ER27-508-000 · 2026-11-16 · Southern California Edison Company
SCE OSC - Large Load, TOT Revisions
PDF page 1
Jeffrey Nelson
Director, FERC Rates &
Market Integration
P.O. Box 800
2244 Walnut Grove Ave.
Rosemead, CA 91770
November 16, 2026
The Honorable Debbie-Anne A. Reese
Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, DC 20426
Re:
Southern California Edison Company Docket No. ER27-___-000 –
Dear Secretary Reese:
On June 18, 2026, the Commission issued an Order Instituting Proceeding Under Section 206 of the Federal Power Act (“FPA”) (“Order to Show Cause” or “Order”) regarding interconnections and transmission service for large loads. The Order directed the California Independent System Operator (“CAISO”) and the Participating Transmission Owners (“PTOs”) to (1) show cause as to why their respective Tariffs remain just and reasonable and not unduly discriminatory or preferential; or (2) explain what changes to their respective Tariffs they believe would remedy the concerns if the Commission were to determine that the Tariff has in fact become unjust and unreasonable or unduly discriminatory or preferential and, therefore, proceeds to establish a replacement Tariff.
Southern California Edison Company (“SCE”) supports the Commission’s efforts to ensure that large loads can be integrated into our transmission system in a manner that does not shift costs or cause harm to smaller customers. In fact, if done properly, the integration of new load has the potential to both provide transmission cost relief and to enhance reliability to everyone on the grid. SCE’s proposals herein set the groundwork to realize these benefits, while at the same time providing transparency and reasonable rules for integrating new large loads.
PDF page 2
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 2
November 16, 2026
2
SCE, as a PTO, hereby submits this filing under FPA Section 205 with proposed changes to its Transmission Owner Tariff (“TO Tariff”) to address items identified in the Order. This Transmittal Letter also addresses the Commission’s Briefing Questions at Section IV of the Order.
I. BACKGROUND
As SCE stated in its Request for Abeyance, many of the Commission’s identified concerns can only be resolved with complementary or, at a minimum, non-conflicting tariff provisions among the CAISO Tariff and the various TO Tariffs. In order to respond to the deficiencies raised in the Order to Show Cause, SCE has had robust coordination with other California PTOs and the CAISO while developing the tariff changes described herein. Shortly after the Commission issued the Order to Show Cause, SCE began engaging with the CAISO and other stakeholders to coordinate its response. SCE actively participated in the CAISO stakeholder process that produced the CAISO’s Large Loads Enhancements proposal. SCE attended the CAISO’s stakeholder meetings on its Straw Proposal and the CAISO Draft Final Proposal and submitted written comments on each, including comments on the definition of Large Load, the large load application process and interconnection study procedures, operational requirements, service agreements, and the CAISO’s draft tariff language. SCE also continuously coordinated with the other PTOs, including Pacific Gas and Electric Company (“PG&E”) and San Diego Gas & Electric Company (“SDG&E”), and with the CAISO throughout the process to promote a fair and compatible application of requirements and procedures across the CAISO system, and to identify where the PTOs and the CAISO are aligned and where their positions differ.
Ultimately, the CAISO has decided to defer to the various PTOs to adopt and implement TO Tariff changes to their load interconnection processes to respond to most of the deficiencies
PDF page 3
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 3
November 16, 2026
3
preliminarily identified in the Order to Show Cause.1 This approach requires each PTO to develop their TO Tariff provisions on critical issues, including the application and study process; flexible transmission service; and cost-shifting mitigation. SCE appreciates that the ISOs/RTOs have significant regional differences that must be recognized. In light of the existing division of responsibilities between PTOs and the CAISO, SCE understands that the CAISO’s approach may be unique amongst ISOs/RTOs subject to the Commission’s Orders to Show Cause2 in having the PTOs address these issues in their own TO Tariffs. In the absence of CAISO direction or tariff changes applicable to Eligible Customers taking transmission service on behalf of large load, SCE understands that there will likely be some diversity as to the details and substance of the various TO Tariff filings in response to the Order to Show Cause. Each PTO starts with a unique tariff, and thus changes must necessarily conform to the unique features of each PTO tariff. Despite this necessary diversity among TO Tariffs, the Commission’s goals in issuing the Order nevertheless can and should be reached. As such, and particularly given the compressed timeline for responses to the Order to Show Cause, SCE believes uniformity in the PTOs’ tariffs should not be expected. Nonetheless, SCE understands it is aligned with PG&E, SDG&E, and LS Power in requiring security or upfront payments for network upgrades triggered by large loads, as well as exit fees, to help protect against cost shifting due to speculative or departing loads. SCE also understands that it and other PTOs are also implementing similar flexible interim interconnection proposals. Moreover, SCE has reached agreement with the CAISO and other PTOs on the foundational issue of the definition of Large Load.
1 CAISO Large Load Enhancements, Draft Final Proposal (“CAISO Draft Final Proposal”) (Sept. 24, 2026). Due to SCE submitting its compliance filing on the same day as the CAISO, SCE is basing its understanding of the CAISO’s expected filing on the CAISO Draft Final Proposal, which were accepted by the CAISO Board at its October 28, 2026 meeting, as well as the CAISO’s draft tariff language provided on October 30, 2026. See https://stakeholdercenter.caiso.com/StakeholderInitiatives/Large-loads.2 SCE has reviewed stakeholder postings as well as Section 205 and 206 filings already submitted by other ISOs and RTOs.
PDF page 4
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 4
November 16, 2026
4
II. RESPONSE TO SHOW CAUSE ORDER
In the Order to Show Cause, the Commission found that CAISO’s existing CAISO Tariff and/or the TO Tariffs preliminarily appear to be unjust, unreasonable, or unduly discriminatory or preferential.3 CAISO and the PTOs were directed to either file revised tariff language, or show cause as to why their tariffs remain just and reasonable and not unduly discriminatory or preferential without provisions addressing:
(a) the application process, study procedures, and ongoing operational requirements that apply to Eligible Customers seeking transmission service on behalf of large loads;
(b) additional transparency concerning the network upgrade costs to provide transmission service to Eligible Customers on behalf of large loads; and a pro forma cost recovery agreement between CAISO, the relevant transmission owner, and Eligible Customer taking transmission service on behalf of the large load to mitigate the risk of cost shifting among transmission customers, and a mechanism to ensure such payments are appropriately credited toward transmission owners’ transmission revenue requirements consistent with the Commission’s cost-of-service regulations;
(c) the rates, terms, and conditions of service that apply to co-location arrangements;
(d) transmission services that reflect Eligible Customers taking
transmission service on behalf of co-located loads, load with behind the meter generation, and flexible large loads that are willing and able to limit their use of the transmission system under certain conditions; and
3 Order at P 3.
PDF page 5
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 5
November 16, 2026
5
(e) the rates, terms, and conditions of service applicable to interconnection customers serving electrically proximate large load or co-located load[.]
In this filing, SCE proposes revisions to its TO Tariff in response to the concerns identified in the Order to Show Cause that are not being fully addressed by the CAISO in its own CAISO Tariff revisions. In coordination with the CAISO’s expected revisions to its own CAISO Tariff, SCE’s tariff revisions will connect large loads to the grid more efficiently, while also helping to shield existing ratepayers throughout the CAISO region from transmission costs linked to those large loads.
Currently, SCE’s TO Tariff governs the interconnection of certain loads to SCE’s transmission facilities that are under the operational control of the CAISO. Specifically, SCE’s TO Tariff was drafted in order to facilitate the interconnection of other transmission owners’ facilities to SCE’s transmission system as well as the interconnection of Load-Serving Entities’ (“LSEs”) transmission facilities to SCE’s facilities. In this filing, the body of SCE’s existing TO Tariff regarding Eligible Customer interconnections remains largely unchanged. Instead, SCE proposes to create a new Appendix titled the Large Load Interconnection Procedures (“LLIP”) to augment existing TO Tariff interconnection and cost responsibility sections with new provisions specifically tailored to the transmission interconnection of both Eligible Customers serving Large Loads and Large Loads that obtain their retail transmission service from SCE. The new LLIP will be used when such entities seek to interconnect to SCE’s transmission system; for all other interconnections under the TO Tariff, SCE’s existing TO Tariff provisions will apply. In developing the LLIP, SCE used Commission-approved Wholesale Distribution Access Tariff (“WDAT”) generator interconnection procedures as a starting point and revised the procedures where necessary to accommodate load requests.
PDF page 6
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 6
November 16, 2026
6
A. APPLICATION PROCESS, STUDY PROCEDURES, AND ONGOING
OPERATIONAL REQUIREMENTS
Order to Show Cause Section A (“Transmission Service to Eligible Customers on Behalf of Large Loads”) preliminarily found that CAISO’s Tariff and/or the TO Tariffs appear to be unjust and unreasonable because they lack provisions that address, with sufficient clarity and consistency, how CAISO and/or the Participating Transmission Owners will timely study (i.e., within 60-90 days of receiving the request) the provision of transmission service to Eligible Customers on behalf of large loads.4 Regarding the definition of large load, the Order preliminarily found that the CAISO’s Tariff and/or the TO Tariffs appear to be unjust and unreasonable because they lack a definition of large load, as a new category of load, including a load size and interconnection voltage threshold, which should be based on the characteristics of CAISO’s transmission system. The Commission ordered CAISO and/or the PTOs to explain whether their tariffs remain just and reasonable without such a definition or propose tariff revisions establishing their own definition of large load.5 The Commission was also concerned that CAISO’s existing Tariff and/or the TO Tariffs fail to deter speculative or duplicative requests for transmission service.6 Finally, the Commission suggested that a pro forma agreement to memorialize certain operational terms to support transmission system reliability, including the terms of any flexible transmission service arrangement, would be appropriate for inclusion in the CAISO Tariff and/or PTO Tariffs.7
1. Tariff Changes to Incorporate a Definition of Large Load
In Paragraph 57 of the Order, the Commission found that the CAISO and TO Tariffs lack a definition of large load and directed that an appropriate definition, including a load size and
4 Id. at P 38.5 Id. at P 57.6 Id. at P 55.7 Id. at P 64.
PDF page 7
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 7
November 16, 2026
7
interconnection voltage threshold, be based on the characteristics of CAISO’s transmission system. The Commission suggested that it would be reasonable to define a large load as a new commercial or industrial customer, located at a single site behind one or more points of interconnection, that has a peak load of 50 MW or greater, interconnects to the transmission system at a voltage level greater than 69 kV, and is not part of a co-location arrangement. To satisfy this directive, SCE proposes to incorporate the CAISO’s definition of “Large Load” into its TO Tariff. (See TO Tariff Section 3, stating that capitalized terms not defined in the TO Tariff shall be defined in the CAISO Tariff). Under the CAISO’s proposed tariff language, a “Large Load” is “[a]n End User located at a single site behind one or more points of interconnection to the CAISO Controlled Grid, and that has a peak load of 50 MW or greater.” SCE participated in the CAISO’s stakeholder process and supports this definition. The CAISO’s proposed definition as incorporated into SCE’S TO Tariff is just and reasonable and responsive to the Order for three reasons. First, it adopts the 50 MW peak load threshold suggested by the Commission, which the CAISO adopted and which the other PTOs now support. Second, because the definition applies to an End User located at a single site behind one or more points of interconnection to the CAISO Controlled Grid, it is based on the characteristics of CAISO’s transmission system, and it applies only to loads that interconnect to the transmission facilities placed under the CAISO’s Operational Control and governed by the TO Tariff. Loads interconnected to SCE’s distribution and sub-transmission systems are subject to the jurisdiction of the California Public Utilities Commission and are therefore outside the scope of the definition. Third, a uniform definition across the CAISO Tariff and the TO Tariffs will provide clarity and consistency and avoid conflicting definitions of the same term. The Large Load Interconnection Procedures, the Large Load Study Process Agreement, and the Transmission Security and Reliability Agreement described below apply to Large Loads as so defined.
PDF page 8
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 8
November 16, 2026
8
SCE notes that the CAISO has stated that it may refine the definition as NERC develops similar terms for computational loads. In the event the CAISO changes its definition in the future, SCE expects to conform its definition to maintain consistency across the tariffs.
2. Tariff Changes to Update Application Process
Consistent with the CAISO’s position, SCE proposes to continue to utilize the current framework of shared responsibilities among the CAISO and the PTOs for the interconnection of large loads to SCE’s transmission system. Under that framework, SCE is largely responsible for processing applications and studying new large loads, while the CAISO remains responsible for reviewing those studies and ensuring alignment with transmission planning activities. The Order preliminarily found that the TO Tariffs lack provisions that address, with sufficient clarity and consistency, how the PTOs will timely study (i.e., within 60-90 days of receiving the request) the provision of transmission service to Eligible Customers on behalf of large loads. SCE’s proposed Large Load Interconnection Procedures (“LLIP”), a new Appendix XV to the TO Tariff, address this concern by establishing a defined, time-bound application and study process for Large Loads. Although technically an “interconnection process,” the study process adopted ensures that power can be delivered to the Large Load under the CAISO’s unique transmission regime.
Critical to the LLIP are its eligibility criteria. The CAISO has expressed concern that existing provisions in the TO Tariffs apply only to a subset of Eligible Customers.8 SCE understands this language to acknowledge that not all transmission interconnections proceed through an Eligible Customer. Specifically, when SCE interconnects large loads that SCE will serve at retail, the TO Tariff does not require SCE to apply for an interconnection to itself as an Eligible Customer under the TO Tariff. A plain reading of the Order could suggest that SCE’s
8 Id. at P 83.
PDF page 9
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 9
November 16, 2026
9
own retail transmission customers should be excluded from obligations under the Order since SCE is not its own Eligible Customer. However, SCE does not believe that the Commission meant to exclude SCE’s own transmission-connected retail transmission customers from requirements that are within FERC’s jurisdiction and that concern the FERC-jurisdictional transmission system. For instance, SCE believes that it should be obligated to engage in the same study requirements and timelines regardless of whether the Large Load is SCE’s own retail transmission customer or whether the Large Load is provided retail transmission service (including bundled service) by another Eligible Customer, such as a Utility Distribution Company or MSS Operator. SCE’s LLIP thus applies the same transmission-related requirements to SCE’s own Large Load retail transmission customers as it does to Eligible Customers seeking to interconnect on behalf of Large Loads, subject to exceptions based on areas such as the evaluation of distribution upgrades for SCE’s own retail transmission customers that are exclusively within state law jurisdiction.
Accordingly, SCE has defined the Large Load Interconnection Customer to whom the LLIP applies as “an Eligible Customer that proposes to interconnect and sell retail transmission service to a Large Load except for when the Large Load Owner seeking to interconnect the Large Load with the Participating TO’s Transmission System will be a retail transmission customer of the Participating TO, in which case the Large Load Owner shall be the Large Load Interconnection Customer.” (LLIP Section 2.) To preserve jurisdictional boundaries, Large Load Owners who are retail transmission customers of SCE will still seek interconnection under the Local Regulatory Authority. However, the FERC-jurisdictional transmission-related procedures and obligations in the LLIP will also apply to those Large Loads that are SCE’s retail transmission customers. In response to the Commission’s Briefing Question at P 123, SCE notes that the LLIP also preserves existing commercial arrangements because it is only applicable to new Large Load requests for interconnection submitted after the Commission approves the TO
PDF page 10
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 10
November 16, 2026
10
Tariff changes. (LLIP Section 1.2, “This LLIP applies to all Large Loads seeking interconnection to Participating TO’s transmission system after the effective date of this Appendix XV to the TO Tariff.”)
Under the LLIP, a Large Load Interconnection Customer begins the process by
submitting an Interconnection Request using the form included as Attachment 1 to the LLIP, together with an Interconnection Study Deposit of $250,000, a Commercial Readiness Deposit equal to two times the study deposit, the technical data required by Appendix A to Attachment 1, and a demonstration of Site Control (LLIP Section 4.2.1). Within 10 Business Days of receipt, SCE, as the Participating TO, notifies the customer whether the request is valid, and a customer with a deficient request must cure it within the time provided in LLIP Section 4.3.2 (LLIP Sections 4.3.1 and 4.3.2). The Participating TO may defer the start of the study where higher- queued projects must be studied first, in which case it must notify the customer and provide monthly status updates (LLIP Section 4.4). Within 15 Business Days after the request is deemed valid, the Participating TO schedules a Scoping Meeting with the customer and, if applicable, the CAISO, to discuss Service Commencement Dates and interconnection options and to determine the Point of Interconnection (LLIP Section 4.5). Within 5 Business Days after the Scoping Meeting, the Participating TO provides the Large Load Study Process Agreement, which is included as Attachment 2 to the LLIP, and the customer must execute it within 30 Calendar Days after the Scoping Meeting or its Interconnection Request will be deemed withdrawn (LLIP Section 4.5). The agreement outlines the scope of the study (through the assumptions in its Appendix A), provides a non-binding good faith estimate of the study cost, and memorializes the customer’s obligation to pay the actual costs of the Interconnection Studies and to increase its Commercial Readiness Deposit after the final study report. It also permits the Participating TO to share study results with the CAISO, any Affected System Operator, and the Western Electricity Coordinating Council.
PDF page 11
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 11
November 16, 2026
11
The Participating TO then performs a serial Large Load Interconnection Study, which consists of a short circuit analysis, a power flow analysis, an electromagnetic transient (“EMT”) screening. The study identifies a non-binding good faith estimate of the scope and cost of the Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades, as applicable, that are required as a result of the Interconnection Request, and will also identify the need for any additional studies (LLIP Section 4.6.1.1). Where the Large Load will be a retail transmission customer of the Participating TO, the study evaluates the impact of the proposed interconnection on the safety and reliability of the Participating TO’s Transmission System and, if applicable, any Affected System, and does not evaluate Distribution Upgrades, which are governed by the Local Regulatory Authority. The study will also consider the use of alternative transmission technologies, including dynamic line ratings, advanced power flow control devices, advanced conductors, and transmission switching when evaluating transmission solutions (LLIP Section 4.6.1.1). The Participating TO shares the study results with the CAISO for review and concurrence under Section 25.7 of the CAISO Tariff, consistent with the CAISO’s role in reviewing those studies and ensuring alignment with transmission planning, as described above (LLIP Sections 4.6 and 4.6.1.2). If the Participating TO identifies a need for additional studies to comply with Applicable Reliability Standards, such as stability, variable load impact, or EMT analysis, they are performed as part of the scope of work under a new pro forma Transmission Security and Reliability Agreement (“TSRA”) at the customer’s cost (LLIP Section 4.6.3).
The LLIP provides firm timelines that are responsive to the Commission’s 60–90-day expectation. The Participating TO will use Reasonable Efforts to complete the Large Load Interconnection Study within 90 Calendar Days after execution of the Large Load Study Process Agreement (LLIP Section 4.6.1.2). A Report Meeting among the Participating TO, the CAISO (if applicable), and the Large Load Interconnection Customer must be held within 10 Business
PDF page 12
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 12
November 16, 2026
12
Days after the study report is provided to the customer to discuss the results, including assigned cost responsibility (LLIP Section 4.6.1.3). If the Participating TO will not meet the required timeframe, it must notify the customer of the schedule status and provide an estimated completion date with an explanation of why additional time is required (LLIP Section 4.6.1.2). After the Report Meeting, the customer may submit written comments, and the Participating TO will determine whether a revised study report is necessary and issue any revised report within 15 Business Days after the Report Meeting (LLIP Section 4.6.1.2).
The LLIP also includes provisions to ensure that Participating TO study resources are directed to commercially viable projects, which is discussed in Section II.A.3 below. Within 30 Calendar Days after receiving the final study report, the customer must increase its Commercial Readiness Deposit to 20% of its Large Load Network Upgrade cost assignment identified in the study, or its Interconnection Request will be deemed withdrawn (LLIP Section 4.6.1.4). Where the study shows that the full amount of a Large Load’s request cannot be accommodated until network upgrades are completed, the LLIP allows the customer to request an optional Flexible Interim Large Load Interconnection (“FILI”) Study after the Large Load Interconnection Study, to determine whether the Large Load may interconnect on a limited basis in the interim (LLIP Section 4.6.2). If the customer elects a FILI Study, the Participating TO will complete within 60 Calendar Days. This option is discussed in Section II.C below. Finally, NERC is still developing operational standards and study requirements that may affect the studies SCE needs to conduct. Further refinement of the LLIP may be required to conform with NERC standards.
3. Tariff Changes to Deter Speculative Large Load
The Order directed the CAISO and PTOs to address how their tariffs deter speculative or duplicative large load interconnection requests, which can consume study resources and create
PDF page 13
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 13
November 16, 2026
13
uncertainty in transmission planning. The LLIP addresses this concern by requiring each Large Load Interconnection Customer to demonstrate commercial readiness and financial commitment at each stage of the process, and by imposing financial consequences on customers that withdraw after study resources have been committed.
First, to be deemed valid, an Interconnection Request must be accompanied by an Interconnection Study Deposit of $250,000 and a Commercial Readiness Deposit equal to two times the study deposit, in the form of an irrevocable letter of credit, cash, a surety bond, or other security reasonably acceptable to the Participating TO (LLIP Sections 4.2.1 and 4.7.1). The Interconnection Study Deposit is applied to the prudent costs incurred by the Participating TO, the CAISO, or third parties to perform and administer the study (LLIP Section 4.2.1.1). The Commercial Readiness Deposit is refundable in accordance with LLIP Section 3.10.1, although the Participating TO may hold it until the Service Commencement Date, and it is retained as financial security for any Withdrawal Penalty. Within 30 Calendar Days after receiving the final study report, the customer must increase its Commercial Readiness Deposit to 20% of its Large Load Network Upgrade cost assignment identified in the study, or its Interconnection Request is deemed withdrawn (LLIP Section 4.6.1.4). As a result, the financial commitment required of a customer increases as the study identifies the upgrades the customer’s load would require. Second, the LLIP requires the customer to demonstrate Site Control at the time of its Interconnection Request (LLIP Section 4.2.1). Site Control means the exclusive land right to develop, construct, operate, and maintain the Large Load over the term of its expected operation, which may be shown by ownership of, a leasehold interest in, or a right to develop a site of sufficient size; an option to purchase or acquire a leasehold on such a site; or other documentation that clearly demonstrates the customer’s right to exclusively occupy such a site (LLIP Section 2). Requiring evidence of control over the site where the load will be located screens out requests from customers that have no realistic ability to build the project, and helps
PDF page 14
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 14
November 16, 2026
14
prevent multiple, duplicative requests for the same site. In addition, a customer that proposes a Service Commencement Date more than seven years after its request must demonstrate that the required engineering, permitting, and construction will take longer than seven years (LLIP Section 3.7.1).
Third, the LLIP imposes a Withdrawal Penalty that increases as the process advances (LLIP Section 3.10). A customer that withdraws its Interconnection Request, or is deemed withdrawn, before the Large Load Interconnection Study begins is not subject to a Withdrawal Penalty. If the customer withdraws, is deemed withdrawn, or otherwise does not achieve its Service Commencement Date at any point after the study begins, its Withdrawal Penalty will be the greater of (1) its $250,000 study deposit or (2) an amount determined by the stage at which the withdrawal occurs: (a) two times the actual cost of the study, if the customer withdraws or is deemed withdrawn during the study or after receipt of the study report; (b) 10% of its estimated Large Load Network Upgrade costs, if it withdraws or is deemed withdrawn after receipt of the draft TSRA but before it executes the TSRA or requests that the TSRA be filed unexecuted; or
(c) once it has executed the TSRA or requested that the TSRA be filed unexecuted, the amount calculated under the TSRA, which, before the Service Commencement Date, is the greater of 20% of its estimated Large Load Network Upgrade costs or the actual cost of any abandoned Large Load Network Upgrade facilities (LLIP Section 3.10.1(c); TSRA Appendix B). The penalty does not apply if the withdrawal has no material impact on the cost or timing of any equal or later queued request, or if the customer withdraws after receiving a study report in which its assigned Large Load Network Upgrade costs have increased by more than 25% over its preceding study report or by more than 100% over its initial Large Load Interconnection Study report (LLIP Section 3.10). A customer also is not subject to the penalty if it withdraws within 30 Calendar Days after an additional study increases those costs by more than 25% (LLIP Section 4.6.3). Once service begins, the customer is instead subject to the Exit Fee and
PDF page 15
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 15
November 16, 2026
15
Minimum Annual Revenue Obligation provisions of the TSRA, as described in Section II.B below.
Together, these provisions ensure that customers requesting study resources commit capital, provide evidence that the Large Load Owner controls the proposed site where the Large Load will be located, and bear the cost of withdrawing, which discourages speculative or duplicative requests.
4. Tariff Changes to Create a New Pro Forma Transmission Security and
Reliability Agreement
The Order directed the CAISO and PTOs to address the ongoing operational
requirements that apply to Eligible Customers taking transmission service on behalf of large loads, and to consider an agreement that memorializes the terms on which such service is provided. SCE proposes to address these requirements through the new pro forma TSRA, included as Attachment 3 to the LLIP. The TSRA is a standard-form agreement between the Large Load Interconnection Customer and SCE, as the Participating TO, that SCE tenders, together with draft appendices, after the Large Load Interconnection Study is complete (LLIP Section 5.1). It consolidates in one agreement the facilities, operational, reliability, and financial security terms applicable to the Large Load. The TSRA is executed only by the customer and SCE; the CAISO’s role in SCE’s new flexible interim interconnection service, FILI is reflected through a new Operating Conditions Agreement for Flexible Load Interconnection (“FILI Agreement”) among the customer, SCE, and the CAISO (LLIP Attachment 4), discussed below and in Section II.C. The TSRA has a term of 15 years from its effective date (TSRA Article 2.2). It consists of twenty-nine Articles, covering, among other things, term and termination (Article 2), regulatory filings (Article 3), scope of service (Article 4), engineering, procurement, and construction (Article 5), testing and inspection (Article 6), metering (Article 7),
PDF page 16
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 16
November 16, 2026
16
communications (Article 8), operations (Article 9), maintenance (Article 10), performance obligations and financial security (Article 11), invoices (Article 12), emergencies (Article 13), default (Article 17), indemnity and insurance (Article 18), confidentiality (Article 22), information requirements and audit rights (Articles 24 and 25), and disputes (Article 27), and of seven appendices (Appendices A through G).
