to access the grid faster than they can today. In exchange for increased speed, these loads will bear the risk of being curtailed when the grid is constrained until the transmission upgrades needed to provide service are constructed. But that doesn’t mean that the load will always have to shut down completely during peak periods. Rather, if the co-located load is paired with a new generator, and that generator is still waiting to begin its own front-of-meter service, the load can take service directly from the generator in the interim until both “graduate” to full, front-of-meter service. This pathway is important because traditional, front-of-meter network transmission service provides the broadest benefits to both load and generators—a network load can be served by any generator on the grid, and a network generator can sell its power to any customer on the grid.
12. Fifth, today’s order encourages further progress on solutions beyond co-location to keep up with growing electricity demand by directing PJM to provide the Commission with a detailed report that describes its ongoing initiatives to reduce both technical and financial barriers to building new generation and efficiently connect large loads. Given PJM’s announcement yesterday that its 2027/2028 Base Residual Auction was short of its reliability requirement, the solutions enabled by both today’s order and PJM’s ongoing initiatives to accelerate new generation are immensely important and urgent. The information PJM will file allows the Commission to monitor PJM’s progress and ensure that any further Commission actions on large load issues in the PJM region skate to where the puck is going. To that end, Secretary Wright recently asked the Commission to consider a range of “potential reforms to ensure the timely and orderly interconnection of large loads to the transmission system.”519 Although the Secretary’s initiative is
519 U.S. Department of Energy, Secretary of Energy, Direction that the Commission Initiate Rulemaking Procedures and Proposal Regarding the Interconnection of Large Loads Pursuant to the Secretary’s Authority Under Section 403 of the Department of Energy Organization Act (Oct. 23, 2025). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 139 Date Filed: 10/19/2026
PDF page 141
Docket No. EL25-49-000, et al.- 6 -
broader than both co-location and PJM, I am pleased that today’s order makes major progress on the important matters that he referred to the Commission.
13. Finally, all of the Commission’s actions in this proceeding respect the long- standing jurisdictional line between federal and state authority provided by Congress and affirmed by the Supreme Court. Co-located loads will continue to receive a bill for state- regulated retail service just like any other load. Moreover, states retain exclusive jurisdiction to allocate how the costs of FERC-jurisdictional transmission charges are divided between their retail ratepayers, including co-located loads. The difference today’s order makes is that utilities and load-serving entities will now have access to new transmission service options that will help lower costs for everyone.
14. Today’s order is just the next step on important work that the Commission cannot do alone. I encourage all parties to approach today’s order, and the path forward that it directs, with an open mind. Durable consensus requires your collective expertise to implement a solution capable of meeting today’s challenges, realizing the historic opportunity that load growth presents, and delivering the reliable and affordable energy on which we all depend. Our country deserves no less.
For these reasons, I vote to approve today’s order.
________________________
David Rosner
Commissioner
Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 140 Date Filed: 10/19/2026
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
Before Commissioners:
PJM Interconnection, L.L.C.
Allegheny Electric Cooperative, Inc.
American Transmission Systems, Incorporated Atlantic City Electric Company
Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative
PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company
Trans-Allegheny Interstate Line Company Transource West Virginia, LLC
UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company
AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.
AEP West Virginia Transmission Company, Inc. Appalachian Power Company
Indiana Michigan Power Company
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Docket Nos. EL25-49-000
EL25-49-001
Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 142 Date Filed: 10/19/2026
PDF page 144
Docket Nos. EL25-49-000, et al.
- 2 -
Wheeling Power Company
Duquesne Light Company
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
Constellation Energy Generation, LLC
v. PJM Interconnection, L.L.C.
AD24-11-000
EL25-20-000
(Consolidated)
(Issued December 18, 2025)
CHANG, Commissioner, concurring:
1. In today’s order, the Commission addresses the rates, terms, and conditions through which Co-Located Loads may take service from the PJM Interconnection, L.L.C. (PJM) system. I write separately to address certain aspects of the Commission’s proposed replacement rate and highlight the importance of developing a minimum charge for the new transmission services we establish today.
Today’s Order
2. Due to significant delays in PJM’s ability to interconnect new generation and load, large loads, including data centers, have preferred co-location arrangements to expedite their access to the PJM system. As today’s order discusses, PJM’s current tariff does not provide adequate clarity for the rules governing co-location arrangements. With today’s Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 143 Date Filed: 10/19/2026
PDF page 145
Docket Nos. EL25-49-000, et al.
- 3 -
action, the Commission is providing guidance on how loads and generators may co- locate, including the development of new transmission services that recognize their ability to limit their energy withdrawals from the transmission system. The responsibility for setting these rules sits with the Commission. As we work together to address this issue, we must continue to keep protection of other customers from unnecessary risks and costs at the forefront of our decision making.
3. Today’s order represents the first step to developing a package of solutions to address co-location in the PJM footprint. Specifically, by recognizing that controllable Co-Located Loads might use less service from the transmission system than traditional loads in front of the meter, the order’s revised transmission service framework may reduce the number of, and costs associated with, future transmission upgrades. The order also helps to clarify how new generation resources may connect to the system on a provisional basis to serve Co-Located Loads.
4. Designing this new co-location framework highlights an essential component of the overall package: how we protect other customers from adverse reliability impacts and unjustified cost shifts. The Commission will ultimately resolve the rates, terms, and conditions of these new services following the paper hearing and compliance processes we direct today. As we consider the record, we will assess how those rates, terms, and conditions facilitate the efficient interconnection of Co-Located Loads, control transmission costs needed to serve them, and protect other customers against unjustified cost shifts.
Need for a Minimum Charge
5. One aspect of the paper hearing is particularly essential to protecting customers against transmission cost shifts under the new framework established through today’s order: the need to establish a minimum charge for the Firm and Non-Firm Contract Demand transmission services.
6. The order proposes to establish these two new transmission services for use where the Co-Located Loads can electrically control the amount of energy that they will receive from the PJM system. As the order explains, all Co-Located Loads are synchronized to the PJM transmission system through their generators. All generators, and as relevant here, all generators that are part of Co-Located Arrangements, rely on the PJM transmission system to operate. Without the PJM grid, Co-Located Loads and their associated generators would be islanded. In today’s order, neither of the newly developed Contract Demand transmission services requires Co-Located Loads to take any specific quantity of transmission service. In particular, the order contemplates that, under the new Contract Demand transmission services, if the Co-Located Load takes no service, Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 144 Date Filed: 10/19/2026
PDF page 146
Docket Nos. EL25-49-000, et al.
- 4 -
it would pay only for black start and regulation service.1 Because the charges for those services only account for the provision of those discrete ancillary services, they do not contribute to the actual cost of building, operating, or maintaining the grid, or the Co- Located Load’s explicit reliance on the PJM system. Black start and regulation service charges are nearly inconsequential.2 Thus, just paying black start and regulation service charges does not constitute the Co-Located Loads paying for their “fair share” of the cost of maintaining and operating the transmission system. Furthermore, under such a scenario, a Co-Located Load would not pay for a portion of PJM’s administrative costs, which are typically included in transmission service rates, even though the Co-Located Load benefits from services provided by PJM.
7. As a result, absent developing rates that explicitly charge the Co-Located Loads for their synchronization to and reliance on the PJM system, it is possible that a Co- Located Load would not contribute to the costs of operating and maintaining the system. Similarly, if a Co-Located Load takes a de minimis amount of Firm or Non-Firm Contract Demand service, it would pay only a minimal amount of system costs. Such scenarios would fail to recognize the benefits Co-Located Loads receive from the grid and risk shifting system costs to other customers. Simply put, Co-Located Loads electrically connected to the grid (through a co-located generator) benefit from the system and should cover their costs. This is a foundational cost causation principle that the Commission must uphold.
8. In the paper hearing established in today’s order, the Commission seeks comments on whether the rates, terms, and conditions for these two new transmission services should reflect a minimum charge that recognizes that, without the transmission system, the Co-Located Load and generators could not operate as envisioned. The paper hearing also seeks briefing on how such a charge should be determined3 and whether PJM administrative services charges should be applied to the new services.4 To ensure the
1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at P 206 (2025).2 According to data from the most recent State of the Markets Report by the PJM Independent Market Monitor, regulation and black start services constituted an average of $159 million and $47.5 million, respectively, for January through September 2024 and 2025, while transmission constituted an average of $10.81 billion for those two years. See PJM Independent Market Monitor, 2025 Q3 State of the Markets Report at 18, https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2025/2025q3- som-pjm-sec1.pdf.3 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 at P 219, questions 3 and 4.4 Id. questions 1 and 2. Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 145 Date Filed: 10/19/2026
PDF page 147
Docket Nos. EL25-49-000, et al.
- 5 -
Commission has a full and complete record on this issue, I encourage commenters to address the following points and questions in their responses to the paper hearing.
9. First, a just and reasonable replacement rate for the new transmission services should reflect some form of minimum transmission service charge, which would protect other customers against cost shifts resulting from Co-Located Loads that rely upon the transmission system but do not directly or meaningfully contribute to its costs via transmission service payments. This minimum charge would provide a floor to the Co- Located Load’s cost responsibilities to pay for a portion of system costs, commensurate with the benefits that the Co-Located Load receives from the system, even where it plans to draw little or no energy from that system. I welcome comments on the need for such a minimum charge, including, but not limited to: (1) whether a Co-Located Load that is synchronized to the grid but does not meaningfully contribute to transmission system costs violates cost causation principles; and (2) whether such minimum charge is necessary for those that choose to take either the Firm and Non-Firm Contract Demand transmission service.
10. Second, I welcome comments on both the rate design and the specific costs to be included in such a minimum charge. For instance, given that all Co-Located Loads rely on the existence of the PJM grid and are synchronized to it, such loads should pay for at least their fair share of the system’s operations and maintenance costs. In addition, I welcome comments as to whether Co-Located Loads should bear responsibility for some portion of the capital investments required to ensure the transmission grid continues to reliably serve all customers, and if so, the specific calculation of such charges. Next Steps and Open Issues
11. While today’s order is consequential, it is important that we place it in the proper context: it addresses a significant but discrete issue in PJM, and sets out services and guidance for a commercial model that may only be viable in a limited number of states where the co-located generator is eligible under state law to serve Co-Located Load. For states where retail loads must be served by the local electric utility, the model contemplated in this order may not apply, and thus it does not necessarily provide a replicable approach for large loads generally. Therefore, the broader challenge of reliably, efficiently, and fairly interconnecting large loads and the generation needed to serve them remains before the Commission, the states, and industry.
12. Further, today’s order does not address the broader reliability challenges impacting the PJM footprint and its customers. While the order directs PJM to clarify options that exist under its current tariff, it does not address the clogged interconnection queue that has driven the interest in co-location in the first place as a way to expedite large loads’ access to the grid. Solving this foundational problem will require a durable fix to the interconnection process that helps resources interconnect at a much more Document Accession #: 20251218-3081 Filed Date: 12/18/2025
Case: 26-3635 Document: 1-1 Page: 146 Date Filed: 10/19/2026
PDF page 148
Docket Nos. EL25-49-000, et al.
- 6 -
efficient pace. As part of solving this problem, PJM must ensure that the transmission system is built to adequately support the interconnection of new, needed generation. I have a strong preference for durable reforms over one-off fixes.5 Sound investments are driven by good data, comprehensive planning, and disciplined operations. The Commission, states, grid planners and operators, and utilities must balance near-term pressures and incentives with delivering long-term value to the customers we serve. Beyond this proceeding, I am concerned about PJM’s ability to procure sufficient resources to reliably serve both new and existing load. PJM’s resource adequacy construct must deliver clear price signals while being mindful of ratepayer costs.
13. As we consider further reforms, the Commission’s core regulatory principles – most notably open access to the transmission system (including through an efficient interconnection process) – remain the foundation for addressing load growth and related challenges. While reform to existing approaches is likely needed, customers – particularly captive ones – must not bear the cost of a data center-driven infrastructure buildout, and the risks and costs associated with this buildout must not be shifted to small businesses and residential customers.
Conclusion
14. Following the paper hearing and compliance process, the Commission will determine the just and reasonable replacement rates. This process will consider comments regarding the design of these new transmission services, and how to ensure that other customers are protected against unnecessary risks and costs. As we establish new transmission services, it cannot come at the expense of other ratepayers. I look forward to reviewing the record developed in response to today’s order while the Commission, the states, PJM, and others work to address the broader reliability and interconnection challenges facing the region.
5 See, e.g., Sw. Pwr. Pool, Inc., 192 FERC ¶ 61,062, at P 3 (2025) (Chang, Comm’r, concurring). Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 147 Date Filed: 10/19/2026
PDF page 149
Docket Nos. EL25-49-000, et al.
- 7 -
For these reasons, I respectfully concur.
________________________
Judy W. Chang
Commissioner
Document Accession #: 20251218-3081 Filed Date: 12/18/2025 Case: 26-3635 Document: 1-1 Page: 148 Date Filed: 10/19/2026
ATTACHMENT B
PJM Interconnection, L.L.C. et al.; Notice of Denial of Rehearing By Operation of Law and Providing for Further Consideration, 194 FERC ¶ 62,089 (Feb. 20, 2026).
Case: 26-3635 Document: 1-1 Page: 150 Date Filed: 10/19/2026
PDF page 152
194 FERC ¶ 62,089
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
Allegheny Electric Cooperative, Inc.
American Transmission Systems, Incorporated Atlantic City Electric Company
Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative
PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company
Trans-Allegheny Interstate Line Company Transource West Virginia, LLC
UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company
AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.
AEP West Virginia Transmission Company, Inc. Appalachian Power Company
Indiana Michigan Power Company
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Docket Nos. EL25-49-002
Document Accession #: 20260220-3002 Filed Date: 02/20/2026 Case: 26-3635 Document: 1-1 Page: 151 Date Filed: 10/19/2026
PDF page 153
Docket No. EL25-49-002, et al.
-2-
Duquesne Light Company
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
Constellation Energy Generation, LLC
v. PJM Interconnection, L.L.C.
AD24-11-001
EL25-20-001
(Consolidated)
NOTICE OF DENIAL OF REHEARING BY OPERATION OF LAW AND
PROVIDING FOR FURTHER CONSIDERATION
(Issued February 20, 2026)
Rehearing has been timely requested of the Commission’s order issued on December 18, 2025, in this proceeding. PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025). In the absence of Commission action on a request for rehearing within 30 days from the date it is filed, the request for rehearing may be deemed to have been denied. 16 U.S.C. § 825l(a); 18 C.F.R. § 385.713 (2025); Allegheny Def. Project v. FERC, 964 F.3d 1 (D.C. Cir. 2020) (en banc).
As provided in 16 U.S.C. § 825l(a), the requests for rehearing of the above-cited order filed in this proceeding will be addressed in a future order to be issued consistent with the requirements of such section. As also provided in 16 U.S.C. § 825l(a), the Commission may modify or set aside its above-cited order, in whole or in part, in such manner as it shall deem proper.
Debbie-Anne A. Reese,
Secretary.
Document Accession #: 20260220-3002 Filed Date: 02/20/2026
Case: 26-3635 Document: 1-1 Page: 152 Date Filed: 10/19/2026
ATTACHMENT C
PJM Interconnection, L.L.C. et al.; Order on Rehearing, Clarification, Compliance Filing, and Paper Hearings, 195 FERC ¶ 61,209 (June 18, 2026).
Case: 26-3635 Document: 1-1 Page: 154 Date Filed: 10/19/2026
PDF page 156
195 FERC ¶ 61,209
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
Before Commissioners: Laura V. Swett, Chairman; David Rosner, Lindsay S. See,
Judy W. Chang, and David LaCerte.
PJM Interconnection, L.L.C.
Allegheny Electric Cooperative, Inc.
American Transmission Systems, Incorporated Atlantic City Electric Company
Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative
PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company
Trans-Allegheny Interstate Line Company Transource West Virginia, LLC
UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company
AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.
AEP West Virginia Transmission Company, Inc. Appalachian Power Company
Indiana Michigan Power Company
Docket Nos. EL25-49-002
EL25-49-000
Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 155 Date Filed: 10/19/2026
PDF page 157
Docket No. EL25-49-002, et al.- 2 -
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Duquesne Light Company
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
Constellation Energy Generation, LLC
v. PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
AD24-11-001
EL25-20-001
(consolidated)
ER26-1479-000
ORDER ON REHEARING, CLARIFICATION, COMPLIANCE FILING, AND PAPER
HEARING
(Issued June 18, 2026)
1. On December 18, 2025, the Commission issued an order in the show cause proceeding in Docket No. EL25-49-000, et al., pursuant to section 206 of the Federal Power Act (FPA),1 finding PJM Interconnection, L.L.C.’s (PJM) Tariff unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to generators serving
1 16 U.S.C. § 824e. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 156 Date Filed: 10/19/2026
PDF page 158
Docket No. EL25-49-002, et al.- 3 -
Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.2
2. The Commission directed PJM to file, within 60 days of the date of issuance of the order, a compliance filing to revise its Tariff to set forth specific terms and conditions that an Interconnection Customer in PJM seeking to serve Co-Located Load must follow to effectuate a Co-Location Arrangement. In addition, the Commission directed PJM to submit in its compliance filing revisions to its Tariff to require that the Eligible Customer taking transmission service on behalf of the Co-Located Load takes one of three transmission services: (1) Network Integration Transmission Service (NITS), including a new interim, non-firm transmission service available until all Network Upgrades necessary to provide the requested NITS are complete (Interim NITS), (2) a new Firm Contract Demand (FCD) transmission service, or (3) a new Non-Firm Contract Demand (NFCD) transmission service.3 The Commission established a paper hearing to determine the just and reasonable rates, terms, and conditions for these new transmission services.
3. The Commission also found the Behind the Meter Generation (BTMG) rules in the Tariff to be no longer just and reasonable, and the Commission directed PJM to submit in its compliance filing revisions to its Tariff to revise the retail BTMG netting rules and to implement a transition process for existing BTMG participants.42 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at P 2 (2025) (December Order). The December Order defined the Tariff as PJM’s Open Access Transmission Tariff (OATT), the Amended and Restated Operating Agreement of PJM, and the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region. See Appendix for tariff records accepted in this order.3 Capitalized terms used but not otherwise defined in this order have the meanings ascribed to them in the Tariff.4 PJM defines BTMG as “a generation unit that delivers energy to load without using the Transmission System or any distribution facilities (unless the entity that owns or leases the distribution facilities has consented to such use of the distribution facilities and such consent has been demonstrated to the satisfaction of the Office of the Interconnection); provided, however, that [BTMG] does not include: (i) at any time, any portion of such generating unit’s capacity that is designated as a Generation Capacity Resource; or (ii) in an hour, any portion of the output of such generating unit that is sold to another entity for consumption at another electrical location or into the PJM Interchange Energy Market.” PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – A-B (21.0.0) (defining BTMG). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 157 Date Filed: 10/19/2026
PDF page 159
Docket No. EL25-49-002, et al.- 4 -
4. On January 16, 2026, Exelon and FirstEnergy5 timely filed a request for rehearing of the December Order. On January 20, 2026, Industrials6 timely filed a request for clarification or, in the alternative, rehearing. On January 20, 2026, Constellation Energy Generation, LLC (Constellation) filed a request for clarification or, in the alternative, rehearing. On January 20, 2026, PIOs7 filed a limited request for clarification. On January 20, 2026, Joint Parties8 filed a request for clarification. On February 9, 2026, Andrew Hinz filed a late request for rehearing.
5. On February 23, 2026, in Docket No. ER26-1479-000, PJM filed its second compliance filing as directed by the December Order.
6. On February 23, 2026, in Docket No. EL25-49-000, PJM and the Indicated TOs9 each submitted an initial brief to address the Commission’s paper hearing questions with
5 The request for rehearing was filed only by (1) Exelon Corporation (Exelon), on behalf of Atlantic City Electric Company, Baltimore Gas and Electric Company, Commonwealth Edison Company, Commonwealth Edison Company of Indiana, Inc., Delmarva Power & Light Company, PECO Energy Company, and Potomac Electric Power Company; and (2) FirstEnergy Service Company, as agent for its affiliates American Transmission Systems, Incorporated, Jersey Central Power & Light Company, Mid-Atlantic Interstate Transmission LLC, Keystone Appalachian Transmission Company, The Potomac Edison Company, Monongahela Power Company and Trans-Allegheny Interstate Line Company (collectively, FirstEnergy).6 As to the request for clarification or, in the alternative, rehearing, Industrials are the PJM Industrial Customer Coalition (PJM ICC) and the Industrial Energy Consumers of America (IECA). 7 As to the request for clarification, PIOs are EarthJustice, Environmental Defense Fund, and Sierra Club.8 As to the request for clarification, Joint Parties are Eolian LP, Antora Energy LLC, and Verrus LLC. 9 We refer to the Indicated PJM Transmission Owners that submitted briefing jointly in the paper hearing as Indicated TOs. The transmission owners that submitted briefing jointly in the paper hearing are: American Electric Power Service Corporation on behalf of its affiliates, Appalachian Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian Transmission Company, AEP Indiana Michigan Transmission Company, AEP Kentucky Transmission Company, AEP Ohio Transmission Company, and AEP West Virginia Transmission Company; The Dayton Power and Light Company d/b/a AES Ohio; Dominion Energy Services, Inc. on behalf of Virginia Electric and Power Company d/b/a Dominion Energy Virginia; Duke Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 158 Date Filed: 10/19/2026
PDF page 160
Docket No. EL25-49-002, et al.- 5 -
respect to the new transmission services. On March 25, 2026, and on April 24, 2026, parties submitted response briefs and reply briefs, respectively.
7. In this order, we address the requests for rehearing and clarification of the December Order, PJM’s compliance filing, and the paper hearing on the new transmission services. Pursuant to Allegheny Defense Project v. FERC,10 the rehearing requests filed in this proceeding may be deemed denied by operation of law. However, as permitted by section 313(a) of the FPA,11 we are modifying the discussion in the December Order and setting aside the order, in part, as discussed below.12 In addition, we are granting, in part, and denying, in part, the requests for clarification.
8. Next, we find that PJM’s compliance filing partially complies with the directives of the December Order. As such, we accept in part and reject in part PJM’s proposed Tariff revisions, and we direct PJM to file, within 60 days of the date of issuance of this order, a further compliance filing.
9. Finally, in response to the record developed in the paper hearing, we establish as just and reasonable certain rates, terms, and conditions for the new transmission services directed in the December Order (i.e., Interim NITS, FCD transmission service, and NFCD transmission service). We direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff. We also direct the PJM transmission owners to file, within 60 days of the date of issuance of this order, a compliance filing to revise the Tariff.
Energy Business Services, LLC for Duke Energy Kentucky, Inc. and Duke Energy Ohio, Inc.; Duquesne Light Company; East Kentucky Power Cooperative; Exelon; FirstEnergy; PPL Electric Utilities Corporation; Public Service Electric and Gas Company; Rockland Electric Company; and the Southern Maryland Electric Cooperative.
10 964 F.3d 1 (D.C. Cir. 2020) (en banc).11 16 U.S.C. § 825l(a) (“Until the record in a proceeding shall have been filed in a court of appeals, as provided in subsection (b), the Commission may at any time, upon reasonable notice and in such manner as it shall deem proper, modify or set aside, in whole or in part, any finding or order made or issued by it under the provisions of this chapter.”).12 Allegheny Def. Project, 964 F.3d at 16-17. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 159 Date Filed: 10/19/2026
PDF page 161
Docket No. EL25-49-002, et al.- 6 -
Contents
I. Background ..............................................................................................................- 9 -
A. February Order ..................................................................................................- 9 -
B. December Order ..............................................................................................- 11 -
II. Notice of Filings and Responsive Pleadings.......................................................- 14 -
A. PJM’s Compliance Filing................................................................................- 14 -
B. Paper Hearing on New Transmission Services ...............................................- 15 -
III. Procedural Matters..............................................................................................- 16 -
IV. Requests for Rehearing and/or Clarification.......................................................- 18 -
A. Jurisdiction ......................................................................................................- 19 -
1. Sales for Resale in Interstate Commerce.........................................................- 19 -
2. Retail Allocation of Commission-Jurisdictional Rates ...................................- 20 -
3. Retail BTMG...................................................................................................- 22 -
4. Retail Backup Service .....................................................................................- 24 -
B. Show Cause Findings ......................................................................................- 26 -
1. Overview, Transmission Service, Regulation and Black Start........................- 26 -
2. Retail BTMG Netting Rules............................................................................- 41 -
3. Transmission Service Options for BTMG.......................................................- 50 -
C. Replacement Rate............................................................................................- 52 -
1. Transmission Services.....................................................................................- 52 -
2. Necessary Study Process for Existing Interconnection Customers.................- 87 -
3. New Generators Serving Co-Located Load.....................................................- 95 -
D. Informational Report .......................................................................................- 97 -
1. December Order ..............................................................................................- 97 -
2. Request for Clarification .................................................................................- 98 -
3. Determination..................................................................................................- 99 -
V. Compliance .........................................................................................................- 99 -
A. BTMG Rules ...................................................................................................- 99 -
1. Materiality Threshold ......................................................................................- 99 -
2. Grandfathering and Transition Period...........................................................- 116 - Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 160 Date Filed: 10/19/2026
PDF page 162
Docket No. EL25-49-002, et al.- 7 -
3. QFs and Cogeneration Facilities ...................................................................- 121 -
B. Transmission Service.....................................................................................- 127 -
1. December Order ............................................................................................- 127 -
2. PJM Compliance Filing.................................................................................- 129 -
3. Pleadings........................................................................................................- 130 -
4. Answers .........................................................................................................- 131 -
5. Determination................................................................................................- 132 -
C. Necessary Studies..........................................................................................- 135 -
1. December Order ............................................................................................- 135 -
2. PJM Compliance Filing.................................................................................- 136 -
3. Pleadings........................................................................................................- 136 -
4. Determination................................................................................................- 139 -
D. Other..............................................................................................................- 143 -
1. December Order ............................................................................................- 143 -
2. PJM Compliance Filing.................................................................................- 144 -
3. Pleadings........................................................................................................- 147 -
4. Answers .........................................................................................................- 150 -
5. Determination................................................................................................- 150 -
E. Effective Date................................................................................................- 154 -
1. PJM Compliance Filing.................................................................................- 154 -
2. Effective Date Pleadings ...............................................................................- 154 -
3. Determination................................................................................................- 155 -
VI. Paper Hearing....................................................................................................- 155 -
A. Rates, Terms, and Conditions for Firm and Non-Firm Contract Demand
Transmission Service...............................................................................................- 156 -
1. December Order ............................................................................................- 156 -
2. Nature of FCD and NFCD Transmission Services........................................- 157 -
3. Study Process.................................................................................................- 171 -
4. Rates and Charges .........................................................................................- 179 -
5. Other..............................................................................................................- 193 -
B. Additional Charge for Eligible Customers Taking FCD and/or NFCD
Transmission Service...............................................................................................- 199 -
1. December Order ............................................................................................- 199 - Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 161 Date Filed: 10/19/2026
Docket No. EL25-49-002, et al.- 9 -
5. Determination................................................................................................- 244 -
H. Rates, Terms, and Conditions for Interim NITS ...........................................- 246 -
1. Initial Briefs...................................................................................................- 246 -
2. Response Briefs.............................................................................................- 247 -
3. Reply Briefs...................................................................................................- 250 -
4. Answers .........................................................................................................- 251 -
5. Determination................................................................................................- 252 -
I. Annual Report on New Transmission Services ................................................- 256 - J.
Proposed Effective Date ...................................................................................- 258 -
1. Initial Briefs...................................................................................................- 258 -
2. Response Briefs.............................................................................................- 259 -
3. Reply Briefs...................................................................................................- 262 -
4. Answer...........................................................................................................- 264 -
5. Determination................................................................................................- 264 - K.
Additional Arguments ...................................................................................- 265 -
1. Behind the Meter Generation ........................................................................- 265 -
2. Reliability Backstop Auction ........................................................................- 265 -
3. Eligible Customer Requirements...................................................................- 267 -
4. Demand Side Pathways .................................................................................- 268 -
5. Interconnection..............................................................................................- 269 -
6. Co-Location Arrangement with Electric Storage Resource ..........................- 270 -
I. Background
A. February Order
10. In February 2025, the Commission instituted a new proceeding in Docket
No. EL25-49-000 to examine whether the Tariff remains just and reasonable and not
unduly discriminatory or preferential without provisions addressing with sufficient clarity
or consistency the rates, terms, and conditions of service that apply to co-location
arrangements.13 The February Order defined Co-Located Load as a “‘configuration [that]
refers to end-use customer load that is physically connected to the facilities of an existing
13 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115, at P 2 (2025) (February Order). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 163 Date Filed: 10/19/2026
PDF page 165
Docket No. EL25-49-002, et al.- 10 -
or planned Customer Facility on the Interconnection Customer’s side of the Point of Interconnection to the PJM Transmission System.’”14 As in the February Order, when referring to both the Co-Located Load and the associated generator, we will use the term Co-Location Arrangement.
11. As explained in the February Order, Co-Location Arrangements are becoming increasingly common in PJM and, since the issuance of the February Order, entities continue to raise issues involving Co-Location Arrangements with the Commission.15 The Commission set forth, in the February Order, the principles relating to the Commission’s jurisdiction over the matters relevant to Co-Location Arrangements.16 The Commission also made several preliminary findings about the justness and reasonableness of the Tariff. First, the Commission found that the Tariff appears to be unjust and unreasonable or unduly discriminatory or preferential because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and 14 Id. P 3 & n.4. We note that, in the February Order, the Commission adopted this definition from the Guidance Document that PJM developed on Co-Located Load. See id. PJM rescinded this document pending Commission guidance in this docket. PJM March 24, 2025 Response at 33. Prior to PJM’s transition to its new interconnection process, PJM used the terms Interconnection Customer and Generation Interconnection Customer. The Tariff defines Generation Interconnection Customer as “an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region.” PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – G – H) (9.0.1) (defining Generation Interconnection Customer). The Tariff’s new rules for generation interconnection, effective January 3, 2023, utilize the terms Project Developer and Generation Project Developer. The Tariff defines Generation Project Developer as “an entity that submits a Generation Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region.” PJM, Intra-PJM Tariffs, OATT, § VIII subpt. A 400 (Definitions G) (0.1.0) (defining Generation Project Developer). For simplicity, in this order, and consistent with the February Order and December Order, the Commission will use the term Interconnection Customer to refer to both the Tariff definitions of Generation Interconnection Customer and Generation Project Developer.
15 See, e.g., PJM Interconnection, L.L.C., 191 FERC ¶ 61,112 (2025) (accepting necessary studies agreement). The February Order consolidated the new show cause proceeding with a pending complaint proceeding in Docket No. EL25-20-000 involving Co-Located Load.16 February Order, 190 FERC ¶ 61,115 at P 66. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 164 Date Filed: 10/19/2026
PDF page 166
Docket No. EL25-49-002, et al.- 11 -
conditions of service that apply to Co-Location Arrangements.17 In addition, the Commission preliminarily found that this lack of applicable Tariff provisions raises the potential for undue discrimination or preferential treatment.18
12. As to specific concerns raised regarding Co-Location Arrangements, the Commission found that the Tariff may be unjust, unreasonable, unduly discriminatory, or preferential because it does not specify the transmission service that Co-Location Arrangements must take, if any, or otherwise provide a process to ensure that Co-Location Arrangements are paying for the benefits they receive from the transmission system consistent with cost causation principles, which provide that all Commission-jurisdictional rates and charges must “reflect to some degree the costs actually caused by the customer who must pay for them,” and that costs must be allocated in a manner that is at least roughly commensurate with the benefits that entity receives.19 The Commission also found that the absence of rates, terms, and conditions of interconnection service specific to Co-Location Arrangements, and, especially regarding studies of the impacts of those arrangements, may render the Tariff unjust and unreasonable or unduly discriminatory or preferential.20 Moreover, the Commission found that the absence of rates, terms, and conditions governing the use and sale of ancillary services and black start services by Co-Location Arrangements may render the Tariff unjust and unreasonable or unduly discriminatory or preferential.21 The Commission directed briefing to build a record on these issues as well as a possible replacement rate.
B. December Order
13. In the December Order, the Commission found the Tariff unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf
17 Id. P 74.18 Id. P 75.19 Id. PP 74-78 (citing Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1368 (D.C. Cir. 2004); Ill. Com. Comm’n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009)).20 Id. P 79.21 Id. P 82. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 165 Date Filed: 10/19/2026
PDF page 167
Docket No. EL25-49-002, et al.- 12 -
of Co-Located Load.22 The Commission explained that the absence of such provisions leaves entities unable to determine what steps they must take to effectuate Co-Location Arrangements and creates uncertainty that has resulted in disparate treatment in PJM because transmission owners have taken different approaches to performing the necessary steps that apply to Interconnection Customers seeking to serve Co-Located Load through a Co-Location Arrangement.23 The Commission found that the absence of such provisions also introduces the risk that Co-Located Load may benefit from regulation and black start services without contributing to cost recovery for such services.24
14. Specifically, the Commission found the Tariff unjust and unreasonable because there is a lack of sufficient clarity or consistency as to the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load.25 As part of the replacement rate, the Commission directed PJM to file revisions to the generation interconnection procedures of the Tariff, including to require an Interconnection Customer who will use its generator to serve Co-Located Load to specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load, and revisions to clarify its Necessary Study process.26 The Commission also directed PJM to revise its Tariff to clarify that an Interconnection Customer seeking to serve a Co-Located Load with a newly interconnecting generator may: (1) request interconnection service at a level below its maximum facility output; (2) use existing procedures in the Tariff to accelerate the study of the interconnection service request if the request has no cost allocation for Network Upgrades and does not require further studies; (3) request provisional interconnection service; and (4) request Surplus Interconnection Service.27
15. The Commission also found the Tariff unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.28 The Commission further found the Tariff
22 December Order, 193 FERC ¶ 61,217 at P 175.23 Id.24 Id.25 Id. P 176.26 Id. PP 176, 187-192, 225-230.27 Id. PP 176, 231-235.28 Id. PP 177, 193. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 166 Date Filed: 10/19/2026
PDF page 168
Docket No. EL25-49-002, et al.- 13 -
unjust and unreasonable because it does not address charges related to Co-Located Loads’ use of regulation and black start services, which introduces the risk that Co-Located Load may benefit from regulation and black start services without contributing to cost recovery for such services and, thereby, the risk that costs may be allocated entirely to other transmission customers and passed through to residential customers, among others.29 The Commission found that NITS charged on a gross demand basis is one just and reasonable transmission service option for Eligible Customers taking transmission service on behalf of Co-Located Loads, but it is not the only option.30 The Commission thus directed PJM to revise its Tariff to create three new transmission services (i.e., Interim NITS, FCD transmission service, and NFCD transmission service) that reflect that Eligible Customers taking service on behalf of Co-Located Loads are willing and able to limit their energy withdrawals from the transmission system under certain conditions.31 Specific to these new transmission services, the Commission established paper hearing procedures to determine the just and reasonable rates, terms, and conditions for such services.32
16. The Commission also found the existing retail BTMG netting rules in the Tariff to be unjust and unreasonable. PJM’s existing Tariff allows load serving entities (LSE) that provide service to loads with qualifying BTMG to reduce their costs by netting output from BTMG in the calculation of their peak demand for the purpose of determining NITS charges.33 The Commission explained that these retail BTMG netting rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers’ full gross load in transmission and resource adequacy planning.34 Thus, the Commission directed PJM to revise its retail BTMG netting rules.35 In recognizing concerns about the potential impacts on existing BTMG customers, the Commission directed PJM to maintain the current retail BTMG netting rules for customers that fall below a new MW materiality threshold for the amount of load at a particular electrical location that Network Customers may net using BTMG and to implement a two-part transition process
29 Id. P 177.30 Id. PP 195-196.31 Id. PP 178, 200-202, 206, 208-218.32 Id. PP 178, 194, 203, 207, 219.33 Id. P 7.34 Id. PP 179, 186.35 Id. PP 179, 221. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 167 Date Filed: 10/19/2026
PDF page 169
Docket No. EL25-49-002, et al.- 14 -
for retail BTMG including: (1) the establishment of a three-year transition period; and
(2) the ability to grandfather certain entities with existing contracts.36
II. Notice of Filings and Responsive Pleadings
A. PJM’s Compliance Filing
17. Notice of PJM’s compliance filing in Docket No. ER26-1479-000 was published in the Federal Register, 91 Fed. Reg. 9849 (Feb. 27, 2026) with interventions and protests due on or before March 16, 2026.
18. Timely motions to intervene were filed by American Forest & Paper Association (AF&PA); PJM Industrial Customer Coalition (PJM ICC); Industrial Energy Consumers of America (IECA); Monitoring Analytics, LLC, acting in its capacity as the Independent Market Monitor for PJM (Market Monitor); LS Power Development, LLC; Enchanted Rock, LLC (Enchanted Rock); Illinois Municipal Electric Agency; American Clean Power Association; New Jersey Division of Rate Counsel; PJM Power Providers Group; American Electric Power Service Corporation; Exelon Corporation; Constellation Energy Generation, LLC (Constellation); Public Citizen, Inc.; East Kentucky Power Cooperative, Inc.; Clean Energy Buyers Association; Edison Electric Institute; Maryland Office of People’s Counsel (Maryland OPC); EDF Power Solutions, Inc. (EDFps); Solar Energy Industries Association (SEIA); Advanced Energy United (AEU); Buckeye Power, Inc.; Electric Power Supply Association; Duquesne Light Company; North Carolina Electric Membership Corporation; New Jersey Board of Public Utilities; Appalachian Voices; Pennsylvania Office of Consumer Advocate; Public Service Electric and Gas Company, PSEG Power LLC and PSEG Energy Resources & Trade LLC (collectively, PSEG Companies); Old Dominion Electric Cooperative (ODEC); National Railroad Passenger Corporation (Amtrak); Dominion Energy Services, Inc.; Crusoe Energy Systems, Inc. (Crusoe); Consolidated Edison Company of New York, Inc.; PPL Electric Utilities Corporation (PPL); Rockland Electric Company; Illinois Industrial Energy Consumers; American Municipal Power, Inc. (AMP); Grid Reform; Invenergy Renewables LLC and Invenergy Thermal LLC (Invenergy); Data Center Coalition (DCC); Eastman Chemical Company (Eastman); Northern Virginia Electric Cooperative, Inc. (NOVEC); Vistra Corp. (Vistra); Mainspring Energy; Northeastern REMC; Borough of Chambersburg, Pennsylvania; Capital Power Corporation; Eolian, L.P. (Eolian); Antora Energy, Inc. (Antora); Calibrant Energy (Calibrant); Convergent Energy and Power (Convergent); and Verrus, LLC (Verrus).
19. Motions to intervene out of time were filed by Arkon Energy Hannibal and Office of the Illinois Attorney General.
36 Id. PP 179, 221, 223-224. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 168 Date Filed: 10/19/2026
PDF page 170
Docket No. EL25-49-002, et al.- 15 -
20. Timely comments and/or protests were filed by Eastman; EDFps; Digital Power Network; Vistra; Maryland OPC; AEU/SEIA; Eolian, Antora, Calibrant, Convergent, Mainspring, and Verrus (together, Joint Parties); Calibrant, Antora, Convergent, Eolian, and Mainspring (together, BTMG Parties); Invenergy; Energy Artisans, LLC (Energy Artisans); DCC; PJM ICC, IECA, AF&PA (collectively, Industrials) and Amtrak (Industrials/Amtrak); Digital Power Network; Crusoe; AMP; Appalachian Voices; and Constellation.
21. On April 8, 2026, Constellation filed a motion for leave and supplemental protest in this compliance proceeding and in Docket No. ER26-1088-000. On April 14, 2026, Exelon filed an answer to Constellation’s motion. On April 24, 2026, Indicated TOs filed a motion for leave to answer and answer to certain protests and comments. On May 8, 2026, the BTMG Parties and Industrials/Amtrak each filed a motion for leave to answer and answer the Indicated TOs’ April 24 answer. On May 12, 2026, Eastman filed a motion for leave to answer and answer the Indicated TOs’ April 24 answer. On June 3, 2026, Indicated TOs filed a motion for leave to answer and answer.
22. Several parties filed briefs for the paper hearing in Docket No. EL25-49-000 and filed these submissions in this compliance proceeding as well. Specifically, in this compliance proceeding: on March 25, 2026, Enchanted Rock filed its reply brief; on March 26, 2026, Alliance to Save Energy filed comments; and on April 24, 2026, Earthjustice filed its reply brief.
B. Paper Hearing on New Transmission Services
23. On February 23, 2026, in Docket No. EL25-49-000, PJM and Indicated TOs each submitted an initial brief. On March 25, 2026, response briefs were submitted by: Market Monitor; Geronimo Power, LLC; AEU/SEIA; Constellation; Eolian, Antora, Calibrant, Convergent, Mainspring, Verrus, and U.S. Energy Storage Coalition (collectively, Joint Co-Location Developers); Vistra; ODEC; Enchanted Rock; Indicated TOs; Industrials/Amtrak; NOVEC; DCC; and Alliance to Save Energy (Alliance). On April 24, 2026, reply briefs were submitted by: Earthjustice; ODEC; PJM; Maryland OPC; Constellation; Indicated TOs; Joint Co-Location Developers; and Industrials/Amtrak. On May 7, 2026, Enchanted Rock filed a motion for leave to answer and answer to PJM’s reply brief. On May 11, 2026, Constellation filed a motion for leave to answer and answer to PJM’s and Indicated TOs’ reply briefs. On May 21, 2026, Geronimo Power filed a motion for leave to answer and answer to PJM’s and Indicated TOs’ reply briefs. On May 28, 2026, Indicated TOs filed a motion for leave to answer and answer to various reply briefs and Constellation’s May 11 answer.
24. On December 29, 2025, American Clean Power Association filed a motion to intervene out of time in this proceeding. On January 12, 2026, Vitol, Inc. filed a motion to intervene out of time in this proceeding. On January 13, 2026, Pennsylvania Office of Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 169 Date Filed: 10/19/2026
PDF page 171
Docket No. EL25-49-002, et al.- 16 -
Consumer Advocate filed a motion to intervene out of time in this proceeding. On January 16, 2026, Voltus, Inc. filed a motion to intervene out of time in this proceeding. On January 16, 2026, Emerald AI submitted comments out-of-time in Docket No. EL25-49-000. On January 26, 2026, Andrew D. Hinz filed a motion to intervene out of time and comments. On March 20, 2026, Amtrak and AF&PA each filed a motion to intervene out of time in this proceeding. On March 25, 2026, Calibrant, Convergent, Verrus, and U.S. Energy Storage Coalition filed a motion to intervene out of time in this proceeding.
III. Procedural Matters
25. Pursuant to Rule 214 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.214 (2025), the notices of intervention and timely, unopposed motions to intervene in Docket Nos. ER26-1479-000 and EL25-49-000 serve to make the entities that filed them parties to these proceedings.
26. Pursuant to Rule 214(d) of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.214(d), we grant the late-filed motions to intervene in Docket Nos. ER26-1479-000 and EL25-49-000 given these entities’ interests in the proceedings, the early stage of the proceedings, and the absence of undue prejudice or delay. Interventions in Docket No. EL25-49-000 are prospective only and such entities may not challenge the December Order.
27. We note that Verrus did not intervene until after the December Order. When, as here, late intervention is sought after the issuance of a dispositive order, the prejudice to other parties and burden upon the Commission of granting the late intervention may be substantial. Thus, movants bear a higher burden to demonstrate good cause for granting such late intervention.37 Verrus indicates the proceeding has changed significantly with the initiation of the paper hearing proceeding.38 We do not find this explanation to be sufficient to meet the higher burden to show good cause for granting intervention following a dispositive order. As discussed above, we grant Verrus’s motion to intervene as-of the filing date (March 25, 2026); however, we dismiss it to the extent Verrus joins Eolian and Antora in the request for clarification of the December Order.3937 PJM Interconnection, L.L.C., 167 FERC ¶ 61,209, at P 24 (2019); PJM Interconnection, L.L.C., 157 FERC ¶ 61,193, at P 10 (2016).38 Reply Brief of Joint Co-Location Developers and Motion to Intervene Out-of-Tome of Calibrant, Convergent, U.S. Energy Storage Coalition, and Verrus at 6.39 PJM Interconnection, L.L.C., 157 FERC ¶ 61,193 at P 10; Pac. Gas & Elec. Co., 100 FERC ¶ 61,097, at P 5 (2002). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 170 Date Filed: 10/19/2026
PDF page 172
Docket No. EL25-49-002, et al.- 17 -
28. Rule 213(a)(2) of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.213(a)(2) (2025), prohibits an answer to a protest or answer unless otherwise ordered by the decisional authority. We accept the answers submitted in Docket Nos. EL25-49-000 and in ER26-1479-000, as well as Constellation’s supplemental protest, because they have provided information that assisted us in our decision-making process.
29. On February 2, 2026, Constellation filed a motion for leave and answer to Exelon and FirstEnergy’s request for rehearing. On February 12, 2026, Exelon and FirstEnergy filed an answer in opposition to that motion. On February 19, 2026, the Pennsylvania Office of Consumer Advocate filed a motion for leave to answer and answer in support of Industrials’ request for clarification or rehearing.40 On February 5 and March 9, 2026, respectively, Market Monitor and PJM filed answers and motions for leave to answer Constellation’s request for clarification or rehearing. On February 20 and March 24, 2026, Constellation filed motions for leave and answers to, respectively, Market Monitor’s and PJM’s answers. Rule 713(d) of the Commission’s Rules of Practice and Procedure41 prohibits an answer to a request for rehearing.42 Accordingly, we deny these motions and we reject these answers filed by Constellation, Exelon and FirstEnergy, Pennsylvania Office of Consumer Advocate, Market Monitor, and PJM.43
30. On February 9, 2026, Andrew Hinz filed a request for rehearing. Pursuant to section 313(a) of the FPA,44 an aggrieved party must file an application for rehearing within 30 days after the issuance of the Commission’s order; in this case, that deadline is
40 Pennsylvania Office of Consumer Advocate is not a party to this proceeding with respect to rehearing or clarification of the December Order and therefore may not file an answer to a request for rehearing or clarification.41 18 C.F.R. § 385.713(d)(1) (2025).42 Id.43 We note that the Pennsylvania Office of Consumer Advocate’s, Market Monitor’s, and PJM’s motions and answers responded to requests for clarification and, in the alternative, rehearing. Because the Commission has discretion in how to characterize pleadings and examines the substance of pleadings, we construe these pleadings as ultimately functioning in substance to respond to requests for rehearing and thus treat them as such. Sw. Power Pool, Inc., 182 FERC ¶ 61,083, at P 14 (2023).44 16 U.S.C. § 825l(a). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 171 Date Filed: 10/19/2026
PDF page 173
Docket No. EL25-49-002, et al.- 18 -
no later than 5:00 PM U.S. Eastern Time45 on January 19, 2026. Because the 30-day rehearing deadline is a statutory requirement, it cannot be waived or extended.46 Therefore, we reject Andrew Hinz’s request for rehearing as untimely.
IV. Requests for Rehearing and/or Clarification
31. As discussed further below, we sustain our finding that the Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.47 We also sustain our finding that the Tariff is unjust and unreasonable because it does not include transmission services that reflect the willingness and ability of an Eligible Customer taking service on behalf of a Co-Located Load to limit its energy withdrawals from the transmission system under certain conditions.48 As a replacement rate, we continue to direct PJM to establish the new transmission services discussed in the December Order.49
32. We also set aside, in part, the December Order; we find that requiring Eligible Customers taking transmission service on behalf of load with BTMG to take NITS, without the option to instead take such alternative transmission services, would be unjust and unreasonable for the same reasons we made the same finding in the December Order with respect to Eligible Customers taking transmission service on behalf of Co-Located Load. As a replacement rate, we direct PJM to revise its Tariff to extend the new transmission services to Eligible Customers taking service on behalf of load with BTMG.
45 The Commission’s regular business hours end at 5:00 p.m., U.S. Eastern Time. 18 C.F.R. § 375.101(c) (2025); 18 C.F.R. § 385.2003(c) (2025); FERC, eFiling User Guide (May 23, 2024), https://www.ferc.gov/media/efiling-user-guide.46 See, e.g., City of Campbell v. FERC, 770 F.2d 1180, 1183 (D.C. Cir. 1985) (“The 30-day time requirement of the [FPA] is as much a part of the jurisdictional threshold as the mandate to file for a rehearing.”); Bos. Gas Co. v. FERC, 575 F.2d 975, 977-98, 979 (1st Cir. 1978) (describing identical rehearing provision of Natural Gas Act as “a tightly structured and formal provision” and holding that “[n]either the Commission or the courts are given any form of jurisdictional discretion”).47 December Order, 193 FERC ¶ 61,217 at P 159.48 Id.49 Id. P 160. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 172 Date Filed: 10/19/2026
PDF page 174
Docket No. EL25-49-002, et al.- 19 -
33. We also continue to find that PJM’s retail BTMG netting rules are unjust and unreasonable.50 We continue to direct PJM to revise the Tariff’s retail BTMG netting rules.51 We also set aside, in part, the December Order; we find that it is just and reasonable to allow certain cogeneration Qualifying Facilities (QFs) that are Network Customers to be able to net by using BTMG, without being subject to the new materiality threshold, if they demonstrate that they are integrated with load such that, when their generating facility trips offline, the load follows.
34. We also continue to direct PJM to clarify its interconnection procedures and agreements to ensure that it is clear to both new and existing Interconnection Customers how to interconnect in a Co-Location Arrangement.52
A. Jurisdiction
1. Sales for Resale in Interstate Commerce
a. December Order
35. In the December Order, the Commission found that several aspects of Co-Location Arrangements fall squarely within the jurisdiction of the states. In particular, the Commission affirmed that “states have authority over their generation resource mix, including through their siting authority” and further explained that “[t]his authority means that which generating facilities are sited and allowed to serve Co-Located Load is also a question of state law.”53 In addition, the Commission “decline[d] in this proceeding to comprehensively address jurisdictional matters regarding the interconnection of retail loads served through a Co-Location Arrangement to the interstate transmission system.”54
b. Request for Clarification and/or Rehearing
36. Constellation requests that the Commission clarify that the Commission has jurisdiction over the wholesale sale of energy by a generator to a retail supplier even if the retail supplier then resells that energy to a Co-Located Load. Constellation states that
50 Id. P 186.51 Id. PP 221-224.52 Id. P 161.53 Id. P 169.54 Id. P 170. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 173 Date Filed: 10/19/2026
PDF page 175
Docket No. EL25-49-002, et al.- 20 -
the December Order is unclear in that it states that “states have authority over their generation resource mix, including through their siting authority” and that “which generating facilities are sited and allowed to serve Co-Located Load is also a question of state law.”55 Constellation explains that generators often do not serve Co-Located Load directly and instead sell electricity at wholesale to an entity, such as a retail supplier, that will then engage in the ultimate retail sale to the Co-Located Load. In such circumstances, Constellation argues that such sales for resale are exclusively within the Commission’s jurisdiction.56
c. Determination
37. In response to Constellation’s request for clarification or rehearing, we reiterate that, where a generator sells electricity at wholesale in interstate commerce to another entity that then resells that electricity at retail to a Co-Located Load, the generator’s sale for resale is exclusively within the Commission’s jurisdiction.57 Thus, state authority does not extend to the wholesale sale of energy by a generator to a retail supplier, regardless of the specific type of ultimate retail customer. However, as the Commission explained in the December Order, both “which generating facilities are sited” and which generating facilities are “allowed to serve Co-Located Load” are “question[s] of state law.”58
2. Retail Allocation of Commission-Jurisdictional Rates
a. December Order
38. In the December Order, the Commission held that “states have exclusive jurisdiction over how the costs assigned to Eligible Customers on behalf of Co-Located Load taking Commission-jurisdictional transmission services,” including the new transmission services, “are allocated to individual retail consumers that are Co-Located Load, just as states have exclusive jurisdiction over how to allocate the costs of all
55 Constellation Request for Clarification or Rehearing at 6-7 (citing December Order, 193 FERC ¶ 61,217 at P 169) (emphasis in original).56 Id. at 6-7 (citing 16 U.S.C. § 824(b)(1); Orangeburg v. FERC, 862 F.3d 1071, 1086-87 (D.C. Cir. 2017)).57 Orangeburg, 862 F.3d at 1086-87 (“FERC—not state commissions—has ‘exclusive authority to regulate the . . . sale at wholesale of electric energy in interstate commerce.’”) (quoting New Eng. Power Co. v. N.H., 455 U.S. 331, 340 (1982)).58 December Order, 193 FERC ¶ 61,217 at P 169. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 174 Date Filed: 10/19/2026
PDF page 176
Docket No. EL25-49-002, et al.- 21 -
Commission-jurisdictional rates (including for energy, capacity, and transmission) among retail customers, including allocating costs among different classes of retail customers.”59 b. Request for Clarification and/or Rehearing
39. Constellation requests that the Commission clarify that states do not have unlimited authority over how to allocate the costs of all Commission-jurisdictional rates and that they cannot use their authority over retail allocation to indirectly regulate the interconnection of generators serving Co-Located Load.60 For example, Constellation claims that a state cannot impose via the exercise of its jurisdiction over retail sales a requirement that attempts to prohibit a transaction that the Commission says is permitted.61 Constellation asserts that some utilities have asked their state commission for authority to condition retail service in the state on the load’s acceptance of a Transmission Security Agreement that calculates its security requirement based on a gross NITS rate despite the fact that the Commission has said that other rates must be made available.62 Constellation argues that the December Order is unclear in that it provides that “states have exclusive jurisdiction over how to allocate the costs of all Commission-jurisdictional rates (including for energy, capacity, and transmission) among retail customers, including allocating costs among different classes of retail customers.”63 c. Determination
40. In response to Constellation’s request, we deny clarification and sustain the December Order. In the December Order, the Commission appropriately explained that “states have exclusive jurisdiction over how to allocate the costs of all Commission-jurisdictional rates (including for energy, capacity, and transmission) among retail customers, including allocating costs among different classes of retail customers.”64 On the other hand, we note that states “may not seek to achieve ends, however legitimate, through regulatory means that intrude on FERC’s authority over interstate wholesale
59 Id. P 167.60 Constellation Request for Clarification or Rehearing at 8 (citing Hughes v. Talen Energy Mktg., LLC, 578 U.S. 150, 164-65 (2016); Nantahala Power & Light Co. v. Thornburg, 476 U.S. 953, 966 (1986)).61 Id.62 Id.63 Id. at 7 (citing December Order, 193 FERC ¶ 61,217 at P 167).64 December Order, 193 FERC ¶ 61,217 at P 167 (emphasis added). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 175 Date Filed: 10/19/2026
PDF page 177
Docket No. EL25-49-002, et al.- 22 -
rates . . . .”65 While Constellation frames its request around the jurisdictional findings in the December Order, Constellation raises a specific matter that is not the subject of and is otherwise outside the scope of this proceeding, i.e., the terms of transmission security agreements. We nonetheless reiterate that: (1) Eligible Customers taking transmission service on behalf of Co-Located Load must have the option to take one of three transmission services, i.e., NITS or Interim NITS, FCD transmission service, or NFCD transmission service;66 and (2) while it remains just and reasonable for an Eligible Customer taking transmission service on behalf of Co-Located Load to take NITS charged on a gross demand basis,67 an Eligible Customer may instead choose to take another transmission service.68
3. Retail BTMG
a. December Order
41. In the December Order, the Commission found that circumstances have changed since the Commission approved PJM’s retail BTMG netting rules such that these rules are no longer just and reasonable. In particular, the Commission found that PJM’s existing retail BTMG netting rules do not limit the amount of qualifying load that a Network Customer may net by using BTMG and do not provide any protections against potential transmission and resource adequacy planning problems or against the costs of maintaining sufficient resources to serve these loads being shifted onto other customers.69 The Commission concluded that PJM’s retail BTMG netting rules are no longer consistent with cost causation principles because large loads configured in a BTMG arrangement with significant generation will raise cost-shifting concerns compared to loads pursuing smaller amounts of netting.7065 Hughes v. Talen Energy Mktg., LLC, 578 U.S. 150, 164.66 December Order, 193 FERC ¶ 61,217 at P 193.67 Id. P 195.68 Id. P 199.69 Id. P 186.70 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 176 Date Filed: 10/19/2026
PDF page 178
Docket No. EL25-49-002, et al.- 23 -
b. Request for Clarification and/or Rehearing
42. Industrials argue that the Commission failed to explain and justify its assertion of jurisdiction over “retail BTMG that merely offsets retail load.”71 Industrials contend that “retail BTMG [is not within] the Commission’s jurisdiction over the transmission of electric energy in interstate commerce” because “[b]y definition, BTMG is produced by a generation unit ‘that delivers energy to load without using the Transmission System.’”72 Industrials assert that the Commission’s finding “necessarily entails piercing the retail meter veil, which serves as the bright-line boundary of the Commission’s statutory authority.”73 Industrials further maintain that the Commission failed to provide a well-reasoned basis for the assertion of jurisdiction over the configurations of retail customers whose BTMG is not selling wholesale power and is not using the transmission system.74 Industrials argue that, here, “retail BTMG involves neither jurisdictional sales nor jurisdictional transmission.”75
c. Determination
43. We disagree with Industrials that the BTMG netting rules are outside of the Commission’s jurisdiction. Industrials misunderstand the December Order as targeting retail sales from BTMG or the delivery of energy from BTMG to load, but this is not the case. The BTMG netting rules instead allow PJM to calculate the charges for
71 Industrials Request for Clarification or Rehearing at 39. 72 Id. at 40 (citing PJM, Intra-PJM Tariffs, OATT, § I.1 (Definitions – A-B) (22.0.0)).73 Id.74 Id. at 40-41 (citing Nat’l Ass’n of Regul. Util. Comm’rs v. FERC, 475 F.3d 1277, 1280 (D.C. Cir. 2007); Detroit Edison Co. v. FERC, 334 F.3d 48, 53 (D.C. Cir. 2003)).75 Id. at 41-42. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 177 Date Filed: 10/19/2026
PDF page 179
Docket No. EL25-49-002, et al.- 24 -
transmission service in interstate commerce.76 The calculation of such transmission charges is squarely within the Commission’s jurisdiction under the FPA.77
4. Retail Backup Service
a. December Order
44. In the December Order, the Commission required that PJM modify its Tariff to require that an Eligible Customer taking transmission service on behalf of a Co-Located Load take one of three transmission services: (1) NITS or Interim NITS; (2) FCD transmission service; or (3) NFCD transmission service.78
b. Request for Rehearing
45. Exelon and FirstEnergy contend that the Commission’s new FCD and NFCD transmission services infringe on state retail authority, asserting that the states, not the Commission, have jurisdiction to decide when and in what circumstances retail load will be curtailed, and how utilities should charge and treat retail customers in those circumstances.79 Exelon and FirstEnergy claim that, for example, states might require the provision of backup service to retail customers who lost supply from their contracted supplier, would regulate the distribution system costs associated with such service that would be charged to the retail customer, and would regulate the costs and terms of the backup service.80 Exelon and FirstEnergy assert that the Commission’s order appears to create a new federal construct because it defines the extent and terms of backup service to
76 PJM, Intra-PJM Tariffs, OATT, § III, § 34.2 (Netting of Behind the Meter Generation) (0.0.0); see December Order, 193 FERC ¶ 61,217 at P 7 (“[T]he Tariff allows load serving entities . . . that provide service to loads with qualifying BTMG to reduce their costs by netting output from BTMG in the calculation of their peak demand for the purpose of determining NITS charges.”) (emphasis added).77 Orangeburg, 862 F.3d at 1086-87 (“FERC—not state commissions—has ‘exclusive authority to regulate the transmission . . . of electric energy in interstate commerce.’”) (quoting New Eng. Power Co., 455 U.S. at 340); Calpine Corp. v. FERC, 702 F.3d 41, 50 (D.C. Cir. 2012) (“[T]he regulation of transmission charges is undoubtedly within FERC’s jurisdiction . . . .”).78 December Order, 193 FERC ¶ 61,217 at P 193.79 Exelon and FirstEnergy Request for Rehearing at 53.80 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 178 Date Filed: 10/19/2026
PDF page 180
Docket No. EL25-49-002, et al.- 25 -
retail customers who lose their contracted retail power supplier.81 Exelon and FirstEnergy argue that the Commission’s new transmission services lack the limitation in the Commission’s wholesale demand response programs, which allow states to prohibit retail consumers from participating in wholesale demand response.82
c. Determination
46. We are not persuaded by Exelon and FirstEnergy’s assertions that FCD and NFCD transmission services infringe on state retail authority. In the December Order, the Commission held that Eligible Customers taking transmission service on behalf of a Co-Located Load must have the option to take one of three transmission services:
(1) NITS or Interim NITS; (2) FCD transmission service; or (3) NFCD transmission service.83 Exelon and FirstEnergy do not explain how FCD and NFCD transmission services define the extent and terms of backup service to retail customers who lose their contracted power supplier and cite no specific aspect of the December Order that does so.84 As such, we find that Exelon and FirstEnergy fail to demonstrate that the Commission’s replacement rate regulates the terms of retail service.8581 Id. at 53, 55.82 Id. at 54 (citing FERC v. EPSA, 577 U.S. 260, 275 (2016)).83 December Order, 193 FERC ¶ 61,217 at P 193.84 FPA section 313(a) requires that an “application for rehearing shall set forth specifically” its grounds. 16 U.S.C. § 825l(a) (emphasis added). We follow Commission practice, with which courts have agreed, and reject arguments, like this one, on rehearing lacking sufficient specificity. PJM Interconnection, L.L.C., 171 FERC ¶ 61,040, at P 22 (2020); see also Ind. Util. Regul. Comm’n v. FERC, 668 F.3d 735, 736 (D.C. Cir. 2012); LA Storage, LLC, 182 FERC ¶ 61,026, at P 25 & n.75 (2023).85 Exelon and FirstEnergy argue that the Commission’s new transmission services lack the limitation in the Commission’s wholesale demand response programs, which allows states to prohibit retail consumers from participating in wholesale demand response. Exelon and FirstEnergy Request for Rehearing at 54 (citing FERC v. EPSA, 577 U.S. at 275). The considerations that led the Commission to include that “opt-out” in the rulemakings that led to Order Nos. 719 and 745, such as a confluence of federal and state jurisdiction with respect to demand response, are not present in this proceeding. Moreover, the Commission was not required to include the “opt-out” even in those rulemakings. See Nat’l Ass’n of Regul. Util. Comm’rs v. FERC, 964 F.3d 1177, 1187 (D.C. Cir. 2020) (“But because FERC has the exclusive authority to determine who may Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 179 Date Filed: 10/19/2026
PDF page 181
Docket No. EL25-49-002, et al.- 26 -
B. Show Cause Findings
1. Overview, Transmission Service, Regulation and Black Start
a. December Order
47. As relevant here, the Commission found in the December Order that the Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load. The Commission also found that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.86
b. Request for Rehearing
48. Exelon and FirstEnergy argue that the Commission did not meet its burden under FPA section 206 to show that the existing PJM Tariff is unjust and unreasonable.87 Exelon and FirstEnergy argue that the Commission provides no evidentiary support for its finding that the Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.88 Exelon and FirstEnergy allege that the Tariff already has provisions explaining how to serve load in PJM and the Commission does not even mention them.89
49. Exelon and FirstEnergy dispute that the Constellation Complaint supports the Commission’s finding of uncertainty.90 Exelon and FirstEnergy contend that the actual participate in the wholesale markets, the Supremacy Clause—not Order No. 841— requires that States not interfere.”).
86 December Order, 193 FERC ¶ 61,217 at P 177.87 Exelon and FirstEnergy Request for Rehearing at 13.88 Id. at 14 (citing December Order, 193 FERC ¶ 61,217 at P 175).89 Id. at 15 (discussing and citing Tariff provisions).90 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 180 Date Filed: 10/19/2026
PDF page 182
Docket No. EL25-49-002, et al.- 27 -
situation described in the Constellation Complaint giving rise to the purposed uncertainty revealed that “any delay resulted from a decision made by Constellation in its attempt to bypass retail service requirements and to obtain service in violation of Illinois law.”91 Exelon and FirstEnergy argue that, if any clarification was necessary, the Commission has now clarified that Co-Location Arrangements must be properly metered and designate and involve transmission service to an Eligible Customer. Exelon and FirstEnergy allege that service can proceed in an orderly fashion. Exelon and FirstEnergy argue that the Commission ignored record evidence that customers’ load service requests proceed on a timely basis when customers take service through an Eligible Customer.92 Exelon and FirstEnergy also maintain that Talen Energy’s recent changes to its Co-Location Arrangement with Susquehanna Nuclear, LLC show that the Tariff works.93
50. Exelon and FirstEnergy next challenge the Commission’s finding that the Tariff is unjust and unreasonable because it does not include transmission services that reflect that an Eligible Customer taking service on behalf of a Co-Located Load that is willing and able to limit its energy withdrawals from the transmission system under certain conditions.94 Exelon and FirstEnergy allege that there is no evidence that the cost of NITS deters service or impacts data center development. Exelon and FirstEnergy also argue that there is no evidence to support the Commission’s statement that requiring NITS could necessitate inefficient and costly transmission buildout and costs paid by transmission customers that may not be necessary if Eligible Customers taking transmission service on behalf of Co-Located Loads are willing to limit their energy withdrawals and take a transmission service that requires fewer Network Upgrades.95 Exelon and FirstEnergy maintain that charging load on a contract demand basis does not change the physical and engineering impacts of the load.96 Exelon and FirstEnergy acknowledge that installing systems to limit grid usage might change system impacts and the need for upgrades, but there is nothing in the record demonstrating that such systems are more beneficial for Co-Located Load than other loads or that such systems warrant
91 Id. at 15-16 (citing Constellation, Docket No. EL25-20-000, Complaint, Ex. 5, attach. 1).92 Id. at 17.93 Id. at 17-18 (citing PJM, Docket No. ER24-2172-000, Amended ISA, attach. A, Schedule F, Part F.4 (filed June 3, 2024)).94 Id. at 18 (citing December Order, 193 FERC ¶ 61,217 at P 159).95 Id. at 19 (citing December Order, 193 FERC ¶ 61,217 at P 199).96 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 181 Date Filed: 10/19/2026
PDF page 183
Docket No. EL25-49-002, et al.- 28 -
the use of different ratemaking principles for Co-Located Load as compared to other loads.97 Exelon and FirstEnergy argue that system impacts may be reduced when a load is located near a generator, but that is true whether the load contracts with remote generation or an abutting generator. Exelon and FirstEnergy assert that the study process can determine how to site to reduce transmission upgrades for the customer using the customer’s gross load.
51. Exelon and FirstEnergy argue that the Commission provides no support for its statement that Co-Located Loads may be able to receive transmission service faster with use of a new, limited transmission service product than they would if they selected NITS, to the extent that providing NITS would require Network Upgrades that the limited transmission service would not.98 Exelon and FirstEnergy assert that the transmission system is affected even when no net power is withdrawn from the system.99 Exelon and FirstEnergy contend that the Commission endorses an unsound approach by suggesting that loads that do not withdraw from the system can be interconnected on a fast track without studying physical impacts.
52. Exelon and FirstEnergy highlight the Commission’s statement that, while the Commission finds that NITS charged on a gross demand basis is one just and reasonable transmission service option for Eligible Customer taking transmission service on behalf of Co-Located Loads, it is not the only option.100 Exelon and FirstEnergy state that the Commission itself acknowledges that the existing service options are feasible and just and reasonable, but the Commission merely wants more options. Exelon and FirstEnergy argue that when the Commission finds a tariff not unjust and unreasonable under the first prong of FPA section 206, as it suggests here, the Commission does not need to set a remedy.
53. Exelon and FirstEnergy disagree with the Commission’s assessment that Co-Located Loads merit a different rate based on the combination of transmission system burdens and benefits. Exelon and FirstEnergy first state that Co-Located Loads benefit from regulation and black start, as the Commission recognized.101 Exelon and FirstEnergy argue that transmission interconnections provide an avenue for data center loads to readily acquire back-up power when co-located generators are not available.
97 Id. at 19-20.98 Id. at 20 (citing December Order, 193 FERC ¶ 61,217 at P 205).99 Id. at 21.100 Id. at 22 (citing December Order, 193 FERC ¶ 61,217 at P 195).101 Id. at 30 (citing December Order, 193 FERC ¶ 61,217 at PP 209, 219). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 182 Date Filed: 10/19/2026
PDF page 184
Docket No. EL25-49-002, et al.- 29 -
Exelon and FirstEnergy argue that, based solely on these uses of the transmission system, Co-Located Loads have no greater claim to preferential rates than other similarly situated transmission customers. Exelon and FirstEnergy argue that the Commission failed to consider the many advantages to Co-Located Loads when they connect to the transmission system. For example, Exelon and FirstEnergy assert that, if the project were islanded instead of grid connected, all back-up generation would sit idled when not needed, forgoing significant revenues from selling surplus power into the wholesale market. Exelon and FirstEnergy also allege that it is very difficult to supply islanded generation with black start and regulation.102
54. Exelon and FirstEnergy argue that the Commission failed to respond to arguments about the unique aspects of co-location with nuclear plants. Exelon and FirstEnergy state that a nuclear facility must be interconnected to the grid as a Nuclear Regulatory Commission licensing obligation, and thus a Co-Location Arrangement with a nuclear unit depends on the grid.103 Exelon and FirstEnergy assert that, in a Co-Location Arrangement with a nuclear unit, Co-Located Load depends on services such as regulation, voltage support, black start, and other ancillary services delivered over the grid all the time because nuclear units cannot provide these services.104 c. Determination
55. On rehearing, we sustain the Commission’s finding in the December Order that the Tariff is unjust and unreasonable.105 First, we continue to find that the Tariff does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load
102 Id. at 31.103 Id. at 32-33 (citing Exelon, Docket No. EL25-20-000, Comments, attach. 1, ¶¶ 11-13, 16)).104 Id. at 32 (citing Exelon, Docket No. EL25-20-000, Comments, attach. 1, ¶¶ 14-19)).105 December Order, 193 FERC ¶ 61,217 at PP 175-177. As discussed in the December Order, we continue to find the Tariff also unjust and unreasonable in additional related ways—for example, we continue to find that the Tariff is unjust and unreasonable because it does not address charges for black start and regulation service to Eligible Customers taking transmission service on behalf of Co-Located Load. Id. P 159. We do not interpret Exelon and FirstEnergy, however, to be disputing this finding. Separate portions of this order address our findings in this proceeding that additional aspects of the Tariff are unjust and unreasonable. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 183 Date Filed: 10/19/2026
PDF page 185
Docket No. EL25-49-002, et al.- 30 -
and Eligible Customers taking transmission service on behalf of Co-Located Load.106 Second, we continue to find that the Tariff does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.107
56. Substantial evidence supports the Commission’s finding that the Tariff lacks sufficient clarity as to the rules governing Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.108 There is significant support in the record for this finding.109 In particular, PJM recognizes that its Tariff lacks sufficient clarity in this area.110 We also find persuasive the comments in the record from a range of stakeholders reflecting the uncertainty facing entities seeking to effectuate Co-location Arrangements within PJM.111106 Id. P 175.107 Id. P 177.108 Id. PP 175-176.109 Id. P 176 n.376.110 PJM March 24, 2025 Response at 32 (noting that its “Tariff provisions d[o] not contemplate the type of arrangements at issue in this docket”); id. at 35 (“The extent to which netting [rules under the Tariff] could . . . apply to co-located data center load is not clear at this time.”); see also Vistra April 23, 2025 Reply Comments at 11 (arguing that PJM has “effectively conceded” that the Tariff does not contain sufficient clarity).111 See Constellation May 8, 2025 Answer at 3-9 (collecting record support and concluding “[i]n sum, the record in this proceeding unequivocally supports the . . . finding that the PJM Tariff lacks clear co-location rules”); AEU April 23, 2025 Reply Comments at 19 (“Loads and generators pursuing [C]o-[L]ocation [A]rrangements need clarity as to how these arrangements will be studied, and how those studies will be evaluated. There must be a level of uniformity and detail outlining study requirements to ensure regulatory certainty for large loads and new generation and storage resources seeking to serve large loads. This level of uniformity is currently lacking in PJM’s interconnection procedures and cost allocation methodology . . . .”); Electric Power Supply Association (EPSA)/PJM Power Providers Group (P3) April 23, 2025 Reply Comments at 2 (“EPSA and P3 agree with the Commission that PJM needs to establish tariff provisions and rules to accommodate the array of [C]o-[L]ocated [L]oad arrangements that will facilitate the timely and effective integration of large loads locating in the region.”); DCC April 23, 2025 Reply Comments at 7 (“. . . [T]he Commission should direct PJM to develop clear, enforceable tariff language that affirms Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 184 Date Filed: 10/19/2026
PDF page 186
Docket No. EL25-49-002, et al.- 31 -
57. Further, there has been significant confusion and dispute over what rules govern Co-Location Arrangements in PJM. As the Commission found in the December Order, the absence of clear tariff provisions creates uncertainty that has resulted in disparate treatment of potential Co-Location Arrangements in PJM, where transmission owners have taken different approaches to performing the necessary steps that apply to Interconnection Customers seeking to serve Co-Located Load through a Co-Location Arrangement, leading to no consistent understanding of entities’ responsibilities with respect to their planned Co-Location Arrangements.112 Further, in 2024, PJM developed a now-rescinded “Guidance Document,” which included non-binding guidance for generators and loads seeking to enter into Co-Location Arrangements113—further suggesting that PJM’s existing Tariff did not provide sufficient clarity resulting in a lack of consistent understanding among stakeholders. Indeed, parties have raised varying interpretations of the rules that apply to Co-Location Arrangements across Commission proceedings.114
the permissibility of multiple co-location configurations, including those where load is served directly from a generation resource located on or near the same site. Tariff clarity is essential to reduce unnecessary disputes, avoid case-by-case confusion, and enable transmission providers to process interconnection and load addition requests efficiently and predictably.”).
112 December Order, 193 FERC ¶ 61,217 at P 175 & n.375 (citing Constellation, Complaint, Docket No. EL25-20-000 (filed Nov. 22, 2024); Baltimore Gas & Electric Company and PECO Energy Company, Petition for Declaratory Order, Docket No. EL24-149-000 (filed Sept. 30, 2024); Constellation April 23, 2025 Reply Comments at 4 n.4). 113 PJM, PJM Guidance on Co-Located Load (Mar. 22, 2024) (updated Apr. 17, 2024), https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/pjm- guidance-on-co-located-load.pdf.114 For instance, an amended ISA to which PPL was a party stated that “The Co-Located Load is not Network Load, and it is intended that the Co-Located Load will never consume capacity and/or energy from the PJM Transmission System.” PJM Interconnection, L.L.C. (Susquehanna), Amended Susquehanna ISA, Docket No. ER24-2172, Schedule F, Part F (filed June 3, 2024); see also, e.g., PJM Interconnection, L.L.C., 189 FERC ¶ 61,078, at PP 14, 26 (2024). On the other hand, there are allegations in the record that Exelon has delayed work on Constellation’s requests to co-locate load with certain of its generators due to Exelon’s concerns that such requests are not allowed under the Tariff without arranging for wholesale Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 185 Date Filed: 10/19/2026
PDF page 187
Docket No. EL25-49-002, et al.- 32 -
58. In fact, based on our review of the Tariff, the Tariff indeed does not contain provisions specifying the rules governing Co-Location Arrangements.115 For instance, the Tariff lacks provisions specifying: the terms and conditions for Interconnection Customers seeking to use their generators to serve Co-Located Load;116 that an Interconnection Customer who will use its generator to serve Co-Located Load must designate an Eligible Customer who will take transmission service on behalf of the Co-Located Load;117 the rules governing transmission service—including the rates, terms, and conditions of that service—taken by an Eligible Customer on behalf of Co-Located Load;118 and the charges for black start and regulation service to Eligible Customers taking transmission service on behalf of Co-Located Load.119 In sum, due to the absence of these provisions, the Tariff lacks sufficiently clear answers to important questions about how to effectuate Co-Location Arrangements.
59. The finding that the Tariff is unjust and unreasonable due to the lack of sufficient clarity is bolstered by several factors. First, the lack of sufficient clarity leaves entities unable to determine what steps they can or must take to effectuate or administer Co-Location Arrangements of various configurations.120 Interconnection Customers seeking to use their generators to serve Co-Located Load have no means of knowing their responsibilities with respect to serving Co-Location Arrangements and the terms and conditions that apply to these arrangements.121 Without an Eligible Customer designated to take transmission service on behalf of a Co-Located Load, the Tariff lacks a mechanism to address and ensure proper charges for situations in which a Co-Located Load withdraws energy from the transmission system.122 Second, an absence of transmission or retail distribution service. February Order, 190 FERC ¶ 61,115 at PP 51,
75. 115 December Order, 193 FERC ¶ 61,217 at P 175.
116 Id. P 176.117 Id.118 Id.; see also, e.g., id. P 175.119 Id. P 177; see also id. PP 159, 181-185.120 Id. P 175.121 Id. P 176.122 Id. Indeed, Exelon and FirstEnergy concede that they agree that “[a]n Eligible Customer serving a co-located load must be designated because it is the Eligible Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 186 Date Filed: 10/19/2026
PDF page 188
Docket No. EL25-49-002, et al.- 33 -
sufficient clarity in these circumstances creates regulatory uncertainty, thus undermining a “central purpose” of the FPA—“predictability.”123 Third, the lack of sufficient clarity leads here to the potential for undue discrimination, preferential treatment, or otherwise unjustifiable disparate conduct. As discussed above, disparate treatment has occurred in PJM, where transmission owners have taken different approaches to addressing Co-Location Arrangements.124 Finally, the lack of sufficient clarity introduces the risk that costs related to Co-Location Arrangements may not be allocated consistent with cost causation principles because, for instance, Eligible Customers taking transmission service on behalf of Co-Located Load could benefit from regulation and black start services without contributing to cost recovery for such services, thus risking that costs may be allocated entirely to other transmission customers and passed through to residential customers, among others.125 In total, these factors are magnified by the facts that Co-Location Arrangements are becoming increasingly common in PJM, entities continue to raise issues involving Co-Location Arrangements with the Commission,126 and Co-Location Arrangements may include large amounts of load and generation. Given these ramifications and consistent with precedent,127 the Commission appropriately found that the lack of sufficient clarity in the Tariff has rendered it unjust and unreasonable. Customer that seeks and obtains transmission service and pays for it.” Exelon and FirstEnergy Request for Rehearing at 2.
123 PJM Power Providers Grp. v. FERC, 96 F.4th 390, 401-02 (3d Cir. 2024) (describing a central purpose of the filed rate doctrine: predictability). Ensuring predictability ultimately supports a primary purpose of the FPA, “encourag[ing] the orderly development of plentiful supplies of electricity . . . at reasonable prices.” Pub. Utils. Comm’n of Cal. v. FERC, 367 F.3d 925, 929 (D.C. Cir. 2004) (quoting NAACP v. FPC, 425 U.S. 662, 670 (1976); see EPSA, 577 U.S. at 290 (“The statute aims to protect ‘against excessive prices’ and ensure effective transmission of electric power.” (citations omitted)).124 December Order, 193 FERC ¶ 61,217 at P 175; February Order, 190 FERC ¶ 61,115 at P 75.125 December Order, 193 FERC ¶ 61,217 at P 177; see also id. PP 181-185.126 Id. P 4.127 E.g., Invenergy Transmission LLC v. Midcontinent Indep. Sys. Operator, Inc., 193 FERC ¶ 61,033, at P 53 (2025) (finding tariff unjust and unreasonable because it did not address when and how certain transmission projects are incorporated into a transmission planning model and because existing provisions lacked “sufficient specificity and certainty”); PJM Interconnection, L.L.C., 167 FERC ¶ 61,030, at PP 22, 41, 59 (2019) (“[W]e find that the PJM Operating Agreement is unjust and unreasonable Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 187 Date Filed: 10/19/2026
PDF page 189
Docket No. EL25-49-002, et al.- 34 -
60. Notwithstanding the Commission’s findings, Exelon and FirstEnergy argue that because the Tariff provides for NITS and point-to-point service (PTPS)—with terms governing them—“[t]here is no inability to determine how to serve [co-located] load in PJM.”128 Yet, the existence of provisions governing NITS and PTPS does not undermine our findings that the Tariff both lacks sufficient clarity and does not contain provisions specifying the rules governing Co-Location Arrangements. The applicability, operation, and/or interpretation of the cited general provisions (among others) with respect to Eligible Customers taking transmission services on behalf of Co-Located Load and Co-Location Arrangements are the issues that, in part, give rise to the lack of sufficient clarity we target here.
61. Next, Exelon and FirstEnergy respond to the Commission’s citation of the Constellation Complaint by blaming “any delay” giving rise to uncertainty on Constellation.129 But this response misunderstands the Commission’s reasoning. The Commission cited the Constellation Complaint as one piece of evidence to demonstrate that there is “no consistent understanding” of the rules governing Co-Location Arrangements.130
62. Similarly, Exelon and FirstEnergy allege that “in 2025, [Commonwealth Edison Company] received more than 25 customer service applications for large load service, representing new load in excess of 20 GW” and “[t]here is no suggestion in the record that any customer is encountering problems with those requests.”131 Beyond the fact there is no representation that any of those applications relate to Co-Located Load, this limited set of applications before a single Transmission Owner does not demonstrate because it fails to provide a sufficient level of clarity regarding the permissible components of energy market cost-based offers”); N.Y. Indep Sys. Operator, Inc., 162 FERC ¶ 61,107, at PP 160, 173 (2018) (“We find this difference in definitions to be unclear and, therefore, unjust and unreasonable”); Dominion Energy Mktg., Inc., v. ISO New Eng. Inc., 155 FERC ¶ 61,121, at P 17 (2016) (“We find that [the] existing Tariff is unclear as to whether new incremental capacity and existing capacity at the same generating station must submit a composite offer in order to participate in [a capacity auction]. As a result of this lack of clarity, the Tariff fails to provide adequate notice of what the requirement is and, thus, we find the Tariff is unjust and unreasonable.”).
128 Exelon and FirstEnergy Request for Rehearing at 14-15.129 Id. at 15-16.130 December Order, 193 FERC ¶ 61,217 at P 175.131 Exelon and FirstEnergy Request for Rehearing at 17. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 188 Date Filed: 10/19/2026
PDF page 190
Docket No. EL25-49-002, et al.- 35 -
sufficient clarity even if those requests “proceed on a timely basis.”132 As explained above, the Commission continues to be concerned about disparate treatment by different Transmission Owners in this context.133
63. Exelon and FirstEnergy also state that in one proceeding pertaining to Co-Located Load, a load and generator entered into a “front-of-the-meter” arrangement and thus “conceded that PJM Network Service works . . . and is a service upon which all customers may rely.”134 A decision in one proceeding to abandon a Co-Location Arrangement does not undermine the Commission’s finding that there is a lack of sufficient clarity related to Co-Location Arrangements writ large (and, in fact, might support it).
64. Finally, Exelon and FirstEnergy contend that “[t]o the extent clarification was needed, the Commission has now clarified . . . that these arrangements must be properly metered and must designate and involve transmission service to an Eligible Customer.”135 This argument is misplaced. Exelon and FirstEnergy’s argument that the replacement rate should be narrower—that only part of it would be sufficient—should be directed not to the finding that the Tariff is unjust and unreasonable but to the determination of a just and reasonable replacement rate. Further, the portions of the replacement rate that Exelon and FirstEnergy reference—requiring proper metering and involving transmission service to an Eligible Customer—do not resolve the Commission’s concerns as to a lack of sufficient clarity in the Tariff. For example, the Commission found a lack of sufficient clarity as to the terms and conditions for Interconnection Customers seeking to use their generators to serve Co-Located Load.136
65. We also continue to find that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.137 Requiring Eligible Customers taking
132 Id.133 See supra notes 114, 126.134 Exelon and FirstEnergy Request for Rehearing at 17-18 (discussing the proceedings in Docket Nos. ER24-2172-000 and ER24-2171-001).135 Id. at 16-17.136 December Order, 193 FERC ¶ 61,217 at P 176.137 Id. P 177; see also S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41, 64-68 (D.C. Cir. 2014) (explaining that to find a practice unjust and unreasonable, the Commission need not rely on “empirical evidence” and can rely on “reasonable economic Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 189 Date Filed: 10/19/2026
PDF page 191
Docket No. EL25-49-002, et al.- 36 -
transmission service on behalf of Co-Located Load to take NITS, without the option to instead take such alternative transmission services, is economically inefficient. Here, the record demonstrates that some Eligible Customers taking service on behalf of Co-Located Loads are willing and able to limit their energy withdrawals. With only the current services offered, having found that Eligible Customers taking NITS will be charged based on gross load, prospective Eligible Customers taking transmission service on behalf of Co-Located Load would have to take a transmission service that does not reflect the load’s willingness and ability to limit use of the transmission system—which is an inefficient result. The Commission has long recognized that providing differentiated service options can produce more efficient results because customers can choose the service that is most closely tailored to their specific needs, rather than a one-service-fits-all approach.138 Requiring Eligible Customers taking service on behalf of Co-Located Loads to take NITS creates an unacceptable risk of more costly Network Upgrades that would be unnecessary if such Eligible Customers were willing and permitted to take a transmission service that reflects Co-Located Loads that are willing propositions” “likely enough to be within the Commission’s authority” and noting that the use of words such as “might, may, or could” does not make its determination legally deficient (internal quotation marks omitted)).
138 See, e.g., Integration of Variable Energy Res., Order No. 764, 139 FERC ¶ 61,246, at PP 2, 22, order on reh’g & clarification, Order No. 764-A, 141 FERC ¶ 61,232 (2012), order on clarification & reh’g, Order No. 764-B, 144 FERC ¶ 61,222 (2013) (explaining that the Commission sought “to provide all transmission customers the option of using more frequent transmission scheduling intervals within each operating hour, at 15-minute intervals,” which will allow them “the flexibility to adjust their transmission schedules, thus limiting their exposure to imbalance charges” and lead to “more efficient utilization of transmission and generation resources”); Standardization of Generator Interconnection Agreements & Procs., Order No. 2003, 104 FERC ¶ 61,103 (2003), order on reh’g, Order No. 2003-A, 106 FERC ¶ 61,220, at P 534, order on reh’g, Order No. 2003-B, 109 FERC ¶ 61,287 (2004), order on reh’g, Order No. 2003-C, 111 FERC ¶ 61,401 (2005), aff’d sub nom. Nat’l Ass’n of Regul. Util. Comm’rs v. FERC, 475 F.3d 1277 (D.C. Cir. 2007) (explaining that “an Interconnection Customer that elects to be studied for Network Resource Interconnection Service has the option also to be studied for Energy Resource Interconnection Service and proceed with Network Resource Interconnection Service or a lower level Interconnection Service whereby only certain Network Upgrades will be completed” and finding that “[t]his option thus allows the Interconnection Customer to avoid having to fund Network Upgrades that it does not need”). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 190 Date Filed: 10/19/2026
PDF page 192
Docket No. EL25-49-002, et al.- 37 -
and able to limit their energy withdrawals.139 We further reiterate that there is support in the record for the foregoing analysis.140
66. On rehearing, Exelon and FirstEnergy dispute the Commission’s finding that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking transmission service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.141 First, Exelon and FirstEnergy argue that “there is no evidence that the cost of paying for Network Service deters service or has any impact whatsoever on development of data centers” because “data center development interest in PJM is overwhelming.”142 But the Commission was not required to show that its FPA section 206 step one findings would have a particular effect on data centers. Instead, as explained in the prior paragraph, the Commission’s findings relate to economic and other harms from a lack of transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system.143 In any event, we continue to reason that requiring Eligible Customers taking transmission service on behalf of Co-Located Load to take NITS does have a negative impact relative to transmission services that reflect these loads’ willingness and ability to limit energy withdrawals. These negative impacts could include unnecessary Network Upgrade costs, which cause an unjust and unreasonable increase in transmission rates. The assertion that “development interest” in data centers may currently be high, or will remain high if Eligible Customers taking transmission service on behalf of Co-Located Loads that are willing and able to limit their withdrawals from the transmission system are required to take NITS on a gross basis, does not address the counterfactual at issue (i.e., requiring Eligible Customers taking transmission service on behalf of Co-Located Load to take NITS relative to transmission services that reflect these loads’ willingness and ability to limit energy withdrawals).