The TSRA addresses ongoing operational and reliability requirements in several respects. It requires each party to comply with Applicable Reliability Standards and Electric Reliability Organization requirements and to share the information reasonably required for the other party to do so (TSRA Article 9.1). It requires the Participating TO and the CAISO to operate and control the Participating TO’s Transmission System in a safe and reliable manner, and it allows the Participating TO and the CAISO to provide operating instructions to the Large Load Interconnection Customer consistent with the TSRA and applicable operating protocols (TSRA Article 9.3). It requires the customer to operate the Large Load in a safe and reliable manner and in accordance with the requirements of its Balancing Authority Area, as set forth in Appendix D, and prohibits the customer from operating the Large Load in parallel with the Participating TO’s Transmission System without the Participating TO’s prior written approval (TSRA Article 9.3). The customer must also comply with the Participating TO’s Interconnection Handbook (TSRA Article 5.6.4); install a Remote Terminal Unit and provide telemetry before the Service Commencement Date (TSRA Article 8); design the Large Load to maintain a power factor between 0.99 leading and 0.97 lagging at the Point of Interconnection (TSRA Article 9.5.1); provide frequency and voltage ride-through capability (TSRA Article 9.6.1); and install system protection facilities and other protective devices (TSRA Article 9.6.3). The TSRA also provides for the exchange of switching and tagging rules and of disturbance analysis data, including oscillography, protective relay targets, breaker operations, and sequence of events records (TSRA Article 9); sets maintenance obligations for both parties (TSRA Article 10); and
PDF page 17
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 17
November 16, 2026
17
addresses Emergency Conditions, including the Participating TO’s authority to reduce service to, or disconnect, the Large Load (TSRA Article 13).
The TSRA also provides for the design, procurement, and construction of facilities needed to serve the Large Load (TSRA Article 5). The Participating TO uses Reasonable Efforts to complete its Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades by the dates in Appendix C (Article 5.1). Design and procurement begin once the Interconnection Studies are complete, the Participating TO has received the customer’s written authorization to proceed by the date specified in Appendix C, and the customer has provided the required security (Article 5.2). Construction begins once any required regulatory approvals and real property rights have been obtained and the customer has given its written authorization to proceed with construction (Article 5.3). That said, the (generally applicable) seven-year limit from service request to Service Commencement Date means that the customer must provide such written authorization at such a time that leaves sufficient time to complete facilities before this seven-year period runs out. The TSRA also requires the customer to provide specifications for its own interconnection facilities, initially at least 180 Calendar Days, and in final form at least 90 Calendar Days, before the Service Commencement Date, so that the Participating TO can confirm they are compatible with the Transmission System (Article 5.6.1).
For customers that elect FILI, TSRA Article 9.7 provides that the conditions and limitations applicable to FILI service, including curtailments, are specified in Appendix E to the TSRA. In addition, such customers must execute the FILI Agreement included as Attachment 4 to the LLIP with SCE and the CAISO before the Service Commencement Date (LLIP Section 4.6.2.1). That agreement describes the circumstances in which the CAISO or SCE may temporarily curtail the Large Load, and the mechanism that will be used to do so, consistent with Section 25.7.2 of the CAISO Tariff. FILI is discussed further in Section II.C below.
PDF page 18
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 18
November 16, 2026
18
The TSRA includes seven appendices (Appendices A through G) that are completed for each Large Load Interconnection Customer. Under LLIP Section 5.1, within 30 Calendar Days after the Report Meeting for the final Large Load Interconnection Study report (or the final FILI Study report, if applicable), the Participating TO tenders a draft TSRA together with draft appendices, and the customer has 30 Calendar Days to provide written comments or notify the Participating TO that it has none. The parties may negotiate the appendices for up to 60 Calendar Days after the final study report; the customer must then execute the TSRA, request that it be filed unexecuted, or initiate dispute resolution, or its Interconnection Request is deemed withdrawn, and the Participating TO may declare an impasse and file the TSRA unexecuted with the Commission within 21 Calendar Days (LLIP Sections 5.2 and 5.3). The appendices are described below.
Appendix A (Description of Participating TO’s Interconnection Facilities, Large Load Network Upgrades, Distribution Upgrades, Costs, Payments and Interconnection Financial Security) describes the scope of work for the Large Load Interconnection Customer’s Interconnection Facilities and for the Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades identified in the Large Load Interconnection Study, together with the associated cost estimates, payments, and security. The LLIP also defines the Point of Interconnection and the Point of Change of Ownership by reference to Appendix A.
Appendix B (Requirements for Mitigation of Potential Cost Shifting Related to New Transmission Facilities) is the central cost-shifting protection in the TSRA, as described in Section II.B below, and it is the appendix to which TSRA Articles 11.3, 11.4.2.1, and 11.4.2.3 refer.
Appendix C (Milestones) sets the dates for the design, procurement, and construction of the Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load
PDF page 19
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 19
November 16, 2026
19
Network Upgrades, against which the Participating TO uses Reasonable Efforts to complete its work (TSRA Article 5.1). It also sets the dates by which the customer must provide written authorization to proceed with design, procurement, and construction and post the required Interconnection Financial Security (TSRA Articles 5.2, 5.3, and 11.4). If the Participating TO reasonably expects that it will not meet a milestone date, it must promptly notify the customer in writing.
Appendix D (Interconnection Details) sets out the interconnection details and operating requirements with which the customer must operate the Large Load, which are updated as those requirements change (TSRA Article 9.3).
Appendix E (Flexible Interim Load Interconnection Conditions) applies only to customers that elect FILI. It is where the conditions and limitations of the interim service, including curtailments, are specified under TSRA Section 9.8, and it is used together with the FILI Agreement in Attachment 4 to the LLIP.
Appendix F (Security Arrangements Details) addresses the infrastructure security of the Participating TO’s Transmission System and Distribution System equipment and its operations and control hardware and software. It states the expectation that the CAISO, transmission providers, market participants, and Large Load Interconnection Customers interconnected to the Participating TO’s Transmission System will comply with infrastructure-protection recommendations and best practices, including physical, operational, and cyber-security practices.
B. COST SHIFTING MITIGATION
Order Section B (“Cost Shifting Risk Among Transmission Customers”) preliminarily found that CAISO’s Tariff and/or the TO Tariffs appear to be unjust and unreasonable because they lack adequate mechanisms to mitigate the risk of cost shifting among transmission
PDF page 20
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 20
November 16, 2026
20
customers, which may result in unjust and unreasonable rates for transmission service.9 In particular, the Commission was concerned about the apparent lack of (1) transparency regarding the assignment of network upgrades, and their associated costs, that are needed to provide transmission service to Eligible Customers on behalf of large loads; and (2) a pro forma cost recovery agreement to help ensure that Eligible Customers bear the risk and are ultimately responsible for costs incurred to provide transmission service, including the cost of network upgrades.10
The Order directed the CAISO and the PTOs to explain whether the tariffs remain just and reasonable without (1) robust, accurate, and systematic provision of data on CAISO’s website in a single location, and in an easily accessible format that is searchable and allows users to filter the data, regarding the cost for network upgrades needed to provide transmission service to Eligible Customers on behalf of large loads; and (2) a pro forma cost recovery agreement between CAISO, the relevant transmission owner, and the Eligible Customer taking transmission service on behalf of a large load, or to propose tariff revisions to provide additional transparency and establish such a pro forma cost recovery agreement.11
In response to the Order, the CAISO is not proposing changes to its Tariff to address cost shifting risk among transmission customers. Instead, as stated in the CAISO Draft Final Proposal, it believes it is prudent for cost allocation rules to be set forth in the PTO tariffs rather than the CAISO tariff.12 In the absence of CAISO tariff changes, changes to each PTO’s tariff will be required in order to mitigate cost shifting. Accordingly, SCE is proposing revisions to its TO Tariff to mitigate cost shifting risks associated with the interconnection of large loads to SCE’s transmission system. SCE understand the general framework and Large Load obligations
9 Id. at P 65.10 Id.11 Id. at P 66.12 CAISO Draft Final Proposal, p. 44.
PDF page 21
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 21
November 16, 2026
21
of SCE’s proposal are aligned with PG&E’s proposal. Each Large Load Interconnection Customer will be subject to these cost obligations.
1. Tariff Changes to Mitigate the Risk of Cost Shifting for Transmission
Facilities to Serve Large Load
The cost obligation provisions of SCE’s proposal are found in the LLIP and in the pro forma Transmission Security and Reliability Agreement (“TSRA”) (Attachment 3 to the LLIP). As discussed above in Section II.A.2, SCE understands that the Commission’s intent was not to exclude SCE’s own retail transmission customers from new FERC-jurisdictional, transmission- related obligations associated with transmission service to large loads (including obligations related to the avoidance of cost shifting). SCE’s LLIP transmission security requirements thus apply to either an Eligible Customer seeking to interconnect a Large Load, or where the Large Load Owner is SCE’s retail transmission customer, the Large Load Owner.
Obligating Large Load Owners who are SCE’s retail transmission customers to comply with cost shifting mitigation requirements is necessary in order to achieve the Commission’s goals of reducing the risk of cost shifting among transmission customers. As noted above in Section II.A.2, SCE does not interconnect to its own TO Tariff as an Eligible Customer of itself when interconnecting its own transmission retail customers to SCE’s transmission system. Even if SCE were, hypothetically, determined to be an Eligible Customer of itself, any cost obligations resulting from the construction of new SCE transmission facilities that are assigned to SCE would flow into SCE’s Formula Rate and thus, into the Transmission Access Charge (“TAC”) paid by all CAISO participants. Thus, obligating only SCE (as a fictional Eligible Customer) to pay transmission network upgrade costs would not satisfy the requirements of the Order to Show Cause to help prevent cost shifts among transmission customers since all of those costs would end up in the TAC regardless. In the absence of any state law obligation or voluntary
PDF page 22
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 22
November 16, 2026
22
agreement,13 SCE believes that obligating the Large Load Owner who is SCE’s retail transmission customer to provide cost shift mitigation security is thus required to comply with the Commission’s Order.
SCE’s proposal does not impermissibly invade the Local Regulatory Authority’s jurisdiction over retail customers, as it is clear that the Commission retains jurisdiction over the allocation of certain transmission costs. For instance, the Commission determines transmission rates for SCE’s retail rate classes in ruling on SCE’s Formula Rate, which is part of SCE’s TO Tariff. As discussed in Section II.A.2 above, SCE’s proposed tariff revisions align with jurisdictional boundaries, given that the Large Load Owners who are SCE’s retail transmission customers still seek interconnection through state law tariffs. The TSRA does not supplant those state law tariffs, but layers in additional cost provisions that are solely directed at FERC- jurisdictional costs for transmission system upgrades. Allocation for distribution system costs and distribution retail rates remains exclusively with the Local Regulatory Authority. The TSRA mitigates cost shifting for network upgrades through provisions located in TSRA Article 11 and Appendix B in three ways: (1) security for Large Load Network Upgrades triggered by the Large Load Interconnection Customer, and as applicable, any additional upgrades identified by the CAISO; (2) a 15-year minimum transmission revenue obligation backed by 5 years of security, which is meant to protect against stranded asset costs of broader network upgrades; and (3) exit fees for early termination. Collectively, these provisions help mitigate the potential for cost shifts to other transmission customers arising out of the interconnection of large loads where the large load does not materialize as planned or is not developed at all.1413 Currently no state law tariff requires SCE’s retail transmission customers to provide security or payments for transmission network upgrades that are necessary to serve their load.14 Order at P 82.
PDF page 23
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 23
November 16, 2026
23
First, the Large Load Interconnection Customer must provide Interconnection Financial Security at least 30 Calendar Days before work begins on the Large Load Network Upgrades attributable to it (TSRA Section 11.4.2.1). Large Load Network Upgrades are defined as “the additions, modifications, and upgrades to the CAISO Controlled Grid at or beyond the Point of Interconnection necessary to serve one or more Large Loads safely and reliably that are identified through the Large Load Interconnection Study and sent to the CAISO for concurrence pursuant to ISO Tariff Section 25.7.” (LLIP Section 2). That security equals the estimated cost of the upgrades, including engineering, procurement, construction, and overhead, and increases if the scope changes. In recognition of the reduced need for security to protect against cost shifting once the large load customer begins paying transmission rates, once retail service begins, the Large Load Interconnection Customer may reduce its associated security annually by 75% of the amount of MWh counted as Gross Load of the Large Load Interconnection Customer associated with withdrawals by the Large Load multiplied by the Regional Access Charge. Any balance remaining after fifteen years is drawn down and credited under SCE’s Formula Rate via the Transmission Revenue Balancing Account Adjustment (TO Tariff Article 3.106). Likewise, where the CAISO determines that additional cost-shifting protection is needed concerning shared network upgrade costs, the costs for such upgrades will be included in the security requirement. (TSRA Section 2, defining “ISO-Identified Network Upgrades.”) In the case where the Large Load Interconnection Customer is expected to drive significant additional transmission costs, the identification of ISO-Identified Network Upgrades will allow for additional cost-shifting protection.
Second, Appendix B imposes a Minimum Annual Revenue Obligation (“MARO”) so that the Large Load contributes to the transmission revenue requirement even if it does not ramp as planned. Each year’s MARO equals the Minimum Obligation Capacity (in MW) for that year,
PDF page 24
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 24
November 16, 2026
24
times the hours in the year, times 80% and 75%,15 times the Regional Access Charge. The rates are fixed for fifteen years, and a fifteen-year Minimum Capacity Schedule, reaching the customer’s Requested Maximum Load by Year 5, sets the capacity. A delay in the load’s ramp does not postpone scheduled increases. The MARO is intended to cover at least some of the transmission network costs associated with transmission service to the Large Load Interconnection Customer that are not identified as Large Load Network Upgrades. Such costs would include, for instance, shared network upgrades included in the CAISO’s TPP process to serve data center load growth, which could result in cost shifting to other transmission customers if the Large Load Interconnection Customer’s load does not materialize as expected. SCE reconciles the MARO annually. If the customer’s retail transmission revenues exceed the MARO, nothing further is due. Otherwise, SCE invoices the shortfall, payable within 30 Calendar Days, and the payment is treated as revenue providing a Transmission Revenue Credit in SCE’s Formula Rate process, which reduces the risk of transmission cost shifting to other transmission customers. The customer must also post security for the MARO equal to five years of the MARO at full capacity. If a shortfall goes unpaid for 60 Calendar Days, SCE may draw on that security, and the customer must replenish it within 30 Calendar Days. Third, the customer bears the cost of prematurely terminating service through exit fees. Before service begins, a customer that fails to take service owes a Withdrawal Penalty equal to the greater of 20% of its estimated Large Load Network Upgrade costs or the actual cost of abandoned facilities (TSRA Appendix B; LLIP Section 3.10.1(c)). After service begins, early termination triggers an Exit Fee equal to all remaining required security, including the MARO security, due within 30 Business Days, and SCE may draw on the security if it is not paid.
15 The 80% multiplier approximates the capacity factor of the Large Load, and the 75% multiplier represents the minimum payment threshold.
PDF page 25
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 25
November 16, 2026
25
Finally, in order to avoid creating duplicative credit support requirements, Section 11.4.2.4 provides that Large Load Interconnection Customer may avoid duplicative credit requirements by demonstrating to Participating TO that security or payments provided pursuant to a retail agreement with the Large Load Owner satisfies some portion of Large Load Interconnection Customer’s obligations.16
In the absence of CAISO direction on cost-shifting mitigation, SCE believes that it is important for the various PTOs to align, to the extent possible, on the approach to mitigation in order to ensure consistency across the CAISO territory. As noted, SCE understands that its cost shifting mitigation proposal shares key features with those of other PTOs. PG&E in particular is proposing substantively similar cost-shifting mitigation measures in its own tariff revisions, including an additional minimum revenue obligation intended to cover broader network upgrades above and beyond those Large Load Network Upgrades triggered by the Large Load. In response to the Commission’s Briefing Question at P 125, SCE believes that its proposed approach provides the appropriate structure and minimum level of protection to prevent unjust and unreasonable cost shifts among transmission customers related to network upgrade costs required for large loads at this time. SCE also supports the CAISO’s commitment to explore additional cost-shifting protection for non-FERC-jurisdictional PTOs in a future stakeholder process.1716 Order at P 82 (“We preliminarily find that an Eligible Customer may include a credit support or other financial security posted by a large load as part of a retail agreement to avoid creating duplicative credit support requirements.”)17 CAISO Draft Final Proposal, p. 42 (“The CAISO additionally recognizes the ultimate need to bring non-FERC jurisdictional PTOs into alignment with the cost allocation framework of the FERC- jurisdictional PTOs. The CAISO proposes to address this framework in a future CAISO stakeholder initiative and filing, once greater certainty exists around the mechanisms the PTOs propose to adopt to prevent cost-shifting under this Order.”)
PDF page 26
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 26
November 16, 2026
26
C. FLEXIBLE SERVICE
In Section D of the Order (“Extending New Transmission Services to Eligible Customers Taking Service on Behalf of Flexible Large Loads”), the Commission preliminarily found that the CAISO tariff may be unjust and unreasonable because it does not include transmission services that reflect Eligible Customers taking transmission service on behalf of flexible large loads that are willing and able to limit their use of the transmission system under certain conditions.18 The Order directed the CAISO to explain whether its Tariff remains just and reasonable without the transmission services described by the Commission in the PJM Co- Location Order, with regional variation as appropriate, being available to Eligible Customers taking transmission service on behalf of flexible large loads, or propose appropriate Tariff revisions.
As stated in the CAISO Draft Final Proposal, the CAISO is not proposing to create new “transmission services” or create more responsibilities around Eligible Customers, which would require redesigning transmission and interconnection service entirely.19 The CAISO does not believe such a redesign is warranted, and the Commission expressly invited the CAISO to explain alternative service frameworks that may enable similar flexibility. Instead, the CAISO proposes to create new, flexible interim interconnection service options that will enable large loads and co-located loads to limit their energy withdrawals or injections until the needed network upgrades are complete. The CAISO’s proposed name for this service is Flexible Interim Load Interconnection. The CAISO Draft Final Proposal indicated that PTOs will have the primary role in defining and implementing this interconnection service offering.20 For instance, CAISO has not proposed a pro forma FILI agreement as part of its tariff revisions. Instead, the
18 Order at P 104.19 CAISO Draft Final Proposal, p. 67.20 Id. at p. 66.
PDF page 27
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 27
November 16, 2026
27
CAISO tariff revisions indicate that each PTO will have its own pro forma agreement to memorialize the terms of any FILI arrangement.
In the CAISO Draft Final Proposal, the CAISO indicated that it sees value in development of permanent flexible service approach but defers the permanent offering to a future initiative.21 SCE concurs that there is value to developing a permanent flexible service and agrees that the CAISO will need to play a lead role in the development of that proposal. SCE continues to see customer benefits in flexibility and will actively participate in the CAISO’s future stakeholder process to develop that permanent flexible service.
Although the Order did not direct SCE, as a PTO, to provide an interim flexible service for large loads, SCE is supporting the CAISO’s proposed FILI in this filing, including by proposing its own pro forma FILI agreement.
1. Tariff Changes to Implement New Flexible Interim Interconnection Service SCE proposes tariff changes to implement FILI, which the LLIP defines as curtailable, interim transmission interconnection service for a Large Load, provided by the CAISO and the Participating TO, that enables the Large Load to interconnect before completion of specified Large Load Network Upgrades, Distribution Upgrades, or the Participating TO’s Interconnection Facilities. Specifically, SCE proposes to offer FILI through Sections 4.6.2 and 4.6.2.1 of the LLIP, Section 9.7 and Appendix E of the TSRA, and the new FILI Agreement.
To obtain FILI, a large load would first request interconnection under the LLIP. If the 90-day Large Load Interconnection Study finds that the full amount of the large load’s interconnection request cannot be accommodated without transmission network upgrades, the large load may request a FILI Study to determine (i) whether the Large Load may interconnect and begin receiving limited service before all upgrades are completed; (ii) the conditions and
21 Id. at p. 68.
PDF page 28
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 28
November 16, 2026
28
limitations of such service; (iii) the upgrades and the associated cost; and (iv) the estimated duration required to provide the limited service (LLIP Section 4.6.2).
The Large Load Interconnection Customer may request a FILI Study after the Large Load Interconnection Study. If the customer elects to proceed with a FILI Study, the Participating TO will complete the study within 60 Calendar Days (LLIP Section 4.6.2). The Participating TO will perform the FILI Study, and the Large Load Interconnection Customer will be responsible for the actual costs of the study. If at any time the Participating TO determines that it will not meet the required time frame for completing the FILI Study, it shall notify the customer of the schedule status and provide an estimated completion date with an explanation of the reasons why additional time is required. The Participating TO will share the results with the CAISO for review and concurrence, and if the customer requests it within 10 Business Days after the FILI Study report is issued, the Participating TO, the CAISO, and the customer will hold a Report Meeting (LLIP Section 4.6.2).
As detailed in Section 9.8 and Appendix E of the TSRA and in the FILI Agreement (Attachment 4 to the LLIP), large loads with FILI will be subject to the operational requirements to ensure that they do not cause reliability impacts on the grid, including potential curtailment. Once transmission network upgrades are completed, the Large Load will be able to have its full load served (i.e., receive firm service).
SCE understands other PTOs are also presenting similar FILI proposals in their tariff revisions.
D. PROXIMATE LARGE LOAD AND CO-LOCATED LOAD
In Section E (“Interconnection Customers Serving Electrically Proximate Large Load and Co-Located Load”), the Order found that that the CAISO tariff appears to be unjust and unreasonable because it does not contain provisions allowing an interconnection customer to seek the generator interconnection service(s) that reflects the operational dynamics of serving
PDF page 29
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 29
November 16, 2026
29
either: (1) an electrically proximate large load; or (2) a co-located load, as defined in the Order, that has a high peak load (i.e., large co-located loads that are 50 MW or greater).22 The Commission defined an “electrically proximate large load” as a large load “sufficiently electrically close to the interconnection customer’s requested point of interconnection, such that the impact on the transmission system of the combination of the generating facility and the load, with the exception of the transmission facilities between the two, will be effectively the same as if they were located at the same substation (e.g., large load that is located no more than two substations from the generating facility).”23 The Order did not direct SCE, as a PTO, to take any action regarding proximate large loads.
In the CAISO Draft Final Proposal, the CAISO proposes considering provisions for interconnection customers to serve electrically proximate large loads in a future stakeholder initiative.24 The CAISO stated that it intends to prioritize the more common stand-alone and co- located load and generator interconnections with this proposal and filing and will focus on proximate load and generation arrangements once the process for co-location is underway. SCE supports the CAISO’s proposal to consider provision regarding proximate load in a future stakeholder initiative.
In Section C (“Co-Location Arrangements and Load with Behind the Meter Generation”), the Commission preliminarily found the CAISO tariff to be deficient as it does not currently address the rates, terms, and conditions that apply to co-location arrangements.25 SCE supports the CAISO proposal to clarify how co-located large loads and generation may interconnect to and operate within the CAISO-controlled grid and will work with the CAISO to implement this proposal. SCE agrees with CAISO that the PTOs will continue to govern and study all load
22 Order at P 113.23 Id. at P 112.24 CAISO Draft Final Proposal, p. 69. The term interconnection customer is lower-cased and undefined, but presumably refers to a generator or a combination of generation and storage.25 Order at P 93.
PDF page 30
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 30
November 16, 2026
30
interconnection requests pursuant to their tariffs, and the CAISO will continue to govern and study wholesale generation interconnection requests of exporting generators. SCE also supports the CAISO proposal that new or existing large loads seeking to co-locate with new generation that may export energy to the transmission grid will require a CAISO interconnection study under the CAISO’s Resource Interconnection Standards, Appendix KK to the CAISO Tariff. The Commission also posed several Briefing Questions regarding co-located and proximate loads. In response to the Commission’s Briefing Question at P 124 regarding the impacts of new transmission services, SCE emphasizes that neither the CAISO nor SCE are proposing any new transmission services. Because no new transmission services are being proposed, there will be no impact of the introduction of new transmission services on transmission planning in the CAISO. Of note, neither the CAISO nor the PTOs are proposing “permanent flexibility” at this time. The CAISO has committed to an additional stakeholder process to explore the details on what “permanent flexibility” could encompass.26 SCE supports further exploration of permanent flexibility that has the potential to provide customer benefits including reduced transmission costs (for both the interconnecting customer and likely other transmission customers), as well as potential reliability benefits. Implementation of permanent flexibility is likely to impact multiple aspects of the transmission process, including interconnection, operations and planning. However, until the CAISO concludes this future process, it is premature to describe its impacts on the transmission planning process. With respect to the Briefing Questions at P 127 concerning co-located and proximate generators’ participation in the energy and ancillary services market and considerations regarding resource adequacy, SCE notes that the CAISO Tariff governs both participation in the CAISO’s energy and ancillary services market and how generating facilities count for the
26 CAISO Draft Final Proposal, p. 68.
PDF page 31
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 31
November 16, 2026
31
purposes of resource adequacy. Accordingly, SCE believes that these questions are best positioned for a response by CAISO.
1. Tariff Changes to Address Co-Located Load
As discussed above in Section II.A, all new Large Loads will be required to comply with the application and study procedures in the LLIP, as well as the operational requirements in the TSRA. This will include any Large Loads with non-exporting co-located generation. Additionally, SCE has incorporated specific provisions to address the Commission’s concerns about co-located loads, including:
• Scope of LLIP study for non-exporting co-located generation. Co- located generation serving a Large Load that will not export to the CAISO Controlled Grid is evaluated for impacts on SCE’s Transmission System as part of the LLIP study process, provided it is included in the Interconnection Request (LLIP Section 3.1). The Large Load
Interconnection Study identifies the impacts of the Large Load and the incremental impacts of non-exporting co-located generation that is not subject to short circuit duty dependence (LLIP Section 4.6.1.1).
• Exporting co-located generation. Co-located generation that will export to the CAISO Controlled Grid must submit a separate generator
interconnection request to the CAISO under Section 25.7.6 and Appendix KK of the CAISO Tariff, while the Large Load itself is evaluated under the LLIP (LLIP Section 3.1; LLIP Attachment 1).
• Interconnection Request form. LLIP Attachment 1 (Interconnection Request form) requires a description of any co-located generation, including whether it will export, its proposed date of initial operation, and
PDF page 32
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 32
November 16, 2026
32
gross Large Load and gross co-located generation reported separately (not netted); maximum net withdrawal with the generation online; the largest co-located unit or storage device that could trip; and firm and curtailable withdrawal requested when the generation is unavailable (which cannot exceed the requested maximum load). It also requires non-export control information, including ride-through capability and protection settings, the expected response of the generation and load to a sudden loss of either, protection coordination, and disturbance monitoring.
• Technical data. Large Loads co-locating with non-exporting generation must complete the applicable generator data in Appendix A to LLIP Attachment 1 (synchronous, induction, wind, or inverter-based), including power flow, dynamic and, if required, EMT models.
• Inverter standards. New LLIP Section 3.11 requires inverters in co- located generating facilities, including storage that later injects electricity, to meet UL-1741 and UL-1741 Supplement B certification.
• Study base case. The Base Case used for the Interconnection Studies may include Large Loads and any co-located generation (LLIP Section 2).
• Cost responsibility and security. Under TSRA Sections 11.3.1 and 11.4.2.2, the customer bears the full actual cost of, and must post security at least 30 Calendar Days before work begins on, Large Load Network Upgrades attributable to non-export co-located generation. Where the customer is SCE’s retail transmission customer, cost assignment and security follow SCE’s retail tariffs, subject to the Local Regulatory Authority.
PDF page 33
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 33
November 16, 2026
33
• Construction, testing and operation. The TSRA extends to co-located generation, where applicable, the as-built drawing and data requirements (Section 5.6.3); pre- and post-service testing, parallel-operation approval and right to observe testing (Sections 6.1–6.3); operation and maintenance obligations and coordination (Sections 9.4, 10.2, 10.3); synchronization (Section 9.5); and system protection and fault-removal requirements (Sections 9.7.4.1 and 9.7.5). The customer may not operate the co-located generation in parallel with SCE’s system without SCE’s prior written approval.
• Metering and changes in data. “Metering Equipment” includes metering at co-located generation, and the customer may not energize or operate the Large Load or co-located generation until SCE completes studies when the customer’s actual data differs materially from that originally provided (TSRA Article 24.3).
E. SUMMARY OF OTHER PROPOSED TARIFF CHANGES
In addition to the proposed changes described above, SCE is proposing revisions to the body of its TO Tariff that are necessary to incorporate the new LLIP and clarify certain provisions. These changes are summarized below.
i. The Table of Contents has been revised to add a new appendix, Appendix XV (Large Load Interconnection Procedures) and its Attachments 1 through 4.
ii. Sections 1 and 1.3 have been modified to clarify the entities that provide retail transmission service that may apply for Large Loads interconnections.
iii. The introduction of Section 3 has been revised to account for defined terms in Appendix XV. SCE has also revised the definition of a Transmission Revenue Credit to confirm that any remaining Interconnection Financial Security under the TSRA that has been drawn down by Participating TO will be included as a Transmission Revenue Credit in calculating SCE’s Transmission Revenue Balancing Account Adjustment.
PDF page 34
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 34
November 16, 2026
34
iv. Section 4 has been revised to clarify Eligible Customers who qualify for transmission service under the CAISO Tariff.
v. Section 7.1 has been revised to incorporate Appendix XV.
vi. Section 8.1 has been revised to incorporate the interconnection of Large Loads as a Participating TO obligation as governed by Appendix XV.
vii. Section 9.1 has been revised to indicate that expansions on behalf of Large Loads are governed by Appendix XV.
viii. Section 10.1 has been revised to indicate that requests for interconnection on behalf of Large Loads are governed by Appendix XV rather than the existing wholesale load procedures.
ix. Section 13.2 has been revised to reference Appendix XV, as applicable.
III. EFFECTIVE DATE
SCE requests that the Commission accept the tariff revisions submitted in this compliance filing effective as of February 16, 2027, 92 days after the date of this filing.
IV. CONTENTS OF FILING
Besides this transmittal letter, this filing includes these attachments:
Att. A
Clean TO Tariff sheets incorporating this compliance filing
Att. B
Red-lined document showing the revisions in this compliance filing
The Marked Tariff Attachment includes TO Tariff Sections 1, 3, 4, 7-10, and 13. SCE seeks a waiver of the need to redline TO Tariff Appendix XV, which is a brand new Appendix.
V. OTHER FILING REQUIREMENTS
No expenses or costs included in the rates tendered herein have been
alleged or judged in any administrative or judicial proceeding to be illegal, duplicative, or unnecessary costs that are demonstrably the product of discriminatory employment practices. SCE believes that the data contained in this letter and the attachments provide sufficient information upon which to approve this filing; however, to the extent necessary, SCE further requests that the Commission waive its filing requirements contained in Sections 35.5 and 35.13 of the Commission’s regulations (18 C.F.R. §§ 35.5 and 35.13).
PDF page 35
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 35
November 16, 2026
35
SCE believes that this filing conforms to any rule of general applicability and to any Commission order specifically applicable to SCE and, upon request, will make this letter and all enclosures available for public inspection in SCE’s principal office located in Rosemead, California. SCE has served copies of this transmittal to those persons whose names appear on the mailing list enclosed.
VI. CORRESPONDENCE
Pursuant to Rule 203(b)(3) of the Commission’s Rules of Practice and Procedure, SCE requests that all correspondence, pleadings, and other communications regarding the filing should be directed to the following:
Ellen Kenney
Senior Attorney
Southern California Edison Company
P.O. Box 800
Rosemead, CA 91770
Tel (626) 949-3825
Email: Ellen.Kenney@sce.com
With a copy to:
Jeffrey Nelson
Director, FERC Rates & Market Integration
Southern California Edison Company
P.O. Box 800
Rosemead, CA 91770
Tel (626) 302-4834
Email: Jeffrey.Nelson@sce.com
VII. NOTICE
In addition to serving the California Public Utilities Commission, SCE is serving notice of these proposed tariff revisions on all parties to EL26-71-000 and SCE’s TO Tariff customers.
PDF page 36
Ms. Debbie-Anne A. Reese, Secretary
Federal Energy Regulatory Commission
Page 36
November 16, 2026
36
VIII. CONCLUSION
For the reasons set forth above, SCE respectfully requests that the Commission accept SCE’s proposed tariff revisions as filed, and rescind the Order to Show Cause as to SCE’s TO Tariff.
Very truly yours,
/s/ Jeffrey Nelson
Jeffrey Nelson
Southern California Edison Company
Director, FERC Rates & Market Integration
PDF page 37
ATTACHMENT A
Clean TO Tariff Sheets
PDF page 38
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
TABLE OF CONTENTS
1. PREAMBLE … 1.1 Transmission Access for Participating TOs … 1.2 Transmission Access for Wheeling Customers … 1.3 Transmission Access for End-Users …
2. EFFECTIVE DATE …
3. TO DEFINITIONS …
4. ELIGIBILITY …
5. ACCESS CHARGES AND TRANSMISSION RATES … 5.1 Low Voltage Access Charge … 5.2 Wheeling Access Charge … 5.3 End-User Transmission Rates … 5.4 Transmission Revenue Requirement … 5.5 Transmission Revenue Balancing Account Adjustment (TRBAA) …
5.6 Transmission Access Charge Balancing Account Adjustment (TRBAA) …
6. ANCILLARY SERVICES - APPLICABILITY AND CHARGES …
7. BILLING AND PAYMENT … 7.1 End-Users … 7.2 Low Voltage Access Charge Revenues … 7.2.1 Billing Procedure … 7.2.2 Interest on Unpaid Balances … 7.2.3 Default … 7.3 Wheeling and Usage Charge Revenues …
8. OBLIGATION TO INTERCONNECT OR CONSTRUCT TRANSMISSION EXPANSIONS &
FACILITY UPGRADES … 8.1 Participating TO Obligation to Interconnect … 8.1.1 Interconnection to Transmission System … 8.1.1.1 Letter Agreement … 8.1.2 Costs Associated with Interconnection … 8.1.3 Interconnection Agreement … 8.1.4 Due Diligence to Construct … 8.1.5 Energization … 8.1.6 Coordination with ISO on Interconnection Requests …
8.2 Participating TO Obligation to Construct Transmission Expansions or Facility
Upgrades … 8.2.1 Obligation to Construct … 8.2.2 Local Furnishing Participating TO Obligation to Construct …
8.3 Request for FERC Deference Regarding Need Determination …
9. EXPANSION PROCESS … 9.1 Determination of Facilities … 9.1.1 Payment of Facilities Study’s Cost ....................................................................... Tariff Record Proposed Effective Date: 02/16/27
Version Number: 19.0.0
Option Code: A
PDF page 39
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
9.1.1.1 Market Participant to Pay for Facilities Study …
9.1.1.2 Project Sponsor or Project Proponent to Pay for Facilities Study …
9.1.1.3 Principal Beneficiaries to Pay for Facilities Study …
9.1.2 Payment Procedure … 9.1.3 Facilities Study Procedures … 9.2 Obligation to Build … 9.2.1 Due Diligence to Construct … 9.2.2 Delay in Construction or Expansion … 9.2.2.1 Alternatives to the Original Facility Additions …
9.2.2.2 Refund Obligation for Unfinished Facility Additions …
9.3 Provisions Relating To Transmission Construction On the Systems Of Other
TOs … 9.3.1 Responsibility for Third Party Additions … 9.3.2 Coordination of Third-Party System Additions … 9.3.3 Expansion by “Local Furnishing Participating TOs” …
10. INTERCONNECTION PROCESS … 10.1 Applicability … 10.2 Applications … 10.3 Interconnection Application … 10.4 Review of Completed Interconnection Application … 10.5 Notice of Need for System Impact Study … 10.6 System Impact Study Cost Reimbursement … 10.6.1 Cost Reimbursement … 10.6.2 Multiple Parties … 10.7 System Impact Study Procedures … 10.7.1 Procedures Upon Completion of System Impact Study …
10.8 Notice of Need for Facilities Study … 10.9 Facilities Study Procedures … 10.9.1 Execution of Interconnection Agreement … 10.10 Partial Interim Service … 10.11 Expedited Interconnection Procedures …
11. UNCONTROLLABLE FORCES AND INDEMNIFICATION …
11.1 Procedures To Follow if Uncontrollable Force Occurs …
11.2 Indemnification …
12. REGULATORY FILINGS … 12.1 Open Access … 12.2 STRANDED COST RECOVERY …
13. CREDITWORTHINESS … 13.1 UDCs, MSSs, and Scheduling Coordinators Using the Participating TO’s Low
Voltage Transmission Facilities … 13.2 End-Users …
14. DISPUTES …
15. RECOVERY OF RELIABILITY SERVICES COSTS …
16. MISCELLANEOUS … 16.1 Notices … 16.2 Waiver … 16.3 Confidentiality … 16.3.1 Maintaining Confidentiality If Not for Public Disclosure …
16.3.2 Disclosure of Confidential Information …
PDF page 40
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
16.4 TO Tariff Supersedes Existing Tariffs … 16.5 Titles … 16.6 Severability … 16.7 Preservation of Obligations … 16.8 Governing Law … 16.9 Appendices Incorporated … 16.10 Conflict With ISO Tariff … 16.11 Conflicting Operating Instructions … 16.12 Self Provision of Ancillary Services …
APPENDIX I - TRANSMISSION REVENUE REQUIREMENT ....................................................... APPENDIX II - CHARGES FOR WHOLESALE TRANSMISSION SERVICES …
APPENDIX III – TRANSMISSION RATES FOR END-USE SERVICE …
APPENDIX IV – RATES FOR CERTAIN ANCILLARY SERVICE BIDS …
APPENDIX V - NOTICES ............................................................................................................... APPENDIX VI - RELIABILITY SERVICES RATE SCHEDULE ..................................................... APPENDIX VII - INTERCONNECTION PROCEDURES IN EFFECT PRIOR TO JULY 1, 2005 ...
APPENDIX VIII – NOT USED ......................................................................................................... APPENDIX IX – FORMULA RATE ................................................................................................ APPENDIX X – RATE SCHEDULE FOR RECOVERY OF COSTS ASSOCIATED WITH
FACILITIES INSTALLED PURSUANT TO INTERCONNECTION AGREEMENTS.……………..
APPENDIX XI – TRANSMISSION MAINTENANCE AND COMPLIANCE REVIEW …
APPENDIX XII – STAKEHOLDER REVIEW PROCESS ............................................................... APPENDIX XIII – LETTER AGREEMENT ..................................................................................... APPENDIX XIV - WEST OF DEVERS FORMULA RATE……………………………… …
APPENDIX XV – LARGE LOAD INTERCONNECTION PROCEDURES…………………………..
PDF page 41
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
1. Preamble.
The Participating TO's revenue requirements and applicable rates and charges for transmission access over the ISO Controlled Grid and the terms and conditions for transmission expansion and interconnection are set forth in this TO Tariff and the ISO Tariff.
1.1 Transmission Access for Participating TOs.
Participating TOs are able to participate in the ISO and utilize the entire ISO Controlled Grid to serve their End-Use Customers. The applicable High Voltage Access Charges and Transition Charges shall be paid by Participating TOs to the ISO pursuant to the ISO Tariff. If a Participating TO utilizes the Low Voltage Transmission Facilities of another Participating TO, such Participating TO shall also pay the Low Voltage Access Charge of the other Participating TO.
1.2 Transmission Access for Wheeling Customers.
Wheeling allows Scheduling Coordinators to deliver Energy through or out of the ISO Controlled Grid to serve a load located outside the transmission or Distribution System of a Participating TO. Wheeling Access Charges shall be paid by Scheduling Coordinators to the ISO pursuant to the ISO Tariff.
1.3 Transmission Access for End-Users.
End-Users receive transmission service over the ISO Controlled Grid through the Utility Distribution Company, Small Utility Distribution Company, or MSS Operator to whose transmission or distribution facilities the End-User is directly connected. Charges to End-Users for access to the ISO Controlled Grid shall be paid to the applicable Utility
PDF page 42
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Distribution Company, Small Utility Distribution Company, or MSS Operator to whose transmission or distribution facilities the End-User is directly connected.
PDF page 43
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3. TO Definitions.
Capitalized terms used in this TO Tariff shall have the meanings set out below or in Appendix XV unless otherwise stated. Capitalized terms used in this tariff and not defined below or in Appendix XV shall have the meanings set out in the ISO Tariff. 3.1
Access Charge. A charge paid by all UDCs, MSSs and, in certain cases, Scheduling Coordinators, delivering Energy to Gross Load, as set forth in Section 26.1 of the ISO Tariff. The Access Charge includes the High Voltage Access Charge, the Transition Charge, and the Low Voltage Access Charge.
3.2
Automatic Generation Control (AGC). Generation equipment that
automatically responds to signals from the ISO’s EMS control in real time to control the power output of electric generators within a prescribed area in response to a change in system frequency, tieline loading, or the relation of these to each other, so as to maintain the target system frequency and/or the established interchange with other areas within the predetermined limits.
3.3
Ancillary Services. Regulation, Spinning Reserve, Non-Spinning Reserve, Voltage Support and Black Start together with such other interconnected operation services as the ISO may develop in cooperation with Market Participants to support the transmission of Energy from Generation resources to Loads while maintaining reliable operation of the ISO Controlled Grid in accordance with Good Utility Practice.
Tariff Record Proposed Effective Date: 05/01/2026
Version Number: 16.0.0
Option Code: A
PDF page 44
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.4
Applicable Reliability Criteria. The reliability standards established by NERC, WECC, and Local Reliability Criteria as amended from time to time, including any requirements of the Nuclear Regulatory Commission.
3.5
Available Transfer Capacity. For a given transmission path, the capacity rating in MW of the path established consistent with ISO and WECC transmission capacity rating guidelines, less any reserved uses applicable to the path. 3.6
Base Transmission Revenue Requirement. The Transmission Revenue Requirement before deducting the Transmission Revenue Balancing Account Adjustment (TRBAA) and, for wholesale purposes, before deducting Standby Transmission Revenues.
3.7
Black Start. The procedure by which a Generating Unit self-starts without an external source of electricity thereby restoring power to the ISO Controlled Grid following system or local area blackouts.
3.8
Business Day. Monday through Friday, excluding federal holidays and the day after Thanksgiving Day.
3.9
(Omitted)
3.10 Completed Application Date. The date on which a party submits an Interconnection Application that satisfies the requirements of a Completed Interconnection Application.
3.11 Completed Interconnection Application. An Interconnection Application that satisfies all of the information and other requirements of Section 10.3 of this TO Tariff.
PDF page 45
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.12 Congestion. A condition that occurs when there is insufficient Available Transfer Capacity to implement all Preferred Schedules simultaneously or, in real time, to serve all Generation and Demand. “Congested” shall be construed accordingly. 3.13 Congestion Management. The alleviation of Congestion in accordance with applicable ISO Protocols and Good Utility Practice.
3.14 Converted Rights. Those transmission service rights as defined in Section 4.3.1.6 of the ISO Tariff.
3.15 CPUC. The California Public Utilities Commission, or its successor. 3.16 (Omitted)
3.17 Demand. The rate at which Energy is delivered to Loads and Scheduling Points by Generation, transmission or distribution facilities. It is the product of voltage and the in-phase component of alternating current measured in units of watts or standard multiples thereof, e.g., 1,000W = 1kW, 1,000kW = 1MW, etc.
3.18 Direct Assignment Facilities. Facilities or portions of facilities that are owned by the Participating TO necessary to physically and electrically interconnect a particular party requesting Interconnection under this TO Tariff to the ISO Controlled Grid at the point of interconnection. Direct Assignment Facilities shall be specified in the Interconnection Agreement that governs Interconnection service to such party and shall be subject to FERC approval.
3.19 Dispatch. The operating control of an integrated electric system to: i) assign specific Generating Units and other sources of supply to effect the supply to meet the relevant area Demand taken as Load rises or falls; ii) control operations and maintenance of high voltage lines, substations, and equipment, including administration
PDF page 46
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
of safety procedures; iii) operate interconnections; iv) manage Energy transactions with other interconnected Control Areas; and v) curtail Demand.
3.20 Distribution System. The distribution assets of a TO, UDC, or MSS. 3.21 Eligible Customer. (i) Any utility (including Participating TOs, Market Participants and any power marketer), Federal power marketing agency, or any person generating Energy for sale or resale; Energy sold or produced by such entity may be Energy produced in the United States, Canada or Mexico; however, such entity is not eligible for transmission service that would be prohibited by Section 212(h)(2) of the Federal Power Act; and (ii) any retail customer taking unbundled transmission service pursuant to a state retail access program or pursuant to a voluntary offer of unbundled retail transmission service by the Participating TO.
3.22 Encumbrance. A legal restriction or covenant binding on the Participating TO that affects the operation of any transmission lines or associated facilities and which the ISO needs to take into account in exercising Operational Control over such transmission lines or associated facilities if the Participating TO is not to risk incurring significant liability. Encumbrances shall include Existing Contracts and may include: (1) other legal restrictions or covenants meeting the definition of Encumbrance and arising under other arrangements entered into before the ISO Operations Date, if any; and (2) legal restrictions or covenants meeting the definition of Encumbrance and arising under a contract or other arrangement entered into after the ISO Operations Date. 3.23 End-Use Customer or End-User. A purchaser of electric power who purchases such power to satisfy a Load directly connected to the ISO Controlled Grid or to a Distribution System and who does not resell the power.
PDF page 47
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.24 Energy. The electrical energy produced, flowing or supplied by generation, transmission or distribution facilities, being the integral with respect to time of the instantaneous power, measured in units of watt-hours or standard multiples thereof, e.g., 1,000 Wh = 1kWh, 1,000 kWh = 1MWh, etc.
3.25 Entitlements. The right of the Participating TO obtained through contract or other means to use another entity's transmission facilities for the transmission of Energy.
3.26 Existing Contracts. The contracts which grant transmission service rights in existence on the ISO Operations Date (including any contracts entered into pursuant to such contracts) as may be amended in accordance with their terms or by agreement between the parties thereto from time to time.
3.27 Existing Rights. The transmission service rights and obligations of non- Participating TOs under Existing Contracts, including all terms, conditions, and rates of the Existing Contracts, as they may change from time to time under the terms of the Existing Contracts.
3.28 Expedited Interconnection Agreement. A contract between a party which has submitted a Request for Expedited Interconnection Procedures and the Participating TO under which the Participating TO agrees to process, on an expedited basis, the Completed Interconnection Application of such party and which sets forth the terms, conditions, and cost responsibilities for such interconnection.
3.29 Facilities Study Agreement. An agreement between a Participating TO and either a party requesting Interconnection to the ISO Controlled Grid, Market Participant, Project Sponsor, or identified principal beneficiaries pursuant to which the party
PDF page 48
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
requesting such Interconnection, Market Participants, Project Sponsor, or identified principal beneficiaries agrees to reimburse the Participating TO for the cost of performing or reviewing a Facilities Study.
3.30 Facility or Facilities Study. An engineering study conducted to determine required modifications to the Participating TO’s transmission system, including the estimated cost and scheduled completion date for such modifications that will be required to provide needed services.
3.31 FERC. The Federal Energy Regulatory Commission or its successor. 3.32 FPA. Parts II and III of the Federal Power Act, 16 U.S.C. § 824 et seq., as they may be amended from time to time.
3.33 FTR (Firm Transmission Right). A contractual right, subject to the terms and conditions of the ISO Tariff, that entitles the FTR Holder to receive, for each hour of the term of the FTR, a portion of the Usage Charges received by the ISO for transportation of energy from a specific originating Zone to a specific receiving Zone and, in the event of an uneconomic curtailment to manage Day-Ahead congestion, to a Day-Ahead scheduling priority higher than that of a schedule using Converted Rights capacity that does not have an FTR.
3.34 FTR Holder. The owner of an FTR, as registered with the ISO.
3.35 Generating Unit. An individual electric generator and its associated plant and apparatus whose electrical output is capable of being separately identified and metered or a Physical Scheduling Plant that, in either case, is: (a) located within the ISO Control Area; (b) connected to the ISO Controlled Grid, either directly or via interconnected
PDF page 49
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
transmission, or distribution facilities; and (c) that is capable of producing and delivering net Energy (Energy in excess of a generating station’s internal power requirements). 3.36 Generation. Energy delivered from a Generating Unit.
3.37 Good Utility Practice. Any of the practices, methods, and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period, or any of the practices, methods, and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety, and expedition. Good Utility Practice is not intended to be any one of a number of the optimum practices, methods, or acts to the exclusion of all others, but rather to be acceptable practices, methods, or acts generally accepted in the region.
3.38 Gross Load. Gross Load is all Energy (adjusted for distribution losses) delivered for the supply of End-User Loads directly connected to the transmission facilities or Distribution System of the Participating TO. Gross Load shall exclude the portion of the Load of an individual End-Use Customer of the Participating TO that is served by a Generating Unit that: (a) is located on the customer's site or provides service to the customer's site through over-the-fence arrangements as authorized by Section 218 of the California Public Utilities Code; (b) is a qualifying small power production facility or qualifying cogeneration facility, as those terms are defined in the FERC's regulations implementing Section 201 of the Public Utility Regulatory Policies Act of 1978; (c) was serving the customer's Load on or before March 31, 2000; and (d) secured Standby Service from the Participating TO under terms approved by a Local
PDF page 50
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Regulatory Authority or FERC, as applicable, as of March 31, 2000 and continues to secure Standby Service from the Participating TO or can be curtailed concurrently with an outage of the Generating Unit serving the Load.
3.39 High Voltage Access Charge. A component of the Access Charge determined by the ISO and assessed to the Participating TO under Section 26.1 of the ISO Tariff. 3.40 High Voltage Existing Contracts Access Charge. A charge for access to the ISO Controlled Grid under certain specified Existing Contracts to be paid by the Existing Contract holder to the Participating TO. Such rate shall be calculated by dividing the High Voltage Transmission Revenue Requirement applicable to wholesale customers by the sum of Edison’s twelve monthly retail system peak demands measured at the ISO Controlled Grid level, consistent with such revenue requirement. 3.41 High Voltage Transmission Facility. A transmission facility under the operational control of the ISO that is owned by the Participating TO or to which the Participating TO has an Entitlement that is represented by a Converted Right and that operates at a voltage at or above 200 kilovolts, and supporting facilities, and the costs of which are not directly assigned to one or more specific customers. 3.42 High Voltage Transmission Revenue Requirement. The portion of the Participating TO's TRR associated with and allocable to the Participating TO's High Voltage Transmission Facilities and Converted Rights associated with High Voltage Transmission Facilities.
3.43 High Voltage Utility-Specific Rate. The Participating TO's High Voltage Transmission Revenue Requirement divided by the Participating TO's forecasted Gross Load.
PDF page 51
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.44 High Voltage Wheeling Access Charge. The Wheeling Access Charge
assessed by the ISO associated with the recovery of the Participating TOs' High Voltage Transmission Revenue Requirements in accordance with Section 26.1 of the ISO Tariff.
3.45 (Omitted)
3.46 Interconnection. Transmission facilities, other than additions or replacements to existing facilities that: i) connect one system to another system where the facilities emerge from one and only one substation of the two systems and are functionally separate from the ISO Controlled Grid facilities such that the facilities are, or can be, operated and planned as a single facility; or ii) are identified as radial transmission lines pursuant to contract; or iii) produce Generation at a single point on the ISO Controlled Grid; provided that such interconnection does not include facilities that, if not owned by the Participating TO, would result in a reduction in the ISO’s Operational Control of the Participating TO’s portion of the ISO Controlled Grid.