67. Second, Exelon and FirstEnergy contend that the Commission has no evidence144 to support the risk of “costly and inefficient transmission system buildout” under NITS
139 December Order, 193 FERC ¶ 61,217 at PP 177, 199, 205.140 Id. PP 199 & n.423, 205, 434; see also PP 160, 177-178.141 Exelon and FirstEnergy Request for Rehearing at 18.142 Id. at 18-19.143 December Order, 193 FERC ¶ 61,217 at P 177.144 Exelon and FirstEnergy Request for Rehearing at 19-20 (citing, among other things, December Order, 193 FERC ¶ 61,217 at P 199). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 191 Date Filed: 10/19/2026
PDF page 193
Docket No. EL25-49-002, et al.- 38 -
compared to “fewer Network Upgrades” and “lower Network Upgrade costs” under an alternative service.145 To the contrary, the Commission has provided a robust rationale for this risk, as explained above. Exelon and FirstEnergy state that “network studies are based on physics and engineering” so NITS cannot “impose[] unnecessary transmission upgrade costs.”146 We agree with the premise that studies are based on physics and engineering, but not the conclusion. Many Network Upgrades are caused by the amount of MW flow on the transmission system but certain Network Upgrades are not (e.g., they may be caused by stability or voltage-related issues).147 Therefore, as Exelon and FirstEnergy concede, under a transmission service designed to reflect load’s willingness and ability to limit energy withdrawals, “if the load installs systems aimed at limiting its use of the grid, those might change the system impacts and need for upgrades.”148 Conversely, NITS requires PJM to plan the transmission system to deliver power to load,149 even if that load does not intend to ever withdraw power from the system, which could result in unnecessary Network Upgrades. Exelon and FirstEnergy also claim that “[t]he fact that a load is located near a generator may well reduce system impacts . . .
145 December Order, 193 FERC ¶ 61,217 at P 177.146 Exelon and FirstEnergy Request for Rehearing at 19.147 Exelon and FirstEnergy additionally contend that “even when no net power is being withdrawn from the system . . . the transmission system is affected and needed by the load—indeed, the Commission agreed with this proposition when it found that co- located loads do utilize load-following based on gross rather than net load.” Id. at 19-21. Again, we do not find that the need for Network Upgrades is based only on withdrawals; instead, we find that reducing the amount of MW flow can lead to the need for fewer or less costly Network Upgrades. The December Order does not promote ignoring impacts when no net power is being withdrawn.148 Id. at 19-20. We note that Exelon and FirstEnergy also state that “the same can be said for similar systems applied to other loads. Nothing in the record [supports] that such systems are more beneficial for co-located load projects than for any other load [or] the use of different ratemaking principles when such installations are in place. To the contrary, . . . the Commission has consistently rejected arguments that different ratemaking should be applied even where there are physical limits to the amount of transmission system use.” Id. We understand these arguments as directed to the replacement rate, and thus we address them below. To the extent they are directed to the Commission’s FPA section 206 step one finding, we disagree for the same reasons stated below.149 PJM, Intra-PJM Tariffs, OATT, § III, § 28.2 (Transmission Provider Responsibilities) (1.0.0). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 192 Date Filed: 10/19/2026
PDF page 194
Docket No. EL25-49-002, et al.- 39 -
regardless of whether the load has contracted with the generator it abuts, or with remote generation.”150 This assertion ignores the fact that a new transmission service reflecting willingness and ability to limit energy withdrawals could further reduce system impacts—for instance through the “systems aimed at limiting [the] use of the grid” that Exelon and FirstEnergy reference.151 We similarly disagree with Exelon and FirstEnergy’s claim that a new transmission service would not “alter what must be studied in assessing the physics and engineering of any proposed new configuration.”152 Studies for a customer taking a new transmission service that limits the amount of energy that may be withdrawn would reflect that limitation.153 Such potential transmission service could alter the level of steady-state transmission system usage studied (i.e., the “physics”) and the design of the physical facilities, necessary control technologies, and/or protection systems needed to effectuate that arrangement compared to a traditional Network Customer (i.e., the “engineering”), contrary to Exelon and FirstEnergy’s assertions.
68. Third, Exelon and FirstEnergy assert that the Commission contradicted itself in finding the Tariff unjust and unreasonable in lacking alternative transmission services because the Commission also stated that “‘it continues to be just and reasonable for an Eligible Customer taking transmission service on behalf of Co-Located Load to elect, as one of the required transmission services from which the Eligible Customer must choose, to take NITS.’”154 The Commission did not find that current set of transmission service options is just and reasonable. Instead, the Commission stated, it continues to be just and reasonable for such an Eligible Customer “to elect” NITS “as one of the required
150 Exelon and FirstEnergy Request for Rehearing at 20.151 Id. at 19-20. Exelon and FirstEnergy likewise claim that Co-Location Arrangements “will have the same potential benefit regardless of whether there is a contractual supply arrangement with a nearby generator and regardless of whether it pays for transmission service based on net or gross load.” Id. at 21. This assertion again misses the key distinction. Under a new alternative transmission service reflecting willingness and ability to limit energy withdrawals, there could be fewer or less costly Network Upgrades if the Eligible Customer can select a lower (but otherwise satisfactory) level of demand.152 Id. at 20.153 Exelon and FirstEnergy state that “[t]here is simply no evidence” for an argument that a new transmission service could speed access to service. Id. But the Commission’s findings are not based on speeding access to service or creating “fast-track interconnection.” Id. at 20-21. 154 Id. at 21-22 (quoting December Order, 193 FERC ¶ 61,217 at P 195). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 193 Date Filed: 10/19/2026
PDF page 195
Docket No. EL25-49-002, et al.- 40 -
transmission services.”155 But it is unjust and unreasonable for that set of options to lack the alternatives the Commission discussed.156
69. Fourth, Exelon and FirstEnergy argue that the Commission’s finding that the Tariff is unjust and unreasonable because it lacks alternative transmission service options misunderstands the benefits and burdens “to co-located projects of being interconnected to the grid.”157 The Commission did not find, however, that Co-Located Loads could receive no benefits from or place no burdens on the transmission system. Instead, the Commission found that the Tariff was unjust and unreasonable because it did not reflect the features of Co-Location Arrangements that make the existing transmission service options unacceptable.158 An Eligible Customer taking transmission service on behalf of Co-Located Load must be charged for the benefits received from and the burdens placed on the transmission system—but that does not mean the status quo is not unjust and unreasonable. Co-Located Load may be able to reduce the benefits received from and the burdens placed on the transmission system if it is willing and able to limit energy withdrawals. We do not dispute, and indeed continue to find, that Co-Located Loads do receive benefits even if they have zero net energy withdrawals, specifically from regulation and black start services.159 The Commission’s finding that the Tariff is unjust and unreasonable does not preclude the recognition of those benefits.
70. Finally, Exelon and FirstEnergy maintain that the Commission’s “finding that the existing PJM Tariff is [unjust and unreasonable] is arbitrary and capricious because the Commission failed to consider the unique issues that attend co-location with nuclear plants.”160 This argument is misplaced. The Commission found that the Tariff is unjust and unreasonable for, in part, the two reasons discussed above.161 In particular, the Commission found the Tariff unjust and unreasonable because it does not include an option for Eligible Customers on behalf of Co-Located Loads to take transmission services that reflect their willingness and ability to limit their energy withdrawals from
155 December Order, 193 FERC ¶ 61,217 at P 195 (emphasis added).156 Id. P 177.157 Exelon and FirstEnergy Request for Rehearing at 30-32; see also id. (discussing various benefits and burdens).158 December Order, 193 FERC ¶ 61,217 at P 177.159 Id. P 185.160 Exelon and FirstEnergy Request for Rehearing at 32-33.161 December Order, 193 FERC ¶ 61,217 at PP 176, 177. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 194 Date Filed: 10/19/2026
PDF page 196
Docket No. EL25-49-002, et al.- 41 -
the transmission system. The fact that a nuclear generator in a Co-Location Arrangement might be dependent on the transmission system because that nuclear generator cannot operate without a robust interconnection to the transmission system, or cannot load follow, does not undermine these core findings. Exelon and FirstEnergy attempt to use these facts to conclude that the Co-Located Load is effectively using the transmission system in a similar manner to a load served by remote resources. We disagree because, regardless of load following, the energy used by the Co-Located Load is provided (at least in part) by its Co-Located Generator, not via the transmission system. Eligible Customers on behalf of Co-Located Loads that are served by a Co-Located Generator that is a nuclear generator should be permitted to take transmission services that reflect that they are willing and able to limit their withdrawals from the transmission system under certain conditions. To the extent a nuclear generator that is part of a Co-Location Arrangement operates differently than other Co-Located Generators, that is an issue that may be assessed in subsequent study processes, or simply by the nuclear generator itself, as the Interconnection Customer (not the Eligible Customer) in determining whether and how to enter into a Co-Location Arrangement.
2. Retail BTMG Netting Rules
a. Scope and Adequate Notice
i. December Order
71. The Commission found that PJM’s retail BTMG netting rules are no longer just and reasonable and clarified that this finding applies to all Network Load.162
ii. Request for Clarification and/or Rehearing
72. Citing the Administrative Procedure Act (APA) and Commission Rule 209, Industrials argue that changes to retail BTMG netting rules are outside the scope of the February Order.163 Industrials assert that the February Order set the scope of the proceeding and limited it to Co-Located Load and Co-Location Arrangements, thus excluding BTMG. Industrials argue that no part of the February Order included the possibility of the Commission’s BTMG netting findings in the December Order. Industrials allege there are important distinctions between Co-Location Arrangements and BTMG, particularly that a BTMG arrangement is a retail load-modification
162 Id. P 186.163 Industrials Request for Clarification or Rehearing at 22 (citing 5 U.S.C. § 706; 18 C.F.R. § 385.209 (2025)); see also 5 U.S.C. § 554. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 195 Date Filed: 10/19/2026
PDF page 197
Docket No. EL25-49-002, et al.- 42 -
construct, whereas a Co-Location Arrangement is a wholesale-system-impacting load integration construct.164
iii. Determination
73. We disagree with Industrials that changes to retail BTMG netting rules are beyond the scope of this proceeding because the Commission provided adequate notice as to those changes.
74. Under the APA, an agency setting a matter for hearing must provide parties with adequate notice of the issues that would be considered, and ultimately resolved, at that hearing.165 Under Commission Rule 209(b), “an order to show cause will contain a statement of the matters about which the Commission is inquiring, and a statement of the authority under which the Commission is acting. The statement is tentative and sets forth issues to be considered by the Commission.”166
75. While Industrials allege that the Commission in the February Order “set the scope of the proceeding to Co-Located Load,”167 the Commission did no such thing. The February Order contains no finding limiting the proceeding’s scope to “Co-Located Load.” Instead, the February Order also expressly raises, among many other topics, relevant generation configurations168 and overall addresses issues that attend to load with on-site or otherwise nearby generation, which logically includes BTMG.169164 Industrials Request for Clarification or Rehearing at 22-26.165 N. Va. Elec. Coop., Inc. v. FERC, 945 F.3d 1201, 1205 (D.C. Cir. 2019); 5 U.S.C. § 554(b)(3) (establishing notice requirement for adjudications).166 18 C.F.R. § 385.209(b). 167 Industrials Request for Clarification or Rehearing at 22.168 February Order, 190 FERC ¶ 61,115 at P 79.169 Id. P 76 (discussing concerns related to generation and load being “likely to use or benefit from the transmission system in different ways depending on how they are configured” and giving examples such as “Network Load may co-locate with a generator that is not a grid resource and that either serves the load as an off-grid backup or that reduces the Network Load’s consumption during peak hours” (emphasis added)). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 196 Date Filed: 10/19/2026
PDF page 198
Docket No. EL25-49-002, et al.- 43 -
76. In any event, Industrials themselves acknowledge that the Commission’s briefing questions in fact specifically included BTMG.170 In particular, the Commission asked parties to address “how co-located loads are similar to or disparate from other types of arrangements where load and generation share the same point of interconnection (such as Behind the Meter Generation[)].”171 This question reflects that the Commission would consider BTMG configurations in determining a just and reasonable replacement rate. Industrials contend that the Commission’s reference to “other arrangements” in this question shows that retail BTMG and Co-Located Load are distinct concepts, but Industrials’ claims are belied by their assertions in their reply comments to the February Order that BTMG configurations and Co-Location Arrangements identically impact the transmission system.172 And regardless of their similarity, the Commission’s briefing question raises the subject of the treatment of BTMG. Additional briefing questions in the February Order also sufficiently raise the subject of BTMG. The Commission directed parties to submit briefing on transmission services, including potential changes to the rates, terms, and conditions of NITS to accommodate Co-Location Arrangements.173 PJM’s retail BTMG netting rules are part of PJM’s rates, terms, and conditions for NITS.174 Finally, the Commission also asked “whether portions of the Guidance Document may serve as a just and reasonable and not unduly discriminatory or preferential replacement rate,”175 and that document states, “[i]f the co-located Customer Facility elects to be designated as [BTMG], it will be allowed to net the co-located load directly against the output of the co-located Customer Facility.”176 We thus find that the February Order provided adequate notice that the Commission would consider PJM’s BTMG netting rules as part of this proceeding.
77. The record developed in response to the February Order further reflects that Industrials had notice and an opportunity to address changing PJM’s retail BTMG netting
170 Industrials Request for Clarification or Rehearing at 25. 171 February Order, 190 FERC ¶ 61,115 at P 88 (briefing question a.iv).172 PJM ICC and IECA April 23, 2025 Reply Comments at 9.173 February Order, 190 FERC ¶ 61,115 at P 88 (briefing question b.iv).174 PJM, Intra-PJM Tariffs, OATT, § III, § 34.2 (Netting of Behind the Meter Generation) (0.0.0). 175 February Order, 190 FERC ¶ 61,115 at P 88 (briefing question a.iii).176 PJM, PJM Guidance on Co-Located Load (Mar. 22, 2024) (updated Apr. 17, 2024), https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/pjm- guidance-on-co-located-load.pdf. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 197 Date Filed: 10/19/2026
PDF page 199
Docket No. EL25-49-002, et al.- 44 -
rules. While Industrials attempt to minimize the briefing questions as “scarcely mention[ing]” BTMG among a large number of topics in the February Order, PJM submitted detailed concerns that the retail BTMG netting rules were no longer just and reasonable in direct response to the February Order.177 And parties debated the merits of PJM’s concerns in reply comments.178 All parties, including Industrials, had an opportunity to rebut PJM’s claims before the Commission could weigh the evidence on this matter. As courts have explained, subsequent briefing on a topic serves as evidence of adequate notice as to that topic.179
b. Whether PJM’s Retail BTMG Rules Are Unjust and
Unreasonable
i. December Order
78. In finding that PJM’s retail BTMG netting rules are no longer just and reasonable, the Commission explained that circumstances had changed since the Commission approved PJM’s rules in 2004.180 The Commission stated that PJM explains that the BTMG netting rules were “conceived for, and [have] been implemented for, substantially smaller loads (like a warehouse with solar panels) and not on the scale of large data
177 PJM March 24, 2025 Response at 34 (“The co-located load arrangements at issue here, large data centers, could be viewed as similar to BTM Generation that currently exists under PJM’s Tariff (as reflected in Ex. A, Option 3). But as explained herein, the BTM Generation paradigm does not fit co-location arrangements particularly well because it was not designed with large load co-location in mind.”); id. at 36-37 (“In sum, discussions in the record regarding PJM’s BTM Generation rules raise questions about the status of those rules. PJM is open to exploring . . . whether the 20-year-old method of allocating costs pursuant to the BTM Generation netting rules remains consistent with cost causation principles.”).178 Compare AMP April 23, 2025 Reply Comments at 10 (“The record provides no basis to revisit the current PJM Tariff provisions addressing BTMG.”), with Northeastern Rural Electric Membership Corporation (NREMC) April 23, 2025 Reply Comments at 5 (“Additionally, simple netting of generation against load could allow these facilities [i.e., data centers] to avoid most, if not all, costs by netting out to zero as the entire load is supplied by the co-located generator, despite the co-located loads reliance and benefit from the grid. This would shift costs and burdens unfairly to other users, violating core principles of just and reasonable ratemaking.”).179 N. Va. Elec. Coop., Inc., 945 F.3d at 1206. 180 December Order, 193 FERC ¶ 61,217 at P 186 (citing PJM, 107 FERC ¶ 61,113 (2004) (2004 BTMG Order)). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 198 Date Filed: 10/19/2026
PDF page 200
Docket No. EL25-49-002, et al.- 45 -
centers.”181 However, the Commission stated that large loads, both existing and in the planning stages with PJM, have proliferated in recent years, and PJM has persuasively explained the problems that could occur if Network Customers with large loads were allowed to use the existing BTMG netting rules in the Tariff.182 The Commission stated that, for example, PJM explains that “[a]llowing very large loads like data centers to net is problematic because loads in this configuration do not carry reserves.”183 The Commission stated that such loads must nevertheless be served, however, allowing them to “lean on the PJM system when the [BTMG] is on a full or partial outage or if the load exceeds the rating of the [BTMG].”184 The Commission emphasized that PJM’s existing BTMG netting rules do not limit the amount of qualifying load that a Network Customer may net by using BTMG and do not provide any protections against this potential transmission and resource adequacy planning problem or against the costs of maintaining sufficient resources to serve these loads being shifted onto other customers.185 The Commission found that PJM’s BTMG netting rules are no longer consistent with cost causation principles, because large loads configured in a BTMG arrangement with significant generation will raise cost-shifting concerns compared to loads pursuing smaller amounts of netting. The Commission found that PJM’s existing BTMG netting rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.
ii. Request for Clarification and/or Rehearing
79. Industrials argue that the Commission erred by failing to address prior precedent on cost causation and failing to demonstrate that the existing BTMG netting rules were
181 Id. (quoting PJM March 24, 2025 Response at 13).182 Id. (citing Docket No. AD24-11-000, Large Loads Co-Located at Generating Facilities Tr. at 9:2-3 (noting that “large data centers [] need these significant new amounts of energy for their business”); PJM Interconnection, L.L.C., 188 FERC ¶ 61,200, at P 5 (2024) (“PJM explains that the [tariff] proposal [to allocate load adjustments] was spurred by the recent proliferation of data centers that are contributing to large additions of forecasted load concentrated within a specific wholesale metering area.”)).183 December Order, 193 FERC ¶ 61,217 at P 186 (quoting PJM March 24, 2025 Response at 36). 184 Id. (quoting PJM March 24, 2025 Response at 13 n.5).185 Id. (citing PJM, Intra-PJM Tariffs, OATT, § III, § 34.2 (Netting of Behind the Meter Generation) (0.0.0)). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 199 Date Filed: 10/19/2026
PDF page 201
Docket No. EL25-49-002, et al.- 46 -
unjust and unreasonable.186 Industrials contend that Commission precedent established the “actual use” principle, which holds that “actual use” of the transmission system is a just and reasonable approach for assessing transmission charges that comports with cost causation.187 Industrials argue that the Commission here abandons the “actual use” principle by finding BTMG netting unjust and unreasonable.188 According to Industrials, the December Order also “creates an unreasonable split between those who manage costs by managing load and those who manage costs by investing in generation.”189 “In other words,” Industrials contend, “the effect of the ‘gross load’ approach is unduly discriminatory, because it allows ‘actual use’ to govern NITS costs for some (i.e., load-only customers), but not for others (i.e., those who have invested in retail behind-the-meter generation).”190 Industrials acknowledge that “[i]f standby fees or other charges need to be considered in accordance with cost-causation principles, the Commission may explore those,” but argue that “eliminating altogether the assessment of charges based on ‘actual use’ is unduly discriminatory and fails to reckon with well-established Commission precedent.”191186 Industrials Request for Clarification or Rehearing at 34; see also id. at 5, 19-20.187 Id. at 35-36 (citing 2004 BTMG Order, 107 FERC ¶ 61,113, at P 4 (finding “no transmission or distribution facilities are used to deliver energy from the generating unit to the load”); Occidental Chem. Corp. v. PJM Interconnection, 102 FERC ¶ 61,275, at P 14 (2003) (Occidental) (“Access charges for use of PJM’s transmission system should be allocated to network customers based on a network customer’s actual use of PJM’s system, consistent with the principle of cost causation.”); PJM Interconnection, L.L.C., 167 FERC ¶ 61,268, at P 23 (2019) (PJM) (affirming Commission’s conclusion in Occidental that Network Customers’ charges for use of PJM’s transmission system should be allocated based on a Network Customer’s actual use of PJM’s system); ISO New Eng., Inc., 178 FERC ¶ 61,086, at P 51 (2022) (ISO-NE) (finding just and reasonable ISO New England Inc.’s proposal to exclude from the Monthly Regional Network Load served by unregistered BTMG and the portion of the output of a Generator Asset that serves load located behind the same retail customer meter and assign Regional Network Service charges to Network Customers based on each Network Customer’s actual use of the system)).188 Industrials Request for Clarification or Rehearing at 35-37.189 Id. at 37.190 Id. at 37-38.191 Id. at 38. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 200 Date Filed: 10/19/2026
PDF page 202
Docket No. EL25-49-002, et al.- 47 -
80. Industrials argue that the Commission did not develop a sufficient record on which to base its determinations on BTMG netting rules in the Tariff.192 Industrials give several examples of “real-life facility configurations” that will face substantial harms or be undercompensated under a “gross load” approach.193 Industrials argue that, without a well-developed record, the Commission may not be able to fully recognize the cost causation implications of the removal of all netting rules.
iii. Determination
81. We disagree with Industrials that the Commission failed to address prior precedent in the December Order or show that PJM’s retail BTMG netting rules were unjust and unreasonable.194 The Commission in the December Order summarized its decision approving PJM’s retail BTMG netting rules, including the finding in the 2004 BTMG Order accepting the BTMG netting rules that “charges for use of PJM’s transmission system should be allocated to network customers based on a network customer’s actual use of PJM’s system, consistent with the principle of cost causation.”195 We recognize that the Commission’s 2004 BTMG Order relied upon Occidental for the proposition that NITS charges should be based on actual use,196 and that, after 2004, the Commission has relied upon Occidental and/or the 2004 BTMG Order to support similar findings.197 But the Commission in the December Order did not find that it is no longer just and unreasonable to ever allocate transmission charges based on actual use. Rather, the Commission found that PJM’s retail BTMG netting rules are no longer consistent with cost causation principles for a specific reason, that is, because large loads configured in a BTMG arrangement with significant generation will raise cost-shifting concerns
192 Id. at 26; see also id. at 6.193 Id. at 27-31; see also id. at 4-5.194 Id. at 34-38.195 December Order, 193 FERC ¶ 61,217 at P 7 (quoting 2004 BTMG Order, 107 FERC ¶ 61,113 at P 28); Id. P 186 (citing 2004 BTMG Order, 107 FERC ¶ 61,113).196 2004 BTMG Order, 107 FERC ¶ 61,113 at P 28 (citing Occidental, 102 FERC ¶ 61,275).197 See PJM, 167 FERC ¶ 61,268 at P 23 (discussing Occidental for the proposition that the Commission has found that RTOs and transmission owners must recognize load reductions from interruptible load programs in computing billing determinants); ISO-NE, 178 FERC ¶ 61,086 at P 51 (finding just and reasonable ISO New England’s proposal to charge Network Customers based on actual use of the system). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 201 Date Filed: 10/19/2026
PDF page 203
Docket No. EL25-49-002, et al.- 48 -
compared to loads pursuing smaller amounts of netting.198 The Commission thus explained that these PJM retail BTMG netting rules, while previously consistent with cost causation principles at the time the Commission approved them, were rendered unjust and unreasonable by a change in circumstances. In further support of its finding that these rules are no longer just and reasonable, the Commission found that PJM’s existing retail BTMG netting rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.199 The Commission orders relying on actual use principles that Industrials cite do not reflect the problems currently posed in PJM by large loads configured in a BTMG arrangement.200
82. We also disagree with Industrials that the Commission did not develop a sufficient record on which to base its determination in the December Order on PJM’s retail BTMG netting rules.201 As discussed above, the Commission adequately supported its findings that PJM’s retail BTMG netting rules are no longer just and reasonable. Importantly, the Commission relied on evidence submitted by PJM detailing problems that could occur if Network Customers with large loads were allowed to use the existing retail BTMG netting rules in the Tariff.202 Other parties raised similar concerns in the record.203
83. Industrials instead raise concerns that the Commission’s decision results in significant economic harm to entities who have used PJM’s retail BTMG netting rules
198 December Order, 193 FERC ¶ 61,217 at P 186.199 Id.; see PJM, Intra-PJM Tariffs, OATT, § III, § 34.2 (Netting of Behind the Meter Generation) (0.0.0).200 See, e.g., ISO-NE, 178 FERC ¶ 61,086 at P 8 (explaining that, decades ago, behind-the-meter generation was typically larger on-site generation connected to industrial load, but since then, behind-the-meter generation has evolved with increasing amounts of widely distributed behind-the-meter generation that is below 5 MW, such as solar photovoltaic generation).201 Industrials Request for Clarification or Rehearing at 26-27.202 December Order, 193 FERC ¶ 61,217 at P 186 (“For example, PJM explains that “[a]llowing very large loads like data centers to net is problematic because loads in this configuration do not carry reserves.”) (quoting PJM March 24, 2025 Response at 36).203 Id. P 73 (“NREMC argues that large Co-Located Loads paired with BTMG present significantly greater operational risks than traditional BTMG arrangements because they lack adequate reserves.”) (citing NREMC April 23 Reply Comments at 5). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 202 Date Filed: 10/19/2026
PDF page 204
Docket No. EL25-49-002, et al.- 49 -
and the Commission may not have fully recognized the cost causation implications of the removal of all netting rules.204 We find these concerns unpersuasive for several reasons. First, we believe Industrials’ argument concerns how the Commission fashions a replacement rate that determines the extent to which entities may be able to continue to rely on netting,205 not to the Commission’s finding that the existing rate in PJM is no longer just and reasonable.
84. Second, as the Commission explained in the December Order in its determination on transmission services, NITS charges based on gross load for Network Load are roughly commensurate with the benefits received because Network Load has the right to be served from the transmission system at any time.206 The Commission’s decision to revise PJM’s retail BTMG netting rules may increase transmission charges for Network Customers who have used PJM’s retail BTMG netting rules, but this change better aligns the benefits and costs for these customers and addresses cost-shifting concerns because it reflects the fact that they must be served even when their retail BTMG is on outage.207
85. Third, as discussed elsewhere in this order, we set aside the December Order in part and permit Eligible Customers taking transmission service on behalf of load served by BTMG to have the option to take the new transmission services set forth in the December Order. Therefore, Eligible Customers taking transmission service on behalf of load served by BTMG will, at minimum, not be required to take NITS on a gross load basis but will have the option to take and be charged for different transmission services.
86. Fourth, we note that Industrials offer six examples involving specific BTMG arrangements that could be financially harmed by the removal of PJM’s retail BTMG netting rules. As discussed above, to the extent these BTMG arrangements are financially harmed, that implicates the Commission’s decision to set a replacement rate as to the extent to which such entities may continue to net going forward. Also, as discussed below, we set aside the December Order in part and direct PJM to exempt certain cogeneration facilities from revised retail BTMG netting rules where the facilities may be integrated with load such that, when their generator trips offline, the load follows (rather than withdrawing energy from the transmission system), as such facilities would not present the cost shift, reliability, or resource adequacy concerns discussed in the
204 Industrials Request for Clarification or Rehearing at 27.205 See supra Part IV.C.1.c.206 December Order, 193 FERC ¶ 61,217 at P 198.207 See id. P 186 (finding that PJM’s retail BTMG netting rules raise cost-shifting concerns due to large loads configured in BTMG arrangements). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 203 Date Filed: 10/19/2026
PDF page 205
Docket No. EL25-49-002, et al.- 50 -
December Order.208 To the extent that any of the facilities discussed in Industrials’ six examples could demonstrate that they do not present such concerns, they may fall within the exemption that we direct PJM to submit as part of the compliance filing discussed below.209
87. We also disagree with Industrials that the December Order unduly discriminates against Network Customers who manage costs by investing in generation as compared to Network Customers who manage costs by managing load. Undue discrimination prohibited by the FPA can occur when similarly situated customers are treated differently.210 Here, Industrials fail to show that the December Order results in differential treatment because Network Customers are subject to charges for NITS based on gross load whether or not they have associated generation, with the exception of the materiality threshold for retail BTMG discussed below. In addition, the December Order neither addresses nor limits Network Customers’ ability to manage load, whether or not they have associated generation.
3. Transmission Service Options for BTMG
a. December Order
88. As explained above, the Commission found that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.211
89. The Commission found that PJM’s retail BTMG netting rules were no longer just and reasonable, explaining that these rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers
208 Id.209 See, e.g., Industrials Request for Clarification or Rehearing at 27 (“Because the manufacturing process requires steam produced for generation, the bulk of the load can remain online only if generation is operational. If the generation goes down, the load will largely cease as well.”).210 Cal. Indep. Sys. Operator Corp., 193 FERC ¶ 61,117, at P 33 (2025).211 December Order, 193 FERC ¶ 61,217 at P 193. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 204 Date Filed: 10/19/2026
PDF page 206
Docket No. EL25-49-002, et al.- 51 -
using BTMG but does not consider such customers in transmission and resource adequacy planning.212
b. Request for Clarification and/or Rehearing
90. Industrials request clarification that the new transmission services must be made available to Eligible Customers taking transmission service on behalf of load-only customers with BTMG.213 Industrials argue that Eligible Customers taking transmission service on behalf of load-only customers with BTMG should also be allowed to benefit from the new transmission services.214
c. Determination
91. We set aside, in part, the December Order. In addition to the finding in the December Order that the Tariff is unjust and unreasonable as to Eligible Customers taking transmission service on behalf of Co-Located Load, we also find that the Tariff is unjust and unreasonable because it does not include transmission services that reflect that Eligible Customers taking transmission service on behalf of load with BTMG are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Requiring Eligible Customers taking transmission service on behalf of load with BTMG to take NITS, without the option to instead take such alternative transmission services that reflect their willingness and ability to limit their energy withdrawals, would be unjust and unreasonable for the same reasons we made the same finding with respect to Eligible Customers taking transmission service on behalf of Co-Located Load.215 For purposes of this order, then, we use the term Eligible Load to refer to Co-Located Load216 and/or load with BTMG.217 We also direct PJM to file, within 60 days of the date of issuance of this order, a definition for Eligible Load, or other comparable Tariff revisions to implement these directives, and to revise its definition of BTMG to allow Eligible Customers taking transmission service on behalf of
212 Id. P 186.213 Industrials Request for Clarification or Rehearing at 13-14.214 Id.215 See supra Part IV.B.1.c (discussing further the Commission’s finding in the December Order that the Tariff is unjust and unreasonable as to Eligible Customers taking transmission service on behalf of Co-Located Load).216 See supra P 10.217 See supra note 4. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 205 Date Filed: 10/19/2026
PDF page 207
Docket No. EL25-49-002, et al.- 52 -
load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions to take the new transmission services, consistent with this order. All Eligible Customers taking one of the new transmission services on behalf of Eligible Load will be subject to the requirements discussed below, including, but not limited to, operational requirements such as necessary control technologies and/or protection systems as discussed in part VI.C and penalty charges and other remedial actions as discussed in part VI.D.
C. Replacement Rate
1. Transmission Services
a. NITS
i. December Order
92. As relevant here, the Commission found that NITS must be taken on a gross basis.218
ii. Request for Clarification
93. PIOs request clarification of the December Order regarding cost allocation issues. PIOs argue that, given the unprecedented volume and scale of large load requests, the Commission should evaluate whether existing transmission rate designs remain just and reasonable. PIOs state that the Commission held in the December Order that Co-Located Load taking NITS would be responsible for costs that are “roughly commensurate” with benefits because zonal NITS rates include upgrades and operations and maintenance costs. PIOs argue that this rate design relies on a standard assuming that load growth is incremental and widely distributed, however, whereas discrete large-load pockets trigger multi-million dollar reliability solutions.219
94. PIOs contend that a significant “payer gap” can emerge because customers pay only in proportion to billing determinants rather than by the incremental costs that they trigger. PIOs provide the example of a transmission project portfolio approved in the 2024 Regional Transmission Expansion Plan (RTEP) Window 1 that will cost $5.08 billion and state that if a 1,000 MW data center represents 7% of the zone’s peak determinants, it would contribute only $203 million and leave a $4.877 billion gap for unrelated regional and zonal customers to pay. PIOs therefore request that the Commission clarify how “roughly commensurate” cost allocation is evaluated when a
218 December Order, 193 FERC ¶ 61,217 at P 195.219 PIOs Request for Clarification at 7. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 206 Date Filed: 10/19/2026
PDF page 208
Docket No. EL25-49-002, et al.- 53 -
discrete driver’s pro-rata contribution is minimal compared to the infrastructure it necessitates. PIOs also argue that the Commission should require PJM and the PJM transmission owners to provide transparent reporting for major projects that compares incremental cost causation against pro-rata billing determinant recovery.220
iii. Determination
95. We deny the request for clarification.221 In the December Order, the Commission found that NITS must be taken on a gross basis.222 The Commission did not address cost allocation for Network Upgrades needed to accommodate NITS (or related reporting requirements) and we decline to do so here, finding those issues to be sufficiently distinct from the immediate issues in this proceeding and outside the scope of this proceeding. In any event, we note that these issues would be better addressed in a separate proceeding in which a record could be developed on these technical topics.223
b. New Transmission Services
96. In the December Order, the Commission—having found the Tariff unjust and unreasonable because it lacked relevant provisions with sufficient clarity and transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals—addressed a just and reasonable replacement rate.224220 Id. at 7-8.221 PIOs’ request for clarification is titled and presented as a request for clarification, id. at 1, and we treat it as such, noting that it does not meet the Commission’s requirements for requests for rehearing. 18 C.F.R. § 385.713(c)(2); Pub. Serv. Co. of Colo., 190 FERC ¶ 61,128, at P 24 (2025).222 December Order, 193 FERC ¶ 61,217 at P 195.223 See Mobil Oil Expl. & Prod. Serv. v. United Distrib. Cos., 498 U.S. 211, 230-31 (1991) (“An agency enjoys broad discretion in determining how best to handle related, yet discrete, issues in terms of procedures.”); Tenn. Valley Mun. Gas Ass’n v. FERC, 140 F.3d 1085, 1088 (D.C. Cir. 1998) (the Commission has “broad discretion to determine when and how to hear and decide the matters that come before it”); Stowers Oil & Gas Co., 27 FERC ¶ 61,001, at 61,001 (1984) (“The Commission, like other agencies, is generally master of its own calendar and procedures.”).224 December Order, 193 FERC ¶ 61,217 at P 193. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 207 Date Filed: 10/19/2026
PDF page 209
Docket No. EL25-49-002, et al.- 54 -
97. The Commission directed PJM to submit a compliance filing to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of a Co-Located Load takes one of three transmission services: (1) NITS or Interim NITS,
(2) a new FCD transmission service, or (3) a new NFCD transmission service.225 The Commission also established paper hearing procedures to determine the appropriate rates, terms, and conditions of the new transmission services.226 The Commission stated that Interim NITS is a new interim, non-firm transmission service, which allows an Eligible Customer that has requested NITS on behalf of a Co-Located Load to take non-firm transmission service that can be interrupted until the Network Upgrades necessary to provide NITS are complete and the Co-Located Load can be designated as Network Load.227
98. The Commission stated that, under the FCD transmission service, Eligible Customers will have the right to request transmission service on behalf of a Co-Located Load up to a specified MW quantity, i.e., the contract demand. The Commission stated that the FCD transmission service will have the same reservation and curtailment priority as existing firm transmission services, at the level of the contract demand. However, the Commission stated that, unlike Network Customers, the Eligible Customer taking the FCD transmission service on behalf of the Co-Located Load is not permitted to withdraw energy from the PJM transmission system beyond the contract demand level.228
99. The Commission stated that the new NFCD transmission service will be provided during normal operations, on an as-available basis, and curtailed during emergency operations (i.e., it will be curtailed before existing firm transmission services and the new FCD transmission service). The Commission stated that, under this service, Eligible Customers may reserve transmission service on behalf of a Co-Located Load as needed during normal, non-emergency system operating conditions. The Commission stated that reservations under this service would be available only when there is available transmission capacity, similar to existing non-firm transmission service options in the Tariff.229225 Id.226 Id. P 194.227 Id. P 200.228 Id. P 208.229 Id. P 215. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 208 Date Filed: 10/19/2026
PDF page 210
Docket No. EL25-49-002, et al.- 55 -
i. BTMG
(a) Requests for Clarification and/or Rehearing
100.
As to a replacement rate covering Eligible Customers taking transmission service on behalf of load-only customers with BTMG, Industrials request clarification that the new transmission services must be made available to those customers.230 Industrials argue that Eligible Customers taking transmission service on behalf of load-only customers with BTMG should also be allowed to benefit from the new transmission services.231
(b) Determination
101.
As explained above, we set aside, in part, the December Order and find that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking transmission service on behalf of loads with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Consistent with this new determination, we now direct PJM to revise its Tariff to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. 102.
Specifically, we direct PJM to submit a compliance filing, within 60 days of the date of this order, to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of Eligible Load takes one of three transmission services:
(1) NITS or Interim NITS, (2) FCD transmission service, or (3) NFCD transmission service.232 We find that it is just and reasonable for an Eligible Customer taking transmission service on behalf of Eligible Load to elect, as one of the required transmission services from which the Eligible Customer must choose, to take NITS for the same reasons we made that finding with respect to Eligible Customers taking transmission service on behalf of Co-Located Loads.233
103.
Eligible Customers, on behalf of the Eligible Loads that they represent, may choose the transmission services that match their preferred use of the transmission
230 Industrials Request for Clarification or Rehearing at 13-14.231 Id.232 They must choose at least one of the required transmission services and may take a combination of the FCD and NFCD transmission services.233 December Order, 193 FERC ¶ 61,217 at PP 195, 198. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 209 Date Filed: 10/19/2026
PDF page 211
Docket No. EL25-49-002, et al.- 56 -
system; however, they must choose at least one of the required transmission services, and may take a combination of the FCD and NFCD transmission services. In addition, in instances where load with BTMG includes necessary control technologies and/or protection systems that limit its energy withdrawals, we find that it is a just and reasonable replacement rate to allow an Eligible Customer taking transmission service on behalf of Eligible Load to take and be charged for new types of transmission service that are alternatives, and not equivalent, to NITS: FCD and NFCD transmission services.234
ii. Undue Discrimination
(a) Requests for Clarification and/or Rehearing
104.
Exelon and FirstEnergy argue that the Commission granted an undue preference to Co-Located Loads in requiring new forms for transmission services.235 Exelon and FirstEnergy charge that the Commission failed “to explain why system protection schemes installed in [non-Co-Located Load] configurations would not provide similar benefits and be deserving of preferential rates.”236 Exelon and FirstEnergy contend that the totality of the burdens and benefits of grid interconnection justify charging Co-Located Load the same rate as all other transmission customers. Exelon and FirstEnergy assert that the Commission’s new transmission service reduces the share of embedded costs for Co-Located Loads compared to all other users who receive the same benefits.
105.
Industrials request clarification that the new transmission services must be made available to load-only customers with load flexibility, minimal retail BTMG, or no retail BTMG.237 Industrials contend that this clarification would reduce the risk of undue discrimination because “[m]any large load customers can curtail their load at key times and control the amount of transmission service they use and when they use it.”238 Industrials also argue that this clarification would avoid potential cost shifts that would occur if similarly situated customers were given different options depending only on whether they have small generators on site. Industrials assert that this clarification would
234 See id. P 205.235 Exelon and FirstEnergy Request for Rehearing at 36-39.236 Id. at 38.237 Industrials Request for Clarification or Rehearing at 13 (“Such an approach would align with the natural gas industry’s long history of large gas consumers electing how much service they purchase.”); see also id. at 6-7.238 Id. at 14. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 210 Date Filed: 10/19/2026
PDF page 212
Docket No. EL25-49-002, et al.- 57 -
extend the optionality of the new transmission services to retail BTMG and load-only customers.239 Lastly, Industrials argue that this clarification could make the PJM transmission planning process more efficient.240
(b) Determination
106.
As an initial matter, we dismiss the argument that the new transmission services would be unduly discriminatory or preferential.241 First, we dismiss this argument for lack of finality. Rule 713(b) of the Commission’s Rules of Practice and Procedure permits requests for rehearing “of any final decision or other final order in a proceeding.”242 A final decision is one that imposes an obligation, denies a right, or fixes some legal relationship as a consummation of the administrative process.243 The December Order did not make a final decision on the rates, terms, and conditions for the new transmission services.244 Instead, the Commission found that “additional record evidence is needed” and set these issues for paper hearing procedures.245 Setting a matter
239 Id. at 14-15.240 Id. at 15.241 Exelon and FirstEnergy Rehearing Request at 19-20, 30-31, 36-39, 52-53; Industrials Request for Clarification or Rehearing at 13-14. Further, as discussed above, we set aside the December Order, in part, and find in this order that it is just and reasonable for Eligible Customers taking transmission service on behalf of load with BTMG to take one of three transmission services: (1) NITS or Interim NITS, (2) FCD transmission service, or (3) NFCD transmission service. We therefore do not address whether it would be unduly discriminatory or preferential if the replacement rate were to not allow Eligible Customers taking transmission service on behalf of load with BTMG to take those services.242 18 C.F.R. § 385.713(b); see also 16 U.S.C. § 825l(a) (stating that parties “aggrieved by an order issued by the Commission in a proceeding . . . may apply for a rehearing within thirty days after the issuance of such order”).243 Reliable Automatic Sprinkler Co., Inc. v. Consumer Prod. Safety Comm’n, 324 F.3d 726, 731 (D.C. Cir. 2003) (“Final agency action ‘mark[s] the consummation of the agency’s decision making process’ and is ‘one by which rights or obligations have been determined, or from which legal consequences will flow’”) (quoting Bennett v. Spear, 520 U.S. 154, 178 (1997)).244 December Order, 193 FERC ¶ 61,217 at P 219.245 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 211 Date Filed: 10/19/2026
PDF page 213
Docket No. EL25-49-002, et al.- 58 -
for paper briefing “is interlocutory: it constitutes a procedural step that does not impose an obligation, deny a right, or fix some legal relationship as a consummation of the administrative process.”246 Without a final decision on the rates, terms, and conditions for the new transmission services, it is “premature” to argue or evaluate on rehearing whether those as-yet-undeveloped services would be unduly discriminatory.247 At bottom, “the claimed harms are based on speculation regarding potential action that the Commission could take, rather than any action the Commission has actually taken.”248 Accordingly, because Commission action is not final and is to be succeeded by further Commission action, we dismiss the undue discrimination argument.249
107.
In any event, we also dismiss the undue discrimination argument for the independent reason that it is outside the scope of this proceeding. This proceeding addresses Eligible Customers taking transmission service on behalf of Eligible Load with associated generation, such as through Co-Location Arrangements and BTMG
246 Algonquin Gas Transmission, LLC, 175 FERC ¶ 61,150, at PP 1, 5-8 (2021); see also Kan. Elec. Power Coop., Inc., 181 FERC ¶ 61,017, at P 10 (2022) (finding that, because “the Commission found that its preliminary analysis indicated that the Formal Challenge and Complaint raised issues of material fact that could not be resolved on the record before the Commission and are more appropriately addressed in hearing and settlement judge procedures,” “here, Commission action is not final and is to be succeeded by further Commission action,” thus “a request for rehearing may be dismissed”); City of Hamilton, Ohio, 82 FERC ¶ 61,349, at 62,359 (1998) (“Setting this matter for a trial-type hearing does not impose an obligation, deny a right, or fix some legal relationship as a consummation of the administrative process.”).247 Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8; see also, e.g., F.T.C.
v. Standard Oil Co. of Cal., 449 U.S. 232, 244 n.11 (1980) (Standard Oil) (explaining the fact that a “challenge may be mooted in adjudication warrants the requirement that [party] pursue adjudication, not shortcut it”); MediNatura, Inc. v. Food & Drug Admin., 998 F.3d 931, 939 (D.C. Cir. 2021); CSX Transp., Inc. v. Surface Transp. Bd., 774 F.3d 25, 30 (D.C. Cir. 2014) (explaining that it is a “good sign” that action is non-final when further agency processes may eliminate need for review).
248 Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8.249 See, e.g., Cove Mountain Solar, LLC, 179 FERC ¶ 61,179, at P 7 (2022) (dismissing, in part, rehearing request on finality grounds because the Commission had established hearing and settlement judge procedures); Westlands Transmission, LLC, 177 FERC ¶ 61,175, at P 4 (2021); BridgeTex Pipeline Co., LLC, 164 FERC ¶ 61,111, at PP 10-12 (2018); Pac. Gas & Elec. Co., 162 FERC ¶ 61,246, at PP 6-7 (2018); Talen Energy Mktg., LLC, 158 FERC ¶ 61,077, at PP 3-4 (2017). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 212 Date Filed: 10/19/2026
PDF page 214
Docket No. EL25-49-002, et al.- 59 -
arrangements.250 In an order issued concurrently, the Commission is initiating a separate show cause proceeding in Docket No. EL26-67-000 to address, among other things, whether the Tariff remains just and reasonable and not unduly discriminatory or preferential without provisions addressing transmission services that reflect flexible large loads251 that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Accordingly, it is beyond the scope of this proceeding—and within the scope of the separate proceeding—to argue that the new transmission services should be extended to Eligible Customers taking transmission service on behalf of flexible large loads. We thus dismiss this argument as outside the scope of this proceeding.252 The Supreme Court has made clear that the Commission “enjoys broad discretion in determining how best to handle related, yet discrete, issues in terms of procedures.”253 The Supreme Court has “expressly approved a[] . . . Commission decision to treat [an] issue separately where a different proceeding would generate more appropriate information and where the agency was addressing the question”254—as is true as to the other proceeding. As courts have further recognized, “[w]hile the statute requires the Commission to act upon a finding that rates . . . are unjust or unreasonable, it nowhere mandates that having made such a finding with respect to a discrete issue, the Commission must reopen and reevaluate all other aspects of the filed rate.”255 Here, while the Commission addresses Co-Location Arrangements and BTMG, those findings do not necessitate that the Commission reevaluate transmission services that Eligible Customers take on behalf of other types of load.256250 See, e.g., December Order, 193 FERC ¶ 61,217 at P 2.251 Flexible large loads are a subset of large loads that are not co-located with generation but that are willing and able to limit their use of the transmission system under certain conditions.252 See PJM Interconnection, L.L.C., 126 FERC ¶ 61,030, at P 16 (2009); see also La. Pub. Serv. Comm’n v. Entergy Corp., 169 FERC ¶ 61,179, at P 9 (2019); N.Y. Indep. Sys. Operator, Inc., 127 FERC ¶ 61,042, at P 26 (2009); Union Elec. Co., 113 FERC ¶ 61,320, at P 8 (2005); Cal. Indep. Sys. Operator Corp., 113 FERC ¶ 61,133, at P 24 (2005).253 Mobil Oil, 498 U.S. at 230-31; see supra note 226. 254 Mobil Oil, 498 U.S. at 230-31.255 Colo. Off. of Consumer Couns. v. FERC, 490 F.3d 954, 956 (D.C. Cir. 2007).256 Industrials Request for Clarification or Rehearing at 6-7, 13-14. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 213 Date Filed: 10/19/2026
PDF page 215
Docket No. EL25-49-002, et al.- 60 -
108.
In any event, while we dismiss the undue discrimination argument for the reasons explained above, we address the argument below to provide clarification to the parties. As relevant here, Industrials argue that it is unduly discriminatory for “load-only customers with load flexibility” to not be eligible for the new transmission services.257 Industrials contend this creates undue discrimination “between customers with generation and customers without generation,” who Industrials state “can curtail their load at key times and control the amount of transmission service they use and when they use it.”258 We refer in this subsection to these “load-only customers with load flexibility,” as described by Industrials, as “flexible loads.”
109.
The Commission “has wide discretion to determine what constitutes undue discrimination.”259 Discrimination is undue when there is a difference in rates or terms between similarly situated entities that is not justified by some legitimate factor.260 “[D]istinct operating characteristics” can render entities not similarly situated.261 Here, a relevant distinct operating characteristic is that Eligible Load has an associated generator (Co-Located Generator or BTMG) as part of the Co-Location Arrangement or load configured with BTMG, and flexible load does not. The presence of these associated generators is a material factor in analyzing eligibility for the new transmission services. We anticipate, based on the record here, that Eligible Customers taking transmission
257 Id. at 13-14.258 Id. More generally, Industrials argue that the new transmission services should be extended to all transmission customers. Id. Because we dismiss the undue discrimination argument as nonfinal and outside of scope, we need not address the argument that the new transmission services should be extended to all transmission customers (an even broader, and thus less similar, category). Moreover, we have, in the December Order and in this order, sufficiently discussed eligibility for the new transmission services, including by explaining that it is not unduly discriminatory to limit the new transmission services to Eligible Customers taking transmission service on behalf of Eligible Load, such that we need not further address extending the services to all transmission customers.259 Mo. River Energy Servs. v. FERC, 918 F.3d 954, 958 (D.C. Cir. 2019) (citation modified). For purposes of the undue discrimination analysis in this order, when we refer to Eligible Customers taking transmission service on behalf of Eligible Load as not similarly situated to Eligible Customers taking transmission service on behalf of flexible load, we are referring to Eligible Customers only insofar as they take transmission service on behalf of specific Eligible Loads or flexible loads.260 Sw. Power Pool, Inc., 192 FERC ¶ 61,058, at P 175 (2025).261 Sw. Power Pool, Inc., 193 FERC ¶ 61,198, at P 82 (2025). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 214 Date Filed: 10/19/2026
PDF page 216
Docket No. EL25-49-002, et al.- 61 -
services on behalf of Eligible Loads would rely regularly in whole or in part on their associated generators, not on the transmission system, while Eligible Customers taking transmission services on behalf of flexible loads generally would rely entirely on the transmission system, even as they sometimes shift the amount of energy they take. This dynamic creates different transmission system usage, which is relevant to transmission services, charges, and planning.262
iii. Contract Demand
(a) Request for Rehearing
110.
Exelon and FirstEnergy argue that the Commission has departed from decades of precedent that NITS is based on the entire gross load of the Network Customer, and the Commission failed to adequately explain its departure.263 Exelon and FirstEnergy highlight, for example, the Commission’s statement that it would be inconsistent with cost causation principles to require Eligible Customers taking transmission service on behalf of Co-Located Loads that limit their energy withdrawals to take NITS on a gross demand basis.264 Exelon and FirstEnergy allege that the Commission recognized that
262 For the reasons in this Part, we also reject Industrials’ request for clarification on this issue. Industrials Request for Clarification or Rehearing at 13-14.263 Exelon and FirstEnergy Request for Rehearing at 22-26 (citing Nat’l R.R. Passenger Corp. v. PPL Elec. Utils. Corp., 173 FERC ¶ 61,043 (2020) (Amtrak); Fla. Power & Light, 113 FERC ¶ 61,290 (2005), order on reh’g, 116 FERC ¶ 61,012 (2006), aff’d, 264 F. App’x 4 (D.C. Cir. 2008) (Florida Power & Light); Idaho Power Co., 106 FERC ¶ 61,329 (2004) (Idaho Power); Ameren Servs. Co. v. Prairieland Energy Inc., 131 FERC ¶ 61,125 (2010) (Ameren); Ariz. Pub. Serv. Co., 151 FERC ¶ 61,191 (2015) (APS); Preventing Undue Discrimination & Preference in Transmission Serv., Order No. 890, 118 FERC ¶ 61,119, order on reh’g, Order No. 890-A, 121 FERC ¶ 61,297 (2007), order on reh’g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh’g, Order No. 890-C, 126 FERC ¶ 61,228, order on clarification, Order No. 890-D, 129 FERC ¶ 61,126 (2009); Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Servs. by Pub. Utils.; Recovery of Stranded Costs by Pub. Utils. & Transmitting Utils., Order No. 888, FERC Stats. & Regs. ¶ 31,036 (1996) (cross-referenced at 75 FERC ¶ 61,080), order on reh’g, Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 (cross-referenced at 78 FERC ¶ 61,220), order on reh’g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), order on reh’g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff’d in relevant part sub nom. Transmission Access Pol’y Study Grp. v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff’d sub nom. N.Y. v. FERC, 535 U.S. 1 (2002).264 Exelon and FirstEnergy Request for Rehearing at 28 (citing December Order, 193 FERC ¶ 61,217 at P 199). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 215 Date Filed: 10/19/2026
PDF page 217
Docket No. EL25-49-002, et al.- 62 -
these customers use the transmission system for some services, such as regulation and black start, but for the customer not to use the system for other services makes the customer partially integrated, contrary to Order No. 888-A.265 Exelon and FirstEnergy contend that the Commission has consistently rejected attempts to create a new third type of transmission service by parties whose reasons are exactly the same as the reasons the Commission used to justify its decision to establish Contract Demand transmission service based on net load, such as the notion that Co-Located Loads impose less burden on the grid. Exelon and FirstEnergy argue that the assessment of NITS is not based on actual use, that Network Customers pay the full rate but NITS charges are allocated based on contribution to system peak.266 Exelon and FirstEnergy contend that Network Load needs to be able to call on service regardless of actual usage and utilities have an obligation to serve that load.
(b) Determination
111.
We continue to find that it is just and reasonable to charge for FCD and NFCD transmission services based on the contract demand.267 We disagree with Exelon and FirstEnergy’s arguments that the Commission erred in not requiring the new FCD and NFCD transmission services be charged on a gross load basis and that this decision violates precedent.268 As an initial matter, Exelon and FirstEnergy appear to suggest that the charges for these services would be based “on actual use” or “on net . . . load.”269 As explained in the December Order, however, transmission customers taking the new FCD or NFCD transmission service would “be charged based on their contract demand irrespective of usage.”270 We continue to find that this is a just and reasonable alignment of costs and benefits.271 In particular, for the new FCD transmission service, because transmission customers taking this service would agree to limit withdrawals to the 265 Id. at 24.
266 Id. at 26-29 (citing Indicated TOs June 3, 2025 Answer, Powers Decl.).267 December Order, 193 FERC ¶ 61,217 at P 2.268 Exelon and FirstEnergy Request for Rehearing at 22-30.269 Id.270 December Order, 193 FERC ¶ 61,217 at PP 211, 216 (“Eligible Customers taking the [NFCD] transmission service on behalf of Co-Located Loads will be charged for transmission and ancillary services on an as-reserved contract demand basis, based on the reserved contract demand amount of transmission service (except as noted[)].”).271 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 216 Date Filed: 10/19/2026
PDF page 218
Docket No. EL25-49-002, et al.- 63 -
contract demand through the mandatory implementation of necessary control technologies and/or protection systems, PJM would only plan the transmission system, procure generation capacity, and be obligated to provide transmission service up to that contract demand.272 Similarly, for the new NFCD transmission service, PJM would only be obligated to provide transmission service up to the reserved contract demand when there is sufficient available transmission capacity to provide the requested service.273 If the transmission customers taking the new FCD and NFCD transmission services were charged for that service on a gross load basis, they could be charged for more load than PJM is obligated to plan for, procure generation capacity for, or otherwise serve when transmission capacity is available. And—because these customers would be charged based on their contract demand irrespective of usage—they would be unable to avoid load-ratio cost responsibility by modifying their load at a particular time.274 112.
Exelon and FirstEnergy argue that the new contract demand transmission services are inconsistent with Commission precedent.275 Exelon and FirstEnergy contend that the Commission in the December Order contravened Order No. 888-A, in which the Commission rejected the notion of Network Customers “partially integrat[ing]” or “splitting a discrete load” because “such a split system creates the potential for a customer to game the system thereby evading some or all of its load-ratio cost responsibility for network services.”276 We continue to find that the new contract demand transmission services do not violate Order No. 888-A.277 Most simply, Order No. 888-A rejected splitting load between NITS and PTPS at the same point of delivery.278 That kind of splitting between transmission services at the same point of delivery remains barred under the December Order: Eligible Customers also cannot split
272 Id.; see also id. PP 215-216 (explaining that an Eligible Customer taking NFCD transmission service may reserve service as needed when the service is available, and the Eligible Customer will be charged on an as-reserved contract demand basis).273 Id.; see also id. PP 215-216 (explaining that an Eligible Customer taking NFCD transmission service may reserve service as needed when the service is available, and the Eligible Customer will be charged on an as-reserved contract demand basis).274 Id. P 211.275 Exelon and FirstEnergy Request for Rehearing at 22-30.276 Id. at 23-24 (quoting Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,259) (internal quotation marks omitted). 277 December Order, 193 FERC ¶ 61,217 at P 211.278 Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 217 Date Filed: 10/19/2026
PDF page 219
Docket No. EL25-49-002, et al.- 64 -
load between NITS and FCD or NFCD transmission service at the same point of delivery. Further, under the new contract demand services, load is neither split nor partially integrated. Instead, load is capped at contract demand and Eligible Customers taking transmission service on behalf of Co-Located Loads are charged for that contract demand, irrespective of usage. Moreover, the rationale underlying Order No. 888-A— gaming—is also not present here.279 The new contract demand transmission services will help avoid a cost shift to other transmission customers because Eligible Customers will not be able to reduce their load-ratio share to avoid paying transmission costs or capacity costs because their amount of FCD transmission service is fixed.280
113.
Exelon and FirstEnergy further argue that the Commission contravened Order No. 888-A “[b]ecause the Commission has recognized that the [contract demand transmission service] customers use the transmission system for some services (such as load following and black start),” which would render those customers “partially integrated.”281 We disagree. Receiving ancillary services, such as regulation and black start, does not “integrate” a transmission customer into the transmission network—and particularly not in the manner that NITS does. Specifically, Order No. 888-A clarified that a “request for network service is a request for the integration of a customer’s resources and loads,”282 and a PTPS customer is not integrated, as recognized by Order
279 Id.280 December Order, 193 FERC ¶ 61,217 at P 211. We also note that the Commission justified its findings in Order No. 888-A by discussing “several fundamental operational problems associated with allowing partial network service.” Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260. Those operational problems are not raised or present here because neither FCD nor NFCD transmission service are based on the Eligible Customer’s load ratio. Further, Exelon and FirstEnergy suggest that the December Order is inconsistent with Order No. 890. Exelon and FirstEnergy Request for Rehearing at 25-26 (citing Order No. 890, 118 FERC ¶ 61,119, order on reh’g, Order No. 890-A, 121 FERC ¶ 61,297, order on reh’g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh’g, Order No. 890-C, 126 FERC ¶ 61,228, order on clarification, Order No. 890-D, 129 FERC ¶ 61,126). While they do not cite a particular portion, they appear to be referring to a section that reiterates the already discussed portion of Order No. 888-A. Order No. 890, 118 FERC ¶ 61,119 at P 1619 (citing Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260-61). Our findings as to Order No. 888-A thus apply to Exelon and FirstEnergy’s citation to Order No. 890.281 Exelon and FirstEnergy Request for Rehearing at 24. 282 Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,260. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 218 Date Filed: 10/19/2026
PDF page 220
Docket No. EL25-49-002, et al.- 65 -
No. 888-A.283 Nonetheless, PTPS customers pay for and use ancillary services, including regulation service. Therefore, whether an Eligible Customer taking transmission service on behalf of Co-Located Load could receive ancillary services and/or black start service has no bearing on whether it is “integrated” as a Network Customer.
114.
Exelon and FirstEnergy also argue that the December Order is inconsistent with other Commission precedent.284 These cases do not undermine the December Order. In several cited cases, Network Customers chose to take NITS and sought to receive the benefits of NITS, specifically the right to withdraw energy from the transmission system when their own resources were not available, while arguing that they should be charged a lower rate based on their usage.285 For example, Amtrak relied on the transmission system when the nearby generator was not available, and sought to maintain that arrangement and ability to withdraw energy to meet its gross load at any time, while paying NITS.286 Here, the new FCD and NFCD transmission services set up new obligations and benefits—as well as charges on that new basis.287 For example, under 283 Id. at 30,259-60 (presenting binary of “fully integrated or not integrated”—with full NITS or no NITS, respectively—in opposition to “partially integrated,” which would include NITS and PTPS).
284 Exelon and FirstEnergy Request for Rehearing at 23-30 (citing Amtrak, 171 FERC ¶ 61,237, order on reh’g, 173 FERC ¶ 61,043 (2020); Florida Power & Light, 113 FERC ¶ 61,290, order on reh’g, 116 FERC ¶ 61,012, aff’d, 264 F. App’x 4; Idaho Power, 106 FERC ¶ 61,329; Ameren, 131 FERC ¶ 61,125; APS, 151 FERC ¶ 61,191).285 E.g., Amtrak, 173 FERC ¶ 61,043 at P 12 (“What Amtrak seeks to do is carve out from network service charges the power supplied by Safe Harbor. Such an outcome is impermissible under the PJM Tariff and inconsistent with the nature of NITS.”).286 See id. P 13 (rejecting Amtrak’s rehearing request and explaining that “Amtrak seeks the ability to select when it will use and pay for NITS (i.e., only when inflows occur through PPL’s Manor Substation”)).287 December Order, 193 FERC ¶ 61,217 at PP 208, 210, 211, 212. Indeed, the December Order also responds to new circumstances not present in the cited cases— namely, the proliferation of potential Co-Location Arrangements. Even if the cited cases were controlling here, we find these new circumstances would warrant the Commission’s decision to charge for FCD and NFCD transmission services based on the contract demand. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 219 Date Filed: 10/19/2026
PDF page 221
Docket No. EL25-49-002, et al.- 66 -
FCD transmission service, the Eligible Customer can rely on the service only up to the level of its contract demand.288
115.
In particular, Exelon and FirstEnergy maintain that the December Order is inconsistent with Florida Power & Light, which they characterize as standing for the proposition that “the gross load construct [i]s most appropriate,” “even in the case of physical impossibility of serving the entire load.”289 As an initial matter, there is no “physical impossibility exception”290 in the December Order because the new FCD and NFCD transmission services are based on legally capped demand, not “physical impossibility.”291 Specifically, while in Florida Power & Light the “physical impossibility” was a constraint on the transmission system, which prevented the entire load from being served by the transmission system,292 no such physical constraint on the transmission system exists for an Eligible Customer taking FCD and/or NFCD transmission service on behalf of a Co-Located Load. Rather, such Eligible Customers may elect to take transmission service at a contract demand level less than the amount of the entire load and commit to limiting their withdrawals from the transmission system to the contract demand level. Regardless, in Florida Power & Light, the Commission only discussed “physical impossibility” in dicta.293 In that discussion, the Commission
288 Id. We further reiterate that the absence of this type of option is unjust and unreasonable. Id. P 177.289 E.g., Exelon and FirstEnergy Request for Rehearing at 24-25.290 Florida Power & Light, 113 FERC ¶ 61,290 at P 7.291 December Order, 193 FERC ¶ 61,217 at PP 208, 210, 211, 212. To the extent Exelon and FirstEnergy characterize their argument addressed in this Part as directed toward our “unjust and unreasonable” findings and not the replacement rate, Exelon and FirstEnergy Request for Rehearing at 22-23, we reject this argument based on the same substantive reasons included in this Part.292 Florida Power & Light, 113 FERC ¶ 61,290 at PP 7-8.293 Id. The Commission began by generally rejecting the prospect of alternative proposals from individual customers because of the potential administrative and undue discrimination concerns with setting individual-customer-specific rates (but the Commission did approve the prospect of alternative proposals from utilities). Id. P 6. In other words, the cited adjudications, see, e.g., Exelon and FirstEnergy Request for Rehearing at 23-25; see also id. at 27, are additionally inapposite here to the extent they involved proceedings where only individual customers that claimed to limit their use of the transmission system sought to alter the rates, terms, and conditions of its transmission service and obtain rates and terms for themselves. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 220 Date Filed: 10/19/2026
PDF page 222
Docket No. EL25-49-002, et al.- 67 -
nonetheless did not even rule out the prospect of considering “physical impossibility” in a more generally applicable setting where the impossibility could be administered, verified, and backed by technological and legal constructs—rather than on an ad hoc basis due to a transmission customer’s mere assertions that it was particularly deserving of a specially-designed and administered service.294
iv. Alleged Alternatives to FCD and NFCD
Transmission Services
(a) Request for Rehearing
116.
Exelon and FirstEnergy contend that the Commission “fail[ed] to demonstrate that [the new transmission services] are just and reasonable” because there are already existing mechanisms for customers to reduce load or use other generation in order to reduce withdrawals.295 Exelon and FirstEnergy maintain that PJM’s demand response rules are available to Co-Located Loads and the Commission fails to explain why such rules are inadequate here. Indeed, Exelon and FirstEnergy assert, the Commission stated that those rules are just and reasonable for Co-Located Loads taking NITS.
(b) Determination
117.
We do not find Exelon and FirstEnergy’s argument availing. The mere fact that there may be preexisting mechanisms in the Tariff to accomplish something (even assuming that they are equivalent, which we do not) does not mean that adding an additional mechanism is not just and reasonable. Exelon and FirstEnergy offer no justification or citation to support the proposition that having multiple provisions targeted at similar objectives is not just and reasonable.
118.
Further, demand response operates differently from the contract demand transmission services. In the first place, demand response is not a transmission service. And demand response presents a different set of benefits and burdens—NFCD transmission service would be curtailed earlier than demand response resources would be called on and can be instructed to curtail without any notification (unlike most demand response resources).296 FCD transmission service, on the other hand, is a firm transmission service with the same curtailment priority as existing firm transmission
294 Florida Power & Light, 113 FERC ¶ 61,290 at PP 7-8.295 Exelon and FirstEnergy Request for Rehearing at 36-37.296 December Order, 193 FERC ¶ 61,217 at P 215; see also infra Part VI.G.4. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 221 Date Filed: 10/19/2026
PDF page 223
Docket No. EL25-49-002, et al.- 68 -
services, at the level of contract demand.297 In addition, PJM would not plan for any future load growth for either FCD or NFCD transmission service once the contract demand level of each transmission service is established. As to Interim NITS, that transmission service serves a different function than demand response because it allows Eligible Customers to begin taking a limited, non-firm transmission service on behalf of Co-Located Load before the transmission system is capable of reliably providing NITS at their requested level.
v. Protection Systems
(a) Request for Rehearing
119.
Exelon and FirstEnergy argue that the Commission’s emphasis on protection systems is arbitrary and capricious because it is in tension with the Commission’s open access policies. Exelon and FirstEnergy assert that generators have an interest in designing captive arrangements where customers cannot access alternative supply, which is contrary to the Commission’s open access policies in Order No. 888.298 Exelon and FirstEnergy argue that generators will convert their interconnection facilities into transmission assets and then install relay systems that make load captive to its generation.299 Exelon and FirstEnergy view this arrangement as akin to the problem of transmission owners using their control of transmission facilities to refuse to deliver energy produced by competitors or to deliver competitors’ power on less favorable terms.300
120.
Exelon and FirstEnergy argue that the Commission erred in minimizing the fact that protection systems can and have failed.301 Exelon and FirstEnergy point out that the Commission recognizes that protection systems fail, and to address this risk, directed PJM to apply a penalty rate for the new transmission services. But Exelon and FirstEnergy allege that assessing penalties after the fact does not remediate the reliability implications of faulty protection systems. Exelon and FirstEnergy also argue that protection systems “do not protect the grid from real impacts that occur even when there
297 December Order, 193 FERC ¶ 61,217 at P 208. 298 Exelon and FirstEnergy Request for Rehearing at 39-40.299 Id. at 40.300 Id. (citing N.Y. v. FERC, 535 U.S. at 8-9).301 Id. at 39-41. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 222 Date Filed: 10/19/2026
PDF page 224
Docket No. EL25-49-002, et al.- 69 -
is consumption by a co-located customer but no net withdrawal, such as the impacts of load and voltage spikes and oscillations.”302
(b) Determination
121.
We address both arguments in turn. First, the contemplated use of necessary control technologies and/or protection systems is not inconsistent with the Commission’s open access policies. Co-Location Arrangements are voluntary. The December Order does not mandate that any Co-Located Load or Co-Located Generator enter into a Co-Location Arrangement. In other words, contrary to Exelon and FirstEnergy’s assertions, the Commission is not forcing any entity into being a captive customer, as they would have the option to connect to the transmission system and take NITS like any other Network Customer.
122.
Second, we dismiss the argument regarding protection system failure and the risks they address for lack of finality.303 The December Order did not make a final decision on required technology and what appropriate remedies would be for failure of that technology.304 Instead, the December Order set those issues for paper hearing procedures.305 In any event, the Commission recognized that protection systems, like many technologies, in rare instances can fail; accordingly, the Commission ordered paper briefing on technical requirements to address reliability risks and remedial actions.306 We also note that it is possible that the remedial actions could remediate the reliability implications of such a failure. Further, whatever risks are not avoided by a facility’s necessary control technologies and/or protection systems will be studied in the relevant study processes.
302 Id. at 39.303 See supra P 106.304 December Order, 193 FERC ¶ 61,217 at P 177.305 Id. P 178.306 Id. P 212. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 223 Date Filed: 10/19/2026
PDF page 225
Docket No. EL25-49-002, et al.- 70 -
vi. Benefits of FCD and NFCD Transmission Services
(a) Request for Rehearing
123.
Exelon and FirstEnergy allege that the Commission is wrong to suggest that FCD and NFCD transmission services will promote efficiency or change siting.307 Exelon and FirstEnergy argue that planning and siting depend on physics and engineering of the grid, not whether transmission service is charged on a gross or net load basis. Exelon and FirstEnergy argue that the Commission’s decision to require FCD and NFCD transmission services does not change how the study process should work. Exelon and FirstEnergy warn that, “[i]f transmission providers are forced to pretend a 500 MW load is only 50 MW, or even that it is zero . . . it will threaten reliability and resource adequacy.”308 Exelon and FirstEnergy maintain that no loads should be taken out of the broader planning process, and there is no support for the suggestion that regional planning needs are reduced because of FCD and NFCD transmission services. Exelon and FirstEnergy argue that the Commission’s decision on PJM’s retail BTMG netting rules and the Commission’s concerns about resource adequacy and cost shifting cannot be reconciled with the Commission’s proposed structure for the new transmission services.309
124.
Exelon and FirstEnergy state that the Commission failed to point to any other tariff where these new transmission services have been required by the Commission.310
(b) Determination
125.
As an initial matter, we dismiss this argument for lack of finality.311 The December Order did not make a final decision on the rates, terms, and conditions for the new FCD and NFCD transmission services.312 Instead, the Commission found that “additional record evidence is needed” and set these issues for paper hearing
307 Exelon and FirstEnergy Request for Rehearing at 47-48.308 Id. at 48.309 Id. at 48-49.310 Id. at 36.311 See supra P 106.312 December Order, 193 FERC ¶ 61,217 at P 219. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 224 Date Filed: 10/19/2026
PDF page 226
Docket No. EL25-49-002, et al.- 71 -
procedures.313 Without a final decision on the rates, terms, and conditions for the new FCD and NFCD transmission services, it is “premature” to argue or evaluate on rehearing whether those as-yet-undeveloped services would affect efficiency or siting.314 126.
In any event, while Exelon and FirstEnergy appear to direct this argument toward the replacement rate, we addressed these topics in our discussion of the Commission’s FPA section 206 step one finding above. In short, we continue to find that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions—and that this lack of such transmission services is economically inefficient.315 We direct the new FCD and NFCD transmission services as a just and reasonable way to address this issue (among others). And, while siting choices can reduce the need for Network Upgrades, that fact does not undermine our finding that requiring Eligible Customers taking service on behalf of Co-Located Loads to take NITS for these loads leads to an unacceptable probability of inefficient outcomes by requiring more or more costly Network Upgrades than would potential new FCD and NFCD transmission services.316 We similarly reiterate that the need for many Network Upgrades are caused by the amount of MW flow on the transmission system even though the need for certain Network Upgrades are not (e.g., they may be caused by stability or voltage-related issues).317 Therefore, as Exelon and FirstEnergy concede, under a transmission service that reflects willingness and ability to limit energy withdrawals, “if the load installs systems aimed at limiting its use of the grid, those might change the system impacts and need for upgrades.”318 Likewise, while PJM will only plan the transmission system for FCD transmission service based on the level of contract demand as a matter of transmission capacity, PJM will still be able to consider the gross load for analyzing certain issues such as stability and short circuit.319313 Id.314 Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8.315 December Order, 193 FERC ¶ 61,217 at P 177.316 Id. PP 177, 199, 205.317 See Exelon and FirstEnergy Request for Rehearing at 47-48.318 Id. at 19-20; see also id. at 48.319 December Order, 193 FERC ¶ 61,217 at P 210. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 225 Date Filed: 10/19/2026
PDF page 227
Docket No. EL25-49-002, et al.- 72 -
127.
The Commission’s findings related to retail BTMG netting are not inconsistent with the findings related to the new FCD and NFCD transmission services.320 The Commission stated that “the existing BTMG netting rules in the PJM Tariff [are] unjust and unreasonable” because, “under the existing Tariff, loads with BTMG are not fully accounted for in resource adequacy planning.”321 The Commission explained that “[s]uch loads must nevertheless be served, however, allowing them to lean on the PJM system when the [BTMG] is on a full or partial outage or if the load exceeds the rating of the [BTMG].”322 Eligible Customers taking service on behalf of Co-Located Load will be treated differently under FCD and NFCD transmission services—“PJM will have no obligation to serve the Eligible Customer beyond the contract demand.”323 128.
Exelon and FirstEnergy argue that the Commission failed to point to any other tariff where these new transmission services have been required by the Commission.324 This argument is irrelevant because the Commission need not point to another FPA section 206 proceeding where the Commission set an identical replacement rate in order to set a replacement rate.
vii. Reliability and New Transmission Services
(a) Request for Rehearing
129.
Exelon and FirstEnergy argue that the Commission overlooked important reliability concerns in establishing new transmission services, including that loads impact the system even when there is no net power draw on the system.325 Exelon and FirstEnergy assert that gross load is being followed by resources on the grid at all times, thus impacting the system. Exelon and FirstEnergy assert that the Commission has not explained how reliability planning should proceed when large loads may be incentivized to exceed their contract demand limit for transmission service. Exelon and FirstEnergy contend that the Commission overlooked resource adequacy risks in establishing Interim NITS. Exelon and FirstEnergy allege that it is unclear how it will be determined that load may be served reliably and the Commission failed to give PJM guideposts to make
320 See Exelon and FirstEnergy Request for Rehearing at 48-49.321 December Order, 193 FERC ¶ 61,217 at P 179. 322 Id. P 186.323 Id. P 211.324 Exelon and FirstEnergy Request for Rehearing at 36; see also id at 27, 29, 35.325 Id. at 49-51. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 226 Date Filed: 10/19/2026
PDF page 228
Docket No. EL25-49-002, et al.- 73 -
such a determination. Exelon and FirstEnergy state that it is unknown how and by what standards load would be curtailed and whether curtailment is an adequate response to the need to follow gross load moment-by-moment, and thus the transmission service options cannot be just and reasonable.
130.
Exelon and FirstEnergy argue that, as to Interim NITS, the Commission has not accounted for reliability risks, not knowing when or how curtailments would be implemented, as the Commission has asked for briefing on when Eligible Customers taking this service would be curtailed.326 Exelon and FirstEnergy express concern that future state legislation may create inconsistencies among Co-Located Load in different states.
(b) Determination
131.
We dismiss these arguments for lack of finality.327 The December Order did not make a final decision on several issues relevant to this argument.328 Instead, the Commission found that “additional record evidence is needed” and established paper hearing procedures on: the rates, terms, and conditions for the new transmission services; interconnection requirements and operational practices for special protection schemes; the communications, alarm, SCADA,329 or other requirements necessary for PJM to monitor Co-Located Load transmission system demand status, ensure that relay settings are consistent with special protection scheme design, and inform system operator action in order to limit withdrawals that exceed the amount of contract demand; and the procedures to govern circumstances under which PJM curtails an Eligible Customer taking the three new transmission services.330 Without a final decision on these issues, it is premature to argue or evaluate on rehearing whether the Commission overlooked important reliability concerns in establishing the new transmission services.331 In any event, as to the new FCD and NFCD transmission services, the December Order did not
326 Id. at 37.327 See supra P 106.328 December Order, 193 FERC ¶ 61,217 at P 219.329 Supervisory Control and Data Acquisition (SCADA) is a system of remote control and telemetry used to monitor and control the transmission system. See NERC Glossary of Terms 42, https://www.nerc.com/globalassets/standards/reliability- standards/glossary_of_terms.pdf.330 December Order, 193 FERC ¶ 61,217 at P 219.331 See Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 227 Date Filed: 10/19/2026
PDF page 229
Docket No. EL25-49-002, et al.- 74 -
prohibit PJM or the transmission owners from performing any particular studies that may be necessary or mandate that the level of contract demand would be the only impact studied. For example, when PJM or the transmission owners consider factors unrelated to the contract demand of the Co-Located Load, the December Order did not preclude use of the complete dynamic or EMT model of the Co-Located Load, regardless of what level or type of transmission service the Eligible Customer has requested. 132.
On Interim NITS, specifically, the Commission established paper hearing procedures on “What are the appropriate procedures to govern the circumstances under which PJM curtails an Eligible Customer taking the interim, non-firm transmission service . . . on behalf of a Co-Located Load during emergency procedures?”332 The Commission thus did not make a final decision on this issue either. In any event, the Commission stated that said Interim NITS “would only be available to the extent PJM determines that it can provide some level of interim service reliably.”333
viii. Major Questions Doctrine
(a) Request for Rehearing
133.
Exelon and FirstEnergy assert that the Commission’s replacement rate violates the major questions doctrine.334 Exelon and FirstEnergy argue that the Commission has no authority under FPA section 206 to provide unduly preferential treatment to a certain category of customers, but that the Commission established a replacement rate favoring Co-Located Load without reasoned explanation.
(b) Determination
134.
We disagree with Exelon and FirstEnergy that the December Order violates the major questions doctrine. The major questions doctrine applies in certain “extraordinary cases” involving an agency action that results in a “transformative expansion” of its authority—especially over issues of great “economic and political significance.”335 In 332 December Order, 193 FERC ¶ 61,217 at P 219.
333 Id. P 200.334 Exelon and FirstEnergy Request for Rehearing at 52.335 W. Va. v. EPA, 597 U.S. 697, 721, 724 (2022) (citations and quotations omitted). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 228 Date Filed: 10/19/2026
PDF page 230
Docket No. EL25-49-002, et al.- 75 -
such “extraordinary cases,” courts might “hesitate before concluding that Congress meant to confer such authority.”336
135.
We conclude that this proceeding is not an “extraordinary case” such that the December Order does not implicate the major questions doctrine. In West Virginia v. Environmental Protection Agency, the U.S. Supreme Court identified a number of indicators that tend to identify a case as extraordinary, none of which are present here. First, the December Order does not involve a “transformative expansion” of the FPA or a reimagining of the Commission’s long-held interpretation of that statute.337 Instead, the Commission acted, as it has previously, by finding that an existing practice was unjust and unreasonable and proceeding to establish a just and reasonable replacement rate.338 Second, the December Order does not entail the use of an “ancillary” or “little-used backwater” statutory provision.339 To the contrary, FPA section 206 is central to the Commission’s authority over the rates for transmission service in interstate commerce.340 Third, the Commission did not in the December Order act outside of the Commission’s typical area of “comparative expertise.”341 Indeed, the Commission’s regulation of the
336 Id. at 721 (citations and quotations omitted).337 See id. at 724-25 (finding that an agency’s failure to invoke the asserted power in the past indicates that the major questions doctrine might apply).338 See, e.g., N.Y. v. FERC, 535 U.S. 1 (upholding Commission’s exercise of its FPA section 206 authority in its landmark Order No. 888, which established the pro forma OATT and established new transmission services); S.C. Pub. Serv. Auth. v. FERC, 762 F.3d 41 (upholding Commission’s exercise of its authority under FPA section 206 to remedy deficiencies in existing transmission planning practices).339 W. Va. v. EPA, 597 U.S. at 724, 730.340 See EPSA, 577 U.S. at 290 (“ensur[ing] effective transmission of electric power” is one of the “core objects” of the FPA”); N.Y. v. FERC, 535 U.S. at 7 (“[Section] 205 of the FPA prohibited . . . unreasonable rates and undue discrimination with respect to any transmission . . . subject to the jurisdiction of the Commission, and [section] 206 gave the [Commission] the power to correct such unlawful practices.”) (quotations and citations omitted); Bldg. for the Future Through Elec. Reg’l Transmission Plan. & Cost Allocation, Order No. 1920, 187 FERC ¶ 61,068 (2024), order on reh’g and clarification, Order No. 1920-A, 189 FERC ¶ 61,126, at P 175 (2024) (“FPA section 206 sets forth core Commission regulatory authority to remedy unjust and unreasonable rates, and practices affecting rates, for the transmission of electric energy in interstate commerce.”), order on reh’g and clarification, Order No. 1920-B, 191 FERC ¶ 61,026 (2025).341 W. Va. v. EPA, 597 U.S. at 729. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 229 Date Filed: 10/19/2026
PDF page 231
Docket No. EL25-49-002, et al.- 76 -
rates, terms, and conditions of transmission service in interstate commerce sits at the core of the Commission’s expertise.342 Fourth, the December Order does not assert authority in a manner of great “economic and political significance.”343 Instead, the December Order makes important but discrete changes to the manner in which a subset of transmission customers take and pay for certain transmission services. 136.
In any event, Exelon and FirstEnergy argue that the replacement rate violates the major questions doctrine only insofar as it exceeds the Commission’s jurisdiction or is unduly discriminatory or preferential.344 As explained above, the replacement rate does neither.
c. BTMG
i. Qualifying Facilities
(a) December Order
137.
The Commission directed PJM to revise the Tariff to revise the retail BTMG netting rules.345 The Commission directed PJM to propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG but to otherwise phase-in the elimination of netting. Specifically, the Commission directed PJM to allow Network Customers already using the retail BTMG netting rules to continue to do so for a transition period of three years.346 Further, the Commission directed PJM to grandfather entities with existing contracts for the specific purpose of effectuating a BTMG arrangement for the current term remaining under the existing contract.347342 See S.C. Pub. Serv. Auth. v. FERC, 762 F.3d at 49-54 (summarizing the Commission’s history of reforms to the rates, terms and conditions of interstate transmission service).343 W. Va. v. EPA, 597 U.S. at 721.344 Exelon and FirstEnergy Request for Rehearing at 52.345 December Order, 193 FERC ¶ 61,217 at P 221.346 Id. P 223.347 Id. P 224. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 230 Date Filed: 10/19/2026
PDF page 232
Docket No. EL25-49-002, et al.- 77 -
(b) Request for Clarification and/or Rehearing
138.
Industrials request clarification on whether cogeneration QFs under the Public Utility Regulatory Policies Act of 1978 (PURPA) will be provided access to back-up and maintenance power at just and reasonable rates and be credited for capacity based on the reliability of their generating units.348 Industrials contend that many QFs are cogeneration facilities, and that strong operational and financial incentives exist for cogeneration facilities to operate efficiently. Industrials state that Commission regulations require certain QFs to meet specified efficiency standards and thus should be encouraged.349 Thus, Industrials argue that many QFs operate with a high capacity factor and reliably during transmission peaks. Industrials accordingly seek clarification on whether and how the December Order will apply to cogeneration QFs. Industrials contend that the removal of netting rules will “directly harm large American manufacturing facilities that have invested substantial resources into developing and maintaining on-site generation.”350 Industrials add that removing netting rules may contradict Commission regulations that require back-up and maintenance services for cogeneration QFs. Further, Industrials argue that FCD and NFCD transmission services do not appear to account for forced generation outages. For these reasons, Industrials request that the Commission clarify that cogeneration QFs are exempt from the “gross load” approach or that PJM must include a reasonable “Back-up Power” transmission option that retail BTMG customers, including QFs, can purchase.351
(c) Determination
139.
As discussed below, in response to the Industrials’ request for clarification, we clarify and set aside, in part, the December Order.
140.
First, we clarify that the December Order’s replacement rate does not change any obligation under the Commission’s PURPA regulations regarding QFs’ access to supplementary, back-up, maintenance, and interruptible power. The replacement rate applies only to Network Customers’ usage of NITS under the Tariff, and nothing in the replacement rate undoes the requirement in 18 C.F.R. § 292.305(b)(1) that, as to QFs, “each electric utility shall provide . . . Supplementary power, Back-up power,
348 Industrials Request for Clarification or Rehearing at 10; see also id. at 5.349 Id. at 11 (citing 18 C.F.R. § 292.205 (2025)).350 Id.351 Id. at 11-13. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 231 Date Filed: 10/19/2026
PDF page 233
Docket No. EL25-49-002, et al.- 78 -
Maintenance power, and Interruptible power.”352 While Industrials suggest that removing netting rules may contradict Commission regulations that require back-up and maintenance services for cogeneration QFs, Industrials do not explain how the replacement rate results in Industrials no longer being entitled to back-up and maintenance power under the Commission’s regulations. In addition, Industrials do not explain why it is necessary for the Commission to adopt a change to “credit [QFs] for capacity based on the reliability of their generating units.”353
141.
Second, we set aside, in part, the December Order’s directive that PJM establish a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG.354 We find that it is just and reasonable to allow certain cogeneration QFs that are Network Customers to be able to net by using BTMG, and to be exempt from the new MW threshold, as discussed below. In the December Order, the Commission found that PJM’s retail BTMG rules are no longer consistent with cost causation principles because large loads configured in a BTMG arrangement with significant generation will raise cost-shifting concerns compared to loads pursuing smaller amounts of netting.355 Moreover, the Commission found that PJM’s existing retail BTMG rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.356 We find that there is not sufficient reason, and nor do Industrials articulate such a reason on rehearing, to believe that these concerns are inapplicable to cogeneration QFs categorically. 142.