3.47 Interconnection Agreement. A contract between a party requesting
Interconnection and the Participating TO that owns the transmission facility with which the requesting party wishes to interconnect.
3.48 Interconnection Application. An application that requests Interconnection to the ISO Controlled Grid.
3.49 Interest. Interest shall be calculated in accordance with the methodology specified for interest on refunds in the regulations of FERC at 18 C.F.R. §35.19(a)(2)(iii)(1996). Interest on delinquent amounts shall be calculated from the due
PDF page 52
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
date of the bill to the date of payment. When payments are made by mail, bills shall be considered as having been paid on the date of receipt.
3.50 Independent System Operator (“ISO”). The California Independent System Operator Corporation, a state chartered, nonprofit corporation that controls the transmission facilities of all Participating TOs and dispatches certain Generating Units and Loads.
3.51 ISO ADR Procedures. The procedures for resolution of disputes or differences set out in Section 13 of the ISO Tariff, as amended from time to time. 3.52 ISO Controlled Grid. The system of transmission lines and associated facilities of the Participating TOs that have been placed under the ISO’s Operational Control. 3.53 ISO Protocols. The rules, protocols, procedures and standards promulgated by the ISO (as amended from time to time) to be complied with by the ISO Scheduling Coordinators, Participating TOs and all other Market Participants in relation to the operation of the ISO Controlled Grid and the participation in the markets for Energy and Ancillary Services in accordance with the ISO Tariff.
3.54 ISO Tariff. The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time.
3.55 Load. An end-use device of an End-Use Customer that consumes power. Load should not be confused with Demand, which is the measure of power that a Load receives or requires.
3.56 (Omitted)
PDF page 53
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.57 Local Furnishing Bond. Tax-exempt bonds utilized to finance facilities for the local furnishing of electric energy, as described in section 142(f) of the Internal Revenue Code, 26 U.S.C. § 142(f).
3.58 Local Furnishing Participating TO. Any Tax-Exempt Participating TO that owns facilities financed by Local Furnishing Bonds.
3.59 Local Publicly Owned Electric Utilities. A municipality or municipal corporation operating as a public utility furnishing electric service, a municipal utility district furnishing electric service, a public utility district furnishing electric services, an irrigation district furnishing electric services, or a joint powers authority that includes one or more of these agencies and that owns Generation or transmission facilities, or furnishes electric services over its own or its members’ electric Distribution System. 3.60 Local Regulatory Authority. The state or local governmental authority responsible for the regulation or oversight of a utility.
3.61 Local Reliability Criteria. Reliability criteria established at the ISO Operations Date, unique to the transmission systems of each of the Participating TOs. 3.62 Low Voltage Access Charge. The Access Charge applicable under Section 26.1 of the ISO Tariff to recover the Low Voltage Transmission Revenue Requirement of the Participating TO.
3.63 Low Voltage Existing Contracts Access Charge. A charge for access to the ISO Controlled Grid under certain specified Existing Contracts to be paid by the Existing Contract holder to the Participating TO. Such rate shall be calculated by dividing the Low Voltage Transmission Revenue Requirement applicable to wholesale customers by
PDF page 54
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
the sum of Edison’s twelve monthly retail system peak demands measured at the ISO Controlled Grid level, consistent with such revenue requirement.
3.64 Low Voltage Transmission Facility. A transmission facility under the operational control of the ISO owned by the Participating TO or to which the Participating TO has an Entitlement that is represented by a Converted Right, which is not a High Voltage Transmission Facility, and supporting facilities, and the costs of which are not directly assigned to one or more specific customers.
3.65 Low Voltage Transmission Revenue Requirement. The portion of the Participating TO's TRR associated with and allocable to the Participating TO's Low Voltage Transmission Facilities and Converted Rights associated with Low Voltage Transmission Facilities.
3.66 Low Voltage Wheeling Access Charge. The Wheeling Access Charge associated with the recovery of the Participating TO's Low Voltage Transmission Revenue Requirement in accordance with Section 26.1 of the ISO Tariff. 3.67 Market Participant. An entity, including a Scheduling Coordinator, who participates in the Energy marketplace through the buying, selling, transmission, or distribution of Energy or Ancillary Services into, out of, or through the ISO Controlled Grid.
3.68 MSS (Metered Subsystem). A geographically contiguous system located within a single zone which has been operating as an electric utility for a number of years prior to the ISO Operations Date as a municipal utility, water district, irrigation district, State agency or Federal power administration subsumed within the ISO Control Area and encompassed by ISO certified revenue quality meters at each interface point with the
PDF page 55
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
ISO Controlled Grid and ISO certified revenue quality meters on all Generating Units or, if aggregated, each individual resource and Participating Load internal to the system, which is operated in accordance with a MSS agreement described in Section 4.9.1 of the ISO Tariff.
3.69 NERC. The North American Electric Reliability Council or its successor. 3.70 (Omitted)
3.71 (Omitted)
3.72 New High Voltage Transmission Facility. A High Voltage Transmission Facility of the Participating TO that enters service after the beginning of the transition period described in Section 4 of Schedule 3 of Appendix F of the ISO Tariff, or a capital addition made after the beginning of the transition period described in Section 4.2 of Schedule 3 of Appendix F of the ISO Tariff to an Existing High Voltage Transmission Facility.
3.73 New Participating TO. A Participating TO that is not an Original Participating TO.
3.74 Non-Participating TO. A TO that is not a party to the TCA or for the purposes of Section 16.1 of the ISO Tariff the holder of transmission service rights under an Existing Contract that is not a Participating TO.
3.75 Non-Spinning Reserve. The portion of off-line generating capacity that is capable of being synchronized and ramping to a specified load in ten minutes (or load that is capable of being interrupted in ten minutes) and that is capable of running (or being interrupted) for at least two hours.
PDF page 56
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.76 Operational Control. The rights of the ISO under the Transmission Control Agreement and the ISO Tariff to direct Participating TOs how to operate their transmission lines and facilities and other electric plant affecting the reliability of those lines and facilities for the purpose of affording comparable non-discriminatory transmission access and meeting Applicable Reliability Criteria.
3.77 Original Participating TO. A Participating TO that was a Participating TO as of January 1, 2000. The Original Participating TOs are Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company. 3.78 Participating TO. A party to the TCA whose application under Section 2.2 of the TCA has been accepted and who has placed its transmission assets and Entitlements under the ISO’s Operational Control in accordance with the TCA. A Participating TO may be an Original Participating TO or a New Participating TO. For purposes of this TO Tariff, the Participating TO is Southern California Edison Company.
3.79 Participation Agreement. An agreement between a Participating TO and a Project Sponsor that specifies the terms and conditions under which the Participating TO will construct a transmission addition or upgrade on behalf of the Project Sponsor. 3.80 Physical Scheduling Plant. A group of two or more related Generating Units, each of which is individually capable of producing Energy, but which either by physical necessity or operational design must be operated as if they were a single Generating Unit and any Generating Unit or Units containing related multiple generating components which meet one or more of the following criteria: i) multiple generating components are related by a common flow of fuel which cannot be interrupted without a substantial loss of efficiency of the combined output of all components; ii) the Energy
PDF page 57
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
production from one component necessarily causes Energy production from other components; iii) the operational arrangement of related multiple generating components determines the overall physical efficiency of the combined output of all components; iv) the level of coordination required to schedule individual generating components would cause the ISO to incur scheduling costs far in excess of the benefits of having scheduled such individual components separately; or v) metered output is available only for the combined output of related multiple generating components and separate generating component metering is either impractical or economically inefficient. 3.81 (Omitted)
3.82 Project Proponent. A Market Participant or group of Market Participants that: (i) advocates a transmission addition or upgrade; (ii) is unwilling to pay the full cost of the proposed transmission addition and upgrade, and thus is not a Project Sponsor; and (iii) initiates proceedings under the ISO ADR Procedures to determine the need for the proposed transmission addition or upgrade.
3.83 Project Sponsor. A Market Participant or group of Market Participants or a Participating TO that proposes the construction of a transmission addition or upgrade in accordance with Section 24 of the ISO Tariff.
3.84 Regional Transmission Group (“RTG”). A voluntary organization approved by FERC and composed of transmission owners, transmission users, and other entities, organized to efficiently coordinate the planning, expansion and use of transmission on a regional and inter-regional basis.
3.85 Regulation. The service provided either by Generating Units certified by the ISO as equipped and capable of responding to the ISO’s direct digital control (AGC) signals,
PDF page 58
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
or by System Resources that have been certified by the ISO as capable of delivering such service to the ISO Balancing Authority Area, in an upward and downward direction to match, on a Real-Time basis, Demand and resources, consistent with established Applicable Reliability Criteria. Regulation is used to control the power output of electric generators within a prescribed area in response to a change in system frequency, tieline loading, or the relation of these to each other so as to maintain the target system frequency and/or the established Interchange with other Balancing Authority Areas within the predetermined Regulation Limits. Regulation includes both the increase of output by a Generating Unit or System Resource (Regulation Up) and the decrease in output by a Generating Unit or System Resource (Regulation Down). Regulation Up and Regulation Down are distinct capacity products, with separately stated requirements and ASMPs in each Settlement Period.
3.86 Reliability Criteria. Pre-established criteria that are to be followed in order to maintain desired performance of the ISO Controlled Grid under contingency or steady state conditions.
3.87 Reliability Services. Those services provided by the ISO: 1) that are deemed by the ISO as necessary to maintain reliable electric service in the ISO Control Area; and 2) whose costs are billed by the ISO to the Participating TO pursuant to the ISO Tariff. Reliability Services include services obtained from: Reliability Must-Run units; and generators committed pursuant to the ISO’s Exceptional Dispatch authority, which includes any costs of Exceptional Dispatches as well as any default costs allocated to the Participating TO resulting from its incurrence of Exceptional Dispatch costs pursuant to Section 11.29.17.2.1 of the CAISO Tariff.
PDF page 59
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.88 Reliability Upgrade. The transmission facilities, other than Direct Assignment Facilities, beyond the first point of Interconnection necessary to interconnect a wholesale load safely and reliably to the ISO Controlled Grid, which would not have been necessary but for the Interconnection of a wholesale load, including network upgrades necessary to remedy short circuit or stability problems resulting from the interconnection of a wholesale load to the ISO Controlled Grid. Reliability Upgrades also include, consistent with WECC practice, the facilities necessary to mitigate any adverse impact a wholesale load’s interconnection may have on a path’s WECC path rating. Reliability Upgrades shall be specified in the Interconnection Agreement that governs Interconnection service to the wholesale load and shall be subject to FERC approval.
3.89 (Omitted).
3.90 Request for Expedited Interconnection Procedures. A written request by which an applicant for Interconnection can request expedited processing of its Interconnection Application.
3.91 Scheduling Coordinator. An entity certified by the ISO for the purposes of undertaking the functions specified in Section 4.5.3 of the ISO Tariff. 3.92 Scheduling Point. A location at which the ISO Controlled Grid is connected, by a group of transmission paths for which a physical, non-simultaneous transmission capacity rating has been established for Congestion Management, to transmission facilities that are outside the ISO’s Operational Control.
PDF page 60
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.93 Spinning Reserve. The portion of unloaded synchronized generating capacity that is immediately responsive to system frequency and that is capable of being loaded in ten minutes, and that is capable of running for at least two hours. 3.94 Standby Rate. A rate assessed a Standby Service Customer by the Participating TO, as approved by the Local Regulatory Authority, or FERC, as applicable, for Standby Service which compensates the Participating TO, among other things, for costs of High Voltage Transmission Facilities.
3.95 Standby Service. Service provided by the Participating TO which allows a Standby Service Customer, among other things, access to High Voltage Transmission Facilities for the delivery of backup power on an instantaneous basis to ensure that Energy may be reliably delivered to the Standby Service Customer in the event of an outage of a Generating Unit serving the customer's Load.
3.96 Standby Service Customer. A retail End-Use Customer of the Participating TO that receives Standby Service and pays a Standby Rate.
3.97 Standby Transmission Revenue. The transmission rate revenues associated with Standby Service collected by the Participating TO from those Standby Service Customers who are not billed for Standby Service on a Gross Load basis. 3.98 System Impact Study. An engineering study conducted to determine whether a request for Interconnection to the ISO Controlled Grid would require new transmission additions, upgrades, or other mitigation measures.
3.99 System Impact Study Agreement. An agreement between a Participating TO and an entity that has requested Interconnection to the Participating TO’s transmission
PDF page 61
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
system pursuant to which the entity requesting Interconnection agrees to reimburse the Participating TO for the cost of performing or reviewing a System Impact Study. 3.100 TO Tariff. This Transmission Owner Tariff, as it may be amended or superseded.
3.101 Transition Charge. A component of the Access Charge determined by the ISO and assessed the Participating TO along with the High Voltage Access Charge in accordance with Section 5.7 of Appendix F, Schedule 3 of the ISO Tariff. 3.102 Transmission Access Charge Balancing Account Adjustment ("TACBAA"). A mechanism established by the Participating TO which will ensure that the difference between (i) the actual charges by the ISO pursuant to Section 26.1.2 of the ISO Tariff for the High Voltage Access Charge and Transition Charge and (ii) the revenues disbursed by the ISO pursuant to Section 26.1.3 of the ISO Tariff are recovered from the Participating TO's End-Use Customers.
3.103 Transmission Control Agreement (“TCA”). The agreement between the ISO and Participating TOs establishing the terms and conditions under which TOs will become Participating TOs and how the ISO and each Participating TO will discharge their respective duties and responsibilities, as may be modified from time to time. 3.104 Transmission Owner (“TO”). An entity owning transmission facilities or having firm contractual rights to use transmission facilities.
3.105 Transmission Revenue Balancing Account Adjustment (“TRBAA”). A mechanism established by the Participating TO which will ensure that all Transmission Revenue Credits and other credits specified in Sections 6 and 8 of Appendix F,
PDF page 62
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Schedule 3 of the ISO Tariff, flow through to ISO Tariff and TO Tariff transmission customers.
3.106 Transmission Revenue Credit. The sum of: 1) the revenues received by the Participating TO from the ISO for Wheeling service, including EDAM Recoverable Revenue; (2) the difference between the costs incurred by the Participating TO associated with Existing Rights and the amount of such costs recovered by the Participating TO from the Existing Rights customers (“ETC Cost Differentials”); (3) any additional appropriate amounts included in the ISO Tariff definition of Transmission Revenue Credit set forth in Appendix A of the CAISO Tariff ; and (4) any remaining Interconnection Financial Security under the TSRA that has been drawn down by Participating TO.
3.107 Transmission Revenue Requirement (“TRR”). The TRR is the total annual authorized revenue requirements associated with transmission facilities and Entitlements turned over to the Operational Control of the ISO by the Participating TO, including the Projects under construction identified in Appendix VIII that are to be turned over to the Operational Control of the ISO upon completion. The costs of any transmission facility turned over to the Operational Control of the ISO, including the costs of the Projects under construction identified in Appendix VIII that are to be turned over to the Operational Control of the ISO upon completion, shall be fully included in the Participating TO's TRR. The TRR includes the costs of transmission facilities and Entitlements and deducts Transmission Revenue Credits; for wholesale purposes, credits for Standby Transmission Revenue; and the transmission revenue expected to
PDF page 63
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
be actually received by the Participating TO for Existing Rights and Converted Rights. The TRR is shown in Appendix I.
3.108 Uncontrollable Force. Any act of God, labor disturbance, act of the public enemy, war, insurrection, riot, fire, storm, flood, earthquake, explosion, any curtailment, order, regulation or restriction imposed by governmental, military or lawfully established civilian authorities or any other cause beyond the reasonable control of the ISO or Market Participant which could not be avoided through the exercise of Good Utility Practice.
3.109 Usage Charge. The amount of money, per 1 kW of scheduled flow, that the ISO charges a Scheduling Coordinator for use of a specific congested Inter-Zonal Interface during a given hour.
3.110 Utility Distribution Company (“UDC”). An entity that owns a Distribution System for the delivery of Energy to and from the ISO Controlled Grid, and that provides regulated retail electric service to Eligible Customers, as well as regulated procurement service to those End-Use Customers who are not yet eligible for direct access, or who choose not to arrange services through another retailer.
3.111 Voltage Support. Services provided by Generating Units or other equipment such as shunt capacitors, static var compensators, or synchronous condensers that are required to maintain established grid voltage criteria. This service is required under normal or system emergency conditions.
3.112 Western Electricity Coordinating Council (“WECC”). The Western Systems Coordinating Council or its successor.
PDF page 64
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.113 Wheeling Access Charge. The charge assessed by the ISO that is paid by a Scheduling Coordinator for Wheeling in accordance with Section 26.1 of the ISO Tariff. Wheeling Access Charges shall not apply for Wheeling under a bundled non-economy Energy coordination agreement of a Participating TO executed prior to July 9, 1996. The Wheeling Access Charge may consist of a High Voltage Wheeling Access Charge and a Low Voltage Wheeling Access Charge.
3.114 Wheeling Out. Except for Existing Rights exercised under an Existing Contract in accordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled Grid for the transmission of Energy from a Generating Unit located within the ISO Controlled Grid to serve a Load located outside the transmission and Distribution System of a Participating TO.
3.115 Wheeling Through. Except for Existing Rights exercised under an Existing Contract in accordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled Grid for the transmission of Energy from a resource located outside the ISO Controlled Grid to serve a Load located outside the transmission and Distribution System of a Participating TO.
3.116 Wheeling. Wheeling Out or Wheeling Through.
3.117 Wholesale Customer. A person wishing to purchase Energy and Ancillary Services at a Bulk Supply Point or a Scheduling Point for resale.
3.118 Omitted.
PDF page 65
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
4. Eligibility.
Wholesale transmission service over a Participating TO’s system shall be provided only to Eligible Customers who qualify for transmission service under the ISO Tariff. Any dispute as to whether a customer is eligible for wholesale transmission service shall be resolved by FERC and any dispute as to whether an End-Use Customer is eligible for retail transmission service or retail interconnection service under this TO Tariff shall be resolved by the Local Regulatory Authority.
PDF page 66
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
7. Billing and Payment.
7.1 End-Users.
Billing and payment rules applicable to End-Users shall be pursuant to the then-current rules of the applicable Local Regulatory Authority and, as applicable, Appendix XV. 7.2 Wholesale Customers.
7.2.1 Billing Procedure.
7.2.1.1 Low Voltage Access Charge Revenues. Within a reasonable time after the Participating TO receives from the ISO the monthly kilowatt-hours to which the Low Voltage Access Charge applies, the Participating TO shall submit an invoice to the applicable UDC, MSS or Scheduling Coordinator for the Low Voltage Access Charge billing. The invoice shall be paid by the UDC, MSS, or Scheduling Coordinator within twenty days of receipt. All payments shall be made in immediately available funds payable to the Participating TO, or by wire transfer to a bank named by the Participating TO.
7.2.1.2 Reliability Services Revenues. The Participating TO shall submit an invoice to applicable Wheeling customers for billings under the Reliability Services Rate Schedule. The invoice shall be paid by the Wheeling Customer within twenty days of receipt. All payments shall be made in immediately available funds payable to the Participating TO, or by wire transfer to a bank named by the Participating TO. 7.2.2 Interest on Unpaid Balances.
Interest on any unpaid amounts (including amounts placed in escrow) shall be calculated in accordance with the methodology specified for interest on refunds in
PDF page 67
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
FERC’s regulations at 18 C.F.R. Section 35.19a(a)(2)(iii). Interest on delinquent amounts shall be calculated from the due date of the bill to the date of payment. When payments are made by mail, bills shall be considered as having been paid on the date of receipt by the Participating TO.
7.2.3 Default.
In the event the UDC, MSS, Scheduling Coordinator, or Wheeling Customer fails, for any reason other than a billing dispute as described below, to make payment to the Participating TO on or before the due date as described above, and such failure of payment is not corrected within 30 calendar days after the Participating TO notifies the applicable UDC, MSS, Scheduling Coordinator, or Wheeling Customer to cure such failure, a default by the UDC, MSS, Scheduling Coordinator, or Wheeling Customer shall be deemed to exist. Upon the occurrence of a default, the Participating TO may initiate a proceeding with FERC (or the Local Regulatory Authority for a Local Publicly Owned Electric Utility) to terminate service but shall not terminate service until FERC, or the Local Regulatory Authority, as applicable, so approves any such request. In the event of a billing dispute between the Participating TO and the UDC, MSS, Scheduling Coordinator, or Wheeling Customer, the Participating TO will continue to provide service under this TO Tariff as long as the applicable UDC, MSS, Scheduling Coordinator, or Wheeling Customer: (i) continues to make all payments not in dispute, and (ii) pays into an independent escrow account the portion of the invoice in dispute, pending resolution of such dispute. If the UDC, MSS, Scheduling Coordinator, or Wheeling Customer fails to meet these two requirements for continuation of service, then the Participating TO
PDF page 68
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
may provide notice to the UDC, MSS, Scheduling Coordinator, or Wheeling Customer of its intention to suspend service in sixty days, in accordance with FERC policy. 7.3 Wheeling and Usage Charge Revenues.
The ISO, pursuant to the ISO Tariff, shall pay to Participating TOs all Wheeling and Usage Charge revenues, excluding Usage Charge revenues payable to FTR Holders.
PDF page 69
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
8. Obligation to Interconnect or Construct Transmission Expansions & Facility Upgrades.
8.1 Participating TO Obligation to Interconnect.
The Participating TO shall, at the request of a third party pursuant to Section 10, interconnect its system to the wholesale generation or wholesale load of such third party, or modify an existing wholesale Interconnection. Interconnections under this TO Tariff shall be available to entities eligible to request Interconnection consistent with the provisions of Section 210(a) of the FPA. Interconnections requested by entities or individuals that are not so eligible shall be governed by the Local Regulatory Authority. The procedures for Interconnections of wholesale generation to the ISO Controlled Grid shall be governed by the ISO Tariff, and if applicable, Appendix VII to the TO Tariff. Interconnections of Large Loads are governed by Appendix XV to the TO Tariff. 8.1.1 Interconnection to Transmission System.
Interconnection must be consistent with Good Utility Practice, in conformance with all Applicable Reliability Criteria, all applicable statutes, regulations, and ISO reliability criteria for the ISO Controlled Grid. The Participating TO will not accommodate the Interconnection if doing so would impair system reliability, or would otherwise adversely affect the ability of the Participating TO to honor its Encumbrances existing as of the time a party submits its Interconnection Application. The Participating TO shall identify any such adverse effect on its Encumbrances in the System Impact Study performed pursuant to Section 10.7. To the extent the Participating TO determines that the
PDF page 70
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Interconnection will have an adverse effect on Encumbrances, the party requesting Interconnection shall mitigate such adverse effect.
8.1.1.1 Letter Agreement.
Pursuant to Section 12 of Appendix DD of the ISO Tariff, prior to executing an Interconnection Agreement, a party seeking Interconnection may, in order to advance the implementation of its Interconnection, request, and the Participating TO shall offer the party, a Letter Agreement, a pro forma version of which is set forth in Appendix XIII to the TO Tariff, that authorizes the Participating TO to begin engineering, design, and procurement of long lead-time items, or construction necessary for the establishment of the Interconnection. However, Participating TO shall not be obligated to offer a Letter Agreement if the party seeking Interconnection is in Dispute Resolution as a result of an allegation that the party seeking Interconnection has failed to meet any milestones or comply with any prerequisites specified in the ISO Tariff. The Letter Agreement is an optional procedure. The Letter Agreement shall provide for the party seeking Interconnection to pay the cost of all activities authorized by the party and to make advance payments or provide other satisfactory security for such costs. Following a party seeking Interconnection’s request for a Letter Agreement, the Participating TO shall prepare and tender to the party seeking Interconnection a draft Letter Agreement in the form of the Participating TO’s FERC-approved Letter Agreement as set forth in Appendix XIII to the TO Tariff, including draft exhibits that include the proposed scope of work, estimated costs, payments, financial security and milestones, as applicable. The party seeking Interconnection shall provide written comments, or notification of no comments, to the draft exhibits within thirty (30)
PDF page 71
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Calendar Days. The Participating TO and the party seeking Interconnection shall negotiate concerning any disputed provisions of the exhibits to the draft Letter Agreement for not more than ninety (90) Calendar Days after the Participating TO tenders the draft Letter Agreement to the party seeking Interconnection. If the party seeking Interconnection determines that negotiations are at an impasse, it may request termination of the negotiations at any time after tender of the draft Letter Agreement and request submission of the unexecuted Letter Agreement with FERC or initiate dispute resolution procedures pursuant to Section 14 of this TO Tariff. If the party seeking Interconnection requests termination of the negotiations, but within ninety (90) Calendar Days after the Participating TO tenders the draft Letter Agreement to the party seeking Interconnection, fails to request either the filing of the unexecuted Letter Agreement or initiate dispute resolution procedures, it shall be deemed to have withdrawn its request for a Letter Agreement and the Participating TO shall have no further obligation to enter into a Letter Agreement, unless an extension is mutually agreed to by the parties. The Participating TO shall provide to the party seeking Interconnection a final Letter Agreement within fifteen (15) Business Days after the completion of the negotiation process.
Following submission of the final Letter Agreement to the party seeking Interconnection, the party shall either: (i) execute two originals of the tendered Letter Agreement and return them to the Participating TO; or (ii) request in writing that the Participating TO file with FERC a Letter Agreement in unexecuted form. As soon as practicable, but not later than ten (10) Business Days after receiving either the two executed originals of the tendered Letter Agreement (if it does not conform with a FERC-approved Letter
PDF page 72
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Agreement) or the request to file an unexecuted Letter Agreement, the Participating TO shall file the Letter Agreement with FERC, together with its explanation of any matters as to which the party seeking Interconnection and the Participating TO disagree and support for the costs that the Participating TO proposes to charge to the party seeking Interconnection under the Letter Agreement. An unexecuted Letter Agreement should contain terms and conditions deemed appropriate by the Participating TO for the Interconnection request.