However, we recognize, based on the record, that there may be certain industrial cogeneration QFs that may be integrated with load such that, when their generator trips offline, the load follows (rather than withdrawing energy from the transmission system). For example, as Industrials explain as to certain industrial cogeneration QFs, “if the generator goes offline, the load promptly follows because the manufacturing facility
352 18 C.F.R. § 292.305(b)(1) (2025).353 Industrials Request for Clarification or Rehearing at 10.354 December Order, 193 FERC ¶ 61,217 at P 221.355 Id. P 186.356 Id. To the extent the Commission’s clarification on this issue conflicts with the requested clarification, we otherwise disagree with Industrials’ request to the extent Industrials request rehearing in the alternative. See Industrials Request for Clarification or Rehearing at 2. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 232 Date Filed: 10/19/2026
PDF page 234
Docket No. EL25-49-002, et al.- 79 -
cannot function without the steam output from the generation process.”357 We therefore direct PJM, within 60 days of the date of issuance of this order, to submit on further compliance a process to exempt certain cogeneration QFs from the new retail BTMG netting rules if they demonstrate that they are integrated with load such that, when their generating facility trips offline, the load follows, and they thus do not present the reliability or resource adequacy concerns discussed in the December Order. In developing its compliance proposal, PJM must ensure that the requirements for a cogeneration QF to make this demonstration are not unduly burdensome.
ii. Capacity Obligations
(a) December Order
143.
The Commission found that PJM’s existing retail BTMG netting rules may lead to both reliability and resource adequacy risks because PJM is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.358 The Commission directed PJM to propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG.359 The Commission explained that such a threshold should reduce the reliability and resource adequacy risks that large loads may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion.
(b) Request for Clarification and/or Rehearing
144.
Industrials seek clarification that the removal of BTMG netting rules will only be applicable to transmission and specified ancillary services, not to capacity obligations. Industrials represent that the determination of retail customers’ capacity tags is made by individual electric distribution companies and that large industrial and institutional users have a variety of configurations and approaches to meeting their capacity requirements.360 Industrials contend that the Commission did not analyze the impact of
357 Industrials Request for Clarification or Rehearing at 11.358 December Order, 193 FERC ¶ 61,217 at P 186.359 Id. P 221.360 Industrials Request for Clarification or Rehearing at 15-16. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 233 Date Filed: 10/19/2026
PDF page 235
Docket No. EL25-49-002, et al.- 80 -
the BTMG rule changes on retail customers’ capacity obligations or address alternate capacity products that a retail customer with BTMG could elect.361
(c) Determination
145.
We deny Industrials’ clarification request and sustain the December Order. The Commission’s determination that PJM’s retail BTMG netting rules are no longer just and reasonable rested on a finding that PJM’s existing retail BTMG netting rules may lead to reliability and resource adequacy risks.362 The Commission set a replacement rate to reduce the resource adequacy risks identified in the record.363 We recognize that requiring PJM to revise its retail BTMG netting rules may affect capacity obligations,364 but in the absence of this reform, the resource adequacy problems arising from PJM’s existing retail BTMG netting rules would persist because PJM remains obligated to serve transmission customers using BTMG but under the existing rules does not consider such customers in resource adequacy planning.365 As to Industrials’ concerns about the impact of the retail BTMG netting rule changes on retail customers, we agree with Industrials that the RAA provisions Industrials cite directly apply to LSEs, not retail customers’ capacity obligations,366 and we note that, as part of our replacement rate, we established a grandfathering provision such that existing entities may be able to continue netting for the remainder of a contract entered into for the purpose of effectuating a BTMG arrangement.367 This grandfathering provision may also limit the impacts of the changes to PJM’s retail BTMG netting rules upon some entities’ capacity obligations. In addition, as discussed above, we set aside, in part, the December Order and direct PJM to revise its Tariff to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions. Thus, Eligible Customers taking transmission service on behalf of load with BTMG that
361 Id. at 16.362 December Order, 193 FERC ¶ 61,217 at P 186.363 Id. P 221.364 See, e.g., PJM, Intra-PJM Tariffs, RAA, Schedule 8 (Determination of Unforced Capacity Obligations) (5.3.0).365 December Order, 193 FERC ¶ 61,217 at P 186.366 See, e.g., PJM, Intra-PJM Tariffs, RAA, Schedule 8 (Determination of Unforced Capacity Obligations) (5.3.0).367 December Order, 193 FERC ¶ 61,217 at P 224. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 234 Date Filed: 10/19/2026
PDF page 236
Docket No. EL25-49-002, et al.- 81 -
are willing and able to limit their energy withdrawals from the transmission system under certain conditions may elect to take FCD and/or NFCD transmission service, which could reduce capacity obligations in comparison to a BTMG arrangement where the Eligible Customer elects to take NITS.368
iii. Unlawful Taking of Private Property
(a) December Order
146.
In the December Order, the Commission directed PJM to revise the retail BTMG netting rules in the Tariff.369
(b) Request for Clarification and/or Rehearing
147.
Industrials argue that the Commission’s BTMG findings effectuate an unlawful taking of private property without providing just compensation, in violation of the Fifth Amendment of the United States Constitution. Industrials contend that there is a “per se taking[]” because “the owner is deprived of ‘all economically beneficial us[e]’ of the property due to the government action.”370 Industrials assert that certain manufacturing facilities with on-site generation would be “completely uneconomic.”371 Separately, Industrials contend that there is a regulatory taking under the factors outlined in Penn Central Transportation Co. v. New York City.372 In particular, Industrials state that the BTMG netting findings will cause, in some instances, devastating economic impacts “but perhaps not total deprivation.”373 Industrials also argue that the BTMG netting findings
368 Id. P 211 (“PJM will only plan the transmission system and procure generation capacity for the contract demand—not for load growth, like it does for NITS customers— and PJM will have no obligation to serve the Eligible Customer beyond the contract demand.”); id. P 218 (“The new Non-Firm Contract Demand transmission service will not include a charge for generation capacity.”).369 Id. P 221.370 Industrials Request for Clarification or Rehearing at 31-32 (quoting Lingle v. Chevron U.S.A., 544 U.S. 528, 538 (2005)).371 Id. at 32 (listing examples).372 Id. at 33 (citing Penn. Cent. Transp. v. City of N.Y., 438 U.S. 104, 124 (1978)).373 Id. at 33-34. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 235 Date Filed: 10/19/2026
PDF page 237
Docket No. EL25-49-002, et al.- 82 -
upset investment-backed expectations and do not “promote or facilitate a public program or public good to justify the economic interference.”374
(c) Determination
148.
As an initial matter, we dismiss Industrials’ argument that the Commission’s BTMG findings effectuate an unlawful taking of private property for lack of finality.375 The December Order did not make a final decision on the applicability and design of the revised retail BTMG netting rules.376 In particular, the Commission stated that it “ma[d]e no finding in this order on a threshold” “for the amount of load at a particular electrical location that Network Customers may net by using BTMG.”377 It would thus be premature to argue or evaluate on rehearing whether those as-yet-undeveloped retail BTMG netting rules effectuate an unlawful taking.378
149.
In any event, the Commission has an obligation under the FPA to ensure that the rates, terms, and conditions of jurisdictional service are just and reasonable. As the Commission found in the December Order, circumstances have changed since the Commission approved PJM’s retail BTMG netting rules such that these rules are no longer just and reasonable.379 The Commission therefore is establishing a just and reasonable replacement rate. And, as the Courts have held, in the context of setting rates, terms, and conditions for jurisdictional service, what is just and reasonable is not a taking.380 Instead, in establishing a just and reasonable replacement rate, the Commission is balancing the respective rights and obligations of the parties and will determine that
374 Id.375 See supra P 106.376 December Order, 193 FERC ¶ 61,217 at P 221.377 Id.378 Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8.379 December Order, 193 FERC ¶ 61,217 at P 186.380 See In re Permian Basin Area Rate Cases, 390 U.S. 747, 770 (1968) (“[T]he just and reasonable standard of the Natural Gas Act coincides with the applicable constitutional standards and any rate selected by the Commission from the broad zone of reasonableness permitted by the Act cannot properly be attacked as confiscatory.”) (punctuation and citations omitted); see also N.Y. Indep. Sys. Operator, Inc., 151 FERC ¶ 61,075, at P 63 (2015). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 236 Date Filed: 10/19/2026
PDF page 238
Docket No. EL25-49-002, et al.- 83 -
appropriate replacement rate through the course of the paper hearing and compliance proceedings.381
iv. Materiality Threshold
(a) December Order
150.
The Commission directed PJM to propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG.382 The Commission stated that parties would have an opportunity to comment on PJM’s proposed threshold before we establish this replacement rate.383
(b) Request for Clarification and/or Rehearing
151.
Industrials seek clarification that any retail BTMG materiality threshold implemented will be sufficiently high to permit traditional manufacturers and institutional customers to continue to net generation, consistent with actual use of the transmission system.384 Industrials argue that a threshold of at least 200 MW would appropriately recognize the major energy investments most existing industrial and institutional loads have made over decades, consistent with the “actual use” principle, without making
381 N.Y. Indep. Sys. Operator, Inc., 151 FERC ¶ 61,075 at P 63 (citing Jersey Cent. Power & Light Co. v. FERC, 810 F.2d 1168, 1191 (D.C. Cir. 1987) (en banc) (Starr, J. concurring) ((“Unlike garden-variety takings, the requirements of the Takings Clause are satisfied in the rate regulatory setting when justice is done, that is to say the striking of a reasonable balance between competing interests.”)); see also supra P 137 (describing the materiality threshold, phase-in, and grandfathering), PP 141-142 (setting aside the December Order in part to allow certain cogeneration QFs to continue to net).382 December Order, 193 FERC ¶ 61,217 at P 221.383 Id.384 Industrials Request for Clarification or Rehearing at 16. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 237 Date Filed: 10/19/2026
PDF page 239
Docket No. EL25-49-002, et al.- 84 -
uneconomic their resource adequacy contributions.385 Industrials contend that this threshold would still address the primary concern driven by new large loads.386 152.
To the extent the Commission does not grant clarification, Industrials argue that the MW materiality threshold, transition period, and grandfathering provision fail to correct the asserted defects created in the December Order.387 While Industrials “welcome exemptions as helpful,” they describe those policies as “the exception that proves the rule.”388 Industrials contend that the threshold could create unintended consequences such as perverse incentives to make on-site generation projects smaller, undue discrimination via a bright-line threshold, or a limit that is too low.389 Industrials suggest that, rather than an arbitrary threshold, the Commission should maintain its traditional netting approach but find alternative means to ensure that standby or backup costs are addressed for very large loads. Industrials recommend that if the Commission pursues a mandatory threshold, it should choose a multi-pronged threshold aligned with the drivers of current transmission demand and the reliability risks posed.390 Specifically, Industrials argue, the Commission should set the threshold high enough to permit traditional manufacturers and industrial loads to continue netting—such as 200 MW.391385 Id. at 16 & n. 23 (“We understand that industrial combined heat and power . . . units may, in certain cases, exceed 200 MW. Given the Administration’s interest in reshoring American manufacturing and the pressing need to keep long-established generation units economic, 200 MW may be insufficient.”).386 Id. at 16-17.387 Id. at 42.388 Id.389 Id. at 42-43 (stating also that “[n]either a MW-based threshold nor a grandfathering provision correct jurisdictional deficiencies” and the Commission should “find alternative means to ensure that standby or backup costs are addressed for very large loads”).390 Id. at 43.391 Id. at 43-44. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 238 Date Filed: 10/19/2026
PDF page 240
Docket No. EL25-49-002, et al.- 85 -
(c) Determination
153.
As an initial matter, we dismiss Industrials’ argument that any retail BTMG materiality threshold implemented will be insufficiently high for lack of finality.392 The December Order did not make a final decision on the materiality threshold to be used in the revised the retail BTMG netting rules.393 In particular, the Commission stated that it “ma[d]e no finding in this order on a threshold” “for the amount of load at a particular electrical location that Network Customers may net by using BTMG.”394 It would thus be premature to argue or evaluate on rehearing whether that as-yet-undeveloped retail BTMG materiality threshold be insufficiently high.395
154.
In response to the Industrials’ arguments on rehearing regarding the MW threshold, transition period, and grandfathering provision, we continue to find that this three-pronged approach as to a replacement rate is just and reasonable.396 As an initial matter, we note that Industrials primarily take issue with the Commission’s decision to set a MW threshold, alleging it is arbitrary and may be unduly discriminatory.397 We disagree. We recognize that no threshold may be perfect, but the Commission has discretion in drawing administrative lines it deems necessary,398 and we continue to believe that a threshold is not only necessary for the reasons set out in the December Order, but also that we can exercise reasonable discretion to set a threshold consistent with the Commission’s intent to reduce the concerns raised by PJM’s existing retail BTMG netting rules. As the Commission explained in the December Order, “such a threshold should reduce the reliability and resource adequacy risks [] that large loads may
392 See supra P 106.393 December Order, 193 FERC ¶ 61,217 at P 221.394 Id.395 Algonquin Gas Transmission, 175 FERC ¶ 61,150 at P 8.396 December Order, 193 FERC ¶ 61,217 at PP 221-224.397 Industrials Request for Clarification or Rehearing at 16-17, 42-43.398 See Vonage Holdings Corp. v. FCC, 489 F.3d 1232, 1242 (D.C. Cir. 2007) (“It is true that an agency may not pluck a number out of thin air when it promulgates rules in which percentage terms play a critical role. When a line has to be drawn, however, the Commission is authorized to make a ‘rational legislative-type judgment.’ If the figure selected by the agency reflects its informed discretion, and is neither patently unreasonable nor ‘a dictate of unbridled whim,’ then the agency’s decision adequately satisfies the standard of review.”) (citation and internal quotation marks omitted). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 239 Date Filed: 10/19/2026
PDF page 241
Docket No. EL25-49-002, et al.- 86 -
pose to PJM, while also allowing Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion.”399 The Commission also acknowledged that such a materiality threshold “will not eliminate the risk” identified in the December Order, but found that it “will ensure that the risk is limited.”400 As the Commission explained in the December Order, an important part of the problem is that “PJM’s existing retail BTMG netting rules do not limit the amount of qualifying load that a Network Customer may net by using BTMG.”401 We also note that, as discussed above, we set aside, in part, the December Order’s elimination of BTMG netting as to certain cogeneration QFs. In addition, we note that above we set aside, in part, the December Order and extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, thereby providing such customers the option to elect to take a transmission service that matches their preferred use of the transmission system.402 Lastly, we note that, while Industrials suggest the Commission find an alternative approach to a mandatory threshold to ensure that standby or backup costs are addressed for “very large loads,”403 they fail to support their request with any specificity.404399 December Order, 193 FERC ¶ 61,217 at P 221.400 Id.401 Id. P 186.402 Id. P 194 (stating that “Eligible Customers, on behalf of the Co-Located Loads that they represent, may choose the transmission services that match their preferred use of the transmission system”). 403 Industrials Request for Clarification or Rehearing at 43.404 FPA section 313(a) requires that an “application for rehearing shall set forth specifically” its grounds. 16 U.S.C. § 825l(a) (emphasis added). We follow Commission practice, with which courts have agreed, and reject arguments on rehearing, such as this one, lacking sufficient specificity. PJM Interconnection, L.L.C., 171 FERC ¶ 61,040 at P 22; see also Ind. Util. Regul. Comm’n, 668 F.3d at 736; LA Storage, LLC, 182 FERC ¶ 61,026 at P 25 & n.75. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 240 Date Filed: 10/19/2026
PDF page 242
Docket No. EL25-49-002, et al.- 87 -
2. Necessary Study Process for Existing Interconnection Customers
a. Treatment of Capacity Interconnection Rights (CIRs) for
Co-Located Generators
i. December Order
155.
The Commission found that an existing generator may not begin serving Co-Located Load that is not Network Load until it has de-listed its CIRs for the portion of the generator to be designated to serve any Co-Located Load that is not receiving NITS.405 A capacity resource’s CIRs are rights to inject generation as a Generation Capacity Resource into the transmission system at the Point of Interconnection.406
ii. Request for Clarification and/or Rehearing
156.
Constellation argues that the December Order appears to require a capacity resource to delist its CIRs even when the capacity resource remains fully capable of serving the grid during capacity emergencies.407 Constellation explains that generators and Co-Located Load may seek contractual arrangements in which the generator will serve the grid rather than the Co-Located Load during a capacity emergency and the Co-Located Load will either curtail or rely on backup generation. Constellation claims that it would be inconsistent with PJM’s existing rules to require delisting in these circumstances. According to Constellation, PJM’s existing rules only require a capacity resource entering an external sale to delist its CIRs when the resource “has a financially and physically firm commitment to an external sale of its capacity.”408 157.
Constellation therefore seeks clarification that the December Order does not require a capacity resource to delist its CIRs to serve a Co-Located Load that is taking NFCD transmission service if PJM can verify that the Co-Located Load has no contractual right to energy from the generator during a capacity emergency and that the Co-Located Load has the ability either to curtail or draw on back-up power.409405 December Order, 193 FERC ¶ 61,217 at P 230.406 PJM Interconnection, L.L.C., 168 FERC ¶ 61,155, at P 7 n.15 (2019).407 Constellation Request for Clarification or Rehearing at 3 (citing December Order, 193 FERC ¶ 61,217 at P 230).408 Id. at 4 (quoting PJM, Intra-PJM Tariffs, OATT, attach. DD.6 § 6.6) (emphasis in original).409 Id. at 4-5 (referring to “the ability to (i) interrupt and/or (ii) turn on back-up diesels or other back-up power or draw on batteries when transmission under the Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 241 Date Filed: 10/19/2026
PDF page 243
Docket No. EL25-49-002, et al.- 88 -
Constellation argues that the Commission could require the Co-Located Load to disclose information regarding its protective relay scheme and its interruptible commitment and could impose penalties on the Co-Located Load for failure to comply with its commitment.
158.
To the extent that the Commission does not grant clarification, Constellation seeks rehearing. Constellation argues that requiring a capacity resource to delist its CIRs in these circumstances would be a failure of reasoned decision making.410 Constellation also argues that it would be unduly discriminatory to require a capacity resource serving a Co-Located Load to delist for entering into an interruptible commitment but not to require capacity resources to delist before making other non-firm commitments.411
iii. Determination
159.
We deny Constellation’s request for clarification and sustain the December Order’s finding that an existing generator may not begin serving Co-Located Load that is not Network Load until it has delisted its CIRs for the portion of the generator to be designated to serve any Co-Located Load that is not receiving NITS.412 160.
Constellation proposes a scenario in which an Eligible Customer taking NFCD transmission service on behalf of Co-Located Load would not be allowed to withdraw power from the transmission system during emergency conditions and the Eligible Customer would guarantee that it would further curtail its demand in order to allow the Co-Located Generator to provide energy to the system. NFCD transmission service governs when an Eligible Customer may withdraw energy from the transmission system, but it does not govern the firmness of any bilateral agreement to supply energy between the Co-Located Load and the Co-Located Generator. We understand Constellation’s scenario to be one in which the Co-Located Load—when relying on the Co-Located Generator—does not schedule its power by relying on FCD or NFCD transmission service.
non-firm contract demand service is interrupted and the co-located generator is serving the grid”).
410 Id. at 6 (citing Elec. Consumers Res. Council v. FERC, 747 F.2d 1511, 1513-14 (D.C. Cir. 1984)).411 Id. (citing 5 U.S.C. § 706(2)(A); Consol. Edison of N.Y., Inc. v. FERC, 45 F.4th 265 (D.C. Cir. 2022)).412 December Order, 193 FERC ¶ 61,217 at P 230. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 242 Date Filed: 10/19/2026
PDF page 244
Docket No. EL25-49-002, et al.- 89 -
161.
Under Constellation’s scenario, the Co-Located Generator would not be capable of meeting its entire capacity requirement. In addition to the requirement to perform during emergencies, Generation Capacity Resources are required to offer into the Day-Ahead Market throughout the delivery year.413 Constellation’s proposal would allow a Generation Capacity Resource to violate this requirement and provide an inferior capacity product (compared to other Generation Capacity Resources) for the same capacity payment. We thus deny Constellation’s request for clarification and sustain the December Order.
162.
We also reject Constellation’s argument that Generation Capacity Resources engaged in non-firm external bilateral transactions are not required to delist their CIRs and are comparable.414 A Generation Capacity Resource engaged in a non-firm external bilateral transaction must still make offers into PJM’s day-ahead market.415 b. Cost Responsibility for Network Upgrades
i. December Order
163.
In the December Order, the Commission required PJM to revise its Tariff to expressly indicate that the Interconnection Customer will be responsible for the costs of any modifications or Network Upgrades that are needed as a result of PJM’s study of the change to the Interconnection Service Agreement (ISA) or Generation Interconnection Agreement (GIA) to allow the existing generator to serve Co-Located Load, including to reflect any reduction in CIRs, inclusive of all necessary Network Upgrades. The Commission found that this change will clarify that costs associated with such Co-Location Arrangements will not be unfairly shifted to other transmission customers. The Commission further directed PJM to revise its Tariff to clarify that an existing generator may not commence service to a Co-Located Load until all required Network Upgrades, special protection schemes, and metering are in service.416413 Under the Tariff, a capacity resource is required to offer its Installed Capacity (ICAP) equivalent of the resource’s cleared Unforced Capacity (UCAP) into the PJM energy markets every day if not on outage or derated. PJM, Intra-PJM Tariffs, OATT, attach. K, app. § 1.10 (Scheduling) (46.1.1), § 1.10.1A(d).414 Constellation Request for Clarification or Rehearing at 6.415 PJM, Intra-PJM Tariffs, OATT, attach. K, app. § 1.10 (46.1.1), § 1.10.1A(d).416 December Order, 193 FERC ¶ 61,217 at P 228; see also id. P 176 (summarizing same). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 243 Date Filed: 10/19/2026
PDF page 245
Docket No. EL25-49-002, et al.- 90 -
ii. Request for Rehearing
164.
Exelon and FirstEnergy challenge the Commission’s directive that an
Interconnection Customer seeking to serve Co-Located Load using an existing generator must bear the costs of all Network Upgrades.417 Exelon and FirstEnergy contend that the Commission has departed, without explanation, from its policy that all transmission customers share the embedded costs of the transmission system, including Network Upgrade costs, consistent with cost causation principles.418 Exelon and FirstEnergy assert that this policy is sensible because all loads benefit from the transmission network, including Co-Located Load. Exelon and FirstEnergy argue that the Commission acknowledges that Co-Located Load benefits from the transmission network as a whole because the Commission found Co-Located Load relies on regulation and black start.419 Exelon and FirstEnergy contend that regulation and black start cannot be delivered in isolation: they depend on diverse resources around the grid transmitting power over transmission lines, on other operating reserves and voltage support services, and on Network Upgrades. Exelon and FirstEnergy also argue that the December Order is internally inconsistent and discriminatory because it preserves NITS as a just and reasonable approach, but the NITS funding model conflicts with the proposed assignment of costs to Co-Located Load.420
165.
Exelon and FirstEnergy assert that the Commission should not erode its rolled-in rate policy and identify several consequences of such erosion.421 First, Exelon and FirstEnergy contend that, if Co-Located Loads need only pay for incremental investment, they avoid paying for the broader system on which they depend, resulting in other customers paying a forced subsidy.422 Exelon and FirstEnergy express concern that, once a Co-Located Load fulfills its responsibility for funding certain upgrades, prohibitions on “and” pricing mean the Co-Located Load would not be responsible for further transmission service payments even though the transmission system requires maintenance. Second, Exelon and FirstEnergy argue that the Commission’s approach creates challenges akin to those in the generator interconnection space, such as the potential for future Co-Located Load customers to trigger significant upgrades, and
417 Exelon and FirstEnergy Request for Rehearing at 42-43.418 Id. at 42.419 Id. at 43.420 Id. at 44.421 Id. at 44-47.422 Id. at 45. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 244 Date Filed: 10/19/2026
PDF page 246
Docket No. EL25-49-002, et al.- 91 -
incentives for speculative behavior and Point of Interconnection shopping.423 Third, Exelon and FirstEnergy argue that significant up-front requirements could hinder economic development for Co-Located Load customers that are not data centers.
iii. Determination
166.
We sustain the December Order’s requirement that an Interconnection Customer will be responsible for the costs of any modifications or Network Upgrades that are needed to allow the existing generator to serve Co-Located Load, including to reflect any reduction in CIRs, inclusive of all necessary Network Upgrades.424 We disagree with Exelon and FirstEnergy’s argument that the Commission created a “new paradigm” as to Interconnection Customers’ cost responsibility for Network Upgrades needed to accommodate modifications those customers make to their own generators.425 To the contrary, the Commission directed PJM to revise the Tariff to expressly state that Interconnection Customers have this cost responsibility in order to “clarify that costs associated with such Co-Location Arrangements will not be unfairly shifted.”426 In other words, even without this revision to improve the Tariff’s clarity, this requirement was the preexisting one. The Tariff provides that an Interconnection Customer is responsible for the costs of additions to the Transmission System that are required to accommodate modifications to the generator.427 For example, apart from Co-Location Arrangements, if an Interconnection Customer decreased the capacity of a generator due to technological changes at that facility, the Interconnection Customer would be responsible for the costs of Network Upgrades needed to accommodate that decrease.428 This requirement
423 Id. at 46.424 December Order, 193 FERC ¶ 61,217 at P 228.425 Exelon and FirstEnergy Request for Rehearing at 42-47.426 December Order, 193 FERC ¶ 61,217 at P 228 (emphasis added).427 PJM, Intra-PJM Tariffs, pt. IX, subpt. B, app. 2 (2.0.0), § 3.4(b) (Modification Costs) (“Project Developer shall be responsible for the costs of any additions, modifications, or replacements to the Interconnection Facilities and Transmission Owner Upgrades or the Transmission System that are required, in accord with Good Utility Practice and/or to maintain compliance with Applicable Laws and Regulations or Applicable Standards, in order to accommodate additions, modifications, or replacements made by Project Developer to the Generating Facility or Merchant Transmission Facility or to the Project Developer Interconnection Facilities.”); see also, e.g., id. Attachment O, Appendix 2, § 3.4(b) Modification Costs (0.0.0).428 Id. Part IX.B, Appendix 2, § 3.4(b) Modification Costs (2.0.0). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 245 Date Filed: 10/19/2026
PDF page 247
Docket No. EL25-49-002, et al.- 92 -
likewise applies to Interconnection Customers seeking to modify their interconnection to serve Co-Located Load if the attendant decrease in energy injected to the transmission system necessitates Network Upgrades. Accordingly, if the Commission had not directed the revision at issue here, Interconnection Customers would still bear the cost responsibility at issue—the Commission simply acted to improve the clarity of the Tariff on this topic. Exelon and FirstEnergy thus attack a requirement in the Tariff that the Commission approved before this proceeding and that the Commission did not change in this proceeding.
167.
For the same reason, Exelon and FirstEnergy are incorrect in arguing that the Commission “depart[ed] from prior precedent” with a requirement that “differs from the approach taken in the PJM Tariff.”429 As explained, the Commission did not change the preexisting Tariff regime. In any event, despite their assertion, Exelon and FirstEnergy do not include citations to precedent addressing this topic.430
168.
Exelon and FirstEnergy also misunderstand the requirement they criticize. Exelon and FirstEnergy characterize the Commission’s directive as ordering that “[C]o-[L]ocated [L]oad must self-fund any needed transmission upgrades.”431 The cost responsibility at issue, however, is limited to existing Interconnection Customers and pertains only to the specified Network Upgrades related to their own modifications.432 In short, the Commission did not direct that Co-Located Load would self-fund Network Upgrades. Their criticisms of the clarification that the Commission directed to the current Tariff are thus flawed. The Commission specifically stated that the requirement to self-fund any needed Network Upgrades was appropriate because when “an Interconnection Customer seek[s] to serve Co-Located Load using an existing generating facility” “existing transmission customers” must be “protect[ed]” “from bearing the cost of Network Upgrades required for an Interconnection Customer to begin serving Co-Located Load.”433 Otherwise, costs could be “unfairly shifted” based on the conduct of
429 Exelon and FirstEnergy Request for Rehearing at 42, 44.430 In the relevant section of Exelon and FirstEnergy’s rehearing request, they do cite several cases and orders that do not address this topic. For example, Exelon and FirstEnergy cite Coalition of MISO Transmission Customers v. FERC, 45 F.4th 1004, 1009 (D.C. Cir. 2022), for a general statement of cost causation principles and they cite two orders regarding load-ratio share for NITS. Id. at 42-47 & nn.110-111.431 Id. at 42.432 PJM, Intra-PJM Tariffs, pt. IX, subpt. B, app. 2, (2.0.0), § 3.4(b) (Modification Costs).433 December Order, 193 FERC ¶ 61,217 at P 176 (emphasis added). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 246 Date Filed: 10/19/2026
PDF page 248
Docket No. EL25-49-002, et al.- 93 -
Interconnection Customers.434 The entity responsible for causing the need for the Network Upgrade costs is therefore the relevant Interconnection Customer, and Exelon and FirstEnergy are incorrect to assert that a “load pays” framework should apply here.435 It is the conduct of the Interconnection Customer that triggers the Network Upgrades at issue.
169.
Exelon and FirstEnergy nonetheless contend that “[C]o-[L]ocated [L]oad should be charged for the benefits it receives from the grid and for the burdens it places upon the grid.”436 Exelon and FirstEnergy further give the example of the use of regulation and black start services.437 The December Order appropriately addressed such use. The December Order determined, for example, that Eligible Customers serving Co-Located Loads that seek to rely on the transmission system to the same extent as Network Customers will continue to be eligible to take NITS, billed on a gross demand basis; Eligible Customers can take and pay for the new contract demand transmission services that reflect a Co-Located Load’s ability to limit withdrawals from the transmission system; and Eligible Customers taking transmission service on behalf of Co-Located Load must be assessed charges for regulation and black start services on a gross demand basis, to ensure appropriate cost recovery for such services.438 In sum, the findings we discuss here related to Interconnection Customer cost responsibility do not disturb the Commission’s findings addressing appropriate charges for transmission service—an obligation on Eligible Customers not Interconnection Customers.
170.
Exelon and FirstEnergy also argue that the Commission improperly assessed “cost causation” because it “randomly applied” “cost responsibility” “only to cases where the added load is served through an existing generator interconnection facility.”439 As explained above, however, the Commission simply applied the existing Tariff. The
434 Id. P 228.435 Exelon and FirstEnergy Request for Rehearing at 43; see also id. at 43-44 n.113 (stating that the December Order “departs from th[e] longstanding approach” of “rolling the costs of load-driven network upgrades into transmission rates”).436 Id. at 43; see also id. at 45-46; id. at 47 (stating that “it should not be assumed that large loads will trigger system upgrades with costs in excess of what they would otherwise contribute to the system if they paid traditional network rates based on their load-share ratio”).437 Id. at 43.438 December Order, 193 FERC ¶ 61,217 at P 160.439 Exelon and FirstEnergy Request for Rehearing at 44. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 247 Date Filed: 10/19/2026
PDF page 249
Docket No. EL25-49-002, et al.- 94 -
Commission likewise affirmed the allocation of cost responsibility to the parties that cause the costs—the Interconnection Customers—who do so through their conduct in modifying their existing arrangement.440 Accordingly, we disagree with Exelon and FirstEnergy’s assertion that these costs should instead be spread “to all network customers.” In PJM, the costs of Network Upgrades are directly assigned to the interconnection customer—referred to as participant funding.441 In its Order No. 2003 compliance proceeding, PJM explained that “the ‘but for’ provisions of the PJM tariff . . . require an Interconnection Customer to pay 100 percent of the Network Upgrades that must be made for the Interconnection Customer to connect to the PJM grid.”442 In PJM, Interconnection Customers are also responsible for the costs of any changes to the transmission system that are required to accommodate additions, modifications, or replacements made by the Interconnection Customer to the generator or its interconnection facilities.443 The Commission’s directive thus adheres to Commission precedent and the Tariff and also does not conflict with (or change) “the Network Service funding model.”444
171.
We also find unavailing the “several issues” Exelon and FirstEnergy contend the Commission’s determination created.445 We find each speculative and unsupported by evidence. More specifically, Exelon and FirstEnergy assert that the Commission is improperly accounting for a “benefit to other customers to include new [C]o-[L]ocated [L]oads in the pool of payers for the existing transmission network.”446 Yet as explained above, the December Order establishes a set of transmission service options that ensures that Eligible Customers taking service on behalf of Co-Located Loads are allowed to
440 Indeed, Exelon and FirstEnergy acknowledge that “exiting incumbent generators” cause the relevant costs by referring to “transmission upgrade costs they cause by serving [C]o-[L]ocated [L]oad.” Id.441 PJM Interconnection, L.L.C., 108 FERC ¶ 61,025, at P 20 (2004).442 Id. P 19. PJM’s current generator interconnection rules include similar “but for” provisions. See PJM, Intra-PJM Tariffs, pt. VIII, subpt. C, § 404 (1.0.0), § 404(A)(5) (Cost Allocation for Network Upgrades).443 PJM, Intra-PJM Tariffs, pt. IX, subpt. B, app. 2, § 3.4 (2.0.0), § 3.4(b) (Modification Costs).444 Exelon and FirstEnergy Request for Rehearing at 44.445 Id. at 45-47 (including argument that the Commission’s “approach creates challenging dynamics like those we have seen in the generator interconnection space”).446 Id. at 45-46. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 248 Date Filed: 10/19/2026
PDF page 250
Docket No. EL25-49-002, et al.- 95 -
choose the transmission service that aligns with their use of the transmission system and therefore aligns the charges for service with the benefits received. Exelon and FirstEnergy’s conjecture that “significant up-front requirements could hinder economic development”447 disregards the voluntary nature of Co-Location Arrangements, which reflect an additional opportunity for developers to consider.
3. New Generators Serving Co-Located Load
a. December Order
172.
In the December Order, the Commission found that the Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load and Eligible Customers taking transmission service on behalf of Co-Located Load.448 Pertinent to new generators, the Commission directed PJM to revise its Tariff to clarify that PJM shall consider requests for interconnection service below the full generating capability of the generator, so that an Interconnection Customer may request interconnection service at a level below its maximum facility output to serve Co-Located Load;449 that Interconnection Customers seeking to use new generators to serve Co-Located Load may use existing procedures to accelerate a new service request if the request has no cost allocation for Network Upgrades and does not require further studies;450 that an Interconnection Customer seeking to use a new generator to serve Co-Located Load may request provisional interconnection service;451 and that an Interconnection Customer seeking to use a new generator to serve Co-Located Load at an existing Point of Interconnection may request Surplus Interconnection Service, if the existing Interconnection Customer at that Point of Interconnection has made Surplus Interconnection Service available.452447 Id. at 46-47.448 December Order, 193 FERC ¶ 61,217 at P 159.449 Id. P 232.450 Id. P 233.451 Id. P 234.452 Id. P 235. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 249 Date Filed: 10/19/2026
PDF page 251
Docket No. EL25-49-002, et al.- 96 -
b. Request for Clarification
173.
Joint Parties request the Commission clarify that a Co-Located Load may nominate a net withdrawal limit in the same manner that it may nominate a net injection limit when requesting new or modifying existing interconnection service.453 Joint Parties argue that the Commission found that creating new transmission services is necessary to ensure that Co-Located Loads pay only for the services they use and to avoid costly and inefficient transmission system buildout, and that the same logic “should compel complementary reforms to the generator interconnection process, because that process also may evaluate withdrawals from the Co-Located Load and therefore may also result—absent clarification—in ‘costly and inefficient transmission system buildout.’”454 Joint Parties argue that clarification is necessary to realize the Commission’s intent of ensuring that Co-Located Loads do not pay for services that they do not use and do not trigger Network Upgrades that they do not need. Joint Parties explain that, to the extent PJM performs interconnection service study steps involving withdrawal assumptions from both the storage facility and the Co-Located Load, those steps “must allow the interconnection customer to provide for limits to the injection and withdrawal rights for the generation and co-located load facilities reflecting the proposed integration of those facilities.”455 Joint Parties clarify that they recommend against the Commission requiring Co-Located Load be included in the interconnection study process, as the timing of the load interconnection process may not match.456
174.
Joint Parties argue that, without clarification, PJM may assume that the Co-Located Load and the charging load of the storage resource create overlapping grid impacts, when both could be managed to limit the overall withdrawal of the resource and avoid withdrawing energy when doing so would create grid impacts that necessitate Network Upgrades. Joint Parties explain that, while the December Order recognizes that “co-located resources” can limit withdrawals and prevent unnecessary transmission buildout, Joint Parties argue the order applies this logic only to transmission service and not interconnection service.457 Joint Parties contend that not applying this logic to interconnection service would reduce the benefits of creating the non-firm transmission
453 Joint Parties Request for Clarification at 2-3, 5 (citing December Order, 193 FERC ¶ 61,217 at P 232). 454 Id. at 3 (citing December Order, 193 FERC ¶ 61,217 at P 177).455 Id. at 5-6.456 Id. at 8 n.20.457 Id. at 10 (citing December Order, 193 FERC ¶ 61,217 at P 199). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 250 Date Filed: 10/19/2026
PDF page 252
Docket No. EL25-49-002, et al.- 97 -
service.458 Joint Parties request that the Commission require PJM to specify what information about the Co-Located Load is required for the purposes of the new service request study process, similar to the Commission’s requirement about the Necessary Study process, to ensure that PJM does not include overlapping load and energy storage withdrawals.459
c. Determination
175.
We deny Joint Parties’ request for clarification. Joint Parties’ request misconstrues the findings in the December Order that the Tariff is unjust and unreasonable because it does not contain provisions addressing with sufficient clarity or consistency the rates, terms, and conditions of service that apply to Interconnection Customers serving Co-Located Load.460 The December Order did not require PJM to integrate into the interconnection study process operating assumptions of both a Co-Located Load and electric storage resources that are part of a Co-Location Arrangement. PJM has already committed to studying the electric storage resources of Interconnection Customers as charging during off-peak periods, consistent with PJM’s fuel-based dispatch assumptions set forth in its planning criteria.461
D. Informational Report
1. December Order
176.
In the December Order, the Commission directed PJM to submit in Docket No. EL25-49-000, within 30 days of the date of issuance of the December Order, a detailed informational report addressing, among other things “the development of enhanced load forecasting . . . measures to assist PJM in determining the amount of new capacity that is needed to maintain system reliability.”462458 Id. at 9-10.459 Id. at 8 (citing December Order, 193 FERC ¶ 61,217 at P 227).460 December Order, 193 FERC ¶ 61,217 at P 159.461 PJM Interconnection, 195 FERC ¶ 61,031, at P 180 (2026) (accepting PJM’s proposal, in relevant part, in compliance with the Commission’s Order No. 2023 interconnection reforms).462 December Order, 193 FERC ¶ 61,217 at PP 237-239. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 251 Date Filed: 10/19/2026
PDF page 253
Docket No. EL25-49-002, et al.- 98 -
2. Request for Clarification
177.
PIOs request clarification as to how the Commission intends to respond to or otherwise use information provided in the record regarding PJM’s load forecasting practices. PIOs further request that any subsequent order from the Commission address the issues raised in the record regarding the continuing and ongoing deficiencies in PJM’s load forecasting process. PIOs explain that PJM is using these load forecasts as inputs in the upcoming Base Residual Auction and RTEP and argue that, without a specific Commission directive, PJM is unlikely to timely resolve issues that PIOs allege exist with the load forecasts.463 PIOs note that the Commission required PJM to provide an informational filing that includes an update regarding the development of “enhanced load forecasting” and acknowledge that the Commission stated that it “will not act on or notice this informational [f]iling.”464
178.
PIOs note that Commissioner Rosner submitted a letter to PJM about load
forecasting in September 2025 and take issue with PJM’s October 2025 response.465 According to PIOs, PJM’s response to this letter does not require or specify a particular methodology for forecasting large loads, without which PIOs allege that LSEs and Electric Distribution Companies will continue to report data with widely varying accuracy and that load forecasts will remain uncertain. PIOs also argue that PJM’s response fails to identify a way for PJM to address the double counting of data centers or to enable PJM to respond dynamically to significant updates to load forecasts.466 179.
PIOs contend that recent events have validated their concerns regarding the accuracy of PJM’s load forecasts. For example, according to PIOs, PJM staff have acknowledged that the 2026 forecast would likely reflect a decrease in forecasted load for that time period in light of an update to how PJM implements load adjustments. Given the alleged inaccuracy of PJM’s load forecasts, and because PJM uses its load forecasts to essentially set the demand curve for capacity obligations, for reliability studies, and to support the RTEP, PIOs question how these processes remain just and reasonable without significant revisions to PJM’s load forecasting practices.467463 PIOs Request for Clarification at 2-3.464 Id. at 2 (citing December Order, 193 FERC ¶ 61,217 at P 238 & n.486).465 Id. at 4-5.466 Id.467 Id. at 5-7. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 252 Date Filed: 10/19/2026
PDF page 254
Docket No. EL25-49-002, et al.- 99 -
3. Determination
180.
We deny the request for clarification. The directive in the December Order to PJM to file an informational report that includes load forecasting represents the Commission’s actions in this proceeding related to load forecasting.468 The Commission will review the informational report in its normal course and remains committed to monitoring PJM’s load forecasting. Separately, we note that in the order that we are issuing concurrently in Docket No. EL26-67-000, we direct PJM to show cause as to why its Tariff remains just and reasonable without sufficiently clear and consistent Tariff provisions that address the application process for requesting transmission service to Eligible Customers on behalf of large loads and the study procedures for studying the provision of transmission service to Eligible Customers on behalf of large loads, including a non-refundable application fee and sufficient readiness requirements that escalate at distinct phases of the study process to deter duplicative or speculative requests for transmission service (e.g., meaningful milestones and/or financial commitments).
V. Compliance
A. BTMG Rules
1. Materiality Threshold
a. December Order
181.
The Commission found that PJM’s existing retail BTMG netting rules were no longer just and reasonable and directed several changes, including directing PJM to propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG.469 The Commission found that a materiality threshold would reduce the reliability and resource adequacy risks that large loads may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion. The Commission noted “as points of reference that PJM requires any generator larger than 10 MW to be individually metered and that the Commission’s definition of a small generator is 20 MW.”470468 December Order, 193 FERC ¶ 61,217 at PP 237-239.469 Id. P 221. The Commission did not direct PJM to make any changes to its rules for Non-Retail BTMG, finding that the record did not demonstrate the need for changes given that Non-Retail BTMG is already capped. Id. P 222.470 Id. P 221 (citing PJM Manual 14G: Generation Interconnection Requests, Rev. 8 (eff. July 26, 2023), § 1.6.2; Standardization of Small Generator Interconnection Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 253 Date Filed: 10/19/2026
PDF page 255
Docket No. EL25-49-002, et al.- 100 -
b. PJM Compliance Filing
182.
PJM proposes to modify the existing Tariff definition of BTMG and add a new definition for Retail BTMG to establish a materiality threshold for Retail BTMG.471 PJM explains that the current Tariff definition of BTMG includes both Retail and Non-Retail BTMG, but the Tariff only specifically defines Non-Retail BTMG.472 Therefore, PJM proposes to separately define Retail BTMG as BTMG that is used to serve a retail load served by a Network Customer located at the same electrical location, where such generation has a cumulative nameplate rating of no greater than 50 MW.473 PJM also proposes to clarify in the Tariff that Retail BTMG may not be part of a Co-Located Load configuration. PJM argues that this clarification is necessary “to avoid unexpected and unintended hybrid scenarios mixing BTMG and the new transmission service products.”474
183.
PJM states that the proposed materiality threshold, along with other exclusions discussed below, will avoid the “unintended consequence of causing Retail BTMG resources to prematurely cease operations and discontinue investment in grid-enhancing backup generation,” which may otherwise impact system reliability.475 PJM argues that a lower threshold of 10 or 20 MW would likely exclude Retail BTMG with limited impact on the transmission system in comparison to Co-Located Load coming online today. Agreements & Procs., Order No. 2006, 111 FERC ¶ 61,220, at P 1, order on reh’g, Order No. 2006-A, 113 FERC ¶ 61,195 (2005), order granting clarification, Order No. 2006-B, 116 FERC ¶ 61,046 (2006)).
471 Compliance Transmittal at 6-7 (citing December Order, 193 FERC ¶ 61,217 at P 179).472 Id. at 5-6 (citing PJM, Intra-PJM Tariffs, pt. I, Definitions A-B (24.0.0), Behind The Meter Generation; PJM, Proposed Tariff, PJM, pt. I, Definitions L-M-N (52.0.0), Non-Retail Behind The Meter Generation). PJM explains Non-Retail BTMG is BTMG used to net load through a distribution system. PJM clarifies that no substantive changes are proposed to the Non-Retail BTMG netting rules, but PJM does propose clarifying Tariff edits to avoid confusion with the new retail BTMG netting rules. Id. at 7, 15-16.473 Id. at 7.474 Id. at 18.475 Id. at 12. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 254 Date Filed: 10/19/2026
PDF page 256
Docket No. EL25-49-002, et al.- 101 -
PJM also contends that many of the lower MW generators would not be willing to enter the interconnection queue due to age and the potential cost of Network Upgrades.476 184.
PJM also proposes to exclude on-site backup generation at the same electrical location as the retail load that can only be used to serve such retail load during conditions that may threaten the integrity or reliability of the PJM region or the regional power system from the 50 MW materiality threshold, arguing that to do otherwise would disincentivize retail customers from installing backup generation that would improve reliability.477 PJM notes that the Department of Energy recently issued an order during Winter Storm Fern directing PJM to direct backup generation resources to operate before taking certain emergency actions.478 PJM states that exempting backup generation from the materiality threshold will ensure this reliability tool remains available. Finally, PJM states that a materiality threshold based on the size of the generator that may qualify as Retail BTMG, rather than the amount of load that may net, establishes a clear and bright line for what can continue qualifying as Retail BTMG, given that the size of a load may fluctuate.479
185.
PJM states that, should the Commission not accept PJM’s proposal regarding grandfathering, discussed below, PJM requests the Commission to allow a higher interim initial materiality threshold for the start of the transition period to avoid causing Retail BTMG to cease operations and exacerbate the resource adequacy issues in PJM.480 PJM states that, should the Commission take this path, PJM would commit to reviewing additional data on the size and extent of existing Retail BTMG to inform a final threshold.
c. Pleadings
i. Size of Threshold
186.
Constellation argues that PJM’s proposed 50 MW materiality threshold for BTMG is too high and urges the Commission to either reject it or require modifications to
476 Id. at 12-13.477 Id. at 13 (citing US Department of Energy, Order No. 202-26-06 (Jan. 26, 2026), https://www.energy.gov/documents/doe-order-no-202-26-06-pjm).478 Id. at 13-14 (citing US Department of Energy, Order No. 202-26-06).479 Id. at 13-14.480 Id. at 14-15 (noting PJM ICC’s request for a 200 MW threshold in PJM ICC’s Request for Clarification or Rehearing, Docket No. EL25-49-000, et al., at 44). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 255 Date Filed: 10/19/2026
PDF page 257
Docket No. EL25-49-002, et al.- 102 -
address undue discrimination against Co-Located Loads. Constellation argues that this threshold will allow a significant number of loads with BTMG to take advantage of unjust and unreasonable netting and include backup generation as offsetting BTMG, but deny such treatment to Co-Located Load, despite there being no physical, technical, or economic reason why a netting construct should apply differently for customers with BTMG or with Co-Located Generators. Constellation argues that PJM has not provided any explanation for why the proposed threshold is relevant to reducing the reliability and resource adequacy risks that large or increasing BTMG may pose to PJM and argues that PJM’s justifications for the threshold are unsupported.481
187.
Other parties argue that PJM’s proposed threshold is too low.482
Industrials/Amtrak argue that a threshold of at least 200 MW would better capture the large loads driving reliability and cost-shifting concerns, while maintaining the existing retail BTMG netting rules that promote smaller resource adequacy investments, and avoid economic damage to industrial, institutional, and transportation sectors. Industrials/Amtrak argue that a 200 MW threshold is also appropriate because PURPA defines small generation for non-cogeneration QFs as 80 MW or smaller, meaning large generation must be greater than 80 MW. Industrials/Amtrak also argue that this threshold would simplify the transition process by eliminating most grandfathering issues and bolstering resource adequacy and grid efficiency, thereby avoiding inefficient transmission investment. Industrials/Amtrak argue that a 200 MW threshold would respect the importance of onshoring manufacturing and support Amtrak’s operations, because Amtrak relies on more than 50 MW of retail BTMG, generated at 25 Hz, to provide energy supply and the only black start capability to the south end of Amtrak’s Northeast Corridor traction power system.483
188.
Energy Artisans also support a 200 MW materiality threshold.484 Energy Artisans argue that, for sites that exceed this higher threshold, the Commission should require PJM to use the proposed Interim NITS because it would provide PJM with a “safety
481 Constellation Protest and Comments on Compliance Filing at 9-11.482 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 9, 25; Crusoe Comments on Compliance Filing at 4; Eastman Protest and Comments on Compliance Filing at 6; EDFps Comments on Compliance Filing at 4; Energy Artisans Protest of Compliance Filing at 1; DPN Comments on Compliance Filing at 4.483 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 9, 25, 31, 33, 39.484 Energy Artisans Protest of Compliance Filing at 2. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 256 Date Filed: 10/19/2026
PDF page 258
Docket No. EL25-49-002, et al.- 103 -
switch” to manage reliability during peak emergencies without forcing expensive upgrades or disconnection on industrial users.
189.
Eastman similarly argues that, if the Commission does not maintain netting for BTMG facilities like Eastman’s Kingsport facility, the Commission must establish a threshold of at least 200 MW on a permanent basis. Eastman explains that its Kingsport facility has generation with a nameplate capacity of 194 MW, but that it cannot withdraw that amount of energy through its interconnection with Kingsport Power and could not operate solely on electric power from the grid. Eastman argues that imposing an arbitrarily low materiality threshold would eliminate the grid benefits that its BTMG facilities have provided.485
190.
Industrials/Amtrak and Eastman argue that setting the threshold too low will increase costs for many existing loads with BTMG and make a lot of existing BTMG uneconomic.486 Industrials/Amtrak argue that even if load with BTMG were to have that generation participate in the PJM markets, there is no guarantee of that generation earning sufficient revenue to make up for the loss of netting, especially as transmission upgrades may be required to interconnect the generation. Industrials/Amtrak also argue that setting the threshold too low will force substantial burdens on existing customers to become Commission-regulated public utilities, secure PJM membership, and undertake related credit and risk requirements. Moreover, Industrials/Amtrak argue, a low threshold would remove the incentive to operate efficiently and during stressed system conditions, as well as create additional work for PJM staff to study BTMG that must either go through the interconnection queue or deactivate. Industrials/Amtrak contend that retirement of existing BTMG would increase demand and transmission planning needs in the near term, resulting in higher transmission rates.487 Energy Artisans argue that PJM’s proposed 50 MW materiality threshold is an arbitrary cap that ignores the capital-intensive investments made by large-scale industrial facilities.488 191.
Industrials/Amtrak argue that BTMG can provide benefits to the transmission system, including reducing large loads on the system, congestion, and transmission
485 Eastman Protest and Comments on Compliance Filing at 6.486 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 7; Eastman Protest and Comments on Compliance Filing at 6.487 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 15, 25-26, 28.488 Energy Artisans Protest of Compliance Filing at 1. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 257 Date Filed: 10/19/2026
PDF page 259
Docket No. EL25-49-002, et al.- 104 -
system build out, as well as operating during system emergencies.489 EDFps argues that BTMG can reduce grid congestion, avoid queue delays, lower Network Upgrade needs, and provide economic and community benefits such as tax revenues and jobs.490 192.
Crusoe argues that while the 50 MW threshold aligns with PJM’s definition of large load additions, this threshold is not a bright-line test for what constitutes a reliability risk. Crusoe contends that the materiality threshold should be flexible to account for the fact that Co-Location Arrangements can vary significantly and should be scaled in proportion to the load served. Crusoe argues that a lower threshold risks forcing existing BTMG resources offline during the transition period, which would increase burden on the grid by converting currently netted load into Network Load. Crusoe claims that BTMG arrangements benefit the transmission system by serving load on a streamlined basis, avoiding generator interconnection queue delays, and reducing the need for Network Upgrades.491
193.
Energy Artisans also contend that the 50 MW materiality threshold is unduly discriminatory because it establishes a 50 MW nameplate cap for retail BTMG while maintaining a 3,000 MW regional cap for Non-Retail BTMG.492 In the absence of demonstrated negative impacts from existing BTMG configurations, Energy Artisans claim that the 50 MW materiality threshold is a pretext for cost-shifting. 194.
EDFps argues that PJM’s proposed 50 MW threshold is arbitrary and will disincentivize large loads from installing their own generation and thereby stifle innovation. EDFps contends that the threshold will instead incentivize the development of smaller loads, as well as segmented loads close in proximity to avoid the threshold, leading to inefficient and redundant construction of interconnection facilities. EDFps notes that the “optimal sizing of Retail BTMG” for an artificial intelligence data center, for example, would be higher than 50 MW and that the threshold would force new large loads to develop grid-connected resources instead of BTMG resources.493 EDFps argues that this threshold would result in generation going through the interconnection process unnecessarily.
489 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 6.490 EDFps Comments on Compliance Filing at 2, 4.491 Crusoe Comments on Compliance Filing at 4-5.492 Energy Artisans Protest of Compliance Filing at 2.493 EDFps Comments on Compliance Filing at 4. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 258 Date Filed: 10/19/2026
PDF page 260
Docket No. EL25-49-002, et al.- 105 -
195.
EDFps argues the materiality threshold should instead be 100% of the load size at the electrical location, “combined with operational safeguards and appropriate transmission charges.”494 Specifically, EDFps proposes that retail BTMG larger than 50 MW would still be permitted to net generation against load for the purposes of energy and capacity market settlements, but would pay transmission and/or distribution network charges on a gross basis.495
196.
DPN similarly argues that PJM’s proposal may be too restrictive for digital infrastructure projects, many of which operate at scales well above 50 MW, and that behind-the-meter configurations can provide a viable pathway to speed-to-power. Additionally, DPN argues, the Commission should not require projects to rely on a framework that may compound PJM’s already significant queue and study delays without greater justification. DPN argues that the Commission should require PJM to better justify why 50 MW is the appropriate threshold at this stage and whether a higher threshold, at least on an interim basis, would better accommodate current uncertainty while PJM and the Commission continue to refine their understanding of large load impacts.496
197.
AEU/SEIA claim that PJM’s proposal to require site-located generation to enter the interconnection queue is unjust and unreasonable. AEU/SEIA assert that PJM requires BTMG arrangements that exceed the materiality threshold or do not qualify for grandfather status to transition to a Co-Location Arrangement, which entails pursuing a full interconnection agreement with PJM. AEU/SEIA contend that there is no benefit to subjecting these projects to the standard queue process as they do not require deliverability and will rarely trigger Network Upgrades. AEU/SEIA requests that PJM be encouraged to establish a streamlined, expedited process for resources that do not intend to export to the grid, which would allow PJM to maintain visibility while minimizing delays for non-exporting resources.497
ii. PJM Proposal to Tie Threshold to Generator
Nameplate Rating
198.
Several parties urge the Commission to reject PJM’s proposal to base the materiality threshold on the amount of generation that can be netted rather than load,
494 Id. at 1-2.495 Id. at 4-5.496 DPN Comments on Compliance Filing at 4-5.497 AEU/SEIA Limited Protest of Compliance Filing at 11-13. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 259 Date Filed: 10/19/2026
PDF page 261
Docket No. EL25-49-002, et al.- 106 -
arguing that this proposal is inconsistent with the December Order.498 BTMG Parties argue that the scale of the reduction in load (i.e., what PJM considers and plans for versus what PJM may actually need to serve) determines whether the potential for resource adequacy problems and cost shifts are problematic—not the nameplate of the generation used to effect the load reduction.499 Similarly, Industrials/Amtrak argue that nameplate capacity does not necessarily reflect the actual capability of BTMG, such as, for example, a steam system where the generation output is limited by the steam system’s capability.500 199.
BTMG Parties further argue that such a nameplate generation-based threshold is unjust, unreasonable, and unduly discriminatory because it would also unnecessarily constrain commercial opportunities to serve loads with BTMG without better protecting reliability or commensurate reductions in resource adequacy or cost-shift risks and would treat differently BTMGs with similar resource adequacy and cost-shift impacts. BTMG Parties argue that accepting PJM’s proposal would violate notice requirements and that the metering, telemetry, and control capabilities already deployed for existing BTMG resources demonstrate that BTMG can reliably comply with the operational requirements necessary to implement a netting-based threshold.501
200.
BTMG Parties argue that, in the alternative, the Commission should require PJM to increase its proposed nameplate rating-based materiality threshold for retail BTMG eligibility to 200 MW to preserve opportunities for load to realize the commercial benefit of sizing nameplate generation above the amount of load that a retail customer seeks to net while still achieving the Commission’s aim of limiting resource adequacy impacts and cost-shift concerns.502
201.
AEU/SEIA argue that PJM’s proposed threshold is inconsistent with how PJM assesses capacity accreditation in the capacity market and lacks the necessary flexibility to accommodate resource diversity and hybrid configurations such as storage paired with solar. AEU/SEIA add that there are a number of reasons that, in a BTMG configuration, the generator’s nameplate capacity exceeds the customer’s netting. AEU/SEIA contend
498 BTMG Parties Joint Protest of Compliance Filing at 1, 4-5; Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 34-35 (citing December Order, 193 FERC ¶ 61,217 at P 179); AEU/SEIA Limited Protest of Compliance Filing at 3. See also Earthjustice Reply Briefing at 24.499 BTMG Parties Joint Protest of Compliance Filing at 6.500 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 35.501 BTMG Parties Joint Protest of Compliance Filing at 2, 6-12.502 Id. at 2, 12-13. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 260 Date Filed: 10/19/2026
PDF page 262
Docket No. EL25-49-002, et al.- 107 -
that a reasonable approach would be to permit facilities to exceed 50 MW nameplate capacity provided the customer’s netting is limited to 50 MW, and the facility uses approved telemetry and automated system controls.503 Appalachian Voices argues that PJM’s compliance filing is unclear as to whether it will apply the 50 MW materiality threshold to all generation or to each individual generator at a single customer site.504 202.
Industrials/Amtrak state that, if the Commission opts for a generation-based materiality threshold, they support PJM’s proposal on backup generation.505 Industrials/Amtrak explain that emergency backup generation is often sized similarly to other on-site generation to function as a full backup power source and provides additional generation options in emergency conditions, such as the Department of Energy’s recent statement regarding the operation of private, behind-the-meter generation during Winter Storm Fern.506 EDFps argues that the Commission should direct PJM to clarify that battery energy storage systems and hybrid systems functioning in a load-following, non-exporting capacity manner during a curtailment event qualify under the “backup generation” exception from the materiality threshold for the revised retail BTMG netting rules and can continue to serve the load regardless of their size.507
iii. PJM Proposal to Disqualify Network Customers
Above the Materiality Threshold
203.
Several parties argue that the Commission should allow netting up to the amount of the materiality threshold, rather than disqualifying a customer from netting for any amount of load if its BTMG exceeds the threshold.508 Industrials/Amtrak argue that this allowance would be more consistent with the December Order, reduce discrimination concerns, and avoid incentivizing loads to reduce the size of their generation to ensure
503 AEU/SEIA Limited Protest of Compliance Filing at 4-5.504 Appalachian Voices Limited Protest of Compliance Filing at 4 (citing Compliance Transmittal at 11-12).505 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 10.506 Id. at 40-41 (citing U.S. Department of Energy, Emergency Order No. 202-26-06).507 EDFps Comments on Compliance Filing at 8.508 Id. at 9, 34; Eastman Protest and Comments on Compliance Filing at 7; Energy Artisans Protest of Compliance Filing at 2; EDFps Comments on Compliance Filing at 5. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 261 Date Filed: 10/19/2026
PDF page 263
Docket No. EL25-49-002, et al.- 108 -
netting eligibility.509 Industrials/Amtrak contend that PJM’s proposal would distort investment decisions, produce outcomes disconnected from actual system needs, harm resource adequacy, and harm economic development opportunities in PJM.510 204.
Energy Artisans contend that by rejecting a hybrid BTMG and Co-Location approach, under which facilities could net up to the materiality threshold, PJM would force large loads off of BTMG status and onto the grid.511 EDFps disagrees with PJM that allowing netting up to the amount of the materiality threshold would lead to additional metering costs, noting that grandfathered entities and those below the threshold would not incur any such costs. EDFps also argues that it should be up to individual entities whether the additional cost for metering is worth exceeding the threshold. EDFps states that load served by a retail BTMG resource would be required to purchase NFCD transmission service up to the amount covered by the retail BTMG and FCD transmission service for the remainder of the load and could not lean on the system.512
iv. Answers
205.
Indicated TOs argue that PJM’s proposed 50 MW materiality threshold strikes the appropriate balance between allowing continued use of retail BTMG and limitations to ensure reliability. Indicated TOs agree with PJM that 50 MW is reasonable because it aligns with the PJM Board’s definition of large load additions, preserves existing treatment for smaller and longstanding retail BTMG arrangements, and avoids sweeping in retail customers whose grid impacts are comparatively limited. Indicated TOs argue that PJM reasonably based the threshold on generator size because generator capacity is static.513
206.
Industrials/Amtrak argue that the Indicated TOs fail to substantiate their position with any evidence in support of the 50 MW threshold, and do not address any of the arguments for a 200 MW or greater threshold. Industrials/Amtrak contend that load under 200 MW, particularly industrial and institutional load, is not driving current
509 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 9-10.510 Id. at 36.511 Energy Artisans Protest of Compliance Filing at 2.512 EDFps Comments on Compliance Filing 2, 6-7.513 Indicated TOs April 24 Answer at 2-3. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 262 Date Filed: 10/19/2026
PDF page 264
Docket No. EL25-49-002, et al.- 109 -
reliability challenges.514 Eastman contends that the Indicated TOs’ answer inappropriately lumps together all industrial BTMG facilities, ignoring that not all loads using BTMG create reliability and resource adequacy risks.515 BTMG Parties argue that Indicated TOs’ defense of a nameplate-based threshold is non-responsive to the BTMG Parties’ argument because the sole question before the Commission is compliance.516 Indicated TOs respond that PJM’s 50 MW threshold is reasonable and should be accepted.517 Indicated TOs further argue that the Commission did not preclude a generation-based threshold, as it provided points of reference based on generator size, not the size of the load.518 Indicated TOs lastly allege that parties conflate the two issues of the materiality threshold and the grandfathering provision, and that the need for an adequate grandfathering provision is not a convincing reason to increase the size of the materiality threshold.
d. Determination
207.
We accept in part, and reject in part, PJM’s compliance filing with respect to the BTMG materiality threshold. Specifically, we accept as just and reasonable PJM’s proposal to set the materiality threshold at 50 MW and to exclude on-site backup power from that threshold. However, we reject PJM’s proposal to apply the threshold to the cumulative nameplate capacity of generation that is used to serve a retail load served by a Network Customer located at the same electrical location, rather than to the total amount of load that can be netted at that electrical location, because this proposal does not comply with the Commission’s directives in the December Order.519 We thus direct PJM to file, within 60 days of the date of this order, a compliance filing to revise its proposed
514 Industrials/Amtrak Answer at 3-4 (citing Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 25).515 Eastman Answer at 2 (citing December Order, 193 FERC ¶ 61,217 at P 107).516 BTMG Parties Answer at 2-3.517 Indicated TOs June 3 Answer at 3.518 Id. at 4.519 We therefore reject Proposed Tariff, § I.1 Definitions R-S (Retail Behind The Meter Generation) (46.0.0) and § VIII.A 400, Definitions R (Retail Behind The Meter Generation) (7.0.0). We accept Proposed Tariff, § I.1 Definitions A-B (Behind The Meter Generation) (24.0.0); § III.34.2 (Netting of Retail Behind the Meter Generation) (1.0.0); § III.34.3 (Netting of Non-Retail Behind The Meter Generation) (2.0.0); § VII.A 300, Definitions B (Behind The Meter Generation) (2.0.0); and § VIII.A 400, Definitions B (Behind The Meter Generation) (2.0.0). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 263 Date Filed: 10/19/2026
PDF page 265
Docket No. EL25-49-002, et al.- 110 -
definition of Retail BTMG in its Tariff to permit a Network Customer to net up to 50 MW of load that it is serving using BTMG at a particular electrical location. 208.
In the December Order, the Commission explained the materiality threshold as follows: “Such a threshold should reduce the reliability and resource adequacy risks discussed above that large loads may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion.”520 Based on the record here, we find that a threshold of 50 MW is just and reasonable and preferable to the 200 MW threshold that some commenters propose because a 50 MW threshold will ensure that PJM plans its transmission system and procures sufficient capacity resources to serve a greater percentage of the load that, in the event that the BTMG that typically serves it is unavailable, PJM would be nonetheless obligated to serve. As such, we find that PJM’s proposed 50 MW materiality threshold is more likely to help maintain resource adequacy and reliability relative to a larger threshold.521 Whereas Constellation argues that PJM’s proposed materiality threshold of 50 MW is too high and unsupported, we agree with PJM that 50 MW strikes a reasonable balance between a lower threshold, which may restrict netting more than necessary to respond to resource adequacy concerns, and a higher threshold, which would fail to address the resource adequacy concerns identified in the December Order.522 209.
In response to protesters’ concerns that the proposed materiality threshold of 50 MW is too low and will result in significant economic consequences to existing BTMG arrangements,523 we note that the Commission addressed this concern in the
520 December Order, 193 FERC ¶ 61,217 at P 221.521 See id. P 186 (“We find that PJM’s existing BTMG rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.”).522 See Vonage Holdings Corp. v. FCC, 489 F.3d at 1242; ExxonMobil Gas Mktg. Co. v. FERC, 297 F.3d 1071, 1085 (D.C. Cir. 2002) (“We are generally ‘unwilling to review line-drawing performed by the Commission unless a petitioner can demonstrate that lines drawn . . . are patently unreasonable, having no relationship to the underlying regulatory problem.’”) (citations omitted).523 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 27-28 (alleging economic damage to retail customers); DPN Comments on Compliance Filing at 4 (expressing concern that 50 MW risks foreclosing pathways for digital infrastructure projects “through imposing additional barriers to utilization”); Eastman Protest and Comments on Compliance Filing at 6 (“the proposed threshold would remove the economic benefits that Eastman has relied on to continue operating its BTMG at the Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 264 Date Filed: 10/19/2026
PDF page 266
Docket No. EL25-49-002, et al.- 111 -
December Order and established separate mechanisms—a transition period of three years for Network Customers currently using PJM’s retail BTMG netting rules and grandfathering for certain entities in a BTMG arrangement—in recognition of the potential impacts for existing BTMG customers of a change in the retail BTMG netting rules.524 While we recognize the concerns raised in this record that adopting any limitations on netting may have economic consequences for individual Network Customers, we must balance those concerns against the Commission’s finding that PJM’s retail BTMG netting rules are unjust and unreasonable due to the reliability, resource adequacy, and cost-shifting concerns they create.525 As discussed above, the materiality threshold primarily serves to reduce reliability and resource adequacy risks that large loads may pose to PJM, and we find that PJM’s proposed 50 MW materiality threshold strikes a reasonable balance between mitigating those risks and limiting the costs associated with doing so.
210.
We decline to require Eligible Customers seeking NITS on behalf of load with BTMG to take Interim NITS for load above the materiality threshold, as Energy Artisans request. Energy Artisans appear to contemplate taking a combination of Interim NITS and NITS at the same Point of Delivery, which is not permitted.526 However, we note that such customers may take Interim NITS, as discussed in Part IV.527 211.
We also disagree with arguments that the materiality threshold should be higher to ensure that BTMG resources have an incentive to operate efficiently.528 This concern Kingsport facilities . . . .”); Energy Artisans Protest of Compliance Filing at 1 (“PJM’s proposal to implement a 50 MW ‘Materiality Threshold’ for Retail BTMG is an arbitrary cap that ignores the long-term, capital-intensive investment cycles of large-scale industrial facilities.”).
524 December Order, 193 FERC ¶ 61,217 at PP 222-224.525 Id. P 186.526 Energy Artisans Protest of Compliance Filing at 2 (“For sites exceeding this 200 MW threshold, the Commission should direct PJM to utilize the proposed [Interim NITS] under the new Part XI of the Tariff.”).527 See supra Part IV.C.1.b.i (extending the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions).528 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 7, 16, 25, 32. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 265 Date Filed: 10/19/2026
PDF page 267
Docket No. EL25-49-002, et al.- 112 -
does not overcome the Commission’s finding that large amounts of netted Network Load present reliability and resource adequacy risks. When BTMG operates during peak or emergency conditions, it may enhance resource adequacy in the short term by lowering the demand on the system, but when it fails to operate (which, despite any incentive to operate, is possible), the result would be that PJM would have an obligation to serve the load that such BTMG typically serves without having planned adequate transmission facilities or procured sufficient capacity resources to fulfill that obligation. The Commission found that risk unjust and unreasonable in the December Order.529 212.
We also disagree with Energy Artisans that a 50 MW materiality threshold is unduly discriminatory because it establishes a 50 MW cap for Retail BTMG while maintaining a 3,000 MW regional cap for Non-Retail BTMG.530 The materiality threshold and the cap on Non-Retail BTMG function differently—the Non-Retail BTMG cap is a region-wide cap on the amount of load that may net using Non-Retail BTMG,531 whereas the materiality threshold for Retail BTMG is on the amount of load that may net at a particular electrical location.532
213.
We acknowledge EDFps’ concern that a 50 MW materiality threshold on Retail BTMG could encourage the development of smaller loads combined with smaller generators, and force new large loads to develop resources interconnected to the transmission system instead of BTMG resources.533 As the Commission explained in the December Order, the Commission eliminated retail BTMG netting to prevent large loads from using the retail BTMG netting rules; the Commission agreed with PJM that allowing large loads to net is problematic because such loads do not carry reserves and are able to rely on the transmission system when the BTMG is not sufficient to meet the load.534 EDFps’ alternative proposal would not remedy this concern because it would continue to net BTMG for the purposes of capacity market settlements.535529 December Order, 193 FERC ¶ 61,217 at P 186.530 Energy Artisans Protest of Compliance Filing at 2.531 See PJM, Intra-PJM Tariffs, OATT, § III, § 34.3 (Netting of Non-Retail Behind The Meter Generation) (1.0.0).532 December Order, 193 FERC ¶ 61,217 at P 221.533 EDFps Comments on Compliance Filing at 3-4.534 December Order, 193 FERC ¶ 61,217 at P 186.535 EDFps Comments on Compliance Filing at 4-5. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 266 Date Filed: 10/19/2026
PDF page 268
Docket No. EL25-49-002, et al.- 113 -
214.
Further, we find AEU/SEIA’s assertion that requiring BTMG arrangements that exceed the materiality threshold or do not qualify for grandfather status to transition to a Co-Location Arrangement, which entails pursuing an interconnection agreement with PJM, is unjust and unreasonable is an untimely request for rehearing of the December Order. In the December Order, the Commission found that PJM’s existing retail BTMG netting rules are unjust and unreasonable because they may lead to both reliability and resource adequacy risks in PJM.536 The Commission then directed PJM to revise its retail BTMG netting rules to establish a new MW materiality threshold for the amount of load at a particular electrical location that Network Customers may net using BTMG and to implement a transition process that includes the ability to grandfather certain entities with existing contracts.537 Because AEU/SEIA’s assertion challenges the Commission’s finding that PJM’s existing retail BTMG netting rules are unjust and unreasonable and the related compliance directives—and not whether PJM complied with those directives—we find that it is an untimely request for rehearing of the December Order and dismiss it on that basis.538
215.
However, we agree with protesters that PJM’s proposal to design the materiality threshold for netting based on whether the “generation has a cumulative nameplate rating of no greater than 50 MW” fails to comply with the Commission’s directive in the December Order. Specifically, the Commission directed PJM to “propose a new MW threshold for the amount of load at a particular electrical location that Network Customers may net by using BTMG.”539 As such, PJM’s proposal to instead apply the materiality threshold to the cumulative nameplate capacity of the generation used by a Network Customer to serve retail load located at the same electrical location is facially inconsistent with the December Order.
216.
PJM alleges that its proposal to apply its proposed materiality threshold based on the cumulative nameplate capacity of the generation is consistent with or superior to the Commission’s directive to limit reliability and resource adequacy risks. In particular, PJM alleges that its proposal is consistent with the Commission’s points of reference to various generator sizes, as well as the recognition that BTMG is defined as a generation unit rather than a load. We find PJM’s arguments unpersuasive. While the Commission
536 December Order, 193 FERC ¶ 61,217 at P 179 (finding that “the existing BTMG rules may lead to both reliability and resource adequacy risks because PJM, per its Tariff, is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning”).537 Id. P 179.538 Louisville Gas & Elec. Co., 185 FERC ¶ 61,120, at P 39 (2023).539 December Order, 193 FERC ¶ 61,217 at P 221 (emphasis added). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 267 Date Filed: 10/19/2026
PDF page 269
Docket No. EL25-49-002, et al.- 114 -
referenced examples of generator sizes in the December Order, those examples were in reference to an unambiguous threshold for the amount of load that a Network Customer may net.540 In addition, while BTMG is defined as a generation unit, that fact alone is not a reason to propose to apply the materiality threshold to a Network Customer based on the amount of generation at the same electrical location rather than applying that threshold to the amount of load that may be netted at that location. Lastly, PJM avers that, whereas load sizes can fluctuate, the nameplate capacity of a generator provides a bright line for purposes of qualifying for netting. This argument too is unpersuasive, because regardless of whether a Network Customer’s load increases or decreases over time, the 50 MW materiality threshold we approve today makes clear how much of the load at a single electrical location a Network Customer may net using BTMG. 217.
We also agree with protesters that PJM’s interpretation of the December Order as prohibiting any netting when a Network Customer exceeds the materiality threshold is incorrect.541 PJM supports its interpretation by pointing to the Commission’s directive in the December Order that PJM “maintain the current BTMG rules for customers that fall below a new MW materiality threshold,” but PJM reads this language out of context.542 Read in full context, the Commission’s replacement rate for BTMG in the December Order only involves setting a new materiality threshold “for the amount of load at a particular electrical location that Network Customers may net by using BTMG,” which the Commission further stated would “allow[] for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion.”543 Thus, we find that the Commission’s directive in the December Order allows for netting of load up to the newly established materiality threshold.
218.
Moreover, the Commission expressly states that a materiality threshold “for all BTMG should reduce the reliability and resource adequacy risks that large or increasing
540 Id. (“Although we make no finding in this order on a threshold that would be just and reasonable, we note as points of reference that PJM requires any generator larger than 10 MW to be individually metered and that the Commission’s definition of a small generator is 20 MW.”) (footnotes omitted).541 Compliance Transmittal 10-11 (“[T]he proposal is based on an interpretation of the compliance directive that demands an ‘all or nothing’ approach to Retail BTMG qualification—meaning that a Retail BTMG cannot both net up to a certain threshold but still potentially have generation and load above that threshold which cannot be net”); see Eastman Protest and Comments on Compliance Filing at 7; Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 34.542 Compare December Order, 193 FERC ¶ 61,217 at P 179, with id. P 221.543 Id. P 221 (emphasis added). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 268 Date Filed: 10/19/2026
PDF page 270
Docket No. EL25-49-002, et al.- 115 -
BTMG may pose to PJM.”544 To use an example similar to that provided by the BTMG Parties, PJM’s proposal would prohibit a Network Customer serving 50.1 MW of load using BTMG from netting any load, but it would allow a Network Customer serving 50 MW of load using BTMG to net all of that 50 MW of load, even though they have virtually identical resource adequacy impacts on the transmission system.545 We find that this outcome would be unduly discriminatory and conflict with the December Order.546 We also note that protesters persuasively dispute PJM’s suggestion that its proposal helps load with BTMG avoid incurring significant costs and compliance risks if their arrangements exceed the materiality threshold.547 We agree with EDFps that Network Customers should decide whether the costs and requirements associated with complying with the revised retail BTMG netting rules are appropriate or cost-effective for their business when determining whether to maintain or pursue BTMG arrangements.548 219.
In response to EDFps’ request that the Commission clarify that electric storage resources and hybrid resources qualify for the back-up exemption, we note that PJM’s retail BTMG netting rules do not restrict what resources may qualify as back-up generation, but instead specify only that the generation must be at the same electrical location as the retail load and that it can only be used to serve such retail load during conditions that may threaten the integrity or reliability of the PJM Region or the regional power system.549
220.
Accordingly, we direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff consistent with the Commission’s directive in the December Order and our determination here. Specifically, we reject PJM’s
544 Id. P 179.545 BTMG Parties Joint Protest of Compliance Filing at 10.546 December Order, 193 FERC ¶ 61,217 at P 221 (“Such a threshold should reduce the reliability and resource adequacy risks discussed above that large loads may pose to PJM, while also allowing for Network Customers to reduce their transmission charges in a transparent, not unduly discriminatory fashion.”).547 See, e.g., BTMG Parties Joint Protest of Compliance Filing at 11 n.20 (“PJM does not provide any factual support for these assertions, and these statements do not match BTMG Parties’ experience as developers of BTMG in PJM.”).548 EDFps Comments on Compliance Filing at 7.549 Id., pt. VIII, Subpart A, section 400 Definitions R (definition of Retail Behind the Meter Generation) (7.0.0). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 269 Date Filed: 10/19/2026
PDF page 271
Docket No. EL25-49-002, et al.- 116 -
proposed definition of Retail Behind The Meter Generation550 and direct PJM to submit a compliance filing modifying the Tariff to instead create a materiality threshold that allows Network Customers to net from their Network Load up to 50 MW of load served by using BTMG at a single electrical location.
2. Grandfathering and Transition Period
a. December Order
221.
The Commission directed PJM to establish a transition period of three years for Network Customers currently using PJM’s existing retail BTMG netting rules.551 The Commission also directed PJM to include in its compliance filing revisions to grandfather entities with existing contracts for the specific purpose of effectuating a BTMG arrangement for the current term remaining under the existing contract.552 The December Order did not direct any changes to Non-Retail BTMG.553
b. PJM Compliance Filing
222.
PJM proposes to modify the existing Tariff definition of BTMG and add a new definition for Retail BTMG to implement a three-year transition period and provide the ability to grandfather certain entities with existing contracts.554 Specifically, PJM proposes that any existing retail BTMG with a contract that was entered into as of the date of the December Order would be permitted to remain eligible to net against Network Loads as Retail BTMG irrespective of the materiality threshold through the term of the contract.555 PJM explains that this proposal could include a wide variety of contracts, including “utility contracts, fuel contracts, maintenance contracts, and more.”556 PJM
550 PJM, Proposed Tariff, § I.1 Definitions R-S (Retail Behind The Meter Generation) (46.0.0) and § VIII.A 400, Definitions R (Retail Behind The Meter Generation) (7.0.0).551 December Order, 193 FERC ¶ 61,217 at P 223.552 Id. P 224.553 Id. P 222.554 Compliance Transmittal at 6-7 (citing December Order, 193 FERC ¶ 61,217 at P 179).555 Id. at 8.556 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 270 Date Filed: 10/19/2026
PDF page 272
Docket No. EL25-49-002, et al.- 117 -
further proposes that this exemption would encompass existing renewal or extension rights recognized under any existing contracts to “avoid interference with such reliance expectations upon which investment decisions likely have been made . . . .”557 PJM states that if the Commission accepts its proposal, it will explore with stakeholders whether manual language should be developed to help elaborate on what types of agreements may qualify.558
c. Pleadings
i. Comments
223.
AEU/SEIA ask the Commission to reject PJM’s proposal to transition existing retail BTMG through December 18, 2028 and instead extend the transition period until the effective date of PJM’s compliance filing to avoid harming projects already underway. AEU/SEIA allege that setting the grandfathering date earlier than the effective date for the new co-location pathways would leave a problematic gap for projects that were moving forward in good faith and exacerbate uncertainty. AEU/SEIA argue that any project “in process” as of the transition date should be eligible for grandfathering if it has made significant progress toward completion though not fully operational.559 Otherwise, AEU/SEIA allege, PJM’s proposal will result in significant stranded assets.
224.
Similarly, BTMG Parties argue that the deadlines for the transition period and grandfathering eligibility will exclude retail customers that recently finalized or will imminently finalize projects while providing limited system benefit. BTMG Parties argue that PJM should be required to instead use the date of a Commission order acting on PJM’s filing, or, at minimum, 180 days from the December 18, 2025 date of the Co-Location Order (June 16, 2026), as the date from which the grandfathering and transition period run. BTMG Parties argue that this date would better afford a workable transition for market participants that does not penalize developers for attempting to develop resources during a historic resource adequacy crisis in PJM.560 225.
AEU/SEIA also ask the Commission to clarify that the types of agreements that may qualify for PJM’s proposal include utility interconnection study agreements, engineering, procurement, and construction contracts, and any form of binding agreement
557 Id. at 9.558 Id. at 9 n.32.559 AEU/SEIA Limited Protest of Compliance Filing at 7-9.560 BTMG Parties Joint Protest of Compliance Filing at 2-3, 13-16. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 271 Date Filed: 10/19/2026
PDF page 273
Docket No. EL25-49-002, et al.- 118 -
between the load and the BTMG developer.561 Otherwise, AEU/SEIA warn, developers face the risk of delay and additional regulatory burdens that could remove projects underway.
226.
Industrials/Amtrak support PJM’s proposal to grandfather existing contracts, noting that BTMG customers operate under diverse agreements, some of which renew year to year, which should be eligible for grandfathering. Industrials/Amtrak also argue that grandfathering rules and status should be clear, broadly construed, and easily confirmed for existing BTMG customers to ensure stability and regulatory certainty.562 227.
AEU/SEIA argue that PJM’s proposal is unjust and unreasonable because it is not clear as to whether grandfathering status applies to the site itself or the generator asset. AEU/SEIA suggest that grandfathering the generation while allowing these existing customers to pursue additional BTMG below the materiality threshold is a logical extension of PJM’s observation that additions below the materiality threshold would have little or no impact. AEU/SEIA argue that clarifying that customers with grandfathered BTMG have a “clean slate” to pursue additional BTMG up to the materiality threshold would also allow existing customers to help address PJM’s resource adequacy and infrastructure needs. AEU/SEIA contend that many existing customers have neither the desire nor the economic incentive to pursue co-location and that, for smaller projects, PJM’s full interconnection process will be too costly and complex.563 Eastman similarly requests that the Commission require PJM’s grandfathering provision to apply to BTMG facilities rather than the service agreement. Otherwise, Eastman argues, a BTMG facility could lose its grandfathered status if the relevant service agreement is modified because, for example, the facility was modified to become more efficient.564
228.
Industrials/Amtrak argue that most BTMG differs from the large loads that the Commission addressed in the December Order. Specifically, Industrials/Amtrak argue that BTMG is not new, is not the cause of the changed circumstances, and does not present the reliability risks posed by large, inverter-based loads.565 Further, Industrials/Amtrak contend, new large loads differ from BTMG in that new large loads do not have substantial cogeneration, do not generally operate large motors that can help
561 AEU/SEIA Limited Protest of Compliance Filing at 7-8.562 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 10, 39.563 AEU/SEIA Limited Protest of Compliance Filing at 9-11.564 Eastman Protest and Comments on Compliance Filing at 7.565 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 6-7, 13; see also Energy Artisans Protest of Compliance Filing at 1. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 272 Date Filed: 10/19/2026
PDF page 274
Docket No. EL25-49-002, et al.- 119 -
with stability on the grid, can turn off and on nearly instantaneously, and can reach sizes well beyond traditional BTMG and the 200 MW threshold proposed by
Industrials/Amtrak. Industrials/Amtrak further claim the December Order “did not find that BTMG rules were unjust and unreasonable as used by manufacturers with cogeneration, other QFs (which are size limited under PURPA), or even traditional ‘large’ loads with BTMG . . . .”566
ii. Answers
229.
Indicated TOs argue that PJM’s materiality threshold should be paired with grandfathering provisions that appropriately recognize that customers have relied on retail BTMG netting rules and eliminating such rules could cause financial harm. Indicated TOs therefore propose several additions and clarifications to PJM’s proposal. First, Indicated TOs argue that grandfathering treatment should extend to all projects that are not yet in service and would have been eligible for retail BTMG treatment, but have made “substantial progress towards completion.”567 Indicated TOs also argue that the exclusion regarding existing contracts should be construed broadly to cover a wide range of contracts and recognition of renewal rights in those contracts. Indicated TOs argue that existing retail BTMG arrangements that have been physically in service and operating for a significant period of time should be grandfathered to avoid disrupting long-standing arrangements.568
230.
BTMG Parties and Industrials/Amtrak agree with Indicated TOs that
grandfathering should extend to projects that would have been eligible for retail BTMG treatment but for the imposition of the materiality threshold and have made substantial progress toward completion in order to protect the investment-backed expectations of PJM customers (and the BTMG developers) and to ensure just and reasonable rates. BTMG Parties and Industrials/Amtrak also argue that the existing contract exception should be construed broadly to cover a wide range of contracts.569 BTMG Parties also argue that arrangements that have been physically in service and operating for a significant period of time should be grandfathered.570566 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 14 (emphasis in original).567 Indicated TOs April 24 Answer at 3.568 Id. at 3-4.569 BTMG Parties Answer at 2-4; Industrials/Amtrak Answer at 6-7.570 BTMG Parties Answer at 4. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 273 Date Filed: 10/19/2026
PDF page 275
Docket No. EL25-49-002, et al.- 120 -
d. Determination
231.
We find that PJM’s proposed Tariff revisions comply with the directives in the December Order.571
232.
First, we find that PJM complies with the directive to revise its Tariff to allow Network Customers already using the retail BTMG netting rules to continue to do so for a transition period of three years from the date of issuance of the December Order.572 AEU/SEIA and BTMG Parties express concern that such a transition period unfairly harms entities that were planning to finalize arrangements in order to use PJM’s retail BTMG netting rules. But these parties did not seek rehearing of the Commission’s decision in the December Order to establish a transition period to minimize the impact on existing BTMG customers. In that order, the Commission explicitly directed PJM to “allow Network Customers already using the BTMG rules to continue to do so for a transition period of three years . . . from the date of issuance of this order.”573 Thus, we find that AEU/SEIA’s and BTMG Parties’ arguments constitute untimely requests for rehearing of the December Order.574 However, even if these arguments were properly before us, AEU/SEIA and BTMG Parties offer no suggested transition period to encompass certain potential BTMG customers in a manner that would not be arbitrary.575 233.
Second, we find that PJM complies with the directive to revise its Tariff to grandfather entities with existing contracts that effectuate a BTMG arrangement for the
571 See PJM, Proposed Tariff, § I.1 Definitions R-S (Retail Behind The Meter Generation) (46.0.0) and § VIII.A 400, Definitions R (Retail Behind The Meter Generation) (7.0.0).572 December Order, 193 FERC ¶ 61,217 at P 223; PJM, Compliance Filing, attach. B (defining Retail BTMG to provide “for a transition period through December 18, 2028” for Retail BTMG “used to serve a retail load served by a Network Customer to net load prior to December 18, 2025.”).573 December Order, 193 FERC ¶ 61,217 at P 223.574 See, e.g., Louisville Gas & Elec. Co., 185 FERC ¶ 61,120 at P 39; ISO New Eng. Inc., 132 FERC ¶ 61,098, at P 12 (2010) (“The Commission has held that requests to alter a compliance filing in a manner that differs from the order requiring the compliance filing constitute a collateral attack on the order requiring the compliance filing.”).575 See BTMG Parties Joint Protest of Compliance Filing at 15 (characterizing a “limited class of BTMG developers that were very close to finalizing their projects”). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 274 Date Filed: 10/19/2026
PDF page 276
Docket No. EL25-49-002, et al.- 121 -
current term remaining under the existing contract.576 In response to concerns from AEU/SEIA and BTMG Parties, we clarify that the Tariff proposal applies to a contractual arrangement—for which generation used to serve retail load served by a Network Customer to net load is the subject—“that was in effect as of December 18, 2025.” Therefore, entities with projects that have contractual arrangements “in place, even if they are not yet fully operational” by December 18, 2025 may qualify under the Tariff proposal.577 In addition, in response to AEU/SEIA, we clarify that the types of agreements that may qualify under PJM’s proposal may include engineering, procurement, and construction contracts, and we encourage PJM, as it states in its transmittal, to explore developing language in its manuals on what other types of agreements may qualify.578 Moreover, in response to AEU/SEIA and Eastman, who raise overlapping concerns about whether grandfathering applies to the generator, we clarify that it does apply to the generator, as the Tariff proposal on grandfathering reflects.579 In further response to Eastman, parties to an existing BTMG contract could modify the agreement to, for example, make the facilities more efficient—provided that the modification is not prohibited by the existing contract and does not fundamentally alter the contractual arrangement that was in effect as of December 18, 2025. And in further response to AEU/SEIA, we clarify that customers with BTMG within the scope of this grandfathering provision may also avail themselves of the new materiality threshold to net up to 50 MW of load served by a Network Customer because this threshold applies to a particular electrical location.
3. QFs and Cogeneration Facilities
a. PJM Compliance Filing
234.
PJM proposes that the new materiality threshold should not apply to any QF over 50 MW serving as Retail BTMG as of the date of the December Order. PJM
576 December Order, 193 FERC ¶ 61,217 at P 224; PJM, Compliance Filing, attach. B (defining Retail BTMG to include “any generation used to serve a retail load served by a Network Customer to net load if it is the subject of a contractual arrangement (including but not limited to a bilateral agreement or interconnection agreement) that was in effect as of December 18, 2025 through the end of the term of such agreement, which may be renewed or extended per the terms of such agreement”).577 AEU/SEIA Limited Protest of Compliance Filing at 7.578 Compliance Transmittal at 9 n.32.579 PJM, Compliance Filing, attach. B (defining Retail BTMG in part to include “any generation used to serve a retail load served by a Network Customer to net load if it is the subject of a contractual arrangement . . .”). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 275 Date Filed: 10/19/2026
PDF page 277
Docket No. EL25-49-002, et al.- 122 -
acknowledges that the December Order does not reference PURPA, yet because the December Order was issued against the backdrop of PURPA, “PJM interprets the Commission’s [grandfathering] compliance directive as allowing the extension of legacy treatment” to such facilities. PJM states that some of the QFs impacted by this exemption are cogeneration facilities that provide economic and energy efficiency benefits.580 In support of its proposal, PJM notes that QFs have size limitations and cogeneration QFs must meet efficiency requirements.581 PJM explains that BTMG with existing contractual arrangements or QF status have been in place without any known operational issues to date, and so should be allowed to continue netting under their existing arrangements.582
b. Pleadings
235.
Industrials/Amtrak argue that QFs should be eligible for retail netting for their full load, but the eligibility should not be linked to QF status as of the date of the order.583 Industrials/Amtrak explain that, without retail netting, QFs may be denied the backup service to which they are entitled under PURPA. Industrials/Amtrak argue that for cogeneration QFs, “the BTMG netting construct aligns with their efficient, reliable energy production configurations, matching the intent of Congress and the [Commission].”584 Industrials/Amtrak argue that QFs have stronger operational and financial incentives to operate reliably and efficiently than other generators and must meet certain efficiency standards. However, Industrials/Amtrak note that many resources eligible to be QFs have not maintained QF status because PURPA permits the Commission to deem certain QFs as having sufficient market access that it removes (for those QFs) the utility’s obligation to purchase excess power generated by the QF. Industrials/Amtrak explain that many customers with QFs were required by this status change to secure interconnection service and market-based rate authority to sell excess energy into the PJM markets.585 Industrials/Amtrak argue this “history should not limit
580 Compliance Transmittal at 9-10.581 Id. at 10 (citing 16 U.S.C. § 824a-3; 18 C.F.R. § 292.204 (2025)).582 Id.583 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 8, 17. 584 Id. at 8.585 Id. at 8, 20, 22. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 276 Date Filed: 10/19/2026
PDF page 278
Docket No. EL25-49-002, et al.- 123 -
the ability of retail customers with cogeneration facilities to avail themselves of retail BTMG netting for energy production behind the retail meter.”586
236.
Industrials/Amtrak argue that the BTMG netting rules ensure QFs have access to backup power to which they are entitled by PURPA, at rates that are not based upon an assumption that forced outages or other reductions in electric output by all QFs on the system will occur simultaneously, during system peak, or both.587 Industrials/Amtrak contend that the FCD or NFCD transmission services would not be sufficient to replace netting, because the FCD transmission service is calculated on the maximum the load might draw from the grid when the QF would only use the system sporadically, and NFCD transmission service must be scheduled in advance. Industrials/Amtrak also argue that these services do not align with the costs or risk profile of cogeneration QFs, such that, without netting, QF customers may lose their ability to manage costs even if their load and generation are synchronized or they never rely on transmission services, creating a cost-causation gap.588
237.
Industrials/Amtrak argue that exempting QFs is appropriate and consistent with the goals of the December Order because the Commission did not address PURPA. Industrials/Amtrak also argue that no circumstances have changed with regards to QFs, which have been operating similarly for decades, and that PJM acknowledges that existing retail BTMG arrangements with QFs have been in place without operational issues. Industrials/Amtrak further argue that QFs contribute to resource adequacy and reliability because some are limited in their use of the transmission system by the integration between the load and generation.589
238.
Eastman argues that the proposed changes to BTMG netting ignore the operational realities of facilities like Eastman’s Kingsport facility, which uses its on-site electrical generation not only to provide electric power but also steam necessary for industrial processes at the facility. Eastman explains that if the Kingsport facility is unable to generate power, it also cannot generate steam, which reduces the industrial output and the need for additive power from the grid. Eastman claims that during periods of grid stress, the Kingsport facility is more likely to support the grid than to create operational
586 Id. at 22.587 Id. at 19.588 Id. at 20-21.589 Id. at 17-19, 21. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 277 Date Filed: 10/19/2026
PDF page 279
Docket No. EL25-49-002, et al.- 124 -
constraints. Therefore, the Commission should allow BTMG facilities like the Kingsport facility to continue to net.590
c. Answer
239.
Industrials/Amtrak note that many of the customers impacted by the change in BTMG netting rules are QFs under PURPA, subject to efficiency standards (and for non-cogeneration QFs, size limits).591
d. Determination
240.
Consistent with our determination on rehearing,592 PJM must submit a further compliance filing that includes a process to exempt certain cogeneration QFs from the new retail BTMG netting rules if they demonstrate that they are integrated with load such that, when their generating facility trips offline, the load follows. We therefore reject PJM’s compliance filing as it relates to QFs. Specifically, we reject PJM’s proposal to exempt from the materiality threshold all QFs serving as retail BTMG as of the date of the December Order.593 PJM has not demonstrated that all load with BTMG that is either designated, or eligible to be designated, as a QF is meaningfully distinguishable from load with other categories of BTMG for purposes of the concerns and directives discussed in the December Order.
241.
In the December Order, the Commission found that PJM’s retail BTMG netting rules could create resource adequacy and reliability risks because PJM is obligated to serve transmission customers using BTMG but does not consider such customers in transmission and resource adequacy planning.594 The Commission found that PJM’s existing retail BTMG netting rules do not limit the amount of qualifying load that a Network Customer may net by using BTMG and do not provide any protections against this potential transmission and resource adequacy planning problem or against the costs of maintaining sufficient resources to serve these loads being shifted onto other
590 Eastman Protest and Comments on Compliance Filing at 5, 8.591 Industrials/Amtrak Answer at 3, 5-6.592 See supra Part IV.C.1.c.i.593 Compliance Transmittal at 9; PJM, Proposed Tariff, § I.1 Definitions R-S (Retail Behind The Meter Generation) (46.0.0) and § VIII.A 400, Definitions R (Retail Behind The Meter Generation) (7.0.0).594 December Order, 193 FERC ¶ 61,217 at P 186. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 278 Date Filed: 10/19/2026
PDF page 280
Docket No. EL25-49-002, et al.- 125 -
customers.595 The Commission did not distinguish in its determination between load served by QFs that are BTMG and load served by other categories of BTMG. 242.
PJM argues that some QFs may have economic benefits and are energy efficient, but PJM does not demonstrate that loads served by QFs that are BTMG do not cause the concerns the Commission discussed in the December Order.596 Nor does PJM demonstrate why these loads are not similarly situated to other loads served by other categories of BTMG.
243.
PJM also notes that QFs have size limitations and cogeneration QFs must meet efficiency requirements.597 However, the Commission in the December Order directed a materiality threshold because netting a smaller amount of load does not raise the same level of resource adequacy and reliability concerns as netting above the threshold.598 PJM does not demonstrate why the materiality threshold should apply differently to load served by QFs that are BTMG and load served by other categories of BTMG. Further, efficiency requirements are not unique to QFs—other generators may have efficiency requirements for other reasons or meet similar efficiency targets on their own. PJM has not demonstrated why such requirements are a meaningful consideration in whether to apply disparate treatment to load served by QFs that are BTMG and load served by other categories of BTMG. Industrials/Amtrak similarly argue that QFs contribute to resource adequacy and reliability because some are limited in their use of the transmission system due to the integration between the load and generation.599 However, as Industrials/Amtrak acknowledge, this is only true of some QFs, and above we have recognized that a particular subgroup, cogeneration QFs, warrant different treatment. 244.
Industrials/Amtrak also argue that it is not clear whether QFs will have access to the FCD or NFCD transmission services.600 As discussed supra, Eligible Customers taking transmission service on behalf of Co-Located Loads, as well as Eligible Customers taking transmission service on behalf of a load with BTMG, may elect to take FCD
595 Id.596 See Compliance Transmittal at 10 (broadly asserting that BTMG arrangements with QF status have been netting within PJM without known operational issues to date).597 Compliance Transmittal at 10 (citing 16 U.S.C. § 824a-3; 18 C.F.R. § 292.204).598 December Order, 193 FERC ¶ 61,217 at P 221.599 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 18-19,
21. 600 Id. at 20.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 279 Date Filed: 10/19/2026
PDF page 281
Docket No. EL25-49-002, et al.- 126 -
and/or NFCD transmission services.601 While we acknowledge that Industrials/Amtrak also argue that these new transmission services will not replace netting,602 our determination herein to allow Eligible Customers taking transmission service on behalf of loads with BTMG to take transmission service based on contract demand rather than NITS should they so choose could help such Eligible Customers to manage costs if they infrequently rely on transmission service or can reserve needed transmission service in advance (such as when the QF that serves them is on a planned maintenance outage). 245.
Industrials/Amtrak argue that without retail netting, QFs may be denied access to backup service at rates that are not based upon an assumption that forced outages or other reductions in electric output by all QFs on the system will occur simultaneously, during system peak, or both, as required by PURPA. Under the Commission’s PURPA regulations, the rates at which a host utility provides backup service must be just and reasonable and (1) shall not be based upon an assumption (unless supported by factual data) that forced outages or other reductions in output by all QFs on an electric utility’s system will occur simultaneously, or during system peak, or both; and (2) shall consider the extent to which scheduled outages of the QF can be usefully coordinated with scheduled outages of the utility’s facilities.603 The Commission’s directive in the December Order to PJM to revise its Retail BTMG netting rules implicates the terms of the Tariff for the provision of transmission service, specifically NITS, not back-up service. Therefore, Industrials’/Amtrak’s concern regarding backup service appears to conflate rates for sales of back-up power and rates for transmission service, rendering the concern misplaced. As is already the case elsewhere, such as in Midcontinent Independent System Operator, Inc. (MISO),604 NITS transmission rates in PJM, going forward, will be based on gross demand during the system peak. Because this directive from the December Order has no bearing on the rates at which a host utility provides backup service to QFs, it necessarily does not conflict with the requirement in the Commission’s PURPA regulations that the rates for such backup service not assume all QFs are on forced outage.
601 See supra Part IV.B.3.c.602 Industrials/Amtrak Joint Protest and Comments on Compliance Filing at 20.603 18 C.F.R. § 292.305(c).604 See Midwest Indep. Transmission Sys. Operator, Inc., 106 FERC ¶ 61,073, at P 26 (2004) (“[MISO]’s proposal to base Network Service charges for delivery of station power on the basis of coincident-peak output is not consistent with its OATT or with Commission precedent. Accordingly, [MISO] should include load served by behind-the-meter generation, including station power load met through on-site self-supply, in Network Load when it charges for Network Service.”). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 280 Date Filed: 10/19/2026
PDF page 282
Docket No. EL25-49-002, et al.- 127 -
246.
With respect to Eastman’s arguments, Eastman appears to reference a
cogeneration facility, which uses its on-site electrical generation to provide not only electric power but also steam necessary for industrial processes at the facility.605 Because we set aside, in part, the December Order and find that certain cogeneration QFs should be exempted from the replacement rate upon a demonstration that they do not present the reliability or resource adequacy concerns discussed in the December Order, Eastman’s concern appears to be addressed.606
B. Transmission Service
1. December Order
247.
The Commission directed PJM to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of a Co-Located Load takes one of three transmission services: (1) NITS or Interim NITS, (2) a new FCD transmission service, or
(3) a new NFCD transmission service.607 The December Order set many of the terms and conditions of these services for paper hearing procedures.608
248.
The December Order stated that Interim NITS must allow an Eligible Customer that has requested NITS on behalf of a Co-Located Load to take non-firm transmission service that can be interrupted until the Network Upgrades necessary to provide NITS are complete and the Co-Located Load can be designated as Network Load.609 The Commission also found that this service should be temporary, available only to Eligible Customers that have requested NITS on behalf of Co-Located Loads that cannot yet be reliably served with NITS and only until the necessary Network Upgrades are completed and the Co-Located Load is designated as Network Load. The December Order further stated that Interim NITS would be optional for an Eligible Customer seeking NITS on behalf of a Co-Located Load and only available to the extent PJM determines that it can provide some level of interim service reliably. The Commission found that Eligible Customers should pay the NITS rate for this service, as well as ancillary services charges and charges for black start service, but they will not be charged for generation capacity because, as interruptible loads, capacity will not be procured on their behalf until such time as the Network Upgrades are in place to serve them. The Commission clarified that
605 Eastman Protest and Comments on Compliance Filing at 5.606 See supra Part IV.C.1.c.i.c.607 December Order, 193 FERC ¶ 61,217 at P 193.608 Id. P 194.609 Id. P 200. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 281 Date Filed: 10/19/2026
PDF page 283
Docket No. EL25-49-002, et al.- 128 -
Interim NITS may not be combined with the FCD transmission service or NFCD transmission service.
249.
With respect to FCD and NFCD transmission services, the Commission found these services should be permanent transmission services available to Eligible Customers taking transmission service on behalf of Co-Located Load.610 The December Order provided that the Co-Located Load must be able and willing to prevent or limit its energy withdrawals and must be separately metered from the associated generator. The December Order also stated that Eligible Customers taking transmission service on behalf of Co-Located Loads may take a combination of FCD transmission service and NFCD transmission service, but that Eligible Customers taking transmission service on behalf of Co-Located Loads that will not withdraw energy from the transmission system must take NFCD transmission service at 0 MW. The Commission also found that Eligible Customers taking either service on behalf of Co-Located Load would be charged for regulation and black start services based on gross demand, rather than the reserved amount of transmission service.611
250.
The Commission found that FCD transmission service should have the same reservation and curtailment priority as existing firm transmission services at the level of the contract demand and be charged for transmission, ancillary services, and capacity based on the contract demand, with the exception of regulation and black start services.612 The Commission explained that PJM would only have an obligation to plan for the Network Upgrades necessary to serve Eligible Customers taking this new FCD transmission service on behalf of Co-Located Loads at their contract demand, and that PJM would procure capacity for these customers and should charge them based on their contract demand.613 The Commission further found that FCD transmission service should have a minimum term of one year and that PJM should propose an anti-toggling mechanism for Eligible Customers switching between FCD and NFCD transmission services.614
251.
With respect to NFCD transmission service, the Commission found the service should be available during normal operation and curtailed during emergency operations, similar to existing non-firm transmission service options. The Commission found the
610 Id. P 206.611 Id. PP 209, 216.612 Id. PP 208-209.613 Id. P 210.614 Id. P 213. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 282 Date Filed: 10/19/2026
PDF page 284
Docket No. EL25-49-002, et al.- 129 -
service should be available for terms ranging from one hour to one month and charged based on as-reserved contract demand.615 The December Order clarified that PJM should not include NFCD transmission service loads in its transmission or resource adequacy planning.616
2. PJM Compliance Filing
252.
PJM clarifies that the compliance filing only includes the organizational Tariff changes needed to implement the Commission’s compliance directives regarding creating new transmission services and that the majority of the changes will be determined through the paper hearing.617 First, PJM submits several “shell” Tariff sheets, including a new Part XI governing the new transmission services, new Attachment F-3A for the service agreement for Eligible Customers taking NITS or Interim NITS on behalf of a Co-Located Load, and Attachment F-4 for the service agreement for Eligible Customers taking FCD transmission service or NFCD transmission service on behalf of a Co-Located Load.618 PJM states that it will file the full text of these sections upon the Commission’s decision following the conclusion of the paper hearing.619 253.
PJM states that it further proposes modifications to Tariff Part III, governing NITS, to clarify that an Eligible Customer taking transmission service on behalf of Co-Located Load must take a transmission service or take steps to disconnect the load from the transmission system.620 PJM also proposes new language clarifying that an Eligible Customer taking transmission service on behalf of a Co-Located Load may not take NITS or Interim NITS at the same time as FCD or NFCD transmission service.621 Finally, PJM proposes that Co-Located Load that is not served by an Eligible Customer
615 Id. PP 215-216.616 Id. P 218.617 Compliance Transmittal at 18-19.618 Id. at 19-21.619 Id. at 21.620 Id. at 22.621 Id. at 22-23. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 283 Date Filed: 10/19/2026
PDF page 285
Docket No. EL25-49-002, et al.- 130 -
taking transmission service on its behalf “must take all necessary steps to disconnect from the Transmission System.”622
3. Pleadings
254.
EDFps supports PJM’s proposed framework for the new transmission services.623 Constellation requests modifications to PJM’s proposed Tariff revisions for Interim NITS, including: (1) replacing a load’s “option to seek” Interim NITS with an “option to take”; (2) revising section 28.1 of the Tariff to clarify that Interim NITS is available to Eligible Customers taking service on behalf of Co-Located Load; and (3) revising section 29.1 of the Tariff to clarify that the required conditions to receive NITS also apply to Interim NITS.624
255.
Crusoe argues that PJM’s proposal in the paper hearing does not answer critical questions such as how the initial contract demand quantity is determined, whether contract demand quantities can be adjusted as Co-Located Load grows in phases, or how PTPS interacts with Co-Location Arrangements where both generation and load sit on the developer’s side of the Point of Change in Ownership.625
256.
Crusoe supports Interim NITS as a workable, near-term solution to allow load to operate on the transmission system while a Co-Located Generator and/or retail BTMG is still being built and interconnected.626 Crusoe claims, however, that PJM’s proposed approach appears to treat a new Co-Located Generator as equivalent to a Network Resource prior to it receiving such status. On that basis, Crusoe speculates that PJM may intend to prevent a Co-Located Generator or retail BTMG from supplying energy to Co-Located Load during a grid curtailment event if that load is being served via Interim NITS. Crusoe contends that this prohibition would create a disincentive to large load customers using Interim NITS as an option for speedy interconnection. 257.
DCC similarly alleges that PJM’s proposal to prohibit customers from relying on a Co-Located Generator during curtailment events makes the proposal unworkable and without practical value. DCC also requests that PJM define the trigger, scope, and sequence of Interim NITS curtailment with respect to the operational limits identified in
622 PJM, Proposed Tariff, Part III (NITS) (4.0.0).623 EDFps Comments on Compliance Filing at 8.624 Constellation Protest and Comments on Compliance Filing at 18-19.625 Crusoe Comments on Compliance Filing at 8.626 Id. at 6. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 284 Date Filed: 10/19/2026
PDF page 286
Docket No. EL25-49-002, et al.- 131 -
the study and should not be able to curtail load for unrelated, broader resource adequacy concerns.627
258.
Joint Parties argue that the Commission should reject PJM’s proposed Tariff revisions that preclude retail loads served by BTMG from taking the new transmission services and otherwise limit eligibility for the new transmission services to load that is connecting to a generator with interconnection rights. Joint Parties argue that these retail loads are similarly situated to Co-Located Loads in their willingness and ability to limit their energy withdrawals from the transmission system under certain conditions.628 259.
DCC argues that PJM’s proposal does not provide clear timelines for customers to be transitioned from Interim NITS to NITS.629 DCC expresses concern that, without clear timelines, Interim NITS could persist indefinitely, creating uncertainty for customers making long-term investments.
4. Answers
260.
Indicated TOs argue that the Commission should reject requests to reject or defer action on PJM’s proposal to limit the new transmission services to Co-Located Load, because, Indicated TOs contend, the December Order limited such services to Eligible Customers taking transmission service on behalf of Co-Located Load. Indicated TOs argue that there is no evidence in the record to support that load-only customers should be entitled to use the new transmission services, which Indicated TOs explain are tied to generator-specific attributes that load-only customers do not share, such as an associated generator, separate metering from the generator, and the ability and willingness to prevent or limit withdrawals through the Co-Location Arrangement itself.630 261.
Indicated TOs state they do not oppose the requested clarification that Interim NITS customers be permitted to continue serving on-site load with a Co-Located Generator during a curtailment event, provided that PJM implements safeguards to ensure that any such operation does not result in unreserved use of the transmission system or otherwise compromise reliability.631627 DCC Comments on Compliance Filing at 6-7.628 Joint Parties Protest of Compliance Filing at 10.629 DCC Comments on Compliance Filing at 8.630 Indicated TOs April 24 Answer at 6-7.631 Id. at 7-8. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 285 Date Filed: 10/19/2026
PDF page 287
Docket No. EL25-49-002, et al.- 132 -
262.
BTMG Parties argue that the record contains ample evidence to support extending new transmission service eligibility to all customers willing and able to limit withdrawals from the grid, including load-only customers served by BMTG or otherwise able to consume flexibly.632 BTMG Parties contest Indicated TOs’ claim that there is absolutely no evidence in the record, noting that the Commission relied on Antora’s comments explaining that its thermal battery technology provides for an inherently flexible, low-load factor load, whether or not co-located with generation.633 BTMG Parties argue that the ability to inject to the grid is not required to enable a load to limit withdrawals from the transmission system, and that the Commission should require PJM to tailor new transmission service eligibility more closely to the Commission’s justification in issuing the Co-Location Order, namely the willingness and ability to limit withdrawals from the transmission system under specified circumstances.634 BTMG Parties contend that if a load is able to meet technology-neutral technical requirements to demonstrate reliable curtailment eligibility, it should be allowed to take the new transmission services.
5. Determination
263.
We accept PJM’s compliance filing with respect to outlining new transmission services in the Tariff, noting that, as discussed above in Part IV.B.3, we set aside, in part, the December Order and direct PJM to submit further compliance to revise its Tariff to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.635 We find that PJM complies with the directive in the December Order to modify its Tariff to require that an Eligible Customer taking transmission service on behalf of Co-Located Load takes one of three transmission services: (1) NITS or Interim NITS, (2) a new FCD
632 BTMG Parties Answer at 8.633 Id. at 5-6 (citing December Order, 193 FERC ¶ 61,217 at P 199).634 Id. at 8-9.635 Specifically, we accept Proposed Tariff, § III.28.1 (Scope of Service) (2.0.0); § III.29.1 (Conditions Precedent for Receiving Service) (4.0.0); § III.29.2 (Application Procedures) (4.0.0); § III.31.6 (Annual Load and Resource Information Update) (4.0.0); Part XI (Transmission Services Available for Eligible Customers Taking Service on Behalf of Co-Located Loads) (0.0.0); attach. F-3A (Service Agreement for Regional Network Integration Transmission Service And/or Interim Regional Network Integration Transmission Service (For Co-Located Load)) (0.0.0); and attach. F-4 (Service Agreement For Contract Demand Transmission Service (For Co-Located Load)) (0.0.0). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 286 Date Filed: 10/19/2026
PDF page 288
Docket No. EL25-49-002, et al.- 133 -
transmission service, or (3) a new NFCD transmission service.636 We acknowledge PJM’s statement that it filed on compliance only a limited number of the changes directed in the December Order, given the number of issues set to be resolved through the paper hearing.
264.
However, we reject the Tariff provisions proposing that Co-Located Load that is not served by an Eligible Customer taking transmission service on its behalf “must take all necessary steps to disconnect from the Transmission System.”637 We find this provision duplicative of PJM’s proposed changes to Part VIII, Subpart B, section 403(A)(1)(r)(iv), which specify that “[t]o the extent that a Project Developer seeks to serve Co-Located Load using its generating facility but not identify an Eligible Customer, then the Project Developer must terminate its generating facility’s interconnection to the Transmission System and serve the Co-Located Load fully islanded from the Transmission System.”
265.
We reject Constellation’s request to direct PJM to modify its proposed tariff language such that a load has an “option to take” Interim NITS instead of an “option to seek” Interim NITS.638 We acknowledge, as Constellation notes, that the December Order stated that “[t]his new interim, non-firm transmission service must allow an Eligible Customer that has requested NITS on behalf of a Co-Located Load to take non-firm transmission service that can be interrupted until the Network Upgrades necessary to provide NITS are complete . . . .”639 However, the December Order also stated that Interim NITS “would only be available to the extent PJM determines that it can provide some level of interim service reliably.”640 We accept PJM’s proposal and clarify that Interim NITS is an option but not a right, as it is available to an Eligible Customer taking transmission service on behalf of Co-Located Load only to the extent that PJM determines it can be provided reliably. Constellation appears to request that the Commission require PJM to provide Interim NITS regardless of this reliability limitation, which would not be just and reasonable or consistent with the December Order. We reject Constellation’s other requested clarifications on the required conditions to receive Interim NITS as not required for PJM to comply with the December Order. Further, because PJM proposes to create a new Tariff section governing Interim NITS,
636 December Order, 193 FERC ¶ 61,217 at P 193.637 PJM, Proposed Tariff, Part III (General) (4.0.0).638 Constellation Protest and Comments on Compliance Filing at 18-19.639 December Order, 193 FERC ¶ 61,217 at P 200.640 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 287 Date Filed: 10/19/2026
PDF page 289
Docket No. EL25-49-002, et al.- 134 -
Constellation has not shown why it is necessary to add details regarding Interim NITS to the existing Tariff sections addressing NITS.641
266.
In its comments on the compliance filing, Crusoe makes several misplaced arguments about the illustrative tariff PJM submitted in the paper hearing.642 Crusoe argues that PJM’s illustrative tariff does not explain how the initial contract demand quantity is determined. It is not clear what Crusoe means, given that the purpose of FCD and NFCD transmission services is to allow an Eligible Customer taking service on behalf of Co-Located Load to request a specific contracted amount of transmission service.643 The initial level of transmission service will thus be determined in the first instance by the requesting Eligible Customer. PJM will evaluate those requests pursuant to its study process, which we address below.644 Crusoe also argues that PJM does not explain how PTPS interacts with Co-Location Arrangements where both the generator and load sit on the Interconnection Customer’s side of the Point of Change in Ownership. However, this arrangement appears to refer to PJM’s proposed change to the definition of Co-Located Load, which we reject herein.645
267.
Crusoe’s request for clarification as to how phased-in load will be treated under FCD and NFCD transmission services is addressed below in Part VI.A.2. Crusoe and DCC also make arguments about curtailment rules or procedures for Eligible Customers taking Interim NITS on behalf of Co-Located Load, and that issue is addressed below in Part VI.G. Finally, comments urging the Commission to reject PJM’s compliance filing for failing to make the new transmission services available to Eligible Customers on behalf of non-Co-Located Loads are untimely requests for rehearing. These commenters argue for a modification of the December Order, not that PJM has failed to comply with it.646 However, we address related arguments on rehearing of the December Order above in Parts IV.B.3 and IV.C.1.b.ii.
641 Compliance Transmittal at 19-20.642 Crusoe Comments on Compliance Filing at 8. To accompany its initial brief on paper hearing, PJM submitted an illustrative tariff with proposed rates, terms, and conditions for the three new transmission services.643 See December Order, 193 FERC ¶ 61,217 at PP 208, 216.644 See infra Part VI.A.3.645 See infra Part V.D.5.a.646 See, e.g., ISO New Eng. Inc., 132 FERC ¶ 61,098 at P 12 (“The Commission has held that requests to alter a compliance filing in a manner that differs from the order Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 288 Date Filed: 10/19/2026
PDF page 290
Docket No. EL25-49-002, et al.- 135 -
268.
Finally, we note that DCC’s concerns regarding the terms and conditions of Interim NITS are misplaced arguments about the illustrative tariff PJM submitted in the paper hearing and are discussed in Part VI.H.
C. Necessary Studies
1. December Order
269.
The Commission directed PJM to revise the Tariff to clarify that an existing Interconnection Customer seeking to modify its ISA or GIA to allow its generator to serve Co-Located Load, including to reflect any reduction in its CIRs, must follow the Necessary Study process to effectuate such Co-Location Arrangement.647 In addition, the Commission directed PJM to add to the Tariff a description of the scope of the analysis that it will perform as part of the Necessary Study process when an Interconnection Customer seeks to use its existing generator to serve Co-Located Load, consistent with PJM’s discussion of how it conducts necessary studies associated with Interconnection Customers seeking to amend their ISAs or GIAs to use existing generators to serve Co-Located Load, including to reflect any reduction in CIRs. The Commission found that PJM must include a description of the information that the Interconnection Customer must provide about the Co-Located Load for the purposes of the Necessary Study, and that the Necessary Study process must assess any special protection scheme that is part of a Co-Location Arrangement.648
270.
The Commission directed PJM to revise the Tariff to indicate that the
Interconnection Customer will be responsible for the costs of any modifications or Network Upgrades that are needed as a result of PJM’s study of the change to the ISA or GIA to allow the existing generator to serve Co-Located Load, including to reflect any reduction in CIRs, inclusive of all necessary Network Upgrades.649 The Commission found that the Tariff should make clear that an existing generator may not commence service to a Co-Located Load until all required Network Upgrades, special protection schemes, and metering are in service.650 Finally, the Commission clarified that an existing generator may not begin serving Co-Located Load that is not Network Load until requiring the compliance filing constitute a collateral attack on the order requiring the compliance filing.”).
647 December Order, 193 FERC ¶ 61,217 at P 226.648 Id. P 227.649 Id. P 228.650 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 289 Date Filed: 10/19/2026
PDF page 291
Docket No. EL25-49-002, et al.- 136 -
it has delisted its CIRs for the portion of the generator to be designated to serve any Co-Located Load that is not receiving NITS.651
2. PJM Compliance Filing
271.
PJM states that it proposes changes to Parts III and VIII of the Tariff to comply with the Commission’s directives regarding the Necessary Study process for existing Interconnection Customers, including clarifying that customers must enter into a Necessary Study Agreement with PJM.652 PJM also proposes to require customers to provide PJM with all information needed to perform the Necessary Studies, which PJM proposes to detail in the PJM manuals.653 PJM states that a Project Developer may not make changes to its facilities until it has completed the Necessary Study process and the amended GIA is effective. PJM proposes that the Tariff state that Necessary Studies to be performed include thermal, short circuit, and stability studies under various seasonal and load conditions, as detailed in the PJM manuals, and assess any necessary control technologies and protection systems required. Lastly, PJM states that the Tariff will require the Project Developer to be responsible for the cost of any modifications or Network Upgrades necessary as a result of an Interconnection Customer’s decision to serve the Co-Located Load.654
272.
PJM clarifies that these changes apply to all existing interconnection customers, regardless of whether they have effective interconnection agreements issued pursuant to Parts IV, VI, VII, or VIII of the Tariff.655 PJM states that, should an interconnection customer not have a three-party interconnection agreement involving PJM, the customer would need to first convert to a three-party agreement before following the Necessary Study process.
3. Pleadings
273.
A number of parties have concerns with PJM’s compliance filing. Several parties protest PJM’s compliance filing and urge the Commission to require PJM to establish
651 Id. P 230.652 Compliance Transmittal at 24-25.653 Id. at 25 (citing December Order, 193 FERC ¶ 61,217 at P 227).654 Id. at 25-28.655 Id. at 24-25. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 290 Date Filed: 10/19/2026
PDF page 292
Docket No. EL25-49-002, et al.- 137 -
deadlines to complete the Necessary Study process.656 Constellation urges the Commission to direct PJM to detail the specific provisions in the PJM manuals to which the proposed Tariff language refers because it does not specify whether PJM is proposing to use the existing Necessary Study process or a new process, and the existing requirements set forth in PJM Manual 14C do not specifically reference the studies to be performed. Crusoe and Constellation urge the Commission to direct PJM to revise the proposed Tariff’s scope of the analysis to explicitly relate to reliability impacts only, rather than impacts generally.657 Crusoe contends that PJM should create a clear, published standard for what triggers the Necessary Study process.
274.
Energy Artisans argue that PJM’s proposed Necessary Study requirements will force industrial users to fund thermal, short circuit, and stability studies and bear the costs of Network Upgrades, control technologies and protection systems, and redundant metering equipment identified during these studies. Energy Artisans allege that these requirements will force many industrial facilities to cease operations, which will lead to higher Network Loads and exacerbate resource adequacy issues in PJM.658 275.
Vistra and Constellation request that PJM clarify how the proposed Tariff revisions describing the Necessary Study process would apply to interconnection customers who have already submitted requests and are undergoing studies. Constellation and Vistra assert that Co-Location Arrangements will face significant delays if they must reenter the Necessary Study process.659 Vistra maintains that PJM’s failure to include a transition mechanism is an unjustified departure from the Commission’s approach to interconnection reform, in which the Commission has regularly required transition mechanisms to avoid disruption and stranded investments.660 Constellation proposes to clarify that Project Developers with existing requests for Necessary Studies for Co-Location Arrangements will be allowed to rely on the results of those studies to the extent relevant in light of the transmission service the Eligible
656 Constellation Protest and Comments on Compliance Filing at 12, 17; DCC Comments on Compliance Filing at 7; Crusoe Comments on Compliance Filing at 9.657 Constellation Protest and Comments on Compliance Filing at 12-14; Crusoe Comments on Compliance Filing at 9.658 Energy Artisans Protest of Compliance Filing at 1-2.659 Constellation Protest and Comments on Compliance Filing at 15; Vistra Protest of Compliance Filing at 4, 6-8.660 Vistra Protest of Compliance Filing at 4-5. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 291 Date Filed: 10/19/2026
PDF page 293
Docket No. EL25-49-002, et al.- 138 -
Customer plans to request on behalf of the Co-Located Load.661 Constellation and Vistra argue that requiring interconnection customers to restart the process would be inconsistent with the filed-rate doctrine and rule against retroactive ratemaking and would effectively penalize parties for failing to comply with rules that did not exist at the time they acted.662
276.
Vistra contends that PJM neither justifies its proposal to require interconnection customers with older interconnection agreements to enter into the new pro forma GIA nor shows how this proposal is consistent with the Commission’s directives. Vistra suggests that this proposal is unrelated to the Commission’s compliance directives and requests clarity about when the interconnection customer needs to enter into the new GIA in the Necessary Study process. Vistra also asserts that PJM’s proposal could result in disputes about whether and how provisions in the updated pro forma GIA apply to older generators, disrupting long-standing Commission precedent. Separately, Vistra indicates that, because PJM locates Necessary Study revisions in Part VIII, which applies to New Service Requests on or after October 1, 2021, it is unclear whether interconnection customers that entered the interconnection process before that date may use the Necessary Study process.663
277.
Joint Parties argue that PJM should be required to clarify that an existing interconnection customer can nominate a joint withdrawal limit in the Necessary Study process.664 Joint Parties argue that this clarification is necessary to realize the December Order’s stated intent of ensuring that Co-Located Loads do not pay for services that they do not use and do not trigger Network Upgrades that they do not need.665 Joint Parties argue that PJM’s proposed Tariff revisions appear to remain silent as to how it will treat energy withdrawals in studying Co-Located Load interconnection requests. Joint Parties state that they seek modest clarifications from PJM that, to the extent PJM performs interconnection study steps involving withdrawal assumptions for Co-Located Loads, an energy storage interconnection customer will be able to specify limits to the injection and
661 Constellation Protest and Comments on Compliance Filing at 14-15.662 Id. at 15; Vistra Protest of Compliance Filing at 4, 6.663 Vistra Protest of Compliance Filing at 14-16.664 Joint Parties Protest of Compliance Filing at 4-6. See also Earthjustice Reply Brief at 22.665 Joint Parties Protest of Compliance Filing at 4-5. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 292 Date Filed: 10/19/2026
PDF page 294
Docket No. EL25-49-002, et al.- 139 -
withdrawal rights reflecting the proposed integration of the storage and Co-Located Load facilities.666
278.
Parties argue that PJM’s proposal for delisting CIRs may be unjust, unreasonable, unduly discriminatory, or inconsistent with the Commission’s directives in the December Order. Vistra claims that PJM’s proposal would require existing generators to provide PJM with the amount of reduction to CIRs to facilitate the Co-Located Load configuration, which Vistra argues is vague and potentially overbroad because it could be read to require that generators include in their CIR reduction any portion of a facility that will ever provide power to a Co-Located Load. Vistra and DCC express concern that PJM’s proposal could require generators to delist more CIRs than necessary.667 Vistra further contends that allowing secondary units to provide occasional, interruptible service to Co-Located Load and to retain their CIRs would be consistent with the Tariff. Vistra and Constellation argue that capacity resources that serve Co-Located Load on an interruptible basis should not be required to delist CIRs.668 Vistra presents an additional concern with PJM’s proposal for reducing CIRs, namely, that PJM fails to explain how it will assess the impact of the reduction of CIRs.669 Vistra alleges that because PJM’s proposal is vague on this point, PJM could, for example, improperly incorporate resource adequacy considerations into its Necessary Study process.
4. Determination
279.
We find that PJM’s proposed revisions to its Necessary Study process partially comply with the directives set forth in the December Order and therefore accept the Tariff revisions in part, reject them in part, and direct a further compliance filing as discussed below.
280.
We accept PJM’s proposed revisions to Part VIII, Subpart A, section 401 and Part IX, Subpart G of the Tariff to comply with the directives in the December Order by:
(1) adding a description of the scope of the analysis that it will perform as part of the Necessary Study process when an Interconnection Customer seeks to use its existing generator to serve Co-Located Load; (2) requiring the Interconnection Customer to be responsible for the costs of any modifications or Network Upgrades that are needed as a
666 Id. at 5.667 Vistra Protest of Compliance Filing at 8-10; DCC Comments on Compliance Filing at 7. 668 Vistra Protest of Compliance Filing at 11; Constellation Protest and Comments on Compliance Filing at 19. 669 Vistra Protest of Compliance Filing at 12. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 293 Date Filed: 10/19/2026
PDF page 295
Docket No. EL25-49-002, et al.- 140 -
result of PJM’s study of the change to the ISA or GIA to allow the existing generator to serve Co-Located Load, including to reflect any reduction in CIRs, inclusive of all necessary Network Upgrades; and (3) clarifying that an existing generator may not commence service to a Co-Located Load until all required Network Upgrades, special protection schemes, and metering are in service.670 We also accept PJM’s proposed revisions to Part IX, Subpart A, Form of Application and Studies Agreement to facilitate PJM’s collection of the information necessary to perform requested Necessary Studies.671 However, with respect to Constellation’s argument that PJM’s proposed Tariff revisions may lack clarity, we direct PJM to specify in its compliance filing what types of additional detail about the studies will be available in the PJM manuals. 281.
We also note in response to Constellation that, per the December Order, PJM’s proposal seeks to clarify the existing Necessary Study process, not create a new one.672 While parties request that the Commission establish deadlines for the Necessary Study process, we note the December Order did not include any such requirement, and our review of these proposed Tariff revisions is limited to whether PJM complies with the directives in the December Order.673 In response to parties’ requests regarding the trigger and scope of the Necessary Study process, we note that the Commission in the December Order directed PJM to clarify its study procedures for an Interconnection Customer that will use its generator to serve Co-Located Load but did not otherwise direct changes to the trigger or scope of the Necessary Study process. Per the Tariff, the scope of the Necessary Study is to determine whether planned modifications to an Interconnection Customer’s facilities “will have a permanent material impact on the Transmission System and to identify the additions, modifications, or replacements to the Transmission System,
670 December Order, 193 FERC ¶ 61,217 at PP 227-228. We also accept the conforming edit to the definition of Necessary Study in Proposed Tariff, § VII.A 300, Definitions N (3.0.0) and § VIII.A 400, Definitions N (4.0.0).671 Compliance Transmittal at 27; PJM, Proposed Tariff, pt. IX, subpt. A, (Form of Application and Studies Agreement) (4.0.0).672 See Compliance Transmittal at 25 (“The thrust of PJM’s proposed revisions require any Existing Interconnection Customer that seeks to serve Co-Located Load to follow a clarified necessary study process detailed in Part VIII of the Tariff and the related Form of Necessary Study Agreement set forth in Tariff, Part IX, Subpart G.”).673 See, e.g., PJM Interconnection LLC, 119 FERC ¶ 61,179, at P 12 (2007) (“The purpose of a compliance filing is to make the directed changes and the Commission’s focus in reviewing them is whether they comply with the Commission’s previously stated directives.”) (citing AES Huntington Beach, LLC, 111 FERC ¶ 61,079, at P 60 & n.25 (2005)). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 294 Date Filed: 10/19/2026
PDF page 296
Docket No. EL25-49-002, et al.- 141 -
if any, that are necessary, in accordance with Good Utility Practice, and/or to maintain compliance with Applicable Laws and Regulations or Applicable Standards, to accommodate the planned modifications.”674 Regarding Joint Parties’ requests regarding study processes for Co-Located Loads paired with electric storage resources, we note that the December Order did not address or otherwise direct changes as to any generator interconnection study procedures for such resources.
282.
We reject in part PJM’s proposed revisions to Part III of its Tariff regarding the requirement for Interconnection Customers with effective ISAs pursuant to Part VI of the Tariff or effective GIAs pursuant to Part VII of the Tariff to enter into a new GIA pursuant to Part VIII of the Tariff and the pro forma GIA in Part IX, Subpart B. We agree with Vistra that such a requirement is inconsistent with the Commission’s recognition in the December Order that existing Interconnection Customers that seek to modify their ISAs or GIAs must follow the Necessary Study process to effectuate a Co-Location Arrangement.675 Interconnection Customers with effective ISAs or GIAs must be able to modify those agreements and undergo the Necessary Study process without entering into new GIAs.
283.
We also agree with protesters that PJM’s proposed revisions lack clarity with respect to how they apply to Interconnection Customers that have already executed Necessary Study Agreements and for which PJM has already completed Necessary Studies.676 The Commission found in the December Order that the Necessary Study process lacked sufficient clarity and directed PJM to add the scope of the analysis it performs as part of the Necessary Study process to its Tariff.677 However, the Commission did not direct changes to the scope of the study, and PJM does not otherwise demonstrate why Interconnection Customers seeking to serve Co-Located Load cannot
674 PJM, Intra-PJM Tariffs, pt. VIII.A, § 400 (Definitions N) (2.0.0) (definition of Necessary Study).675 December Order, 193 FERC ¶ 61,217 at P 226 (“[W]e direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to revise the Tariff to clarify that an existing Interconnection Customer seeking to modify its ISA or GIA to allow its generating facility to serve Co-Located Load, including to reflect any reduction in its CIRs, must follow the necessary study process to effectuate such Co-Location Arrangement.”) (emphasis added).676 Constellation Protest and Comments on Compliance Filing at 15; Vistra Protest of Compliance Filing at 4, 6.677 December Order, 193 FERC ¶ 61,217 at P 227. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 295 Date Filed: 10/19/2026
PDF page 297
Docket No. EL25-49-002, et al.- 142 -
rely on the results of Necessary Studies that have already been performed if the scope of the study has not changed.
284.
For these reasons, we direct PJM to submit a compliance filing within 60 days of the date of issuance of this order to remove the requirement for Interconnection Customers with existing ISAs pursuant to Part VI of the Tariff and GIAs pursuant to Part VII of the Tariff to enter into a new pro forma GIA. We recognize that removing the requirement for Interconnection Customers with existing ISAs pursuant to Part VI of the Tariff and GIAs pursuant to Part VII of the Tariff to enter into a new pro forma GIA will necessitate duplicating the appropriate Necessary Study Tariff provisions (Part VIII, Subpart A, section 401.H.3) in those Tariff sections, and therefore we direct PJM to include these Tariff revisions in its compliance filing. We find that this directive will ensure that Interconnection Customers with effective ISAs or GIAs will not be required to enter into new GIAs if they seek to modify their ISA or GIA to allow their generator to serve Co-Located Load.
285.
We also direct PJM to explain in its compliance filing how its changes ensure the prohibition on Interconnection Customers serving Co-Located Loads from existing generators until all required Network Upgrades, necessary control technologies and/or protection systems, and metering identified as necessary are complete and in service, applies to Interconnection Customers with currently effective GIAs, ISAs, and Necessary Study Agreements, in addition to Interconnection Customers seeking new Necessary Study Agreements and GIAs.
286.
In response to Constellation’s request that the Commission clarify that Interconnection Customers with existing requests for Necessary Studies for Co-Location Arrangements may rely on the results of those studies to the extent relevant in light of the transmission service the associated Eligible Customer plans to request on behalf of the Co-Located Load, we clarify that the studies applicable to a transmission service request for one of the new transmission services are distinct from the Necessary Study process, which studies the modification of a generator interconnection. If an Eligible Customer seeks to take one of the new transmission services on behalf of Co-Located Load, it must request transmission service and follow the appropriate transmission service study procedures as directed in this order.
287.
With respect to Energy Artisans’ argument that requiring industrial users to bear the costs of modifications or Network Upgrades will force industrial facilities to cease operations and exacerbate resource adequacy issues in PJM, we dismiss this argument as an untimely request for rehearing of the December Order’s finding that PJM’s existing retail BTMG netting rules were no longer just and reasonable.678 We reiterate that the
678 Id. P 221; see supra P 232 & n.585. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 296 Date Filed: 10/19/2026
PDF page 298
Docket No. EL25-49-002, et al.- 143 -
requirement to be responsible for costs of modifications or Network Upgrades applies only to Interconnection Customers that seek to modify their ISA or GIA to allow their generator to serve Co-Located Load, and this is a clarification of existing Tariff provisions in the pro forma ISA and GIA, as explained above.679 Interconnection Customers may choose to maintain their current ISAs or GIAs with no modifications, and Interconnection Customers who do not wish to bear these costs may choose not to pursue Co-Location Arrangements.
288.
Consistent with our above discussion, we disagree with Vistra and Constellation that capacity resources should not have to reduce their CIRs to serve Co-Located Load.680 We also reject without prejudice PJM’s proposed Tariff, Part IX, Subpart G, Form of Necessary Studies Agreement, because PJM has proposed changes to the Cost Responsibility section without explanation.681
D. Other
1. December Order
a. Definition of Co-Located Load
289.
In the December Order, the Commission directed PJM to adopt the definition of Co-Located Load specified in the order: “a configuration that refers to end-use customer load that is physically connected to the facilities of an existing or planned Customer Facility on the Interconnection Customer’s side of the Point of Interconnection to the PJM Transmission System.”682
b. Generation Interconnection Procedures, pro forma GIA,
and Common Service Provisions
290.
The Commission also directed PJM to revise its Tariff, VIII, Subpart B, section 403 - Application Rules to add to the list of requirements for a New Service
679 Tariff, Intra-PJM Tariffs, OATT, Attachment O, Appendix 2, § 3.4(b) Modification Costs (0.0.0); id., Part IX.B, Appendix 2, § 3.4(b) Modification Costs (2.0.0).680 See supra Part IV.C.2.a.iii.681 PJM, Proposed Tariff, pt. IX, subpt. G (Form of Necessary Studies Agreement) (3.0.0), § 15 (Cost Responsibility). Specifically, PJM proposes to raise the initial deposit for the Necessary Studies from $25,000 to $50,000.682 December Order, 193 FERC ¶ 61,217 at P 164. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 297 Date Filed: 10/19/2026
PDF page 299
Docket No. EL25-49-002, et al.- 144 -
Request that an Interconnection Customer who will use its generator to serve Co-Located Load must specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load.683 The Commission further directed PJM to submit revisions to the generation interconnection procedures to specify any operational procedures or data exchange requirements that PJM deems necessary for Co-Location Arrangements to remedy the Tariff deficiencies, such as unique operational procedures and data exchange requirements.684 The Commission noted that these revisions would establish a requirement in the Tariff for the Eligible Customer to be charged for transmission and ancillary services that the Eligible Customer must take on behalf of the Co-Located Load. The Commission clarified that, should an Interconnection Customer wish to serve Co-Located Load using its generator but not identify an Eligible Customer, then the Interconnection Customer may take steps to terminate its generator’s interconnection to the PJM transmission system and serve the Co-Located Load fully islanded from PJM’s transmission system.685
291.
The Commission also directed revisions to the Tariff, Part IX, Subpart B GIA to specify that an Interconnection Customer that will use its generator to serve Co-Located Load must specify an Eligible Customer that will take transmission service on behalf of the Co-Located Load.686 The Commission directed PJM to add a new provision to Part I, Common Service Provisions, of the Tariff that requires Interconnection Customers with ISAs or GIAs executed, or requested to be filed unexecuted, prior to the effective date of the revised generation interconnection procedures and pro forma GIA directed in this order that wish to add Co-Located Load or are currently serving Co-Located Load to publicly notify PJM of that addition and identify the Eligible Customer that will take transmission service on behalf of that Co-Located Load.
2. PJM Compliance Filing
a. Definition of Co-Located Load
292.
On April 16, 2026, the Commission issued an order rejecting the portion of PJM’s first compliance filing proposing to define Co-Located Load in a manner that deviated
683 Id. P 188.684 Id. P 188 & n.405.685 Id. P 189.686 Id. P 190. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 298 Date Filed: 10/19/2026
PDF page 300
Docket No. EL25-49-002, et al.- 145 -
from the December Order, without sufficient explanation, by replacing the term “Point of Interconnection” with “Point of Change in Ownership.”687
293.
In the instant filing, PJM states that it proposes modifying the definition of Co-Located Load directed by the Commission in the same manner as proposed in PJM’s first compliance filing.688 PJM states that changing “Point of Interconnection” to “Point of Change in Ownership” is consistent with or superior to the December Order’s directive because it provides additional clarity to interconnection parties, is easier to administer, and reduces litigation potential.689 PJM further explains “[w]hile Point of Change in Ownership describes where a developer’s portion of the Interconnection Facilities connect to the Transmission Owner’s portion of the Interconnection Facilities, Point of Interconnection is a technical and physical term about ‘where’ those Interconnection Facilities connect to the PJM Transmission System.”690 PJM states that the Commission has broad authority to establish the replacement rate under FPA section 206 and that “one stakeholder’s conditional protest in Docket No. ER26-1088 offers another alternative for the Commission to consider in reliance on this Commission authority.”691 PJM explains that “Point of Change in Ownership” will reduce litigation because parties “know what interconnection facilities they own and can plan the connection of Co-Located Load to such facilities accordingly” but that the protest in Docket No. ER26-1088 “does not appear inconsistent with recognizing the principle that Co-Located Loads should only interconnect to a Project Developer’s portion of the Interconnection Facilities.”692 PJM notes that under the GIP, the Project Developer’s Interconnection Facilities are the Interconnection Facilities between a Generating Facility and the Point of Change in Ownership, and include the facilities and equipment and any modification to those facilities and equipment that are necessary to physically and electrically interconnect the Generating Facility.693687 PJM Interconnection, L.L.C., 195 FERC ¶ 61,030 (2026).688 Compliance Transmittal at 31 (citing PJM, Transmittal, Docket No. ER26-1088-000, at 3 n.14 (filed Jan. 20, 2026)).689 Id. at 31-32.690 Id. at 32.691 Id. at 33.692 Id. at 33-34.693 Id. at 34-35. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 299 Date Filed: 10/19/2026
PDF page 301
Docket No. EL25-49-002, et al.- 146 -
b. Generation Interconnection Procedures, pro forma GIA,
and Common Service Provisions
294.
PJM states that it proposes the prescriptive clarifications directed in the December Order. PJM explains that the proposed Tariff revisions comply by: (1) adding to the list of requirements for a New Service Request that an Interconnection Customer who will use its generating facility to serve Co-Located Load must specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load,694 (2) explaining that if an Interconnection Customer wants to serve Co-Located Load but not identify an Eligible Customer, then it may take steps to terminate its generating facility’s interconnection and serve the Co-Located Load fully islanded from PJM’s transmission system,695 (3) explaining that these requirements apply to all Interconnection Customers requesting to interconnect generating facilities to serve Co-Located Load,696 (4) creating a new schedule in the pro forma GIA in the form of a placeholder to specify operational procedures or data exchange requirements as may be required,697 and (5) revising the pro forma GIA to reflect the requirement to specify an Eligible Customer that will take transmission service on behalf of the Co-Located Load.698
295.
In addition, PJM states that it complies with the requirement to add a transition mechanism for existing customers that wish to add Co-Located Load by including the transition mechanism in (1) the definition of Co-Located Generating Facility in Part I of the Tariff, (2) Part III (NITS), and (3) the definition of Co-Located Generating Facility699694 Id. at 28 (citing PJM, Proposed Tariff, pt. VIII, subpt. B, § 403 (4.0.0), § 403(1)(r)).695 Id. at 29 (citing PJM, Proposed Tariff, pt. VIII, subpt. B, § 403 (4.0.0), § 403 (1)(r); Proposed Tariff, Part III (NITS) (4.0.0)).696 Id. (citing PJM, Proposed Tariff, pt. VIII, subpt. B, § 403 (4.0.0), § 403(1)(r); Proposed Tariff, Part III (NITS) (4.0.0)).697 Id. (citing PJM, Proposed Tariff, pt. IX.B (GIA), (0.0.0), Schedule O).698 Id. (citing PJM, Proposed Tariff, pt. IX.B (GIA), (0.0.0), Schedule O).699 PJM proposes the following definition of a Co-Located Generating Facility: “an existing or planned Generating Facility that is physically connected to a Co-Located Load. Any Generation Project Developer with an effective Service Agreement that plans to use a Generating Facility to serve Co-Located Load must provide PJM and the Transmission Owner with advance written notice to begin the Necessary Studies process provided in Tariff, § VIII.A 401(H)(3)(b). If such a Generation Project Developer has an effective Interconnection Service Agreement pursuant to Tariff, Part VI or a Generation Interconnection Agreement pursuant to Tariff, Part VII, such agreement must be Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 300 Date Filed: 10/19/2026
PDF page 302
Docket No. EL25-49-002, et al.- 147 -
in Part VIII, Subpart A, section 400 of the Tariff. PJM asserts that these proposed revisions to the Tariff are “superior to or consistent with the Commission’s directive because it promotes tariff readability and usability.”700
c. Definition of Non-Retail BTMG
296.
PJM states that it is also seeking to avoid any inadvertent changes to the substantive rules pertaining to Non-Retail BTMG.701 For this reason, PJM proposes to add clarifying language in Tariff, Part III, section 34.3 providing that “The daily load of a Network Customer does not include load served by operating Non-Retail Behind The Meter Generation.”702 PJM states that this insertion preserves the status quo on this issue for Non-Retail BTMG.
3. Pleadings
a. Definition of Co-Located Load
297.
Constellation urges the Commission to reject PJM’s proposal to replace the term “Point of Interconnection” in the definition of Co-Located Load with the “Point of Change in Ownership.”703 Constellation argues that changing the specific definition of Co-Located Load already approved by the Commission in the December Order is outside the scope of compliance. Constellation asserts that Point of Change in Ownership is not a defined physical point and may lead to delays or discrimination against certain Co-Location Arrangements. Constellation states that, alternatively, if the Commission accepts PJM’s proposed definition of Co-Located Load, it should (1) direct PJM to revise its Tariff to provide that PJM will determine the Point of Change in Ownership if parties cannot agree; (2) establish deadlines for parties to mutually agree to, or for PJM to determine, the location for Point of Change in Ownership; (3) ensure that the location selected for the Point of Change in Ownership does not eliminate the load from being Co-Located Load unless the Project Developer and Co-Located Load desire it; and superseded by a Generation Interconnection Agreement pursuant to Tariff, Part VIII and the pro forma GIA in Part IX, Subpart B.” PJM, Proposed Tariff, § VII.A 300 (Definitions C) (4.0.0); § VIII.A 400, Definitions C (4.0.0).
700 Compliance Transmittal at 29-30.701 Id. at 16.702 Id.703 Constellation Protest and Comments on Compliance Filing at 2. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 301 Date Filed: 10/19/2026
PDF page 303
Docket No. EL25-49-002, et al.- 148 -
(4) not tolerate any discrimination or delay and use its enforcement authority or other mechanisms to ensure non-discriminatory open access.704
298.
Constellation asserts that recent experience has borne out the concern raised in its initial protest that PJM’s deviation from the Commission’s definition of Co-Located Load will allow transmission owners to effectively block Co-Location Arrangements.705 Constellation states that a transmission owner recently notified Constellation that it would not study Constellation’s proposed design for a Co-Location Arrangement unless Constellation agreed to transfer ownership of certain facilities to the transmission owner, which would mean that the load would no longer be on the generator’s side of the Point of Change in Ownership.706 Constellation argues that, by conditioning the load’s interconnection on the transmission owner’s ownership of those facilities, the transmission owner would prohibit Constellation’s ability to host Co-Located Load at the site and limit the ability of the Co-Located Load to access the transmission services adopted in the December Order.
299.
Vistra requests that the Commission reject PJM’s use of “Point of Change in Ownership” in its proposed definition of Co-Located Load.707 Vistra argues that PJM’s proposed revision to the definition of Co-Located Load creates uncertainty and an opportunity for transmission owners to unduly discriminate against certain customers. Vistra requests that, if the Commission accepts PJM’s proposed definition, then the Commission should direct further compliance to prevent undue discrimination.708 300.
Energy Artisans oppose PJM’s definition of Co-Located Load and its use of Point of Change in Ownership rather than Point of Interconnection as arbitrary and a pretext for cost shifting.709 Energy Artisans allege that the definition “is strategically designed to shrink the legal definition of the facility boundary, thereby capturing more load for grid-service billing and excluding it from the BTMG actual use category.”710704 Id. at 3-5, 7-8.705 Constellation Supplemental Protest of Compliance Filing at 2.706 Id. at 3.707 Vistra Protest of Compliance Filing at 17.708 Id. at 18-19.709 Energy Artisans Protest of Compliance Filing at 2.710 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 302 Date Filed: 10/19/2026
PDF page 304
Docket No. EL25-49-002, et al.- 149 -
b. Generation Interconnection Procedures, pro forma GIA,
and Common Service Provisions
301.
Invenergy argues that PJM proposes to continue operating a bifurcated study process in which there is no requirement for generator interconnection and transmission service request studies to be conducted in concert, on similar time frames, or using similar study assumptions. As a result, Invenergy contends that distinct studies may identify duplicative or unnecessary Network Upgrades. Invenergy requests that the Commission and PJM clarify how the definition of Eligible Customer applies to co-located generators and co-located loads.711
302.
Constellation urges the Commission to direct PJM to revise its proposed definition of Co-Located Generating Facility to clarify that the definition only applies to the portion of the facility serving and physically connected to the Co-Located Load.712 c. Definition of Non-Retail BTMG
303.
AMP argues that PJM’s proposed revision to the definition of Non-Retail BTMG could be construed as preventing generating units that are merely eligible for application of the Non-Retail BTMG rules from participating in Co-Located Load configurations. Specifically, AMP asserts that the use of the word “qualifies” in the proposed definition of Non-Retail BTMG may exclude generation from participating in Co-Located Load configurations even if the generator is not engaged in netting. AMP argues that this apparently unintentional exclusion would restrict Co-Located Load from accessing service from a broad set of PJM generators. AMP avers that revising the Non-Retail BTMG definition is unnecessary and outside the scope of the Commission’s compliance directives. AMP urges the Commission to reject the proposed definition of Non-Retail BTMG or, alternatively, revise the definition to specify that the exclusion applies to generators both qualifying as Non-Retail BTMG and being used for netting under the Tariff.713
d. Timing with Planned Reliability Backstop Auction
304.
The Maryland OPC urges the Commission to defer action on PJM’s proposed revisions until PJM announces details regarding its planned reliability backstop auction, including specifics on how the reliability backstop auction will interact with Co-Location Arrangements to ensure that new Co-Located Loads pay the costs of any new capacity.
711 Invenergy Comments on Compliance Filing at 3, 6.712 Constellation Protest and Comments on Compliance Filing at 17.713 AMP Limited Protest of Compliance Filing at 3, 5-8. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 303 Date Filed: 10/19/2026
PDF page 305
Docket No. EL25-49-002, et al.- 150 -
The Maryland OPC argues that the proposed Tariff revisions fail to explain how increased capacity costs of allowing existing generators to serve Co-Located Load, as opposed to new generators, will be paid by Co-Located Load and not by existing ratepayers.714
4. Answers
305.
In response to Invenergy, Indicated TOs argue that the Commission should not mandate a combined interconnection and transmission study process for Co-Located Loads and Co-Located Generators. Indicated TOs contend this goes beyond the issues the Commission set for hearing, as well as the compliance directed, in the December Order. Indicated TOs argue that PJM’s proposed coordinated study approach is just and reasonable.715
306.
Exelon argues that Constellation’s motion for supplemental protest should be denied because it suggests that Constellation’s experience with one transmission owner implies a universal policy. Exelon states that it is not attempting to prevent large loads, co-located or otherwise, and their load serving entities from receiving transmission service in Exelon’s territories. Exelon also argues that whether a transmission owner owns certain equipment does not necessarily inform where the Project Developer’s interconnection facilities connect to the transmission owner’s interconnection facilities.716
5. Determination
a. Definition of Co-Located Load
307.
As in the Commission’s order addressing PJM’s first compliance filing with the December Order, we reject PJM’s proposed change to the definition of Co-Located Load.717 We note that no party, including PJM, sought rehearing or clarification of this directive, let alone the definition, in response to the December Order. Even here, PJM does not allege that the definition of Co-Located Load set out in the December Order is unjust and unreasonable. Rather, PJM proposes to deviate from this definition by replacing the term “Point of Interconnection” with “Point of Change in Ownership”
714 Maryland OPC Protest of Compliance Filing at 10-11.715 Indicated TOs April 24 Answer at 4-5.716 Exelon Answer at 1, 5-6.717 PJM Interconnection, L.L.C., 195 FERC ¶ 61,030; PJM, Proposed Tariff, § I.1 Definitions C-D (Co-Located Load) (46.0.0); § VII.A 300, Definitions C (Co-Located Load) (4.0.0); § VIII.A 400, Definitions C (Co-Located Load) (4.0.0). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 304 Date Filed: 10/19/2026
PDF page 306
Docket No. EL25-49-002, et al.- 151 -
without sufficient explanation as to how this proposed deviation complies with the Commission’s directive in the December Order.718
308.
Accordingly, we direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing that revises the Tariff’s definition of Co-Located Load to use “Point of Interconnection” instead of “Point of Change in Ownership,” consistent with the Commission’s directive in the December Order.
b. Generation Interconnection Procedures, pro forma GIA,
and Common Service Provisions
309.
We accept the following of PJM’s proposed revisions to establish rules for Interconnection Customers serving Co-Located Load as complying with the December Order: (1) adding to the list of requirements for a New Service Request that an Interconnection Customer who will use its generator to serve Co-Located Load must specify an Eligible Customer who will take transmission service on behalf of the Co-Located Load;719 (2) establishing a new schedule in the pro forma GIA that serves as a placeholder for specifying any operational procedures or data exchange requirements that PJM deems necessary for Co-Location Arrangements;720 (3) applying these requirements to all Interconnection Customers requesting to interconnect their generators to the transmission system and seeking to use those facilities to serve Co-Located Load;721 (4) clarifying that to the extent that an Interconnection Customer wishes to serve Co-Located Load using its generator but not identify an Eligible Customer, then the Interconnection Customer may take steps to terminate its generator’s interconnection to the PJM transmission system and serve the Co-Located Load fully islanded from PJM’s
718 See, e.g., PJM Interconnection LLC, 119 FERC ¶ 61,179 at P 12 (“The purpose of a compliance filing is to make the directed changes and the Commission’s focus in reviewing them is whether they comply with the Commission’s previously stated directives.”) (citing AES Huntington Beach, LLC, 111 FERC ¶ 61,079 at P 60 & n.25).719 See December Order, 193 FERC ¶ 61,217 at P 188; PJM, Proposed Tariff, pt. VIII, subpt. B, 403 (4.0.0), § 403(1)(r).720 See December Order, 193 FERC ¶ 61,217 at P 188; PJM, Proposed Tariff, Part IX.B, Schedule O (0.0.0). PJM explains that it proposes to add a new schedule in the pro forma GIA in the form of a placeholder for such information as the case may require. Compliance Transmittal at 29. We also accept conforming changes to Tariff, Part IX.B, GIA Appendices and Schedules.721 See December Order, 193 FERC ¶ 61,217 at P 189; PJM, Proposed Tariff, pt. VIII, subpt.B, 403 (4.0.0), § 403(1)(r). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 305 Date Filed: 10/19/2026
PDF page 307
Docket No. EL25-49-002, et al.- 152 -
transmission system;722 and (5) revising the pro forma GIA to specify that an Interconnection Customer that will use its generator to serve Co-Located Load must specify an Eligible Customer that will take transmission service on behalf of the Co-Located Load.723
310.
However, we reject PJM’s proposed revisions to comply with the Commission’s directive in the December Order to require Interconnection Customers with ISAs or GIAs executed (or requested to be filed unexecuted) prior to the effective date of the revised generation interconnection procedures and pro forma GIA directed in that order that wish to add Co-Located Load or are currently serving Co-Located Load to publicly notify PJM of that addition and identify the Eligible Customer that will take transmission service on behalf of that Co-Located Load.724 Consistent with our discussion above in Part V.C.4, we agree with protesters that PJM’s proposed revisions here go beyond the directives in the December Order by requiring Interconnection Customers with existing ISAs or GIAs that are currently serving Co-Located Load or wish to add Co-Located Load (and have executed Necessary Study Agreements) to initiate a new Necessary Study process and enter into a new GIA—which the December Order did not require.725 Therefore, while we appreciate PJM’s intent to promote Tariff readability and usability, we find that PJM’s language in the definition of Co-Located Generating Facility does not comply with the December Order, consistent with our findings regarding the same language in Part III of the Tariff.726 We further find that PJM has failed to include a general provision in the Tariff to comply with the Commission’s directive in the December Order to require Interconnection Customers with ISAs or GIAs executed (or requested to be filed unexecuted) prior to the effective date of the revised generation interconnection procedures and pro forma GIA directed in that order that wish to add Co-Located Load or are currently serving Co-Located Load to publicly notify PJM of that addition and
722 See December Order, 193 FERC ¶ 61,217 at P 189; PJM, Proposed Tariff, pt. VIII, subpt. B, § 403 (4.0.0), § 403(1)(r).723 See December Order, 193 FERC ¶ 61,217 at P 190; PJM, Proposed Tariff, pt. IX (GIA), subpt. B, Schedule O (0.0.0).724 See December Order, 193 FERC ¶ 61,217 at P 191; PJM, Part III (NITS) (4.0.0); § VII.A 300, Definitions C (Co-Located Generating Facility) (4.0.0); § VIII.A 400, Definitions C (Co-Located Generating Facility) (4.0.0). We note that the definition of Co-Located Generating Facility in § I.1 Definitions C-D does not include the language that we are rejecting here.725 See, e.g., Vistra Protest of Compliance Filing at 4, 14.726 See supra Part V.C.4. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 306 Date Filed: 10/19/2026
PDF page 308
Docket No. EL25-49-002, et al.- 153 -
identify the Eligible Customer that will take transmission service on behalf of that Co-Located Load, separate from the Necessary Study process.
311.
Therefore, we direct PJM to submit a compliance filing within 60 days of the date of issuance of this order to: (1) revise the definition of Co-Located Generating Facility to remove the following requirement: “If such a Generation Project Developer has an effective Interconnection Service Agreement pursuant to Tariff, Part VI or a Generation Interconnection Agreement pursuant to Tariff, Part VII, such agreement must be superseded by a Generation Interconnection Agreement pursuant to Tariff, Part VIII and the pro forma GIA in Part IX, Subpart B,” and (2) add to Part III a requirement that Interconnection Customers with ISAs or GIAs executed (or requested to be filed unexecuted) prior to the effective date of the revised generation interconnection procedures and pro forma GIA directed in December Order that wish to add Co-Located Load or are currently serving Co-Located Load publicly notify PJM of that addition and identify the Eligible Customer that will take transmission service on behalf of that Co-Located Load.
312.
We disagree with Constellation that PJM’s proposed definition of Co-Located Generating Facility should only apply to the portion of the facility that is serving Co-Located Load. Constellation claims that the definition does not recognize that the entire facility may not serve the Co-Located Load, but Constellation has not identified any substantive concern with that outcome. We find the proposed definition is broad enough to capture both scenarios. Further, PJM’s proposed Tariff language recognizes this possibility elsewhere, such as, for example, Part IX, Subpart A Form of Application and Studies Agreement, section 2, which leaves a space for the Interconnection Customer to list both the Co-Located Load and any requested CIRs.
313.
With respect to Invenergy’s request that PJM perform generator interconnection and transmission service request studies in concert, we note that the December Order did not direct PJM to create such a new study process. Thus, we find that Invenergy’s request is beyond the scope of this proceeding.
c. Definition of Non-Retail BTMG
314.
We agree with AMP that PJM’s proposed revisions to the definition of Non-Retail BTMG may inadvertently prevent generators that could merely qualify as Non-Retail BTMG from participating in Co-Location Arrangements, regardless of whether the generator is being used to net. As PJM recognizes, the December Order “did not direct any changes to Non-Retail BTMG rules.”727 PJM did not provide any justification for its proposed changes to the definition of Non-Retail BTMG, nor did the Commission direct
727 Compliance Transmittal at 7. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 307 Date Filed: 10/19/2026
PDF page 309
Docket No. EL25-49-002, et al.- 154 -
any changes to PJM’s rules for Non-Retail BTMG in the December Order.728 Therefore, we reject PJM’s proposed revisions to the definition of Non-Retail BTMG and direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff to remove the proposed changes, consistent with the December Order’s determination.729
d. Timing with Planned Reliability Backstop Auction
315.
As discussed below, we decline Maryland OPC’s request that the Commission defer action.730 We find that Maryland OPC’s concerns about PJM’s capacity market are beyond the scope of this compliance proceeding, which pertains solely to PJM’s compliance with the Commission’s directives in the December Order.
E. Effective Date
1. PJM Compliance Filing
316.
PJM requests a placeholder effective date of 12/31/9998 because PJM cannot implement the Tariff changes until the Commission sets the terms and conditions of the new transmission services in the paper hearing.731 PJM states that it will submit a clean-up filing proposing an effective date after the Commission issues an order on the paper hearing.732
2. Effective Date Pleadings
317.
Though Vistra says it will address PJM’s proposed June 1, 2029 effective date in its paper hearing brief, Vistra argues in its protest of the compliance filing that PJM has not shown that its proposed effective date is just and reasonable.733 Vistra alleges that the three-year forward capacity market schedule cannot justify a delay in the provision of non-capacity-backed transmission service. Vistra also contends that the forecasts for the
728 December Order, 193 FERC ¶ 61,217 at P 222 (“We clarify we do not direct PJM to change its rules for non-retail BTMG.”).729 PJM, Proposed Tariff, § I.1 Definitions L-M-N (Non-Retail Behind The Meter Generation) (52.0.0).730 See supra Part VI.K.2.731 Compliance Transmittal at 35.732 Id. at 35-36.733 Vistra Protest of Compliance Filing at 7. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 308 Date Filed: 10/19/2026
PDF page 310
Docket No. EL25-49-002, et al.- 155 -
2027/2028 and 2028/2029 Base Residual Auctions (BRA) include the new large loads likely to come online in that timeframe, undermining PJM’s position that the capacity market schedule should delay the provision of firm transmission service. Vistra also argues that PJM has not explained why it will take until 2029 to update its software to accommodate the new curtailment logic.
318.
DCC argues that PJM’s effective date should be earlier than June 1, 2029.734 DCC argues that PJM should work with stakeholders to implement workable solutions in a timely manner that ensures the transmission services can meet the immediate need within the PJM region.
3. Determination
319.
As discussed below in Part VI.J, we direct PJM to submit, within 60 days of the date of issuance of this order, a further compliance filing providing additional information on the effective date.
VI. Paper Hearing
320.
The Commission directed PJM to modify its Tariff to require that the Eligible Customer taking transmission service on behalf of a Co-Located Load takes one of three transmission services: (1) NITS or Interim NITS, (2) FCD transmission service, or
(3) NFCD transmission service.735 With respect to the new transmission services that the Commission required, the Commission established paper hearing procedures to determine the appropriate rates, terms, and conditions of those transmission services.736 PJM did not file tariff revisions in eTariff, but rather, chose to submit illustrative tariff revisions that mirror the arguments PJM filed in its initial brief as part of that brief. The illustrative tariff is not filed as a rate with the Commission, but we consider it as part of the record in response to the paper hearing as we establish the replacement rate set forth below. As discussed in detail below, as the replacement rate, we direct PJM to submit within 60 days of the date of issuance of this order, a compliance filing revising its Tariff to include rates, terms, and conditions for the new transmission services consistent with our findings in the below sections.
734 DCC Comments on Compliance Filing at 7.
735 December Order, 193 FERC ¶ 61,217 at P 193.736 Id. PP 194, 203, 207, 219. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 309 Date Filed: 10/19/2026
PDF page 311
Docket No. EL25-49-002, et al.- 156 -
A. Rates, Terms, and Conditions for Firm and Non-Firm Contract
Demand Transmission Service
1. December Order
321.
With respect to FCD transmission service and NFCD transmission service, the Commission found in the December Order that these transmission services should be permanent transmission services available to Eligible Customers taking transmission service on behalf of Co-Located Load.737 The Commission further stated that for the Eligible Customer taking transmission service on behalf of a Co-Located Load to be eligible for these new transmission services, the Co-Located Load must be able and willing to prevent or limit its energy withdrawals and must be separately metered from the associated generator.738 The Commission also stated that Eligible Customers taking transmission service on behalf of Co-Located Loads may take a combination of FCD transmission service and NFCD transmission service, but that Eligible Customers taking transmission service on behalf of Co-Located Loads that will not withdraw energy from the transmission system must take NFCD transmission service at 0 MW.739 The Commission also found that Eligible Customers taking either transmission service on behalf of Co-Located Loads would be charged for regulation and black start services based on gross demand, rather than the reserved amount of transmission service.740 322.
The Commission found that FCD transmission service should have the same reservation and curtailment priority as existing firm transmission services at the level of the contract demand and be charged for transmission, ancillary services, and capacity based on the contract demand, with the exception of regulation and black start services.741 With respect to NFCD transmission service, the Commission found that the service should be available during normal operations and curtailed during emergency operations, similar to existing non-firm transmission service options.742737 Id. P 206.738 Id.739 Id.740 Id. PP 209, 216.741 Id. PP 208-209.742 Id. P 215. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 310 Date Filed: 10/19/2026
PDF page 312
Docket No. EL25-49-002, et al.- 157 -
2. Nature of FCD and NFCD Transmission Services
a. Initial Briefs
323.
PJM proposes to define FCD transmission service as the transfer of capacity and energy for an Eligible Customer on behalf of a designated Co-Located Load, up to a defined, pre-determined MW level of transmission service as requested by the Eligible Customer and confirmed by PJM, using capacity and energy procured by PJM.743 PJM proposes to define NFCD transmission service as a service offering the transmission of energy for an Eligible Customer on behalf of a designated Co-Located Load, on an as-available basis, up to a defined, pre-determined MW level of transmission service as requested by the Eligible Customer and confirmed by PJM, using energy procured by PJM.744
324.
PJM states that it has conceptualized the FCD and NFCD transmission services based on two key principles: (1) the services are designed to serve loads willing and able to control their withdrawals from the transmission system, and (2) the services are designed to allow PJM to maintain system reliability.745 PJM explains that, to maintain reliability, any portion of the gross demand of the Co-Located Load not served by the Co-Located Generator must be covered by FCD transmission service. PJM also states that, to ensure reliability, PJM’s studies of the transmission service requests for the Co-Located Load must capture the effects of any unscheduled energy withdrawals and validate that such events would not jeopardize system reliability.746 PJM then asserts that, if the Co-Located Load’s gross demand is not covered by FCD transmission service, then the Eligible Customer must cover the remaining gross demand by applying for NFCD transmission service. PJM further states that an Eligible Customer taking service on behalf of a Co-Located Load must request NFCD transmission service equal to the MW level of the Co-Located Generating Facility dedicated to serving the Co-Located Load, so that the customer is eligible to obtain NFCD transmission service if the Co-Located Generating Facility is on outage.747 PJM states that it anticipates that, in practice, requests for NFCD transmission service will be at the MW level that the Co-Located Generating Facility has dedicated to serving the Co-Located Load. PJM states that the Eligible Customer may then, on any given day, reserve NFCD transmission
743 PJM Initial Brief at 13.744 Id. at 30.745 Id. at 6.746 Id. at 6-7.747 Id. at 9, 16. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 311 Date Filed: 10/19/2026
PDF page 313
Docket No. EL25-49-002, et al.- 158 -
service up to the amount specified in the Service Agreement, but only when PJM has determined there is available transmission capacity. If there is not sufficient capacity to grant the request for NFCD transmission service, PJM explains the Eligible Customer may apply for FCD transmission service for the necessary amount, or NITS to serve the entire Co-Located Load.748 PJM maintains that its approach provides flexibility, allowing Eligible Customers to mix and match FCD and NFCD transmission services, so long as the combination of the two services covers the entire gross demand of the Co-Located Load.749
325.
PJM argues that, to prevent FCD and NFCD transmission services from adversely impacting system reliability, it is crucial for the Eligible Customer to show and prove its ability to limit withdrawals from the system. PJM maintains that, for FCD transmission service to properly function, it is essential that any NFCD transmission service for the same Co-Located Load has in place necessary control technologies and/or protective systems approved by PJM and that can effectively limit withdrawals from the transmission system that serve the Co-Located Load.750 PJM proposes to require Eligible Customers taking NFCD transmission service to work with PJM and the affected Transmission Owners to establish necessary control technologies and protection systems for each Service Agreement to ensure reliability.751
326.
PJM explains that FCD transmission service will have priority over NFCD transmission service and equal priority, at the level of the contract demand, with other firm transmission services, including NITS. PJM proposes that NFCD transmission service be curtailed before FCD transmission service and NITS, as discussed further below, and proposes to curtail NFCD transmission service prior to dispatching Pre- Emergency Load Response Program resources or in response to a transfer capability shortage.752748 Id. at 32-33.749 Id. at 11.750 Id. at 15, 31.751 Id. at 34-35.752 Id. at 15, 34. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 312 Date Filed: 10/19/2026
PDF page 314
Docket No. EL25-49-002, et al.- 159 -
b. Response Briefs
327.
Indicated TOs support PJM’s proposal to require Eligible Customers taking service on behalf of Co-Located Load to take a combination of FCD and NFCD transmission services equivalent to the entire gross demand of the Co-Located Load.753 328.
However, a number of parties protest PJM’s proposed requirement that NFCD transmission service be available only when the Co-Located Generating Facility is on an outage.754 Parties argue that the December Order does not impose such a limit on this transmission service and that PJM provides no justification for the change.755 AEU/SEIA contend that the December Order required that NFCD transmission service be available “as needed during normal, non-emergency system operating conditions,” and that, while it cited the use of NFCD transmission service during an outage as one potential use case, the December Order did not impose the limitation described in PJM’s proposed Tariff revisions.756 AEU/SEIA claim that the practical consequences of this limitation are significant, particularly for Co-Located Loads served by resources with variable or intermittent output profiles, which may require supplemental grid withdrawals during any period in which the Co-Located Generator’s output is constrained, reduced, or otherwise insufficient to meet the full gross demand of the Co-Located Load. AEU/SEIA argue that this gap in the availability of NFCD transmission service will force many transmission customers to take NITS.
329.
AEU/SEIA contend that PJM attempts to justify this restriction on operational and planning complexity grounds, but argues that the Commission considered these objections before the December Order and nonetheless required PJM to provide NFCD transmission service.757 AEU/SEIA also contend that this restriction cannot be justified on resource adequacy or reliability grounds, because NFCD transmission service is
753 Indicated TOs Response Brief at 4; Industrials/Amtrak Response Brief at 24.754 Joint Co-Location Developers Response Brief at 6-13; AEU/SEIA Response Brief at 5; Vistra Response Brief at 25; DCC Response Brief at 4; Constellation Response Brief at 10.755 Vistra Response Brief at 26; AEU/SEIA Response Brief at 5-6; Joint Co-Location Developers Response Brief at 7; DCC Response Brief at 5; Constellation Response Brief at 10.756 AEU/SEIA Response Brief at 6-8 (citing December Order, 193 FERC ¶ 61,217 at PP 214-215); Joint Co-Location Developers Response Brief at 6-7.757 AEU/SEIA Response Brief at 8-10 (citing PJM March 24, 2025 Response at 13-15). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 313 Date Filed: 10/19/2026
PDF page 315
Docket No. EL25-49-002, et al.- 160 -
designed to be curtailed before firm transmission services and is available only when transmission capacity exists. AEU/SEIA therefore request that the Commission direct PJM to revise and file Tariff revisions that remove the outage-only limitation and allow for the use of NFCD transmission service on an as-available basis during normal, non-emergency system operating conditions and subject to available transmission capacity and appropriate curtailment priority.
330.
Joint Co-Location Developers argue that PJM’s proposal undermines economic efficiency, restricts competition, may threaten reliability for other customers, and is unclear as applied to partial outages.758 Joint Co-Location Developers maintain that PJM’s proposal is inconsistent with its other transmission service offerings, such as PTPS, which is not designed based on whether generation is on an outage. Joint Co-Location Developers add that PJM’s Interim NITS proposal shows PJM’s ability to offer non-firm service during normal conditions without the need to request a reservation. 331.
DCC argues that PJM’s proposal effectively confines NFCD transmission service to a narrow, outage-only function and prohibits its use to address foreseeable and manageable transmission constraints. DCC argues that PJM has not demonstrated why NFCD transmission service that is (a) requested in advance, (b) subject to PJM approval,
(c) fully curtailable, and (d) supported by required protection and control mechanisms, may appropriately be used to address generator outages but may not be used to address temporary transmission constraints.759
332.
Constellation also criticizes PJM’s view that this proposal is needed to avoid overuse and responds that the Commission indicated that penalty charges should solve that concern.760
333.
Constellation also protests PJM’s proposal to require FCD transmission service for any portion of the Co-Located Load not served by the Co-Located Generating Facility. Constellation argues that the Commission established no such requirement, nor did the Commission require that Eligible Customers take FCD transmission service along with NFCD transmission service.761758 Joint Co-Location Developers Response Brief at 8-11.759 DCC Response Brief at 5.760 Constellation Response Brief at 11-12.761 Id. at 10, 12. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 314 Date Filed: 10/19/2026
PDF page 316
Docket No. EL25-49-002, et al.- 161 -
334.
DCC argues that PJM’s proposal does not provide a workable pathway for phased development or load ramping.762 DCC argues that PJM’s proposal requires that gross load and generation configurations be specified upfront and treats material changes in those configurations as requiring new applications and studies while prohibiting the mixing of NITS and Contract Demand transmission services for the same load. DCC argues that, while PJM has acknowledged limited flexibility in certain circumstances, it does not provide a clear or workable pathway for customers to (a) ramp load over time,
(b) transition between service constructs, or (c) seek to align transmission service with phased project development. DCC argues that the absence of a defined ramping framework introduces uncertainty, increases the risk of delay, and may require repeated study cycles that are not aligned with project timelines. DCC argues that the Commission should require PJM to establish clear rules and processes that enable incremental load additions without triggering unnecessary re-study or requiring customers to fundamentally restructure their service arrangements.763
335.
Market Monitor argues that the assumption underlying NFCD transmission service, that load pays for transmission only when it needs transmission, is untenable.764 Market Monitor states that although NFCD transmission service can only be a standby service, the equivalent availability factor of generators in PJM demonstrates that NFCD transmission service would have to be used regularly. Market Monitor argues that if all or a significant part of data center users wanted to use NFCD transmission service, the system would become unmanageable and the service would not be available consistently, making it meaningless. Market Monitor asserts that there can be no such service as NFCD transmission service that is fully consistent with maintaining a reliable PJM transmission system, and all transmission customers should pay for full NITS service. c. Reply Briefs
336.
PJM argues that its proposal to limit NFCD transmission service to circumstances where the Co-Located Generator is on outage is just and reasonable, consistent with the December Order, and otherwise appropriate. PJM argues that, if customers could take unlimited NFCD transmission service, that would be tantamount to offering Interim NITS permanently.765 PJM next argues that the Commission stated in the December Order that NFCD transmission service would be available “as needed” for customers able to limit withdrawals, which suggests the Commission did not intend for this service to be used on
762 DCC Response Brief at 6.763 Id. at 6-7.764 Market Monitor Response Brief at 5-6.765 PJM Reply Brief at 6-7. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 315 Date Filed: 10/19/2026
PDF page 317
Docket No. EL25-49-002, et al.- 162 -
an everyday basis.766 Moreover, PJM argues, its proposal is appropriate given the inherent risks to the transmission system and operational complexities associated with providing this service continuously, given the limited time period the non-firm service will be required. PJM asserts that the transmission system is not planned and designed to accommodate these non-firm services under North American Electric Reliability Corporation (NERC) reliability standards.
337.
PJM maintains that several aspects of NFCD transmission service are challenging from a reliability perspective, given the range of requirements of NERC reliability standards. PJM alleges that the nature of NFCD transmission service dictates that PJM will not include this service in PJM’s long-term transmission planning and the system will not be evaluated for potential Corrective Action Plans, nor will PJM have procured capacity to serve this load.767 PJM also claims that, because NFCD transmission service relies on transmission capacity that is not currently used, PJM is unlikely to be in a position to provide this service during peaks or other times when the system is operating under stressed conditions. PJM argues that, from a transmission planning perspective, NFCD transmission service increases the operational risk of System Operating Limit and Interconnection Reliability Operating Limit (SOL/IROL) exceedances by operating the system with a reduced margin for contingency to accommodate high-volume loads.768 PJM contends that this operation increases the risk of an emergency occurring if unexpected conditions occur. PJM argues that providing NFCD transmission service will almost inevitably require significant adjustments to PJM’s Operating Plan to mitigate exceedances of SOLs/IROLs each time service is provided due to the nature of the service. PJM maintains that, by definition, NFCD transmission service involves a customer drawing large quantities of power over transmission facilities that were not designed to serve that load and thus will almost certainly necessitate flowing power over various facilities near system limits.769
338.