If the party seeking Interconnection executes the final Letter Agreement, the Participating TO and the party seeking Interconnection shall perform their respective obligations in accordance with the terms of the Letter Agreement, subject to modification by FERC. Upon submission of an unexecuted Letter Agreement, the party seeking Interconnection and the Participating TO shall promptly comply with the unexecuted Letter Agreement, subject to modification by FERC.8.1.2 Costs Associated with Interconnection.
Each party requesting Interconnection shall pay the costs of planning, installing, owning, operating, and maintaining any Direct Assignment Facilities and, if applicable, any Reliability Upgrades required to provide the requested Interconnection. In addition, such party shall implement all existing operating procedures necessary to safely and reliably interconnect such party’s wholesale load to the facilities of the Participating TO and to ensure the ISO Controlled Grid’s conformance with the ISO Grid Planning Criteria, and shall bear all costs of implementing such operating procedures. Any additional costs associated with accommodating the Interconnection shall be allocated
PDF page 73
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
in accordance with the cost responsibility methodology set forth in the ISO Tariff for transmission expansions or upgrades.
8.1.3 Interconnection Agreement.
Pursuant to Section 10.4, 10.7.1, or 10.9.1, a party requesting Interconnection shall request in writing that the Participating TO tender to such party an Interconnection Agreement that will be filed with FERC, or the Local Regulatory Authority, in the case of a Local Publicly Owned Electric Utility. The Interconnection Agreement will include, without limitation, cost responsibilities and payment provisions for any engineering, equipment, construction, ownership, operation and maintenance costs for any Direct Assignment Facilities, any Reliability Upgrades, and for any other mitigation measures. For an Interconnection request to remain a Completed Interconnection Application, the party requesting the Interconnection shall execute the Interconnection Agreement and return it to the Participating TO within thirty (30) Business Days of receipt. Alternatively, if an Eligible Customer requesting the Interconnection requests the Participating TO to file an unexecuted Interconnection Agreement and commits to abide by the terms, conditions, and cost assignments determined to be just and reasonable under the ISO ADR Procedures, including any determination by FERC or on appeal of a FERC determination in accordance with that process, the Participating TO shall promptly file an unexecuted Interconnection Agreement. Provided, however, that if the ISO ADR Procedures concerns whether the requesting entity is an Eligible Customer, the Participating TO shall not be obligated to file an unexecuted Interconnection Agreement or commence construction of the Interconnection facilities or incur other costs under the Interconnection Agreement until a final order determining the just and reasonable rates,
PDF page 74
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
terms, and conditions for such Interconnection Agreement has been issued by the applicable court or regulatory authority. The Interconnection Agreement will set forth a payment schedule that enables the Participating TO to recover its costs. If the applicant elects not to execute the Interconnection Agreement and does not request the Participating TO to file an unexecuted Interconnection Agreement, its Completed Interconnection Application shall be deemed withdrawn, and the applicant shall reimburse to the Participating TO all costs reasonably incurred in processing the application not covered by any System Impact Study Agreement or Facilities Study Agreement.
8.1.4 Due Diligence to Construct.
The Participating TO shall use due diligence to construct, within a reasonable time, any Direct Assignment Facilities and any Reliability Upgrades that it is obligated to construct pursuant to this TO Tariff. The Participating TO’s obligation to build will be subject to:
1) its ability, after making a good faith effort, to obtain any necessary approvals and property rights under applicable federal, state, and local laws; 2) the presence of a cost recovery mechanism with cost responsibility assigned in accordance with the ISO Tariff or applicable FERC precedent; and 3) a signed Interconnection Agreement or a signed Expedited Interconnection Agreement or, by mutual agreement of the parties, FERC acceptance for filing of an unexecuted Interconnection Agreement.
8.1.5 Energization.
The Participating TO shall not be obligated to energize, nor shall the wholesale load be entitled to have its interconnection to the ISO Controlled Grid energized, unless and until an Interconnection Agreement has been executed, or filed at FERC pursuant to
PDF page 75
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Section 8.1.3, and becomes effective and such wholesale load has demonstrated to the ISO's reasonable satisfaction that it has complied with all of the requirements of the ISO Tariff and the requirements of this TO Tariff.
8.1.6 Coordination with ISO on Interconnection Requests.
The Participating TO shall coordinate with the ISO, pursuant to the provisions of the TCA, in developing Interconnection standards and guidelines for processing Interconnection requests under this TO Tariff.
8.2 Participating TO Obligation to Construct Transmission Expansions or Facility Upgrades.
The Participating TO shall be obligated to: (1) perform System Impact or Facility Studies where the Project Sponsor or the ISO agrees to pay the study cost and specifies the project objectives to be achieved, and (2) build transmission additions and facility upgrades where the Participating TO is obligated to construct or expand facilities in accordance with and subject to the limitations of Section 24 of the ISO Tariff and this TO Tariff.
8.2.1 Obligation to Construct.
A Participating TO shall not be obligated to construct or expand transmission facilities or system upgrades unless and until the conditions stated in Section 9.2.1 hereof have been satisfied.
8.2.2 Local Furnishing Participating TO Obligation to Construct.
A Local Furnishing Participating TO shall not be obligated to construct or expand transmission facilities or system upgrades unless and until the conditions stated in Section 9.3.3 hereof have been satisfied.
PDF page 76
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
8.3 Request for FERC Deference Regarding Need Determination.
It is intended that FERC grant substantial deference to the factual determinations of the ISO, (including the ISO’s ADR Procedures), the CPUC, WECC, or RTG coordinated planning processes as to the need for or construction of a facility, the need for full cost recovery, and the allocation of costs.
PDF page 77
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
9. Expansion Process.
9.1 Determination of Facilities.
A Participating TO shall perform a Facilities Study in accordance with this Section where (1) the Participating TO is obligated to construct or expand facilities in accordance with Section 24 of the ISO Tariff and this TO Tariff; (2) a Market Participant agrees to pay the costs of the Facilities Study and specifies the project objectives to be achieved in terms of increased capacity or reduced congestion; or (3) the Participating TO is required to perform a Facilities Study pursuant to the ISO Tariff. Eligible expansions on behalf of Large Loads are not governed by this Section 9 but are instead governed by Appendix XV to the TO Tariff.
9.1.1 Payment of Facilities Study’s Cost.
9.1.1.1 Market Participant to Pay for Facilities Study.
Where a Market Participant requests a Facilities Study and the need for the transmission addition or upgrade has not yet been established in accordance with the procedures established herein and the ISO Tariff, the Market Participant shall pay the cost of the Facilities Study.
9.1.1.2 Project Sponsor or Project Proponent to Pay for Facilities Study. Where the facilities to be added or upgraded have been determined to be needed in accordance with the procedures established herein and the ISO Tariff, the Project Sponsor, Project Proponent, or the ISO requesting the study shall pay the reasonable cost of the Facilities Study. When the Participating TO is the Project Sponsor in accordance with the ISO Tariff, the costs of the Facilities Study shall be recovered through the Access Charges and transmission rates.
PDF page 78
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
9.1.1.3 Principal Beneficiaries to Pay for Facilities Study.
Where the facilities to be added or upgraded have been determined to be needed and the principal beneficiaries have been identified by the ISO or ISO ADR Procedures in accordance with the ISO Tariff, the Project Sponsor and the identified principal beneficiaries shall pay the reasonable cost of the Facilities Study, in such proportions as may be agreed, or, failing agreement, as determined in accordance with the ISO ADR Procedures.
9.1.2 Payment Procedure.
Where a Facilities Study is being conducted pursuant to this TO Tariff, the Participating TO shall, within thirty days of the receipt of all reasonably required information, tender to the Market Participant, Project Sponsor, Project Proponent, ISO, or identified principal beneficiaries, as the case may be, a Facilities Study Agreement that defines the scope, content, assumptions, and terms of reference for such study, the estimated time required to complete it, and such other provisions as the parties may reasonably require and pursuant to which such Market Participant, Project Sponsor, Project Proponent, the ISO, or identified principal beneficiaries agree to reimburse the Participating TO the reasonable cost of performing the required Facilities Study. If the Market Participant, Project Sponsor, Project Proponent, the ISO, or identified principal beneficiaries, as the case may be, agree to the terms of the Facilities Study Agreement, they shall execute the Facilities Study Agreement and return it to the Participating TO within ten Business Days. Alternatively, if the Market Participant, Project Sponsor, Project Proponent, the ISO, or identified principal beneficiaries, as the case may be, request the Participating TO to proceed with the Facilities Study and commit to abide by the terms, conditions,
PDF page 79
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
and cost assignments ultimately determined under the ISO ADR Procedures, including any determination by FERC or appeal of a FERC determination in accordance with that process, the Participating TO shall promptly proceed with the Facilities Study, and the parties shall submit the disputed terms for resolution under the ISO’s ADR Procedures. 9.1.3 Facilities Study Procedures.
Upon receipt of an executed Facilities Study Agreement or alternative request to proceed as provided for in Section 9.1.2, a copy of which has been provided to the ISO by the party requesting the Facilities Study, the Participating TO will use due diligence to complete the required Facilities Study within a sixty (60) day period. If the Participating TO is unable to complete the Facilities Study in the allotted time period, the Participating TO shall notify the Market Participant and provide an estimate of the time needed to reach a final determination along with an explanation of the reasons that additional time is required to complete the study. If additional time is required, the Participating TO will use best efforts to complete the study within 10 months, provided adequate information is provided by all the parties.
9.2 Obligation to Build.
9.2.1 Due Diligence to Construct.
Subject to Section 9.3.3 of this TO Tariff, the Participating TO shall use due diligence to construct, within a reasonable time, additions or upgrades to its transmission system that it is obligated to construct pursuant to the ISO Tariff and this TO Tariff. Alternatively, if a Market Participant requests the Participating TO to file an unexecuted Participation Agreement and commits to abide by the terms, conditions, and cost assignments determined to be just and reasonable under the ISO ADR Procedures,
PDF page 80
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
including any determination by FERC or on appeal of a FERC determination in accordance with that process, the Participating TO shall promptly file an unexecuted Participation Agreement. Provided, however, that if the ISO ADR Procedures concerns whether the requesting entity is an Eligible Customer, the Participating TO shall not be obligated to file an unexecuted Participation Agreement or commence construction of the additions or upgrades or incur other costs under the Participation Agreement until a final order determining the just and reasonable rates, terms, and conditions for such Participation Agreement has been issued by the applicable court or regulatory authority. The Participating TO’s obligation to build will be subject to: 1) its ability, after making a good faith effort, to obtain the necessary approvals and property rights under applicable federal, state, and local laws; 2) the presence of a cost recovery mechanism with cost responsibility assigned in accordance with the ISO Tariff; and 3) a signed Participation Agreement. The Participating TO will not construct or expand its existing or planned transmission system, if doing so would impair system reliability as determined through systems analysis based on the Applicable Reliability Criteria.
9.2.2 Delay in Construction or Expansion.
If any event occurs that will materially affect the time for completion of new facilities, or the ability to complete them, the Participating TO shall promptly notify: (1) the Project Sponsor with regard to facilities determined to be needed; (2) the Parties to the Participation Agreement with regard to facilities determined to be needed pursuant to the ISO Tariff where principal beneficiaries were identified; and (3) the ISO. In such circumstances, the Participating TO shall, within thirty days of notifying such Project Sponsor, Parties to the Participation Agreement, and the ISO of such delays, convene a
PDF page 81
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
technical meeting with such Project Sponsor, Parties to the Participation Agreement, and the ISO to discuss the circumstances which have arisen and evaluate any options available. The Participating TO also shall make available to such Project Sponsor, Parties to the Participation Agreement, and the ISO, as the case may be, studies and work papers related to the cause and extent of the delay and the Participating TO’s ability to complete the new facilities, including all information that is in the possession of the Participating TO that is reasonably needed to evaluate the alternatives. 9.2.2.1 Alternatives to the Original Facility Additions.
If the review process of Section 9.2.2 determines that one or more alternatives exist to the originally planned construction project, the Participating TO shall present such alternatives for consideration to the Project Sponsor, Parties to the Participation Agreement, and the ISO, as the case may be. If upon review of any alternatives, such Project Sponsor, the ISO, or Parties to the Participation Agreement wish to evaluate or to proceed with one of the alternative additions or upgrades, such Project Sponsor, the ISO, or Parties to the Participation Agreement may request that the Participating TO prepare a revised Facility Study pursuant to Sections 9.1.1, 9.1.2, and 9.1.3 of this TO Tariff. In the event the Participating TO concludes that no reasonable alternative exists to the originally planned addition or upgrade and the Project Sponsor or Parties to the Participation Agreement or the ISO disagree, the dispute shall be resolved pursuant to the ISO ADR Procedure.
9.2.2.2 Refund Obligation for Unfinished Facility Additions.
If the Participating TO and the Project Sponsor, the ISO, or Parties to the Participation Agreement, as the case may be, mutually agree that no other reasonable alternatives
PDF page 82
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
exist, the obligation to construct the requested additions or upgrades shall terminate and any deposit not yet applied toward the expended project costs shall be returned with interest pursuant to FERC Regulation 35.19(a)(2)(iii). However, the Project Sponsor and any identified principal beneficiaries, as the case may be, shall be responsible for all costs prudently incurred by the Participating TO through the time the construction was suspended.
9.3 Provisions Relating To Transmission Construction On the Systems Of Other TOs.
9.3.1 Responsibility for Third Party Additions.
A Participating TO shall not be responsible for making arrangements for any engineering, permitting, and construction of transmission or distribution facilities on the system(s) of any other entity or for obtaining any regulatory approval for such facilities. The Participating TO will undertake reasonable efforts through the coordinated planning process to assist in making such arrangements, including, without limitation, providing any information or data required by such other electric system pursuant to Good Utility Practice.
9.3.2 Coordination of Third-Party System Additions.
Where transmission additions or upgrades being built pursuant to the ISO Tariff require additions or upgrades on other systems, to the extent consistent with Section 9.3.3 of this TO Tariff, the Participating TO shall coordinate construction on its own system with the construction required by others. The Participating TO, after consultation with the ISO, the Project Sponsor, and Parties to the Participation Agreement, as the case may be, may defer construction if the new transmission facilities on another system cannot
PDF page 83
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
be completed in a timely manner. The Participating TO shall notify such Project Sponsor, Parties to the Participation Agreement, and the ISO, in writing of the basis for any decision to defer construction and the specific problems which must be resolved before it will initiate or resume construction of the new facilities. Within forty Business Days of receiving written notification by the Participating TO of its intent to defer construction pursuant to this section, such Project Sponsor, Parties to the Participation Agreement, or the ISO may challenge the decision in accordance with the ISO ADR Procedure.
9.3.3 Expansion by “Local Furnishing Participating TOs”.
Notwithstanding any other provision of this TO Tariff, prior to requesting that a Local Furnishing Participating TO construct or expand facilities, the ISO or Project Sponsor shall tender (or cause to be tendered) an application under Section 211 of the FPA requesting FERC to issue an order directing the Local Furnishing Participating TO to construct or expand facilities as necessary to provide transmission service as determined pursuant to the ISO Tariff. Such Local Furnishing Participating TO shall thereafter, within ten Business Days of receiving a copy of the Section 211 application, waive its right to a request for service under Section 213(a) of the FPA and to the issuance of a proposed order under Section 212(c) of the FPA. Upon receipt of a final order from FERC under Section 211 of the FPA that is no longer subject to rehearing or appeal, such Local Furnishing Participating TO shall construct or expand facilities to comply with that FERC order and shall transfer to the ISO Operational Control over the Local Furnishing Participating TO’s expanded transmission facilities in accordance with the ISO Tariff.
PDF page 84
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
10. Interconnection Process.
10.1 Applicability.
All requests for Interconnection of wholesale load directly to the ISO Controlled Grid from parties eligible to request such Interconnection consistent with Section 210(a) of the FPA shall be processed pursuant to the provisions of this Section 10, except requests for interconnection on behalf of Large Loads to be located in the ISO BAA shall be subject to the procedures in Appendix XV of the TO Tariff. All requests for Interconnection of wholesale generation directly to the ISO Controlled Grid shall be processed pursuant to the provisions of the ISO Tariff, and if applicable, Appendix VII of the TO Tariff. Requests for interconnection on behalf of Large Loads by retail transmission customers of Participating TO shall be subject to the procedures in Appendix XV of the TO Tariff and the Local Regulatory Authority, as applicable.
10.2 Applications.
A party requesting Interconnection shall submit a written Interconnection Application which provides the information required in Section 10.3 to the Participating TO and shall send a copy of the application to the ISO. The Participating TO shall time-stamp the application to establish study priority.
10.3 Interconnection Application.
An Interconnection Application shall provide all of the information listed in 18 CFR § 2.20, including, but not limited to, the following:
(i) The identity, address, telephone number, and facsimile number of the party requesting Interconnection;
PDF page 85
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
(ii) The Interconnection point(s) to the ISO Controlled Grid contemplated by the applicant;
(iii) The resultant (or new) maximum amount of Interconnection capacity;
(iv) The proposed date for energizing the Interconnection and the term of the Interconnection service;
(v) Such other information as the Participating TO reasonably requires to process the application.
In addition to the information specified above, the following information may also be provided in order to properly evaluate system conditions:
(vi) The electrical location of the source of the power (if known) to be transmitted pursuant to the applicant’s request for Interconnection. If the source of the power is not known, a system purchase will be assumed.
Within ten (10) Business Days after receipt of an Interconnection Application, the Participating TO shall determine whether the application is complete (“Completed Interconnection Application”). Wherever possible, the Participating TO will attempt to remedy deficiencies in the Interconnection Application through informal communications with the applicant. If such efforts are unsuccessful, the Participating TO shall return the Interconnection Application to the applicant. The Participating TO will treat the information provided in the Interconnection Application, including the applicant’s identity, as confidential at the request of the applicant except to the extent that disclosure of this information is required by this TO Tariff, by regulatory or judicial order, for reliability purposes pursuant to Good Utility Practice, or pursuant to RTG or ISO transmission
PDF page 86
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
information sharing agreements. The Participating TO shall treat this information consistent with the standards of conduct contained in Part 37 of FERC’s regulations. 10.4 Review of Completed Interconnection Application.
After receiving a Completed Interconnection Application, the Participating TO will determine on a non-discriminatory basis whether a System Impact Study is required. Whenever the Participating TO determines that a System Impact Study is not required and that neither Reliability Upgrades nor changes in existing operating procedures are required, the Participating TO shall notify the applicant within fifteen (15) Business Days of the Completed Application Date. If the Interconnection can be accommodated without any Direct Assignment Facilities, then within thirty (30) Business Days of such notice from the Participating TO, the applicant shall request the Participating TO to tender to the applicant an Interconnection Agreement within thirty (30) Business Days of such request. The Participating TO shall tender to the applicant an Interconnection Agreement as provided in Section 8.1.3. If the Participating TO determines, upon the review of the Completed Interconnection Application, that Direct Assignment Facilities are required, the Participating TO shall tender to the applicant a Facilities Study Agreement within twenty (20) Business Days of the Completed Application Date and continue the interconnection process pursuant to Section 10.8.
10.5 Notice of Need for System Impact Study.
If the Participating TO determines that a System Impact Study is necessary to accommodate the requested Interconnection, the Participating TO shall so inform the applicant, as soon as practicable. In such cases, the Participating TO shall within twenty (20) Business Days of receipt of a Completed Interconnection Application, tender
PDF page 87
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
a System Impact Study Agreement that defines the scope, content, assumptions and terms of reference for such study to be completed by the Participating TO; the estimated time required to complete it; and such other provisions as the parties may reasonably require, and pursuant to which the applicant shall agree to reimburse the Participating TO for the reasonable actual costs of performing the required System Impact Study. A description of the Participating TO’s transmission assessment practices for completing a System Impact Study is provided in the Participating TO’s FERC Form 715. For an Interconnection request to remain a Completed Interconnection Application, the applicant shall execute the System Impact Study Agreement and return it to the Participating TO within ten (10) Business Days together with payment for the reasonable estimated cost of performing the System Impact Study. Alternatively, if the applicant requests the Participating TO to proceed with the System Impact Study and commits to abide by the terms, conditions, and cost assignments ultimately determined under the ISO ADR Procedures, including any determination by FERC or appeal of a FERC determination in accordance with that process, the Participating TO shall promptly proceed with the System Impact Study provided that such request is accompanied by payment for the reasonable estimated cost of the System Impact Study, and the parties shall submit the disputed terms for resolution under the ISO’s ADR Procedures. If the applicant elects not to execute a System Impact Study Agreement, and does not request that the Participating TO proceed with the System Impact Study, its application shall be deemed withdrawn, and the applicant shall reimburse to the Participating TO all costs reasonably incurred in processing the application.
PDF page 88
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
10.6 System Impact Study Cost Reimbursement and Agreement
10.6.1 Cost Reimbursement.
The System Impact Study Agreement shall clearly specify the charge, based on the Participating TO’s estimate of the cost and time for completion of the System Impact Study. The charge shall not exceed the reasonable actual cost of the study. In performing the System Impact Study, the Participating TO shall rely, to the extent reasonably practicable, on existing transmission planning studies. The applicant will not be assessed a charge for such existing studies; however, the applicant will be responsible for the reasonable charges associated with any modifications to existing planning studies that are reasonably necessary to evaluate the impact of the applicant’s request.
10.6.2 Multiple Parties.
If multiple parties request Interconnection at the same location, the Participating TO may conduct a single System Impact Study. The costs of that study shall be pro-rated among the parties requesting Interconnection.
10.7 System Impact Study Procedures.
Upon receipt of an executed System Impact Study Agreement or initiation of the ISO ADR Procedures and receipt of payment for estimated study costs, the Participating TO will use due diligence to complete the required System Impact Study within a sixty (60) calendar day period. The System Impact Study will identify whether any Direct Assignment Facilities or Reliability Upgrades are necessary, as well as whether any transmission additions or upgrades are necessary to serve a wholesale load. The System Impact Study will also identify any adverse impact on Encumbrances existing as
PDF page 89
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
of the applicant’s Completed Application Date. In the event that the Participating TO is unable to complete the required System Impact Study within such time period, it shall so notify the applicant, in writing, and provide an estimated completion date along with an explanation of the reasons why additional time is required to complete the required studies. A copy of the completed System Impact Study and related work papers shall be made available to the applicant and the ISO. The Participating TO will use the same due diligence in completing the System Impact Study for others as it uses when completing studies for its affiliated UDC load. The Participating TO shall notify the applicant immediately upon completion of the System Impact Study.
10.7.1 Procedures Upon Completion of System Impact Study.
Within fifteen (15) Business Days of completion of the System Impact Study, the Participating TO shall notify the applicant whether the transmission system will be adequate to accommodate all of a request for Interconnection. If no costs are likely to be incurred for any Direct Assignment Facilities, any Reliability Upgrades, or implementing any operating procedures, then within thirty (30) Business Days of receipt of the completed System Impact Study, the applicant shall request the Participating TO to tender an Interconnection Agreement within thirty (30) Business Days of such request. The Participating TO shall tender to the applicant an Interconnection Agreement as provided in Section 8.1.3. If costs are likely to be incurred to accommodate a request for Interconnection, the Participating TO shall tender to the applicant a Facilities Study Agreement pursuant to Section 10.8.
PDF page 90
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
10.8 Notice of Need for Facilities Study.
If a System Impact Study indicates that additions or upgrades to the ISO Controlled Grid are needed to satisfy an applicant’s request for Interconnection, the Participating TO shall, within fifteen (15) Business Days of the completion date of the System Impact Study tender to the applicant a Facilities Study Agreement that defines the scope, content, assumptions and terms of reference for such study; the estimated time required to complete the required study; and such other provisions as the parties may reasonably require, and pursuant to which the applicant agrees to reimburse the Participating TO for the reasonable actual costs of performing the required Facilities Study. For an Interconnection request to remain a Completed Interconnection Application, the applicant shall execute the Facilities Study Agreement and return it to the Participating TO within ten (10) Business Days together with payment for the reasonable estimated cost of performing the Facilities Study. Alternatively, if the applicant requests the Participating TO to proceed with the Facilities Study and commits to abide by the terms, conditions, and cost assignments ultimately determined under the ISO ADR Procedures, including any determination by FERC or appeal of a FERC determination in accordance with that process, the Participating TO shall promptly proceed with the Facilities Study provided that such request is accompanied by payment for the reasonable estimated cost of the Facilities Study, and the parties shall submit the disputed terms for resolution under the ISO ADR Procedures. If the applicant elects not to execute a Facilities Study Agreement and does not request that the Participating TO proceed with the Facilities Study, its application shall be deemed withdrawn and the applicant shall reimburse to the Participating TO all costs reasonably
PDF page 91
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
incurred in processing the application not covered by the System Impact Study Agreement.
10.9 Facilities Study Procedures.
Upon receipt of an executed Facilities Study Agreement or initiation of the ISO ADR Procedures and receipt of payment for the estimated study costs, the Participating TO will use due diligence to complete the required Facilities Study within a sixty (60) calendar day period. In the event that the Participating TO is unable to complete the required Facilities Study within such time period, it shall so notify the applicant, in writing, and provide an estimated completion date along with an explanation of the reasons why additional time is required to complete the required studies. A copy of the completed Facilities Study shall be made available to the applicant.
10.9.1 Execution of Interconnection Agreement.
Within thirty (30) Business Days of receipt of the completed Facilities Study, the applicant shall request the Participating TO to tender an Interconnection Agreement within thirty (30) Business Days of such request. The Participating TO shall tender to the applicant an Interconnection Agreement as provided in Section 8.1.3. 10.10 Partial Interim Service.