Indicated TOs support PJM’s proposals to restrict the use of NFCD transmission service to periods when on-site generation is on outage and claim that the Commission did not intend for this service to be a substitute for FCD transmission service or NITS for the portion of on-site load that will not be served by on-site generation. Indicated TOs argue that there is no compelling reason for NFCD transmission service to be available
766 Id. at 7 (quoting December Order, 193 FERC ¶ 61,217 at P 215).767 Id. at 9-10.768 Id. at 11-12.769 Id. at 12-13. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 316 Date Filed: 10/19/2026
PDF page 318
Docket No. EL25-49-002, et al.- 163 -
during non-outage conditions.770 Indicated TOs claim that limiting the use of NFCD transmission service is necessary to ensure the reliable operation of the PJM transmission system, particularly because of the increasing use of special protection schemes, remedial action schemes, and other control technologies and protective systems. Indicated TOs recommend that PJM clarify in the Tariff that an “outage” for these purposes is limited to periods where a generator is offline due to a breakdown or maintenance issues and does not cover other instances when a generator is not operating.771
339.
Joint Co-Location Developers urge the Commission to reject PJM’s attempt to limit the availability of NFCD transmission service and require PJM to establish a NFCD transmission service product available during normal system conditions as required by the December Order.772 Joint Co-Location Developers contend that the workable non-firm transmission service offerings that are broadly available are fully consistent with reliable system operation, as demonstrated in other regions that are rapidly moving to implement non-firm transmission service offerings.773 Joint Co-Location Developers argue that limiting the scope of NFCD transmission service scheduling to generator outages, as PJM proposes, will increase reliance on simple withdrawal-limiting protection systems rather than decrease it because it will increase the frequency with which a customer will not be authorized to withdraw.774 Joint Co-Location Developers explain that this is because withdrawal-limiting protection systems are only active when the customer cannot withdraw, i.e., because no transmission service has been scheduled. Joint Co-Location Developers argue that PJM should limit the arming of remedial action schemes, or avoid installing them in the first place, and instead maximize use of pre-contingency NFCD transmission service curtailment through scheduling, which is similar to how Southwest Power Pool, Inc. (SPP) and Electric Reliability Council of Texas (ERCOT) envision curtailment under the non-firm transmission services that they are developing.775
340.
In response to DCC’s concerns about phasing in Co-Located Load, PJM maintains that its proposal provides a workable pathway for phased development or load
770 Indicated TOs Reply Brief at 3-4.771 Id. at 5-6.772 Joint Co-Location Developers Reply Brief at 10-11.773 Id. at 1.774 Id. at 7.775 Id. at 8. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 317 Date Filed: 10/19/2026
PDF page 319
Docket No. EL25-49-002, et al.- 164 -
ramping.776 PJM argues that the obvious path for Co-Located Load that increases over time is NITS, a transmission service designed to accommodate load growth. If an Eligible Customer elects Contract Demand transmission service, any change to the contracted amount would require a new service request. PJM adds that the Eligible Customer could elect to request Interim NITS or FCD transmission service for their full load amount ahead of time and use that capacity as their demand increases up to the applied for service level. PJM explains that the Commission directed PJM to offer FCD and NFCD transmission services as an alternative to NITS; thus, it is reasonable for this new service to not accommodate load growth as NITS does.
d. Answer
341.
Geronimo Power asserts that PJM’s proposed restrictions on NFCD transmission service are inconsistent with the December Order and should be rejected.777 In response to PJM’s and Indicated TOs’ concerns with making this service more broadly available, Geronimo Power argues that PJM does not need to expand its transmission system or otherwise change its operations to accommodate this load; rather, it merely needs to allow such load to take transmission service when it is available.778 Geronimo Power argues that the effect of PJM’s proposal will be to severely limit co-location opportunities in PJM, because large loads will need to either co-locate with a resource that can be called upon at all times or to take NITS or FCD transmission service that will result in the same inefficient and costly grid buildout that the December Order sought to avoid.779 e. Determination
342.
As discussed below, we find that PJM’s proposal does not comply with the Commission’s directives in the December Order and would fundamentally alter the nature of the FCD and NFCD transmission services that the Commission directed PJM to develop. PJM proposes to require that the Eligible Customer taking transmission service on behalf of a Co-Located Load must take sufficient transmission service to account for the entire gross demand of the Co-Located Load.780 PJM states that an Eligible Customer taking service on behalf of a Co-Located Load must request NFCD transmission service equal to the MW level of the Co-Located Generator dedicated to serving the Co-Located
776 PJM Reply Brief at 37-38.777 Geronimo Power May 21 Answer at 4.778 Id. at 6.779 Id. at 7.780 PJM Initial Brief at 6, 9. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 318 Date Filed: 10/19/2026
PDF page 320
Docket No. EL25-49-002, et al.- 165 -
Load, so that the customer is eligible to obtain NFCD transmission service if the Co-Located Generator is on outage.781 PJM also explains that any portion of the gross demand of the Co-Located Load not served by the Co-Located Generator must be covered by FCD transmission service.782 This proposal would tie the amount of FCD and NFCD transmission services that an Eligible Customer can request to the size of the Co-Located Generator, rather than allowing the Eligible Customer to select any amount, including 0 MW for NFCD transmission service, as the Commission directed. Specifically, the December Order stated that Eligible Customers on behalf of Co-Located Loads would be able to take a combination of FCD and NFCD transmission services, but that “Eligible Customers taking transmission service on behalf of Co-Located Loads that will not withdraw energy from the transmission system must take [NFCD] transmission service at 0 MW.”783 PJM’s proposal would do the opposite. An Eligible Customer taking transmission service on behalf of a Co-Located Load that wished to be served entirely by the Co-Located Generator, and not withdraw any energy from the transmission system, would be required under PJM’s proposal to request NFCD transmission service at a level of contract demand equal to the Co-Located Load’s gross load.784 Moreover, contrary to PJM’s proposal, nothing in the December Order would require an Eligible Customer taking transmission service on behalf of a Co-Located Load to take FCD transmission service at a level of contract demand that reflects the amount of load not served by the Co-Located Generator (or, for that matter, to take FCD transmission service at all). In short, the December Order does not link the level of contract demand for either FCD or NFCD transmission service that an Eligible Customer may take on behalf of a Co-Located Load to the size of the Co-Located Generator or the size of the Co-Located Load.
343.
Taken together, PJM’s proposed new conditions on FCD and NFCD transmission services mean that if PJM determines as a result of studies that it cannot accommodate a request for NFCD transmission service, the Eligible Customer will be required to request and take a firm transmission service (FCD transmission service or NITS) on behalf of the Co-Located Load instead. In the December Order, the Commission directed PJM to implement FCD and NFCD transmission services in response to a finding that the Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain
781 Id. at 9, 16.782 Id. at 6-7.783 December Order, 193 FERC ¶ 61,217 at P 206.784 PJM Initial Brief at 9. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 319 Date Filed: 10/19/2026
PDF page 321
Docket No. EL25-49-002, et al.- 166 -
conditions.785 PJM’s proposal does not address this finding and proposes to create FCD and NFCD transmission services that continue to fail to recognize this flexibility. Moreover, requiring an Eligible Customer seeking to take transmission service on behalf of a Co-Located Load to take FCD transmission service or NITS instead of NFCD transmission service when it does not seek to take firm transmission service would be inconsistent with the Commission’s finding in the December Order that the lack of the required new transmission services could result in unnecessary, costly, and inefficient Network Upgrades, increasing Network Upgrade costs.786 While we recognize that PJM may determine that there is insufficient available transmission capacity to fulfill a request for NFCD transmission service,787 in that scenario, the Eligible Customer seeking to take that service on behalf of a Co-Located Load should then be able to decide whether it would prefer to request FCD transmission service or NITS to serve the load – in which case it may be responsible for Network Upgrade costs – or to take 0 MW of NFCD transmission service and thus have no contractual right to withdraw power from the transmission system.
344.
PJM’s proposal is also inconsistent with the December Order in that PJM proposes to limit the amount of NFCD transmission service that may be reserved by an Eligible Customer to a MW level equivalent to the amount of the Co-Located Generator that is on outage.788 The December Order did not require such a restriction and instead contemplated that NFCD transmission service would be available during “normal” operations when there is sufficient available transmission capacity,789 providing Eligible Customers seeking to take transmission service on behalf of Co-Located Loads the
785 December Order, 193 FERC ¶ 61,217 at P 193.786 See id. P 177 (“[F]or Eligible Customers taking service on behalf of Co-Located Loads that do not reserve transmission or take energy from the transmission system but which receive only regulation and black start services, or that otherwise are willing and able to limit their energy withdrawals from the transmission system, requiring such Eligible Customers to take NITS on behalf of these Co-Located Loads may in some circumstances result in costly and inefficient transmission system buildout that may not be necessary if such Eligible Customers are willing and able to take a transmission service that requires fewer Network Upgrades to provide, and therefore may result in lower Network Upgrade costs, than would NITS.”).787 See id. P 215 (stating that reservations for NFCD transmission service “would be available only when there is available transmission capacity, similar to existing non-firm transmission service options in the Tariff”).788 PJM Initial Brief at 32.789 December Order, 193 FERC ¶ 61,217 at PP 214-215. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 320 Date Filed: 10/19/2026
PDF page 322
Docket No. EL25-49-002, et al.- 167 -
flexibility to request to reserve any amount of NFCD transmission service, regardless of whether the Co-Located Generator was on outage. The Commission’s reference to NFCD transmission service and generator outages was an example and not a threshold requirement for an Eligible Customer to use this service.790 Regardless, because the Commission contemplated that the service would be available during normal operations when there is sufficient available transmission capacity, Eligible Customers seeking to take NFCD transmission service on behalf of Co-Located Loads must be permitted to request such service on an everyday basis. Further, contrary to the December Order, PJM’s proposal to allow Eligible Customers taking transmission service on behalf of Co-Located Loads to take NFCD transmission service only when the Co-Located Generator is on outage fails to reflect Eligible Customers taking transmission service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions because it removes the option to take NFCD transmission service instead of FCD transmission service for portions of the Co-Located Load that are not served by the Co-Located Generator.
345.
PJM argues that these changes to NFCD transmission service are necessary for reliability, to ensure all load is studied. We disagree. Co-Located Load is, as defined in the December Order, behind the Point of Interconnection of an interconnected generator, and PJM would already know the size of the generator and any Co-Located Load from the interconnection process (or Necessary Study), and possibly the transmission service application process. While the portion of load for which the Eligible Customer does not request transmission service would not be modeled by PJM in a transmission service request as withdrawing energy from the transmission system, this outcome is appropriate because the Eligible Customer is not intending to withdraw energy from the transmission system. However, the potential impact of the Co-Located Load on the reliability of the transmission system will still be studied as part of the Necessary Study process for the generator interconnection modification, or as part of a New Service Request. PJM already conducts dynamic studies for Co-Located Load, which evaluate all applicable NERC, PJM, and transmission owner-specific contingencies and criteria, consistent with PJM’s responsibilities to ensure system reliability.791 These studies utilize a composite load model that includes power electronics, cooling, and lighting loads, and the impact of the facility during this study is dependent on the physical parameters of the facility and
790 See id. P 214 (“Eligible Customers taking service on behalf of such loads may, however, still seek to withdraw energy from the transmission system from time to time when transmission capacity is available and not needed by firm customers. For example, an Eligible Customer could seek a transmission reservation for a Co-Located Load in advance for the duration of an expected outage of the associated generator.”) (emphasis added).791 PJM March 24, 2025 Response at 53. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 321 Date Filed: 10/19/2026
PDF page 323
Docket No. EL25-49-002, et al.- 168 -
its control behavior, not the level or type of transmission service taken.792 This model is a complete model of the facility.793 As such, PJM, as it currently does, will know the full impact of factors unrelated to the contract demand of the Co-Located Load, including impacts on stability margins, short circuit limits, power quality and harmonic distortion, voltage flicker, interaction of active power electronic controls with the system (e.g., mitigation of oscillatory behavior), impact of STATCOMs or other reactive compensation devices, and cyclical demand ramps in the sub-synchronous frequency range. PJM provides no explanation why this data already available to them is insufficient to fully study a Co-Located Load absent changes to NFCD transmission service.
346.
PJM also argues that providing NFCD transmission service will require adjustments to PJM’s Operating Plan to mitigate exceedances of SOLs/IROLs each time service is provided due to the nature of the service. While serving load using NFCD transmission service may reduce operating margins on the transmission system, PJM has presented no evidence that changes to PJM’s Operating Plan will be regularly needed. However, should PJM find, based on operating experience in implementing the NFCD transmission service, that significant and frequent manual adjustments are necessary, PJM may consider filing an FPA section 205 filing to adjust the curtailment priority of NFCD transmission service.
347.
PJM also argues that, by definition, NFCD transmission service involves a customer drawing large quantities of power over transmission facilities that were not designed to serve that load and thus will almost certainly necessitate flowing power over various facilities near system limits. While we acknowledge that NFCD transmission service is designed to use available transmission capacity that is not needed by firm transmission customers, we find that PJM’s assertion that providing such service will necessitate flowing power over various transmission facilities near system limits is speculative. In any case, as the Commission stated in the December Order, “[r]eservations under this service would be available only where there is available transmission capacity, similar to existing non-firm transmission service options in the
792 Id. We note that NERC has recommended use of the Power Electronic Reconnecting and Ceasing (PERC1) model, which is a different model than the current model PJM utilizes. However, the general principles are the same. See NERC, Essential Action to Industry: Computational Load Modeling, Studies, Instrumentation, Commissioning, Operations, Protection, and Control at 3 (2026), https://www.nerc.com/globalassets/programs/bpsa/alerts/level-3-computational-load- alert.pdf.793 See, e.g., PJM, PJM Dynamic Model Development Guidelines for Interconnection Analysis § 6, PJM Dynamic Model Development Guidelines. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 322 Date Filed: 10/19/2026
PDF page 324
Docket No. EL25-49-002, et al.- 169 -
Tariff.”794 And consistent with the Commission’s findings in establishing non-firm transmission service under its pro forma Open Access Transmission Tariff, providing non-firm transmission service increases efficiency by allowing customers to use lumpy transmission investment on an as-available basis and may reduce the costs for firm transmission service customers by allowing NFCD transmission service customers to offset the costs of that investment.795 However, we note that if PJM determines that there may be increased operational risks associated with providing NFCD transmission service, it may address those risks by increasing the transmission reliability margin that it uses when studying and determining whether to grant requests for NFCD transmission service. 348.
We recognize that the new FCD and NFCD transmission services represent a significant change in how transmission service has been historically offered in PJM. We also recognize that significant changes to PJM’s software may be necessary to integrate the FCD and NFCD transmission services, including to potentially automate some processes that are currently handled manually by operators with respect to curtailing non-firm transmission services. However, the Commission directed the new FCD and NFCD transmission services as the replacement rate after finding PJM’s existing Tariff unjust and unreasonable. We therefore direct PJM to submit a compliance filing within 60 days of the issuance of this order proposing Tariff revisions to permit Eligible Customers to elect to take FCD transmission service or NFCD transmission service without the limitations that PJM proposes (i.e., (1) the requirement that the Eligible Customer taking transmission service on behalf of a Co-Located Load must take sufficient transmission service to account for the entire gross demand of the Co-Located Load, (2) the requirement for an Eligible Customer taking transmission service on behalf of a Co-Located Load to take FCD transmission service at a level of contract demand that reflects the amount of load not served by the Co-Located Generator, (3) the requirement that an Eligible Customer taking service on behalf of a Co-Located Load must request NFCD transmission service equal to the MW level of the Co-Located Generating Facility dedicated to serving the Co-Located Load if that portion of the Co-Located Load is not covered by FCD transmission service, and (4) the restriction on the use of NFCD transmission service to only those circumstances where the Co-Located Generator is on outage). Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the
794 December Order, 193 FERC ¶ 61,217 at P 215.795 Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,272 (finding “non-firm transmission prices should reflect the interruptibility of the service and should promote efficient use of the transmission system”). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 323 Date Filed: 10/19/2026
PDF page 325
Docket No. EL25-49-002, et al.- 170 -
transmission system under certain conditions, we further direct PJM to reflect this change in its compliance filing.
349.
With respect to DCC’s argument that PJM’s proposal does not provide a workable pathway for phased development or load ramping,796 we disagree. Because FCD transmission service is based on a reserved amount of contract demand and does not account for load growth in the way that NITS does, Eligible Customers seeking to increase the amount of load for which they are taking transmission service over time should be required to submit new transmission service requests for any increases in contract demand. As an alternative, they may request a level of contract demand in their initial transmission service request that reflects their planned total load, even though they may not need the full level of contract demand immediately. To the extent that neither of these options work for a particular Eligible Customer taking transmission service on behalf of a Co-Located Load, that Eligible Customer should consider taking NITS, which accommodates load growth over time, as PJM suggests.797
350.
DCC also argues that PJM prohibits the mixing of NITS and FCD or NFCD transmission service for the same load.798 However, in the December Order, the Commission explicitly stated that NITS cannot be combined with any of the new transmission services.799 As such, we find that DCC’s argument is an untimely request for rehearing of the December Order and dismiss it.800
351.
With respect to DCC’s argument that Eligible Customers serving Co-Located Load should be able to transition between transmission services,801 we note that Eligible Customers taking transmission service on behalf of Co-Located Load that wish to transition from one transmission service to another may do so through the same process
796 DCC Response Brief at 6.797 PJM Reply Brief at 37-38.798 DCC Response Brief at 6.799 December Order, 193 FERC ¶ 61,217 at P 195 n.408 (“Eligible Customers taking NITS on behalf of Co-Located Load may not combine NITS with any of the other transmission services discussed herein.”).800 See, e.g., ISO New Eng. Inc., 132 FERC ¶ 61,098 at P 12 (“The Commission has held that requests to alter a compliance filing in a manner that differs from the order requiring the compliance filing constitute a collateral attack on the order requiring the compliance filing.”).801 DCC Response Brief at 6. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 324 Date Filed: 10/19/2026
PDF page 326
Docket No. EL25-49-002, et al.- 171 -
as any other party requesting new transmission service, with the exception of the anti-toggling procedures discussed below in Part VI.E.
352.
Finally, with respect to Market Monitor’s argument that NFCD transmission service is untenable, we dismiss this argument as an untimely request for rehearing of the December Order. We disagree that NFCD transmission service is untenable if it is not available constantly; to the contrary, NFCD transmission service is designed to be non-firm and as-available, meaning that it will sometimes be unavailable or curtailed. It is possible that if, for example, a significant number of Eligible Customers taking transmission service on behalf of Co-Located Loads were to switch to NFCD transmission service, it would be frequently curtailed, but that is the nature of non-firm, as opposed to firm, transmission service. Eligible Customers taking transmission service on behalf of Co-Located Loads that do not wish to be curtailed should consider requesting a firm transmission service instead.
3. Study Process
a. Initial Briefs
353.
PJM states that it will coordinate with the affected transmission owner to complete studies, obtain relevant data, and identify any necessary enhancements to the transmission system to accommodate the requested level of service.802 PJM also states that, during the study period, it may perform other studies.
354.
PJM proposes that it notify the affected transmission owner of an application for FCD transmission service to allow for coordination to study the potential impacts of providing this service on the transmission owner’s system.803 PJM states that it will determine any necessary studies to provide the requested transmission service. If studies are needed, PJM explains, it will provide an application and studies agreement to the Eligible Customer in which the Eligible Customer will agree to reimburse PJM for study costs. PJM also states that it will consider the results of any transmission owner studies. 355.
PJM proposes that, upon receiving a service request, it will coordinate with the affected transmission owner to complete necessary studies to determine whether, and at what level, NFCD transmission service can be reliably provided.804 PJM proposes that it and the affected transmission owner will determine whether additional studies are required to assess the NFCD transmission service request, and if so, which studies are
802 PJM Initial Brief at 17-18.803 Id. at 24.804 Id. at 32-33. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 325 Date Filed: 10/19/2026
PDF page 327
Docket No. EL25-49-002, et al.- 172 -
appropriate. PJM proposes that it will provide a written explanation if it determines that none or only a portion of the requested service can be reliably provided. b. Response Briefs
356.
Indicated TOs support PJM’s proposed study processes for FCD transmission service and state that it appropriately recognizes the role of transmission owners in evaluating load interconnection requests.805 Indicated TOs argue, however, that the Tariff should specify that load integration studies should be completed first and inform the determination of whether additional studies are necessary for purposes of an Eligible Customer’s request for transmission service on behalf of a Co-Located Load and the interconnection of any on-site generation. Indicated TOs contend that this requirement would maximize the speed and efficiency of the overall process and avoid potential duplication of effort and expense as between PJM and the PJM transmission owners. 357.
Indicated TOs state that PJM appears to contemplate that an Eligible Customer’s initial application for NFCD transmission service would serve as a “holding” request and that the actual reservation and use of the service would require the Eligible Customer to make a request and PJM to determine whether or not the requested amount of service is available.806 Indicated TOs further state that the available amount of NFCD transmission service presumably would serve as the basis for determining the relevant charge to the Eligible Customer. Indicated TOs request that PJM confirm these understandings and add appropriate Tariff language. Indicated TOs also request that PJM clarify whether the study process set forth in section 710.3 of the illustrative tariff provisions is intended to cover only the initial service study or also subsequent determinations as to specific reservation requests. Generally, Indicated TOs argue that more detail should be provided as to the process for evaluating and granting requests for NFCD transmission service, including the timelines associated with such requests, particularly with respect to forced rather than planned outages.807 Indicated TOs also contend that PJM should specify in Tariff language that NFCD transmission service will be available for periods from one month to one hour in duration.
358.
Several parties argue that PJM’s proposed study process is unjust and
unreasonable.808 Constellation argues that PJM fails to sufficiently describe its proposed study procedures for the three new services. Vistra similarly argues that PJM’s study
805 Indicated TOs Response Brief at 5-7.806 Id. at 4.807 Id. at 4-5.808 Vistra Response Brief at 31, 33-35; Constellation Response Brief at 14-15. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 326 Date Filed: 10/19/2026
PDF page 328
Docket No. EL25-49-002, et al.- 173 -
process provides too much discretion to PJM and transmission owners to determine whether studies are required, which studies to conduct, the timeline for doing so, and how to prioritize different requests. First, Vistra asserts that PJM does not propose a mechanism to assign customers a queue position based on the submission of a complete application. Vistra also charges that PJM reserves to itself full discretion to determine whether studies must be conducted and what analyses those studies will involve, and alleges that the proposed tariff does not appear to limit the results of PJM’s analysis of transmission service requests to the results of duly conducted studies because it states that PJM will “consider” the results of the study procedures.809 Vistra and Constellation also argue that PJM provides no timelines or deadlines for processing transmission service requests. Vistra also argues that PJM provides itself total discretion to set study fees with no parameters for setting those fees. Vistra and Constellation express concern that the discretion in PJM’s proposal creates a risk of undue discrimination. Vistra and Constellation argue that PJM’s proposal violates the Commission’s rule of reason policy because the information missing from the tariff proposal significantly affects rates, is readily susceptible of specification, and is not so readily understood as to render recitation superfluous.810 Vistra also contends that PJM’s proposal is unclear on what it means to ensure that non-firm transmission service can be provided “reliably,” and requests that PJM articulate the standard.811
c. Reply Briefs
359.
PJM maintains that its illustrative tariff contains an appropriate amount of detail on the study process and states that it will work with stakeholders to develop implementation details to be set forth in the PJM manuals.812 PJM avers that the illustrative tariff provides more than enough detail to satisfy the Commission’s rule of reason policy. PJM alleges that its proposal builds on its existing processes for studying requests for new transmission service requests. PJM contends that its evaluation of firm transmission service requests will require and follow similar study procedures to what is now required for NITS. For non-firm transmission service requests, PJM asserts that the study approach could differ widely for each request and will depend on a number of factors.
360.
PJM explains that, currently, the transmission owners study in the first instance all requests to connect new load to the transmission system. PJM states that, for each zone,
809 Vistra Response Brief at 33-34 (citing PJM, Initial Brief, attach. A § 702.3).810 Id. at 36-37, 53; Constellation Response Brief at 15-18.811 Vistra Response Brief at 39.812 PJM Reply Brief at 22-23, 26, 32. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 327 Date Filed: 10/19/2026
PDF page 329
Docket No. EL25-49-002, et al.- 174 -
the transmission owner studies the integration of the requested load and identifies upgrades. PJM says that it then performs a “do no harm” analysis of how those transmission owner-identified upgrades would affect the regional transmission system. PJM notes that NITS can then be provided consistent with the in-service date of the identified upgrades.813 PJM contends that the allocation of responsibilities between the transmission owners and PJM in the current study process follows the division of rights recently affirmed by the Commission and courts, i.e., transmission owners’ reservation of rights over local transmission planning and PJM’s responsibility for the regional transmission system.814 PJM claims that it maintains this division of rights in the illustrative tariff provisions.
361.
PJM also rejects protesters’ arguments that its proposal affords PJM and the transmission owners inappropriate discretion. PJM argues that it seeks no more discretion than it currently has under its existing study processes. PJM argues that its evaluation of the transmission system to determine whether it can reliably provide the requested transmission service requires an exercise of engineering judgment, which inherently entails a reasonable exercise of discretion.815
362.
PJM argues that reliability reviews inherently require PJM to make judgment calls as the transmission provider and a NERC-designated Reliability Coordinator, and the flexibility to determine whether new transmission facilities are reasonably likely to be in-service fits squarely within PJM’s expertise. PJM asserts that protesters’ concerns about the level of detail generally concern the transmission owner’s load integration studies, which PJM argues does not inherently implicate the Commission’s jurisdiction under the FPA.816 In response to concerns about study timelines, PJM contends that its evaluation of any transmission service request is dependent on the load integration studies performed by the applicable transmission owner.817 PJM asserts that it does not
813 Id. at 24.814 Id. at 24 & n.68 (citing PJM Interconnection, L.L.C., 172 FERC ¶ 61,136, order on reh’g, 173 FERC ¶ 61,225, at P 19 (2020), aff’d sub nom. Am. Mun. Power, Inc.
v. FERC, 86 F.4th 922 (D.C. Cir. 2023); PJM Interconnection, L.L.C., 173 FERC ¶ 61,242 (2020), order on reh’g, 176 FERC ¶ 61,053 (2021), aff’d sub nom. Am. Mun. Power, Inc., 86 F.4th 922; Monongahela Power Co., 164 FERC ¶ 61,217, at P 14 (2018); Appalachian Power Co., 170 FERC ¶ 61,196, at P 59 (2020)).
815 Id. at 25-26.816 Id. at 34.817 Id. at 28. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 328 Date Filed: 10/19/2026
PDF page 330
Docket No. EL25-49-002, et al.- 175 -
have authority to dictate timelines to transmission owners to complete their studies, given that load integration studies are a matter of local transmission planning. 363.
PJM also alleges that concerns that PJM will reject transmission service requests without basis are unfounded.818 PJM maintains that it will generally grant requests for NITS and FCD transmission service, and PJM will grant Interim NITS requests consistent with the results of any study/studies. As to NFCD transmission service, PJM explains that, if it denies a request in whole or in part, PJM will provide a written explanation to the customer of PJM’s reasoning for the denial, which could form the basis for any complaint to the Commission.
364.
Moreover, PJM argues that the illustrative tariff puts all parties on sufficient notice as to how PJM will determine whether it can provide the requested transmission service and the study procedures to arrive at that determination.819 PJM asserts that the illustrative tariff provides the standard to which PJM will evaluate the requests—whether the requested level of service can be provided reliably.
365.
Indicated TOs concede that more detail regarding the study processes for the new transmission services could be helpful, but they argue that commenters’ concerns as to the potential for delays and undue discrimination are overstated. Indicated TOs contend that it is appropriate and consistent with the Commission’s rule of reason to reference the need to incorporate each transmission owner’s technical requirements in the Tariff while omitting the details. Indicated TOs do not oppose making explicit in the Tariff that the studies referred to are those that the transmission owners will conduct to integrate large load facilities. Indicated TOs reject claims that they will use their role in the study process to delay or deny Co-Location Arrangements or discriminate against Co-Located Load.820
366.
Constellation requests that the Commission deter delays and potential disputes by
(1) establishing deadlines for studies and other transmission owner approvals or consultation requirements, and (2) require PJM’s and transmission owners’ standards, requirements, guidance, and practices on Co-Location Arrangements to be on file with the Commission on a standalone basis or reflected in the Tariff.821818 Id.819 Id. at 30.820 Indicated TOs Reply Brief at 9-11.821 Constellation Reply Brief at 11-12. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 329 Date Filed: 10/19/2026
PDF page 331
Docket No. EL25-49-002, et al.- 176 -
367.
PJM argues that Vistra oversimplifies the provision of non-firm transmission service.822 PJM states that it is not the case that the transmission system has significantly underutilized capacity to provide the envisioned services. PJM alleges that it needs to carefully identify and manage operational risk instead of spontaneously managing non-firm load under an increasingly stressed system. Constellation also argues that PJM should clarify how it will determine the future and real-time availability of NFCD transmission service, which should be based on when transmission capacity is available and not needed by firm customers, consistent with the December Order.823 d. Answers
368.
Constellation argues that the Commission has jurisdiction to regulate load integration studies in connection with jurisdictional transmission service.824 Constellation contends that the Commission should exercise jurisdiction over the load integration studies needed to provide jurisdictional transmission service and direct that these studies be on file, including study deadlines and violations to be studied.825 369.
Indicated TOs argue that transmission owner processes for studying the integration of new retail loads do not implicate the Commission’s jurisdiction, even though such studies will be used as an input in PJM’s process for studying applications for the new transmission services.826 Indicated TOs point out that, even as to studies for Commission-jurisdictional services, the Commission does not require transmission providers to file studies.827 Indicated TOs maintain that, if an Eligible Customer disputes the outcome of PJM’s study process for the new transmission services, the customer can seek redress through the Commission.
e. Determination
370.
We find that PJM’s proposal regarding study procedures for FCD and NFCD transmission services is not sufficiently detailed to be just and reasonable, and we direct
822 PJM Reply Brief at 35-36.823 Constellation Reply Brief at 18 (citing December Order, 193 FERC ¶ 61,217 at P 214).824 Id. at 6.825 Id. at 7.826 Indicated TOs May 28 Answer at 8.827 Id. at 9. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 330 Date Filed: 10/19/2026
PDF page 332
Docket No. EL25-49-002, et al.- 177 -
PJM to file, as the replacement rate, more detailed study procedures that mirror the existing study procedures for transmission service on compliance.828 First, with respect to FCD transmission service, we agree with parties on briefing that PJM’s proposal is vague and unclear. We direct PJM to file Tariff revisions on compliance to study requests for FCD transmission service using the same process PJM uses for new service requests for NITS, i.e., the cluster study process.829 This requirement is just and reasonable because it will treat new firm transmission service requests similarly. 371.
PJM contends that its proposal “has built on its existing processes for studying requests for new transmission services . . . with additional processes necessary to study the novel aspects of Interim NITS and [FCD and NFCD] Transmission Services.”830 PJM also states that “[e]valuation of firm service requests will require and follow similar study procedures to what is now required for NITS.”831 However, PJM’s proposal is lacking in detail. It is not clear whether PJM proposes to study requests for FCD transmission service serially or through its existing cluster study process.832 372.
Regardless, we find that it is just and reasonable to study requests for FCD transmission service through PJM’s existing cluster study process, and we direct PJM to file Tariff revisions on compliance consistent with this directive. We find a serial study process for new FCD transmission service requests, rather than a cluster study as for new NITS requests, would provide disparate treatment to FCD transmission service requests. PJM also does not address a timeline for its study process, meaning FCD transmission service requests could be studied more quickly or more slowly than requests in the new services queue. PJM does not provide a reason for this difference or any explanation as to why such requests should not be studied in the normal cluster process for new service requests. Further, studying such requests as part of the established cluster study process
828 We discuss PJM’s proposed study procedures for Interim NITS below in Part VI.H.829 PJM, Intra-PJM Tariffs, OATT, § III.32.3 Initial Study Procedures (3.0.0) (“A request for service for which a Phase I System Impact Study is required is subject to the System Impact Study Procedures, as set forth in Tariff, Part VII or Tariff, Part VIII, as applicable.”).830 PJM Reply Brief at 23.831 Id. at 26.832 See PJM, Initial Brief, attach. A, § 712.1 (“After receiving the Application for Firm Contract Demand Transmission Service, the Transmission Provider shall determine, in accordance with the PJM Manuals, any necessary studies for reliably providing the requested Firm Contract Demand Transmission Service.”). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 331 Date Filed: 10/19/2026
PDF page 333
Docket No. EL25-49-002, et al.- 178 -
would address many of the concerns in the record because it would ensure Eligible Customers have more detail, transparency, and certainty regarding the study process, which is the primary concern of the protesters.833 Thus, we direct PJM to submit a compliance filing within 60 days of the date of issuance of this order to revise its Tariff to provide that it will study FCD transmission service requests using its existing process for studying firm transmission service requests. Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we further direct PJM to reflect this change in its compliance filing.
373.
With respect to NFCD transmission service, we agree with parties arguing that PJM’s proposal lacks specificity. PJM argues that “the study approach could differ widely for each request, given the different nature of the risks involved, as the system would be operated on an as-conditions-permit basis.”834 The lack of detail creates a level of discretion that is not just and reasonable; while some amount of discretion is likely necessary to ensure PJM is able to perform any additional studies necessary to maintain reliability, Eligible Customers must have some understanding of the study process PJM will use to evaluate transmission service requests. Therefore, we direct PJM to submit a compliance filing within 60 days of the date of issuance of this order that revises its Tariff to include study procedures for NFCD transmission service requests. We note that the Tariff includes detailed procedures for the study of Non-Firm PTPS, which serve as a useful reference. In particular, the Tariff provides that, following receipt of a tendered schedule, PJM will make a determination on a non-discriminatory basis of available transfer capability for PTPS requests, based on a specific methodology detailed in Tariff, Attachment C.835 No party has shown why a similar process should not apply for NFCD transmission service, and PJM has not demonstrated that having so little detail in the Tariff regarding the process for studying requests for NFCD transmission service is just and reasonable. PJM’s compliance filing must also include details about the term length of NFCD transmission service, including the minimum term. Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that
833 See PJM, Intra-PJM Tariffs, pt. VIII, § 404 (1.0.0) (providing overview of system impact studies, including scope of studies).834 PJM Reply Brief at 26. 835 See PJM, Intra-PJM Tariffs, OATT, §§ II.15.2, II.18.4; id. attach. C (Methodology to Assess Available Transfer Capability). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 332 Date Filed: 10/19/2026
PDF page 334
Docket No. EL25-49-002, et al.- 179 -
are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we further direct PJM to reflect this change in its compliance filing. 374.
Indicated TOs request that the Tariff specify that transmission owner load integration studies will be completed first and thereby inform what additional studies are necessary. However, it is not clear from the record what these studies entail, as these studies are not defined in either the Tariff or any of PJM’s manuals, or how transmission owners will study the load. For example, the record indicates that Indicated TOs view a load integration study for Co-Located Load as potentially analyzing “(i) what, if any, upgrades are needed to accommodate the physical gross load amount behind the point of interconnection.”836 To the extent PJM intends to permit transmission owners to study Co-Located Load as if it were native load with NITS, that would not be just and reasonable for FCD and NFCD transmission services. We therefore direct PJM to specify in a compliance filing, which it must submit within 60 days of the date of issuance of this order, how transmission owners shall participate in PJM’s study process for Eligible Loads for FCD and NFCD transmission services and specify in detail the related roles and responsibilities of PJM and the transmission owners in such studies. We decline at this time to adopt Indicated TOs’ requests to incorporate further revisions to the Tariff related to load integration studies.837
4. Rates and Charges
a. Initial Briefs
375.
Indicated TOs propose that the rate for the FCD transmission service be based on the zonal NITS rates and underlying NITS revenue requirements.838 Indicated TOs argue that Eligible Customers taking FCD transmission service on behalf of Co-Located Load and Network Customers should be charged the same rate because the level of service provided to both is the same for all relevant purposes. For example, Indicated TOs argue that both services are firm transmission services for which PJM procures capacity for the customers. Indicated TOs argue that it would be unjust and unreasonable and unduly discriminatory to charge FCD transmission service customers a rate lower than the NITS rate as it would subsidize FCD transmission service customers at the expense of Network Customers. Indicated TOs contend that it is appropriate to use the single peak coincident demand to calculate the FCD transmission service rate because it is an annual service.
836 Indicated TOs Initial Brief at 25-26 (emphasis added).837 Indicated TOs Response Brief at 13, 16, 19.838 Indicated TOs Initial Brief at 6, 8-9. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 333 Date Filed: 10/19/2026
PDF page 335
Docket No. EL25-49-002, et al.- 180 -
376.
Indicated TOs propose that NFCD transmission service pay a charge for the reserved contract demand amount multiplied by a zonal NFCD transmission service rate determined based on the specific term of service.839 Indicated TOs propose to use the same FCD transmission service rate for purposes of establishing the maximum rate for NFCD transmission service. Indicated TOs argue that it is just and reasonable to use the same maximum rate for FCD and NFCD transmission services, because the Commission has permitted pricing Non-Firm PTPS at the rate used for Firm PTPS and because the Commission provides flexibility to arrange and schedule NFCD transmission service. Indicated TOs allege that NFCD transmission service is superior to Non-Firm PTPS because PJM will re-dispatch generation prior to curtailing NFCD transmission service. Indicated TOs propose to consider on a going-forward basis whether a discount is appropriate for NFCD transmission service based on system conditions and use patterns. 377.
In addition to these charges, PJM proposes to assess, for FCD transmission service: (1) administrative service charges, (2) ancillary service charges, (3) black start service charges based on gross demand, (4) regulation charges based on gross demand, and (5) any redispatch costs. PJM contends that these are standard charges associated with use of the transmission system above transmission service rates.840 For NFCD transmission service, PJM also proposes to assess certain charges within its authority:
(1) administrative charges, (2) ancillary services charges, (3) any redispatch costs,
(4) regulation charges based on gross demand, and (5) black start service charges based on gross demand.841
b. Response Briefs
378.
Several parties argue that it is just and reasonable to charge the same rate for FCD transmission service and NITS.842 NOVEC explains that Eligible Customers are receiving a service commensurate with NITS and should therefore pay a cost commensurate with NITS in recognition of the Commission’s cost causation principles. Market Monitor asserts that if customers have the option to convert from FCD transmission service to NITS in the future, and given the long timelines in transmission planning and the extreme lumpiness of transmission investments, PJM must plan as if all
839 Id. at 10, 11-13.840 PJM Initial Brief at 27.841 Id. at 36-37.842 ODEC Response Brief at 8; NOVEC Response Brief at 6-7; Market Monitor Response Brief at 3-4. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 334 Date Filed: 10/19/2026
PDF page 336
Docket No. EL25-49-002, et al.- 181 -
Eligible Customers taking the new contract demand transmission services are Network Customers.
379.
Some parties also agree that it is just and reasonable to use the FCD transmission service rate as the maximum rate for NFCD transmission service.843 NOVEC argues that NFCD transmission service is a network-type service that bears a resemblance to NITS. NOVEC notes that because an Eligible Customer only purchases NFCD transmission service when reserved, transmission costs for an Eligible Customer are lower than firm rates.
380.
Other parties disagree that the proposed rate for NFCD transmission service is just and reasonable.844 Vistra alleges that Indicated TOs fail to justify not offering a discounted rate for NFCD transmission service when such a discount exists for Non-Firm PTPS. Vistra contends that the benefit of re-dispatching generation prior to curtailment does not justify charging a substantially higher rate for a service that is otherwise inferior. Vistra also argues that Indicated TOs’ proposal is unjust and unreasonable and unduly discriminatory because it would create cost shifts between classes of transmission customers, where Eligible Customers taking NFCD transmission service on behalf of Co-Located Load shoulder the cost of firm transmission service, despite taking non-firm transmission service.
381.
Joint Co-Location Developers argue that pricing NFCD transmission service at the same rate as FCD transmission service is not consistent with cost causation principles or the Commission’s purpose in establishing the NFCD transmission service to avoid inefficient system buildout. Joint Co-Location Developers maintain that, as compared to FCD transmission service, the rate for NFCD transmission service should reflect the lesser costs caused by and lesser benefits received by customers taking this service.845 Joint Co-Location Developers claim that, in Order No. 888-A, the Commission explained that, while in some circumstances non-firm transmission rates may be set at the firm transmission rate level, the Commission expects that non-firm transmission rates would, in most instances, be priced below the price cap.846
382.
Geronimo Power states that, combined with PJM’s proposed requirement that an Eligible Customer take NFCD transmission service for the portion of its load served by a
843 ODEC Response Brief at 8; NOVEC Response Brief at 7.844 Vistra Response Brief at 16-17, 23-24; Joint Co-Location Developers Response Brief at 20; Geronimo Power Response Brief at 4.845 Joint Co-Location Developers Response Brief at 20-21.846 Id. at 22 (citing Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,272). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 335 Date Filed: 10/19/2026
PDF page 337
Docket No. EL25-49-002, et al.- 182 -
Co-Located Generator, the implication of the Indicated Transmission Owners’ proposal appears to be that an Eligible Customer taking NFCD transmission service would be required to pay a transmission charge equivalent to the rate paid by transmission customers taking firm transmission service.847 Geronimo Power argues that charging transmission customers taking NFCD transmission service the same amount as a transmission customer taking FCD transmission service is unjust and unreasonable and inconsistent with cost causation principles because these loads will be required to pay a rate equivalent to customers receiving a higher level of service. Geronimo Power asserts that non-firm transmission service should be, and often is, priced lower than firm transmission service, such as in PJM where Non-Firm PTPS customers receive a discount as compared to Firm PTPS customers. Geronimo Power adds that the proposed rate would undermine the incentive for large load customers to reduce their reliance on the grid and therefore would fail to offer a rate that would encourage the efficient use of the transmission system, contrary to the December Order. Further, Geronimo Power states that Indicated TOs should not set an unjust and unreasonable rate based on superior services while they wait until they gather more data to determine the extent to which such unjust and unreasonable rate should be reduced when charging for an inferior service. 383.
ODEC agrees that it is reasonable for PJM to charge FCD and NFCD transmission service customers for applicable PJM administrative charges consistent with PJM’s charges to existing transmission customers.848
384.
ODEC urges the Commission to direct further compliance filings in order to ensure that rates for the new FCD transmission service are just and reasonable by requiring the individual transmission owners to either confirm that their formula or stated rates and metrics reporting enable direct crediting by PJM, or provide whatever revisions are necessary in order to do so.849 ODEC states that this is important so that ODEC and other Network Customers are not subject to paying duplicative charges for the same revenue requirement amount. ODEC adds that it is also important because Indicated TOs state that load-serving entities will submit metrics to PJM used to calculate transmission, capacity, and energy charges, but such metrics may not be consistent among Indicated TOs. ODEC explains that, while it is a load-serving entity, as a transmission customer the metrics are provided to PJM by the transmission owners for the zones where ODEC takes transmission service.
385.
Constellation seeks clarification that Indicated TOs’ proposed rate for FCD transmission service is equal to the applicable transmission owners’ NITS rate calculated
847 Geronimo Power Response Brief at 4, 6, 7-9.848 ODEC Response Brief at 8; see also NOVEC Response Brief at 8.849 ODEC Response Brief at 8-9. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 336 Date Filed: 10/19/2026
PDF page 338
Docket No. EL25-49-002, et al.- 183 -
using that transmission owners’ coincident peak methodology, given that different transmission owners use different methods.850
386.
Industrials/Amtrak argue that the Commission must ensure that transmission owners’ calculation of individual customer and zonal transmission cost allocation is transparent, whether through an Attachment M-2 filing or another publicly transparent and accountable method.851 Industrials/Amtrak also contend that the Commission must provide direction on how the revenue and the billing determinants for FCD and NFCD transmission services and Interim NITS would be incorporated into existing transmission formula rates. Similarly, Geronimo Power states that the Commission should at a minimum require the Indicated Transmission Owners to clarify the nature of the rates and billing determinants that they are proposing, including whether they intend to charge the NFCD transmission service charge on a MWh basis, which would be inconsistent both with how transmission reservation charges are historically structured and the Tariff.852 387.
Industrials/Amtrak argue that neither FCD nor NFCD transmission service provide a cost-based back-up service for cogeneration QFs and similarly-situated retail customers.853 Industrials/Amtrak contend that, because it would require payment for service based on the contracted amount, FCD transmission service inherently assumes that forced outages or other reductions in electric output by all QFs will occur simultaneously, or during the system peak, or both, without any factual data to support that assumption.854 Industrials/Amtrak aver that this is not a realistic assumption for cogeneration QFs. Industrials/Amtrak further argue that it would not comport with cost causation principles to require a FCD transmission service reservation for occasional back-up power needs, particularly where the history and risk of the individual unit is well-established or has met outside standards. Industrials/Amtrak further argue that NFCD transmission service also falls short because it requires pre-scheduling with and approval by PJM, which is inconsistent with back-up power’s use in the event of forced outages, and because it is an as-available product that is subject to interruption.855 Industrials/Amtrak argue that, if the existing netting construct is no longer available, then a firm transmission service must be available for QFs to meet the requirements of
850 Constellation Response Brief at 31.851 Industrials/Amtrak Response Brief at 25-26.852 Geronimo Power Response Brief at 5 n.13.853 Industrials/Amtrak Response Brief at 16-19.854 Id. at 17 (citing Dauphinais Aff. ¶ 44).855 Id. at 18. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 337 Date Filed: 10/19/2026
PDF page 339
Docket No. EL25-49-002, et al.- 184 -
PURPA based on actual use. Industrials/Amtrak contend that there must be a transmission service that applies cost causation standards to occasional, unplanned use of the transmission system.
388.
Industrials/Amtrak argue that cost causation principles dictate that the Commission should authorize cost-based back-up service for all transmission customers, not only QFs.856 Industrials/Amtrak explain that there are a number of facilities that operate on similar principles to QFs but do not maintain QF status for a variety of reasons. Industrials/Amtrak argue that these facilities, too, must occasionally draw from the grid, including for occasional unscheduled outages. Industrials/Amtrak argue that it cannot be just and reasonable or comport with cost causation principles to require facilities requiring only occasional back-up service to pay rates that are the same as FCD transmission service or gross-based NITS. Industrials/Amtrak argue that transmission customers should be charged based on actual use on an hourly basis and should not be charged a standby fee.
389.
Industrials/Amtrak explain that QFs are entitled to supplementary power, back-up power, maintenance power, and interruptible power pursuant to Commission regulations857 and that the rates for back-up power “[s]hall not be based upon an assumption (unless supported by factual data) that forced outages or other reductions in electric output by all [QFs] on an electric utility’s system will occur simultaneously, or during the system peak, or both.”858 Industrials/Amtrak argue the NITS BTMG netting construct meets the requirements of PURPA’s enacting regulations.
c. Reply Briefs
390.
In response to Constellation’s request for clarification, Indicated TOs clarify that the zonal FCD transmission service rate will be calculated using that transmission owner’s specific methodology applicable to Network Customers.859
391.
NOVEC explains that because under PJM’s proposal a transmission customer would only take and pay for NFCD transmission service when the generator was experiencing an outage, the same rate does not equate to the same cost to the customer.860 856 Id. at 20-22, 24.
857 Industrials/Amtrak Response Brief at 14-16 (citing 18 C.F.R. § 292.305(b)).858 Id. at 15 (citing 18 C.F.R. § 292.305(c)(1)).859 Indicated TOs Reply Brief at 18 (citing Constellation Response Brief at 31).860 NOVEC Reply Brief at 10-13. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 338 Date Filed: 10/19/2026
PDF page 340
Docket No. EL25-49-002, et al.- 185 -
NOVEC argues that NFCD transmission service does not impose fewer costs on the transmission system than NITS, just “imposes costs differently” and contends that the Commission needs to be cautious to avoid providing “co-located generators a subsidized low cost option to use the system whenever they need backup.”861 NOVEC argues that Co-Located Load in areas where PJM can accommodate a large amount of NFCD transmission service could end up with the best of both worlds, where they are very rarely curtailed but pay a subsidized rate for transmission service, with the option to switch from FCD transmission service or NITS if PJM can no longer accommodate the required level of NFCD transmission service.
392.
In response to arguments from Joint Co-Location Developers and Geronimo Power about whether it is appropriate to establish NFCD transmission service rates based on FCD transmission service rates, Indicated TOs argue that transmission owners need to gather data on how NFCD transmission service customers are using the service and the effect of that utilization on the transmission system.862 Indicated TOs argue that it is not clear whether NFCD transmission service customers will cause the need for fewer Network Upgrades, and that further analysis is needed to determine whether discounts are appropriate. Finally, Indicated TOs contend that Joint Co-Location Developers’ concerns that the proposed NFCD transmission service rate will discourage industrial development are exaggerated and misplaced. NOVEC similarly argues that it is not the Commission’s place to subsidize certain industries at the expense of customers.863
393.
In response to Vistra’s arguments about applying the rate for zonal Non-Firm PTPS to NFCD transmission service, Indicated TOs argue that doing so would be unreasonable because transmission customers have used Non-Firm PTPS exclusively to facilitate the delivery of specific generation to the PJM border—not for internal use.864 NOVEC also rejects Vistra’s argument that NFCD transmission service should receive the same rate as Non-Firm PTPS, arguing that it would not be appropriate to allow NFCD transmission service the same discount as Non-Firm PTPS because the two products fundamentally differ. Indicated TOs further argue that the discounted Non-Firm PTPS rate reflects historical use and was neither intended nor appropriate for NFCD transmission service because NFCD transmission service is intended to be a limited, supplemental service within PJM and does not facilitate the delivery of specific generation to specific load over a contract path. Indicated TOs also contend that NFCD
861 Id. at 12 (citing Market Monitor Response Brief at 6).862 Indicated TOs Reply Brief at 19-21.863 NOVEC Reply Brief at 14.864 Indicated TOs Reply Brief at 13, 18-19. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 339 Date Filed: 10/19/2026
PDF page 341
Docket No. EL25-49-002, et al.- 186 -
transmission service is superior to Non-Firm PTPS because it has a superior curtailment priority.
394.
Indicated TOs reject Vistra’s argument that Indicated TOs’ proposal to credit the revenues associated with NFCD transmission service to customers taking NITS and FCD transmission service will create unjustified cost shifts among customer classes.865 Indicated TOs argue that these revenue credits are not subsidies but offsets that reduce the amount paid by firm transmission service customers, which is appropriate because transmission rates are designed to recover the fixed costs of building and maintaining the transmission system to provide service to such customers. In the absence of such credits, Indicated TOs argue that the transmission owners would over-recover their revenue requirements. Indicated TOs further argue that the revenue crediting mechanism is fully consistent with previously approved mechanisms such as section 27A, which credits Non-Firm PTPS revenue to Network and Firm PTPS customers.
395.
Industrials/Amtrak argue that NFCD transmission service cannot provide back-up power because it cannot be accessed during a BTMG generation facility outage until a request for it is submitted to and approved by PJM.866 Industrials/Amtrak further argue that NFCD transmission service is also only available on an as-available basis and is subject to both operational and automated interruption.867 Industrials/Amtrak explain that, during a forced outage, a retail customer would be required to automatically curtail load until it submits a NFCD transmission service request and PJM approves that request. 396.
Industrials/Amtrak also argue that FCD transmission service can provide maintenance power on a firm basis, but like back-up power, cannot do so at a cost lower than gross load NITS because it implicitly assumes BTMG maintenance outages cannot be scheduled to avoid peak periods.868
d. Answer
397.
Geronimo Power argues that Indicated TOs’ proposed rate for NFCD transmission service is unjust and unreasonable, will disincentivize Co-Located Loads from relying on NFCD transmission service, and lead to less efficient use of the transmission system.869865 Id. at 31-32 (citing Vistra Response Brief at 23-25).866 Industrials/Amtrak Reply Brief at 8.867 Id. at 8 n.13.868 Id. at 9 n.16.869 Geronimo Power May 21 Answer at 8. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 340 Date Filed: 10/19/2026
PDF page 342
Docket No. EL25-49-002, et al.- 187 -
Geronimo Power asserts that Indicated TOs offer no meaningful response to the question of what is a just and reasonable rate for NFCD transmission service. Geronimo Power argues that the mere fact that Commission policy allows PJM transmission owners to charge up to the firm rate in some cases does not mean that doing so here is just and reasonable.870 Geronimo Power avers that there should be little doubt that some form of discount must be applied as to NFCD transmission service.
e. Determination
398.
We agree with Indicated TOs that it is just and reasonable to base the rate for FCD transmission service on the zonal NITS rates and underlying NITS revenue requirements871 and direct the PJM transmission owners, as the replacement rate, to submit a compliance filing within 60 days of the date of issuance of this order that includes Tariff revisions to effectuate this proposal. Both FCD transmission service and NITS will provide a similar level of firm transmission service, and PJM will plan the transmission system to ensure that it is able to provide both transmission services on a firm basis.872
399.
We find unjust and unreasonable PJM’s proposal to charge Eligible Customers taking FCD or NFCD transmission services on behalf of Co-Located Loads for all ancillary services other than regulation and black start based on total quantity of MWhs of energy delivered to the Co-Located Load.873 In the December Order, the Commission found that Eligible Customers taking the new FCD transmission service on behalf of Co-Located Loads must be charged for ancillary services based on the contract demand, with the exception of regulation and black start services.874 Similarly, the Commission found that Eligible Customers taking the NFCD transmission service on behalf of Co-Located Loads must be charged for ancillary services on an as-reserved contract demand basis, based on the reserved contract demand amount of transmission service, with the exception of regulation and black start services.875870 Id. at 9.871 Indicated TOs Initial Brief at 6.872 Id. at 8-9; December Order, 193 FERC ¶ 61,217 at PP 195, 208.873 PJM, Initial Brief, attach. A, Subpart B, §§ 714.5 & 715.4.874 December Order, 193 FERC ¶ 61,217 at P 209.875 Id. P 216. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 341 Date Filed: 10/19/2026
PDF page 343
Docket No. EL25-49-002, et al.- 188 -
400.
However, we find just and reasonable PJM’s proposal to charge Eligible Customers taking FCD and NFCD transmission services on behalf of Co-Located Loads for regulation and black start services based on gross demand, which is consistent with the Commission’s findings in the December Order. The Commission found in the December Order that “Eligible Customers that take the Firm Contract Demand transmission service on behalf of Co-Located Loads must be charged for regulation and black start services based on a gross demand basis, rather than the contract demand” because all Co-Located Loads rely on regulation and black start services to be served regardless of whether they are withdrawing energy from the transmission system.876 Likewise, the Commission found in the December Order that “Eligible Customers that take the Non-Firm Contract Demand transmission service on behalf of Co-Located Loads use and therefore should be charged for regulation and black start services based on a gross demand basis, rather than the reserved amount of transmission service.”877 Therefore, and consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we direct PJM to submit a compliance filing within 60 days of the date of issuance of this order that revises its Tariff to: (1) charge Eligible Customers taking FCD and/or NFCD transmission services on behalf of Eligible Loads for all ancillary services other than regulation and black start services based on their contract demand; and (2) charge Eligible Customers taking FCD and/or NFCD transmission services on behalf of Eligible Loads for regulation and black start services based on their gross load.
401.
We also find just and reasonable PJM’s proposal to charge Eligible Customers taking FCD and/or NFCD transmission services certain administrative charges. As PJM explains, these are standard charges associated with use of the transmission system above transmission service rates.878 For the same reason, we find just and reasonable PJM’s proposal to charge Eligible Customers taking FCD and/or NFCD transmission services redispatch costs to cover congestion-related costs, given that both of these services will be pool-scheduled and can be served by generators redispatched to mitigate congested transmission paths. We thus direct PJM to submit a compliance filing, within 60 days of the date of issuance of this order, that revises its Tariff to implement these charges. Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission
876 Id. P 209.877 Id. P 216.878 PJM Initial Brief at 27. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 342 Date Filed: 10/19/2026
PDF page 344
Docket No. EL25-49-002, et al.- 189 -
system under certain conditions, we further direct PJM to reflect this change in its compliance filing.
402.
However, we are not persuaded that Indicated TOs’ proposal to set the maximum rate for NFCD transmission service equal to the rate for FCD transmission service is just and reasonable. In the December Order, the Commission was clear that NFCD transmission service would “provide an option for Eligible Customers seeking to use the transmission system on behalf of a Co-Located Load in this more limited manner.”879 Further, NFCD transmission service is non-firm and curtailed prior to FCD transmission service and NITS.880 NFCD transmission service is therefore an inferior service to FCD transmission service and NITS, and we find that the just and reasonable replacement rate here should not charge the same maximum rate for these transmission services. We acknowledge NOVEC’s argument that under PJM’s proposal, an Eligible Customer would only take and pay for NFCD transmission service when the generator serving it is experiencing an outage, so the same rate does not equate to the same cost to the Eligible Customer.881 However, the same rate could apply to Eligible Customers taking the same amount of FCD and NFCD transmission services.
403.
We also find that charging the same maximum rate for both FCD and NFCD transmission services can undermine the benefits of the new NFCD transmission service for other transmission customers. Specifically, discounting non-firm transmission services encourages transmission customers to use such services, which benefits all transmission customers by maximizing use of the existing transmission system. These benefits accrue to other transmission customers in two ways. First, the revenues related to NFCD transmission service will become a credit to, and thus offset, the transmission revenue requirement, which is the basis for the rates that firm transmission customers are charged. Moreover, utilizing NFCD transmission service can avoid unnecessary Network Upgrades, the costs of which would likely be allocated to all firm transmission service customers.
404.
Further, pricing NFCD transmission service at the same rate as FCD transmission service is not consistent with cost causation principles or the December Order’s findings. Specifically, the Commission found that requiring an Eligible Customer taking transmission service on behalf of Co-Located Load to take NITS on a gross demand basis would be inefficient, and could necessitate costly transmission buildout and costs paid by transmission customers that may not be necessary if Eligible Customers taking transmission service on behalf of Co-Located Loads are willing and able to limit their
879 December Order, 193 FERC ¶ 61,217 at P 214 (emphasis added).880 See infra Part VI.G.881 NOVEC Reply Brief at 10. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 343 Date Filed: 10/19/2026
PDF page 345
Docket No. EL25-49-002, et al.- 190 -
energy withdrawals from the transmission system under certain conditions and take a transmission service that requires fewer or less costly Network Upgrades to provide.882 As noted above, the Commission directed the creation of NFCD transmission service, finding that it would provide an option for Eligible Customers taking service on behalf of Co-Located Loads that seek to use the transmission system in a more limited manner.883 The December Order further found that Eligible Customers taking service on behalf of Co-Located Loads should be allowed to choose the transmission service that aligns with their use of the transmission system and therefore aligns the charges for service with the benefits received.884 Indicated TOs’ proposal fails to comply with the directive in the December Order by charging the same rate for FCD and NFCD transmission services; the proposal does not align the charges for transmission service with the benefits received. 405.
Our finding here is also consistent with Commission precedent. In Order No. 888, the Commission determined that the rate for Non-Firm PTPS “is capped at the firm rate.”885 In response to Order No. 888, Duquesne sought clarification that the phrase “the non-firm rate is capped at the firm rate” does not mean the Commission is deviating from its principles that non-firm transmission service must be priced in a manner that reflects the interruptibility of the service and is economically efficient.886 The Commission clarified that the Firm PTPS transmission rate represents a maximum price for non-firm transmission service and emphasized that “non-firm transmission prices should reflect the interruptibility of the service and should promote efficient use of the transmission system, subject to this price cap.”887 The Commission concluded that, “while in some circumstances non-firm transmission rates may be set at a firm transmission rate level, the Commission expects that non-firm transmission rates would, in most instances, be priced below the cap.”888
406.
Thus, while the Commission recognized that the Firm PTPS transmission rate could be a ceiling for the Non-Firm PTPS rate, the Commission also recognized that the rates should vary based on the quality of the transmission service. Our finding here is
882 December Order, 193 FERC ¶ 61,217 at P 199.883 Id. P 214.884 Id. P 199.885 Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,743.886 Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,272.887 Id.888 Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 344 Date Filed: 10/19/2026
PDF page 346
Docket No. EL25-49-002, et al.- 191 -
consistent with Order No. 888 (i.e., that non-firm transmission service rates should generally be priced below firm transmission service rates). Indicated TOs propose making the exception the rule and thus fail to justify that deviation. Indicated TOs argue that NFCD transmission service is a superior level of service compared to Non-Firm PTPS. But, even assuming that statement is correct, it does not follow that NFCD transmission service is therefore a similar level of service as FCD transmission service or NITS.
407.
We recognize that Indicated TOs state that they will consider offering discounts for NFCD transmission service after an initial assessment period to determine whether a discount would encourage efficient use of the transmission system. However, Indicated TOs miss the point of not only aligning the rate with the quality of the service provided, but also designing a rate that incentivizes efficient non-firm uses of the transmission system. It is counterintuitive to expect charging the full rate to inform an analysis of what discounts may be appropriate. Therefore, we find that the possibility of offering discounts at some undefined time in the future is not sufficient to remedy our concerns with their proposal. Under that proposal, Indicated TOs would have no obligation to lower rates in the future and offer no transparency as to how or when that decision would be made; moreover, they provide no compelling explanation as to why it would be just and reasonable to charge for NFCD transmission service at the FCD transmission service rate in the interim.
408.
We further disagree with NOVEC’s characterization of a lower rate for NFCD transmission service as subsidized; as discussed in the body of this order, we find that a lower rate for NFCD transmission service is just and reasonable and consistent with cost causation. A lower rate for NFCD, as compared to FCD, transmission service will also, as NOVEC points out, incentivize transmission customers to use the service in areas where PJM can accommodate a large amount of NFCD transmission service. This is exactly the point–Eligible Customers taking transmission service on behalf of Eligible Loads will be incentivized to take NFCD transmission service in areas where there is excess transmission capacity, and the charges recouped from those customers will offset the rates paid by firm transmission customers that funded the excess transmission capacity. Otherwise, this transmission capacity would remain unused and firm transmission customers would pay more.
409.
NOVEC also argues that in areas where PJM can accommodate a large amount of NFCD transmission service, Co-Located Load could end up with the best of both worlds, where they are rarely curtailed but Eligible Customers taking transmission service on their behalf pay a subsidized rate for transmission service, with the option to switch to FCD transmission service or NITS if PJM can no longer accommodate the required level Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 345 Date Filed: 10/19/2026
PDF page 347
Docket No. EL25-49-002, et al.- 192 -
of NFCD transmission service.889 We disagree that Eligible Customers could “simply switch” to FCD transmission service or NITS if PJM can no longer accommodate the requested level of NFCD transmission service.890 The process to request NITS remains unchanged, and we address the process to request FCD transmission service above. But in either case, provision of firm transmission service will be studied, granted to the extent it can be done so reliably, and only available following construction of any required Network Upgrades.
410.
With respect to Industrials/Amtrak’s argument that neither FCD nor NFCD transmission services provide a cost-based back-up service for cogeneration QFs and similarly-situated retail customers,891 this argument is substantively similar to the argument the same parties raised on compliance, which is addressed supra.892 Industrials/Amtrak contend that, because it would require payment for service based on the contracted amount, FCD transmission service inherently assumes that forced outages or other reductions in electric output by all QFs will occur simultaneously, or during the system peak, or both, without any factual data to support that assumption.893 However, as noted above, this argument appears to conflate rates for sales of back-up power and rates for transmission service, rendering Industrials’/Amtrak’s concerns misplaced. 411.
Industrials/Amtrak further argue that it would not comport with cost causation principles to require a FCD transmission service reservation for occasional back-up power needs and that NFCD transmission service will not be useful for back-up power because it must be requested in advance.894 Again, Industrials/Amtrak appear to conflate back-up power for QFs under PURPA with the subject of this proceeding, which is transmission service taken by Eligible Customers serving Eligible Loads. Further, Industrials/Amtrak state that their concerns are for “whether retail customers can access cost-based . . . back-up service”895 but, with the exception of Eligible Customers that are retail customers taking unbundled transmission service, service available to retail customers is neither the subject of this proceeding nor within the Commission’s
889 NOVEC Reply Brief at 12-13.890 Id.891 Industrials/Amtrak Response Brief at 16-17.892 See supra Part V.A.3.893 Industrials/Amtrak Response Brief at 17 (citing Dauphinais Aff. ¶ 44).894 Id. at 18.895 Id. at 11 (emphasis added). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 346 Date Filed: 10/19/2026
PDF page 348
Docket No. EL25-49-002, et al.- 193 -
jurisdiction. However, to the extent Industrials/Amtrak refer to jurisdictional wholesale transmission service when arguing that “examples exist of bespoke arrangements for industrial and institutional customers that may require firm back-up needs,”896 we continue to find it just and reasonable that Eligible Customers taking NITS be charged on a gross demand basis as explained in the December Order, with limited exceptions.897 Network Load has the right to be served from the transmission system at any time, and PJM and the transmission owners incorporate Network Load into their transmission planning to ensure that they can fulfill their obligation to provide such service. Thus, regardless of whether certain transmission customers that elect NITS to be able to take transmission service on demand choose to only take such service occasionally, the system will be planned to accommodate them at all times. We therefore continue to find that the benefits of NITS align with charging for NITS based on gross demand. We further reiterate that, as discussed in this order, we have set aside, in part, the December Order to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.898 412.
Therefore, we direct the PJM transmission owners to submit, within 60 days of the date of issuance of this order, a compliance filing with the Tariff charges for NFCD transmission service in accordance with this order. Specifically, the PJM transmission owners must propose a lower maximum rate or non-discriminatory discounts for the NFCD transmission service rate. Moreover, the PJM transmission owners must ensure that their proposed Tariff revisions are transparent as to how charges will be calculated for an individual transmission customer. Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we further direct the PJM transmission owners to reflect this change in their compliance filing.
5. Other
a. Initial Briefs
413.
PJM states that any request for FCD and/or NFCD transmission service must comply with Commission regulations for new service requests, and include several items specific to these transmission services, such as a description of the supply characteristics 896 Id. at 12.
897 December Order, 193 FERC ¶ 61,217 at PP 186, 195.898 See supra Part IV.C.1.b.i. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 347 Date Filed: 10/19/2026
PDF page 349
Docket No. EL25-49-002, et al.- 194 -
of the Co-Located Generator and the demand characteristics of the Co-Located Load.899 Upon receiving an application, PJM will evaluate whether the requested level of Contract Demand transmission service can be reliably provided. PJM then explains that the Eligible Customer must meet several conditions precedent, such as certifying that it is willing and able to limit withdrawals from the transmission system when requested by PJM and providing PJM with an authorization or certification from its Relevant Electric Retail Regulatory Authority (RERRA) affirming that the Eligible Customer is authorized to provide energy to the Co-Located Load. PJM also proposes to require that certain facilities and necessary technical arrangements must be completed prior to commencement of requested service.
414.
PJM next explains that, under the Service Agreement for Contract Demand transmission service, service is presumed to continue without expiration, and that there are several bases for termination.900 For example, PJM explains that service can terminate on 42 months’ notice prior to the commencement of a delivery year, and PJM argues that this is appropriate because the contract demand level under FCD transmission service will be accounted for in PJM’s capacity market. PJM proposes circumstances whereby PJM may terminate service for cause: (1) the Eligible Customer breaches its obligations, such as materially changing the Co-Location Arrangement without PJM studying it; or (2) the Eligible Customer is disqualified by failing to follow an operating instruction to curtail or shed load, or after the misoperation, on more than one occasion, of any necessary control technologies or required protection systems (described further below).
415.
PJM next proposes that the Eligible Customer designate the Co-Located Load and the Co-Located Generator and provide the MW level of energy from the Co-Located Generator dedicated to serving the Co-Located Load.901 For reliability purposes, PJM states, the Eligible Customer must provide PJM with timely written or electronic notice of material changes in the demand characteristics of the Co-Located Load or the supply characteristics of the Co-Located Generator. PJM maintains that necessary control technologies and protection systems for NFCD transmission service will be designed based on the specific circumstances of each Co-Location Arrangement, and PJM’s ability to reliably operate the system could be impaired by any material changes to the control technologies or protection systems. PJM proposes to prohibit an Eligible Customer from using FCD transmission service for the sale of either capacity or energy to loads other
899 PJM Initial Brief at 17-19.900 Id. at 20-22.901 Id. at 22-24. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 348 Date Filed: 10/19/2026
PDF page 350
Docket No. EL25-49-002, et al.- 195 -
than the Co-Located Load designated in its Service Agreement or the transmission service to third parties.
b. Response Briefs
416.
ODEC requests clarification regarding how PJM’s requirement that an Eligible Customer taking transmission service on behalf of a Co-Located Load provide PJM with an authorization or certification from its RERRA which affirms that the Eligible Customer is authorized to provide energy to the Co-Located Load would apply to a generation and transmission electric cooperative like ODEC.902 ODEC states that it is unclear whether PJM intends that ODEC, as an Eligible Customer, would need to provide certification that ODEC’s member distribution cooperatives (which are the RERRA in Maryland and Delaware) have authorized ODEC to provide energy to the Co-Located Load. ODEC adds that, where the state regulatory agency is the RERRA, ODEC is unaware of a procedure whereby it would obtain authorization from the Virginia State Corporation Commission to provide energy to Co-Located Loads.
417.
Constellation opposes PJM’s proposal that the Eligible Customer must submit an authorization or certification from the RERRA affirming that the Eligible Customer is authorized to provide energy to the Co-Located Load.903 Constellation argues that, if the generator is the Eligible Customer, it is unreasonable to require that generator to go to the state commission for a special approval if the load is in a retail competition state. Constellation maintains that the Eligible Customer need only show that the load will be served by a transmission owner or licensed competitive retail supplier. 418.
Industrials/Amtrak argue that Co-Located Load on whose behalf an Eligible Customer takes NFCD transmission service should have firm natural gas capacity or other adequate alternatives to be able to utilize the service. Industrials/Amtrak argue this requirement will prevent “misuse” of NFCD transmission service “by generators who have the ability to operate but may want to rely on the grid when it appears to be more economical for that generator.”904 Industrials/Amtrak explain that, from a resource adequacy perspective, policies surrounding NFCD transmission service should encourage loads to bring their own generation.
419.
Indicated TOs request that PJM add to section 710.1 of PJM’s illustrative tariff provisions, as a condition precedent for receiving FCD or NFCD transmission service, a requirement that the Eligible Customer satisfy any load-connection related requirements
902 ODEC Response Brief at 6-7.903 Constellation Response Brief at 29.904 Industrials/Amtrak Response Brief at 24. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 349 Date Filed: 10/19/2026
PDF page 351
Docket No. EL25-49-002, et al.- 196 -
imposed by the applicable PJM transmission owner.905 Indicated TOs argue that PJM should add language to the list of information in section 710.2 of PJM’s illustrative tariff provisions to be provided in an application for FCD and/or NFCD transmission service to the effect that the customer has met applicable load interconnection study obligations. Indicated TOs request that PJM add a placeholder section for listing required control technologies or protection systems to section 5.0 of PJM’s proposed Attachment F-4.906 420.
Indicated TOs request that PJM clarify whether the use of “Delivery Point” in section 710.2 subsection (iii) and subclause (i) of section 710.5 is appropriate in light of PJM’s proposed definition of Co-Located Load, which is based on facilities located on the same side of the Point of Change in Ownership.907
421.
Indicated TOs contend that PJM should clarify in section 711.3 of PJM’s illustrative tariff provisions or in PJM’s manuals what constitutes “material changes” for purposes of the annual information updates to be provided by Eligible Customers.908 Indicated TOs argue that PJM should revise section 712.2 of PJM’s illustrative tariff provisions to require PJM to notify the affected PJM transmission owner(s) of any request for NFCD transmission service. Indicated TOs argue that PJM should revise section 713 of PJM’s illustrative tariff provisions to require that notice of any curtailment be provided not only to the Eligible Customer but also to the affected PJM transmission owner or Electric Distribution Company.
422.
Constellation recommends that, for Eligible Customers requesting transmission service on behalf of Co-Located Load, if the customer facilities include an existing generator, a certification be required that the existing generator supports the transmission service request.909 Constellation argues that this requirement would ensure the Co-Located Load is physically connected to the facilities of the existing or planned Customer Facility. Alliance promotes their framework for looking at how to responsibly enable large-load integration while preserving reliability, cost causation, and affordability.910905 Indicated TOs Response Brief at 18. 906 Id. at 19, 24.907 Id. at 18-19 n.41.908 Id. at 20-22.909 Constellation Response Brief at 30.910 Alliance Response Brief at 2. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 350 Date Filed: 10/19/2026
PDF page 352
Docket No. EL25-49-002, et al.- 197 -
c. Reply Briefs
423.
In response to parties’ comments, particularly those of Indicated TOs, PJM proposes certain revisions to its illustrative tariff language for FCD and NFCD transmission services.911 Specifically, PJM notes that it proposes revisions to section 711.3 to provide that the applicable transmission owner will be notified of material changes to Co-Located Arrangements, as well as a reference to the PJM manuals for further description of what would constitute a material change. PJM further proposes changes to section 713.1 to provide that PJM will notify the applicable transmission owners of any instruction to curtail Co-Located Load.
424.
Constellation urges the Commission to deny Indicated TOs’ proposal to replace “Delivery Point” with “Point of Change in Ownership” in PJM’s requirements for applications for FCD and NFCD transmission services because it would risk uncertainty or delays for parties in Co-Location Arrangements.912 Constellation asserts that the Tariff should use “Point of Interconnection,” consistent with the definition of Co-Located Load. 425.
Since filing its initial brief, PJM states that it has determined that changes to Auction Revenue Rights rules must be modified to recognize that FCD transmission service customers will contribute towards enhancing and maintaining the transmission system and should have the right to request Auction Revenue Rights.913 To effectuate this modification, PJM proposes a revision to Operating Agreement, Schedule 1, section 7.4.2(d) and includes a new Operating Agreement, Schedule 1, section 7.4.2(l) to detail the Auction Revenue Rights rules specific to Eligible Customers taking FCD transmission service.914
d. Determination
426.
We disagree with PJM that it is just and reasonable for the replacement rate to require Eligible Customers requesting FCD or NFCD transmission service to provide an authorization or certification from its RERRA affirming that the Eligible Customer is authorized to provide energy to the Co-Located Load.915 PJM does not provide any explanation or context for proposing this requirement, and it is not clear why an Eligible
911 PJM Reply Brief at 62-63.912 Constellation Reply Brief at 9 (citing Indicated TOs Response Brief at 19).913 PJM Reply Brief at 65.914 Id. at 65-66.915 PJM Initial Brief at 18-19. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 351 Date Filed: 10/19/2026
PDF page 353
Docket No. EL25-49-002, et al.- 198 -
Customer would need to go through this extra step under the Tariff to prove it is authorized to serve load. If an Eligible Customer that is not authorized to provide energy to load attempts to do so, that would be a matter for the RERRA’s enforcement mechanisms.
427.
We similarly disagree with Constellation that it is necessary to require Eligible Customers requesting FCD or NFCD transmission service on behalf of Co-Located Load to include a certification from the Co-Located Generator, if it is an existing generator, to ensure that the Co-Located Load is physically connected to the generator’s facilities. The Commission already made clear that Co-Located Load must be “physically connected to the facilities of an existing or planned Customer Facility on the Interconnection Customer’s side of the Point of Interconnection to the PJM Transmission System.”916 If an Eligible Customer attempts to request FCD or NFCD transmission service on behalf of a load that did not meet the definition of Co-Located Load, that should be referred to the Commission’s Office of Enforcement and Regulatory Accounting.
428.
Industrials/Amtrak argue that Co-Located Load on whose behalf an Eligible Customer takes NFCD transmission service should have firm natural gas capacity or other adequate alternatives to be able to utilize the service.917 Industrials/Amtrak explain that such a requirement would “avoid misuse of the [NFCD transmission] service by generators who have the ability to operate but may want to rely on the grid when it appears to be more economical for that generator.” The December Order contained no such limitation and Industrials/Amtrak have failed to justify adding it here. Specifically, the December Order stated that NFCD transmission service would reflect Eligible Customers taking service on behalf of Co-Located Loads that may not “necessarily plan to withdraw energy from the transmission system on a regular basis” but “still seek to withdraw energy from the transmission system from time to time when transmission capacity is available and not needed by firm customers.”918 The December Order thus contemplates that NFCD transmission service would be an option for Eligible Customers taking transmission service on behalf of Co-Located Load, not a mandate. 429.
Indicated TOs request that the Commission direct as part of the replacement rate requirements related to Eligible Customers satisfying requirements related to load interconnections.919 Indicated TOs have not explained why these requirements are
916 December Order, 193 FERC ¶ 61,217 at P 1 & n.3; February Order, 190 FERC ¶ 61,115 at P 3 & n.4.917 Industrials/Amtrak Response Brief at 24.918 December Order, 193 FERC ¶ 61,217 at P 214.919 Indicated TOs Response Brief at 18-19. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 352 Date Filed: 10/19/2026
PDF page 354
Docket No. EL25-49-002, et al.- 199 -
necessary, and so we decline to make them a part of the replacement rate at this time. However, we agree with Indicated TOs’ request that PJM add a placeholder section for listing necessary control technologies and/or protection systems to section 5.0 of PJM’s proposed Attachment F-4.
430.
We also find PJM’s proposal to allow FCD transmission service customers to request Auction Revenue Rights in stage 2 of the allocation process to be just and reasonable. Given the underlying design of the FCD transmission service, we find the presumption that FCD transmission service customers contribute towards enhancing and maintaining the transmission system on par with other Firm PTPS transmission customers to be reasonable. PJM’s proposal provides FCD transmission service customers an equivalent opportunity to request Auction Revenue Rights. We direct PJM to submit a compliance filing within 60 days of the date of issuance of this order to revise its Tariff consistent with this replacement rate. Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we further direct PJM to reflect this change in its compliance filing.
B. Additional Charge for Eligible Customers Taking FCD and/or NFCD
Transmission Service
1. December Order
431.
As part of the paper hearing, the Commission asked the parties:
Should the rate paid by an Eligible Customer on behalf of a
Co-Located Load taking only the new Non-Firm Contract
Demand transmission service that elects to not reserve any
amount of that service for a period of time (e.g., one month)
reflect not only charges for regulation and black start
services, but also an additional charge given that regulation
and black start services could not be provided without the
transmission system? If so, how should that additional charge
be determined?
432.
In addition, the Commission asked:
Should the rate paid by an Eligible Customer on behalf of a
Co-Located Load taking only a de minimis amount of the new
Firm or Non-Firm Contract Demand transmission services
reflect not only (i) charges for regulation and black start
service and (ii) the transmission service charges for that
de minimis amount of service, but also an additional charge
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 353 Date Filed: 10/19/2026
PDF page 355
Docket No. EL25-49-002, et al.- 200 -
reflecting that the Co-Location Arrangement is physically
connected and synchronized to the PJM transmission system?
If so, how should that additional charge be determined?
2. Initial Briefs
433.
Indicated TOs propose to charge a Grid Reliance Charge to Eligible Customers taking FCD or NFCD transmission service based on the difference between either the contract amount of FCD transmission service, or the reserved amount of NFCD transmission service, and the customer’s gross on-site load.920 Indicated TOs explain that the Grid Reliance Charge is designed to reflect the costs of using the transmission system to deliver black start and regulation services, as well as the inherent benefit that all customers receive through their synchronization to and reliance on the transmission system. Indicated TOs state that the Grid Reliance Charge also recognizes the costs associated with the operations, maintenance, and other activities that Indicated TOs will need to perform for the transmission system and to accommodate the increased number of protection schemes required for Co-Location Arrangements. Indicated TOs propose to calculate this charge for each zone based on an average fixed percentage of the portion of transmission depreciation and operations and maintenance expense associated with providing grid reliance services, and to apply that percentage to each transmission owner’s annual revenue requirement.921 Indicated TOs argue that it is appropriate to use annual depreciation and operations and maintenance expenses because these expenses best capture the portions of a transmission owner’s revenue requirement relating to the ongoing reliable operation of the transmission system. Indicated TOs propose an initial percentage of 25.8%, subject to adjustment every five years.
434.
In further justifying the Grid Reliance Charge, Indicated TOs assert that Co-Located Load and its associated Co-Located Generator benefit from the existence and reliable operation of the transmission system because they are electrically connected to the transmission system, and should contribute to paying the costs of continuing to reliably operate the system regardless of the amount of energy withdrawn. Indicated TOs contend that a large Co-Location Arrangement with zero MW of FCD or NFCD transmission service still depends on the grid for the delivery of various ancillary services and a suite of synchronization support services, such as stable frequency, inertia, stability services, fault current capability, and ride-through and protection coordination. Indicated TOs argue that the Commission has long recognized that an integrated transmission
920 Indicated TOs Initial Brief at 14.921 Id. at 14-16. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 354 Date Filed: 10/19/2026
PDF page 356
Docket No. EL25-49-002, et al.- 201 -
system provides broad reliability benefits to all customers of the system, and this recognition has guided Commission decisions on ratemaking and cost allocation.922 435.
Indicated TOs maintain that their proposed methodology for the Grid Reliance Charge is a just and reasonable way to estimate with an appropriate level of precision the benefits to Co-Located Load from relying on the grid while ensuring this charge can be fairly and efficiently implemented.923 Indicated TOs state that they have included detailed testimony on the proposed methodology, and they highlight that the allocator is based on costs included in transmission plant and transmission operations and maintenance FERC accounts.924 Indicated TOs contend that their proposal is conservative in a number of respects, for example, they exclude amortization and general plant depreciation, as well as administrative and general expenses. Indicated TOs explain that the allocator will be multiplied by each transmission owner’s rate for NITS and FCD transmission service, resulting in an “unadjusted” Grid Reliance Charge rate. Indicated TOs further explain that they propose to multiply this unadjusted rate by a ratio that accounts for the difference between the demand used to account for the NITS and FCD transmission service rate and the gross load for Eligible Customers on behalf of Co-Located Load, resulting in the final Grid Reliance Charge for each zone. Indicated TOs propose to update the allocation percentage every five years to ensure rate stability and avoid the allocators becoming stale. Indicated TOs propose to apply the revenues from the Grid Reliance Charge as credits to NITS and FCD transmission service customers in the relevant zone to avoid double recovery or inappropriate cost shifts.
3. Response Briefs
a. Basis for an Additional Charge
436.
ODEC and NOVEC support Indicated TOs’ proposal for a Grid Reliance Charge to be applied to customers taking FCD and NFCD transmission service.925 ODEC argues such a charge ensures that Co-Located Loads pay their “fair share” of costs that are commensurate with the benefits Co-Located Loads receive from the transmission system, including the costs associated with delivery of black start and regulation services. NOVEC similarly asserts that Co‑Located Load depends on the transmission system to deliver black start and regulation services, the charges for which a delivery component is
922 Id. at 15-16 (citing W. Mass. Elec. Co. v. FERC, 165 F.3d 922, 927 (D.C. Cir. 1999)).923 Id. at 16.924 Id. at 16-18.925 ODEC Response Brief at 10; NOVEC Response Brief at 9. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 355 Date Filed: 10/19/2026
PDF page 357
Docket No. EL25-49-002, et al.- 202 -
not included. NOVEC argues that without the Grid Reliance Charge, a Co-Located Load that reserved no FCD or NFCD transmission service would be a free rider, as it would benefit from the payments of existing transmission customers to maintain the transmission system without making any contribution towards it.
437.
Geronimo Power argues that Indicated TOs have not demonstrated that their proposed Grid Reliance Charge reflects Co-Located Loads’ actual impact on or benefits from interconnection with the transmission system and is consistent with cost causation principles.926 Further, Geronimo Power states that Indicated TOs have failed to demonstrate that there is a separate delivery component to black start and regulation services and that, if there were such a component, Indicated TOs have not explained why it would not be unduly discriminatory to apply it only to Co-Located Loads. 438.
Vistra argues that Indicated TOs fail to address the nuances in the Commission’s paper hearing questions on additional charges or the actual ways that NFCD transmission service customers might rely on the grid.927 Vistra asserts that the Commission’s questions illustrate that customers could use NFCD transmission service in different ways but transmission owners would impose the same charge regardless. Vistra maintains that, while Indicated TOs argue that Co-Located Loads are all synchronized to the grid, synchronization is not, itself, a service. Vistra alleges that, in contrast to the Commission’s long-standing policy that transmission providers offer and price ancillary services separately, Indicated TOs create a new service for what appears to be an undefined ancillary service (i.e., grid reliance) to cover a suite of synchronization support services. Vistra argues that it is not consistent with cost causation principles to impose the same grid reliance charge for very different types of grid reliance. Vistra contends that the Commission did not prejudge whether or when a grid reliance charge is necessary and that the Commission could conclude no such charge is necessary for customers taking zero MWs or a de minimis amount of the new transmission services. 439.
Industrials/Amtrak argue that, as an as-available service, there should be no standby fee charging NFCD transmission service customers for access to the transmission system that is not guaranteed. Instead, Industrials/Amtrak contend that customers should be charged based on actual use on an hourly basis.928926 Geronimo Power Response Brief at 10-11, 13-14.927 Vistra Response Brief at 19-21.928 Industrials/Amtrak Response Brief at 24. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 356 Date Filed: 10/19/2026
PDF page 358
Docket No. EL25-49-002, et al.- 203 -
b. Methodology for Determining Additional Charge
440.
NOVEC states that the proposed Grid Reliance Charge is just and reasonable because it is limited to depreciation and operations and maintenance, and conservatively excludes a return on rate base and associated income taxes.929 NOVEC also notes that because revenues earned from the Grid Reliance Charge are returned to NITS and FCD transmission service customers as a revenue credit, the structure avoids any risk of double recovery.
441.
Alliance argues that the additional charge question is important and should be resolved in a way that protects other customers from unjustified cost shifts.930 Alliance takes no position on a specific dollar figure; instead, it recommends that any additional charge reflect the contributions of load that have efficient operations or verified load flexibility through reductions in their cost obligations.
442.
Regarding Indicated TOs’ argument that the Grid Reliance Charge will also cover costs associated with the protection schemes for Co-Located Load, Geronimo Power argues there is no reason to believe transmission owners will bear any such costs that could not be addressed in interconnection agreements.931
443.
Vistra argues that, even if some charge is appropriate, Indicated TOs have not justified their proposed rate.932 Vistra contends that it is unreasonable to propose that a customer that never takes transmission service receives benefits approximating 25.8% of the transmission owners’ revenue requirement. Vistra highlights that only 0.5% of PJM’s monthly total billings are related to black start and regulation charges and that, to the extent an NFCD transmission service customer never reserves transmission service relies on the transmission system, that reliance is for the sole purpose of receiving black start and regulation service. As such, Vistra argues, the percentage of PJM’s total monthly billings that relates to black start and regulation charges is a reasonable proxy for the amount of transmission system costs that are associated with use of the grid to deliver black start and regulation service.
444.
Vistra also contends that Indicated TOs’ proposal conflicts with the Commission’s transmission pricing policy because it disincentivizes efficiency and focuses on reallocating a large share of sunk costs. Moreover, Vistra contends, Indicated TOs’
929 NOVEC Response Brief at 10.930 Alliance Response Brief at 4.931 Geronimo Power Response Brief at 14.932 Vistra Response Brief at 21-23. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 357 Date Filed: 10/19/2026
PDF page 359
Docket No. EL25-49-002, et al.- 204 -
proposal would create significant and unjustified cost shifts between NFCD transmission service customers and Network Customers.933 Vistra suggests it is not clear what transmission owners, which are major Network Customers, will do with the bill credits and that it is not a foregone conclusion that they will pass savings onto retail customers. 445.
Constellation contends that Indicated TOs’ proposed Grid Reliance Charge rests on an unsound methodology that violates cost causation principles.934 Constellation requests that the charge be recalculated based on the “minimum system” method. Constellation asserts that Indicated TOs both exclude reasonable costs and include unreasonable costs in the grid reliance capability operations and maintenance and provide very little justification for their proposal. Moreover, Constellation argues that Indicated TOs inappropriately include full depreciation costs for a variety of transmission components that are sized to meet actual peak demand requirements of the PJM system, even though customers paying the Grid Reliance Charge do not withdraw energy from the PJM system. In support of the minimum system method, Constellation argues it is designed to calculate the set of costs that a Co-Located Load that benefits from the existence of wires but imposes no demand on the grid should share. Constellation explains that its method involves determining the minimum size of all electricity system components that could be used by the utility to recreate its system and connect each customer to the grid, and then applying this fraction to each transmission owners’ NITS rate.
4. Reply Briefs
a. Basis for an Additional Charge
446.
Indicated TOs contend that being connected to the grid provides obvious benefits in terms of the ability to access resources that are not co-located with load.935 Indicated TOs further argue that being connected to the grid includes benefits like delivering ancillary services and essential reliability services, such as frequency support, inertia, voltage stability, fault current capability, ride-through and protections coordination, and providing sufficient short-circuit capability. Indicated TOs state that they are unaware of any existing or proposed Co-Located Load customers that are choosing to island their load and on-site generation, and they infer from that fact that Co-Located Loads should
933 Id. at 23-25.934 Constellation Response Brief at 25-28.935 Indicated TOs Reply Brief at 22 (citing Joint Blazunas/Schafer/Hammer Rebuttal Test. at 16); see also Joint Blazunas/Schafer/Hammer Rebuttal Test. at 31. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 358 Date Filed: 10/19/2026
PDF page 360
Docket No. EL25-49-002, et al.- 205 -
share in the basic costs of operating and maintaining the grid upon which they rely.936 Indicated TOs further argue that an additional charge is appropriate because ancillary services such as black start and regulation provide no value without the ability to access the transmission system to obtain them.937
b. Methodology for Determining Additional Charge
447.
Indicated TOs defend their proposed methodology, arguing that it produces a more conservative result focused on recovery of the costs necessary to support the ongoing reliable operation of the transmission system, rather than a return on investment.938 Indicated TOs criticize Constellation’s proposal to use the “minimum system” method, arguing that it is not used at the transmission level and lacks any correlation between the benefits Co-Located Load receives and the electrical connection of customers. Indicated TOs also reject Vistra’s proposed methodology, arguing that Vistra draws no connection between the percentage of billed revenue for regulation and black start and the costs of the transmission system to deliver those services and the benefits associated with grid connection.
448.
NOVEC argues that Constellation’s minimum system proposal is not cost-aligned with the use of black start service or regulation service because black start service relies on the existence and durability of the transmission system in a way that Constellation’s minimum system methodology does not capture.939 NOVEC further argues that the ratio method advanced by Vistra arbitrarily confuses the cost of black start and regulation services with the cost of the transmission infrastructure necessary for customers to receive them.
449.
Joint Co-Location Developers argue that the proposed Grid Reliance Charge is derived from an unsound methodology that violates cost causation principles.940 Joint Co-Location Developers argue that the Commission should direct the PJM transmission
936 Indicated TOs Reply Brief at 22.937 Id. at 22-23.938 Id. at 24, 26-27, 29.939 NOVEC Reply Brief at 23, 26.940 Joint Co-Location Developers Reply Brief at 3 (citing Constellation Response Brief at 25; Geronimo Power Response Brief at 9-15; Vistra Response Brief at 18-23). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 359 Date Filed: 10/19/2026
PDF page 361
Docket No. EL25-49-002, et al.- 206 -
owners to adopt the alternate cost calculation framework proposed by Constellation, which follows the Commission’s cost causation principles.941
450.
Industrials/Amtrak argue that the proposed Grid Reliance Charge fails to reflect how different customers actually rely on the transmission system and would result in customers that take little or no energy from the grid subsidizing traditional network customers, violating cost causation principles.942 Industrials/Amtrak argue that NFCD transmission service should not be charged a standby fee such as the Grid Reliance Charge, as NFCD transmission service does not provide any guaranteed availability.
5. Answers
451.
Constellation contends that Indicated TOs’ proposal would force customers that do not impose demand on the transmission system to pay for transmission components sized to serve peak load, while also arbitrarily excluding costs related to rate of return and taxes.943 Constellation defends its proposed minimum system methodology. 452.
Geronimo Power asserts that, while it does not oppose the concept of a grid reliance charge, Indicated TOs continue to fail to show that it is necessary and reflects Co-Located Loads’ actual grid impact or the transmission service they will receive.944 Geronimo Power argues that Indicated TOs’ proposal to assess a charge for the delivery of black start and regulation service when other customers are not required to pay a separate delivery charge is unjust, unreasonable, and unduly discriminatory or preferential.945 Geronimo Power maintains that Indicated TOs have not demonstrated that the purported synchronization benefits will accrue to the same degree for Co-Located Load that is being primarily supplied by on-site generation.946
453.
Indicated TOs respond to Constellation’s argument that the Indicated TOs’ proposed charge is based on the cost of the transmission system to serve peak demand rather than to delivery ancillary services, arguing that the purpose of the Grid Reliance
941 Id. at 4 (citing Constellation Response Brief, attach. 1, (Testimony of Zachary Ming), at 14-15).942 Industrials/Amtrak Reply Brief at 11-12, 14.943 Constellation May 11 Answer at 11-12.944 Geronimo Power May 21 Answer at 10.945 Id. at 11.946 Id. at 12. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 360 Date Filed: 10/19/2026
PDF page 362
Docket No. EL25-49-002, et al.- 207 -
Charge is not only to recover costs to deliver ancillary services, but to ensure Co-Located Load customers pay their fair share of the transmission system as it exists and the associated benefits that it provides to all interconnected customers, including essential reliability services.947 Indicated TOs maintain that their proposed charge does so by calculating the annual depreciation and operations and maintenance expenses that constitute a reasonable proxy for the costs of providing those benefits. Indicated TOs assert that Constellation’s minimum system method is only appropriate for and applicable to distribution level service.
6. Determination
454.
In the December Order, the Commission sought briefing on whether the
Commission should establish an additional charge for Eligible Customers on behalf of a Co-Located Load that elects to not reserve any amount of transmission service or only a de minimis amount of transmission service.948 In response, parties submitted briefs addressing a range of issues, including, among others: (1) what potential benefits Eligible Customers that are synchronized to the transmission system might receive when not drawing energy from the transmission system; (2) whether those potential benefits warrant an additional charge or are adequately addressed through any transmission service charges that the Eligible Customer is already responsible for; and (3) proposed rates for such a charge and whether those proposed rates are consistent with cost causation principles.
455.
We have considered that record and conclude that it does not adequately substantiate the need for an additional charge at this time or how such a charge should be calculated and assessed. In particular, the record contains insufficient description of the potential nature or magnitude of the cited benefits or the potential costs that transmission providers or owners may incur when providing these benefits to Eligible Customers on behalf of Co-Located Loads. For example, Indicated TOs state that, even where an Eligible Customer has requested FCD or NFCD transmission service for 0 MW, a large Co-Location Arrangement will still depend on the transmission system for a suite of synchronization support services, such as stable frequency, inertia, stability services (damping, angle stability), fault current capability, and ride-through and protection coordination.949 However, beyond briefly listing such benefits, the record lacks specificity regarding what these services are, what costs they involve, and how they
947 Indicated TOs May 28 Answer at 11.948 December Order, 193 FERC ¶ 61,217 at P 219, questions 3 and 4.949 Indicated TOs Initial Brief at 15. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 361 Date Filed: 10/19/2026
PDF page 363
Docket No. EL25-49-002, et al.- 208 -
benefit Eligible Customers on behalf of Co-Located Loads. Accordingly, we decline to establish an additional charge at this time.
456.
Nonetheless, we recognize that the new transmission services created in this proceeding could raise novel questions regarding application of cost causation principles, particularly if, in practice, many Eligible Customers taking the new transmission services on behalf of Eligible Load elect to take a de minimis or not reserve any amount of transmission service. We believe that experience with the actual use of these new transmission services will improve our understanding of any potential issues and inform whether future action is needed. To the extent parties identify such issues resulting from how Eligible Customers on behalf of Eligible Load use the new transmission services, they may submit filings under FPA section 205 or complaints under FPA section 206, as appropriate, and the Commission will consider the records before us at that time.
C. Interconnection Requirements and Operational Practices for
Necessary Control Technologies and/or Protection Systems
1. Initial Briefs
457.
PJM states that NERC has established reliability standard requirements for the various forms of control technologies that may be relied upon for grid stability to which Eligible Customers are expected to adhere.950 PJM explains that the PJM manuals and, as applicable, NERC reliability standards will contain the interconnection requirements and operational practices needed for necessary control technologies and protection systems to maintain system reliability if a Co-Located Load or Co-Located Generator trips offline. PJM asserts that the NERC reliability standards form baseline interconnection requirements and operational practices, and the PJM manuals provide additional details and, at times, more stringent standards for remedial action schemes. PJM describes an illustrative list of interconnection requirements and operational practices in its brief, including NERC Reliability Standards PRC-012-2 and PRC-017-1, PJM Manual 3, section 1.8, and PJM Manual 7, section 17.2.951
458.
Indicated TOs do not offer a specific proposal at this time, but they highlight concerns and key elements relating to interconnection, planning, and operational practices for the new transmission services.952 Indicated TOs assert that it is novel to use multiple special protection schemes/remedial action schemes to protect the grid from large amounts of on-site load exceeding their contractual withdrawal limitations.
950 PJM Initial Brief at 56-57. 951 Id. at 57-58.952 Indicated TOs Initial Brief at 22-26. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 362 Date Filed: 10/19/2026
PDF page 364
Docket No. EL25-49-002, et al.- 209 -
Indicated TOs recommend that all special protection schemes and remedial action schemes be fully redundant to protect against the failures of protection schemes. Indicated TOs recommend that the Eligible Customer taking FCD transmission service, NFCD transmission service, or Interim NITS on behalf of Co-Located Load pay for PJM- and transmission owner-administered studies to ensure any special protection schemes or remedial action schemes can mitigate the risks of potential failure modes. Indicated TOs request the option to review and agree to curtailment procedures and operational control mechanisms. Indicated TOs argue that all special protection schemes and remedial action schemes must meet PJM and transmission owner technical criteria. 459.
Indicated TOs state that the Commission should consider requiring more frequent testing of special protection schemes and remedial action schemes than is currently required by NERC reliability standards. Indicated TOs argue that they and PJM should receive test results of protection schemes and that any inadequate special protection schemes or remedial action schemes should be updated accordingly. Indicated TOs argue that they and PJM should be permitted to implement and enforce reasonable limits on the total amount of load that can be covered by special protection schemes or remedial action schemes. Indicated TOs request that the Commission direct NERC to establish requirements so that Eligible Customers taking FCD transmission service, NFCD transmission service, or Interim NITS on behalf of Co-Located Loads would be responsible for meeting relevant NERC reliability standards. Indicated TOs contend that the Commission must strictly enforce compliance with NERC Reliability Standard PRC-012-2 (Remedial Action Schemes), which includes nine requirements to address all aspects of remedial action schemes. Indicated TOs also emphasize that they will need to perform load integration studies for any Co-Located Load, as they currently do for large load customers, which could involve analysis of whether upgrades are needed to accommodate the physical gross load behind the Point of Interconnection.
2. Response Briefs
460.
Vistra opposes Indicated TOs’ request to implement and enforce limits on the amount of load that can be covered by special protection schemes, including in certain areas.953 Vistra expresses concern that this limit could lead to undue discrimination, and argues that if the Commission permits such limits, the Commission must ensure standardized and transparent guidelines are in place. Vistra contends that Indicated TOs’ proposal would violate the comparability requirement because PJM’s existing procedures do not include location-based restrictions for remedial action schemes. Vistra also opposes Indicated TOs’ proposal to own special protection schemes, arguing that it would needlessly raise the cost of transmission service.
953 Vistra Response Brief at 27-28, 31. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 363 Date Filed: 10/19/2026
PDF page 365
Docket No. EL25-49-002, et al.- 210 -
461.
NOVEC states that at a minimum, PJM’s proposal to incorporate NERC reliability standards is just and reasonable.954 NOVEC also states that the Commission should direct NERC to establish registration requirements for Co-Located Loads so that they can be responsible for meeting NERC reliability standards.
462.
NOVEC states that special protection schemes should be fully redundant and that the applicable transmission owner should be able to establish technical criteria for the interconnection of Co-Located Load.955 NOVEC argues that transmission owners are familiar with the operating characteristics of their own systems, and any criteria should be flexible enough to include reasonable requirements the transmission owners believe are necessary to protect the transmission system.
463.
Industrials/Amtrak argue that, to the extent that special protective schemes are required by the Commission for access to NFCD transmission service, the requirements should account for realistic on-site constraints, such as certain load/generation configurations that allow only a limited amount of draw from the transmission system.956 464.
In response to PJM’s Initial Brief, Indicated TOs argue that any Eligible Customer taking any of the new transmission services (including FCD transmission service) ought to comply with requirements to implement necessary control technologies and protection systems to ensure that a Co-Located Load does not exceed its specified level of service.957 Indicated TOs therefore request that PJM add language to section 708(c) of PJM’s illustrative tariff provisions making clear that Interim NITS, FCD transmission service, and NFCD transmission service are contingent on the implementation of necessary control technologies and protection systems, where applicable. Relatedly, Indicated TOs propose to strike the phrase “only in the case of Non-Firm Contract Demand Transmission Service” from subclause (ii) of section 710.5 of PJM’s illustrative tariff provisions.958 Similarly, Indicated TOs contend that PJM should revise section 713.6 of PJM’s illustrative tariff provisions so as to not limit the requirement to establish necessary control technologies and protection systems to NFCD transmission service.
954 NOVEC Response Brief at 16-17.955 Id. at 17.956 Industrials/Amtrak Response Brief at 25.957 Indicated TOs Response Brief at 7-8, 17-18.958 Id. at 19-20, 22. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 364 Date Filed: 10/19/2026
PDF page 366
Docket No. EL25-49-002, et al.- 211 -
465.
Indicated TOs argue that PJM should include language in the Tariff making clear that necessary control technologies and protection systems may be required on both the customer’s and the transmission owner’s side of the Point of Interconnection, including in section 710.5 of PJM’s illustrative tariff provisions.959
466.
Indicated TOs argue that it is important for PJM to work with the PJM transmission owners and other stakeholders to develop details on the requirements associated with control technologies and protection systems necessary to ensure that Co-Located Loads do not exceed their relevant withdrawal limitations.960 467.
Constellation seeks clarification that PJM only intends to apply existing requirements in Manual 3 to Co-Location Arrangements, not to establish new requirements solely for such arrangements.961 Constellation also seeks clarification that PJM does not intend to restrict the use of permanent system protection schemes. 468.
Constellation supports Indicated TOs’ first four recommendations, subject to clarification to avoid delay and discrimination.962 For example, while Constellation supports requiring full redundancy for special protection schemes and remedial action schemes, Constellation argues that it is not clear what full redundancy means. Constellation opposes the Indicated TOs’ remaining recommendations as unsupported and discriminatory.
3. Reply Briefs
469.
Indicated TOs state that they agree that the transmission owner and customer each may own the circuit breaker(s) and protection systems at their respective facilities and, in response to Constellation, state that the number of breakers will be determined by the transmission owner’s and customer’s design practices and budgets, as well as the
959 Id. at 8-9, 20.960 Id. at 9.961 Constellation Response Brief at 21.962 Id. at 22-25. More specifically, Constellation supports, subject to clarification, Indicated TOs’ recommendations that: (1) all special protection schemes and remedial action schemes be fully redundant; (2) customers should pay for PJM and transmission owner-administered studies to ensure any special protection schemes and remedial action schemes can effectively mitigate the risks of potential failure modes; (3) transmission owners have the option to review and agree to any customer load curtailment procedures or operational control mechanisms; and (4) all special protection schemes and remedial action schemes must fully meet PJM and transmission owner technical criteria. Id. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 365 Date Filed: 10/19/2026
PDF page 367
Docket No. EL25-49-002, et al.- 212 -
transmission owner’s technical criteria. Indicated TOs disagree with Constellation’s assertion that new technical criteria specific to Co-Located Load need not be added to PJM Manual 3. Indicated TOs argue that such revisions or additions may be unavoidable due to the technical characteristics of Co-Located Load and contend that PJM and the PJM transmission owners should not be restricted from developing and implementing criteria applicable to Co-Located Load as a class if warranted by reasonable technical differences.963
470.
Indicated TOs argue that Constellation’s request for the Commission to reject certain recommendations made by Indicated TOs is without merit. Indicated TOs reject Constellation’s claim that these recommendations treat Co-Located Loads differently without legitimate basis and explain that certain transmission owners already require protection on their facilities in certain circumstances.964
471.
Indicated TOs argue that Vistra provides no convincing reason for the Commission to reject Indicated TOs’ recommendation for reasonable limits on the amount of load covered by special protection schemes/remedial action schemes in specific geographic areas. Indicated TOs acknowledge, however, that implementing such limitations would require the development of further details and guidelines.965 472.
Joint Co-Location Developers argue that PJM and Market Monitor ignore the distinction between simple withdrawal-limiting protection systems that are required by PJM for sites taking non-firm transmission service and standard remedial action schemes.966 Joint Co-Location Developers explain that unlike standard remedial action schemes, which monitor and control components across the grid, simple withdrawal-limiting protection systems monitor and control only facility-internal components, monitoring flows, adjusting consumption or generation at the site level, and disconnecting from the grid if necessary. Joint Co-Location Developers argue that simple withdrawal-limiting protection systems can be relied upon much more extensively than standard remedial action schemes without creating the same complexities and interdependencies.
963 Indicated TOs Reply Brief at 11-13.964 Id. at 13-14.965 Id. at 14.966 Joint Co-Location Developers Reply Brief at 6-7. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 366 Date Filed: 10/19/2026
PDF page 368
Docket No. EL25-49-002, et al.- 213 -
473.
Joint Co-Location Developers agree with Indicated TOs that all special protection schemes and remedial action schemes should be fully redundant.967
474.
Constellation argues that Indicated TOs’ recommendation that PJM impose necessary control technologies and protection systems on both the customer’s side and the transmission owner’s side of the Point of Interconnection for Co-Located Loads as a default requirement is unsupported and unduly discriminatory.968 Constellation asserts that always requiring double special protection schemes is not good utility practice and would likely be appropriate only in rare situations.969
475.
Constellation contends that system studies of unauthorized use should be standardized, transparent, and based on reasonable assumptions set ahead of time to avoid disparate treatment.970 Constellation states that PJM can use the standardized study processes and established reliability tests in its existing generator interconnection process and RTEP process to determine whether a special protection scheme is needed. 476.
Constellation argues that criteria for special protection schemes should leverage current RTEP planning criteria to develop specific criteria for Co-Located Load risks that are reasonable and transparent.971
477.
Constellation asserts that the special protection scheme that PJM requires an Eligible Customer to implement should be commensurate with the risks identified in the studies. Constellation argues that special protection schemes are not appropriate for every situation, and PJM only requires them when studies identify actual overloads and conditions that could cause cascading failures that PJM cannot mitigate through normal operations.972 Constellation contends that double special protection schemes should not be employed when other measures can maintain system reliability and real-time monitoring can address any unexpected reliability issue.973967 Id. at 7 n.23 (citing Indicated TOs Initial Brief at 23).968 Constellation Reply Brief at 13-14 (citing Indicated TOs Response Brief at 8).969 Id. at 14 (citing Kormos Aff. ¶¶ 7, 11).970 Id. at 15.971 Id. at 15-16.972 Id. at 16 (citing Kormos Aff. ¶¶ 5-6).973 Id. at 18. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 367 Date Filed: 10/19/2026
PDF page 369
Docket No. EL25-49-002, et al.- 214 -
4. Answer
478.
In response to Constellation, Indicated TOs argue that, in order for an Eligible Customer to take one of the new transmission services, it is necessary and just and reasonable to require an Eligible Customer to include appropriate protection systems.974 Indicated TOs further assert that special protection schemes on the Co-Located Load customer’s and the transmission owner’s side of the point of interconnection should not be limited to what Constellation claims are higher-risk situations.975 Indicated TOs claim that, without protection system redundancy, the transmission system is at risk.976 Indicated TOs reject Constellation’s assertion that PJM should use a PJM-driven study process to evaluate special protection schemes, arguing that special protection schemes and remedial action schemes are within the purview of the transmission owners, and PJM is not equipped to perform these studies. Indicated TOs also allege that the cost to implement protection systems is extremely low compared to other costs to develop and interconnect Co-Located Load and would not be a deterrent.977
5. Determination
479.
We decline to direct PJM’s proposal as part of the replacement rate because it does not require Eligible Customers taking FCD transmission service to have necessary control technologies and/or protection systems to limit their energy withdrawals from the transmission system to their contract demand level. We find that PJM’s proposal is inconsistent with the directives in the December Order. In the December Order, the Commission found that an Eligible Customer that is willing and able to limit its energy withdrawals from the transmission system under certain conditions should be able to take transmission services on behalf of Co-Located Load that reflect their ability to limit withdrawals.978 The Commission stated that where a Co-Location Arrangement includes special protection schemes that limit its energy withdrawals, it is a just and reasonable replacement rate to allow an Eligible Customer taking transmission service on behalf of such load to take these transmission services.979 We clarify, however, that the December
974 Indicated TOs May 28 Answer at 4.975 Id. at 5.976 Id. at 6.977 Id. at 7.978 December Order, 193 FERC ¶ 61,217 at PP 159-160.979 Id. PP 204-205. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 368 Date Filed: 10/19/2026
PDF page 370
Docket No. EL25-49-002, et al.- 215 -
Order did not limit eligibility to take the new transmission services only to Co-Location Arrangements that include a special protection scheme.980
480.
Based on the record here, we find it just and reasonable that, in order for an Eligible Customer to take Interim NITS, FCD, and/or NFCD transmission services on behalf of any Eligible Load, an Eligible Customer must have necessary control technologies and/or protection systems, which may include a special protection scheme, to limit its energy withdrawals to its contract demand level.981 This replacement rate is consistent with prior Commission precedent for interconnection service, which recognizes that these necessary control technologies and/or protection systems are essential to enforce physical limits and ensure system reliability where an Interconnection Customer has requested a level of service below its maximum capacity.982 Further, consistent with the Commission’s determination in Order No. 845, nothing prevents an Eligible Customer taking Interim NITS, FCD, and/or NFCD transmission service on behalf of Eligible Load from proposing its own necessary control technologies and/or protection systems for consideration, which may include a special protection scheme.983 481.
PJM’s proposal falls short because it does not require Eligible Customers taking FCD transmission service to have necessary control technologies and/or protection systems to limit their energy withdrawals from the transmission system to their contract demand level. As such, PJM would have to rely on penalties that disqualify an Eligible Customer from taking FCD transmission service if the Eligible Customer fails to follow established load shedding and curtailment procedures, and financial penalties for unreserved use of the PJM transmission system, to discourage excess energy withdrawals. However, load shedding and curtailment events for a transmission service that will be treated as the equivalent of NITS for purposes of curtailment will be rare; and PJM itself has stated concerns that financial penalties alone are insufficient to deter
980 Id. P 205 (“For these reasons, in these instances where the Co-Location Arrangement includes special protection schemes that limit its energy withdrawals, we find that it is a just and reasonable replacement rate to allow an Eligible Customer taking transmission service on behalf of such load to take and be charged for new types of transmission service that are alternatives, and not equivalent, to NITS.”).981 While we will continue to use the term “special protection scheme” in this proceeding, we reiterate that this term is equivalent to “remedial action scheme.” Id. P 204.982 Reform of Generator Interconnection Procs. & Agreements, Order No. 845, 163 FERC ¶ 61,043, at P 367 (2018), order on reh’g, Order No. 845-A, 166 FERC ¶ 61,137, order on reh’g, Order No. 845-B, 168 FERC ¶ 61,092 (2019).983 Id. P 372. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 369 Date Filed: 10/19/2026
PDF page 371
Docket No. EL25-49-002, et al.- 216 -
unreserved use.984 Accordingly, and consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing with Tariff revisions that require Eligible Customers taking Interim NITS, FCD, and/or NFCD transmission service on behalf of Eligible Loads, to have necessary control technologies and/or protection systems.
482.
We find it just and reasonable for PJM to include the interconnection requirements and operational practices needed for necessary control technologies and/or protection systems in the PJM manuals and, as applicable, to rely on relevant NERC reliability standards, consistent with PJM’s current practices. Further, we find it appropriate for PJM to develop new interconnection requirements and operational practices that recognize the unique nature of Co-Location Arrangements and the new transmission services. However, PJM has not, to date, actually proposed any interconnection requirements and operational practices specific to Co-Location Arrangements, nor does PJM indicate which of its existing interconnection requirements and operational practices it will apply to Co-Location Arrangements. Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we direct PJM to submit, as part of its compliance filing due within 60 days of the date of issuance of this order, an explanation of what new and existing interconnection requirements and operational practices it will apply to Eligible Customers taking Interim NITS, FCD, and/or NFCD transmission services on behalf of Eligible Load. We agree with Indicated TOs that it is important for PJM to work with the transmission owners to develop specificity regarding the requirements associated with necessary control technologies and/or protection systems necessary to ensure that Eligible Customers do not withdraw energy from the transmission system in excess of their contract demand. 483.
We do not agree that all parties’ recommendations to clarify PJM’s proposal are just and reasonable, or even within the scope of this proceeding. However, we agree that some guidance on the study and implementation of necessary control technologies and/or protection systems would be of value. Therefore, and consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we explain several principles that PJM’s compliance filing should consider.
984 PJM Initial Brief at 50. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 370 Date Filed: 10/19/2026
PDF page 372
Docket No. EL25-49-002, et al.- 217 -
484.
First, Eligible Customers shall pay for PJM and transmission owner-administered studies to evaluate and design necessary control technologies and/or protection systems, consistent with their responsibilities for the costs of other studies performed as part of the evaluation of their transmission service request. However, the scope of these studies should be defined in the Tariff, consistent with the level of detail for other transmission services, as discussed in Part VI.A.3.985 Furthermore, we reiterate our finding above that an Eligible Customer taking transmission service on behalf of an Eligible Load may propose its own necessary control technologies and/or protection systems for consideration as part of this study, which may include a special protection scheme, although PJM and the transmission owners retain their existing discretion regarding the determination of what is necessary to ensure the reliability of the transmission system. 485.
Second, if a special protection scheme is employed as necessary control technologies and/or protection systems, then such special protection schemes implemented must be, at minimum, fully redundant. Given questions by commenters regarding what “redundant” specifically means, we clarify that such special protection schemes must be able to withstand removal of part or all of one scheme due to a failure, or to allow for maintenance on a scheme, while providing full scheme capability with a functionally equivalent and separate scheme.986
486.
Third, all necessary control technologies and/or protection systems, which may include a special protection scheme, must fully meet PJM and transmission owner technical criteria, as well as any applicable NERC reliability standards. 487.
Fourth and finally, both PJM and the transmission owners shall have the option to review and agree to the implementation of the Eligible Customer’s necessary control technologies and/or protection systems as defined in the service agreement, to ensure that it meets both PJM and transmission owner technical criteria, and is capable of limiting withdrawals from the transmission system.
488.
We disagree with Indicated TOs that PJM should include language in the Tariff making clear that necessary control technologies and/or protection systems may be required on both the Interconnection Customer’s and the transmission owner’s side of the Point of Interconnection. PJM and the transmission owners will, as noted in the principles above, be responsible for evaluating and designing necessary control technologies and/or protection systems for each Co-Location Arrangement. The location or number of devices required should be based on the engineering judgment of PJM and 985 See supra Part VI.A.3.
986 See, e.g., WECC, Remedial Action Scheme Design Guide, § 4.10 (July 2022), https://www.wecc.org/sites/default/files/documents/meeting/2024/WECC%20RAS%20D esign%20Guide%202022.pdf. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 371 Date Filed: 10/19/2026
PDF page 373
Docket No. EL25-49-002, et al.- 218 -
the transmission owners.987 Similarly, we find that questions of ownership of these facilities, or the potential to earn a rate of return on said facilities, are outside the scope of this proceeding.
489.
In response to Indicated TOs, we find that there is insufficient information in this record to justify allowing them or PJM to implement and enforce limits on the total amount of load that can be covered by a special protection scheme. If PJM or its transmission owners wish to impose a specific limit, they may submit a new filing under FPA section 205 with a sufficient showing, based on experience gained once Eligible Customers begin taking Interim NITS, FCD, and/or NFCD transmission service on behalf of Eligible Load. However, implementation of a special protection scheme should not be universally required as a condition of taking these transmission services; rather, only necessary control technologies and/or protection systems are required. If PJM or its transmission owners wish to limit the use of special protection schemes on their system, they can also design necessary control technologies and/or protection systems for Eligible Customers that do not have a special protection scheme.
490.
We decline to address NOVEC’s request that the Commission direct NERC to establish registration requirements for Co-Located Loads. Whereas NOVEC’s request may be availing in the context of a FPA section 215 proceeding, the instant case arises under FPA section 206. In addition, NERC is already considering registration requirements for large loads, including potentially Co-Located Loads, as part of its Large Load Action Plan.988
D. Penalty Charge or Other Remedial Action for New Transmission
Services
1. Initial Briefs
491.
PJM proposes different penalties where an Eligible Customer: (1) fails to follow established load shedding and curtailment procedures; (2) relies on necessary control
987 Cf. RWE Clean Energy, LLC v. PJM Interconnection, L.L.C., 194 FERC ¶ 61,212, at P 42 (2026) (“The Commission generally allows transmission providers to exercise their engineering judgment when conducting interconnection studies, including deferring to transmission providers’ discretion regarding how to maintain a reliable transmission system.”); Order No. 1920-A, 189 FERC ¶ 61,126 at P 450 (“Finally, we clarify that the Commission generally provides transmission providers with the discretion to use engineering judgment in designing and conducting transmission planning studies, and we therefore decline to address Dominion’s hypothetical in the abstract.”).988 See NERC, Large Loads Action Plan, https://www.nerc.com/initiatives/large- loads-action-plan (last visited May 15, 2026). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 372 Date Filed: 10/19/2026
PDF page 374
Docket No. EL25-49-002, et al.- 219 -
technologies or protection systems that fail more than once; and (3) makes unreserved use of the transmission system.989 PJM argues that, where an Eligible Customer fails once to respond to established load shedding and curtailment procedures, the customer is disqualified automatically because of the significant reliability risk. PJM asserts that its proposal is just and reasonable and consistent with the key principles that (1) Eligible Customers are willing and able to control their withdrawals from the transmission system and (2) the services are designed to allow PJM to maintain system reliability. PJM proposes that, if the Eligible Customer is taking FCD or NFCD transmission service and is disqualified, such customer may still take NITS or Interim NITS. PJM proposes that, if the Eligible Customer is taking Interim NITS and is disqualified, such customer may take NITS.990
492.
PJM argues that when a control technology or protection scheme misoperates there can be serious consequences.991 PJM proposes that, after one instance of misoperation, the Eligible Customer will be prohibited from taking transmission service or otherwise withdrawing energy from the transmission system for a period of up to 120 days from misoperation to allow for an analysis of the necessary control technology or protection system scheme’s operational performance. PJM asserts that this proposed pause is consistent with NERC requirements for an investigation into the operation of a remedial action scheme992 and will allow PJM time to investigate, identify, and implement fixes to better protect the transmission system.993 PJM proposes that, after two instances of misoperation, the Eligible Customer will be automatically disqualified from taking the relevant new transmission service because of the significant reliability risks. PJM asserts that this rule properly balances the need to protect reliability against the desire of an Eligible Customer taking service on behalf of a Co-Located Loads to take a transmission service lesser than NITS because the Co-Located Loads are willing and able to limit their energy withdrawals. PJM maintains that a second instance of a misoperation makes it evident that the necessary control technology or protection system cannot adequately protect the system from the Co-Located Load’s unreserved energy withdrawals. PJM explains that an Eligible Customer disqualified from taking FCD or
989 PJM Initial Brief at 40.990 Id. at 41-43.991 Id. at 43-44. Misoperation, as contemplated by PJM, relies on and incorporates the term as defined by NERC (e.g., PRC-004-6). See, e.g., NERC, PRC-004-6 – Protection System Misoperation Identification & Correction (June 12, 2025), https://www.nerc.com/globalassets/standards/reliability-standards/prc/prc-004-6.pdf.992 Reliability Standard PRC-004-6.993 PJM Initial Brief at 45. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 373 Date Filed: 10/19/2026
PDF page 375
Docket No. EL25-49-002, et al.- 220 -
NFCD transmission service on this ground may either take NITS or Interim NITS, and that an Eligible Customer disqualified from taking Interim NITS on this ground may take NITS. PJM supports its proposal to permit an Eligible Customer disqualified from taking the new transmission services to take NITS by reasoning that NITS, in and of itself, addresses curtailment, load shed, and control technology or protection scheme misoperation risk.994
493.
PJM states that it supports a penalty for unreserved use in addition to the operational penalties and intends to work with the transmission owners to explore a financial penalty.995 PJM argues that financial penalties alone are insufficient to incentivize Eligible Customers to comply with load shed, curtailment, and control technology and protection system obligations. PJM asserts that many, if not most, Eligible Customers taking service on behalf of a Co-Located Load could elect to absorb financial penalties for unreserved use rather than follow curtailment or load shed procedures or avoid misoperation of the protective technology or system. 494.
Indicated TOs assert that any penalty regime should rely on both operational consequences and complementary financial penalties.996 Indicated TOs allege that it is of the utmost importance that Co-Located Loads respect contractual limits because Co-Location Arrangements involve substantial amounts of load connected to the grid and failure to respect these limits could pose severe reliability consequences for the system. 495.
Indicated TOs support PJM’s proposal but argue that additional details must be developed as to how operational consequences would be applied.997 Indicated TOs also state that financial penalties could be valuable where the Eligible Customer exceeds its contract demand, even if such deviations are mitigated by a special protection scheme.
2. Response Briefs
496.
ODEC supports PJM’s proposed penalty structure, including operational penalties.998 NOVEC states that disqualification for failure to follow load shedding or
994 Id. at 45-50.995 Id. at 50.996 Indicated TOs Initial Brief at 19.997 Id. at 20.998 ODEC Response Brief at 11. Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 374 Date Filed: 10/19/2026
PDF page 376
Docket No. EL25-49-002, et al.- 221 -
curtailment procedures is necessary to protect the integrity of the transmission system.999 Indicated TOs request that Tariff language be included requiring that the relevant transmission owner’s approval be obtained before service to an Eligible Customer is reinstated following a control technology/protection system misoperation. 497.
Constellation opposes the proposal to suspend or disqualify an Eligible Customer, arguing it is excessive and applies regardless of fault and does not apply to Non-Firm PTPS customers.1000 Constellation urges the Commission to follow SPP’s proposal for Conditional High Impact Large Load Service (CHILLS) and align treatment of unreserved use for the new services with its treatment of Non-Firm PTPS. DCC expresses concern about PJM’s operational penalties in light of the lack of clarity around PJM’s curtailment procedures for the new transmission services.1001 Vistra similarly argues that PJM’s proposed operational penalties diverge from the Commission’s directives and violate the comparability principle because the December Order does not contemplate disqualification and, more generally, such a penalty structure exceeds what the Commission has allowed for unreserved use of the transmission system.1002 Vistra contends that PJM’s proposal is excessively punitive and may be unduly discriminatory in comparison to customers that take PTPS. Vistra also alleges that PJM’s proposal also violates the comparability requirement because it treats Co-Location Arrangements using special protection schemes differently from any other entities using such schemes. Vistra also points out that, if the Commission accepts transmission owners’ proposal to own special protection schemes, then misoperation of such schemes must attach to the transmission owner, not the Eligible Customer.
498.
Joint Co-Location Developers argue that PJM’s proposed penalty provisions are unjust and unreasonable because they are not “narrowly designed to balance the need to deter conduct that is harmful to the system with the need to limit excessive and unnecessary costs.”1003 Joint Co-Location Developers express concern that PJM’s proposed disqualification rules will dissuade Eligible Customers from taking the new transmission services because of the risk of stranding or undermining investments in the
999 NOVEC Response Brief at 11-12. 1000 Constellation Response Brief at 19-20. See also Joint Co-Location Developers Response Brief at 25. 1001 DCC Response Brief at 7. 1002 Vistra Response Brief at 29-31. 1003 Joint Co-Location Developers Response Brief at 23 (quoting Mirant Kendall, LLC, 110 FERC ¶ 61,272, at P 17 (2005)). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 375 Date Filed: 10/19/2026
PDF page 377
Docket No. EL25-49-002, et al.- 222 -
new services.1004 Joint Co-Location Developers propose that PJM adopt financial penalties sufficient to deter gaming of transmission service subscription. Joint Co-Location Developers contend that a disqualification-based penalty is not necessary because transmission owners can manually disconnect a facility in case of potential severe reliability risk. Joint Co-Location Developers assert that failure to respond to curtailment would have a similar impact from a resource adequacy perspective to a capacity resource failing to perform during emergency events, in which case only a non-performance charge is assessed. Joint Co-Location Developers urge that, if the Commission adopts disqualification as a penalty, the Commission should adopt intent (or at least fault), materiality, and repetition elements prior to disqualification to ensure disqualification sends an actionable signal.1005 Joint Co-Location Developers suggest that that an operational penalty is excessive for misoperation of control technologies or protection systems because misoperation without withdrawal does not risk system harm.1006
499.
Indicated TOs propose a financial penalty charge structure with two components:
(1) a base penalty charge; and (2) a penalty ratchet.1007 The base penalty charge would be assessed for any hour in which at least one five-minute interval occurs during which a customer’s metered load at the Point of Interconnection exceeds its reserved transmission service. The penalty ratchet would apply additional daily penalties if exceedances occurred in more than one hour during a day, additional weekly penalties if exceedances occurred on more than one day during a week, and additional monthly penalties if exceedances occurred in more than one week during a month. Further, each of these penalties would entail escalating financial liabilities for repeated penalties, which Indicated TOs argue would reinforce the expectation that Co-Located Load customers manage their load in a manner consistent with their reserved transmission service. 500.
NOVEC states that a penalty for unreserved use in addition to disqualification and pause-in-service rules is appropriate, as this penalty would be an additional deterrent that would help make the market or other ratepayer whole if a Co-Located Load customer exceeds its contract demand.1008 NOVEC suggests that any financial penalty should compensate other customers for any harm caused by the Eligible Customer’s departure 1004 Id. at 24-25.
1005 Id. at 26 (citing PJM Interconnection, L.L.C., 178 FERC ¶ 61,104, at PP 60-61 (2022)).
1006 Id. at 26.
1007 Indicated TOs Response Brief at 12-13.
1008 NOVEC Response Brief at 13 (citing Indicated TOs Initial Brief at 20). Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 376 Date Filed: 10/19/2026
PDF page 378
Docket No. EL25-49-002, et al.- 223 -
from Co-Location requirements or, if there is no harm, be set at a level sufficient to encourage compliance with the Tariff’s scheduling requirements.
501.
ODEC suggests that the Commission also consider whether any protections are needed for local utilities or transmission owners should they need to take the extraordinary measure of disconnecting an Eligible Customer taking service on behalf of Co-Located Loads, if the Eligible Customer’s use of the transmission system exceeds contract demand or is called upon for load shedding and curtailment.1009 ODEC states that, in such instance, the local utility or transmission owner should not be liable for legal, financial, or other damages that might be experienced by an Eligible Customer. NOVEC asserts that PJM’s penalty language should be revised to specify that when an Eligible Customer serves multiple Co‑Located Loads, only the culpable Co‑Located Load is disqualified rather than the Eligible Customer as a whole.1010
3. Reply Briefs
502.
PJM argues that monetary penalties, in place of non-monetary penalties, would undermine the value of reliability and hand it to a single site or a class of load that may decide to pay the penalty in place of operating as agreed to ensuring overall system reliability.1011 PJM alleges that non-monetary operational penalties are essential to the responsible integration of large loads. PJM maintains that its non-monetary operational penalties represent a measured approach that balances significant reliability concerns with the interest in integrating large loads quickly. However, PJM notes that, in response to protesters’ concerns, PJM proposes revisions to its illustrative tariff language to add discretion to the strict application of non-monetary operational penalties. 503.
PJM argues that the Commission did not foreclose non-monetary penalties because the December Order “also direct[s] parties to brief . . . any other remedial action that PJM should take to address withdrawals in excess of the contract demand.”1012 PJM also claims that financial penalties alone are insufficient to support reliability in light of the volume of load that is anticipated to come online in short order and the nature of how these new loads will seek to connect through co-location with potentially critical generators. PJM rejects Vistra’s contention that non-monetary penalties are a departure from Commission precedent, and responds that the Commission has long held that where monetary penalties do not incentivize actions consistent with reliability, it may be 1009 ODEC Response Brief at 11-12.
1010 NOVEC Response Brief at 14-15.
1011 PJM Reply Brief at 40-43.
1012 Id. at 49-50 (quoting December Order, 193 FERC ¶ 61,217 at P 212). Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 377 Date Filed: 10/19/2026
PDF page 379
Docket No. EL25-49-002, et al.- 224 -
necessary to implement “a range of non-monetary and monetary penalties” to promote behavior that supports and improves the reliability of the bulk power system.1013 PJM rejects Joint Co-Location Developers’ suggestion that PJM adopt financial penalties sufficient to deter gaming, and responds that PJM’s proposed penalty structure is not intended to address gaming but to support reliability. In response to Joint Co-Location Developers’ suggestion that disqualification is unnecessary because transmission owners can manually disconnect a facility, PJM argues that it is inconsistent with reliable operation of the transmission system to shift responsibility away from the Eligible Customer. PJM also alleges that it and the transmission owner will become aware of an improperly set-up protection scheme only after the misoperation incident, which will expose the PJM system to risk. PJM adds that when a transmission owner manually cuts load suddenly, without proper coordination, it can have disastrous and dangerous cascading system effects.1014
504.
Nevertheless, PJM proposes revisions to its illustrative tariff language to permit, where appropriate, PJM to exercise discretion in determining when disqualification penalties are appropriate based on PJM’s assessment of factors including the reliability impact of the failure to curtail or shed load or the misoperation of control technologies or protection system schemes. PJM adds that, with these revisions, the Eligible Customer taking transmission service on behalf of Co-Located Load will not be held liable for the actions of others.1015
505.
Several parties agree that financial penalties are insufficient to ensure reliability.1016 ODEC asserts that it does not agree that PJM’s proposed suspension and disqualification measures are unfairly imposed regardless of fault and will make the services unduly risky for many loads. Earthjustice argues that PJM’s operational penalties are proportionate to the prospective harm associated with a customer’s failure to follow curtailment orders. Earthjustice argues that, while opposing commenters note that PJM’s proposed penalties are stricter than the penalties it has levied in other circumstances, those comments fail to acknowledge that the stakes here are higher. 1013 Id. at 51 (quoting Rules Concerning Certification of the Elec. Reliability Org.; and Procs. for the Establishment, Approval, and Enf’t of Elec. Reliability Standards, Order No. 672, 114 FERC ¶ 61,104, at PP 49, 455, order on reh’g, Order No. 672-A, 114 FERC ¶ 61,328 (2006)).
1014 Id. at 52-53.
1015 Id. at 54.
1016 ODEC Reply Brief at 4-5; Earthjustice Reply Brief at 2-3, 5, 8; Indicated TOs Reply Brief at 14-15 (citing Joint Blazunas/Schafer/Hammer Rebuttal Test. at 4). Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 378 Date Filed: 10/19/2026
PDF page 380
Docket No. EL25-49-002, et al.- 225 -
Earthjustice argues that PJM’s penalty proposal is appropriately designed to protect system reliability, rather than assign fault.
506.
Industrials/Amtrak urge the Commission to exercise caution in overly harsh operational penalties, especially for existing retail customers who may be forced to move from retail BTMG arrangements to Co-Location Arrangements. Industrials/Amtrak argue that it is reasonable to pay financial penalties, but a retail customer should not be banned from NFCD transmission service for a lone violation.1017
507.
PJM rejects Vistra’s contention that its non-monetary penalties for misoperation of necessary control technologies or protection systems are unduly discriminatory. PJM alleges that NERC, Market Monitor, and PJM’s 2026 load forecast each demonstrate that the new large loads integrating into PJM’s transmission system are not similarly situated to traditional loads. PJM adds that disqualification penalties do not foreclose Eligible Customers from taking transmission service entirely, and that, where Eligible Customers demonstrate that they cannot (or are unwilling to) limit withdrawals, it is appropriate for those Eligible Customers to take NITS.1018
508.
Indicated TOs reject Constellation’s argument that PJM should simply adopt financial penalties as is the case with SPP’s High Impact Large Load (HILL) process.1019 Indicated TOs argue that SPP’s HILL process is different in that, under PJM’s proposal, Co-Located Load customers may be in the position of installing and operating their own control technologies and protection systems. Indicated TOs further argue that PJM and SPP are different regions with different characteristics, including topology and proliferation of large loads. Indicated TOs also dismiss DCC’s and Vistra’s concerns regarding Co-Located Load’s liability for penalties associated with control technologies and protection systems operated by other parties, including transmission owners. Indicated TOs argue that installation of redundant protection facilities by transmission owners should not serve as an excuse for the failure of customers to properly maintain and operate their own equipment.
509.
NOVEC states that it generally supports Indicated TOs’ proposed financial penalty charge structure, subject to Indicated TOs providing further information.1020 ODEC supports financial penalties but states that PJM’s implementation of its penalties must not subject ODEC or its member distribution cooperatives to service interruptions or 1017 Industrials/Amtrak Reply Brief at 17-18.
1018 PJM Reply Brief at 43, 45, 47.
1019 Indicated TOs Reply Brief at 15-16.
1020 NOVEC Reply Brief at 26-27.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 379 Date Filed: 10/19/2026
PDF page 381
Docket No. EL25-49-002, et al.- 226 -
disqualification, or financial penalties, as a result of requiring ODEC to serve as the Eligible Customer.1021
510.
Indicated TOs further explain their financial penalty proposal, explaining that when a Co-Located Load exceeds its reserved transmission service limit, which includes any reductions based on curtailments directed by PJM, the base penalty charge will be assessed for any hour (Exceedance Hour) in which at least one five-minute interval (Exceedance Interval) occurs during which a customer’s metered load at the point of delivery exceeds its reserved transmission service. Indicated TOs state that the base penalty charge will apply to each Exceedance Hour.1022
511.
Indicated TOs state that the base penalty charge will be calculated as the product of the Hourly Exceedance MW, the Equivalent Hourly FCD transmission service rate, and the number of Exceedance Intervals within the hour, where the Hourly Exceedance MW is equal to the maximum telemetered load during the hour less the reserved transmission service limit for the hour and where the Equivalent Hourly FCD transmission service rate is equal to the FCD transmission service rate divided by 8,760 hours.1023 Indicated TOs explain that the FCD transmission service rate is used as the basis for assessing the penalty because, when a customer exceeds its reserved transmission service limit without authorization, the excess usage effectively imposes firm-level demand on the system.
512.
Indicated TOs state that the penalty ratchet applies escalating FCD-equivalent transmission service rates as the frequency of unreserved transmission use increases. Indicated TOs explain that the penalty ratchet applies daily, weekly, monthly, or annual penalty charges depending on whether exceedances occur within the same calendar day, week, month, or year, and that these penalty charges are equal to the Daily FCD-Equivalent Rate, Weekly FCD-Equivalent Rate, Monthly FCD-Equivalent Rate, and FCD Annual Rate, respectively.1024 Indicated TOs further explain that, where a daily penalty charge is assessed, it is in addition to the base penalty charge applicable to each individual Exceedance Hour; where a weekly penalty charge is assessed, it is in addition to the base penalty charges and daily penalty charges; and so on.
1021 ODEC Reply Brief at 4.
1022 Indicated TOs Reply Brief at 16-17.
1023 Indicated TOs Reply Brief, Joint Blazunas/Schafer/Hammer Rebuttal Test. at 8-9.
1024 Id. at 10-14.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 380 Date Filed: 10/19/2026
PDF page 382
Docket No. EL25-49-002, et al.- 227 -
513.
Indicated TOs propose to distribute daily, weekly, and monthly penalty revenues on a monthly basis to Eligible Customers taking NITS or FCD transmission service that have not been penalized during the month, as pro rata bill credits. Indicated TOs further propose to distribute annual penalty charges on an annual basis to Eligible Customers taking NITS and FCD transmission service that have not been penalized during the year as pro rata bill credits.1025
4. Answer
514.
Constellation alleges that PJM’s reliability arguments are not persuasive, because PJM’s example involves grid-connected load, not Co-Located Load.1026 Constellation argues that PJM fails to explain how resource adequacy concerns justify its proposed penalty scheme, and points out that PJM has proposed no such penalties for Connect and Manage.1027 Constellation next argues that a four-month suspension is not consistent with NERC requirements, as PJM claims.1028
5. Determination
515.
We find that it is just and reasonable to impose operational and financial penalties on Eligible Customers taking the three new transmission services as part of the replacement rate, given that these services are designed for Eligible Customers taking transmission service on behalf of Eligible Loads that are willing and able to limit their withdrawals from the transmission system under certain conditions, and there are significant reliability risks if Eligible Customers fail to do so. However, we decline to adopt PJM’s proposed replacement rate. First, we disagree that it is just and reasonable to disqualify an Eligible Customer from taking any of the new transmission services after the first instance of failing to follow a curtailment or load shedding directive, as discussed below. We instead find that it is just and reasonable to establish an operational penalty whereby, after the second instance of failing to follow a curtailment or load shedding directive, PJM will terminate the transmission service agreement with the Eligible Customer taking Interim NITS, FCD, or NFCD transmission service on behalf of the Eligible Load. We agree with PJM that there are significant reliability risks associated with failing to follow a curtailment or load shedding directive, but we find that PJM’s one strike proposal is unnecessarily strict. We direct PJM to file, within 60 days 1025 Id. at 15-16.
1026 Constellation May 11 Answer at 8-9.
1027 Id. at 9.
1028 Id. at 9-10.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 381 Date Filed: 10/19/2026
PDF page 383
Docket No. EL25-49-002, et al.- 228 -
of the date of issuance of this order, a compliance filing to revise its Tariff consistent with these findings.
516.
Second, we find that it is just and reasonable to establish an operational penalty of suspension in service for a period of up to 120 days for an Eligible Customer taking Interim NITS, FCD, and/or NFCD transmission service after the first misoperation of necessary control technologies and/or protection systems given the reliability risks associated with such misoperation. However, as above, we disagree with PJM’s proposal regarding disqualification, and we instead find that it is just and reasonable to establish an operational penalty whereby, after the second misoperation of necessary control technologies and/or protection systems, PJM will terminate the transmission service agreement with the Eligible Customer taking Interim NITS, FCD, and/or NFCD transmission service on behalf of Eligible Load. We direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff consistent with these findings.
517.
Third, we find that it is just and reasonable to subject an Eligible Customer taking any of the three new transmission services on behalf of Eligible Load to financial penalties in any circumstance where the transmission customer uses transmission service that it has not reserved. We thus direct the PJM transmission owners to file, within 60 days of the date of issuance of this order, a compliance filing that effectuates Indicated TOs’ proposed framework for financial penalties for Eligible Customers taking one of the three new transmission services that withdraw from the transmission system in excess of their contract demand level (i.e., for unreserved use).
518.
Before addressing each topic in turn, as an initial matter, we disagree with protesters that operational penalties, either for failure to follow a curtailment or load shedding directive, or for misoperation of necessary control technologies and/or protection systems, “diverg[e] from” or were “not contemplated” in the December Order.1029 The financial penalties that the Commission required only apply to Eligible Customers’ unreserved use of the transmission system and are consistent with the Commission’s directives in the December Order.1030 The Commission has previously found that transmission customers should be subject to unreserved use penalties in circumstances where a transmission customer uses transmission service in excess of its 1029 Constellation Response Brief at 19; Vistra Response Brief at 29.
1030 December Order, 193 FERC ¶ 61,217 at P 212 (directing a penalty rate for excess withdrawals of energy from the transmission system by an Eligible Customer taking FCD transmission service on behalf of a Co-Located Load); id. P 217 (directing same as to excess withdrawals by an Eligible Customer taking NFCD transmission service on behalf of a Co-Located Load).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 382 Date Filed: 10/19/2026
PDF page 384
Docket No. EL25-49-002, et al.- 229 -
reserved capacity or if it uses transmission service where it does not have a reservation, and as discussed further below, we find it just and reasonable that an Eligible Customer taking any of the three new transmission services on behalf of Eligible Load incur a financial penalty for unreserved use of the transmission system.1031 But the Commission also directed briefing broadly on the rates, terms, and conditions of the new transmission services, including “other remedial action[s]” in addition to financial penalties, as pertinent to this question.1032 We find that an operational penalty for Eligible Customers taking Interim NITS, FCD transmission service, and/or NFCD transmission service on behalf of Eligible Load for misoperation of necessary control technologies and/or protection systems is consistent with the December Order’s finding that Eligible Customers may take Interim NITS, FCD transmission service, and/or NFCD transmission service because it is the use of necessary control technologies and/or protection systems that effectively limits their energy withdrawals from the transmission system.1033 The Commission in the December Order also broadly sought briefing on the appropriate procedures to govern circumstances under which PJM curtails an Eligible Customer taking any of the three new transmission services, and we find that an operational penalty for an Eligible Customer taking the new transmission services on behalf of Eligible Load failing to follow a curtailment or load shedding directive is within the scope of provisions that we can consider as part of establishing curtailment procedures for the three new transmission services.
a. Failure to Follow Curtailment or Load Shedding Directive
519.
We find that it is just and reasonable to establish an operational penalty for an Eligible Customer taking any of the new transmission services on behalf of Eligible Load after the second instance of failing to follow a curtailment or load shedding directive. Specifically, we find that it is just and reasonable for PJM to terminate the transmission service agreement with the Eligible Customer taking Interim NITS, FCD transmission service, or NFCD transmission service on behalf of Eligible Load after the second instance of failing to follow a curtailment or load shedding directive. We direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff consistent with this finding. PJM persuasively argues that there are significant reliability risks associated with failure to curtail, and “financial penalties, alone, are not sufficient to incentivize Eligible Customers to comply with Load Shed and Curtailment.”1034 However, we agree with concerns raised in the record that PJM’s 1031 Order No. 890, 118 FERC ¶ 61,119 at P 834.
1032 December Order, 193 FERC ¶ 61,217 at P 219.
1033 Id. P 205; see supra Part VI.C.
1034 PJM Initial Brief at 41-42, 45, 50.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 383 Date Filed: 10/19/2026
PDF page 385
Docket No. EL25-49-002, et al.- 230 -
proposal to disqualify an Eligible Customer taking one of the three new transmission services on behalf of Eligible Load from continuing to take any of those services is unnecessarily strict. When considering the need to ensure reliability is preserved, as well as to allow Eligible Customers taking transmission service on behalf of Eligible Load to adapt to a new transmission service paradigm, we find that, on balance, complete disqualification is excessive because it would impose penalties on the Eligible Customer that apply to all of its transmission service agreements, even those for which it has followed all curtailment or load shedding directives. However, we agree with PJM that a strict operational penalty will deter conduct contrary to the fundamental principle upon which the new transmission services required by the December Order were based, which is that Eligible Customers taking service on behalf of Co-Located Loads are willing and able to limit their energy withdrawals from the transmission system under certain conditions.1035 We therefore find, as part of the just and reasonable replacement rate, that the transmission service agreement with the Eligible Customer taking Interim NITS, FCD transmission service, or NFCD transmission service on behalf of Eligible Load should be terminated on the second instance of failing to follow a curtailment or load shedding directive. The Eligible Customer will remain eligible to take the three new transmission services on behalf of other Eligible Loads through its other transmission service agreements. NITS remains an option for an Eligible Customer disqualified from taking one of the new transmission services; however, such Eligible Customer may not begin taking NITS until all necessary Network Upgrades are completed.1036
520.
Recognizing that we are not adopting the exact penalty framework for failing to follow a curtailment or load shedding directive that PJM proposes, we nevertheless disagree with many of protesters’ arguments on this matter. Joint Co-Location Developers, for example, argue that disqualification is not necessary because transmission owners can manually disconnect a facility. This argument supports PJM’s premise that a financial penalty alone cannot deter the Eligible Customer taking one of the three new transmission services on behalf of Co-Located Load from failing to control unauthorized withdrawals; instead, it unreasonably and unnecessarily shifts the responsibility to manage complying with the Tariff and the terms of the transmission service from the Eligible Customer to the transmission owners. Joint Co-Location 1035 December Order, 193 FERC ¶ 61,217 at P 177 (“we also find that PJM’s Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.”).
1036 See PJM Initial Brief at 43 (“Importantly, however, such an Eligible Customer may take NITS, which would begin after all necessary upgrades are placed into service.”).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 384 Date Filed: 10/19/2026
PDF page 386
Docket No. EL25-49-002, et al.- 231 -
Developers also claim that disqualification is disproportionate and may not send an actionable signal without “fault or materiality elements.” This argument is misplaced, as PJM’s requirements for the new transmission services make the Eligible Customer’s responsibilities clear and actionable: prior to commencement of service, the Eligible Customer must demonstrate to PJM’s satisfaction that it can fully comply with load shedding and curtailment procedures. Lastly, Joint Co-Location Developers suggest that the Commission’s approval of a non-performance charge rate for capacity resources that fail to perform in emergency events means that an Eligible Customer that fails to follow a curtailment or load shedding directive can be sufficiently penalized through a similar charge. Joint Co-Location Developers allege that failure to respond or perform in both these circumstances is similar from a resource adequacy perspective. We disagree that the two are comparable. Capacity resources are purchased to meet the needs of transmission customers taking existing firm service, such as NITS. As PJM explains in its initial brief, the choice to take NITS decreases the likelihood of significant issues arising from failure to curtail.1037 By contrast, the Commission created the three new transmission services to reflect that Eligible Customers taking transmission service on behalf of Co-Located Load are willing and able to limit their energy withdrawals from the transmission system under certain conditions that are different than those under which Network Customers take NITS.1038 For these reasons, we find that it is just and reasonable to subject Eligible Customers on behalf of such loads to a stricter penalty regime.
521.
We also disagree with Constellation’s suggestion that the Commission should adopt SPP’s approach for CHILLS, which contains only penalties for exceeding the transmission customer’s reserved capacity.1039 The Commission has permitted regional 1037 Id. at 48-49.
1038 December Order, 193 FERC ¶ 61,217 at P 2; see, e.g., id. P 208
(distinguishing an Eligible Customer’s rights under FCD transmission service in contrast to NITS).
1039 Sw. Power Pool, Inc., 195 FERC ¶ 61,196, at 98 (2026).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 385 Date Filed: 10/19/2026
PDF page 387
Docket No. EL25-49-002, et al.- 232 -
variation among RTOs/ISOs1040 and need only explain its choice and how it has chosen a just and reasonable rate.1041
522.
We also find that ODEC has not demonstrated a need, nor does the record developed in this paper hearing otherwise reflect a need, to establish protections for transmission owners if the Eligible Customer may experience damages as a result of the transmission owner disconnecting the Eligible Customer. Lastly, with respect to Joint Co-Location Developers’ concern that PJM’s proposed disqualification rules will dissuade Eligible Customers from taking the new transmission services because of the risk of stranding or undermining investments in the new transmission services, we note that an Eligible Customer is not required to take the new transmission services and may elect to take NITS if that transmission service option better reflects the Eligible Customer’s use of the transmission system and risk profile.1042
1040 See, e.g., Reg’l Transmission Orgs., Order No. 2000, FERC Stats. & Regs. ¶ 31,089, at 31,073 (1999) (cross-referenced at 89 FERC ¶ 61,285), order on reh’g, Order No. 2000-A, FERC Stats. & Regs. ¶ 31,092 (2000) (cross-referenced at 90 FERC ¶ 61,201), aff’d sub nom. Pub. Util. Dist. No. 1 of Snohomish Cnty. v. FERC, 272 F.3d 607 (D.C. Cir. 2001) (stating there is no “one size fits all” approach to RTO governance); Offer Caps in Mkts. Operated by Reg’l Transmission Orgs. & Indep. Sys. Operators, Order No. 831, 157 FERC ¶ 61,115, at P 147 (2016), order on reh’g & clarification, Order No. 831-A, 161 FERC ¶ 61,156 (2017) (permitting regional variation for treatment of incremental energy offers above $1,000/MWh that the RTO/ISO or Marketing Monitoring Unit cannot verify prior to the start of the market clearing process); Wholesale Competition in Regions with Organized Elec. Mkts., Order No. 719, 125 FERC ¶ 61,071, at P 62 (2008), order on reh’g, Order No. 719-A, 128 FERC ¶ 61,059, order on reh’g, Order No. 719-B, 129 FERC ¶ 61,252 (2009) (permitting regional variation for RTOs/ISOs developing requirements for demand response resources participating in ancillary service markets).
1041 See ExxonMobil Oil Corp. v. FERC, 487 F.3d 945, 955 (D.C. Cir. 2007) (“We need not decide whether the Commission has adopted the best possible policy as long as the agency has acted within the scope of its discretion and reasonably explained its actions.”); Cities of Batavia v. FERC, 672 F.2d 64, 84 (D.C. Cir. 1982) (“[T]he billing design need only be reasonable, not theoretically perfect.”).
1042 See PJM Reply Brief at 47 (arguing that disqualification penalties reflect that Eligible Customers take the level of transmission service that aligns with their demonstrated use of the transmission system).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 386 Date Filed: 10/19/2026
PDF page 388
Docket No. EL25-49-002, et al.- 233 -
b. Misoperation of Necessary Control Technologies and/or
Protection Systems
523.
We find that it is just and reasonable to establish an operational penalty of suspension in service for a period of up to 120 days for an Eligible Customer taking Interim NITS, FCD, and/or NFCD transmission service on behalf of Eligible Load after the first misoperation of necessary control technologies and/or protection systems. However, as noted above, we disagree with PJM’s proposal regarding disqualification, and we instead find that it is just and reasonable to establish an operational penalty whereby, after the second misoperation of necessary control technologies and/or protection systems, PJM will terminate the transmission service agreement with the Eligible Customer taking Interim NITS, FCD transmission service, or NFCD transmission service on behalf of Eligible Load. We direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff consistent with these findings.
524.
We agree with PJM that there are significant reliability risks associated with misoperation of special protection schemes, and that “financial penalties, alone, are not sufficient to incentivize Eligible Customers to comply with . . . control technology and protection system obligations.”1043 We find that this replacement rate serves to deter conduct contrary to the fundamental principle around which the new transmission services created by the Commission were based, i.e., that Eligible Customers taking service on behalf of Co-Located Loads are willing and able to limit their energy withdrawals from the transmission system under certain conditions.1044 Moreover, we agree with PJM that, after the first misoperation of necessary control technologies and/or protection systems, suspension of service for a period of up to 120 days is reasonable to allow for an analysis by PJM, and the affected transmission owner(s) as necessary, of the operational performance of the necessary control technologies and/or protection systems. 1043 PJM Initial Brief at 41-42, 45, 50.
1044 December Order, 193 FERC ¶ 61,217 at P 177 (“we also find that PJM’s Tariff is unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking service on behalf of Co-Located Loads that are willing and able to limit their energy withdrawals from the transmission system under certain conditions.”); see id. P 205 (“We note that, in general, special protection schemes allow Eligible Customers on behalf of Co-Located Load to effectively limit their withdrawals from the transmission system. For these reasons, in these instances where the Co-Location Arrangement includes special protection schemes that limit its energy withdrawals, we find that it is a just and reasonable replacement rate to allow an Eligible Customer taking transmission service on behalf of such load to take and be charged for new types of transmission service that are alternatives, and not equivalent, to NITS.”). Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 387 Date Filed: 10/19/2026
PDF page 389
Docket No. EL25-49-002, et al.- 234 -
In response to the Indicated TOs, we find that it is reasonable that the Tariff provide that service may resume following PJM’s approval, as well as the relevant transmission owner’s approval of the necessary control technologies and/or protection systems for consistency with the transmission owner’s technical standards.
525.
However, we reject PJM’s proposal not to apply such a penalty to Eligible Customers taking FCD transmission service on behalf of Co-Located Load, consistent with our findings above that Eligible Customers taking FCD transmission service on behalf of Co-Located Load must also have necessary control technologies and/or protection systems to limit their energy withdrawals from the transmission system to their contract demand level.1045 We also disagree with protesters’ arguments opposing PJM’s proposal to establish an operational penalty for misoperation of necessary control technologies and/or protection systems. Vistra suggests that PJM’s proposal unduly discriminates against Co-Location Arrangements as compared to other entities using special protection schemes, but this penalty proposal (which Vistra mistakenly alleges applies only to special protection schemes) is not relevant to existing transmission services in PJM.1046 By contrast, as discussed above, correct operation of necessary control technologies and/or protection systems is foundational to the new transmission services. Vistra’s separate claim that PJM’s proposal is unduly discriminatory “insofar as it treats unreserved use of the transmission system by point-to-point customers differently from unreserved use by customers taking these new transmission services” is misplaced. In contrast to Eligible Customers taking Interim NITS, FCD transmission service, and/or NFCD transmission service on behalf of Eligible Load, PTPS customers are not required to establish necessary control technologies and/or protection systems in order to take PTPS.1047 We also find unpersuasive Joint Co-Location Developers’ allegation that this operational penalty is even more excessive, as compared to a penalty for failure to follow curtailment or load shedding directives, because misoperation without withdrawal does not risk system harm.1048 We agree with PJM that “[w]hen a control technology or protection scheme misoperates, there can be serious consequences.”1049 Where PJM 1045 See supra Part VI.C.
1046 See PJM Initial Brief at 47 (justifying its proposal to allow that an Eligible Customer disqualified from the new transmission services may take NITS because “NITS, in and of itself, addresses Curtailment, Load Shed, and control technology or protection scheme misoperation risk”).
1047 Id. at 50 (“PJM supports a penalty for unreserved use in addition to the disqualification and pause-in-rules discussed above.”); see id. at 41 (Table 1 (Penalties)). 1048 Joint Co-Location Developers Response Brief at 26.
1049 PJM Initial Brief at 43, 45; PJM Reply Brief at 52-53.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 388 Date Filed: 10/19/2026
PDF page 390
Docket No. EL25-49-002, et al.- 235 -
plans and operates the system around an assumption that necessary control technologies and/or protection systems will work, unexpected system behavior due to misoperation risks system reliability regardless of whether withdrawals occur, and we find that it is reasonable not to rely only on financial penalties to mitigate these risks. 526.
We disagree with Constellation’s suggestion that the Commission should adopt SPP’s approach from CHILLS, which contains only penalties for exceeding the transmission customer’s reserved capacity,1050 but not suspension or disqualification, for the same reasons discussed above.
527.
We agree with NOVEC that PJM’s proposed penalty language to disqualify the Eligible Customer as a whole from taking the relevant transmission service is not just and reasonable. Instead, we direct PJM to propose on compliance Tariff provisions providing that, after the second misoperation of necessary control technologies and/or protection systems pertaining to a transmission service agreement governing an Eligible Customer taking Interim NITS, FCD transmission service, and/or NFCD transmission service on behalf of Eligible Load, PJM will terminate the transmission service agreement. The Eligible Customer could still take transmission service, including Interim NITS, FCD transmission service, and NFCD transmission service, on behalf of other loads through other transmission service agreements.
528.
ODEC asserts that PJM’s implementation of its penalties must not subject ODEC or its member distribution cooperatives to service interruptions or disqualification, or financial penalties, as a result of requiring ODEC to serve as the Eligible Customer. The Commission set a replacement rate in the December Order applicable to Eligible Customers taking transmission service on behalf of Co-Located Load. The operational (and financial) penalties we establish in this order apply to Eligible Customers who elect to take the new transmission services on behalf of Eligible Load and who do not comply with the terms and conditions of the new transmission services, including misoperation of necessary control technologies and/or protection systems. The December Order does not require that Eligible Customers on behalf of Co-Located Load take one of the new transmission services and they may choose to take NITS instead. The Co-Located Load cannot force an Eligible Customer to take a type of transmission service it does not wish to take. As the Commission explained in the December Order, NITS remains a just and reasonable transmission service option that an Eligible Customer on behalf of a Co-Located Load may choose.1051
1050 Sw. Power Pool, Inc., 195 FERC ¶ 61,196 at 98.
1051 December Order, 193 FERC ¶ 61,217 at P 195.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 389 Date Filed: 10/19/2026
PDF page 391
Docket No. EL25-49-002, et al.- 236 -
c. Unreserved Use of the Transmission System
529.
We find that it is just and reasonable to impose a financial penalty on an Eligible Customer taking any of the new transmission services on behalf of Eligible Load for unreserved use of the transmission system. We find that it is just and reasonable to use Indicated TOs’ two-part penalty framework and to apply, within that framework, a penalty rate that is twice the rate we establish in this order for FCD transmission service.1052 Indicated TOs propose a base penalty charge for each hour in which the Eligible Customer’s reserved service limit is exceeded at the Point of Interconnection during at least one five-minute interval (Exceedance Hour) and a penalty ratchet when exceedances occur repeatedly.1053 Specifically, Indicated TOs propose that, if more than one Exceedance Hour occurs on the same day, then an additional daily penalty applies; if exceedances occur on multiple days within the same week, an additional weekly penalty applies; if exceedances occur in multiple weeks within the same month, then an additional monthly penalty applies; and if exceedances occur in multiple months within the same year, then an additional annual penalty applies.1054 We agree with Indicated TOs that progressively increasing the consequences of repeated penalties encourages Eligible Customers to manage their usage consistent with their reserved transmission service limit.1055 We note that Indicated TOs submit testimony indicating that they propose to distribute revenues collected from financial penalty charges on a monthly basis to Eligible Customers taking NITS and FCD transmission service. However, we find that unreserved use penalties should be distributed to all non-offending transmission 1052 See Order No. 890, 118 FERC ¶ 61,119 at P 848 (“As a result, we establish a rebuttable presumption that unreserved use penalties no greater than twice the firm point-to-point rate for the penalty period defined above are just and reasonable.”); id. P 846 (basing penalty charges on the period of unreserved use and determining that, as a general rule, more than one assessment for a given duration will increase the penalty period to the next longest duration).
1053 Indicated TOs Response Brief at 12 (“When a Co-Located Load exceeds its reserved transmission service limit, the base penalty charge will be assessed for any hour in which at least one five-minute interval occurs during which a customer’s metered load at the point of interconnection exceeds its reserved transmission service.”); Indicated TOs Reply Brief at 16.
1054 Indicated TOs Reply Brief at 16; Indicated TOs Reply Brief, Ex.
No. PTO-0005 at 7.
1055 Indicated TOs Response Brief at 12-13; Indicated TOs Reply Brief at 17. Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 390 Date Filed: 10/19/2026
PDF page 392
Docket No. EL25-49-002, et al.- 237 -
customers consistent with Order No. 890.1056 We direct the PJM transmission owners to file, within 60 days of the date of issuance of this order, a compliance filing consistent with these findings.
E. Anti-Toggling Mechanisms for Firm Contract Demand Transmission
Service
530.
In the December Order, the Commission found that FCD transmission service should have a minimum term of one year, but that PJM should propose an anti-toggling mechanism for Eligible Customers switching between FCD and NFCD transmission service.1057
1. Initial Briefs
531.
PJM proposes an anti-toggling mechanism to prevent transmission customers from switching between FCD and NFCD transmission services by providing that the portion of the Co-Located Load served by FCD transmission service is not eligible to be served by NFCD transmission service for five years following the effective date of the Service Agreement. Conversely, PJM explains, it does not bar Co-Located Load served by NFCD transmission service from being served by FCD transmission service in future years. However, PJM proposes an exception if there is a physical change to the Co-Located Generator that would materially alter the MW level dedicated to the load or to the Co-Located Load that would materially alter the MW level of its gross demand.1058 PJM argues this exception is necessary to ensure that, if an Eligible Customer materially changes either the generation capacity or the load on a gross demand basis, the Tariff provides flexibility to determine whether FCD or NFCD transmission service should be taken for the new incremental portion.
532.
PJM also maintains that its proposed 42-month notice of termination acts as an anti-toggling device in a manner similar to the five-year commitment period applicable to the Fixed Resource Requirement alternative in the PJM capacity market. PJM explains that its notice period recognizes that PJM incorporates these loads in the capacity market, 1056 See Order No. 890, 118 FERC ¶ 61,119 at P 860 (“Unreserved use penalties are assessed against transmission customers and should, therefore, be distributed to all non-offending transmission customers, whether affiliated with the transmission provider or not.”).
1057 December Order, 193 FERC ¶ 61,217 at P 213.
1058 PJM Initial Brief at 53-54.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 391 Date Filed: 10/19/2026
PDF page 393
Docket No. EL25-49-002, et al.- 238 -
and it would unreasonably shift costs to other loads if Co-Located Loads could avoid capacity charges incurred on their behalf by terminating service prematurely.1059 533.
Indicated TOs propose a five-year minimum commitment period for FCD
transmission service, arguing that doing so is necessary to ensure that FCD transmission service customers cannot trigger Network Upgrades and then cease taking service, thereby potentially shifting costs to other transmission customers, and because it mirrors the commitment period for loads seeking to procure their own capacity.1060 Indicated TOs argue that, where Network Upgrades are attributable to FCD transmission service customers, separate payment guarantees may be required to prevent Network Customers from being left “holding the bag” if an FCD transmission service customer exits the system before the costs of the Network Upgrades are fully paid.1061 Finally, Indicated TOs recommend that the Commission adopt the same requirements for FCD transmission service that apply to notices of termination for NITS, including the 42-month notice period.1062
2. Response Briefs
534.
NOVEC states that it supports PJM’s five‑year minimum service commitment and 42‑month notice requirement. NOVEC asserts that the minimum service commitment sends timely price signals to the capacity market, enhances market stability, and minimizes upgrade‑related risks if a Co-Located Load withdraws. NOVEC notes that the notice-of-termination period is identical to the requirements for termination of NITS and prevents Co-Located Loads from avoiding capacity charges by prematurely terminating their agreement.1063
3. Determination
535.
Except as noted below, we find PJM’s proposed anti-toggling mechanism to be a just and reasonable replacement rate. In particular, we find that PJM’s proposal to prohibit, for a period of five years, Eligible Customers taking transmission service on behalf of a Co-Located Load from taking NFCD transmission service for any portion of 1059 Id. at 54-55.
1060 Indicated TOs Initial Brief at 21 (citing December Order, 193 FERC ¶ 61,217 at P 213).
1061 Id. at 21 n.50.
1062 Id. at 21 & n.52.
1063 NOVEC Response Brief at 15-16.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 392 Date Filed: 10/19/2026
PDF page 394
Docket No. EL25-49-002, et al.- 239 -
Co-Located Load served by FCD transmission service will ensure that such Eligible Customers do not attempt such a switch based on expected capacity market conditions, consistent with the December Order.1064 We further find that PJM’s proposed 42-month notice of termination provision applicable to FCD transmission service customers mirrors that applicable to Network Customers and recognizes that PJM has procured capacity on their behalf. We direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing to revise its Tariff consistent with these findings. 536.
However, we find PJM’s proposed exceptions regarding changes to the
Co-Located Generator or Co-Located Load are not just and reasonable to the extent they would permit Eligible Customers to decrease the level of contract demand for FCD transmission service they take on behalf of an Eligible Load, and increase the level of contract demand for NFCD transmission service, without being subject to the anti-toggling provision. The Commission found that the anti-toggling mechanism should ensure Eligible Customers taking transmission service on behalf of Co-Located Loads cannot switch from FCD to NFCD transmission service based on expected capacity market conditions.1065 As such, PJM’s proposal is not consistent with the December Order, and we direct PJM to propose an anti-toggling mechanism without an exception for Eligible Customers taking FCD transmission service on behalf of Eligible Load in a compliance filing within 60 days of the date of issuance of this order. 537.
We also reject Indicated TOs’ proposal for a five-year minimum commitment period. As Indicated TOs acknowledge, the Commission required in the December Order that the minimum term for FCD transmission service should be one year.1066 As such, we find that Indicated TOs’ arguments in support of its proposal are an untimely request for rehearing of the December Order.1067
1064 December Order, 193 FERC ¶ 61,217 at P 213.
1065 Id.
1066 Id.
1067 See, e.g., ISO New Eng. Inc., 132 FERC ¶ 61,098 at P 12 (“The Commission has held that requests to alter a compliance filing in a manner that differs from the order requiring the compliance filing constitute a collateral attack on the order requiring the compliance filing.”).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 393 Date Filed: 10/19/2026
PDF page 395
Docket No. EL25-49-002, et al.- 240 -
F. Communications, Alarm, SCADA, or Other Requirements
1. Initial Briefs
538.
PJM proposes to develop telemetry requirements for Co-Located Load so that PJM can monitor the status of demand placed on PJM’s transmission system, including unreserved use, to ensure reliability.1068 PJM states that it still determining the scope of the tools and requirements necessary to limit withdrawals that exceed reserved use. PJM also proposes to develop data exchange and metering requirements for Co-Located Load that may be similar to those applicable to generation. PJM proposes to develop the capability to differentiate more granularly between the transmission services available to Eligible Customers on behalf of Co-Located Load because they are prioritized differently. PJM maintains that Eligible Customers would need to take these different forms of transmission service on different feeders, or cables leaving substations, to ultimately serve the Co-Located Load.
539.
PJM next proposes to develop requirements and identify any relevant NERC rules to ensure that relay settings are consistent with the design of the necessary control technologies and/or protection systems, as set forth in each Service Agreement.1069 PJM asserts that transmission owners must be heavily involved in ensuring that necessary control technology and/or protection systems are properly designed. PJM explains that it proposes technical requirements that must be in place prior to commencement of service because there are significant risks introduced by the necessary control technology and protection systems. PJM also proposes to make changes to core Markets and Operations systems to incorporate the information provided by Eligible Customers and Co-Located Load to ensure reliability of the PJM transmission system.
2. Response Briefs
540.
Indicated TOs support PJM’s proposal in its initial brief to develop telemetry requirements and require Co-Located Load to meet such requirements in order to monitor Co-Located Loads’ use of the transmission system.1070
3. Determination
541.
We decline to direct PJM’s proposed telemetry, data exchange, metering, and relay setting requirements as the replacement rate because PJM has not provided 1068 PJM Initial Brief at 59-61.
1069 Id. at 60-61.
1070 Indicated TOs Response Brief at 10-11.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 394 Date Filed: 10/19/2026
PDF page 396
Docket No. EL25-49-002, et al.- 241 -
sufficient detail to find they are just and reasonable. PJM by its own admission has not finished determining the scope of what might be necessary to limit energy withdrawals from the transmission system. Accordingly, and consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing with Tariff revisions it deems necessary for PJM to be able to ensure that an Eligible Customer has adequate telemetry, data exchange, and metering requirements such that PJM may monitor the Eligible Load’s use of the transmission system, limit withdrawals, and ensure relay settings are consistent with necessary control technologies and/or protection systems.
G. Curtailment Procedures for Interim NITS and Non-Firm Contract
Demand Transmission Service
1. Initial Briefs
542.
PJM proposes that Interim NITS and NFCD transmission service will be curtailed before FCD transmission service and NITS.1071 PJM also proposes that it may curtail Interim NITS or NFCD transmission service prior to dispatching the Pre-Emergency Load Response Program or in response to a transfer capability shortage as a result of system reliability conditions. PJM proposes that FCD transmission service be treated equal to NITS for purposes of curtailment.1072 PJM states that it reserves the right to curtail the three new transmission services on a non-discriminatory basis for the purpose of making necessary adjustments to, changes in, or repairs on its lines, substations, and facilities, and in cases where continuation of service would endanger persons or property. PJM proposes that the Eligible Customer must shed load in accordance with previously established procedures under the relevant Service Agreement.
543.
PJM acknowledges that its system does not differentiate between different types of transmission service because all load within PJM is currently served by NITS.1073 Thus, PJM explains, core systems would need to be implemented to enable sufficient granularity when shedding an Eligible Customer’s Co-Located Load being served by two different levels of transmission service, i.e., both FCD and NFCD transmission services. PJM clarifies that, assuming these core system design changes can be implemented, Eligible Customers taking transmission service on behalf of Co-Located Load would 1071 PJM Initial Brief at 63.
1072 Id. at 64.
1073 Id. at 65-66.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 395 Date Filed: 10/19/2026
PDF page 397
Docket No. EL25-49-002, et al.- 242 -
need to take different forms of transmission service on different feeders, or cables leaving substations, to ultimately serve Co-Located Load.
2. Response Briefs
544.
Joint Co-Location Developers argue that PJM fails to adequately clarify when and how NFCD transmission service and Interim NITS shall be curtailed, in particular the curtailment trigger.1074 Joint Co-Location Developers maintain that the curtailment trigger significantly affects rates and service and is realistically susceptible of specification and should be included in the tariff. Joint Co-Location Developers assert that PJM does not clarify whether and how it will determine curtailment priority among its different classes of non-firm service, including Non-Firm PTPS, NFCD transmission service, and Interim NITS.
545.
Constellation argues that it is discriminatory to require different feeders and would unnecessarily delay Co-Location Arrangements.1075 At minimum, Constellation asserts that such a requirement should not apply in the case of Interim NITS since the Co-Located Load is not taking both firm and non-firm service.
546.
AEU/SEIA explain that the December Order established a curtailment hierarchy in accordance with which Interim NITS and NFCD transmission service will be curtailed before NITS and FCD transmission service and before pre-emergency demand response resources are dispatched.1076 AEU/SEIA claim that PJM’s implementation of this hierarchy is contradictory because PJM states that it “may” curtail Interim NITS and NFCD transmission service prior to dispatching the Pre-Emergency Load Response Program and that it “will” curtail Interim NITS and NFCD transmission service before demand response resources are called upon to reduce load.1077 AEU/SEIA argue that this inconsistency must be resolved because a customer considering whether to take Interim NITS or NFCD transmission service needs to know whether curtailment before pre-emergency demand response is a certainty or a possibility.
547.
AEU/SEIA contend that PJM has provided no information about the conditions that would actually trigger curtailment of Interim NITS or NFCD transmission service in practice and that, because these are novel services, no historical curtailment data 1074 Joint Co-Location Developers Response Brief at 17.
1075 Constellation Response Brief at 29-30.
1076 AEU/SEIA Response Brief at 11.
1077 Id. (citing PJM Initial Brief at 63-64).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 396 Date Filed: 10/19/2026
PDF page 398
Docket No. EL25-49-002, et al.- 243 -
exists.1078 AEU/SEIA further argue that modeling of expected curtailment frequency and duration or examples of how curtailment would operate for a hypothetical Co-Location Arrangement must be provided in order for customers to make informed business decisions on the transmission service that best serves their needs. If it is not, AEU/SEIA argue that prospective customers will default to taking NITS. AEU/SEIA request that the Commission require PJM to develop and publish historical analysis and forward-looking modeling of curtailment frequency and duration for Interim NITS and NFCD transmission service, as informed by historical system conditions in PJM and broken down by zone. AEU/SEIA also argue that PJM should set out in its reply brief how it intends to operationalize curtailment for NFCD transmission service, including the sequence in which Co-Located Loads will be curtailed relative to other non-firm services and the mechanism by which curtailment instructions will be communicated and enforced. Without this sequence, AEU/SEIA claim that neither the Commission nor affected parties can evaluate whether PJM’s proposed curtailment framework is consistent with the December Order’s requirement that NFCD transmission service be available “as needed during normal, non-emergency system operating conditions.”1079
3. Reply Briefs
548.
Earthjustice argues that the Commission should require PJM to clarify how and when PJM will enforce its curtailment procedures, including: (1) how PJM will communicate its curtailment directives; (2) how and when transmission providers will determine that load shed is necessary, which loads will be curtailed first, and at what stage curtailments will occur; and (3) how a data center will be disqualified and the timeline for that disqualification.1080
549.
Industrials/Amtrak argue that many traditional large loads cannot shut off immediately if their on-site generation trips.1081
1078 Id. at 12-14.
1079 Id. at 14 (quoting December Order, 193 FERC ¶ 61,217 at P 215). 1080 Earthjustice Reply Brief at 14, 16.
1081 Industrials/Amtrak Reply Brief at 6.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 397 Date Filed: 10/19/2026
PDF page 399
Docket No. EL25-49-002, et al.- 244 -
4. Answers
550.
Constellation argues that PJM inappropriately attempts in its reply brief to reinstate a curtailment criterion of a capacity/reserve shortage and that the Commission rejected this element of PJM’s proposed Option 7 in the December Order.1082
5. Determination
551.
We find PJM’s proposed curtailment hierarchy for Interim NITS, FCD
transmission service, and NFCD transmission service to be just and reasonable. PJM’s proposal to treat FCD transmission service as comparable to NITS is consistent with the December Order,1083 as is PJM’s proposal to curtail Interim NITS and NFCD transmission service prior to firm transmission services.1084 In addition, we find PJM’s proposal to curtail Interim NITS and NFCD transmission service prior to deployment of its Pre-Emergency Load Response Program, or in response to a transfer capability shortage as a result of system reliability conditions, to be just and reasonable because it is consistent with how Non-Firm PTPS is curtailed.1085 We disagree with Constellation that PJM’s proposal to curtail Interim NITS during capacity or reserve shortages is inconsistent with the Commission’s findings in the December Order that PJM’s proposed construct for an interim transmission service was too broad and not sufficiently detailed to direct as a replacement rate.1086 Constellation misunderstands the December Order, which found it was not reasonable to allow the transitional period for Interim NITS to continue until any resource adequacy challenges associated with the addition of the Co-Located Load were addressed, and instead limited the transitional period to the time 1082 Constellation May 11 Answer at 13 (citing December Order, 193 FERC ¶ 61,217 at P 202).
1083 See, e.g., December Order, 193 FERC ¶ 61,217 at P 208 (stating that FCD transmission service will have the same curtailment priority as existing firm transmission services).
1084 See, e.g., id. P 201 (stating that Interim NITS “will be curtailed before existing firm transmission services and the new Firm Contract Demand Transmission Service”); id. P 215 (stating same with respect to NCFD transmission service).
1085 See PJM, Intra-PJM Tariffs, OATT, § II, § 14.7 (Curtailment or Interruption of Service) (0.0.0) (describing PJM’s curtailment procedures for Non-Firm PTPS); PJM Manual 13: Emergency Operations, Rev. 97 (eff. November 20, 2025), § 2.3.2. 1086 Constellation May 11 Answer at 13 (citing December Order, 193 FERC ¶ 61,217 at P 202).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 398 Date Filed: 10/19/2026
PDF page 400
Docket No. EL25-49-002, et al.- 245 -
needed to complete any Network Upgrades identified in the study process.1087 The Commission did not find, as Constellation alleges, that Interim NITS could not be curtailed as a result of capacity or reserve shortages. Here, we find that PJM’s proposal to curtail Interim NITS during capacity or reserve shortages is just and reasonable and consistent with both the nature of the transmission service as a non-firm transmission service for which Eligible Customers do not pay generation capacity charges, and the need to maintain reliability.