If the Participating TO determines that there will not be adequate transmission capability to satisfy the full amount requested in a Completed Interconnection Application, the Participating TO nonetheless shall be obligated to offer and provide the portion of the requested Interconnection that can be accommodated without any additional Direct Assignment Facilities or Reliability Upgrades. However, the Participating TO shall not be obligated to provide the incremental amount of requested Interconnection that
PDF page 92
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
requires such additional facilities or upgrades until such facilities or upgrades have been placed in service.
10.11 Expedited Interconnection Procedures.
In lieu of the procedures set forth above, the applicant shall have the option to expedite the processing of its Completed Interconnection Application. In order to exercise this option, the applicant shall submit in writing a Request for Expedited Interconnection Procedures to the Participating TO within ten (10) Business Days after receiving a copy of the System Impact Study for the proposed Interconnection. Within ten (10) Business Days after receiving a Request for Expedited Procedures, the Participating TO shall tender an Expedited Interconnection Agreement that requires the applicant to compensate the Participating TO for all costs reasonably incurred pursuant to the terms of this TO Tariff for processing the Completed Interconnection Application and providing the requested Interconnection. While the Participating TO agrees to provide the applicant with its best estimate of the costs of any needed Direct Assignment Facilities and, if applicable, Reliability Upgrades and other charges that may be incurred, unless otherwise agreed by the parties, such estimate shall not be binding and the applicant must agree in writing to compensate the Participating TO for all actual Interconnection costs reasonably incurred pursuant to the provisions of this TO Tariff. The applicant shall execute and return such Expedited Interconnection Agreement within ten (10) Business Days of its receipt or the applicant's request for Interconnection will cease to be a Completed Interconnection Application and will be deemed terminated and withdrawn. In that event, the applicant shall reimburse the Participating TO for all costs
PDF page 93
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
reasonably incurred in processing the application not covered by the terms of the System Impact Study Agreement.
PDF page 94
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
13. Creditworthiness.
13.1 UDCs, MSSs, and Scheduling Coordinators Using the Participating TO's Low Voltage Transmission Facilities.
For the purpose of determining the ability of a UDC, MSS, and Scheduling Coordinator to meet its obligations related to service using the Participating TO's Low Voltage Transmission Facilities hereunder, the Participating TO may require reasonable credit review procedures for the UDC, MSS, or Scheduling Coordinator. This review shall be made in accordance with standard commercial practices. In addition, the Participating TO may require the UDC, MSS, or Scheduling Coordinator to provide and maintain in effect during the term of the service, an unconditional and irrevocable letter of credit as security to meet its responsibilities and obligations under this TO Tariff, or an alternative form of security proposed by the UDC, MSS, or Scheduling Coordinator and acceptable to the Participating TO, and consistent with commercial practices established by the Uniform Commercial Code, that protect the Participating TO against the risk of non- payment.
13.2 End-Users.
Creditworthiness rules applicable to End-Users shall be pursuant to the then-current rules of the applicable Local Regulatory Authority and, as applicable, Appendix XV.
PDF page 95
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
APPENDIX XV
LARGE LOAD
INTERCONNECTION PROCEDURES (LLIP)
Tariff Record Proposed Effective Date: 02/16/27
Version Number: 0.0.0
Option Code: A
PDF page 96
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
TABLE OF CONTENTS
Section 1. Objectives and Applicability … 1.1 Objectives……………………………………………………………...
1.2 Applicability…………………………………………………………….
Section 2. Definitions …
Section 3. General Provisions Applicable to All Interconnection Requests 3.1 Interconnection Requests
3.2 Transmission Interconnection Service … 3.2.1
The Product … 3.2.2
No Applicability to Transmission Service …
3.2.3
Roles and Responsibilities …
3.3 Comparability … 3.4 Base Case Data … 3.5 Coordination with Affected Systems … 3.6 Capacity of the Large Load … 3.7 Proposed Service Commencement Date …
3.7.1
Interconnection Request …
3.7.2
After Start of the Large Load Interconnection Study … 3.8 Queue Position
3.9 Withdrawal … 3.10 Withdrawal Penalty
3.10.1 Calculation of the Withdrawal Penalty
3.11 Standards for Co-located Inverter Based Generating Facilities
Section 4. Large Load Study Process … 4.1 Timing for Submitting Interconnection Requests … 4.2 Processing of Interconnection Request … 4.2.1
Initiating an Interconnection Request …
4.2.1.1 Use of Interconnection Study Deposit …
4.3 Validation of Interconnection Request … 4.3.1
Acknowledgment of Interconnection Request …
4.3.2
Deficiencies in Interconnection Request …
4.4 Potential Deferral of the Interconnection Studies
4.5 Scoping Meeting … 4.6 Interconnection Studies … 4.6.1
Large Load Interconnection Study …
4.6.1.1 Scope of the Large Load Study … 4.6.1.2 Timing of the Large Load Interconnection Study Results
4.6.1.3 Large Load Interconnection Study Report Meeting
4.6.1.4 Increase in the Commercial Readiness Deposit……
4.6.1.5 Restudy……………………………………………………
4.6.1.6 Modifications …
PDF page 97
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
4.6.2 Optional Flexible Interim Load Interconnection (FILI) Study 4.6.2.1 FILI Agreement with Participating TO and ISO……
4.6.3 Additional Studies … 4.6.4 Financing of Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades
4.7 Interconnection Financial Security … 4.7.1
Types of Interconnection Financial Security …
Section 5. Transmission Security and Reliability Agreement … 5.1 Tender … 5.2 Negotiation … 5.3 Execution and Filing
5.4 Commencement of Interconnection Activities … 5.5 Large Load Interconnection Customer To Meet Requirements of the
Participating TO’s Interconnection Handbook …
Section 6. Construction of Participating TO’s Interconnection Facilities,
Distribution Upgrades, and Large Load Network Upgrades ..
6.1 Schedule … 6.2 Construction Sequencing … 6.2.1
General … 6.2.2
Advancing Construction of Distribution Upgrades and
Large Load Network Upgrades that are Part of an Expansion Plan of
the Participating TO … 6.3 Special Provisions for Affected Systems …
Section 7. Miscellaneous … 7.1 Confidentiality … 7.1.1
Scope … 7.1.2
Release of Confidential Information …
7.1.3
Rights … 7.1.4
No Warranties … 7.1.5
Standard of Care … 7.1.6
Order of Disclosure … 7.1.7
Remedies … 7.1.8
Disclosure to FERC, its Staff, or a State …
7.2 Disputes … 7.2.1
Submission …
Attachment 1 – Interconnection Request Form
Attachment 2 – Large Load Study Process Agreement
Attachment 3 – Transmission Security and Reliability Agreement
PDF page 98
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Attachment 4 – Operating Conditions Agreement for Flexible Interim Load Interconnection (FILI)
LARGE LOAD INTERCONNECTION PROCEDURES (LLIP)
Section 1. Objectives and Applicability
1.1 Objectives
The objective of this LLIP is to implement requirements for Large Load interconnections to the Participating TO’s Transmission System pursuant to the TO Tariff. In addition to all applicable requirements under the Local Regulatory Authority, the requirements of the LLIP also apply to a Large Load that will be a retail transmission customer of the Participating TO.
1.2 Applicability
The LLIP is applicable to a Large Load Interconnection Customer that is either (1) proposing to interconnect a Large Load to Participating TO’s transmission system; (2) seeking to increase the capacity of an existing Large Load processed under the LLIP; or
(3) with respect to an existing Participating TO transmission-interconnected load not processed under the LLIP, is seeking an increase of 50 MW or greater. This LLIP applies to all Large Loads seeking interconnection to Participating TO’s transmission system after the effective date of this Appendix XV to the TO Tariff.
Section 2. Definitions
Terms used in this LLIP with initial capitalization shall have the meanings set forth below. The singular of any definition shall include the plural and the plural shall include the singular. If a term with initial capitalization used herein is not defined, such term shall have the meanings ascribed to such term in Section 3 of the TO Tariff.
Affected System shall mean an electric system other than the Participating TO’s Transmission System and Distribution System that may be affected by the proposed interconnection.
Affected System Operator shall mean the entity that operates an Affected System.
Applicable Laws and Regulations shall mean all duly promulgated applicable federal, state and local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or administrative orders, permits and other duly authorized actions of any Governmental Authority
Base Case shall mean data including, but not limited to, base power flow, short circuit and stability data bases, underlying load, generation, and transmission facility
PDF page 99
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
assumptions, contingency lists, including relevant remedial action schemes, and transmission diagrams used to perform the Interconnection Studies. The Base Case may include Critical Energy Infrastructure Information (as that term is defined by FERC). The Base Case may include transmission facilities as approved by the Participating TO or ISO, as applicable, Large Load Network Upgrades that are included in a signed interconnection agreement, Distribution Upgrades, Large Load Network Upgrades, Large Loads and any co-located generation, and load forecast. The Base Case may also include generation facilities that (i) are directly interconnected to the Distribution System or ISO Controlled Grid; (ii) are interconnected to Affected Systems and may have an impact on the Interconnection Request; (iii) have a pending request to interconnect to the Distribution System or an Affected System; or (iv) are not interconnected to the Distribution System or ISO Controlled Grid, but are subject to the terms and conditions of a fully executed interconnection agreement (or its equivalent predecessor agreement) or for which an unexecuted interconnection agreement (or its equivalent predecessor agreement) has been requested to be filed with FERC.
Business Day shall mean Monday through Friday, excluding Federal Holidays.
Calendar Day shall mean any day including Saturday, Sunday or a Federal Holiday.
Commercial Readiness Deposit shall mean a deposit paid as set forth in LLIP Sections 4.2.1 and 4.6.1.4.
Confidential Information shall mean any confidential, proprietary or trade secret information of a plan, specification, pattern, procedure, design, device, list, concept, policy or compilation relating to the present or planned business of a Party, which is designated as confidential by the Party supplying the information, whether conveyed orally, electronically, in writing, through inspection, or otherwise.
Dispute Resolution shall mean the applicable procedure for resolution of a dispute between the Parties as described in TO Tariff Section 14.
Flexible Interim Load Interconnection (FILI) shall mean curtailable, interim transmission interconnection service for a Large Load provided by the ISO and Participating TO, enabling the Large Load to interconnect prior to completion of the Large Load’s Large Load Network Upgrades, Distribution Upgrades, or Participating TO’s Interconnection Facilities.
Interconnection Financial Security shall mean any of the financial instruments listed in LLIP Section 4.7.1 provided by the Large Load Interconnection Customer to comply with its obligations under the LLIP or the TSRA.
PDF page 100
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Interconnection Handbook shall mean a handbook, developed by the
Participating TO and posted on the Participating TO’s website or otherwise made available by the Participating TO, describing the technical and operational requirements for wholesale generators and loads connected to the Participating TO’s Transmission System, as such handbook may be modified or superseded from time to time. Participating TO’s standards contained in the Interconnection Handbook shall be deemed consistent with Good Utility Practice and Applicable Reliability Standards. In the event of a conflict between the terms of the LLIP and the terms of the Participating TO’s Interconnection Handbook, the terms in the LLIP shall govern.
Interconnection Request shall mean an Interconnection Application in the form of Attachment 1 to Appendix XV to the TO Tariff, to interconnect a new Large Load, or to increase the capacity of, or make a Material Modification to the operating characteristics of, an existing Large Load that is interconnected with the Participating TO’s Transmission System.
Interconnection Study shall mean any of the following studies: the Large Load Interconnection Study, the FILI Study, restudies, and any additional studies performed pursuant to LLIP Section 4.6.3.
Interconnection Study Deposit shall mean the cash deposit provided to the Participating TO under LLIP Section 4.2.1 as a requirement of a valid Interconnection Request to be used to offset the cost of the Interconnection Studies.
Large Load Capacity shall mean the maximum capacity of the Large Load at the Point of Interconnection.
Large Load Interconnection Customer shall mean an Eligible Customer that proposes to interconnect and sell retail transmission service to a Large Load except for when the Large Load Owner seeking to interconnect the Large Load with the Participating TO’s Transmission System will be a retail transmission customer of the Participating TO, in which case the Large Load Owner shall be the Large Load Interconnection Customer.
Large Load Interconnection Customer Interconnection Facilities shall mean all facilities and equipment owned, controlled, or operated by the Large Load Interconnection Customer or the Large Load Owner up to the Point of Change of Ownership as identified in Appendix A to the TSRA, including any modifications, additions or upgrades to such facilities and equipment.
Large Load Interconnection Procedures (LLIP) shall mean the interconnection procedures applicable to an Interconnection Request set forth in this Appendix XV to the TO Tariff.
PDF page 101
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Large Load Interconnection Study shall mean an engineering study conducted by the Participating TO for a Large Load Interconnection Customer under the LLIP that evaluates the impact of the proposed interconnection on the safety and reliability of Participating TO’s Transmission System and Distribution System and, if applicable, an Affected System. The Large Load Interconnection Study will also determine a list of facilities (including Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades), the cost of those facilities, and the time required to interconnect the Large Load Facility with the Participating TO’s Transmission System. When the Large Load will be a retail transmission customer of the Participating TO, the Large Load Interconnection Study will only evaluate the impact of the proposed interconnection on the safety and reliability of Participating TO’s Transmission System and, if applicable, an Affected System, and will not evaluate any Distribution Upgrades, which are governed by the Local Regulatory Authority. The scope of the study is defined in LLIP Section 4.6.1.1.
Large Load Owner shall mean the legal entity that owns, controls, and operates the Large Load.
Large Load Study Process Agreement shall mean the agreement entered into by the Large Load Interconnection Customer and the Participating TO which sets forth the Parties’ agreement to perform Interconnection Studies under the LLIP, a pro forma version of which is set forth in Attachment 2 to the LLIP.
Material Modification shall mean those modifications that have a material impact on the cost or timing of any Interconnection Request, or any other valid interconnection request to the Participating TO or the ISO, with a equal or later Queue Position date.
Large Load Network Upgrades shall mean the additions, modifications, and upgrades to the ISO Controlled Grid at or beyond the Point of Interconnection necessary to serve one or more Large Loads safely and reliably that are identified through the Large Load Interconnection Study and sent to the ISO for concurrence pursuant to ISO Tariff Section 25.7. Large Load Network Upgrades do not include Distribution Upgrades or Participating TO’s Interconnection Facilities.
Participating TO’s Interconnection Facilities shall mean all facilities and equipment owned, controlled, or operated by the Participating TO from the Point of Change of Ownership to the Point of Interconnection as identified in Appendix A to the TSRA, including any modifications, additions or upgrades to such facilities and equipment. Participating TO’s Interconnection Facilities are transmission facilities but are not controlled by the ISO. Participating TO’s Interconnection Facilities are sole use facilities and shall not include Distribution Upgrades or Large Load Network Upgrades.
Participating TO’s Transmission System shall mean the facilities owned and operated by the Participating TO and that have been placed under the ISO’s Operational Control, which facilities form part of the ISO Controlled Grid.
PDF page 102
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Point of Change of Ownership shall mean the point, as set forth in Appendix A to the TSRA, where the Large Load Interconnection Customer's interconnection facilities connect to the Participating TO’s Interconnection Facilities.
Point of Interconnection shall mean the point, as set forth in Appendix A to the TSRA, where the Participating TO’s Interconnection Facilities connect to the Participating TO’s Transmission System.
Queue Position shall mean the order of a valid Interconnection Request, relative to all other pending valid Interconnection Requests, established pursuant to LLIP Section 3.10.
Reasonable Efforts shall mean, with respect to an action required to be attempted or taken by a Party under the LLIP or the TSRA, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests.
Report Meeting shall mean the meeting among the Participating TO, the Large Load Interconnection Customer, and if applicable, the ISO and other Affected System Operators to discuss the results of the Interconnection Studies as set forth in the LLIP.
Scoping Meeting shall mean the meeting between representatives of the Large Load Interconnection Customer and Participating TO, and if applicable, the ISO, conducted for the purpose of discussing alternative interconnection options, to exchange information including any transmission data and earlier study evaluations that would be reasonably expected to impact such interconnection options, to analyze such information, and to determine the potential feasible Points of Interconnection.
Service Commencement Date shall mean the date the Large Load is initially operated in parallel with the Participating TO’s Transmission System and transmission interconnection service is provided to the Large Load Interconnection Customer pursuant to the terms of an executed TSRA.
Site Control shall mean the exclusive land right to develop, construct, operate, and maintain the Large Load over the term of expected operation of the Large Load. Site Control may be demonstrated by documentation establishing: (1) ownership of, a leasehold interest in, or a right to develop a site of sufficient size to construct and operate the Large Load; (2) an option to purchase or acquire a leasehold site of sufficient size to construct and operate the Large Load for such purpose; or (3) any other documentation that clearly demonstrates the right of Large Load Interconnection Customer or Large Load Owner, as applicable, to exclusively occupy a site of sufficient size to construct and operate the Large Load.
System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, that protects (1) the Participating TO’s Transmission System, Participating TO’s Interconnection Facilities, Distribution System,
PDF page 103
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
ISO Controlled Grid, and Affected Systems from faults or other electrical disturbances occurring at the Large Load and (2) the Large Load from faults or other electrical system disturbances occurring on the ISO Controlled Grid, Participating TO’s Interconnection Facilities, and Affected Systems or on other delivery systems or other generating systems to which the ISO Controlled Grid is directly connected.
Transmission Interconnection Service shall mean the service provided by the Participating TO associated with interconnecting the Large Load to the Participating TO’s Transmission System and enabling the Large Load Interconnection Customer to receive electric energy at the Point of Interconnection, pursuant to the terms of the TSRA and the TO Tariff.
Transmission Security and Reliability Agreement (TSRA) shall mean the form of agreement applicable to an Interconnection Application pertaining to a Large Load processed pursuant to the LLIP, a pro forma version of which is set forth in Attachment 3 to Appendix XV of the TO Tariff.
Withdrawal Penalty shall mean the penalty assessed by Participating TO to a Large Load Interconnection Customer that chooses to withdraw or is deemed withdrawn from Participating TO’s interconnection queue or whose Large Load does not otherwise reach its Service Commencement Date. The calculation of the Withdrawal Penalty is set forth in LLIP Section 3.10.1.1.
Section 3.
General Provisions Applicable to All Interconnection Requests
3.1
Interconnection Requests
A Large Load Interconnection Customer shall submit to Participating TO an Interconnection Request in the form of Attachment 1 to this LLIP for processing under the LLIP. The Participating TO will forward a copy of the Interconnection Request to the ISO, as applicable.
An Interconnection Request for the expansion of capacity of an existing Large Load shall be treated the same as an Interconnection Request for a new Large Load pursuant to this LLIP.
Co-located generation serving a Large Load that will not export to the ISO Controlled Grid will be evaluated for impacts to the Participating TO’s Transmission System as part of the LLIP study process, provided the co- located generation is included in the Interconnection Request. Co-located generation that will export to the ISO Controlled Grid is required to submit a generator interconnection request to the ISO in accordance with Section 25.7.6 of the ISO Tariff for evaluation of the proposed generator
interconnection and the Large Load will be evaluated pursuant to the LLIP.
3.2
Transmission Interconnection Service
PDF page 104
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.2.1 The Product. Transmission Interconnection Service allows Large Load Interconnection Customer to connect the Large Load to the Participating TO’s Transmission System and be eligible to receive electric energy and capacity from the ISO Controlled Grid.
3.2.2 No Applicability to Transmission Service. Nothing in this LLIP shall constitute a request for transmission service or confer upon a Large Load Interconnection Customer any right to receive transmission service.
3.2.3 Roles and Responsibilities.
3.2.3.1
Each Interconnection Request will be subject to the direction and oversight of the Participating TO. The Participating TO will conduct or cause to be performed the required Interconnection Studies and any additional studies the Participating TO determines to be reasonably necessary. The analysis of impacts on, and upgrades required to, the Participating TO’s Transmission System will be performed by the Participating TO and will be subject to review and concurrence by the ISO. The Participating TO will perform all required studies related to the Participating TO’s Transmission System and will coordinate with Affected System Operators in accordance with LLIP Section 3.5.
3.2.3.2 The Participating TO will complete or cause to be completed all studies as required within the timelines provided in this LLIP.
3.2.3.3
Each Large Load Interconnection Customer shall pay the actual costs of all Interconnection Studies, and any additional studies the Participating TO determines to be reasonably necessary in response to the Interconnection Request. The Participating TO shall reimburse the ISO for the actual cost of any portion of the Interconnection Studies that the ISO performs related to the ISO Controlled Grid, as applicable.
3.2.3.3.1 The Participating TO shall issue invoices for Interconnection Studies that shall include a detailed and itemized accounting of the cost of each
Interconnection Study. Whenever the actual cost of performing the Interconnection Studies exceeds the Interconnection Study Deposit, the Large Load
Interconnection Customer shall pay the undisputed difference in accordance with the Participating TO
PDF page 105
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
issued invoice within thirty (30) Calendar Days. The
Participating TO shall not be obligated to continue to
have any studies conducted unless the Large Load
Interconnection Customer has paid all undisputed
amounts in compliance herewith.
3.3
Comparability
Participating TO shall receive, process and analyze all Interconnection Requests in a timely manner as set forth in this LLIP. Participating TO will use the same Reasonable Efforts in processing and analyzing Interconnection Requests from all Large Load Interconnection Customers, whether the Large Load is owned by Participating TO and its Affiliates or by a third party.
3.4
Base Case Data
Participating TO shall provide Base Case data to a Large Load Interconnection Customer upon request subject to confidentiality provisions in LLIP Section 7.1. Participating TO shall provide base power flow, short circuit databases, including all underlying assumptions, and contingency list used in the Large Load Interconnection Customer’s Interconnection Studies. Participating TO is permitted to require that the Large Load Interconnection Customer sign a confidentiality agreement before the release of commercially sensitive information or Critical Energy Infrastructure Information in the Base Case data. Such Base Cases may include all (i) Large Loads, (ii) generation projects, and (iii) transmission projects, including merchant transmission projects that are proposed for the Transmission System for which a transmission expansion plan has been submitted and approved by the applicable authority.
3.5
Coordination with Affected Systems
The Participating TO will notify the Affected System Operators that are potentially affected by a Large Load Interconnection Customer’s Interconnection Request. The Participating TO will coordinate the conduct of any studies required to determine the impact of the Interconnection Request on Affected Systems with Affected System Operators and, if possible, include those results (if available) in its applicable Interconnection Study within the time frame specified in this LLIP. Participating TO will include such Affected System Operators in all meetings held with Large Load Interconnection Customer as required by this LLIP. Large Load Interconnection Customer will cooperate with Participating TO in all matters related to the conduct of studies and the determination of modifications to Affected Systems. If an Affected System Operator, that has been informed its system is an Affected System refuses
PDF page 106
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
to cooperate with the Participating TO with whom interconnection has been requested in all matters related to the conduct of studies and the determination of whether modifications to its Affected System are necessary to avoid adverse impacts, it waives any right in any fora that the Participating TO’s provision of service has adversely impacted such Affected System Operator.
3.6
Capacity of the Large Load
The Interconnection Request shall be evaluated using the maximum capacity requested by the Large Load Interconnection Customer. However, if the maximum capacity that the Large Load is capable of receiving is greater than the maximum capacity requested by the Large Load Interconnection Customer, the Large Load Interconnection Customer will be required to limit the Large Load capacity to no greater than the amount requested (e.g., through use of a control system, power relay(s), or other similar device settings or adjustments), and the Large Load Interconnection Customer must obtain the Participating TO’s agreement, with such agreement not to be unreasonably withheld, that the manner in which the Large Load Interconnection Customer proposes to implement such a limit will not adversely affect the safety and reliability of the Participating TO’s Transmission System. If the Participating TO does not so agree, then the Interconnection Request must be withdrawn or revised to specify the maximum capacity that the Large Load is capable of receiving. Furthermore, nothing in this section shall prevent a Participating TO from considering a capacity higher than the limited capacity, if appropriate, when evaluating system protection impacts.
3.7
Proposed Service Commencement Date
The proposed Service Commencement Date of the new Large Load or increase in capacity of the existing Large Load shall not exceed seven years from the date the Interconnection Request is received by Participating TO for those Interconnection Requests studied in accordance with the Large Load Interconnection Procedures, unless Large Load Interconnection Customer demonstrates and the Participating TO agrees, such agreement not to be unreasonably withheld, that engineering, permitting and construction of the new Large Load or increase in capacity of the existing Large Load will take longer than the seven year period.
3.7.1 Interconnection Request. If the proposed Service Commencement Date in the Interconnection Request is more than seven years from the date the Interconnection Request is received by the Participating TO, the Large Load Interconnection Customer must demonstrate, subject to the Participating TO’s agreement, such agreement not to be unreasonably withheld, that the required engineering, permitting and construction of the Large Load will take longer than the seven-year period.
PDF page 107
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.7.2 After Start of the Large Load Interconnection Study. Any request to extend the Service Commencement Date after commencement of the Large Load Interconnection Study under the LLIP, or following execution of a TSRA, shall be subject to the following:
(i) Requested extension does not exceed seven years from Service Commencement Date in the original Interconnection Request. A request to extend the Service Commencement Date that does not exceed seven years from the Service Commencement Date in the original Interconnection Request is subject to the modification assessment process specified in LLIP Section 4.6.1.6.
(ii) Requested extension exceeds seven years from Service Commencement Date in the original Interconnection Request. A request to extend the Service Commencement Date that exceeds seven years from the Service Commencement Date in the original Interconnection Request shall (a) demonstrate, subject to the Participating TO’s agreement, such agreement not to be unreasonably withheld, that engineering, permitting and construction of the new Large Load or increase in capacity of the existing Large Load will take longer than the seven-year period, and (b) be subject to the modification assessment process specified in LLIP Section 4.6.1.6.
3.8 Queue Position
3.8.1 Assignment of Queue Position.
Participating TO shall assign a Queue Position as follows: the Queue Position shall be assigned based upon the date and time of receipt of all items required pursuant to the provisions of LLIP Section 4.2.1.
3.8.2 Higher Queue Position.
A higher Queue Position assigned to an Interconnection Request is one that has been placed “earlier” in the queue in relation to another Interconnection Request that is assigned a lower Queue Position.