552.
We disagree with commenters that PJM must provide specific details in its Tariff, such as the trigger and procedures for curtailment of Interim NITS and FCD or NFCD transmission services, or how PJM will enforce its curtailment procedures. We find that requiring PJM to specify the curtailment priority of these new transmission services in its Tariff, while leaving specific implementation details in its manuals and individual service agreements, provides transmission customers sufficient certainty as to their priority relative to other transmission services and ensures that PJM has sufficient flexibility to preserve system reliability in varying operating conditions.1088 We find that it is just and reasonable and important to protect transmission system reliability to provide PJM with sufficient operational flexibility during emergency procedures to curtail transmission customers as needed to preserve reliability.1089
553.
However, we find that PJM does not adequately explain its curtailment hierarchy amongst non-firm transmission services. For example, while PJM states that it will curtail Interim NITS and NFCD transmission service prior to deployment of its Pre-Emergency Load Response Program, it does not detail if these transmission services will be curtailed before or after Non-Firm PTPS, or if curtailment priority within NFCD transmission service will be based on duration, as are curtailments for Non-Firm PTPS.1090
1087 December Order, 193 FERC ¶ 61,217 at P 202.
1088 See PJM, Intra-PJM Tariffs, OATT, § II.14.7 Curtailment or Interruption of Service (0.0.0) (describing PJM’s curtailment procedures for Non-Firm PTPS). 1089 See Order No. 890-A, 121 FERC ¶ 61,297 at P 566 (“If the [conditional firm transmission] customer selects the annual hourly cap option, the transmission provider will have the flexibility to conditionally curtail the customer for any reliability reason during those hours, including but not limited to, the system condition(s) identified in the system impact study.”).
1090 PJM, Intra-PJM Tariffs, OATT, § II.14.7 Curtailment or Interruption of Service (0.0.0).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 399 Date Filed: 10/19/2026
PDF page 401
Docket No. EL25-49-002, et al.- 246 -
554.
We also find that PJM has not justified its assertion that an Eligible Customer taking different forms of transmission service on behalf of Co-Located Load would need to take those services on different feeders. PJM states that this requirement is based on the need for core systems to be implemented to enable sufficient granularity when shedding an Eligible Customer’s Co-Located Load being served by two different levels of transmission service.1091 While we recognize that core systems will need to be implemented, PJM provides no explanation as to why these systems could not be sufficiently flexible as to accommodate a single feeder with two different levels of transmission service on it. 1092
555.
Accordingly, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to revise the Tariff to include the curtailment priorities for Interim NITS, FCD transmission service, and NFCD transmission service consistent with our findings above. This language must specify that FCD transmission service shall be treated the same as NITS for the purposes of curtailment, and that Interim NITS and NFCD transmission service will be curtailed prior to deployment of PJM’s Pre- Emergency Load Response Program, or in response to a transfer capability shortage as a result of system reliability conditions. PJM’s submittal must also detail the curtailment priorities between Non-Firm PTPS, Interim NITS, and NFCD transmission service, including how or if PJM will prioritize transmission customers for curtailment based on duration of service. Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we further direct PJM to reflect this change in its compliance filing.
H. Rates, Terms, and Conditions for Interim NITS
1. Initial Briefs
556.
PJM proposes to model the non-rate terms and conditions for Interim NITS on NITS.1093 PJM proposes that an Eligible Customer may take Interim NITS on behalf of Co-Located Load until Network Upgrades are complete, and then the customer will automatically convert to a Network Customer. PJM states that an Eligible Customer receiving Interim NITS on behalf of Co-Located Load will receive non-firm transmission 1091 PJM Initial Brief at 66.
1092 For example, this system could assume that load on a feeder is firm up until the Eligible Customer’s Firm Contract Demand withdrawal limit, and non-firm above that contract demand amount.
1093 PJM Initial Brief at 67-70.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 400 Date Filed: 10/19/2026
PDF page 402
Docket No. EL25-49-002, et al.- 247 -
service for the delivery of energy to Co-Located Load. PJM proposes that, upon receipt of request, PJM will determine the amount of Interim NITS that can be reliably provided based on the results of appropriate studies and in consultation with the affected transmission owner. PJM proposes that, for Interim NITS, the Eligible Customer must meet certain conditions and appropriate technical requirements. PJM proposes that the Eligible Customer have an ongoing obligation to notify PJM of material changes in the demand characteristics of the Co-Located Load and the supply characteristics of the Co- Located Generator. PJM explains that the Co-Location Arrangement cannot change during the term of the Interim NITS without discussion and possible further studies by PJM.
557.
PJM proposes load shedding and curtailment provisions applicable to Interim NITS, including that prior to commencement of service, the Eligible Customer must demonstrate its ability to comply with PJM’s load shedding and curtailment procedures.1094 PJM proposes to require Eligible Customers taking Interim NITS to work with PJM and the affected transmission owners to establish necessary control technologies and/or protection systems. PJM proposes that Eligible Customers will be assessed certain non-transmission-related rates, including: (1) administrative service charges, (2) ancillary services charges except for regulation, (3) black start service charges based on gross demand, and (4) any redispatch costs. PJM proposes a single Service Agreement specific to Eligible Customers serving Co-Located Load via Interim NITS or NITS. Indicated TOs propose to apply the NITS rate to Eligible Customers taking Interim NITS.1095
2. Response Briefs
558.
Indicated TOs propose several clarifications to PJM’s illustrative Tariff provisions.1096 First, Indicated TOs propose revisions to section 702.4 to require an Eligible Customer to satisfy any applicable technical requirements imposed by the relevant transmission owner. Second, Indicated TOs propose revisions to section 703.2 to clarify that both new and increased Co-Located Loads will be studied pursuant to a new application for transmission service. Third, Indicated TOs contend that PJM should provide additional information as to what would constitute a “material change” in the demand characteristics of a Co-Located Load for purposes of an Eligible Customer’s notice obligations under section 703.3. Fourth, Indicated TOs recommend that PJM establish load shedding practice guidelines applicable to Co-Location Arrangements for purposes of load shedding conducted under section 705.3 of PJM’s illustrative tariff 1094 Id. at 71-75.
1095 Indicated TOs Initial Brief at 5 n.13.
1096 Indicated TOs Response Brief at 13-17, 23.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 401 Date Filed: 10/19/2026
PDF page 403
Docket No. EL25-49-002, et al.- 248 -
provisions. Indicated TOs explain that they are particularly concerned with automatic load shedding schemes because of the possibility that unintentional activation of these schemes may result in unwanted shedding of nearby customer loads in addition to the Co-Located Load. Fifth, Indicated TOs propose revisions to section 705.5 to require that the necessary control technologies and/or protection systems that must be approved by PJM are also approved by and developed in accordance with the transmission owners’ interconnection standards, guidelines, and practices. Sixth, Indicated TOs assert that the reference to the transmission owner’s cost responsibility for redispatch costs in section 706.2 of PJM’s illustrative tariff provisions is incorrect and request that PJM remove such reference from the filed Tariff records. Seventh, Indicated TOs propose to correct a typo to the conditions of Part XI of the Tariff in section 2.0 of PJM’s proposed Attachment F-3A. Last, Indicated TOs request that PJM add a placeholder section for listing required control technologies and/or protection systems to section 4.0 of PJM’s proposed Attachment F-3A.
559.
Vistra argues that PJM’s study process is flawed because it provides too much discretion to PJM and transmission owners to determine whether studies are required, which studies to conduct, the timeline for doing so, and how to prioritize different requests.1097 Also, Vistra contends that PJM’s proposal is unclear on what it means to ensure that non-firm transmission service can be provided reliably, and that it is critical customers seeking non-firm service not be held to some higher standard. Constellation similarly argues that PJM’s proposed study procedures lack sufficient detail to prevent delay and discrimination by transmission owners.1098 Constellation argues that PJM must spell out the studies it will perform in the tariff, as well as the timetable for completing the studies.
560.
Market Monitor argues that Interim NITS is not consistent with PJM’s planning process and poses potentially significant reliability risks due to the complexity introduced by the necessary control technology and protection systems. Market Monitor states that these risks mean there is not an unlimited amount of Interim NITS that can be provided, which raises questions about which customers would be allowed to take Interim NITS if demand exceeds supply.1099
561.
Several parties oppose any restriction on Co-Located Loads accessing on-site generation while using Interim NITS and being curtailed, noting that PJM’s initial brief is not clear on whether such a requirement is being proposed. Parties argue that such a requirement would be in violation of the December Order and significantly degrade the 1097 Vistra Response Brief at 31, 39.
1098 Constellation Response Brief at 14-15.
1099 Market Monitor Response Brief at 6-7.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 402 Date Filed: 10/19/2026
PDF page 404
Docket No. EL25-49-002, et al.- 249 -
value of Interim NITS.1100 DCC argues that allowing customers to be curtailed despite bringing their own generation does not align with the Commission’s objective to enable more flexible and timely service arrangements for Co-Located Load.1101 DCC argues that PJM’s proposal does not recognize an intermediate operational state in which Co-Located Generators can operate in parallel with the grid on a limited, non-exporting or non-market-participating basis while completing interconnection requirements. Enchanted Rock argues that because this limitation during curtailment conditions is a practice that affects rates and service significantly, that is reasonably susceptible of specification, and that is not so generally understood in any contractual arrangement as to render recitation superfluous, it must be included within the Tariff in order to be effectuated.1102
562.
AEU/SEIA request that the Commission direct PJM to revise its Interim NITS proposal to explicitly allow Eligible Customers to use on-site generation to serve load continuously, provided that the generator is new and that the Co-Located Load does not simultaneously withdraw energy from the transmission system.1103 Joint Co-Location Developers assert that, as long as Co-Located Generators are not capacity resources, they should be free to serve Co-Located Loads during curtailment conditions.1104 563.
Constellation asks the Commission to direct PJM to include a transitional mechanism for pending large load NITS applicants so that this new service is not unnecessarily limited to new applicants.1105
1100 See AEU/SEIA Response Brief at 20 (citing December Order, 193 FERC ¶ 61,217 at P 201); Enchanted Rock Response Brief at 7; Joint Co-Location Developers Response Brief at 18.
1101 DCC Response Brief at 3-4.
1102 Enchanted Rock Response Brief at 7.
1103 AEU/SEIA Response Brief at 21.
1104 Joint Co-Location Developers Response Brief at 19.
1105 Constellation Response Brief at 14.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 403 Date Filed: 10/19/2026
PDF page 405
Docket No. EL25-49-002, et al.- 250 -
3. Reply Briefs
564.
In consideration of parties’ comments, particularly those of Indicated TOs, PJM proposes certain revisions to the illustrative tariff provisions for Interim NITS and NITS, and the Service Agreement for Interim NITS.1106
565.
PJM articulates several reasons why Interim NITS customers should not be allowed to access the Co-Located Generator when PJM curtails the Co-Located Load.1107 First, PJM states that Interim NITS will be curtailed when the system cannot support it in real time, whether with sufficient generation or transmission capacity. Second, PJM argues that Interim NITS must be designed to allow PJM to maintain system reliability, both from a transmission and capacity perspective, and that allowing an interruptible customer to preclude PJM from accessing a generation resource during times of system stress would be contrary to that objective. PJM maintains that, if the Co-Located Generator is a capacity resource, then PJM has the first call on such resource’s energy to meet the region’s needs. Third, PJM explains that Interim NITS is a type of NITS and is served by the pool of resources and not any one dedicated resource. PJM asserts that allowing an Interim NITS customer to take energy from the Co-Located Generator during curtailment would effectively transform this service into something akin to FCD or NFCD transmission service, where the Co-Located Generator dedicates a MW level of output to the Co-Located Load. Lastly, PJM argues that Interim NITS is predicated on the Co-Located Load’s willingness to curtail, and allowing an Interim NITS customer access to the Co-Located Generator during times of system stress is contrary to this foundational element of the December Order.1108 PJM also asserts that providing a right to an Interim NITS customer to access the Co-Located Generator during times of system stress is illogical when such right is not available to full Network Customers. NOVEC urges the Commission to accept PJM’s proposal and argues that if prospective customers find that Interim NITS is not desirable, they have the flexibility to pursue a combination of FCD and NFCD transmission services.1109
566.
PJM defends its process for Interim NITS to determine whether “additional studies are needed” by arguing that the NITS study could provide sufficient information for PJM to determine if Interim NITS can be reliably provided.1110 PJM maintains that it should 1106 PJM Reply Brief at 60-64.
1107 Id. at 16-20.
1108 Id. at 21 (citing December Order, 193 FERC ¶ 61,217 at P 201).
1109 NOVEC Reply Brief at 16.
1110 PJM Reply Brief at 27.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 404 Date Filed: 10/19/2026
PDF page 406
Docket No. EL25-49-002, et al.- 251 -
not be required to provide as much detail for Interim NITS determinations as for FCD and NFCD transmission services given that Interim NITS is derivative of the customer’s existing NITS request and associated studies, although the illustrative tariff authorizes PJM to perform additional studies if needed.1111
567.
Joint Co-Location Developers argues that the Interim NITS proposal undermines PJM’s reliability rationale for NFCD transmission service outage restrictions because PJM has proposed to make it broadly available during normal operating conditions, and PJM has not claimed that doing so will compromise reliability.1112
568.
Constellation avers that PJM’s omission of any detail with respect to this study process does not comply with the Commission’s directive to provide additional record evidence to set the appropriate replacement rates, terms, and conditions for Interim NITS and urges the Commission to direct PJM to file its study process for Interim NITS within 30 days.1113
4. Answers
569.
Constellation asks the Commission to direct PJM to revise its illustrative tariff to clarify that large loads with pending NITS applications shall be studied for Interim NITS at the request of the load without having to submit a separate application.1114 570.
Enchanted Rock reiterates that PJM’s implementation of Interim NITS is fundamentally flawed because, while an Eligible Customer takes Interim NITS on behalf of a Co-Located Load, PJM proposes not to allow that Co-Located Load to receive any capacity or energy from a Co-Located Generator and instead to treat the Co-Located Generator as a capacity resource.1115 Enchanted Rock disagrees with PJM that this limitation accords with the principles of the December Order that the new transmission services are designed to serve loads that are willing and able to control their withdrawals from the transmission system and to allow PJM to maintain system reliability. Enchanted Rock avers to the contrary that allowing a Co-Located Load to take capacity and energy from a Co-Located Generator enables that Co-Located Load to control its withdrawals 1111 Id. at 31-32.
1112 Joint Co-Location Developers Reply Brief at 9-10.
1113 Constellation Reply Brief at 12.
1114 Constellation May 11 Answer at 14.
1115 Enchanted Rock May 7 Answer at 2-3.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 405 Date Filed: 10/19/2026
PDF page 407
Docket No. EL25-49-002, et al.- 252 -
from the transmission system.1116 Enchanted Rock also contends that PJM is mistaken in its argument that the PJM region has first call on the output of a Co-Located Generator before the Co-Located Generator has completed PJM’s interconnection study process and received a GIA, because until that point, the Co-Located Generator is not eligible to be a capacity resource. Enchanted Rock argues that forcing the Co-Located Generator to be dispatched under emergency conditions during this period would be unduly discriminatory by imposing on these Co-Located Generators obligations that are not imposed on similarly situated generators.1117 Finally, Enchanted Rock argues that it would be illogical that an Interim NITS customer not be allowed to rely on its non-firm Co-Located Generator in order to remain online during emergencies when it is taking non-firm transmission service. Enchanted Rock further contends that it would be unjust and unreasonable for a Co-Located Load to bear the full capital and development risk of bringing a Co-Located Generator online only for PJM to dispatch the Co-Located Generator to serve firm Network Customers during emergencies—precisely when PJM is serving firm Network Customers but curtailing Interim NITS customers.1118
5. Determination
571.
We find PJM’s proposal for Interim NITS to be just and reasonable, subject to the clarifications directed below, and direct PJM to file, as the replacement rate, rates, terms, and conditions for Interim NITS as detailed below on compliance. We generally agree with PJM that the non-rate terms and conditions for Interim NITS reflect those applied to NITS, with necessary modifications to reflect the interim and non-firm nature of this new transmission service. We find that PJM’s proposals that an Eligible Customer taking Interim NITS will receive non-firm transmission service for the delivery of energy to Co-Located Load and convert automatically to a Network Customer when Network Upgrades are complete to be consistent with the directives in the December Order.1119 We direct PJM to file, within 60 days of the date of issuance of this order, a compliance filing revising its Tariff consistent with these findings. Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able 1116 Id. at 5-6.
1117 Id. at 6-8.
1118 Id. at 8-9.
1119 December Order, 193 FERC ¶ 61,217 at P 200 (stating that Interim NITS “can be interrupted until the Network Upgrades necessary to provide NITS are complete and the Co-Located Load can be designated as Network Load”).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 406 Date Filed: 10/19/2026
PDF page 408
Docket No. EL25-49-002, et al.- 253 -
to limit their energy withdrawals from the transmission system under certain conditions, we further direct PJM to reflect this change in its compliance filing. 572.
We find that Indicated TOs’ proposal to apply the NITS rate to Eligible Customers taking Interim NITS on behalf of Co-Located Load is just and reasonable and consistent with the December Order.1120 Therefore, and consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we direct the PJM transmission owners to submit, within 60 days of the date of issuance of this order, a compliance filing to apply the NITS rate to Eligible Customers taking transmission service on behalf of Eligible Loads.
573.
Consistent with our findings in Part VI.A.4, we also find just and reasonable PJM’s proposal to charge Eligible Customers taking Interim NITS on behalf of Co-Located Load certain administrative and ancillary services charges, and to assess charges based on gross demand for regulation and black start service. We find PJM’s proposal consistent with the December Order.1121 Moreover, we find it is just and reasonable to charge Interim NITS customers redispatch costs to cover congestion-related costs, given that Interim NITS will be pool-scheduled and can be served by generators redispatched to mitigate congested transmission paths. Accordingly, and consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we direct PJM to submit, within 60 days of the date of issuance of this order, a compliance filing to incorporate in the Tariff revisions to assess to Eligible Customers taking transmission service on behalf of Eligible Loads: (1) administrative service charges, (2) ancillary service charges, (3) black start service charges,
(4) regulation charges, and (5) any redispatch costs.
574.
We note that only curtailment procedures were explicitly included in the paper hearing, and Tariff provisions governing other terms and conditions for Interim NITS, including the study process, should be filed on compliance.1122 That said, we find it is just and reasonable to allow PJM greater discretion as to how it studies Interim NITS 1120 Id. (stating that Interim NITS customers would pay the NITS rate). 1121 Id. (stating that Interim NITS customers would pay ancillary service charges and charges for black start service).
1122 Id. P 219.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 407 Date Filed: 10/19/2026
PDF page 409
Docket No. EL25-49-002, et al.- 254 -
requests, in comparison to requests for FCD transmission service.1123 We disagree with Vistra that PJM’s proposed study process provides too much discretion to PJM and transmission owners. We reiterate that Interim NITS is only “available to the extent PJM determines that it can provide some level of interim service reliably,”1124 and therefore we find that it is just and reasonable to limit this service to situations in which PJM, in consultation with transmission owners, grants such service based on the results of appropriate studies. The Commission generally defers to transmission providers’ discretion regarding how to maintain a reliable transmission system.1125 575.
We further find that Interim NITS is distinguishable from FCD and NFCD transmission services, for which we direct PJM to provide additional detail in the Tariff regarding the study process as discussed Part VI.A.3, because Interim NITS is a temporary service akin to provisional interconnection service in that both services are intended to allow a customer to temporarily use an amount of a service that can be provided reliably until such customer may begin taking the full requested service. In both cases, the Commission requires the transmission provider to determine if the requested service could be provided reliably.1126 Similar to provisional interconnection 1123 See PJM, Intra-PJM Tariffs, OATT, § VIII.L 439 Provisional Interconnection Service (0.0.0) (providing that PJM “may grant such service at its discretion based upon an evaluation that will consider the results of available studies”); Order No. 890, 118 FERC ¶ 61,119 at P 957 (in the case that a request for long-term Firm PTPS cannot be satisfied out of existing capacity, the transmission provider is required to identify options for providing service but has discretion to study and offer a mix of planning redispatch and conditional firm options for a single service request). 1124 December Order, 193 FERC ¶ 61,217 at P 200.
1125 RWE Clean Energy, LLC, 194 FERC ¶ 61,212 at P 42 (“The Commission generally allows transmission providers to exercise their engineering judgment when conducting interconnection studies, including deferring to transmission providers’ discretion regarding how to maintain a reliable transmission system.”). 1126 December Order, 193 FERC ¶ 61,217 at P 200 (“Moreover, this new service would be optional for an Eligible Customer seeking NITS on behalf of a Co-Located Load and would only be available to the extent PJM determines that it can provide some level of interim service reliably.”); Order No. 845, 163 FERC ¶ 61,043 at P 440 (“In response to CAISO, we clarify that ‘a certain amount of capacity already studied’ refers to situations where, for example, available studies or additional studies as necessary indicate that there is a certain amount of interconnection service available without the need for additional network upgrades and the transmission provider can reliably accommodate the interconnection service.”).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 408 Date Filed: 10/19/2026
PDF page 410
Docket No. EL25-49-002, et al.- 255 -
service, we find that it is just and reasonable, in the case of this new interim transmission service, to afford PJM greater discretion as to how it decides to study Interim NITS requests, in comparison to requests for FCD and NFCD transmission services, and thus we decline to direct PJM to provide more detail in its Tariff on the process for studying requests for Interim NITS.1127 We also disagree with Constellation that it is necessary for PJM to study requests for Interim NITS as part of the NITS process, rather than pursuant to a separate application. On compliance, we direct PJM to file Tariff provisions to effectuate a study process for Interim NITS, as discussed herein. Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we further direct PJM to reflect this change in its compliance filing. 576.
Regarding requests from parties that Interim NITS customers be allowed access to the Co-Located Generator during curtailments, we find that it is just and reasonable to prohibit the Eligible Customer taking Interim NITS on behalf of Co-Located Load from drawing energy from the Co-Located Generator when the Eligible Customer is curtailed, if the Co-Located Generator is a capacity resource. As PJM explains, capacity resources have an obligation to serve Network Load, and this obligation is particularly important during emergency or pre-emergency conditions when PJM needs all resources at its disposal to maintain reliability.1128 However, in response to parties, we clarify that such a restriction would not be applicable to an Eligible Customer taking Interim NITS on behalf of Co-Located Load if the associated Co-Located Generator does not yet have any interconnection service or has only provisional interconnection service. Further, this restriction applicable to an Eligible Customer taking Interim NITS on behalf of Co-Located Load would not be applicable if the associated Co-Located Generator is seeking capacity resource status, but not yet obtained such status, because that Co- Located Generator would not yet have any obligation to provide capacity under the 1127 See PJM, Intra-PJM Tariffs, OATT, § VIII.L 439 Provisional Interconnection Service (0.0.0) (providing that PJM “may grant such service at its discretion based upon an evaluation that will consider the results of available studies”); RWE Clean Energy v. PJM Interconnection, L.L.C., 194 FERC ¶ 61,212 at P 42 (“The Commission generally allows transmission providers to exercise their engineering judgment when conducting interconnection studies, including deferring to transmission providers’ discretion regarding how to maintain a reliable transmission system.”); Order No. 890, 118 FERC ¶ 61,119 at P 957 (in the case that a request for long-term Firm PTPS cannot be satisfied out of existing capacity, the transmission provider is required to identify options for providing service but has discretion to study and offer a mix of planning redispatch and conditional firm options for a single service request).
1128 PJM Reply Brief at 18.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 409 Date Filed: 10/19/2026
PDF page 411
Docket No. EL25-49-002, et al.- 256 -
Tariff. We therefore direct PJM to submit, within 60 days, a compliance filing to incorporate the rates, terms, and conditions for Interim NITS that includes clarifications to specify that (1) an Eligible Customer taking Interim NITS on behalf of Co-Located Load may be served by a Co-Located Generator that is seeking capacity resource status during a curtailment condition to the extent that Co-Located Generator has yet to obtain interconnection service or has only provisional interconnection service, and (2) an Eligible Customer on behalf of Co-Located Load cannot expect to be served by a Co-Located Generator that is a capacity resource during a curtailment condition. Consistent with our determination above to extend the three new transmission services set forth in the December Order to Eligible Customers taking service on behalf of load with BTMG that are willing and able to limit their energy withdrawals from the transmission system under certain conditions, we further direct PJM to reflect this change in its compliance filing.
577.
We disagree with Market Monitor’s arguments that Interim NITS is not consistent with PJM’s transmission planning process and poses potentially significant reliability risks. As discussed above, we adopt PJM’s proposal for application and studies for Interim NITS, which limits the amount of Interim NITS available to an Eligible Customer seeking to take Interim NITS on behalf of a Co-Located Load to the amount that PJM, in consultation with the affected transmission owner(s), determines can be provided reliably to that customer while maintaining the reliability of the transmission system. 578.
We decline to adopt Constellation’s proposal to include a transitional mechanism for pending NITS applications. PJM’s proposal does not prohibit any NITS applicant from also applying for Interim NITS, provided the applicant pays the additional study fee and is subject to the technical requirements for Interim NITS. Therefore, we find such a transitional mechanism not to be necessary.
I. Annual Report on New Transmission Services
579.
Having addressed the rates, terms, and conditions for each of the new transmission services (subject to additional compliance), we now turn to our ongoing oversight of the implementation and use of these new transmission services. As discussed in the December Order and reiterated today, we expect that these new transmission services will facilitate more efficient use of the existing transmission system and limit unnecessary transmission system buildout. However, we also recognize that the new transmission services represent new developments in the provision of transmission service in the PJM region. These developments require effective oversight and monitoring to help ensure the transmission services are working as intended and do not create reliability issues or raise novel questions regarding application of cost causation principles. Transparent information on the use of the new transmission services is also important for prospective Eligible Customers on behalf of Eligible Loads to assess which transmission service to request and where on the transmission system to make such requests. We conclude that Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 410 Date Filed: 10/19/2026
PDF page 412
Docket No. EL25-49-002, et al.- 257 -
the Commission, states, PJM market participants, and stakeholders would benefit from additional transparency about these new transmission services, and we therefore direct PJM to prepare an annual report, posted to its website, containing information about the demand for and use of these new transmission services. Accordingly, we direct PJM to submit, as part of its compliance filing within 60 days of the date of issuance of this order, proposed Tariff provisions requiring such a report and a proposal for the information to be included in that annual report.
580.
As PJM considers the scope and content of that annual report, we propose that the following information could aid the Commission, states, PJM market participants, and stakeholders in assessing the impact of the new transmission services:
1) Data regarding each transmission service request seeking each of the new services by transmission zone, including:1129
a. Peak gross load of the Eligible Load
b. Category of the Eligible Load
c. Type and MW of transmission service being requested
d. Type and MW of transmission service granted
e. Dates of reservation and usage (for non-firm services)
2) Total MW of each type of transmission service taken each year by transmission zone, including:
a. Total amount of FCD transmission service taken relative to peak gross load at the meter receiving FCD transmission service
b. Total amount of NFCD transmission service taken relative to peak gross load at the meter receiving NFCD transmission service
c. Total amount of Interim NITS relative to peak gross load at the meter receiving Interim NITS
1129 Some of the information we identify here is likely to be available on PJM’s Open Access Same-Time Information System. PJM may account for that availability in designing its proposal and addressing the potential burden associated with preparing the annual report.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 411 Date Filed: 10/19/2026
PDF page 413
Docket No. EL25-49-002, et al.- 258 -
3) Information about transmission revenues paid by Eligible Customers on behalf of Eligible Loads for each transmission service by transmission zone, including: a. Total revenues paid by Eligible Customers taking each service per transmission zone
b. Percentage of each transmission owner’s total revenue requirement paid via revenues from each new service
c. MWs of each new transmission service taken by Eligible Customers
serving Eligible Loads as a percentage of peak gross load for each
transmission owner
4) Frequency and magnitude of curtailment from the reservation of NFCD transmission service and Interim NITS by transmission zone
5) Frequency and magnitude of denials of NFCD transmission service reservation requests by transmission zone
J.
Proposed Effective Date
1. Initial Briefs
581.
PJM proposes an effective date of June 1, 2029, for the three new transmission services. PJM advances two rationales for its proposal: (1) integration of the new transmission services into PJM’s capacity market so that PJM can procure capacity for Eligible Customers taking FCD transmission service on behalf of Co-Located Loads cannot occur until 2029; and (2) necessary modifications to the PJM core markets and operations software will take time.1130 PJM also argues that this effective date will not be a limiting factor because Eligible Customers taking the new transmission services on behalf of Co-Located Load and their Co-Located Generators likely will not be online before June 1, 2029, given interconnection requirements, supply chain issues, procurement challenges, and capacity auction timelines.1131
582.
As to the capacity market, PJM argues that demand associated with Co-Located Loads will significantly affect PJM’s load forecast and thus have significant implications for the capacity market. PJM explains, however, that while the BRA for the 2028/2029 delivery year (beginning June 1, 2028) has not taken place, the load forecast and eligible 1130 PJM states this includes Real-Time Security Constrained Economic Dispatch, Day-Ahead Market, and dispatch software. PJM Initial Brief, Horger Aff. ¶ 16. 1131 PJM Initial Brief at 79-82.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 412 Date Filed: 10/19/2026
PDF page 414
Docket No. EL25-49-002, et al.- 259 -
capacity have already been determined, and it is no longer possible to implement changes before the BRA is conducted. Therefore, according to PJM, the 2029/2030 delivery year (beginning June 1, 2029) is the first BRA in which the effects of the new transmission services can be considered and PJM can procure capacity for Eligible Customers taking FCD transmission service on behalf of Co-Located Loads.1132
583.
As to the technical implementation issues, PJM argues that implementing the proposed curtailment priorities applicable to Interim NITS and NFCD transmission service will require modifying PJM’s economic dispatch software and dispatch tools in order to incorporate system automation that will avoid undesirable outcomes. PJM further contends that work cannot begin until the rates, terms, and conditions of these new transmission services are finalized, and that changes to these systems will be dependent on vendor availability, the speed with which systems changes can be designed, and interaction with other software changes.1133
2. Response Briefs
584.
Some parties support PJM’s proposed effective date. Market Monitor argues that all load in PJM currently is served by NITS, and that PJM has demonstrated that it must significantly modify core systems to address curtailing load where an Eligible Customer takes more than one kind of transmission service on behalf of Co-Located Load.1134 NOVEC contends that entities other than PJM must also prepare for these new transmission services by making operational adjustments and regulatory and billing changes to ensure costs reflect cost causation principles.1135
585.
Constellation, DCC, Joint Co-Location Developers, and Vistra oppose PJM’s proposed effective date, and make a variety of arguments against PJM’s rationales for it or in favor of alternative proposals for faster implementation.1136 As to arguments PJM makes about the capacity market, Vistra contends that resource adequacy considerations 1132 Id. at 79-80 (citing Horger Aff. ¶¶ 11-13). PJM also argues that inclusion of these services in Incremental Auctions would be inappropriate because they are conducted to procure replacement resources and generally result in small adjustments. Id. at 80-81 (citing Horger Aff. ¶ 15).
1133 Id. at 81; Horger Aff. ¶ 16.
1134 Market Monitor Response Brief at 8.
1135 NOVEC Response Brief at 17-18.
1136 Constellation Response Brief at 7; Joint Co-Location Developers Response Brief at 28; Vistra Response Brief at 8-9.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 413 Date Filed: 10/19/2026
PDF page 415
Docket No. EL25-49-002, et al.- 260 -
are beyond the scope of a transmission provider’s obligation to serve and that the Commission requires transmission providers to make transmission service decisions based on available transfer capacity.1137 Constellation, Joint Co-Location Developers, and Vistra each criticize PJM on the basis that Interim NITS and NFCD transmission service are not capacity-backed services such that PJM need not procure capacity on their behalf. Joint Co-Location Developers contend that PJM does not explain why a customer taking NITS would be reflected in capacity market demand forecast but a customer taking FCD transmission service would not. Similarly, Vistra argues that large loads were already included in the load forecasts for the 2027/2028 and 2028/2029 BRAs and that some of the new large loads in the forecasts may take the new transmission services. Joint Co-Location Developers argue that, if PJM’s concerns stem from a planning need associated with existing capacity resources de-registering, then PJM should propose a delayed implementation limited to particular use cases.
586.
As to PJM’s technical implementation issues, Vistra and Joint Co-Location Developers criticize PJM for failing to offer any specificity.1138 Vistra alleges that previous experience, such as in PJM’s implementation of Order No. 841, suggests that PJM should be able to implement software changes much more quickly. Vistra further charges that the Commission should demand more support to justify delaying implementation than PJM has provided here, as it did in prior cases such as MISO’s implementation of Order No. 2222. Similarly, Joint Co-Location Developers argue that curtailable products can be implemented on much faster timelines, pointing in particular to SPP’s CHILLS and PJM’s planned Connect and Manage proposal. Vistra also argues that PJM’s systems should already be capable of curtailing because its Tariff provides Non-Firm PTPS. Joint Co-Location Developers assert that PJM does not explain why additional software must be developed for FCD transmission service, which is similar to NITS. Lastly, Joint Co-Location Developers state that their attached testimony notes that leveraging price responsive demand modifications to security constrained economic dispatch could allow PJM to implement faster any security constrained economic dispatch changes for non-firm loads.
587.
Several parties disagree with PJM that Co-Located Generators will not be online before June 1, 2029.1139 Joint Co-Location Developers argue that there are likely to be projects already in development that may opt to use these new transmission services. 1137 Vistra Response Brief at 7 (citing, e.g., Order No. 890, 118 FERC ¶ 61,119 at P 2).
1138 Id. at 10-12; Joint Co-Location Developers Response Brief at 29-30. 1139 Joint Co-Location Developers Response Brief at 30; Vistra Response Brief at 9-10; Constellation Response Brief at 8.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 414 Date Filed: 10/19/2026
PDF page 416
Docket No. EL25-49-002, et al.- 261 -
Vistra adds that some generators are not capacity resources, are already in the process of de-listing, or could enter into a bilateral agreement with another generator to cover its capacity obligation. Constellation points out that load co-locating with existing generation could take Interim NITS.
588.
Several parties request that the Commission make all or certain of the new transmission services available earlier.1140 DCC argues that PJM has not demonstrated that all elements of the proposed services must be deferred for several years, nor has it identified opportunities for phased or interim implementation. DCC argues that the Commission should consider whether certain components of the framework can be implemented on an accelerated or staged basis to provide near-term benefits while longer-term systems are developed. Joint Co-Location Developers ask the Commission to require that FCD transmission service be available within six months of an order accepting PJM’s filing and NFCD transmission service and Interim NITS be available at the earliest date technically feasible.
589.
Constellation urges the Commission to establish a separate track to approve rates and terms for Interim NITS and make them effective no later than October 1, 2026.1141 Constellation argues that PJM offers no legitimate reason for proposing a three-and-a-half-year delay and argues that it should not be difficult to adopt as soon as possible. Constellation maintains that, if the Commission separates and implements Interim NITS on a fast track, potential logistical challenges will not risk delay. Constellation suggests that the Commission review FCD and NFCD transmission services on a separate track and urges the Commission not to delay them until June 2029. Vistra proposes that, even if the Commission accepts PJM’s software-based justifications, the Commission should require PJM to immediately accommodate Co-Location Arrangements for which software changes are irrelevant, such as where the Eligible Customer does not reserve any amount of NFCD transmission service on behalf of Co-Located Load.1142 Vistra asserts that, whereas PJM contends that it needs software upgrades to apply appropriate curtailment priorities, a customer that reserves zero MWs of transmission service has no service to curtail. Vistra contends that it is not just and reasonable to prevent service on the basis of a software upgrade that is, at best, nominally relevant to that service. Vistra maintains that delaying service to customers that pull no energy from the grid is inconsistent with the December Order’s goal to remedy PJM’s 1140 DCC Response Brief at 9; Joint Co-Location Developers Response Brief at 27-28.
1141 Constellation Response Brief at 6-9.
1142 Vistra Response Brief at 12-14.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 415 Date Filed: 10/19/2026
PDF page 417
Docket No. EL25-49-002, et al.- 262 -
failure to provide transmission service reflecting a Co-Located Load’s willingness and ability to limit withdrawals.
3. Reply Briefs
590.
PJM asserts that NFCD transmission service is not easy to implement from an operations perspective, particularly at scale, and in addition to exposing the system to higher reliability risks, will also require PJM to modify key systems.1143 PJM explains that changes to Energy Management Systems are needed to ensure that PJM’s systems are able to properly account for the provision of energy to Co-Located Load in the day-ahead and real-time market. PJM contends that its Energy Management System does not currently distinguish between different types of load, and that feature must be added. PJM argues that it must determine how to properly model and reflect NFCD transmission service and Co-Located Load in the different systems given that NFCD transmission service requires the transmission system to operate on reduced contingency margins. PJM maintains that significant modifications to the market clearing engines used in both the day-ahead and real-time markets will be required because PJM must be able to curtail NFCD transmission service with little to no advanced notification to respond to significant SOL/IROL exceedances.
591.
Separate from systems updates, PJM argues that it will still be challenging from an operational perspective to provide NFCD transmission service.1144 PJM explains that its systems must not only accurately reflect how this new service affects the transmission system, but PJM must also account for this service in the Operating Plans and then implement those plans manually when needed in real time. PJM argues that, because the transmission system is not designed to accommodate NFCD transmission service, it will likely trigger many more SOL/IROL exceedances for PJM to mitigate in the Operating Plan and require operations at or near operating limits, rendering the system less flexible to respond to unexpected changes during operations. PJM contends that it will be imperative that loads taking NFCD transmission service can be removed from the system as soon as possible when needed.
592.
PJM claims it will need additional tariff language and manuals to operationalize requests for service.1145 PJM asserts that it reserves the right to further supplement the record in this proceeding if and when it develops such tariff language. 1143 PJM Reply Brief at 13-14.
1144 Id. at 14-15.
1145 Id. at 16.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 416 Date Filed: 10/19/2026
PDF page 418
Docket No. EL25-49-002, et al.- 263 -
593.
PJM clarifies that June 1, 2029, is the effective date for providing the new transmission services and that, once the Commission establishes the terms and conditions for these new services, PJM is willing to start accepting service requests and processing service applications.1146 PJM states its intent to get a headstart on establishing the details as to how it would implement the illustrative tariff by soon commencing discussions with stakeholders regarding implementation details, to be stated in PJM manuals, for these new transmission services. PJM contends that, with these clarifications, there is no need to establish a transition mechanism for pending NITS applications, as Constellation suggests. In response to concerns that PJM failed to provide a specific timeline for software development, PJM contends that it cannot determine a more exact development schedule at this time because these are new transmission services.
594.
Some commenters continue to support PJM’s proposed effective date.1147 Other commenters continue to criticize PJM’s proposed effective date. Joint Co-Location Developers argue that it is unclear why PJM must delay implementation until 2029, given that ERCOT has committed to implementation of controllable load as soon as 2027.1148 Joint Co-Location Developers further argue that PJM has provided no reason why its system uniquely requires a longer implementation process compared to other RTOs, and that PJM is well placed to implement changes to its security constrained economic dispatch given the existing capability of its nodal Price Responsive Demand implementation.
595.
Constellation argues that PJM’s proposed effective date would impose a three- to five-year moratorium on Co-Location Arrangements and undermines the December Order by allowing rates found to be unjust and unreasonable to remain in place for years.1149 Constellation asserts that PJM has devoted significant resources to such changes and has the tools to implement new rules quickly. Constellation urges the Commission to promptly approve the rates and terms for Interim NITS, including the study process, by no later than October 1, 2026.
1146 Id. at 55-57.
1147 NOVEC Reply Brief at 27; Earthjustice Reply Brief at 19.
1148 Joint Co-Location Developers Reply Brief, Supp. Aff. of Andrew Levitt and Aniruddh Mohan at 10 (citing ERCOT Large Load Interconnection Batch Study Workshop #7 at 25 (April 9, 2026), ERCOT-Large-Load-Batch-Study-Workshop7- 20260409_v03.pptx).
1149 Constellation Reply Brief at 3-5.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 417 Date Filed: 10/19/2026
PDF page 419
Docket No. EL25-49-002, et al.- 264 -
4. Answer
596.
Constellation opposes PJM’s requested effective date and points out that PJM seeks to begin Connect and Manage July 1, 2027, to allow the interconnection of non-capacity-backed loads that are potentially interruptible during capacity shortages, unless the load brings its own generation.1150 Constellation contends that it is not credible that PJM will take more than three years to implement Interim NITS, but less than one year to commence Connect and Manage.1151 Constellation asks the Commission to make Interim NITS effective no later than October 1, 2026, so that service can begin no later than June 1, 2027.
5. Determination
597.
We find that PJM has not provided sufficient information for the Commission to find that its proposed June 1, 2029, effective date is just and reasonable. We are concerned that the proposed June 1, 2029, effective date unduly delays the availability of the new transmission services, particularly those where PJM does not procure generation capacity for Eligible Customers taking the transmission service on behalf of Eligible Load, i.e., Interim NITS and NFCD transmission service. As discussed above, while PJM will procure generation capacity in forward capacity auctions to serve Eligible Customers taking FCD transmission service based on the contract demand level, PJM will not consider Interim NITS or NFCD transmission service in its resource adequacy planning. Further, we agree with Vistra and Joint Co-Location Developers that PJM’s proposal lacks specificity. In particular, we find that the implementation details for the software updates necessary for PJM’s economic dispatch software and dispatch tools lack specificity. Though PJM states that it cannot determine “a more exact development schedule” for software development,1152 the Commission generally requires more support for the timeliness of a proposed effective date.1153 We believe that the instant order provides PJM further clarity. We note that June 1, 2029, is approximately three years from now, and the issues raised by this proceeding, including those pertaining to Co-Located Load, are urgent in nature and, therefore, merit serious consideration of an earlier effective date. Therefore, we direct PJM to reconsider its proposed effective date of June 1, 2029. Moreover, we direct PJM to make a compliance filing, due within 60 days of the date of issuance of this order, in which PJM must explain whether it can 1150 Constellation May 11 Answer at 2.
1151 Id. at 3.
1152 PJM Reply Brief at 57.
1153 See, e.g., Midcontinent Indep. Sys. Operator, Inc., 190 FERC ¶ 61,031, at P 163 & n.302 (2025).
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 418 Date Filed: 10/19/2026
PDF page 420
Docket No. EL25-49-002, et al.- 265 -
make the new transmission services available on different effective dates. In the compliance filing, PJM should specifically discuss whether Interim NITS and NFCD transmission service can be made effective at an earlier date for Eligible Customers taking transmission service on behalf of Eligible Loads.
K.
Additional Arguments
1. Behind the Meter Generation
a. Reply Briefs
598.
Industrials/Amtrak argue that the Commission should take the following actions:
(1) set a realistic retail BTMG threshold to focus new Co-Located Load rules on “gridbusting” growth above 200-300 MW, not on existing industrial customers (e.g., consumer goods manufacturers, steel mills, chemical manufacturers, paper mills, and pharmaceutical factories); (2) qualify all QFs for retail BTMG treatment without a date limit, consistent with PURPA regulations; (3) set clear grandfathering rules to enable existing, established users to avoid intensive PJM study queues, study deposits, and processes for operations that continue to function properly.1154
599.
PJM argues that certain parties raise issues beyond the scope of this proceeding. PJM contends that Industrials/Amtrak improperly ask the Commission to examine BTMG.1155
b. Determination
600.
Industrials/Amtrak raise issues with respect to PJM’s retail BTMG netting rules that we address in PJM’s second compliance filing above.1156
2. Reliability Backstop Auction
a. Reply Briefs
601.
Maryland OPC asserts that PJM’s proposed terms and conditions do not explain how existing capacity resources that shift to Co-Location Arrangements with new data centers would be treated relative to the PJM’s proposed reliability backstop procurement (RBP). For example, Maryland OPC states that it is unclear whether capacity from existing generators that remove themselves from the capacity market and enter 1154 Industrials/Amtrak Reply Brief at 15.
1155 PJM Reply Brief at 58-59.
1156 See supra Part V.A.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 419 Date Filed: 10/19/2026
PDF page 421
Docket No. EL25-49-002, et al.- 266 -
Co-Location Arrangements with new data center load would need to be replaced with new capacity through the RBP or in the regular BRA, and whether new data center load that co-locates with an existing generator will be included in the cost allocation of the RBP.1157 Maryland OPC states that if the capacity of existing generation that shifts to serve new co-located data center load is added to the BRA, ratepayers would be saddled with enormous costs that should be assigned to the Co-Located Load, in contravention of the White House and PJM Governors’ Statement of Principles and the White House’s Ratepayer Protection Pledge. Maryland OPC requests that the Commission at minimum require PJM demonstrate how its proposal meets ratepayer protection standards set forth in the Statement of Principles and Ratepayer Protection Pledge and defer action on the proposed revisions until after PJM proposes tariff revisions to implement its RBP. Maryland OPC also raises concern that PJM’s initial brief suggests PJM does not intend for existing load to be eligible for the new transmission services.1158 b. Determination
602.
As an initial matter, we clarify that, contrary to Maryland OPC’s concern, PJM’s paper hearing proposal does not restrict Eligible Customers on behalf of existing Co-Located Load from taking the new transmission services. We decline Maryland OPC’s request to defer action. Maryland OPC expresses concern that PJM’s paper hearing proposal does not address how existing capacity resources that seek to serve Co-Located Loads would be treated relative to a potential future filing by PJM to address its reliability backstop mechanism. We find that Maryland OPC’s concerns about PJM’s capacity market are beyond the scope of this paper hearing, which addresses the rates, terms, and conditions for new transmission services for Eligible Customers to take on behalf of Eligible Loads.1159
1157 Maryland OPC Reply Brief at 9-11.
1158 Id. at 8 (noting PJM’s explanation that it is unlikely that new generation will be operational before its proposed June 1, 2029 effective date).
1159 In recognition of the goal to prevent unfair cost shifts, we also note that as part of the President’s Ratepayer Protection Pledge, a number of computational loads have committed to paying for “all new power delivery infrastructure upgrades to service their data centers.” Proclamation No. 11014, 91 Fed. Reg. 11439 (Mar. 4, 2026). Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 420 Date Filed: 10/19/2026
PDF page 422
Docket No. EL25-49-002, et al.- 267 -
3. Eligible Customer Requirements
a. Response Briefs
603.
Invenergy requests that the Commission and PJM clarify how the definition of Eligible Customer applies to Co-Located Generators and Co-Located Loads.1160 Invenergy explains that, where a state retail choice program results in unbundled retail access, customers may take transmission service as an Eligible Customer, and that therefore, Invenergy believes that a Co-Located Load could qualify as an Eligible Customer in a retail choice jurisdiction.1161 Invenergy seeks clarity as to whether, in the context of a Co-Location Arrangement, a Co-Located Generator qualifies as an Eligible Customer on behalf of the Co-Located Load, and whether that Co-Located Generator’s status as an Eligible Customer depends on whether the Co-Location Arrangement is in a retail choice jurisdiction.
b. Reply Briefs
604.
NOVEC argues that the Commission should consider a more definitive delineation of who may be an Eligible Customer as well as the scope of the Eligible Customer’s obligations. Specifically, NOVEC seeks confirmation that it cannot be required to serve as an Eligible Customer serving Co-Located Load unless it agrees to do so.1162 605.
NOVEC argues that the Commission cannot require LSEs to modify their retail rates to accommodate these new services and undertake the administrative burden of being an Eligible Customer for a Co-Located Load unless the LSE chooses to do so. Further, NOVEC contends that it should not be subject to potential liability for the transmission costs, much less penalties for non-compliance with the Tariff’s requirements, if a Co-Located Load for which NOVEC is serving as Eligible Customer fails to meet or comply with all applicable provisions.1163
606.
Indicated TOs express support for PJM’s decision to retain the existing definition of Eligible Customer. In response to Invenergy’s request for clarification as to how that definition applies to Co-Located Generators and Co-Located Loads, Indicated TOs argue that it will depend on an individual Co-Located Generator’s specific factual circumstances. Indicated TOs contend that a Co-Located Generator is unlikely to meet 1160 Invenergy Comments at 6.
1161 Id. (citing Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,689). 1162 NOVEC Reply Brief at 5.
1163 Id. at 7.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 421 Date Filed: 10/19/2026
PDF page 423
Docket No. EL25-49-002, et al.- 268 -
the definition of an Eligible Customer for purposes of obtaining FCD or NFCD transmission service because it is more likely to sell its output directly to the on-site load at retail. Indicated TOs further contend that the ability of Co-Located Load or an entity representing the load to qualify as an Eligible Customer would necessarily depend on whether its host jurisdiction has adopted retail choice.1164
c. Determination
607.
With respect to Invenergy’s request, we note the Tariff defines an Eligible Customer as (1) any electric utility or any person generating electric energy for sale for resale, but with respect to transmission service that the Commission is prohibited from ordering by section 212(h) of the FPA, such entity is eligible only if the service is provided pursuant to a state requirement that the Transmission Provider or Transmission Owner offer the unbundled transmission service, or pursuant to a voluntary offer of such service by a Transmission Owner or (2) any retail customer taking unbundled transmission service pursuant to a state requirement that the Transmission Provider or a Transmission Owner offer the transmission service, or pursuant to a voluntary offer of such service by a Transmission Owner.1165 A Co-Located Generator may serve as an Eligible Customer if it meets the requirements of this definition of Eligible Customer. 608.
We also clarify that nothing in this order or the December Order requires LSEs to modify their retail rates to accommodate the new transmission services. We require PJM, as the transmission provider, to offer these services, but we do not require LSEs to offer them to their retail customers. In other words, we do not require any LSE to become an Eligible Customer taking one of the new transmission services on behalf of an Eligible Load.
4. Demand Side Pathways
a. Response Briefs
609.
Alliance supports converting Options 7 and 8 from PJM’s March 2025 Answer into enforceable tariff language. Alliance supports strong measurement and verification of load reductions from demand response and energy efficiency in order to implement Options 7 and 8.1166
1164 Indicated TOs Reply Brief at 6-7.
1165 PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions – E-F (41.0.0).
1166 Alliance Response Brief at 5-6.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 422 Date Filed: 10/19/2026
PDF page 424
Docket No. EL25-49-002, et al.- 269 -
b. Determination
610.
Alliance’s comments are essentially an untimely request for rehearing of the December Order. Alliance overlooks that the December Order required PJM to create a new interim non-firm transmission service similar to PJM’s Option 7. As part of our determinations with respect to the rates, terms, and conditions for Interim NITS, we are directing PJM to submit a compliance filing to revise its Tariff to implement this new transmission service. As for PJM’s Option 8, wherein Co-Located Load that is Network Load may participate as a demand response resource, the Commission in the December Order did not direct any changes to PJM’s demand response rules. We reiterate, as the Commission explained in the December Order, there is not sufficient evidence to conclude that the existing Tariff is not just and reasonable as it relates to the existing demand response rules.1167 Co-Located Loads that elect to be Network Load may participate as a demand response resource under PJM’s existing Tariff to the extent that they meet the requirements to participate as such.
5. Interconnection
a. Response Briefs
611.
AEU/SEIA claim that PJM proposes to require all co-located generators to undergo full interconnection studies, including those that have no intention of exporting power to the transmission system.1168 AEU/SEIA argue that PJM indisputably requires sufficient information about proposed co-located generators to reliably plan and operate the transmission system, but that subjecting non-exporting facilities to full interconnection studies will impose costs, delays, and administrative burden that are disproportionate to the reliability benefits that are achieved. AEU/SEIA further argue that this would further strain the interconnection queue to the detriment of the PJM region and its customers.
b. Reply Briefs
612.
PJM argues that AEU/SEIA improperly assert that PJM should not study all interconnecting generators.1169
1167 December Order, 193 FERC ¶ 61,217 at P 242.
1168 AEU/SEIA Response Brief at 15-16 (citing PJM Initial Brief at 82). 1169 PJM Reply Brief at 58.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 423 Date Filed: 10/19/2026
PDF page 425
Docket No. EL25-49-002, et al.- 270 -
c. Determination
613.
We find that AEU/SEIA’s concerns about interconnection studies for Co-Located Generators are beyond the scope of this paper hearing, which concerns the rates, terms, and conditions of new transmission services that Eligible Customers may take on behalf of Eligible Loads. However, we note that the Commission has approved PJM’s proposal to comply with the directives of the December Order that, for Interconnection Customers seeking to use new generators to serve Co-Located Load: PJM will consider requests for interconnection service below the full generating capability of the generator, and such Interconnection Customers may use existing procedures to accelerate a new service request if they satisfy the criteria of the Tariff.1170
6. Co-Location Arrangement with Electric Storage Resource
a. Response Brief
614.
Joint Co-Location Developers ask that PJM clarify that its transmission service requirements for electric storage charging apply to storage co-located with load, and exempt customers from the Maximum Facility Output where the customer’s load shape and characteristics are inherently flexible.1171 Joint Co-Location Developers state that PJM does not require electric storage resources to take transmission service for charging, except where the storage charges during the zonal peak hour without being dispatched. Joint Co-Location Developers claim that, in the context of PJM’s proposal to limit NFCD transmission service to 100% of the Maximum Facility Output of the Co-Located Generator, PJM appears to allow the relevant Co-Located Load to take service while the co-located electric storage resource charges. Joint Co-Location Developers maintain that PJM should clarify this point in its Tariff to avoid any implication that this activity is prohibited. Joint Co-Location Developers request that PJM clarify that co-located charging loads, like standalone electric storage resources, do not require transmission service unless they charge during the zonal peak hour without being dispatched, and that any withdrawals for electric storage charging at the Point of Interconnection for which transmission service is not required do not count toward the Maximum Facility Output. Joint Co-Location Developers request, in the alternative, that PJM remove the Maximum Facility Output limit for loads co-located with electric storage resources. 1170 PJM Interconnection, L.L.C., 195 FERC ¶ 61,030 at P 25.
1171 Joint Co-Location Developers Response Brief at 13-14.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 424 Date Filed: 10/19/2026
PDF page 426
Docket No. EL25-49-002, et al.- 271 -
b. Reply Brief
615.
PJM argues Joint Co-Location Developers improperly ask the Commission to examine transmission service for charging electric storage resources.1172 c. Determination
616.
To the extent Joint Co-Location Developers ask the Commission to address transmission service for electric storage resources, such request is beyond the scope of this paper hearing, which concerns the rates, terms, and conditions of new transmission services for Eligible Customers on behalf of Eligible Loads. However, insofar as Joint Co-Location Developers raise concerns about PJM’s proposed requirement that an Eligible Customer electing to take NFCD transmission service “must apply for [NFCD transmission service] equivalent to the megawatt level of the Co-Located Generating Facility dedicated to serving the Co-Located Load,” which Joint Co-Location Developers refer to as the Maximum Facility Output limit, we reject PJM’s proposal above.1173 The Commission orders:
(A)
In response to the requests for rehearing, the December Order is hereby modified and set aside, in part, as discussed in the body of this order. (B)
The clarification requests are hereby denied in part and granted in part, as discussed in the body of this order.
(C)
PJM is hereby directed to submit, within 60 days of the date of issuance of this order, a compliance filing with revisions to its Tariff as described in Part IV.B.3. (D)
PJM is hereby directed to submit, within 60 days of the date of issuance of this order, a compliance filing with revisions to its Tariff as described in Part IV.C.1.b.i. (E)
PJM is hereby directed to submit, within 60 days of the date of issuance of this order, a compliance filing with revisions to its Tariff as described in Part IV.C.1.c.i. (F)
PJM is hereby directed to submit, within 60 days of the date of issuance of this order, a compliance filing as described in Part V.
(G)
PJM is hereby directed to submit, within 60 days of the date of issuance of this order, a compliance filing as described in Part VI.
1172 PJM Reply Brief at 59.
1173 See supra Part VI.A.2.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 425 Date Filed: 10/19/2026
PDF page 427
Docket No. EL25-49-002, et al.- 272 -
(H)
PJM transmission owners are hereby directed to submit, within 60 days of the date of issuance of this order, a compliance filing as described in Part VI. By the Commission. Commissioner Chang is concurring with a separate statement attached.
( S E A L )
Debbie-Anne A. Reese,
Secretary.
Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 426 Date Filed: 10/19/2026
PDF page 428
Docket No. EL25-49-002, et al.- 273 -
Appendix – Tariff Record[s]
PJM Interconnection, L.L.C.
Intra-PJM Tariffs
•
A-B, OATT Definitions -- A - B (24.0.0)
•
L-M-N, OATT Definitions -- L -- M - N (52.0.0)
•
28.1, OATT 28.1 Scope of Service: (2.0.0)
•
29.1, OATT 29.1 Condition Precedent for Receiving Service (4.0.0) •
29.2, OATT 29.2 Application Procedures: (4.0.0)
•
31.6, OATT 31.6 Annual Load and Resource Information Updates: (4.0.0) •
34.2, OATT 34.2 Netting of Behind the Meter Generation. (1.0.0) •
34.3, OATT 34.3 Netting of Non-Retail Behind The Meter Generation (2.0.0) •
300 B, OATT 300 Definitions B (2.0.0)
•
300 N, OATT 300 Definitions N (3.0.0)
•
400 B, OATT 400 Definitions B (2.0.0)
•
400 N, OATT 400 Definitions N (4.0.0)
•
401, OATT Part VIII.A 401 Applications for Cycle Process Intro (5.0.0) •
403, OATT Part VIII.B 403 Application Rules (4.0.0)
•
IX Subpart A, OATT Part IX Subpart A FORM OF APPLICATION AND STUDIES AGRMT (4.0.0)
•
IX.B GIA Appx-Sched, OATT Part IX.B GIA Appendices and Schedules (5.0.0) •
IX.B GIA Schedule O, OATT Part IX.B GIA Schedule O (0.0.0) •
IX Subpart G, OATT Part IX Subpart G FORM OF NECESSARY STUDIES AGREEMENT (3.0.0)
Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 427 Date Filed: 10/19/2026
PDF page 429
Docket No. EL25-49-002, et al.- 274 -
•
XI, OATT XI. TRANSMISSION SERVICES FOR CO LOCATED LOADS (0.0.0)
•
ATTACHMENT F-3A, OATT ATTACHMENT F-3A (0.0.0)
•
ATTACHMENT F-4, OATT ATTACHMENT F-4 (0.0.0)
Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 428 Date Filed: 10/19/2026
PDF page 430
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
Allegheny Electric Cooperative, Inc.
American Transmission Systems, Incorporated Atlantic City Electric Company
Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative
PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company
Trans-Allegheny Interstate Line Company Transource West Virginia, LLC
UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company
AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.
AEP West Virginia Transmission Company, Inc. Appalachian Power Company
Indiana Michigan Power Company
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Docket Nos. EL25-49-002
EL25-49-000
Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 429 Date Filed: 10/19/2026
PDF page 431
Docket No. EL25-49-002, et al.- 2 -
Duquesne Light Company
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
Constellation Energy Generation, LLC
v. PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
AD24-11-001
EL25-20-001
(consolidated)
ER26-1479-000
(Issued June 18, 2026)
CHANG, Commissioner, concurring:
1. In today’s order, the Commission addresses rehearing requests and the paper hearing and compliance record regarding the rates, terms, and conditions through which Co-Located Loads may take transmission service from the PJM Interconnection, L.L.C. (PJM) system. I write separately to address the Commission’s resolution of the “minimum charge” issue raised in my concurrence to the December Order,1 which I believe provides a reasonable path forward based on the record before us.
2. In its December Order, the Commission asked two briefing questions regarding establishing an additional charge for Eligible Customers on behalf of a Co-Located Load that elects not to take any amount of transmission service or only a de minimis amount of
1 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (December Order) (Comm’r Chang, concurring). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 430 Date Filed: 10/19/2026
PDF page 432
Docket No. EL25-49-002, et al.- 3 -
transmission service.2 At that time, I wrote separately to emphasize my concern that the implementation of our rules around the new transmission services could risk cost shifting if those loads take little or no transmission service and thereby do not contribute to paying for the transmission system costs. Broadly, I remain vigilant about the impacts on consumers as the Commission continues to respond to new challenges from large and Co- Located Loads.
3. In today’s order, the Commission concludes that the record does not adequately support either the need for an additional charge at this time, or how such a charge should be calculated and assessed. In so doing, the Commission acknowledges the complexity of (1) documenting the benefits that accrue to Co-Located Loads paying little or no transmission service from the grid, and (2) designing a charge that corresponds to those benefits.
4. As explained in my concurrence to the December Order, because the Commission does not require a Co-Located Load to take any specific amount of the new transmission services, it creates the possibility that the load could pay little or nothing towards the costs of the transmission system, notwithstanding potential benefits it receives from that system. If this fact pattern occurs, particularly on any significant scale, it may result in problematic cost shifts to other transmission customers. However, if Co-Located Loads do, in fact, take meaningful transmission service via an existing service or one or both of the new contract demand services, they would pay transmission charges that contribute to the recovery of the transmission system’s capital and operations and maintenance costs. Therefore, whether underlying concerns around cost shifting actually manifest will ultimately depend on how the new transmission services will be used.
5. So, today’s order reasonably concludes that insights from concrete experience with the use of these new transmission services will help inform whether further action would be needed to address cost shifting issues. Given the challenges demonstrated in the record with articulating or documenting the specific benefits associated with being synchronized to the PJM system, and designing a rate (including conditions under which and the parties to whom it will be charged) that is commensurate with those benefits, I am persuaded that continued monitoring of this issue is appropriate.
6. Furthermore, as part of a broader recognition that implementing the new transmission services represents a significant development in PJM, the Commission directs PJM to prepare an annual report that includes critical information about how these services are being requested and used, as well as how loads using the services contribute toward transmission owners’ revenue requirements.3 The annual reports will provide
2 December Order, 193 FERC ¶ 61,217 at P 219, questions 3 and 4.3 PJM Interconnection, L.L.C., 195 FERC ¶ 61,209, at PP 580-81 (2026). Document Accession #: 20260618-3103 Filed Date: 06/18/2026 Case: 26-3635 Document: 1-1 Page: 431 Date Filed: 10/19/2026
PDF page 433
Docket No. EL25-49-002, et al.- 4 -
information that helps the Commission, the states, market participants, and stakeholders monitor the impacts of these new transmission services, including assessing whether the potential cost shift concern discussed above and in my prior concurrence actually occurs. If it does, I stand ready to consider Federal Power Act section 205 filings or section 206 complaints (including sua sponte action by the Commission) to address those cost shifts. For these reasons, I respectfully concur.
________________________
Judy W. Chang
Commissioner
Document Accession #: 20260618-3103 Filed Date: 06/18/2026
Case: 26-3635 Document: 1-1 Page: 432 Date Filed: 10/19/2026
ATTACHMENT D
PJM Interconnection, L.L.C. et al.; Notice of Denial of Rehearing By Operation of Law and Providing for Further Consideration, 196 FERC ¶ 62,089 (Aug. 20, 2026).
Case: 26-3635 Document: 1-1 Page: 434 Date Filed: 10/19/2026
PDF page 436
196 FERC ¶ 62,089
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
Allegheny Electric Cooperative, Inc.
American Transmission Systems, Incorporated Atlantic City Electric Company
Baltimore Gas and Electric Company
Delmarva Power & Light Company
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
East Kentucky Power Cooperative, Inc.
Essential Power Rock Springs, LLC
Hudson Transmission Partners, LLC
Jersey Central Power & Light Company
Mid-Atlantic Interstate Transmission, LLC Neptune Regional Transmission System, LLC Old Dominion Electric Cooperative
PECO Energy Company
PPL Electric Utilities Corporation
Potomac Electric Power Company
Public Service Electric and Gas Company Rockland Electric Company
Trans-Allegheny Interstate Line Company Transource West Virginia, LLC
UGI Utilities, Inc.
Monongahela Power Company
The Potomac Edison Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana, Inc. The Dayton Power and Light Company
AEP Appalachian Transmission Company, Inc. AEP Indiana Michigan Transmission Company, Inc. AEP Kentucky Transmission Company, Inc. AEP Ohio Transmission Company, Inc.
AEP West Virginia Transmission Company, Inc. Appalachian Power Company
Indiana Michigan Power Company
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Docket Nos. EL25-49-003
Document Accession #: 20260820-3008 Filed Date: 08/20/2026 Case: 26-3635 Document: 1-1 Page: 435 Date Filed: 10/19/2026
PDF page 437
Docket No. EL25-49-003, et al.
-2-
Duquesne Light Company
Virginia Electric and Power Company
Linden VFT, LLC
City of Cleveland, Department of Public Utilities,
Division of Cleveland Public Power
City of Hamilton, OH
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation
AMP Transmission, LLC
Silver Run Electric, LLC
NextEra Energy Transmission MidAtlantic Indiana, Inc.
Wabash Valley Power Association, Inc.
Keystone Appalachian Transmission Company
Large Loads Co-Located at Generating Facilities
Constellation Energy Generation, LLC
v. PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
AD24-11-002
EL25-20-002
(consolidated)
ER26-1479-001
NOTICE OF DENIAL OF REHEARING BY OPERATION OF LAW AND
PROVIDING FOR FURTHER CONSIDERATION
(August 20, 2026)
Rehearing has been timely requested of the Commission’s order issued on June 18, 2026, in this proceeding. PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026). In the absence of Commission action on a request for rehearing within 30 days from the date it is filed, the request for rehearing may be deemed to have been denied. 16 U.S.C. § 825l(a); 18 C.F.R. § 385.713 (2025); Allegheny Def. Project v. FERC, 964 F.3d 1 (D.C. Cir. 2020) (en banc).
As provided in 16 U.S.C. § 825l(a), the requests for rehearing of the above-cited order filed in this proceeding will be addressed in a future order to be issued consistent with the requirements of such section. As also provided in 16 U.S.C. § 825l(a), the Document Accession #: 20260820-3008 Filed Date: 08/20/2026
Case: 26-3635 Document: 1-1 Page: 436 Date Filed: 10/19/2026
PDF page 438
Docket No. EL25-49-003, et al.
-3-
Commission may modify or set aside its above-cited order, in whole or in part, in such manner as it shall deem proper.
Debbie-Anne A. Reese,
Secretary.
Document Accession #: 20260820-3008 Filed Date: 08/20/2026
Case: 26-3635 Document: 1-1 Page: 437 Date Filed: 10/19/2026
ATTACHMENT E
SERVICE LIST
Case: 26-3635 Document: 1-1 Page: 439 Date Filed: 10/19/2026
PDF page 441
Party
Primary Person or Counsel
of Record to be Served
Other Contact to be Served
Andrew
Hinz
Andrew Hinz
1427 PARK AVE
BALTIMORE, MARYLAND 21217
UNITED STATES
ahinz61@outlook.com
Advanced
Energy
United
Michael Haugh
Policy Director
Advanced Energy United
1010 VERMONT AVE NW
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
mhaugh@advancedenergyunited.org
AEP
Appalachian
Transmission
Company,
Inc.
Stacey Burbure
SVP, Transmission Regulatory
Engagement & Compliance
8500 Smiths Mill Road, 4th Floor
New Albany, OHIO 43054
UNITED STATES
slburbure@aep.com
Jessica A. Cano
Assoc.Gen.Counsel Regul. East
1 Riverside Plaza
Columbus, OHIO 43215-2372
jacano@aep.com
AEP Indiana
Michigan
Transmission
Company,
Inc.
Jennifer Key
1330 Connecticut Ave., N.W.
Washington, DISTRICT OF
COLUMBIA 20036
UNITED STATES
jkey@steptoe.com
Jessica A. Cano
Assoc.Gen.Counsel Regul. East
1 Riverside Plaza
Columbus, OHIO 43215-2372
jacano@aep.com
AEP
Kentucky
Transmission
Company,
Inc.
Stacey Burbure
SVP, Transmission Regulatory
Engagement & Compliance
8500 Smiths Mill Road, 4th Floor
New Albany, OHIO 43054
UNITED STATES
slburbure@aep.com
Jessica A. Cano
Assoc.Gen.Counsel Regul. East
1 Riverside Plaza
Columbus, OHIO 43215-2372
jacano@aep.com
AEP Ohio
Transmission
Company,
Inc.
Jessica Cano
Assoc.Gen.Counsel Regul. East
1 Riverside Plaza
Columbus, OHIO 43215-2372
UNITED STATES
jacano@aep.com
Robert L Pennybaker
Regulated Pricing & Analysis M
PO Box 201
TULSA,OHIO 74102
rlpennybaker@aep.com
Case: 26-3635 Document: 1-1 Page: 440 Date Filed: 10/19/2026
PDF page 442
AEP West
Virginia
Transmission
Company,
Inc.
Stacey Burbure
SVP, Transmission Regulatory
Engagement & Compliance
8500 Smiths Mill Road, 4th Floor
New Albany, OHIO 43054
UNITED STATES
slburbure@aep.com
Jessica A. Cano
Assoc.Gen.Counsel Regul. East
1 Riverside Plaza
Columbus, OHIO 43215-2372
jacano@aep.com
AES
Corporation,
The
Elizabeth Savage
AES Corporation, The
4300 Wilson Blvd
Arlington, VIRGINIA 22203
UNITED STATES
elizabeth.savage@aes.com
Allegheny
Electric
Cooperative,
Inc.
Todd Sallade
VP Power Supply & Engineering
Allegheny Electric Cooperative, Inc.
212 Locust Street
Harrisburg, PENNSYLVANIA 17101
todd_sallade@ccsenergy.com
Alliant
Energy
Corporate
Services,
Inc.
Mary Emerson
Corporate Counsel
Alliant Energy Corporation
801 PENNSYLVANIA AVE NW
WASHINGTON, DISTRICT OF
COLUMBIA 20004
UNITED STATES
maryemerson@alliantenergy.com
Alpha
Generation,
LLC
Liam Baker
Senior Vice President Regulato
Alpha Generation, LLC
300 Atlantic Street
5th floor
Stamford, CONNECTICUT 06901
UNITED STATES
lbaker@alphagen.com
Ameren
Services
Company on
behalf of
Ameren
Illinois
Company,
Ameren
Transmission
Stacey Scales
Paralegal
Ameren Services Company
1901 Chouteau
Mail Code 1310
St. Louis, MISSOURI 63103
UNITED STATES
sscales@ameren.com
Jennifer S. Moore
Senior Corporate Counsel
Ameren Services Company
1901 Chouteau Avenue
Mail Code 1310
St. Louis, MISSOURI 63103
jmoore499a@ameren.com
Case: 26-3635 Document: 1-1 Page: 441 Date Filed: 10/19/2026
PDF page 443
Company of
Illinois and
Union
Electric
Company
d/b/a
Ameren
Missouri
American
Clean Power
Association
Brett White
Deputy General Counsel
American Clean Power Association
1299 Pennsylvania Avenue, N.W.
WASHINGTON, DISTRICT OF
COLUMBIA 20004
UNITED STATES
bwhite@cleanpower.org
American
Clean Power
Association
Carrie Zalewski
VP & Markets and Transmission
Washington, DISTRICT OF
COLUMBIA 20036
UNITED STATES
czalewski@cleanpower.org
American
Council on
Renewable
Energy
Elise Caplan
Director of Electricity Policy
American Council on Renewable
Energy
1150 CONNECTICUT AVE NW STE
401
WASHINGTON, DISTRICT OF
COLUMBIA 20036
UNITED STATES
caplan@acore.org
American
Electric
Power
Service
Corporation
Stacey Burbure
SVP, Transmission Regulatory
American Electric Power Company
Engagement & Compliance
8500 Smiths Mill Road, 4th Floor
New Albany, OHIO 43054
slburbure@aep.com
American
Electric
Power
Service
Corporation
Kate Daley
1 Riverside Plaza
Columbus, OHIO 43215
kbdaley@aep.com
Case: 26-3635 Document: 1-1 Page: 442 Date Filed: 10/19/2026
PDF page 444
American
Electric
Power
Service
Corporation
Adam Hickman
1 RIVERSIDE PLZ FL 25
COLUMBUS, OHIO 43215
ajhickman@aep.com
American
Electric
Power
Service
Corporation
LaChon Turner
AEP COMPANIES
801 PENNSYLVANIA AVE NW STE
735
WASHINGTON, DISTRICT OF
COLUMBIA 20004
lturner@aep.com
American
Forest &
Paper
Association
Kenneth Stark
McNees Wallace & Nurick LLC
100 Pine Street
P.O. Box 1166
Harrisburg, PENNSYLVANIA 17108
UNITED STATES
kstark@mcneeslaw.com
Susan E. Bruce
McNees Wallace & Nurick LLC
100 Pine Street
P.O. Box 1166
Harrisburg, PENNSYLVANIA 17108
sbruce@mcneeslaw.com
American
Forest &
Paper
Association
Matthew L. Garber
McNees Wallace & Nurick LLC
100 Pine Street
P.O. Box 1166
Harrisburg, PENNSYLVANIA 17108
mgarber@mcneeslaw.com
American
Municipal
Power, Inc.
Lisa McAlister
Deputy General Counsel - FERC/
American Municipal Power, Inc.
1111 Schrock Road
Suite 100
Columbus, OHIO 43229
UNITED STATES
lmcalister@amppartners.org
Gerit F. Hull
Deputy General Counsel - Regul
American Municipal Power, Inc.
1111 Schrock Road
Suite 100
COLUMBUS, OHIO 43229
ghull@amppartners.org
American
Municipal
Power, Inc.
John E. McCaffrey
Partner
Stinson LLP
1775 Pennsylvania Avenue NW
Suite 800
WASHINGTON, DISTRICT OF
COLUMBIA 20006
john.mccaffrey@stinson.com
Case: 26-3635 Document: 1-1 Page: 443 Date Filed: 10/19/2026
PDF page 445
American
Municipal
Power, Inc.
Christopher J Norton
Director of Market Regulatory
American Municipal Power, Inc.
1111 Schrock Road
Suite 100
Columbus, OHIO 43229
cnorton@amppartners.org
AMERICAN
PETROLEU
M
INSTITUTE
Grace Soderberg
Senior Counsel
AMERICAN PETROLEUM
INSTITUTE
200 MASSACHUSETTS AVE NW
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
soderbergg@api.org
American
Transmission
Systems,
Incorporated
Amanda Parker
Attorney
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
Deborah L. Jacobson, ESQ
Attorney
341 WHITE POND DR
AKRON, OHIO 44320
djacobson@firstenergycorp.com
American
Transmission
Systems,
Incorporated
Amanda Parker
Attorney
FirstEnergy Service Company
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
Tricia S Hartzell
FirstEnergy Legal Specialist
FirstEnergy Service Company
76 S. Main Street
15th Floor
Akron, OHIO 44308
thartzell@firstenergycorp.com
American
Transmission
Systems,
Incorporated
Morgan Parke
Associate General Counsel
FirstEnergy
341 White Pond Dr.
Akron, OHIO 44320
UNITED STATES
mparke@firstenergycorp.com
Americans
for a Clean
Energy Grid
Paige Rodrigues
Americans for a Clean Energy Grid
10 G St NE
Washington, DISTRICT OF
COLUMBIA 20002
UNITED STATES
paige.rodrigues@cleanenergygrid.org
Case: 26-3635 Document: 1-1 Page: 444 Date Filed: 10/19/2026
PDF page 446
AMP
Transmission
, LLC
Lisa G McAlister
Deputy General Counsel - FERC/
1111 Schrock Road
Suite 100
Columbus, OHIO 43229
lmcalister@amppartners.org
AMP
Transmission
, LLC
Lisa McAlister
Deputy General Counsel - FERC/
American Municipal Power, Inc.
1111 Schrock Road
Suite 100
Columbus, OHIO 43229
UNITED STATES
lmcalister@amppartners.org
Christopher J Norton
Director of Market Regulatory
American Municipal Power, Inc.
1111 Schrock Road
Suite 100
Columbus, OHIO 43229
cnorton@amppartners.org
Antora
Energy LLC
Jason Evans
Vice President
Antora Energy LLC
1080 W. Ewing Place - Box B10
Seattle, WASHINGTON 98119
UNITED STATES
jason.evans@tuusso.com
Noah B Long
Director, State & Regulatory P
Antora Energy LLC
200 W DE VARGAS ST STE 200
SANTA FE, NEW MEXICO 87501
noah.long@antora.com
Antora
Energy LLC
Noah Long
Director, State & Regulatory P
Antora Energy LLC
200 W DE VARGAS ST STE 200
SANTA FE, NEW MEXICO 87501
UNITED STATES
noah.long@antora.com
Appalachian
Power
Company
Jessica Cano
Assoc.Gen.Counsel Regul. East
1 Riverside Plaza
Columbus, OHIO 43215-2372
UNITED STATES
jacano@aep.com
Robert L Pennybaker
Regulated Pricing & Analysis M
PO Box 201
TULSA,OHIO 74102
rlpennybaker@aep.com
Appalachian
Voices
Nicholas Guidi
Southern Environmental Law Center
500 NEW JERSEY AVE NW STE 600
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
nguidi@selc.org
Katherine Rogers
Southern Environmental Law Center
122 C ST NW STE 325
WASHINGTON, DISTRICT OF
COLUMBIA 20001
krogers@selc.org
Arevon
Energy, Inc.
Mike Gahimer
Arevon Energy, Inc.
Case: 26-3635 Document: 1-1 Page: 445 Date Filed: 10/19/2026
PDF page 447
14427 Salem Dr E
Carmel, INDIANA 46033
UNITED STATES
mgahimer@arevonenergy.com
Arkansas
Public
Service
Commission
Bridgette Frazier
Arkansas Public Service Commission
1000 CENTER ST
LITTLE ROCK, ARKANSAS 72201
UNITED STATES
bridgette.frazier@arkansas.gov
Atlantic City
Electric
Company
Carlos Isaac
Assistant General Counsel
Exelon Corporation
10 S. Dearborn Street
Chicago, ILLINOIS 60603
UNITED STATES
carlos.isaac@exeloncorp.com
Stan Berman
3502 Fremont Ave N, #1
Seattle, WASHINGTON 98103
stan@bermlaw.com
Avangrid,
Inc.
Julie Morris
Compliance
Avangrid Power, LLC
2701 NW VAUGHN ST STE 300
PORTLAND, OREGON 97210
UNITED STATES
avangridpowerferc@avangrid.com
Alan Trotta
United Illuminating Company, The
157 Church Street
New Haven, CONNECTICUT 06510
alan.trotta@uinet.com
Avangrid,
Inc.
Noelle Kinsch
VP, Gen.Counsel & Corp Sec.
Avangrid Networks, Inc.
80 State Street
Albany, NEW YORK 12207
UNITED STATES
noelle.kinsch@avangrid.com
Kevin Kilgallen
Director, Market Structure & P
Avangrid, Inc.
411 OAKLAND DR
DOWNINGTOWN,
PENNSYLVANIA 19335
kevin.kilgallen@avangrid.com
Baltimore
Gas and
Electric
Company
Carlos Isaac
Assistant General Counsel
Exelon Corporation
10 S. Dearborn Street
Chicago, ILLINOIS 60603
UNITED STATES
carlos.isaac@exeloncorp.com
Stan Berman
3502 Fremont Ave N, #1
Seattle, WASHINGTON 98103
stan@bermlaw.com
Bloom
Energy
Corporation
Joel Newton
VP, Regulatory Law
Bloom Energy Corporation
6611 Dearborn Dr
Falls Church, VIRGINIA 22044
Case: 26-3635 Document: 1-1 Page: 446 Date Filed: 10/19/2026
PDF page 448
UNITED STATES
joel.newton@bloomenergy.com
Boston
Energy
Trading and
Marketing
LLC
Michael Blasik
Diamond Generating Corporation
1 International Place
Suite 910
Boston, MASSACHUSETTS 02110
UNITED STATES
m.blasik@dgc-us.com
Diane Janicki
INDIVIDUAL
500 West Madison
Chicago, ILLINOIS 60661
Diane.Janicki@betm.com
BrightNight
Power
Marketing,
LLC
Duane K. Duclaux
General Counsel
BrightNight, LLC
515 N FLAGLER DR STE P200
WEST PALM BEACH, FLORIDA
33401
duane@brightnightpower.com
BrightNight
Power
Marketing,
LLC
Robert C. Fallon
ENGELMAN FALLON, PLLC
1717 K St. NW
Washington, DISTRICT OF
COLUMBIA 20006
rfallon@efenergylaw.com
Brookfield
Renewable
Trading and
Marketing
LP
Nathalie Godard
Law Clerk
Brookfield Energy Marketing LP
41 Victoria Street
Gatineau, QUEBEC J8X2A1
CANADA
nathalie.godard@brookfieldrenewable.c
om
Aleksandar Mitreski
Brookfield Energy Marketing Inc.
68 Ellington St
Longmeadow, MASSACHUSETTS
01106
aleksandar.mitreski@brookfieldrenewa
ble.com
Brookfield
Renewable
Trading and
Marketing
LP
Steve Kelly
Director
Brookfield Energy Marketing LP
3261 Arters Mill Rd
Westminster, MARYLAND 21158
stephen.kelly@brookfieldrenewable.co
m
Buckeye
Power, Inc.
Lija Kaleps-Clark
Buckeye Power, Inc.
6677 Busch Blvd
Columbus, OHIO 43229
UNITED STATES
lkaleps@ohioec.org
Kurt Helfrich
Buckeye Power, Inc.
6677 Busch Boulevard
Columbus, OHIO 43229
khelfrich@ohioec.org
Case: 26-3635 Document: 1-1 Page: 447 Date Filed: 10/19/2026
PDF page 449
Calibrant
Energy
Matt Barnes
Calibrant Energy
16 Gavin Cir
Andover, MASSACHUSETTS 01810
UNITED STATES
matthew.barnes@calibrantenergy.com
California
Department
of Water
Resources
State Water
Project
Lisa Dowden
Senior Counsel
Spiegel & McDiarmid LLP
1818 N Street, NW
8th Floor
WASHINGTON, DISTRICT OF
COLUMBIA 20036
UNITED STATES
Lisa.Dowden@spiegelmcd.com
Stephen C. Pearson
Spiegel & McDiarmid LLP
1818 N Street, NW
8th Floor
WASHINGTON, DISTRICT OF
COLUMBIA 20036
steve.pearson@spiegelmcd.com
California
Department
of Water
Resources
State Water
Project
Samuel B. Whillans
Spiegel & McDiarmid LLP
1818 N ST NW
8TH Floor
WASHINGTON, DISTRICT OF
COLUMBIA 20036
samuel.whillans@spiegelmcd.com
California
Department
of Water
Resources
State Water
Project
Amanda Drennen
Attorney
Spiegel & McDiarmid LLP
1818 N Street, NW
8th Floor
WASHINGTON, DISTRICT OF
COLUMBIA 20036
UNITED STATES
amanda.drennen@spiegelmcd.com
Nhu Nguyen
Deputy Attorney General
California Department of Justice
1300 I Street
Sacramento, CALIFORNIA 95814
nhu.nguyen@doj.ca.gov
California
Department
of Water
Resources
State Water
Project
E Service
Spiegel & McDiarmid LLP
1818 N Street NW
8th Floor
Washington, DISTRICT OF
COLUMBIA 20036
eservice@spiegelmcd.com
California
Department
of Water
Resources
State Water
Project
Robert S Hedrick
Office of the General Counsel
PO Box 899
SACRAMENTO,
Robert.Hedrick@water.ca.gov
Case: 26-3635 Document: 1-1 Page: 448 Date Filed: 10/19/2026
PDF page 450
California
Department
of Water
Resources
State Water
Project
Robin M. Hennessy
Office of the General Counsel
Department of Water Resources
PO Box 899
SACRAMENTO,
robin.hennessy@water.ca.gov
California
Department
of Water
Resources
State Water
Project
Regina Tochterman
Senior Legal Analyst
California Department of Justice
1300 I Street
Sacramento, CALIFORNIA 95814
Regina.Tochterman@doj.ca.gov
California
Public
Utilities
Commission
Christofer Nolan
California Public Utilities Commission
505 Van Ness Avenue
SAN FRANCISCO, CALIFORNIA
94102
UNITED STATES
christofer.nolan@cpuc.ca.gov
Anand Durvasula
California Public Utilities Commission
505 VAN NESS AVE
SAN FRANCISCO, CALIFORNIA
94102
anand.durvasula@cpuc.ca.gov
California
Public
Utilities
Commission
Simon T. Hurd
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CALIFORNIA 94102
Simon.Hurd@cpuc.ca.gov
Calpine
Corporation
Sarah Novosel
SR Vice President Gov. Affairs
Calpine Corporation
717 Texas Avenue, Suite 1000
Houston, TEXAS 77002
UNITED STATES
snovosel@calpine.com
Calpine
Corporation
Rachael Marsh
V.P. and Managing Counsel
PO Box NA
Houston,TEXAS 77002
UNITED STATES
rachael.marsh@calpine.com
Calpine
Corporation
David Scarpignato
Calpine Corporation
717 Texas Avenue
Suite 1000
Houston, TEXAS 77002
Case: 26-3635 Document: 1-1 Page: 449 Date Filed: 10/19/2026
PDF page 451
UNITED STATES
david.scarpignato@calpine.com
Center for
Biological
Diversity
Howard Crystal
Senior Attorney
Center for Biological Diversity
1411 K ST NW STE 1300
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
hcrystal@biologicaldiversity.org
Chevron
U.S.A. Inc.
Vanessa Colon
Senior Counsel
Chevron U.S.A. Inc.
1400 SMITH ST RM 31158
HOUSTON, TEXAS 77002
UNITED STATES
vanessa.colon@chevron.com
Chevron
U.S.A. Inc.
Andrew Davitt
Chevron U.S.A. Inc.