3.9
Withdrawal
Large Load Interconnection Customer may withdraw its Interconnection Request at any time by written notice of such withdrawal to Participating TO, and the Participating TO will notify the ISO and Affected System Operators, if any, within three (3) Business Days of receipt of such a notice. In addition, after confirmation by the Participating TO of a valid Interconnection Request, if the Large Load Interconnection Customer fails
PDF page 108
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
to adhere to all requirements of this LLIP, except as provided in LLIP Section 7.2 (Disputes), Participating TO shall deem the Interconnection Request to be withdrawn and shall provide written notice to Large Load Interconnection Customer of the deemed withdrawal within five (5) Business Days and an explanation of the reasons for such deemed withdrawal. Upon receipt of such written notice, Large Load Interconnection Customer shall have five (5) Business Days in which to either respond with information or action that either cures the deficiency or supports its position that the deemed withdrawal was erroneous and notifies the Participating TO of its intent to pursue Dispute Resolution.
For an Interconnection Request under the LLIP, withdrawal shall result in the removal of the Interconnection Request from the Interconnection Studies. If a Large Load Interconnection Customer disputes the withdrawal and removal from the Interconnection Studies and has elected to pursue Dispute Resolution, Large Load Interconnection Customer's Interconnection Request will not be considered in any ongoing Interconnection Study during the Dispute Resolution process.
In the event of such withdrawal, Participating TO, subject to the provisions in LLIP Section 7.1, as applicable, shall provide, at Large Load Interconnection Customer's request, all information that Participating TO developed for any completed study conducted up to the date of withdrawal of the Interconnection Request.
3.10
Withdrawal Penalty
A Large Load Interconnection Customer with an Interconnection Request being processed under the LLIP will be subject to a Withdrawal Penalty if it withdraws its Interconnection Request or is deemed withdrawn, or the Large Load does not otherwise achieve its Service Commencement Date, which date may be modified if the necessary Participating TO-owned facilities cannot be constructed on a timeline that meets such date, unless:
(1) the withdrawal does not have a material impact on the cost or timing of any equal or later queued interconnection request; (2) Large Load Interconnection Customer withdraws after receiving Large Load Interconnection Customer’s most recent Interconnection Study report and the Large Load Network Upgrade costs assigned to the Interconnection Request identified in that report have increased by more than twenty-five percent (25%) compared to costs identified in Large Load Interconnection Customer’s preceding Interconnection Study report; or (3) Large Load Interconnection Customer withdraws after receiving an Interconnection Study report issued after completion of the initial Large Load Interconnection Study and the Large Load Network Upgrade costs assigned to the Interconnection Request identified in such Interconnection
PDF page 109
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Study report have increased by more than one hundred percent (100%) compared to costs identified in the initial Large Load Interconnection Study report.
3.10.1 Calculation of the Withdrawal Penalty
If the Large Load Interconnection Customer withdraws its Interconnection Request or is deemed withdrawn prior to the commencement of the Large Load Interconnection Study, Large Load Interconnection Customer will not be subject to a Withdrawal Penalty. If Large Load Interconnection Customer withdraws, is deemed withdrawn, or otherwise does not achieve its Service Commencement Date at any point after the commencement of the Large Load Interconnection Study, that Large Load Interconnection Customer’s Withdrawal Penalty will be the greater of: (1) the Large Load Interconnection Customer’s study deposit required under LLIP Section 4.2.1; or (2) as follows in (a)–(d):
(a) If Large Load Interconnection Customer withdraws or is deemed withdrawn during the Large Load Interconnection Study or after receipt of a Large Load Interconnection Study report, Large Load Interconnection Customer will be charged two (2) times the actual cost of the Large Load Interconnection Study performed for the Large Load Interconnection Customer.
(b) If Large Load Interconnection Customer withdraws or is deemed withdrawn after receipt of the draft TSRA but before Large Load Interconnection Customer has executed a TSRA or has requested that its TSRA be filed unexecuted, Large Load Interconnection Customer will be charged ten percent (10%) its estimated Large Load Network Upgrade costs as reflected in the most recently completed Interconnection Study.
(c) If Large Load Interconnection Customer has executed a TSRA or has requested that its TSRA be filed unexecuted and subsequently withdraws its Interconnection Request, the Large Load Interconnection Customer’s Withdrawal Penalty will calculated as described in the TSRA.
The Commercial Readiness Deposit shall be retained as financial security for the Withdrawal Penalty (if applicable) and other than as described in the TSRA, any security not applied to the Withdrawal Penalty will be released to the Interconnection Customer following withdrawal or the Service Commencement Date.
3.11 Standards for Co-located Inverter Based Generating Facilities
PDF page 110
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Inverters used for the production, and/or later injection from storage, of electricity shall meet the inverter certification standards of UL-1741 and UL-1741 Supplement B.
Section 4. Large Load Study Process
4.1
Timing For Submitting Interconnection Requests
A Large Load Interconnection Customer may submit an Interconnection Request for processing under the LLIP at any time during the year. The Participating TO, in coordination with the ISO, as applicable, will study the Interconnection Request.
4.2 Processing of Interconnection Request
4.2.1
Initiating an Interconnection Request. To initiate an
Interconnection Request under the LLIP, Large Load
Interconnection Customer must submit all of the following: (i) an Interconnection Study Deposit of $250,000; (ii) a completed Interconnection Request in the form of Attachment 1 to the LLIP, including preferred Point of Interconnection and voltage level, and all other technical data; (iii) a Commercial Readiness Deposit equal to two times the study deposit described in this Section 4.2.1 in the form of an irrevocable letter of credit, cash, a surety bond, or other form of security that is reasonably acceptable to Participating TO, in accordance with LLIP Section 4.7.1. This Commercial Readiness Deposit is refunded to Large Load Interconnection Customer according to LLIP Section 3.10.1; however, the Participating TO shall be entitled to hold the Commercial Readiness Deposit until the Large Load Interconnection Customer’s Generating Facility achieves its Service Commencement Date; and (iv) demonstration of Site Control.
4.2.1.1 Use of Interconnection Study Deposit. The
Interconnection Study Deposit shall be applied to pay for prudent costs incurred by the Participating TO, the ISO, or third parties at the direction of the Participating TO or ISO, as applicable, to perform and administer the Interconnection Studies.
In the event a Large Load Interconnection Customer
withdraws its Interconnection Request prior to the
commencement of the Large Load Interconnection Study,
Large Load Interconnection Customer must pay Participating TO the actual costs of processing its Interconnection
Request. In the event a Large Load Interconnection
Customer withdraws after commencement of the Large Load
PDF page 111
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Interconnection Study, Participating TO shall charge and Large Load Interconnection Customer shall pay the actual costs of the Interconnection Studies.
Any difference between the study deposit and the actual cost of the Interconnection Studies shall be paid by or refunded to the Large Load Interconnection Customer. Any invoices for Interconnection Studies shall include a detailed and itemized accounting of the cost of each Interconnection Study. Large Load Interconnection Customers shall pay any such
undisputed costs within thirty (30) Calendar Days of receipt of an invoice. If Large Load Interconnection Customer fails to pay such undisputed costs within the time allotted, its Interconnection Request shall be deemed withdrawn and will be subject to Withdrawal Penalties pursuant to LLIP Section 3.10.1.
The Participating TO will reimburse the ISO or third parties, as applicable, for all work performed on behalf of the withdrawn Interconnection Request at the Participating TO’s direction. The Large Load Interconnection Customer must pay all monies due before it is allowed to obtain any Interconnection Study data or results.
4.3
Validation of Interconnection Request
4.3.1 Acknowledgment of Interconnection Request. Participating TO shall notify the Large Load Interconnection Customer within ten
(10) Business Days of receipt of the Interconnection Request, which notice shall state whether the Interconnection Request is deemed valid.
4.3.2 Deficiencies in Interconnection Request. An Interconnection Request will not be considered to be a valid request until all items in LLIP Section 4.2.1 have been received by Participating TO and deemed valid by the Participating TO. If an Interconnection Request fails to meet the requirements set forth in LLIP Section 4.2.1, Participating TO shall include in its notification to the Large Load Interconnection Customer under LLIP Section 4.3.1 the reasons for such failure and that the Interconnection Request does not constitute a valid request. Large Load Interconnection Customer shall provide Participating TO the additional requested information needed to constitute a valid request. Whenever the additional requested information is provided by the Large Load Interconnection Customer, the Participating TO shall notify the Large Load Interconnection Customer within five (5) Business Days
PDF page 112
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
of receipt of the additional requested information whether the Interconnection Request is valid. If the Interconnection Request continues to fail to meet the requirements set forth in LLIP Section 4.2.1, the Participating TO shall include in its notification to the Large Load Interconnection Customer the reasons for such failure. If an Interconnection Request has not been deemed valid, the Large Load Interconnection Customer must submit all information necessary to meet the requirements of LLIP Section 4.2.1 no later than twenty (20) Business Days after the date the original Interconnection Request was submitted, or ten (10) Business Days after the Participating TO first provided notice that the Interconnection Request was not valid, whichever is later. Interconnection Requests that have not met the requirements of LLIP Section 4.2.1 within twenty (20) Business Days after the date the original Interconnection Request was submitted or ten (10) Business Days after the Participating TO first provided notice that the Interconnection Request was not valid, whichever is later, will be deemed invalid and will not be included in the LLIP.
Interconnection Requests deemed invalid under this LLIP Section 4.3.2 are not subject to LLIP Section 3.9. Large Load
Interconnection Customers with invalid Interconnection Requests under this LLIP Section 4.3.2 may seek relief under LLIP Section 7.2 by notifying the Participating TO within two (2) Business Days of the notice of invalidity.
4.4 Potential Deferral of the Interconnection Studies The Participating TO may defer commencement of the Large Load Interconnection Study when it determines, using Good Utility Practice and reasonable engineering judgment, that the Interconnection Request cannot be studied meaningfully until other pending study results for higher-queued projects are available.
Within ten (10) Business Days after deeming an Interconnection Request valid under Section 4.3.1, the Participating TO will notify the Large Load Interconnection Customer in writing if it is deferring the start of the Interconnection Studies. The notice will include: (i) information regarding the pending studies; and (ii) the estimated start date of the Large Load Interconnection Study. During the period of deferral, the Participating TO will provide a monthly status update to the Interconnection Customer.
4.5
Scoping Meeting
Within fifteen (15) Business Days after the Participating TO notifies the Large Load Interconnection Customer that the Interconnection Request has been deemed valid as set forth in LLIP Section 4.3.2, the Participating
PDF page 113
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
TO shall establish a date agreeable to the Large Load Interconnection Customer, and the ISO, if applicable, for the Scoping Meeting.
The purpose of the Scoping Meeting shall be to discuss reasonable Service Commencement Dates and alternative interconnection options, to exchange information including any transmission data that would reasonably be expected to impact such interconnection options, to analyze such information and to determine the potential feasible Points of Interconnection and eliminate alternatives given resources and available information. The Scoping Meeting shall also include discussion of a deferral of the Interconnection Studies in accordance with LLIP Section 4.4.
The Participating TO will bring to the meeting, as reasonably necessary to accomplish its purpose, such already available technical data, including, but not limited to, (i) general facility loadings, (ii) general instability issues,
(iii) general short circuit issues, (iv) general voltage issues, and (v) general reliability issues.
The Large Load Interconnection Customer will bring to the Scoping Meeting, in addition to the technical data in Appendix A to LLIP Attachment 1, any system studies previously performed. The Participating TO, the ISO, if applicable, and the Large Load Interconnection Customer will also bring to the meeting personnel and other resources as may be reasonably required to accomplish the purpose of the meeting in the time allocated for the meeting. On the basis of the meeting, the Large Load Interconnection Customer shall designate its Point of Interconnection. The duration of the meeting shall be sufficient to accomplish its purpose.
Within five (5) Business Days after the Scoping Meeting, the Participating TO shall provide the Large Load Interconnection Customer with a Large Load Study Process Agreement in the form set forth in LLIP Attachment 2, which shall contain an outline of the scope of the Large Load Interconnection Study, contain a non-binding good faith estimate of the cost to perform such study, and shall specify that the Large Load Interconnection Customer is responsible for the actual cost of the Interconnection Studies, including reasonable administrative costs. The Large Load Interconnection Customer shall execute and deliver to the Participating TO the Large Load Study Process Agreement no later than thirty (30) Calendar Days after the Scoping Meeting, or the Interconnection Request shall be deemed withdrawn.
4.6
Interconnection Studies
The Interconnection Studies shall consist of a Large Load Interconnection Study and any additional studies, including but not limited to those
PDF page 114
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
identified in LLIP Section 4.6.3 required for interconnection of the Large Load, and co-located generation not exporting to the ISO Controlled Grid, to the Participating TO’s Transmission System. The analysis of impacts on, and upgrades required to, the Participating TO’s Transmission System will be performed by the Participating TO and will be subject to the review and concurrence of the ISO in accordance with Section 25.7 of the ISO Tariff. The Interconnection Studies will identify Interconnection Facilities, Distribution Upgrades and required Large Load Network Upgrades necessary to mitigate thermal overloads and voltage violations, and address short circuit, stability, and reliability issues associated with the requested Transmission Interconnection Service. When a Large Load Owner is the Large Load Interconnection Customer, the Interconnection Studies will be limited to the identification of Large Load Network Upgrades necessary to mitigate thermal overloads and voltage violations, and address short circuit, stability, and reliability issues associated with the requested Transmission Interconnection Service.
All cost estimates for Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades, as applicable, contained in the Interconnection Studies will be set forth in the Interconnection Study report in present dollar costs as well as time- adjusted dollar costs, adjusted to the estimated year of construction of the components being constructed.
The Participating TO will prepare an Interconnection Study report to document the results of the Interconnection Studies.
4.6.1 Large Load Interconnection Study.
4.6.1.1 Scope of the Large Load Interconnection Study. The Large Load Interconnection Study will consist of a short
circuit analysis, a power flow analysis, an electromagnetic transient (“EMT”) screening, a non-binding good faith
estimate of the scope and cost of the Participating TO’s
Interconnection Facilities, Distribution Upgrades and Large Load Network Upgrades, and any other studies that are
deemed necessary. The Large Load Interconnection Study
will also identify the need for any additional studies (e.g., stability analysis, EMT study, etc.) to be performed as part of the scope of the TSRA pursuant to LLIP Section 4.6.3.
When there is co-located generation not exporting to the ISO Controlled Grid and not subject to electrical short circuit duty dependence, the Large Load Interconnection Study will
PDF page 115
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
identify the impacts associated with the Large Load and any incremental impacts of the co-located generation. The Large Load Interconnection Study will consider the use of alternative transmission technologies including dynamic line ratings, advanced power flow control devices, advanced conductors, and transmission switching, when evaluating transmission solutions to accommodate new Large Loads and their associated transmission system impacts. The Large Load Interconnection Study shall state the assumptions upon which it is based, state the results of the analyses, and provide the requirement or potential impediments to providing the requested Transmission Interconnection Service, including an estimate of the cost and length of time that would be necessary to correct any problems identified in those analyses and implement the Interconnection.
The Large Load Interconnection Study shall provide a list of Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades, as
applicable, that are required as a result of the Interconnection Request.
4.6.1.2 Timing of the Large Load Interconnection Study Results. The Participating TO shall use Reasonable Efforts to complete the Large Load Interconnection Study within ninety (90) Calendar Days after the execution of a Large Load Study Process Agreement. The Participating TO will issue a Large Load Interconnection Study report to the Large Load Interconnection Customer. The Participating TO will share study results with the ISO for review and concurrence.
At any time the Participating TO determines that it will not meet the required time frame for completing the Large Load Interconnection Study, Participating TO shall notify the Large Load Interconnection Customer as to the schedule status of the Large Load Interconnection Study and provide an estimated completion date with an explanation of the reasons why additional time is required.
Upon request, the Participating TO shall provide the Large Load Interconnection Customer all supporting
documentation, workpapers and relevant pre-Interconnection
PDF page 116
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Request and post-Interconnection Request power flow and short circuit databases for the Large Load Interconnection Study, subject to confidentiality arrangements consistent with LLIP Section 7.1.
Should the Large Load Interconnection Customer provide written comments on the Large Load Interconnection Study report at least five (5) Business Days before the Report Meeting conducted to discuss the report, the Participating TO will address the written comments in the Large Load Interconnection Study Report Meeting. Should the Large Load Interconnection Customer provide comments at any later time (up to the time of the Report Meeting), then such comments shall be considered informal inquiries to which the Participating TO will provide informal, informational responses at the Report Meeting, to the extent possible.
The Large Load Interconnection Customer may submit, in writing, additional comments on the final Large Load Interconnection Study report up to (3) Business Days following the Report Meeting. Based on any discussion at the Report Meeting and any comments received from the Large Load Interconnection Customer or the ISO, the Participating TO will determine whether it is necessary to follow the Large Load Interconnection Study report with a revised study report. The Participating TO will issue any such revised report to the Large Load Interconnection Customer no later than fifteen (15) Business Days following the Report Meeting. If the ISO has not completed its review of the Large Load Interconnection Study report, the Participating TO shall delay its determination of whether a revised study report is required until that review is complete.
4.6.1.3 Large Load Interconnection Study Report Meeting. A Report Meeting shall be held among the Participating TO, the ISO, if applicable, and the Large Load Interconnection Customer to discuss the results of the Large Load Interconnection Study, including assigned cost responsibility. A Report Meeting will be held within ten (10) Business Days of the date the Large Load Interconnection Study report is provided to the Large Load Interconnection Customer.
4.6.1.4 Increase in the Commercial Readiness Deposit. The Large Load Interconnection Customer shall submit an additional deposit that brings the total Commercial Readiness Deposit to twenty percent (20%) of Large Load
PDF page 117
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Interconnection Customer’s Large Load Network Upgrade cost assignment identified in the Large Load Interconnection Study, within thirty (30) Calendar Days after being provided with the final Large Load Interconnection Study report, or its Interconnection Request shall be deemed withdrawn.
Should the Large Load Interconnection Study report be revised as the result of ISO review, in accordance with LLIP Section 4.6.1.2, the increase in the Commercial Readiness Deposit shall be adjusted to reflect twenty percent (20%) of the assigned Large Load Network Upgrades in the revised report within thirty (30) Calendar Days of issuance of the final report.
4.6.1.5 Restudy. If restudy of the Large Load Interconnection Study is required due to a higher queued project dropping out of the queue, or a modification of a higher queued project subject to Section 4.6.1.6, Participating TO shall notify Large Load Interconnection Customer in writing. Such restudy shall take no longer than forty-five (45) Calendar Days from the date of notice. Any cost of restudy shall be borne by the Large Load Interconnection Customer.
4.6.1.6 Modifications. At any time during the course of the Interconnection Studies, the Large Load Interconnection Customer, the Participating TO, or the ISO, as applicable, may identify changes to the planned interconnection that may improve the costs and benefits (including reliability) of the interconnection, and the ability of the proposed change to accommodate the Interconnection Request. To the extent the identified changes are acceptable to the Participating TO, the ISO, as applicable, and Large Load Interconnection Customer, such acceptance not to be unreasonably withheld, Participating TO shall modify the configuration in accordance with such changes without altering the Interconnection Request’s eligibility for participating in Interconnection Studies.
4.6.1.6.1 For any modifications other than those agreed upon under LLIP Section 4.6.1.6, the Interconnection Customer must first request that Participating TO evaluate whether such modification is a Material Modification. In response to Interconnection
Customer's request, Participating TO, in coordination with the ISO, if applicable, shall evaluate the
proposed modifications prior to making them and
PDF page 118
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
inform Interconnection Customer in writing of whether the modifications would constitute a Material Modification. The Participating TO may, at its option, engage the services of the ISO to assist in the assessment of the modification. Any change to the Point of Interconnection shall constitute a Material Modification.
The Large Load Interconnection Customer shall provide the Participating TO a $30,000 deposit for the modification assessment at the time the request is submitted. Except as provided below, any
modification assessment will be concluded, and a response provided to the Large Load Interconnection Customer in writing, within forty-five (45) Calendar Days from the date the Participating TO receives all of the following: 1) the Large Load Interconnection Customer’s written notice to modify the project; 2) a narrative description of the requested modification; 3) technical data required to assess the request, including an updated Appendix A to the
Interconnection Request Form (LLIP Attachment 1), if requested by the Participating TO; 4) any additional information requested by Participating TO; and 5) payment of the $30,000 deposit. If applicable, the Participating TO shall coordinate the modification request with the ISO. If the modification assessment cannot be completed within that time period, the Participating TO shall notify the Large Load Interconnection Customer and provide an estimated completion date with an explanation of the reasons why additional time is required. The Large Load Interconnection Customer will be responsible for the actual costs incurred by the Participating TO and, if applicable, the ISO in conducting the modification assessment. If the actual costs of the modification assessment are less than the deposit provided by the Large Load Interconnection Customer, the Large Load Interconnection Customer will be refunded the balance within thirty (30) Calendar Days of being invoiced. If the actual costs of the modification assessment are greater than the deposit provided by the Large Load Interconnection Customer, the Large Load Interconnection Customer shall pay the balance within thirty (30) Calendar Days of being invoiced.
PDF page 119
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
If the proposed modification is determined to be a
Material Modification by the Participating TO pursuant to the modification assessment described above, the
Large Load Interconnection Customer shall then
either:
(i) withdraw the proposed modification, or
(ii) withdraw the proposed modification and submit a new Interconnection Request reflecting such
modification.
4.6.2 Optional Flexible Interim Load Interconnection (FILI) Study and Agreement. Based on the results of the Large Load Interconnection Study, the Large Load Interconnection Customer may elect to have a FILI Study performed when the estimated completion date of the PTO’s Interconnection Facilities, Distribution Upgrades, or Large Load Network Upgrades identified in the Large Load Interconnection Study is beyond the Large Load Interconnection Customer’s requested Service Commencement Date.
The Large Load Interconnection Customer’s election to proceed with the FILI Study must be made by written notification to the Participating TO within fifteen (15) Business Days of the Large Load Interconnection Study Report Meeting.
The Participating TO will perform the FILI Study within sixty (60) Calendar Days of receipt of the Large Load Interconnection Customer’s written notification. The Large Load Interconnection Customer will be responsible for the actual costs of the Study. At any time Participating TO determines that it will not meet the required time frame for completing the FILI Study, Participating TO shall notify the Large Load Interconnection Customer as to the schedule status of the FILI Study and provide an estimated completion date with an explanation of the reasons why additional time is required.
The FILI study will determine: (i) whether a Large Load Interconnection Customer is eligible to receive non-firm limited load capacity; (ii) the conditions and limitations of such service; (iii) the upgrades and the associated cost, and (iv) the estimated duration required to provide the limited service. The Participating TO will share study results with the ISO for review and concurrence. If requested by the Large Load Interconnection Customer within ten (10) Business Days of the date of the
PDF page 120
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
issuance of the FILI Study report, a Report Meeting shall be scheduled among the Participating TO, the ISO, and the Large Load Interconnection Customer.
The Large Load Interconnection Customer should note the following considerations:
a) Temporary limits may be adjusted if unforeseen conditions arise.
b) Advance notice of non-firm load curtailment may not be possible.
c) Non-firm load may be curtailed during planned or repair outages, which may last longer than 6 months.
d) ISO may have additional operational requirements.
e) Participating TO is not obligated to provide flexibility beyond what it can, in its sole judgment, manage operationally.
f) Interconnection Facilities costs for interim interconnection service will be directly assigned to the Large Load Interconnection Customer.
g) Large Load Interconnection Customers not adhering to the contractual agreement and conditions may be curtailed indefinitely.
4.6.2.1 FILI Agreement with Participating TO and ISO. If the Large Load Interconnection Customer has elected Flexible Interim Load Interconnection (FILI), as reflected in the TSRA, the Large Load Interconnection Customer will be required to execute an agreement with the Participating TO and ISO, in the form of agreement included in Attachment 4 to LLIP, prior to the Service Commencement Date, in accordance with ISO Tariff Section 25.7.2. The agreement shall describe the circumstances in which the ISO or Participating TO may temporarily curtail the Large Load receiving FILI, and the mechanism the ISO or Participation TO will use to perform the curtailment. The ISO will post such FILI agreements on the ISO Website.
4.6.3 Additional Studies. The Participating TO may identify the need for additional studies to comply with Applicable Reliability Standards. These additional studies may include, but not limited to, the following: stability analysis, variable load impact analysis, and EMT analysis. The associated new scope will be identified in the Large Load Interconnection Study pursuant to LLIP Section 4.6.1.1. The additional studies will be performed by the Participating TO as part of the scope of work set forth in the Transmission Security and Reliability Agreement (“TSRA”). The additional studies may result in
PDF page 121
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
the identification of additional facilities scope and cost, and may require a revision to the schedule set forth in the TSRA. The Large Load Interconnection Customer will be responsible for providing the necessary technical information and/or models requested by the Participating TO to conduct the additional studies. The Large Load Interconnection Customer will be responsible for the costs of such studies.
If an additional study results in the need to revise the scope of work of the Large Load Network Upgrades identified in the Large Load Interconnection Study and the updated assigned costs have increased by more than twenty-five percent (25%) compared to costs identified in the Large Load Interconnection Study Report, the Large Load Interconnection Customer shall not be subject to a Withdrawal Penalty under LLIP Section 3.10.1 if the Interconnection Request is withdrawn within thirty (30) Calendar Days of receipt of the additional study report. If the Large Load Interconnection Customer elects to continue with its Interconnection Request, the TSRA will be amended to reflect the results of the additional study.
4.6.4 Financing of Participating TO’s Interconnection Facilities, Distribution Upgrades and Large Load Network Upgrades. The responsibility to finance Participating TO’s Interconnection Facilities and Distribution Upgrades shall be assigned solely to the Large Load Interconnection Customer, except where the Large Load will be a retail transmission customer of Participating TO, in which case the local regulatory authority will determine any financing responsibilities for Distribution Upgrades. The Participating TO will be responsible for financing Large Load Network Upgrades in accordance with the TSRA.