1400 SMITH ST RM 06076
HOUSTON, TEXAS 77002
UNITED STATES
andrewdavitt@chevron.com
City of
Cleveland,
Department
of Public
Utilities,
Division of
Cleveland
Public Power
Tom Smith
1300 Lakeside Avenue
Cleveland, OHIO 44114
tsmith@cpp.org
City of
Hamilton,
Ohio
Michael R. Perry
Director of Electric
345 High Street
Suite 450
Hamilton, OHIO 45011
perrym@ci.hamilton.oh.us
Clean Air
Task Force
Shaun Goho
114 STATE ST FL 6
BOSTON, MASSACHUSETTS 02109
UNITED STATES
sgoho@catf.us
Ann Weeks
Clean Air Task Force
18 Tremont St
Boston, MASSACHUSETTS 02108
aweeks@catf.us
Case: 26-3635 Document: 1-1 Page: 450 Date Filed: 10/19/2026
PDF page 452
Clean
Energy
Buyers
Association
Bryn Baker
Corporate Energy Buyers Associ
1501 M ST NW STE 900
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
bbaker@ceba.org
Clearway
Energy
Group LLC
Gretchen Schott
Assistant General Counsel, Reg
Clearway Energy Group LLC
1200 SMITH ST STE 600
HOUSTON, TEXAS 77002
UNITED STATES
gretchen.schott@clearwayenergy.com
John C Miller
Director, Transmission Policy
Corporate Energy Buyers Association
1501 M ST NW STE 900
WASHINGTON, DISTRICT OF
COLUMBIA 20005
jmiller@ceba.org
Cogentrix
Energy
Power
Management
, LLC
Brian Zimmet
Partner
1 THOMAS CIR NW
ROCK CREEK ENERGY GROUP,
LLP
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
bzimmet@rockcreekenergygroup.com
Marica Sharashenidze
Rock Creek Energy Group, LLP
1 Thomas Circle
Suite 700
Washington, DISTRICT OF
COLUMBIA 20005
msharashenidze@rockcreekenergygro
up.com
Cogentrix
Energy
Power
Management
, LLC
George Knapp
General Counsel
13860 Ballantyne Corporate Place
Suite 300
Charlotte, NORTH CAROLINA 28277
GeorgeKnapp@cogentrix.com
Cogentrix
Energy
Power
Management
, LLC
Stephanie C Kueffner ESQ
Associate General Counsel
Cogentrix Energy Power Management,
LLC
13860 BALLANTYNE CORPORATE
PL STE 300
CHARLOTTE, NORTH CAROLINA
28277
stephaniekueffner@cogentrix.com
Commonwea
lth Edison
Company
Carlos Isaac
Assistant General Counsel
Exelon Corporation
10 S. Dearborn Street
Chicago, ILLINOIS 60603
Stan Berman
3502 Fremont Ave N, #1
Seattle, WASHINGTON 98103
stan@bermlaw.com
Case: 26-3635 Document: 1-1 Page: 451 Date Filed: 10/19/2026
PDF page 453
UNITED STATES
carlos.isaac@exeloncorp.com
Commonwea
lth Edison
Company of
Indiana, Inc.
Marianne Alvarez
Senior Analyst
101 Constitution Ave, NW
Suite 400 East
Washington, DISTRICT OF
COLUMBIA 20001
UNITED STATES
marianne.alvarez@exeloncorp.com
Amy L Blauman
Associate General Counsel
701 Ninth St. N.W.
WASHINGTON, DISTRICT OF
COLUMBIA 20001
amy.blauman@exeloncorp.com
Connecticut
Municipal
Electric
Energy
Cooperative
Scott Strauss
Spiegel & McDiarmid LLP
1818 N Street, NW
8th Floor
WASHINGTON, DISTRICT OF
COLUMBIA 20036
UNITED STATES
Scott.Strauss@spiegelmcd.com
Jeffrey A. Schwarz
Spiegel & McDiarmid LLP
1818 N Street, NW
8th Floor
WASHINGTON, DISTRICT OF
COLUMBIA 20036
jeffrey.schwarz@spiegelmcd.com
Connecticut
Municipal
Electric
Energy
Cooperative
Dave Meisinger
Chief Executive Officer
CMEEC
30 Stott Avenue
Norwich, CONNECTICUT 06360
dmeisinger@cmeec.org
Connecticut
Municipal
Electric
Energy
Cooperative
E Service
Spiegel & McDiarmid LLP
1818 N Street NW
8th Floor
Washington, DISTRICT OF
COLUMBIA 20036
eservice@spiegelmcd.com
Consolidated
Edison
Company of
New York,
Inc. and
Orange and
Rockland
Utilities, Inc.
Joshua Kirstein
Senior Attorney
Consolidated Edison Company of New
York, Inc.
Consolidated Edison Co. of New York,
Inc.
4 Irving Place-18th Floor
New York, NEW YORK 10003
UNITED STATES
kirsteinj@coned.com
Joshua A Kirstein
Senior Attorney
Consolidated Edison Company of New
York, Inc.
Consolidated Edison Co. of New York,
Inc.
4 Irving Place-18th Floor
New York, NEW YORK 10003
kirsteinj@coned.com
Consolidated
Edison
Sebrina Greene
Associate General Counsel
Sebrina M. Greene
Associate General Counsel
Case: 26-3635 Document: 1-1 Page: 452 Date Filed: 10/19/2026
PDF page 454
Company of
New York,
Inc. and
Orange and
Rockland
Utilities, Inc.
Consolidated Edison Company of New
York, Inc.
4 Irving Place
New York, NEW YORK 10003
UNITED STATES
greenes@coned.com
Consolidated Edison Company of New
York, Inc.
4 Irving Place
New York, NEW YORK 10003
greenes@coned.com
Consolidated
Edison
Company of
New York,
Inc. and
Orange and
Rockland
Utilities, Inc.
NEELAM GALE-AHMAD
Paralegal
Con Edison Company of New York
4 IRVING PL
NEW YORK, NEW YORK 10003
galeahmadn@coned.com
Consolidated
Edison
Company of
New York,
Inc. and
Orange and
Rockland
Utilities, Inc.
Dana Lazarus
Director
Con Edison Company of New York
4 Irving Place
New York, NEW YORK 10003
lazarusd@coned.com
Consolidated
Edison
Company of
New York,
Inc. and
Orange and
Rockland
Utilities, Inc.
David C Burns
Project Manager
Consolidated Edison Company of New
York, Inc.
Consolidated Edison Co. of New York,
Inc.
4 Irving Place-18th Floor
New York, NEW YORK 10003
burnsd@coned.com
Constellation
Energy
Generation,
LLC
Christopher Wilson
Director, Fed. Regulatory A
250 Massachusetts Avenue NW
Suite 760
Washington, DISTRICT OF
COLUMBIA 20001
UNITED STATES
FERCe-filings1@Constellation.com
Carrie H Allen
SVP & Deputy General Counsel
101 Constitution Ave. NW Suite 400
East
Washington, DISTRICT OF
COLUMBIA 20001
carrie.allen@constellation.com
Constellation
Energy
Generation,
LLC
Paul Wight
DLA Piper LLP (US)
500 Eighth St, NW
Washington, DISTRICT OF
COLUMBIA 20004
Seth T. Lucia
Assistant General Counsel
250 Massachusetts Avenue, NW
Suite 760
WASHINGTON, DISTRICT OF
Case: 26-3635 Document: 1-1 Page: 453 Date Filed: 10/19/2026
PDF page 455
UNITED STATES
paul.wight@us.dlapiper.com
COLUMBIA 20001
Seth.Lucia@constellation.com
Consumers
Energy
Company
Rachael Moore
Senior Attorney
Consumers Energy Company
One Energy Plaza
Jackson, MICHIGAN 49201
UNITED STATES
rachael.moore@cmsenergy.com
Consumers'
Research
Will Hild
Executive Director
Consumers' Research
1801 F St NW
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
info@consumersresearch.org
Convergent
Energy and
Power LP
Katie Guerry
SVP Regulatory Affairs
Convergent Energy and Power LP
7 TIMES SQ
NEW YORK, NEW YORK 10036
UNITED STATES
kguerry@convergentep.com
Cooperative
Energy
Matthew Rudolphi
Thompson Coburn LLP
1909 K Street, N.W.
Suite 600
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
mrudolphi@thompsoncoburn.com
Joshua E. Adrian
Attorney
Thompson Coburn LLP
1909 K Street NW
Suite 600
WASHINGTON, DISTRICT OF
COLUMBIA 20006
jadrian@thompsoncoburn.com
Cooperative
Energy
Nathan T Bellville
Regulatory Affairs Specialist
South Mississippi Electric Power
Association
PO BOX 15849
HATTIESBURG, MISSISSIPPI 39404
nbellville@cooperativeenergy.com
Cordelio
Services
LLC
Gregory Jones
Paul Hastings LLP
1101 New York Avenue, NW
WASHINGTON, DISTRICT OF
Lily Hunter
Milbank LLP
1101 New York Avenue, NW
Washington, DISTRICT OF
Case: 26-3635 Document: 1-1 Page: 454 Date Filed: 10/19/2026
PDF page 456
COLUMBIA 20005
UNITED STATES
gjones@milbank.com
COLUMBIA 20005
lhunter@milbank.com
Cordelio
Services
LLC
Sophia Faram
Paul Hastings LLP
2050 M St NW
Washington, DISTRICT OF
COLUMBIA 20036
sophiafaram@paulhastings.com
Cordelio
Services
LLC
Luke Pangman
General Counsel
Cordelio Power
100 King St West, Suite 7000
Toronto, ONTARIO M5X 1A9
lpangman@cordeliopower.com
Crete Energy
Venture,
LLC
Cliff Sikora
Earthrise Energy, PBLLC
3033 WILSON BLVD STE 700
ARLINGTON, VIRGINIA 22201
UNITED STATES
cliff.sikora@earthriseenergy.com
Data Center
Coalition
Aaron Tinjum
Data Center Coalition
525-K East Market Street
#253
Leesburg, VIRGINIA 20176
UNITED STATES
aaron@datacentercoalition.org
Morgan A Sipple, ESQ
Data Center Coalition
1250 H ST NW
WASHINGTON, DISTRICT OF
COLUMBIA 20005
morgan@datacentercoalition.org
Data Center
Coalition
Cy McNeill
Data Center Coalition
525 K-East Market, Street #253
Leesburg, VIRGINIA 20175
cy@datacentercoalition.org
Delaware
Municipal
Electric
Corporation,
Inc.
Thomas Rudebusch
Partner
Duncan, Weinberg, Genzer &
Pembroke PC
1667 K Street, NW
Suite 700
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
tlr@dwgp.com
Linda L. Murray-Kimball
Legal Assistant
Duncan, Weinberg, Genzer &
Pembroke PC
1667 K Street, NW
Suite 700
Washington, DISTRICT OF
COLUMBIA 20006-1654
lmk@dwgp.com
Case: 26-3635 Document: 1-1 Page: 455 Date Filed: 10/19/2026
PDF page 457
Delaware
Municipal
Electric
Corporation,
Inc.
Bhaveeta Mody
Duncan, Weinberg, Genzer &
Pembroke PC
1667 K Street, N.W.
Suite 700
WASHINGTON, DISTRICT OF
COLUMBIA 20006
UNITED STATES
bkm@dwgp.com
Kimberly Schlichting
President & CEO
Delaware Municipal Electric
Corporation, Inc.
22 Artisan Dr
Smyrna, DELAWARE 19977
kschlichting@demecinc.net
Delaware
Public
Service
Commission
Matthew Hartigan
Delaware Public Service Commission
861 Silver Lake Blvd.
Suite 100
Dover, DELAWARE 19904
UNITED STATES
matthew.hartigan@state.de.us
Delmarva
Power &
Light
Company
Carlos Isaac
Assistant General Counsel
Exelon Corporation
10 S. Dearborn Street
Chicago, ILLINOIS 60603
UNITED STATES
carlos.isaac@exeloncorp.com
Stan Berman
3502 Fremont Ave N, #1
Seattle, WASHINGTON 98103
stan@bermlaw.com
DISTRICT
OF
COLUMBIA
Brian Caldwell
Senior Assistant Attorney Gene
Office of the Attorney General for the
District of Columbia
400 6TH ST NW FL 9
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
brian.caldwell@dc.gov
Shilpa Sadhasivam
400 6TH ST NW
WASHINGTON, DISTRICT OF
COLUMBIA 20001
shilpa.sadhasivam@dc.gov
Dominion
Energy
Services,
Inc.
Wesley Walker
Senior Assistant General Couns
Dominion Companies
PO Box 25615
Richmond,VIRGINIA 23260-5615
UNITED STATES
wesley.walker@dominionenergy.com
Jacqulynn B. Hugee
Deputy General Counsel
Dominion Energy Services, Inc.
120 Tredegar Street
Richmond, VIRGINIA 23219
jacqulynn.b.hugee@dominionenergy.c
om
Dominion
Energy
Services,
Inc.
James G Davis
Regulatory and Market Policy S
Dominion Energy & Dominion
Generation
120 TREDEGAR ST
Case: 26-3635 Document: 1-1 Page: 456 Date Filed: 10/19/2026
PDF page 458
RIVERVIEW
RICHMOND, VIRGINIA 23219
james.g.davis@dominionenergy.com
DTE Electric
Company
Andrea Hayden
Office of the General Counsel
DTE Electric Company
One Energy Plaza
1635 WCB
Detroit, MICHIGAN 48226
UNITED STATES
andrea.hayden@dteenergy.com
Tristin Rojeck
Regulatory Strategy Consultant
DTE Energy Company
1 ENERGY PLZ
DETROIT, MICHIGAN 48226
tristin.rojeck@dteenergy.com
Duke Energy
Kentucky,
Inc.
Leah Buchanan
Duke Energy eTariff Account
550 South Tryon Street
Charlotte, NORTH CAROLINA 28202
e-tariff@duke-energy.com
Duke Energy
Ohio, Inc.
Sheri May
Associate General Counsel
139 E. 4th Street, 1212-M
Cincinnati, OHIO 45202
sheri.may@duke-energy.com
Duquesne
Light
Company
Michael Brechlin
411 7th Ave
Pittsburgh, PENNSYLVANIA 15219
mbrechlin@duqlight.com
Duquesne
Light
Company
Tishekia Williams
Director of External Affairs a
411 Seventh Avenue
15th Floor
Pittsburgh, PENNSYLVANIA 15219
UNITED STATES
twilliams@duqlight.com
EARTHJUS
TICE
Aaron Stemplewicz
Senior Attorney
EARTHJUSTICE
Clean Energy Program
1617 John F. Kennedy Blvd
Suite 2020
Philadelphia, PENNSYLVANIA 19103
UNITED STATES
astemplewicz@earthjustice.org
East
Kentucky
Daniel Frank
Partner
Denise R Foster Cronin
Vice President, Federal and RT
Case: 26-3635 Document: 1-1 Page: 457 Date Filed: 10/19/2026
PDF page 459
Power
Cooperative,
Inc.
Eversheds Sutherland (US) LLP
700 Sixth Street, N.W.
Suite 700
Washington, DISTRICT OF
COLUMBIA 20001-3980
UNITED STATES
DanielFrank@eversheds-
sutherland.com
East Kentucky Power Cooperative,
Inc.
4775 LEXINGTON ROAD
LEXINGTON, KENTUCKY 40392
denise.cronin@ekpc.coop
East
Kentucky
Power
Cooperative,
Inc.
Allison Salvia
Eversheds Sutherland (US) LLP
700 Sixth Street, NW
Suite 700
Washington, DISTRICT OF
COLUMBIA 20001
UNITED STATES
AllisonSalvia@eversheds-
sutherland.com
East
Kentucky
Power
Cooperative,
Inc.
Kelly Cuthbertson
Associate
Eversheds Sutherland (US) LLP
700 Sixth Street, NW
Suite 700
Washington, DISTRICT OF
COLUMBIA 20001
UNITED STATES
kellycuthbertson@eversheds-
sutherland.com
East
Kentucky
Power
Cooperative,
Inc.
Allison Salvia
700 Sixth Street, NW
Suite 700
Washington, DISTRICT OF
COLUMBIA 20001
UNITED STATES
AllisonSalvia@eversheds-
sutherland.com
Denise R Foster Cronin
Vice President, Federal and RT
4775 LEXINGTON ROAD
LEXINGTON, KENTUCKY 40392
denise.cronin@ekpc.coop
East Texas
Electric
Cooperative,
Inc.
F. Alvin Taylor
Attorney
McCarter & English, LLP
1301 K Street, NW
Suite 1000 West
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
ataylor@mccarter.com
Case: 26-3635 Document: 1-1 Page: 458 Date Filed: 10/19/2026
PDF page 460
EDF
Renewables,
Inc.
Linda Walsh
Husch Blackwell LLP
1801 Pennsylvania Ave. NW, Suite
1000
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
linda.walsh@huschblackwell.com
Corban A. Coffman
Akin Gump Strauss Hauer & Feld LLP
2001 K Street N.W.
Washington, DISTRICT OF
COLUMBIA 20006
ccoffman@akingump.com
EDF
Renewables,
Inc.
Michael Blackwell
Attorney
Husch Blackwell LLP
10700 VALLEY DR
CARMEL, INDIANA 46280
michael.blackwell@huschblackwell.co
m
EDF
Renewables,
Inc.
Emma Simon
Director, Transmission Policy
EDF Renewables Development, Inc.
15445 Innovation Dr
San Diego, CALIFORNIA 92128
emmanix.simon@edf-re.com
EDF
Renewables,
Inc.
Temujin J Roach
Senior Director - Transmission
EDF Renewables, Inc.
3600 American Blvd., W, Suite 400
Minneapolis, MINNESOTA 55413
temujin.roach@edf-re.com
EDF
Renewables,
Inc.
Anton Ptak
Director, Transmission and Int
EDF Renewables, Inc.
3600 AMERICAN BLVD W STE 400
BLOOMINGTON, MINNESOTA
55431
anton.ptak@edf-re.com
Edison
Electric
Institute
Kevin Huyler
Managing Director, Edison Elec
Edison Electric Institute
701 PENNSYLVANIA AVE NW
WASHINGTON, DISTRICT OF
COLUMBIA 20004
UNITED STATES
khuyler@eei.org
Christopher M Randall
Edison Electric Institute
Edison Electric Institute
701 Pennsylvania Avenue, NW
Washington, DISTRICT OF
COLUMBIA 20004
crandall@eei.org
Case: 26-3635 Document: 1-1 Page: 459 Date Filed: 10/19/2026
PDF page 461
Electric
Power
Supply
Association
Nancy Bagot
Senior Vice President
Electric Power Supply Association
1401 New York Avenue, NW
Suite 950
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
NancyB@epsa.org
Electric
Power
Supply
Association
Nancy Bagot
1401 NEW YORK AVE NW STE 950
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
nbagot@epsa.org
Electricity
Consumers
Resource
Council
Karen Onaran
Vice President
ELCON
1101 K Street NW
Suite 700
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
KOnaran@elcon.org
Electricity
Consumers
Resource
Council
Karen Onaran
Vice President
ELCON
1101 K Street NW
Suite 700
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
KOnaran@elcon.org
Enchanted
Rock, LLC
Steven Shparber
Mintz, Levin, Cohn, Ferris, Glovsky
and Popeo, P.C.
555 12TH ST NW STE 1100
WASHINGTON, DISTRICT OF
COLUMBIA 20004
UNITED STATES
sshparber@mintz.com
Joel Yu
Director of Regulatory & Legis
Enchanted Rock, LLC
1113 VINE ST STE 101
HOUSTON, TEXAS 77002
jyu@enchantedrock.com
Enchanted
Rock, LLC
Omar Bustami
Mintz, Levin, Cohn, Ferris, Glovsky
and Popeo, P.C.
James Huang
Director, Wholesale Markets Po
1113 Vine Street
Case: 26-3635 Document: 1-1 Page: 460 Date Filed: 10/19/2026
PDF page 462
3580 Carmel Mountain Road
Suite 300
San Diego, CALIFORNIA 92130
UNITED STATES
OBustami@mintz.com
Suite 101
Houston, TEXAS 77002
jhuang@erock.com
Enerwise
Global
Technologies
, LLC dba
CPower
Aaron Breidenbaugh
CPower Energy Management
CPower, Inc.
64 Westview Rd
Voorheesville, NEW YORK 12186
UNITED STATES
aaron.breidenbaugh@cpowerenergyma
nagement.com
Nancy Chafetz
Senior Director, Regulatory an
LS POWER CORPORATION
1001 Fleet St Unit 400
Baltimore, MARYLAND 21202
nancy.chafetz@cpowerenergymanage
ment.com
Enerwise
Global
Technologies
, LLC dba
CPower
Kenneth D Schisler
Regulatory Affairs
CPower, Inc.
7604 Cooper Point Rd
Bozman, MARYLAND 21612
Kenneth.Schisler@CPowerEnergyMan
agement.com
ENGIE
North
America Inc.
Sarah Bresolin Silver
Vice President
ENGIE North America Inc.
1360 Post Oak Blvd
Houston, TEXAS 77056
UNITED STATES
sarah.bresolin@engie.com
Environment
al Defense
Fund
Ted Kelly
Senior Attorney
Environmental Defense Fund
1875 Connecticut Ave NW Suite 600
Washington, DISTRICT OF
COLUMBIA 20012
UNITED STATES
tekelly@edf.org
Eolian, L.P.
Eric Stoutenburg
Eolian, L.P.
988 Howard Ave Ste
Burlingame, CALIFORNIA 94010
UNITED STATES
eric.stoutenburg@eolianenergy.com
Eolian, LP
Bruce Grabow
Sheppard Mullin Richter & Hampton
Case: 26-3635 Document: 1-1 Page: 461 Date Filed: 10/19/2026
PDF page 463
LLP
2099 Pennsylvania Avenue, NW
Suite 100
Washington, DISTRICT OF
COLUMBIA 20006-6801
UNITED STATES
bgrabow@sheppard.com
Essential
Power OPP,
LLC
Brian Zimmet
Partner
1 THOMAS CIR NW
ROCK CREEK ENERGY GROUP,
LLP
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
bzimmet@rockcreekenergygroup.com
Marica Sharashenidze
Rock Creek Energy Group, LLP
1 Thomas Circle
Suite 700
Washington, DISTRICT OF
COLUMBIA 20005
msharashenidze@rockcreekenergygro
up.com
Essential
Power OPP,
LLC
George Knapp
General Counsel
13860 Ballantyne Corporate Place
Suite 300
Charlotte, NORTH CAROLINA 28277
GeorgeKnapp@cogentrix.com
Essential
Power OPP,
LLC
Stephanie C Kueffner ESQ
Associate General Counsel
Cogentrix Energy Power Management,
LLC
13860 BALLANTYNE CORPORATE
PL STE 300
CHARLOTTE, NORTH CAROLINA
28277
stephaniekueffner@cogentrix.com
Essential
Power Rock
Springs,
LLC
Brian Zimmet
Partner
1 THOMAS CIR NW
ROCK CREEK ENERGY GROUP,
LLP
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
bzimmet@rockcreekenergygroup.com
George Knapp
General Counsel
13860 Ballantyne Corporate Place
Suite 300
Charlotte, NORTH CAROLINA 28277
GeorgeKnapp@cogentrix.com
Essential
Power Rock
Springs,
LLC
Lynn Kirshbaum
1 Thomas Circle NW
Suite 700
Washington, DISTRICT OF
Haley M. Franco
Energy Regulatory Advisor
1 Thomas Circle NW
Suite 700
Case: 26-3635 Document: 1-1 Page: 462 Date Filed: 10/19/2026
PDF page 464
COLUMBIA 20005
UNITED STATES
lkirshbaum@rockcreekenergygroup.co
m
Washington, DISTRICT OF
COLUMBIA 20005
hfranco@rockcreekenergygroup.com
Essential
Power Rock
Springs,
LLC
Brian Zimmet
Partner
1 THOMAS CIR NW
ROCK CREEK ENERGY GROUP,
LLP
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
bzimmet@rockcreekenergygroup.com
Marica Sharashenidze
Rock Creek Energy Group, LLP
1 Thomas Circle
Suite 700
Washington, DISTRICT OF
COLUMBIA 20005
msharashenidze@rockcreekenergygro
up.com
Essential
Power Rock
Springs,
LLC
George Knapp
General Counsel
13860 Ballantyne Corporate Place
Suite 300
Charlotte, NORTH CAROLINA 28277
GeorgeKnapp@cogentrix.com
Essential
Power Rock
Springs,
LLC
Stephanie C Kueffner ESQ
Associate General Counsel
Cogentrix Energy Power Management,
LLC
13860 BALLANTYNE CORPORATE
PL STE 300
CHARLOTTE, NORTH CAROLINA
28277
stephaniekueffner@cogentrix.com
Exelon
Corporation
Max Minzner
SVP and Deputy General Counsel
Exelon BSC-Legal Regulatory
701 9TH ST NW
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
max.minzner@exeloncorp.com
Jordan Kwok
Director, Federal Regulatory A
Exelon Business Services
701 9TH ST NW
WASHINGTON, DISTRICT OF
COLUMBIA 20001
jordan.kwok@exeloncorp.com
Exelon
Corporation
Carlos Isaac
Assistant General Counsel
Exelon Corporation
10 S. Dearborn Street
Chicago, ILLINOIS 60603
UNITED STATES
carlos.isaac@exeloncorp.com
Case: 26-3635 Document: 1-1 Page: 463 Date Filed: 10/19/2026
PDF page 465
Exelon
Corporation
Alejandro Bautista
Assistant General Counsel
Exelon Business Services Company,
LLC
2301 Market Street
Philadelphia, PENNSYLVANIA 19101
alejandro.bautista@exeloncorp.com
FirstEnergy
Service
Company
Amanda Parker
Attorney
FirstEnergy Service Company
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
Tricia S Hartzell
FirstEnergy Legal Specialist
FirstEnergy Service Company
76 S. Main Street
15th Floor
Akron, OHIO 44308
thartzell@firstenergycorp.com
FirstEnergy
Service
Company
Morgan Parke
Associate General Counsel
FirstEnergy
341 White Pond Dr.
Akron, OHIO 44320
UNITED STATES
mparke@firstenergycorp.com
Google
Energy LLC
Jane Rueger
Perkins Coie LLP
700 13th Street, N.W.
Suite 800
Washington, DISTRICT OF
COLUMBIA 20005-3960
UNITED STATES
jane.rueger@ashurstperkins.com
Brian D George
Google LLC
25 MASSACHUSETTS AVE NW
WASHINGTON, DISTRICT OF
COLUMBIA 20001
briangeorge@google.com
Google
Energy LLC
Jacob Neeley
Attorney
Ashurst Perkins Coie US LLP
33 E Main Street
Suite 201
Madison, WISCONSIN 53703
jacob.neeley@ashurstperkins.com
Google LLC
Jane Rueger
Perkins Coie LLP
700 13th Street, N.W.
Suite 800
Washington, DISTRICT OF
COLUMBIA 20005-3960
UNITED STATES
jane.rueger@ashurstperkins.com
Brian D George
Google LLC
25 MASSACHUSETTS AVE NW
WASHINGTON, DISTRICT OF
COLUMBIA 20001
briangeorge@google.com
Case: 26-3635 Document: 1-1 Page: 464 Date Filed: 10/19/2026
PDF page 466
Google LLC
Jacob Neeley
Attorney
Ashurst Perkins Coie US LLP
33 E Main Street
Suite 201
Madison, WISCONSIN 53703
jacob.neeley@ashurstperkins.com
Hamilton
Liberty LLC
Brian Zimmet
Partner
1 THOMAS CIR NW
ROCK CREEK ENERGY GROUP,
LLP
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
bzimmet@rockcreekenergygroup.com
Marica Sharashenidze
Rock Creek Energy Group, LLP
1 Thomas Circle
Suite 700
Washington, DISTRICT OF
COLUMBIA 20005
msharashenidze@rockcreekenergygro
up.com
Hamilton
Liberty LLC
George Knapp
General Counsel
13860 Ballantyne Corporate Place
Suite 300
Charlotte, NORTH CAROLINA 28277
GeorgeKnapp@cogentrix.com
Hamilton
Liberty LLC
Stephanie C Kueffner ESQ
Associate General Counsel
Cogentrix Energy Power Management,
LLC
13860 BALLANTYNE CORPORATE
PL STE 300
CHARLOTTE, NORTH CAROLINA
28277
stephaniekueffner@cogentrix.com
Hamilton
Patriot LLC
Brian Zimmet
Partner
1 THOMAS CIR NW
ROCK CREEK ENERGY GROUP,
LLP
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
bzimmet@rockcreekenergygroup.com
Marica Sharashenidze
Rock Creek Energy Group, LLP
1 Thomas Circle
Suite 700
Washington, DISTRICT OF
COLUMBIA 20005
msharashenidze@rockcreekenergygro
up.com
Hamilton
Patriot LLC
George Knapp
General Counsel
13860 Ballantyne Corporate Place
Suite 300
Case: 26-3635 Document: 1-1 Page: 465 Date Filed: 10/19/2026
PDF page 467
Charlotte, NORTH CAROLINA 28277
GeorgeKnapp@cogentrix.com
Hamilton
Patriot LLC
Stephanie C Kueffner ESQ
Associate General Counsel
Cogentrix Energy Power Management,
LLC
13860 BALLANTYNE CORPORATE
PL STE 300
CHARLOTTE, NORTH CAROLINA
28277
stephaniekueffner@cogentrix.com
Hudson
Transmission
Partners,
LLC
William Hollaway
Gibson, Dunn & Crutcher LLP
1050 Connecticut Ave NW
Washington, DISTRICT OF
COLUMBIA 20036
UNITED STATES
WHollaway@gibsondunn.com
Hudson
Transmission
Partners,
LLC
Edward Stern
President and CEO
Gibson, Dunn & Crutcher LLP
501 Kings Highway East, Suite 300
Fairfield, CONNECTICUT 06825
UNITED STATES
estern@powerbridge.us
Idaho Power
Company
Lisa O'Hara
Corporate Counsel
Idaho Power Company
PO Box 70
BOISE,IDAHO
UNITED STATES
lo'hara@idahopower.com
Illinois
Attorney
General's
Office
Kimberly Janas
Office of the Illinois Attorney General
115 S LA SALLE ST
CHICAGO, ILLINOIS 60603
UNITED STATES
kimberly.janas@ilag.gov
Scott Metzger
Office of the Illinois Attorney General
115 S LA SALLE ST
25TH FLOOR
CHICAGO, ILLINOIS 60603
scott.metzger@ilag.gov
Illinois
Attorney
General's
Office
Susan L. Satter
Chief, Public Utilities Bureau
Office of the Illinois Attorney General
115 S LA SALLE ST
Case: 26-3635 Document: 1-1 Page: 466 Date Filed: 10/19/2026
PDF page 468
CHICAGO, ILLINOIS 60603
susan.satter@ilag.gov
Illinois
Citizens
Utility Board
Eric DeBellis
Illinois Citizens Utility Board
309 W WASHINGTON ST STE 800
CHICAGO, ILLINOIS 60606
UNITED STATES
edebellis@citizensutilityboard.org
Clara Summers
Consumers for a Better Grid Ca
Citizens Utility Board of Illinois
309 W WASHINGTON ST STE 800
CHICAGO, ILLINOIS 60606
csummers@citizensutilityboard.org
Illinois
Municipal
Electric
Agency
Troy Fodor
Vice President General Counsel
Illinois Municipal Electric Agency
3400 Conifer Drive
Springfield, ILLINOIS 62711
UNITED STATES
tfodor@imea.org
Illinois
Municipal
Electric
Agency
Daniel Chung
Staff Attorney
Illinois Municipal Electric Agency
3400 Conifer Drive
Springfield, ILLINOIS 62711
UNITED STATES
dchung@imea.org
Indiana
Michigan
Power
Company
Stacey Burbure
SVP, Transmission Regulatory
Engagement & Compliance
8500 Smiths Mill Road, 4th Floor
New Albany, OHIO 43054
UNITED STATES
slburbure@aep.com
Jessica A. Cano
Assoc.Gen.Counsel Regul. East
1 Riverside Plaza
Columbus, OHIO 43215-2372
jacano@aep.com
Indiana
Office of
Utility
Consumer
Counselor
Arthur Iler
Deputy Consumer Counsel - Fede
Indiana Office of Utility Consumer
Counselor
115 W Washington St
Ste 1500 South
Indianapolis, INDIANA 46204
UNITED STATES
ailer@oucc.in.gov
Scott Jones
Indiana Office of the Utility
Indiana Office of Utility Consumer
Counselor
115 West Washington St. Ste.1500
South
Indianapolis, INDIANA 46204
sjones1@oucc.in.gov
Individual
Bruce Campbell
Principal
Enerwise Global Technologies, LLC
9204 2ND AVE
SILVER SPRING, MARYLAND
Case: 26-3635 Document: 1-1 Page: 467 Date Filed: 10/19/2026
PDF page 469
20910
UNITED STATES
bruce@campbellea.com
Industrial
Energy
Consumers
of America
Kenneth Stark
McNees Wallace & Nurick LLC
100 Pine Street
P.O. Box 1166
Harrisburg, PENNSYLVANIA 17108
UNITED STATES
kstark@mcneeslaw.com
International
Transmission
Company
Lauren Parrottino
Associate Attorney
ITC Holdings Corp.
27175 ENERGY WAY
NOVI, MICHIGAN 48377
UNITED STATES
lparrottino@itctransco.com
Invenergy
Renewables
LLC
Tyler O'Connor
Crowell & Moring LLP
600 5TH ST NW
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
toconnor@crowell.com
Kathryn Douglass
Crowell & Moring LLP
1601 Wewatta Street
Ste. 815
Denver, COLORADO 80202
kdouglass@crowell.com
Invenergy
Renewables
LLC
William Borders
Chief Compliance Officer
Invenergy LLC
One South Wacker Drive
Suite 1500
Chicago, ILLINOIS 60606
UNITED STATES
ferccompliance@invenergy.com
Nicole Luckey
Senior Vice President, Regulat
Invenergy LLC
1 S WACKER DR STE 1800
CHICAGO, ILLINOIS 60606
nluckey@invenergy.com
Invenergy
Thermal
LLC
Tyler O'Connor
Crowell & Moring LLP
600 5TH ST NW
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
toconnor@crowell.com
Kathryn Douglass
Crowell & Moring LLP
1601 Wewatta Street
Ste. 815
Denver, COLORADO 80202
kdouglass@crowell.com
Invenergy
Thermal
LLC
William Borders
Chief Compliance Officer
Invenergy LLC
One South Wacker Drive
Nicole Luckey
Senior Vice President, Regulat
Invenergy LLC
1 S WACKER DR STE 1800
Case: 26-3635 Document: 1-1 Page: 468 Date Filed: 10/19/2026
PDF page 470
Suite 1500
Chicago, ILLINOIS 60606
UNITED STATES
ferccompliance@invenergy.com
CHICAGO, ILLINOIS 60606
nluckey@invenergy.com
Jersey
Central
Power &
Light
Company
Amanda Parker
Attorney
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
Tricia S Hartzell
FirstEnergy Legal Specialist
76 S. Main Street
15th Floor
Akron, OHIO 44308
thartzell@firstenergycorp.com
Jersey
Central
Power &
Light
Company
Amanda Parker
Attorney
FirstEnergy Service Company
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
Tricia S Hartzell
FirstEnergy Legal Specialist
FirstEnergy Service Company
76 S. Main Street
15th Floor
Akron, OHIO 44308
thartzell@firstenergycorp.com
Jersey
Central
Power &
Light
Company
Morgan Parke
Associate General Counsel
FirstEnergy
341 White Pond Dr.
Akron, OHIO 44320
UNITED STATES
mparke@firstenergycorp.com
Kentucky
Power
Company
John Crespo
Deputy General Counsel
1 Riverside Plaza
29th Floor
Columbus, OHIO 43215
UNITED STATES
jccrespo@aep.com
Jennifer L. Key, ESQ
1330 Connecticut Ave., N.W.
Washington, DISTRICT OF
COLUMBIA 20036
jkey@steptoe.com
Keystone
Appalachian
Transmission
Company
Amanda Parker
Attorney
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
Deborah L. Jacobson, ESQ
Attorney
341 WHITE POND DR
AKRON, OHIO 44320
djacobson@firstenergycorp.com
Keystone
Appalachian
Transmission
Company
Amanda Parker
Attorney
FirstEnergy Service Company
76 South Main Street
Akron, OHIO 44308
Tricia S Hartzell
FirstEnergy Legal Specialist
FirstEnergy Service Company
76 S. Main Street
15th Floor
Case: 26-3635 Document: 1-1 Page: 469 Date Filed: 10/19/2026
PDF page 471
UNITED STATES
aparker@firstenergycorp.com
Akron, OHIO 44308
thartzell@firstenergycorp.com
Keystone
Appalachian
Transmission
Company
Morgan Parke
Associate General Counsel
FirstEnergy
341 White Pond Dr.
Akron, OHIO 44320
UNITED STATES
mparke@firstenergycorp.com
Kingsport
Power
Company
Renee Hawkins
Assistant Treasurer
1 Riverside Plz
Columbus, OHIO 43215
UNITED STATES
rvhawkins@aep.com
William E. Johnson, ESQ
Senior Counsel
1 Riverside Plaza
23rd Floor
Columbus, OHIO 43061
wejohnson@aep.com
Klondike
Digital
Infrastructur
e LLC
Debra Raggio
Executive Vice President, Head
Klondike Digital Infrastructure LLC
117 ORONOCO ST
ALEXANDRIA, VIRGINIA 22314
UNITED STATES
draggio@newfortressenergy.com
Lakewood
Cogeneratio
n, LP
Brian Zimmet
Partner
1 THOMAS CIR NW
ROCK CREEK ENERGY GROUP,
LLP
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
bzimmet@rockcreekenergygroup.com
Marica Sharashenidze
Rock Creek Energy Group, LLP
1 Thomas Circle
Suite 700
Washington, DISTRICT OF
COLUMBIA 20005
msharashenidze@rockcreekenergygro
up.com
Lakewood
Cogeneratio
n, LP
George Knapp
General Counsel
13860 Ballantyne Corporate Place
Suite 300
Charlotte, NORTH CAROLINA 28277
GeorgeKnapp@cogentrix.com
Lakewood
Cogeneratio
n, LP
Stephanie C Kueffner ESQ
Associate General Counsel
Cogentrix Energy Power Management,
LLC
13860 BALLANTYNE CORPORATE
PL STE 300
Case: 26-3635 Document: 1-1 Page: 470 Date Filed: 10/19/2026
PDF page 472
CHARLOTTE, NORTH CAROLINA
28277
stephaniekueffner@cogentrix.com
Large Public
Power
Council
Jonathan Schneider
Stinson LLP
1775 Pennsylvania Avenue NW
Suite 800
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
jonathan.schneider@stinson.com
John E. McCaffrey
Partner
Stinson LLP
1775 Pennsylvania Avenue NW
Suite 800
WASHINGTON, DISTRICT OF
COLUMBIA 20006
john.mccaffrey@stinson.com
Large Public
Power
Council
M. Denyse Zosa, ESQ
Stinson Leonard Street LLP
1775 Pennsylvania Avenue NW
Suite 800
Washington, DISTRICT OF
COLUMBIA 20006
denyse.zosa@stinson.com
Lee County
Electric
Cooperative,
Inc.
John Adragna
McCarter & English, LLP
1301 K Street, NW
Suite 1000 West
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
Jadragna@mccarter.com
F. Alvin Taylor
Attorney
McCarter & English, LLP
1301 K Street, NW
Suite 1000 West
Washington, DISTRICT OF
COLUMBIA 20005
ataylor@mccarter.com
Lee County
Electric
Cooperative,
Inc.
Clark Hawkins
Director - Electric Operations
4980 Bayline Drive
North Fort Myers, FLORIDA 33917
Clark.Hawkins@lcec.net
Lee County
Electric
Cooperative,
Inc.
Sarah Bullock
Director Finance and Supply Ch
Lee County Electric Cooperative, Inc.
4980 BAYLINE DR
NORTH FORT MYERS, FLORIDA
33917
sarah.bullock@lcec.net
Lincoln
Generating
Facility,
LLC
Cliff Sikora
Earthrise Energy, PBLLC
3033 WILSON BLVD STE 700
ARLINGTON, VIRGINIA 22201
Case: 26-3635 Document: 1-1 Page: 471 Date Filed: 10/19/2026
PDF page 473
UNITED STATES
cliff.sikora@earthriseenergy.com
LS Power
Developmen
t, LLC
Marjorie Philips
VP, Wholesale Market Policy
LS Power Associates, L.P.
250 W 55TH ST FL 31
NEW YORK, NEW YORK 10019
UNITED STATES
mphilips@lspower.com
LS Power
Developmen
t, LLC
Tom Hoatson
1 Tower Center
East Brunswick, NEW JERSEY 08816
UNITED STATES
thoatson@lspower.com
LS Power
Developmen
t, LLC
Daniel Pierpont
Vice President
LS Power Development, LLC
250 W 55TH ST FL 31
NEW YORK, NEW YORK 10019
UNITED STATES
dpierpont@lspower.com
Mainspring
Energy
Brian Kauffman
Director, Wholesale Market Dev
Mainspring Energy
3601 HAVEN AVE
MENLO PARK, CALIFORNIA 94025
UNITED STATES
brian.kauffman@mainspringenergy.co
m
Mainspring
Energy
Brian Kauffman
Director, Wholesale Market Dev
Mainspring Energy
3601 HAVEN AVE
MENLO PARK, CALIFORNIA 94025
UNITED STATES
brian.kauffman@mainspringenergy.co
m
Maryland
Office of
People's
Counsel
William Fields
Deputy People's Counsel
6 SAINT PAUL ST STE 2102
BALTIMORE, MARYLAND 21202
UNITED STATES
william.fields@maryland.gov
Philip L Sussler
Senior Assistant People's Coun
Maryland Office of People's Counsel
6 SAINT PAUL ST STE 2102
BALTIMORE, MARYLAND 21202
philip.sussler@maryland.gov
Case: 26-3635 Document: 1-1 Page: 472 Date Filed: 10/19/2026
PDF page 474
Maryland
Office of
People's
Counsel
Alexis H Lewis, ESQ
Assistant People's Counsel
Office of People's Counsel
6 SAINT PAUL ST
BALTIMORE, MARYLAND 21202
alexis.lewis@maryland.gov
Maryland
Public
Service
Commission
Ransom (Ted) Davis
Associate General Counsel
Maryland Public Service Commission
6 St. Paul Street
16th Floor
BALTIMORE, MARYLAND 21202
UNITED STATES
Ransom.Davis@Maryland.gov
Miles H Mitchell
General Counsel
Maryland Public Service Commission
6 St. Paul Street
16th Floor, William Donald Schaefer
Tower
Baltimore, MARYLAND 21202
miles.mitchell@maryland.gov
Maryland
Public
Service
Commission
Morris Schreim
6 St. Paul Street
Baltimore, MARYLAND 21202
morris.schreim@maryland.gov
Massachuset
ts Municipal
Wholesale
Electric
Company
Scott Strauss
Spiegel & McDiarmid LLP
1818 N Street, NW
8th Floor
WASHINGTON, DISTRICT OF
COLUMBIA 20036
UNITED STATES
Scott.Strauss@spiegelmcd.com
Jeffrey A. Schwarz
Spiegel & McDiarmid LLP
1818 N Street, NW
8th Floor
WASHINGTON, DISTRICT OF
COLUMBIA 20036
jeffrey.schwarz@spiegelmcd.com
Massachuset
ts Municipal
Wholesale
Electric
Company
Matthew J. Ide
Exec. Director of Special Proj
Massachusetts Municipal Wholesale
Electric Company
327 Moody Street
P.O. Box 426
Ludlow, MASSACHUSETTS 01056
MIde@mmwec.org
Massachuset
ts Municipal
Wholesale
Electric
Company
E Service
Spiegel & McDiarmid LLP
1818 N Street NW
8th Floor
Washington, DISTRICT OF
COLUMBIA 20036
eservice@spiegelmcd.com
Mid-Atlantic
Interstate
Amanda Parker
Attorney
Tricia S Hartzell
FirstEnergy Legal Specialist
Case: 26-3635 Document: 1-1 Page: 473 Date Filed: 10/19/2026
PDF page 475
Transmission
LLC
FirstEnergy Service Company
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
FirstEnergy Service Company
76 S. Main Street
15th Floor
Akron, OHIO 44308
thartzell@firstenergycorp.com
Mid-Atlantic
Interstate
Transmission
LLC
Morgan Parke
Associate General Counsel
FirstEnergy
341 White Pond Dr.
Akron, OHIO 44320
UNITED STATES
mparke@firstenergycorp.com
Mid-Atlantic
Interstate
Transmission
, LLC
Deborah L. Jacobson, ESQ
Attorney
341 WHITE POND DR
AKRON, OHIO 44320
djacobson@firstenergycorp.com
Midwest
Generation,
LLC
Neal Fitch
Sr. Director, Regulatory Affai
NRG Energy, Inc.
804 CARNEGIE CTR
PRINCETON, NEW JERSEY 08540
UNITED STATES
neal.fitch@nrg.com
Midwest
Generation,
LLC
Cortney Slager
VP & Assistant General Counsel
NRG Companies
804 Carnegie Center
Princeton, NEW JERSEY 08540
UNITED STATES
cortney.slager@nrg.com
Midwest
Generation,
LLC
Jennifer Hsia
Assistant General Counsel
NRG Energy
804 Carnegie Center Dr.
Princeton, NEW JERSEY 08540
UNITED STATES
Jennifer.Hsia@nrg.com
Mississippi
Public
Service
Commission
William Booth
Michael Best & Friedrich, LLP
1000 Maine Ave SW
Suite 400
Washington, D.C., DISTRICT OF
Orrie A Walsvik
Associate Attorney
Michael Best & Friedrich, LLP
1000 Maine Avenue, S.W.
Suite 400
Case: 26-3635 Document: 1-1 Page: 474 Date Filed: 10/19/2026
PDF page 476
COLUMBIA 20024
UNITED STATES
wdbooth@michaelbest.com
Washington, DISTRICT OF
COLUMBIA 20024
Orrie.walsvik@MichaelBest.com
Mississippi
Public
Service
Commission
Barton Norfleet
Special Counsel for Federal En
501 N. West Street, Suite 201-A
P.O. Box 1174
JACKSON, MISSISSIPPI 39201
barton.norfleet@psc.ms.gov
Monitoring
Analytics,
LLC
Jeffrey Mayes
General Counsel
Monitoring Analytics, LLC
2621 Van Buren Avenue, Suite 160
Valley Forge Corporate Center
Eagleville, PENNSYLVANIA 19403
UNITED STATES
jeffrey.mayes@monitoringanalytics.co
m
Suzette N Krausen
Executive Assistant
Monitoring Analytics, LLC
2621 Van Buren Ave Ste 160
Norristown, PENNSYLVANIA 19403
Suzette.Krausen@monitoringanalytics.
com
Monitoring
Analytics,
LLC
Joseph Bowring
Monitoring Analytics, LLC
2621 Van Buren Avenue, Suite 160
Norristown, PENNSYLVANIA 19403
Joseph.Bowring@monitoringanalytics.
com
Monongahel
a Power
Company
Amanda Parker
Attorney
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
Deborah L. Jacobson, ESQ
Attorney
341 WHITE POND DR
AKRON, OHIO 44320
djacobson@firstenergycorp.com
Monongahel
a Power
Company
Amanda Parker
Attorney
FirstEnergy Service Company
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
Tricia S Hartzell
FirstEnergy Legal Specialist
FirstEnergy Service Company
76 S. Main Street
15th Floor
Akron, OHIO 44308
thartzell@firstenergycorp.com
Monongahel
a Power
Company
Morgan Parke
Associate General Counsel
FirstEnergy
341 White Pond Dr.
Akron, OHIO 44320
Case: 26-3635 Document: 1-1 Page: 475 Date Filed: 10/19/2026
PDF page 477
UNITED STATES
mparke@firstenergycorp.com
National
Grid
Patrick Tarmey
Senior Counsel
National Grid
170 Data Drive
Waltham, MASSACHUSETTS 02451
UNITED STATES
patrick.tarmey@nationalgrid.com
National
Grid
Renewables
Developmen
t, LLC
Kurt Rempe
National Grid Renewables
Development, LLC
8400 NORMANDALE LAKE BLVD
STE 1200
BLOOMINGTON, MINNESOTA
55437
UNITED STATES
krempe@geronimopower.com
National
Grid
Renewables
Developmen
t, LLC
Matthew Morais
Senior Director, Federal Reg
PJM Interconnection, L.L.C.
8400 Normandale Lake Boulevard
Suite 1200
Bloomington, MINNESOTA 55437
UNITED STATES
mmorais@geronimopower.com
National
Hydropower
Association
Connor Nelson
National Hydropower Associatio
National Hydropower Association
200 MASSACHUSETTS AVE NW
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
connor@hydro.org
Michael Purdie
National Hydropower Association
601 NEW JERSEY AVE NW STE 660
WASHINGTON, DISTRICT OF
COLUMBIA 20001
michael@hydro.org
National
Railroad
Passenger
Corporation
("Amtrak")
Susan Bruce
McNees Wallace & Nurick LLC
100 Pine Street
P.O. Box 1166
Harrisburg, PENNSYLVANIA 17108
UNITED STATES
sbruce@mcneeslaw.com
Kenneth R. Stark
McNees Wallace & Nurick LLC
100 Pine Street
P.O. Box 1166
Harrisburg, PENNSYLVANIA 17108
kstark@mcneeslaw.com
National
Railroad
Matthew L. Garber
McNees Wallace & Nurick LLC
Case: 26-3635 Document: 1-1 Page: 476 Date Filed: 10/19/2026
PDF page 478
Passenger
Corporation
("Amtrak")
100 Pine Street
P.O. Box 1166
Harrisburg, PENNSYLVANIA 17108
mgarber@mcneeslaw.com
National
Rural
Electric
Cooperative
Association
Adrienne Clair
Thompson Coburn LLP
1909 K Street NW
Suite 600
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
aclair@thompsoncoburn.com
National
Rural
Electric
Cooperative
Association
Mary Ann Ralls
Senior Direct, Regulatory Coun
National Rural Electric Cooperative
Association
4301 Wilson Blvd.
Arlington, VIRGINIA 22203
maryann.ralls@nreca.coop
Natural
Resource
Defense
Council
Tom Rutigliano
Sr. Advocate
NRDC/FERC Project
1124 15th St. NW
Suite 300
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
trutigliano@nrdc.org
Nebraska
Public Power
District
David D'Alessandro
Attorney
Stinson LLP
1775 Pennsylvania Avenue, Suite 800
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
david.dalessandro@stinson.com
John McClure
Exec.VP Ext Affair/Gen Counsel
1414 15th Street
Columbus, NEBRASKA 68601
jcmcclu@nppd.com
Nebraska
Public Power
District
Harold Hadland
Nebraska Public Power District
1414 15th Street
Columbus, NEBRASKA 68601
hlhadla@nppd.com
Neptune
Regional
William Hollaway
Gibson, Dunn & Crutcher LLP
Case: 26-3635 Document: 1-1 Page: 477 Date Filed: 10/19/2026
PDF page 479
Transmission
System, LLC
1050 Connecticut Ave NW
Washington, DISTRICT OF
COLUMBIA 20036
UNITED STATES
WHollaway@gibsondunn.com
Neptune
Regional
Transmission
System, LLC
Edward Stern
President and CEO
Gibson, Dunn & Crutcher LLP
501 Kings Highway East, Suite 300
Fairfield, CONNECTICUT 06825
UNITED STATES
estern@powerbridge.us
New Jersey
Division of
Rate Counsel
Robert Glover
New Jersey Division of Rate Counsel
PO Box 003
Trenton,NEW JERSEY 08625
UNITED STATES
rglover@rpa.nj.gov
T. David Wand
Division of Rate Counsel
New Jersey Division of Rate Counsel
140 E. Front St.
4th Flr.
Trenton, NEW JERSEY 08625
dwand@rpa.nj.gov
New Jersey
Division of
Rate Counsel
Debora Layugan
New Jersey Division of Rate Counsel
PO Box 003
Trenton, 08625
dlayugan@rpa.nj.gov
New Jersey
Division of
Rate Counsel
Brian O. Lipman
Director
New Jersey Division of Rate Counsel
PO Box 003
Trenton, 08625
blipman@rpa.nj.gov
New York
State
Reliability
Council,
L.L.C.
Amanda De Vito
Couch White, LLP
540 Broadway, Suite 7
Albany, NEW YORK 12207
UNITED STATES
adevito@couchwhite.com
NextEra
Energy
Transmission
MidAtlantic
Indiana, Inc.
Travis M. Contratto
Principal Attorney
801 Pennsylvania Avenue, N.W.
Suite 220
Washington, DISTRICT OF
COLUMBIA 20004
Travis.Contratto@nee.com
Case: 26-3635 Document: 1-1 Page: 478 Date Filed: 10/19/2026
PDF page 480
North
American
Electric
Reliability
Corporation
Caelyn Palmer
1325 G Street NW
Suite 600
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
caelyn.palmer@nerc.net
Candice Castaneda
Senior Counsel
North American Electric Reliability
Corporation
1401 H Street, N.W.
Suite 410
Washington, DISTRICT OF
COLUMBIA 20005
candice.castaneda@nerc.net
Northeast
Texas
Electric
Cooperative,
Inc.
F. Alvin Taylor
Attorney
McCarter & English, LLP
1301 K Street, NW
Suite 1000 West
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
ataylor@mccarter.com
Northeastern
REMC
Alexandra Jones
VP & Sr. Counsel of Energy and
NORTHEASTERN REMC
6908 GEM CREEK LN
WHITESTOWN, INDIANA 46075
UNITED STATES
a_jones@nremc.com
Eric Jung
President/CEO
NORTHEASTERN REMC
4901 E Park 30 Drive
Columbia City, INDIANA 46725
e_jung@nremc.com
Northern
Virginia
Electric
Cooperative,
Inc.
Alan Robbins
Partner
Washington Energy Law LLP
900 17TH ST NW STE 500-A
WASHINGTON, DISTRICT OF
COLUMBIA 20006
UNITED STATES
arobbins@washingtonenergylaw.com
Patrick Toulme
Northern Virginia Electric
Cooperative,
10323 Lomond Drive
Manassas, VIRGINIA 20109
ptoulme@novec.com
Northern
Virginia
Electric
Cooperative,
Inc.
Debra Roby
Partner
Washington Energy Law LLP
900 17th Street NW
Suite 500-A
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
droby@washingtonenergylaw.com
Northern
Virginia
Thomas Steiger
Associate
Case: 26-3635 Document: 1-1 Page: 479 Date Filed: 10/19/2026
PDF page 481
Electric
Cooperative,
Inc.
Washington Energy Law LLP
900 17th Street NW
Suite 500-A
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
tsteiger@washingtonenergylaw.com
NRG
Business
Marketing
LLC
Neal Fitch
Sr. Director, Regulatory Affai
NRG Energy, Inc.
804 CARNEGIE CTR
PRINCETON, NEW JERSEY 08540
UNITED STATES
neal.fitch@nrg.com
NRG
Business
Marketing
LLC
Cortney Slager
VP & Assistant General Counsel
NRG Companies
804 Carnegie Center
Princeton, NEW JERSEY 08540
UNITED STATES
cortney.slager@nrg.com
NRG
Business
Marketing
LLC
Jennifer Hsia
Assistant General Counsel
NRG Energy
804 Carnegie Center Dr.
Princeton, NEW JERSEY 08540
UNITED STATES
Jennifer.Hsia@nrg.com
Office of the
Ohio
Consumers'
Counsel
Denise Goulet
Partner
McCarter & English, LLP
1301 K ST NW
SUITE 1000 WEST
WASHINGTON, DISTRICT OF
COLUMBIA 20005
UNITED STATES
dgoulet@mccarter.com
Office of the
Ohio
Consumers'
Counsel
Angela O'Brien
Deputy Consumers' Counsel
Office of the Ohio Consumers' Counsel
65 E STATE ST STE 700
OFFICE OF THE OHIO
CONSUMERS' COUNSEL
COLUMBUS, OHIO 43215
Case: 26-3635 Document: 1-1 Page: 480 Date Filed: 10/19/2026
PDF page 482
UNITED STATES
angela.obrien@occ.ohio.gov
Ohio Federal
Energy
Advocate
Thomas Lindgren
Assistant Attorney General
Public Utilities Commission of Ohio
30 East Broad Street
16th Floor
Columbus, OHIO 43215-3793
UNITED STATES
thomas.lindgren@ohioattorneygeneral.
gov
Sarah Parrot
Federal Energy Advocate
Public Utilities Commission of Ohio
180 E BROAD ST
COLUMBUS, OHIO 43215
sarah.parrot@puco.ohio.gov
Ohio Power
Company
Chris Zentz
Partner
750 9th St. NW, #750
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
chris.zentz@akerman.com
Robert L Pennybaker
Regulated Pricing & Analysis M
PO Box 201
TULSA,DISTRICT OF COLUMBIA
74102
rlpennybaker@aep.com
Ohio Power
Company
Joe Bower
700 K Street NW
WASHINGTON, DISTRICT OF
COLUMBIA 20001
joe.bower@bakerbotts.com
Ohio Valley
Electric
Corporation
Nick Privette
3932 U.S. Route 23
piketon, OHIO 47250
UNITED STATES
nprivett@ovec.com
Scott R Cunningham
Electrical Operations Director
PO BOX 468
3932 US ROUTE 23
PIKETON, OHIO 45661
scunning@ovec.com
Old
Dominion
Electric
Cooperative
Jecoliah Williams
555 Eleventh Street NW
Suite 1000
Washington, DISTRICT OF
COLUMBIA 20004
UNITED STATES
jecoliah.williams@lw.com
Adrienne E. Clair
1909 K Street NW
Suite 600
Washington, DISTRICT OF
COLUMBIA 20006
aclair@thompsoncoburn.com
One Power
Company
James Dunn
Senior Counsel
One Power Company
12385 Township Road 215
Findlay, OHIO 45840
UNITED STATES
jdunn@onepower.com
Case: 26-3635 Document: 1-1 Page: 481 Date Filed: 10/19/2026
PDF page 483
Organization
of PJM
States, Inc.
Gregory Carmean
Executive Director
Organization of PJM States, Inc.
700 Barksdale Road
Suite 1
Newark, DELAWARE 19711
UNITED STATES
greg@opsi.us
Pacific Gas
and Electric
Company
Charles Middlekauff
Chief Counsel
Pacific Gas and Electric Company
PO Box 1018
Oakland,CALIFORNIA 94604-1018
UNITED STATES
Charles.Middlekauff@pge.com
PECO
Energy
Company
Carlos Isaac
Assistant General Counsel
Exelon Corporation
10 S. Dearborn Street
Chicago, ILLINOIS 60603
UNITED STATES
carlos.isaac@exeloncorp.com
Stan Berman
3502 Fremont Ave N, #1
Seattle, WASHINGTON 98103
stan@bermlaw.com
Pennsylvania
Office of
Consumer
Advocate
Melanie El Atieh
Deputy Consumer Advocate
Pennsylvania Office of Consumer
Advocate
555 WALNUT ST
5TH FLOOR, FORUM PLACE
HARRISBURG, PENNSYLVANIA
17101
UNITED STATES
melatieh@paoca.org
Denell Lewis
Pennsylvania Office of Consumer
Advocate
555 WALNUT ST
HARRISBURG, PENNSYLVANIA
17101
dlewis@paoca.org
Pennsylvania
Office of
Consumer
Advocate
Josiah Harmar
Assistant Consumer Advocate
Pennsylvania Office of Consumer
Advocate
555 WALNUT ST
5th Floor, Forum Place
HARRISBURG, PENNSYLVANIA
17101
UNITED STATES
jharmar@paoca.org
PJM
Industrial
Susan Bruce
McNees Wallace & Nurick LLC
Case: 26-3635 Document: 1-1 Page: 482 Date Filed: 10/19/2026
PDF page 484
Customer
Coalition
100 Pine Street
P.O. Box 1166
Harrisburg, PENNSYLVANIA 17108
UNITED STATES
sbruce@mcneeslaw.com
PJM
Industrial
Customer
Coalition
Lauren Huff
Paralegal
McNees Wallace & Nurick LLC
100 Pine Street
P.O. Box 1166
Harrisburg, PENNSYLVANIA 17108
lhuff@mwn.com
PJM
Industrial
Customer
Coalition
David S. Mabry
McNees Wallace & Nurick LLC
100 Pine Street
Harrisburg, PENNSYLVANIA 17101
dmabry@mwn.com
PJM
Interconnecti
on L.L.C
Mark Stanisz
Assistant General Counsel
2750 Monroe Blvd.
Audubon, PENNSYLVANIA 19403
UNITED STATES
mark.stanisz@pjm.com
Craig Glazer
V.P., Federal Gov't Policy
1200 G Street, N.W.
Suite 600
Washington, DISTRICT OF
COLUMBIA 20005
craig.glazer@pjm.com
PJM
Interconnecti
on L.L.C
Andrew Swers
1200 G ST NW
Suite 600
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
swers@wrightlaw.com
Ryan J. Collins
Attorney
1200 G Street, N.W.
Suite 600
Washington, DISTRICT OF
COLUMBIA 20005-3898
collins@wrightlaw.com
PJM
Interconnecti
on, L.L.C.
Mark Stanisz
Assistant General Counsel
PJM Interconnection, L.L.C.
2750 Monroe Blvd.
Audubon, PENNSYLVANIA 19403
UNITED STATES
mark.stanisz@pjm.com
Craig Glazer
V.P., Federal Gov't Policy
PJM Interconnection, L.L.C.
1200 G Street, N.W.
Suite 600
Washington, DISTRICT OF
COLUMBIA 20005
craig.glazer@pjm.com
PJM
Interconnecti
on, L.L.C.
Arleigh Helfer
Sr. Counsel
PJM Interconnection, L.L.C.
2750 Monroe Boulevard
Case: 26-3635 Document: 1-1 Page: 483 Date Filed: 10/19/2026
PDF page 485
Audubon, PENNSYLVANIA 19403
arleigh.helfer@pjm.com
PJM Power
Providers
Group
Glen Thomas
101 Lindenwood Drive
Suite 225
Malvern, PENNSYLVANIA 19355
UNITED STATES
gthomas@gtpowergroup.com
Diane L Slifer
101 LINDENWOOD DR STE 225
MALVERN, PENNSYLVANIA 19355
dslifer@gtpowergroup.com
PJM Power
Providers
Group
Laura Chappelle
6688 FOREST BEACH DR
HOLLAND, MICHIGAN 49423
laurac@chappelleconsulting.net
Potomac
Electric
Power
Company
Gary Guy
Assistant General Counsel
Exelon Corporation
701 Ninth Street, NW
Washington, DISTRICT OF
COLUMBIA 20001
UNITED STATES
gary.guy@exeloncorp.com
PPL Electric
Utilities
Corporation
Steven Nadel
PPL Services Corporation
645 Hamilton Street
Suite 601
Allentown, PENNSYLVANIA 18101
UNITED STATES
SMNadel@pplweb.com
PPL Electric
Utilities
Corporation
John Longstreth
K&L Gates LLP
1601 K Street, NW
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
john.longstreth@klgates.com
PPL Electric
Utilities
Corporation
Donald Kaplan
K&L Gates LLP
1601 K Street, NW
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
don.kaplan@klgates.com
Case: 26-3635 Document: 1-1 Page: 484 Date Filed: 10/19/2026
PDF page 486
PPL Electric
Utilities
Corporation
William Keyser
Steptoe LLP
1330 Connecticut Avenue NW
Washington, DISTRICT OF
COLUMBIA 20036
UNITED STATES
wkeyser@steptoe.com
PSEG Power
LLC
Viet Ngo
Managing Counsel
Public Service Enterprise Group
Incorporated
601 New Jersey Ave, NW
Suite 310
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
Viet.Ngo@pseg.com
Jodi Moskowitz
Deputy General Counsel and RTO
PSEG Services Corporation
Strategy Officer
80 Park Plaza, T-20
Newark, NEW JERSEY 07102
Jodi.Moskowitz@pseg.com
PSEG Power
LLC
Robert E. Gardinor
Paralegal
PSEG Services Corporation
80 Park Plaza, T5
Newark, NEW JERSEY 07102
Robert.Gardinor@pseg.com
PSEG
Companies
Viet Ngo
Managing Counsel
Public Service Enterprise Group
Incorporated
601 New Jersey Ave, NW
Suite 310
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
Viet.Ngo@pseg.com
Jodi Moskowitz
Deputy General Counsel and RTO
PSEG Services Corporation
Strategy Officer
80 Park Plaza, T-20
Newark, NEW JERSEY 07102
Jodi.Moskowitz@pseg.com
PSEG
Companies
Robert E. Gardinor
Paralegal
PSEG Services Corporation
80 Park Plaza, T5
Newark, NEW JERSEY 07102
Robert.Gardinor@pseg.com
PSEG
Energy
Resources &
Trade LLC
Viet Ngo
Managing Counsel
Public Service Enterprise Group
Incorporated
601 New Jersey Ave, NW
Jodi Moskowitz
Deputy General Counsel and RTO
PSEG Services Corporation
Strategy Officer
80 Park Plaza, T-20
Case: 26-3635 Document: 1-1 Page: 485 Date Filed: 10/19/2026
PDF page 487
Suite 310
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
Viet.Ngo@pseg.com
Newark, NEW JERSEY 07102
Jodi.Moskowitz@pseg.com
PSEG
Energy
Resources &
Trade LLC
Robert E. Gardinor
Paralegal
PSEG Services Corporation
80 Park Plaza, T5
Newark, NEW JERSEY 07102
Robert.Gardinor@pseg.com
PUBLIC
CITIZEN,
INC
Tyson Slocum
Energy Program Director
PUBLIC CITIZEN, INC
215 PENNSYLVANIA AVE SE
WASHINGTON, DISTRICT OF
COLUMBIA 20003
UNITED STATES
tslocum@citizen.org
Public
Service
Commission
of West
Virginia
Jacqueline Roberts
Federal Policy Advisor, WV Pub
West Virginia Public Service
Commission
201 Brooks Street
Charleston, WEST VIRGINIA 25301
UNITED STATES
jroberts@psc.state.wv.us
Public
Service
Electric and
Gas
Company
Viet Ngo
Managing Counsel
Public Service Enterprise Group
Incorporated
601 New Jersey Ave, NW
Suite 310
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
Viet.Ngo@pseg.com
Jodi Moskowitz
Deputy General Counsel and RTO
PSEG Services Corporation
Strategy Officer
80 Park Plaza, T-20
Newark, NEW JERSEY 07102
Jodi.Moskowitz@pseg.com
Public
Service
Electric and
Gas
Company
Robert E. Gardinor
Paralegal
PSEG Services Corporation
80 Park Plaza, T5
Newark, NEW JERSEY 07102
Robert.Gardinor@pseg.com
Case: 26-3635 Document: 1-1 Page: 486 Date Filed: 10/19/2026
PDF page 488
Public
Service
Electric and
Gas
Company
John Shepherd
Special Asst Attorney General
2200 Pennsylvania Avenue
WASHINGTON, DISTRICT OF
COLUMBIA 20037
UNITED STATES
jshepherd@hunton.com
Jodi Moskowitz
Deputy General Counsel and RTO
Strategy Officer
80 Park Plaza, T-20
Newark, NEW JERSEY 07102
Jodi.Moskowitz@pseg.com
Public
Service
Electric and
Gas
Company
Blake Grow
2200 Pennsylvania Avenue, NW
WASHINGTON, DISTRICT OF
COLUMBIA 20037
bgrow@hunton.com
Repsol
Energy
North
America
Corporation
Jordan Kirwin
Regulatory Affairs
Repsol Energy North America
Corporation
2455 Technology Forest Blvd.
The Woodlands, TEXAS 77381
UNITED STATES
jordan.kirwin@repsol.com
Rockland
Electric
Company
John Longstreth
K&L Gates LLP
1601 K Street, NW
Washington, DISTRICT OF
COLUMBIA 20006
UNITED STATES
john.longstreth@klgates.com
Rockland
Electric
Company
Joshua Kirstein
Senior Attorney
Consolidated Edison Company of New
York, Inc.
Consolidated Edison Co. of New York,
Inc.
4 Irving Place-18th Floor
New York, NEW YORK 10003
UNITED STATES
kirsteinj@coned.com
Joshua A Kirstein
Senior Attorney
Consolidated Edison Company of New
York, Inc.
Consolidated Edison Co. of New York,
Inc.
4 Irving Place-18th Floor
New York, NEW YORK 10003
kirsteinj@coned.com
Rockland
Electric
Company
Sebrina Greene
Associate General Counsel
Consolidated Edison Company of New
York, Inc.
4 Irving Place
New York, NEW YORK 10003
Sebrina M. Greene
Associate General Counsel
Consolidated Edison Company of New
York, Inc.
4 Irving Place
New York, NEW YORK 10003
greenes@coned.com
Case: 26-3635 Document: 1-1 Page: 487 Date Filed: 10/19/2026
PDF page 489
UNITED STATES
greenes@coned.com
Rockland
Electric
Company
NEELAM GALE-AHMAD
Paralegal
Con Edison Company of New York
4 IRVING PL
NEW YORK, NEW YORK 10003
galeahmadn@coned.com
Rockland
Electric
Company
Dana Lazarus
Director
Con Edison Company of New York
4 Irving Place
New York, NEW YORK 10003
lazarusd@coned.com
Rockland
Electric
Company
David C Burns
Project Manager
Consolidated Edison Company of New
York, Inc.
Consolidated Edison Co. of New York,
Inc.
4 Irving Place-18th Floor
New York, NEW YORK 10003
burnsd@coned.com
San Diego
Gas &
Electric
Company
Jonathan Newlander
Attorney
San Diego Gas & Electric Company
8330 Century Park Ct
San Diego, CALIFORNIA 92123
UNITED STATES
JNewlander@sdge.com
Pamela Mills
Regulatory Affairs Mgr
San Diego Gas & Electric
8330 Century Park
san diego, CALIFORNIA 92122
pmills@sdge.com
Shell Energy
North
America
(US), L.P.
Sean Chang
Director, Regulatory Affairs
Shell Energy North America (US), L.P.
1000 Main Street
Level 12
Houston, TEXAS 77002
UNITED STATES
sean.chang@shell.com
Matthew J. Picardi, ESQ
Vice President
Shell Energy North America (US), L.P.
36 Pinewood Ave.
Saratoga Springs, NEW YORK 12866
Matthew.Picardi@shell.com
Shell Energy
North
America
(US), L.P.
Shaela McNulty Collins
S. Power Policy Adv., Corp.
Shell Energy North America (U.S.),
L.P.
1050 K Street NW
Case: 26-3635 Document: 1-1 Page: 488 Date Filed: 10/19/2026
PDF page 490
Suite 700
Washington, DISTRICT OF
COLUMBIA 20001
shaela.collins@shell.com
Sierra Club
Justin Vickers
Senior Attorney
Sierra Club
Environmental Law Program
1229 W. Glenlake Ave.
Chicago, ILLINOIS 60660
UNITED STATES
justin.vickers@sierraclub.org
Dorothy E Jaffe
Managing Attorney
50 F St NW
Washington, DISTRICT OF
COLUMBIA 20001
dori.jaffe@sierraclub.org
Silver Run
Electric,
LLC
Michael R. Engleman
1717 K St. NW
Washington, DISTRICT OF
COLUMBIA 20006
mengleman@efenergylaw.com
Silver Run
Electric,
LLC
Sharon Segner
Vice President
1001 19th Street North
Suite 1200
Arlington, VIRGINIA 22209
ssegner@lspower.com
Solar Energy
Industries
Association
Melissa Alfano
Manager of Regulatory Affairs
Solar Energy Industries Association
1425 K Street, N.W., Suite 1000
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
malfano@seia.org
Ben Norris
Manager of Federal Regulatory
Solar Energy Industries Association
1425 K St NW
Washington, DISTRICT OF
COLUMBIA 20005
bnorris@seia.org
Southern
California
Edison
Company
Ellen Kenney
Southern California Edison Company
2244 WALNUT GROVE AVE
ROSEMEAD, CALIFORNIA 91770
UNITED STATES
ellen.kenney@sce.com
FERC Case Administration
Southern California Edison Company
2244 WALNUT GROVE AVE
ROSEMEAD, CALIFORNIA 91770
ferccaseadmin@sce.com
Southern
Maryland
Electric
Cooperative,
Inc.
John Rohrbach
ED Regulatory
4140 W 99TH ST
CARMEL, INDIANA 46032
UNITED STATES
JRohrbach@acespower.com
Damon Krieger
VP, Legal Affairs, Deputy Gen
15035 Burnt Store Road
P.O. Box 1937
Hughesville, MARYLAND 20637-
Case: 26-3635 Document: 1-1 Page: 489 Date Filed: 10/19/2026
PDF page 491
1937
Damon.Krieger@SMECO.coop
Southern
Maryland
Electric
Cooperative,
Inc.
Mark MacDougall
Senior Vice President and Gene
PO Box 1937
Hughesville,MARYLAND 20637-1937
UNITED STATES
mark.macdougall@smeco.coop
Eugene Bradford
Vice President, Rates and Ener
15035 Burnt Store Rd.
Hughesville, MARYLAND 20637
Eugene.Bradford@smeco.coop
Southern
Maryland
Electric
Cooperative,
Inc.
Damon Krieger
VP, Legal Affairs, Deputy Gen
Southern Maryland Electric
Cooperative, Inc.
15035 Burnt Store Road
P.O. Box 1937
Hughesville, MARYLAND 20637-
1937
UNITED STATES
Damon.Krieger@SMECO.coop
John Rohrbach
ED Regulatory
ACES POWER MARKETING
4140 W 99TH ST
CARMEL, INDIANA 46032
JRohrbach@acespower.com
Southern
Maryland
Electric
Cooperative,
Inc.
Eugene Bradford
Vice President, Rates and Ener
SOUTHERN MARYLAND
ELECTRIC COOP INC
15035 Burnt Store Rd.
Hughesville, MARYLAND 20637
Eugene.Bradford@smeco.coop
Sustainable
FERC
Project
Tom Rutigliano
Sr. Advocate
NRDC/FERC Project
1124 15th St. NW
Suite 300
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
trutigliano@nrdc.org
Talen Energy
Corporation
Jennifer Mansh
Senior VP, Regulatory Counsel
Talen Energy Corporation
600 Hamilton Street
Suite 600
Allentown, PENNSYLVANIA 18101
UNITED STATES
Jennifer.Mansh@talenenergy.com
Jacqueline Fleming
Contracts and Legal Services A
Talen Energy Corporation
600 Hamilton Street, Suite 600
Allentown, PENNSYLVANIA 18101
jacqueline.fleming@talenenergy.com
Case: 26-3635 Document: 1-1 Page: 490 Date Filed: 10/19/2026
PDF page 492
The Dayton
Power and
Light
Company
William M Rappolt
Assistant Gen. Counsel, FERC
4300 WILSON BLVD
ARLINGTON, VIRGINIA 22203
william.rappolt@aes.com
The Potomac
Edison
Company
Michael Kunselman
1301 K Street, NW Suite 500 East
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
michaelkunselman@dwt.com
Evan K Dean, ESQ
Managing Counsel, Transmission
341 WHITE POND DR # B-2
AKRON, OHIO 44320
edean@firstenergycorp.com
The Potomac
Edison
Company
Bradley R. Miliauskas
1251 Avenue of the Americas
21st Floor
New York, NEW YORK 10020
bradleymiliauskas@dwt.com
The Potomac
Edison
Company
Amanda Parker
Attorney
FirstEnergy Service Company
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
Tricia S Hartzell
FirstEnergy Legal Specialist
FirstEnergy Service Company
76 S. Main Street
15th Floor
Akron, OHIO 44308
thartzell@firstenergycorp.com
The Potomac
Edison
Company
Morgan Parke
Associate General Counsel
FirstEnergy
341 White Pond Dr.
Akron, OHIO 44320
UNITED STATES
mparke@firstenergycorp.com
The Retail
Energy
Supply
Association
Elizabeth Whittle
Nixon Peabody LLP
799 9th Street NW
Suite 500
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
ewhittle@nixonpeabody.com
Trans-
Allegheny
Interstate
Line
Company
Evan Dean
Managing Counsel, Transmission
341 WHITE POND DR # B-2
AKRON, OHIO 44320
Morgan E. Parke
Associate General Counsel
341 White Pond Dr.
Akron, OHIO 44320
mparke@firstenergycorp.com
Case: 26-3635 Document: 1-1 Page: 491 Date Filed: 10/19/2026
PDF page 493
UNITED STATES
edean@firstenergycorp.com
Trans-
Allegheny
Interstate
Line
Company
Amanda Parker
Attorney
FirstEnergy Service Company
76 South Main Street
Akron, OHIO 44308
UNITED STATES
aparker@firstenergycorp.com
Tricia S Hartzell
FirstEnergy Legal Specialist
FirstEnergy Service Company
76 S. Main Street
15th Floor
Akron, OHIO 44308
thartzell@firstenergycorp.com
Trans-
Allegheny
Interstate
Line
Company
Morgan Parke
Associate General Counsel
FirstEnergy
341 White Pond Dr.
Akron, OHIO 44320
UNITED STATES
mparke@firstenergycorp.com
Transource
West
Virginia,
LLC
Stacey Burbure
SVP, Transmission Regulatory
Engagement & Compliance
8500 Smiths Mill Road, 4th Floor
New Albany, OHIO 43054
UNITED STATES
slburbure@aep.com
Jessica A. Cano
Assoc.Gen.Counsel Regul. East
1 Riverside Plaza
Columbus, OHIO 43215-2372
jacano@aep.com
U.S. Energy
Storage
Coalition
Noah Roberts
Executive Director
1650 Harvard St NW
Washington, DISTRICT OF
COLUMBIA 20009
UNITED STATES
noah@energystorage.org
UGI Utilities
Inc.
Lindsay Berkstresser
Counsel – Energy & Regulatory
UGI Corporation
500 N. Gulph Road
King of Prussia, PENNSYLVANIA
19406
UNITED STATES
berkstresserl@ugicorp.com
Alexandra Colaizzi
UGI Utilities, Inc.
1 UGI Drive
Denver, PENNSYLVANIA 17517
acolaizzi@ugi.com
UGI Utilities
Inc.
Jesse Tyahla
Director of Energy Supply & Pl
UGI Utilities Inc.
1 UGI Drive
Case: 26-3635 Document: 1-1 Page: 492 Date Filed: 10/19/2026
PDF page 494
Denver, PENNSYLVANIA 17517
jtyahla@ugi.com
UGI Utilities
Inc.
Jamie Jowers
Senior Manager, Energy Supply
UGI Utilities Inc.
1 UGI Drive
Denver, PENNSYLVANIA 17517
jharper@ugi.com
UGI
Utilities, Inc.
Richard Bonnifield
Partner
1801 PENNSYLVANIA AVE NW STE
1000
WASHINGTON, DISTRICT OF
COLUMBIA 20006
UNITED STATES
richard.bonnifield@huschblackwell.co
m
Michael Swerling
UGI Corporation
460 N Gulph Road
King of Prussia, PENNSYLVANIA
19406
swerlingm@ugicorp.com
UGI
Utilities, Inc.
Corban A. Coffman
2001 K Street N.W.
Washington, DISTRICT OF
COLUMBIA 20006
ccoffman@akingump.com
UNION OF
CONCERN
ED
SCIENTIST
S
Michael Jacobs
Sr. Energy Analyst
UNION OF CONCERNED
SCIENTISTS
2 BRATTLE SQ
CAMBRIDGE, MASSACHUSETTS
02138
UNITED STATES
mjacobs@ucs.org
VC
Renewables
LLC
Jason Barker
VP, Regulatory Affairs
Vitol Inc.
931 Metfield Rd
Towson, MARYLAND 21286
UNITED STATES
bja@vcrenewables.com
Edwin Cambero
Compliance officer
2925 RICHMOND AVE
HOUSTON, TEXAS 77098
enc@vitol.com
Vermont
Public Power
Supply
Authority
Scott Strauss
Spiegel & McDiarmid LLP
1818 N Street, NW
8th Floor
WASHINGTON, DISTRICT OF
Jeffrey A. Schwarz
Spiegel & McDiarmid LLP
1818 N Street, NW
8th Floor
WASHINGTON, DISTRICT OF
Case: 26-3635 Document: 1-1 Page: 493 Date Filed: 10/19/2026
PDF page 495
COLUMBIA 20036
UNITED STATES
Scott.Strauss@spiegelmcd.com
COLUMBIA 20036
jeffrey.schwarz@spiegelmcd.com
Vermont
Public Power
Supply
Authority
Kenneth A. Nolan
General Manager
Vermont Public Power Supply
Authority
P.O. Box 126
Waterbury Center, VERMONT 05677
knolan@vppsa.com
Vermont
Public Power
Supply
Authority
E Service
Spiegel & McDiarmid LLP
1818 N Street NW
8th Floor
Washington, DISTRICT OF
COLUMBIA 20036
eservice@spiegelmcd.com
Verrus LLC
Jeffrey Bladen
Verrus LLC
918 N Rengstorff Ave
Mountain View, CALIFORNIA 94043
UNITED STATES
bladen@verrusdata.com
Virginia
Electric and
Power
Company
Kathryn Gantley
Counsel
400 N CAPITOL ST NW STE 875
WASHINGTON, DISTRICT OF
COLUMBIA 20001
UNITED STATES
kathryn.gantley@dominionenergy.com
Jason B Lazos
Contracts Administrator III
201 West Blvd.
Williamston, NORTH CAROLINA
27892
Jason.B.Lazos@dominionenergy.com
Virginia
State
Corporation
Commission
Frederick Ochsenhirt
Legal Advisor to the Commissio
Virginia State Corporation Commission
1300 E MAIN ST
RICHMOND, VIRGINIA 23219
UNITED STATES
frederick.ochsenhirt@scc.virginia.gov
Vistra Corp.
Nicholas Gladd
Wilson Sonsini Goodrich & Rosati, P.C.
201 Washington St.
Suite 2000
Boston, MASSACHUSETTS 02108
Sarah Greenberg
Wilson Sonsini Goodrich & Rosati
1700 K ST NW FL 5
WASHINGTON, DISTRICT OF
COLUMBIA 20006
sgreenberg@wsgr.com
Case: 26-3635 Document: 1-1 Page: 494 Date Filed: 10/19/2026
PDF page 496
UNITED STATES
ngladd@wsgr.com
Vistra Corp.
J. Arnold Quinn
INDIVIDUAL
325 7th Street, N.W
Suite 520
Washington, DISTRICT OF
COLUMBIA 20004
UNITED STATES
arnie.quinn@vistracorp.com
Andrew Weinstein
Director of ISO-NE Markets
Vistra Corp.
325 7th Street, NW
WASHINGTON, DISTRICT OF
COLUMBIA 20004
andrew.weinstein@vistracorp.com
Vitol Inc.
Seth Cochran
Head of Strategic Market Polic
Vitol Inc.
2925 RICHMOND AVE
HOUSTON, TEXAS 77098
UNITED STATES
sco@vitol.com
Edwin Cambero
Compliance officer
2925 RICHMOND AVE
HOUSTON, TEXAS 77098
enc@vitol.com
Voltus, Inc.
Kimaya Abreu
Voltus
Voltus, Inc.
2443 Fillmore Street
#380-3427
San Francisco, CALIFORNIA 94115
UNITED STATES
kabreu@voltus.co
Vote Solar
Nathan Phelps
Vote Solar
131 FARMHOLME RD
STONINGTON, CONNECTICUT
06378
UNITED STATES
nathan@votesolar.org
Wabash
Valley Power
Association,
Inc.
John Adragna
1301 K Street, NW
Suite 1000 West
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
Jadragna@mccarter.com
Jeremy L. Fetty
6702 Intech Blvd.
Indianapolis, INDIANA 46278
J_fetty@wvpa.com
Wabash
Valley Power
Association,
Inc.
F. Alvin Taylor
Attorney
1301 K Street, NW
Suite 1000 West
Randolph Lee Elliott
1301 K Street, NW
Suite 1000 West
Washington, DISTRICT OF
Case: 26-3635 Document: 1-1 Page: 495 Date Filed: 10/19/2026
PDF page 497
Washington, DISTRICT OF
COLUMBIA 20005
UNITED STATES
ataylor@mccarter.com
COLUMBIA 20005
relliott@mccarter.com
Wabash
Valley Power
Association,
Inc.
Jeremy Fetty
Parr Richey Obremskey & Morton
6702 Intech Blvd.
Indianapolis, INDIANA 46278
UNITED STATES
J_fetty@wvpa.com
Wheeling
Power
Company
William Johnson
Senior Counsel
1 Riverside Plaza
23rd Floor
Columbus, OHIO 43061
UNITED STATES
wejohnson@aep.com
Julie Sherwood
1 Riverside Plaza
Floor 28
Columbus, OHIO 43215
jasherwood@aep.com
Case: 26-3635 Document: 1-1 Page: 496 Date Filed: 10/19/2026
PDF page 498
26-3635 Case Caption
1
October 20, 2026 1:14 PM
Vistra Corp.,
Petitioner
v. Federal Energy Regulatory Commission
Case: 26-3635 Document: 1-2 Page: 1 Date Filed: 10/19/2026
PDF page 499
PATRICIA S. DODSZUWEIT
CLERK
OFFICE OF THE CLERK
UNITED STATES COURT OF APPEALS
21400 UNITED STATES COURTHOUSE
601 MARKET STREET
PHILADELPHIA, PA 19106-1790
Website: www.ca3.uscourts.gov
October 20, 2026
TELEPHONE
215-597-2995
Jared B. Fish
Federal Energy Regulatory Commission
888 1st Street NE
Washington, DC 20426
Nicholas M. Gladd
Wilson Sonsini Goodrich & Rosati
201 Washington Street
Suite 2000
Boston, MA 02108
Sarah Greenberg
Wilson Sonsini Goodrich & Rosati
1700 K Street NW
5th Floor
Washington, DC 20006
Robert H. Solomon
Federal Energy Regulatory Commission
888 1st Street NE
Room 9A-01
Washington, DC 20426
RE: Vistra Corp v. FERC
Case Number: 26-3635
Agency Case Number: FERC No. AD24-11
Agency Case Number: FERC No. EL25-20
Agency Case Number: FERC No. EL-25-49
PACER account holders are required to promptly inform the PACER Service Center of any contact information changes. In order to not delay providing notice to attorneys or pro Case: 26-3635 Document: 1-3 Page: 1 Date Filed: 10/19/2026
PDF page 500
se public filers, your information, including address, phone number and/or email address, may have been updated in the Third Circuit database. Changes at the local level will not be reflected at PACER. Public filers are encouraged to review their information on file with PACER and update if necessary.
Effective December 15, 2008, the Court implemented the Electronic Case Files System. Accordingly, attorneys are required to file all documents electronically. See 3d Cir. L.A.R. 113 (2008) and the Court's CM/ECF website at https://www.ca3.uscourts.gov/forms.
To All Parties:
Enclosed is the case opening information regarding the above-captioned petition for review filed by Vistra Corp, docketed at No. 26-3635. The petition was received on October 19, 2026. All inquiries should be directed to your Case Manager in writing or by calling the Clerk's Office at 215-597-2995. This Court's rules, forms and case information are available on our website at http://www.ca3.uscourts.gov.
Pursuant to Fed. R. App. P. 17 (a), the agency must file the record with this Court within forty
(40) days after being served with the petition for review, unless the statute authorizing review provides otherwise.
Attached is a copy of the full caption. Please review the caption carefully and promptly advise this office in writing of any discrepancies.
The docketing fee of $600.00 was received on October 19, 2026. electronically.
10/19/2026 @ 4:26pm.
Payment made through pay.gov..
A03-69773-674.
For Immigration cases only:
The filing of this petition for review will not automatically stay removal. A separate Motion for Stay of Removal must be filed.
Counsel for Petitioner(s) must file:
1. Application for Admission (if applicable);
2. Appearance Form
3. Disclosure Statement (except governmental entities);
4. Docketing Statement.
Case: 26-3635 Document: 1-3 Page: 2 Date Filed: 10/19/2026
PDF page 501
These forms must be filed within 14 days of the date of this letter.
Failure of Petitioner(s) to comply with any of these requirements by the deadline will result in the DISMISSAL of the case without further notice. 3rd Cir. LAR Misc. 107.2.
Counsel for Respondent(s) must file:
1. Application for Admission (if applicable);
2. Appearance Form
3. Disclosure Statement (except governmental entities).
These forms must be filed within 14 days of the date of this letter.
Very truly yours,
Patricia S. Dodszuweit, Clerk
By: s/ James King
Case Manager
267-299-4958
Case: 26-3635 Document: 1-3 Page: 3 Date Filed: 10/19/2026