4.7
Interconnection Financial Security
4.7.1 Types of Interconnection Financial Security. The Interconnection Financial Security posted by a Large Load Interconnection Customer may be any combination of the following types of Interconnection Financial Security provided in favor of the Participating TO:
(a) an irrevocable and unconditional letter of credit issued by a bank or financial institution that has a credit rating of A or better by Standard and Poor’s or A2 or better by Moody’s;
(b) an irrevocable and unconditional surety bond issued by an insurance company that has a credit rating of A or better by Standard and Poor’s or A2 or better by Moody’s;
PDF page 122
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
(c) an unconditional and irrevocable guaranty issued by a company has a credit rating of A or better by Standard and Poor’s or A2 or better by Moody’s;
(d) a cash deposit standing to the credit of the Participating TO and in an interest-bearing escrow account maintained at a bank or financial institution that is reasonably acceptable to the Participating TO;
(e) a certificate of deposit in the name of the Participating TO issued by a bank or financial institution that has a credit rating of A or better by Standard and Poor’s or A2 or better by Moody’s; or
(f) a payment bond certificate in the name of the Participating TO issued by a bank or financial institution that has a credit rating of A or better by Standard and Poor’s or A2 or better by Moody’s.
Interconnection Financial Security instruments as listed above shall be in such form as the Participating TO may reasonably require from time to time by notice to Large Load Interconnection Customers, or in such other form as has been evaluated and approved as reasonably acceptable by the Participating TO.
The Participating TO shall require the use of standardized forms of Interconnection Financial Security to the greatest extent possible. If at any time the guarantor of the Interconnection Financial Security fails to maintain the credit rating required by this LLIP Section 4.7.1, the Large Load Interconnection Customer shall provide to the Participating TO replacement Interconnection Financial Security meeting the requirements of this LLIP Section 4.7.1 within five (5) Business Days of the change in credit rating.
Interest on a cash deposit standing to the credit of the Participating TO in an interest-bearing escrow account under subpart (d) of this LLIP Section 4.7.1 will accrue to the Large Load Interconnection Customer’s benefit.
Execution and filing of the TSRA at FERC are addressed in LLIP Section 5.
Section 5.
Transmission Security and Reliability Agreement
5.1
Tender. Within thirty (30) Calendar Days after the Report Meeting for the final Large Load Interconnection Study report, or the final FILI Study report, if
PDF page 123
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
applicable, the Participating TO shall tender a draft TSRA, together with draft appendices. The draft TSRA shall be in the form of Participating TO's FERC-approved form of TSRA, which is in Attachment 3 to the LLIP. The Large Load Interconnection Customer shall provide written comments, or notification of no comments, to the draft appendices within thirty (30) Calendar Days.
5.2
Negotiation. Notwithstanding LLIP Section 5.1, at the request of Large Load Interconnection Customer Participating TO shall begin negotiations with Large Load Interconnection Customer concerning the appendices to the TSRA at any time after the Participating TO provides the Large Load Interconnection Customer with the final Large Load Interconnection Study report, or the final FILI Study report, if applicable. Participating TO and Large Load Interconnection Customer shall negotiate concerning any disputed provisions of the appendices to the draft TSRA for not more than sixty (60) Calendar Days after the Participating TO provides the Large Load Interconnection Customer with the final Large Load Interconnection Study report or the final FILI Study report if applicable. If Large Load Interconnection Customer determines that negotiations are at an impasse, it may request termination of the negotiations at any time after tender of the draft TSRA pursuant to LLIP Section 5.1 and request submission of the unexecuted TSRA with FERC or initiate Dispute Resolution procedures pursuant to LLIP Section 7.2. If Large Load Interconnection Customer requests termination of the negotiations, but within sixty (60) Calendar Days after issuance of the final Large Load Interconnection Study report, or the final FILI Study report if applicable, fails to request either the filing of the unexecuted TSRA or initiate Dispute Resolution, it shall be deemed to have withdrawn its Interconnection Request. Unless otherwise agreed by the Parties, if Large Load Interconnection Customer has not executed the TSRA, requested filing of an unexecuted TSRA, or initiated Dispute Resolution procedures pursuant to LLIP Section 7.2 within sixty (60) Calendar Days after issuance of the final Large Load Interconnection Study report, or the final FILI Study report if applicable, it shall be deemed to have withdrawn its Interconnection Request. Participating TO shall provide to Large Load Interconnection Customer a final TSRA within fifteen (15) Business Days after the completion of the negotiation process.
The Participating TO may declare an impasse upon sixty (60) Calendar Days after issuance of the final Large Load Interconnection Study report, or the final FILI Study report if applicable, or at anytime following sixty (60) Calendar Days after issuance of the final Large Load Interconnection Study report, or the final FILI Study report if applicable, if the Parties have agreed to extend negotiation of the TSRA. If the Participating TO declares an impasse, the Participating TO will file the TSRA unexecuted with FERC within twenty one (21) Calendar Days.
PDF page 124
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
5.3
Execution and Filing
Large Load Interconnection Customer shall either: (i) execute two originals of the tendered TSRA and return them to Participating TO; or (ii) request in writing that Participating TO file with FERC a TSRA in unexecuted form. As soon as practicable, but not later than ten (10) Business Days after receiving either the two executed originals of the tendered TSRA (if either does not conform with a FERC-approved standard form of TSRA) or the request to file an unexecuted TSRA, Participating TO shall file the TSRA with FERC, together with its explanation of any matters as to which Large Load Interconnection Customer and Participating TO disagree and support for the costs that Participating TO proposes to charge to Large Load Interconnection Customer under the TSRA. An unexecuted TSRA should contain terms and conditions deemed appropriate by Participating TO for the Interconnection Request. If the Parties agree to proceed with design, procurement, and construction of facilities and upgrades under the agreed-upon terms of the unexecuted TSRA, they may proceed pending FERC action.
5.4
Commencement of Interconnection Activities
If Large Load Interconnection Customer executes the final TSRA, Participating TO and Large Load Interconnection Customer shall perform their respective obligations in accordance with the terms of the TSRA, subject to modification by FERC. Upon submission of an unexecuted TSRA, Large Load Interconnection Customer and Participating TO shall promptly comply with the unexecuted TSRA, if agreed to by the Parties pursuant to LLIP Section 5.2, subject to modification by FERC.
5.5
Large Load Interconnection Customer To Meet Requirements of the Participating TO’s Interconnection Handbook
The Large Load Interconnection Customer’s Interconnection Facilities shall be designed, constructed, operated and maintained in accordance with the Participating TO’s Interconnection Handbook. In the event of a conflict between the terms of the LLIP and the terms of the Participating TO’s Interconnection Handbook, the terms in the LLIP shall govern.
Section 6.
Construction of Participating TO's Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades
6.1
Schedule
Participating TO and Large Load Interconnection Customer shall negotiate in good faith concerning a schedule for the Participating TO’s construction of Participating TO's Interconnection Facilities, Distribution Upgrades, and the Large Load Network Upgrades.
PDF page 125
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
6.2
Construction Sequencing
6.2.1 General. In general, the Service Commencement Date will determine the sequence of construction of Distribution Upgrades and Large Load Network Upgrades.
6.2.2 Advancing Construction of Distribution Upgrades and Large Load Network Upgrades that are Part of an Expansion Plan of the Participating TO. A Large Load Interconnection Customer with a TSRA, in order to maintain its Service Commencement Date, may request that Participating TO advance to the extent necessary the completion of Distribution Upgrades and Large Load Network Upgrades that: (i) are necessary to support such Service Commencement Date and (ii) would otherwise not be completed, pursuant to an expansion plan of Participating TO or approved ISO Transmission Plan covering the Participating TO’s service territory, in time to support such Service Commencement Date. Upon such request, Participating TO will use Reasonable Efforts to advance the construction of such Distribution Upgrades and Large Load Network Upgrades to accommodate such request; provided that Large Load Interconnection Customer commits to pay Participating TO any associated expediting costs.
6.3
Special Provisions for Affected Systems
The Large Load Interconnection Customer shall enter into an agreement with the Affected System Operator, as applicable. The agreement shall specify the terms governing payments to be made by the Large Load Interconnection Customer to the Affected System Operator.
Section 7.
Miscellaneous
7.1
Confidentiality
For the purposes of this LLIP Section 7.1, “Party” or “Parties” shall mean the Participating TO, Large Load Interconnection Customer, ISO, or any combination of the Participating TO, Large Load Interconnection Customer, or ISO.
Confidential Information shall include, without limitation, all information relating to a Party's technology, research and development, business affairs, and pricing.
Information is Confidential Information only if it is clearly designated or marked in writing as confidential on the face of the document, or, if the information is conveyed orally or by inspection, if the Party providing the
PDF page 126
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
information orally informs the Party receiving the information that the information is confidential.
If requested by either Party, the other Party shall provide in writing, the basis for asserting that the information referred to in this Article warrants confidential treatment, and the requesting Party may disclose such writing to the appropriate Governmental Authority. Each Party shall be responsible for the costs associated with affording confidential treatment to its information.
7.1.1 Scope. Confidential Information shall not include information that the receiving Party can demonstrate: (1) is generally available to the public other than as a result of a disclosure by the receiving Party; (2) was in the lawful possession of the receiving Party on a non-confidential basis before receiving it from the disclosing Party;
(3) was supplied to the receiving Party without restriction by a third party, who, to the knowledge of the receiving Party after due inquiry, was under no obligation to the disclosing Party to keep such information confidential; (4) was independently developed by the receiving Party without reference to Confidential Information of the disclosing Party; (5) is, or becomes, publicly known, through no wrongful act or omission of the receiving Party or Breach of the TSRA; or (6) is required, in accordance with LLIP Section 7.1.6, Order of Disclosure, to be disclosed by any Governmental Authority or is otherwise required to be disclosed by law or subpoena, or is necessary in any legal proceeding establishing rights and obligations under the TSRA. Information designated as Confidential Information will no longer be deemed confidential if the Party that designated the information as confidential notifies the other Party that it no longer is confidential.
7.1.2 Release of Confidential Information. Neither Party shall release or disclose Confidential Information to any other person, except to its Affiliates (limited by the Standards of Conduct requirements), employees, consultants, Affected System Operators, or to parties who may be or considering providing financing to or equity participation with Large Load Interconnection Customer, or to potential purchasers or assignees of Large Load Interconnection Customer, on a need-to-know basis in connection with these procedures, unless such person has first been advised of the confidentiality provisions of this LLIP Section 7.1 and has agreed to comply with such provisions. Notwithstanding the foregoing, a Party providing Confidential Information to any person shall remain primarily responsible for any release of Confidential Information in contravention of this LLIP Section 7.1.
PDF page 127
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
7.1.3 Rights. Each Party retains all rights, title, and interest in the Confidential Information that each Party discloses to the other Party. The disclosure by each Party to the other Party of Confidential Information shall not be deemed a waiver by either Party or any other person or entity of the right to protect the Confidential Information from public disclosure.
7.1.4 No Warranties. By providing Confidential Information, neither Party makes any warranties or representations as to its accuracy or completeness. In addition, by supplying Confidential Information, neither Party obligates itself to provide any particular information or Confidential Information to the other Party nor to enter into any further agreements or proceed with any other relationship or joint venture.
7.1.5 Standard of Care. Each Party shall use at least the same standard of care to protect Confidential Information it receives as it uses to protect its own Confidential Information from unauthorized disclosure, publication or dissemination. Each Party may use Confidential Information solely to fulfill its obligations to the other Party under these procedures or its regulatory requirements.
7.1.6 Order of Disclosure. If a court or a Government Authority or entity with the right, power, and apparent authority to do so requests or requires either Party, by subpoena, oral deposition, interrogatories, requests for production of documents, administrative order, or otherwise, to disclose Confidential Information, that Party shall provide the other Party with prompt notice of such request(s) or requirement(s) so that the other Party may seek an appropriate protective order or waive compliance with the terms of these confidentiality provisions. Notwithstanding the absence of a protective order or waiver, the Party may disclose such Confidential Information which, in the opinion of its counsel, the Party is legally compelled to disclose. Each Party will use Reasonable Efforts to obtain reliable assurance that confidential treatment will be accorded any Confidential Information so furnished.
7.1.7 Remedies. The Parties agree that monetary damages would be inadequate to compensate a Party for the other Party's Breach of its obligations under this LLIP Section 7.1. Each Party accordingly agrees that the other Party shall be entitled to equitable relief, by way of injunction or otherwise, if the first Party Breaches or threatens to Breach its obligations under this LLIP Section 7.1, which equitable relief shall be granted without bond or proof of damages, and the receiving Party shall not plead in defense that there would be an adequate remedy at law. Such remedy shall not
PDF page 128
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
be deemed an exclusive remedy for the Breach of this LLIP Section 7.1 but shall be in addition to all other remedies available at law or in equity. The Parties further acknowledge and agree that the covenants contained herein are necessary for the protection of legitimate business interests and are reasonable in scope. No Party, however, shall be liable for indirect, incidental, or consequential or punitive damages of any nature or kind resulting from or arising in connection with this LLIP Section 7.1.
7.1.8 Disclosure to FERC, its Staff, or a State. Notwithstanding anything in this LLIP Section 7.1 to the contrary, and pursuant to 18 CFR section 1b.20, if FERC or its staff, during the course of an investigation or otherwise, requests information from one of the Parties that is otherwise required to be maintained in confidence pursuant to the LLIP, the Party shall provide the requested information to FERC or its staff, within the time provided for in the request for information. In providing the information to FERC or its staff, the Party must, consistent with 18 CFR section 388.112, request that the information be treated as confidential and non- public by FERC and its staff and that the information be withheld from public disclosure. Parties are prohibited from notifying the other Party prior to the release of the Confidential Information to FERC or its staff. The Party shall notify the other Party to the TSRA when it is notified by FERC or its staff that a request to release Confidential Information has been received by FERC, at which time either of the Parties may respond before such information would be made public, pursuant to 18 CFR section 388.112. Requests from a state regulatory body conducting a confidential investigation shall be treated in a similar manner, consistent with applicable state rules and regulations.
7.1.9 Subject to the exception in LLIP Section 7.1.8, any information that a Party claims is competitively sensitive, commercial or financial information ("Confidential Information") shall not be disclosed by the other Party to any person not employed or retained by the other Party, except to the extent disclosure is (i) required by law; (ii) reasonably deemed by the disclosing Party to be required to be disclosed in connection with a dispute between or among the Parties, or the defense of litigation or dispute; (iii) otherwise permitted by consent of the other Party, such consent not to be unreasonably withheld; or (iv) necessary to fulfill its obligations under this LLIP or as a transmission service provider or a Balancing Authority Area operator including disclosing the Confidential Information to an RTO or ISO or to a subregional, regional or national reliability organization or planning group. The Party asserting confidentiality shall notify the other Party in writing of the
PDF page 129
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
information it claims is confidential. Prior to any disclosures of the other Party's Confidential Information under this subparagraph, or if any third party or Governmental Authority makes any request or demand for any of the information described in this subparagraph, the disclosing Party agrees to promptly notify the other Party in writing and agrees to assert confidentiality and cooperate with the other Party in seeking to protect the Confidential Information from public disclosure by confidentiality agreement, protective order or other reasonable measures.
7.1.10 This provision shall not apply to any information that was or is hereafter in the public domain (except as a result of a Breach of this provision).
7.1.11 Participating TO shall, at Large Load Interconnection Customer's election, destroy, in a confidential manner, or return the Confidential Information provided at the time of Confidential Information is no longer needed.
7.2
Disputes
7.2.1 Submission. In the event either Party has a dispute, or asserts a claim, that arises out of or in connection with the TSRA, the LLIP, or their performance, such Party (the "disputing Party") shall provide the other Party with written notice of the dispute or claim ("Notice of Dispute"). Such dispute or claim shall be resolved in accordance with the Dispute Resolution Procedures set forth in Section 14 of the TO Tariff.
PDF page 130
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
ATTACHMENT 1 to LLIP
TRANSMISSION OWNER TARIFF
INTERCONNECTION REQUEST FOR A
LARGE LOAD
Submittal and Payment Instructions
The Interconnection Request may be submitted via email at
grid.interconnections@sce.com or mail to:
Southern California Edison Company
Grid Interconnection & Contract Development
P.O. Box 800
2244 Walnut Grove Avenue
Rosemead, CA 91770
The required deposit may be submitted via mail at:
Southern California Edison Company
Attention: Accounts Receivable (GCM)
P.O. Box 800
Rosemead, CA 91771-0001
The undersigned Large Load Interconnection Customer submits this request to interconnect its Large Load with Participating TO’s Transmission System pursuant to Appendix XV of the TO Tariff.
Where Large Load Owner will be a retail transmission customer of Participating TO, requests for interconnection of non-exporting generation will be governed by the Local Regulatory Authority.
1. This Interconnection Request is for (check only one):
A proposed new Large Load.
A proposed new Large Load and co-located generation
An increase in the capacity, or a Material Modification of an existing Large Load.
2. Large Load Interconnection Customer provides the following information:
a. Address or location, including the county, of the proposed new Large Load site (to the extent known) or, in the case of an existing Large Load, the
PDF page 131
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
name and specific location, including the county, of the existing Large Load;
Project Name:
Project Location:
Street Address:
City, State:
County:
Zip Code:
GPS Coordinates:
Assessor’s Parcel Numbers (if available):
b. Maximum rated load and the requested maximum load of the proposed new Large Load or the amount of increase in the load of an existing Large Load;
Maximum rated load (MW): ________
Requested maximum load (MW): ________ or
Increase in the load (MW): ________
Provide five (5) year forecast of monthly load requirements beginning with the first year after service is scheduled to commence.
c. Type of Large Load and general description of the equipment configuration (if more than one type is chosen, include net MW for each);
Computational loads
___ AI/machine-learning training data center _____ MW ___ Cloud, enterprise, colocation or AI inference data center _____ MW ___ Cryptocurrency mining
_____ MW
___ Non-IT Load
_____ MW
Electrochemical and industrial process loads
___ Hydrogen electrolyzer
_____ MW
___ Electric arc furnace or induction furnace
_____ MW
___ Other manufacturing or process industry (e.g., semiconductor fab, chemicals, cement)
_____ MW
___ Other (please describe): ____ MW
d. Description of co-located generation resource(s) (if applicable)
Rated capacity (MW): ________
Will the co-located generation export to the ISO Controlled Grid (Yes or No)?
PDF page 132
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Co-located generation exporting to the ISO Controlled Grid will be evaluated under the ISO Tariff and the Interconnection Customer is required to submit a separate Interconnection Request pursuant to Appendix KK of the ISO Tariff.
CAISO queue number (if applicable): ___________
e. Proposed Service Commencement Date, and Other Key Dates (Day/Month/Year)
Proposed Service Commencement Date:
/ /
Proposed Date of Initial Operation of co-located generation (if applicable) / /
Proposed Term of Service (years): ______________
f. Name, address, telephone number, and e-mail address of Large Load Interconnection Customer's contact person (primary person who will be contacted);
Name:
Title:
Company Name:
Street Address:
City, State:
Zip Code:
Phone Number:
Email Address:
Large Load Interconnection Customer’s DUNS Number:
g. Point of Interconnection:
Transmission Substation (Name and voltage level):
______________________, or
Transmission Line: ______________________, or
Approximate location of the proposed Point of Interconnection _______________ (i.e., specify transmission facility interconnection point name, voltage level, and the location of interconnection);
h. Large Load Interconnection Customer Data (set forth in Appendix A)
The Large Load Interconnection Customer shall provide to the Distribution Provider the technical data called for in Appendix A.
PDF page 133
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3. Applicable Interconnection Study Deposit amount as specified in LLIP Section 4.2.1 made payable to Southern California Edison Company. Send check to Participating TO along with:
1. A completed Interconnection Request form for processing.
2. A completed Appendix A (Transmission Owner Tariff Large Load Data).
4. Commercial Readiness Deposit (CRD) equal to two times the Study Deposit amount in the form of a security instrument in accordance with LLIP Section 4.9.1. A draft security instrument may be submitted with the Interconnection Request but must be finalized within ten (10) Business Days.
5. Evidence of Site Control as specified in LLIP Section 4.2.1 and name(s), address(es) and contact information of site owner(s). (Attach documentation)
6. Representative of Large Load Interconnection Customer to contact:
[To be completed by Large Load Interconnection Customer]
Name:
Title:
Company Name:
Street Address:
City, State:
Zip Code:
Phone Number:
Email Address:
7. This Interconnection Request is submitted by:
Legal name of Large Load Interconnection Customer: ___________________
By: ____________________________
Name: _________________________
Title: __________________________
Date: __________________________
PDF page 134
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix A to
Interconnection Request
TRANSMISSION OWNER TARIFF
LARGE LOAD DATA
Each Large Load Interconnection Customer will complete Sections 1 and 2 of this Appendix A. Each Large Load Interconnection Customer colocating with non-exporting generating facilities will complete the applicable data in Sections 3 through 8 of this Attachment A based on the type of generating facility(ies) requesting interconnection. (Section 5 for synchronous generators, Section 6 for induction generators, Section 7 for wind turbine generators, and Section 8 for inverter-based generators).
Each Large Load Interconnection Customer will complete Sections 9 through 13, as applicable. At any time, Participating TO may require Large Load Interconnection Customer to provide additional technical data, or additional documentation supporting the technical data provided, as deemed necessary by the Participating TO to perform Interconnection Studies, other studies, or evaluations as set forth under the LLIP.
1. Provide the following:
A. Site drawing showing Large Load location and Point of Interconnection with the Participating TO’s Transmission System.
B. Single-line diagram showing applicable equipment such as large load components, generating units (if applicable), step-up transformers, auxiliary transformers, switches/disconnects of the proposed
interconnection, including the required protection devices and circuit breakers. This one-line drawing must be signed and stamped by a
licensed Professional Engineer.
2. Large Load Information:
Provide the following information for the Large Load:
A. Rated total MW consumption and power factor of the Large Load, including IT equipment, power distribution, and cooling:
Total MW: _______________
Power factor: _______________
B. Percentage of the total MW consumption of the Large Load for each of the following load components:
Computing/server load: _____ %
Lighting load: _____ %
Power distribution losses: _____ %
Cooling: _____ %
Other: _____ % (describe if applicable): _______________
Does the percentage change during different seasons and different
times of the day? (Yes/No): _____ If yes, provide a gross estimate
PDF page 135
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
(e.g., Summer Day / Summer Night and Winter Day / Winter Night): _______________
C. If the Large Loadhas some form of forced cooling system, indicate what it is comprised of (check all that apply and add details if needed): ___ Computer Room Air Conditioners (CRACs) with internal compressors: _______________
___ Computer Room Air Handlers (CRAHs) supplied with chilled water: _______________
___ Air-Handling Units (AHUs) dedicated to the data center space: _______________
___ Other (please describe): _______________
D. Motor-driven components of the cooling systems are driven by (check all that apply and add details if needed):
___ Single-speed motors operated across the line (motors connected directly to the AC supply): _______________
___ Motors controlled by variable/adjustable speed drives or electronically commutated motors (ECMs): _______________ ___ Other methods (please specify): _______________
E. Voltage sag levels and durations below which the components within the data center disconnect from the grid:
(1) Computing/server load: _______________
(2) Cooling load: _______________
(3) Are voltage sags sensed per phase or on a three-phase basis for the disconnection action? _______________
(4) Does any load disconnect after a given number of voltage sag events (Yes/No)? If yes, specify: _______________
(5) Any other protection scheme related to voltage sag that may disconnect load: _______________
F. Voltage swell levels and durations above which the components within the data center disconnect from the grid:
(1) Computing/server load: _______________
(2) Cooling load: _______________
(3) Are voltage swells sensed per phase or on a three-phase basis for the disconnection action? _______________
(4) Does any load disconnect after a given number of voltage swell events (Yes/No)? If yes, specify: _______________
(5) Any other protection scheme related to voltage swell that may disconnect load: _______________
G. Frequency thresholds above and below which any computing/server load may disconnect from the grid:
Above: _______________
Below: _______________
H. Reconnection of load after voltage and frequency recover (check all that apply and specify):
___ Reconnects immediately; voltage and frequency levels: _______________
PDF page 136
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
___ Reconnects after a time delay; voltage and frequency levels and delay: _______________
___ Reconnects manually
___ Reconnects on a ramp; ramp rate: _______________
I. Emergency generation and battery energy storage:
(1) Size (MW) and duration: _______________
(2) Can the emergency generation and storage be dispatched to support all or part of the load during system events (Yes/No)? _______________
(3) Can the facility island on emergency generation and storage (Yes/No)? _______________
(4) Can the facility participate in demand-side management during a grid emergency or as an ancillary service (Yes/No)?
_______________
(5) Amount, if any, of server farm load that could be redistributed to redundant server capacity: _______________
(6) Amount, if any, of load that would transfer if the facility were tripped offline: _______________
(7) How fast the load transfer can be performed:
_______________
(8) Is the transfer closed transition (make before break) or open transition (break before make)? _______________
J. Details of existing protection and control schemes that affect the response of the facility: _______________________________________________ K. Acceptable duration of outage (seconds or minutes): _______________ L. Any additional information about the project: ______________________
3. Co-Located Generation Information (if applicable):
Include all on-site generation and storage, including emergency backup generation, and complete (1) - (9) below. Report load and generation as gross values (do not net co-located generation against the Large Load). Provide technical data for the co-located generation resources in Appendix A as applicable.
A. Arrangement and operating mode:
(1) Arrangement (check one):
___ Co-located generation serving the Large Load on the
generator side of the Point of Interconnection
___ Behind-the-meter generation at the Large Load’s retail meter
___ Other (describe): _______________
PDF page 137
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
(2) Operating mode (check all that apply):
___ Emergency backup only (no parallel operation with the PTO’s Transmission System)
___ Continuous parallel operation
___ Islanding capable ___ Peak shaving or load following
(3) New or existing generation; in-service date relative to the Large Load phases in Item 2.b: __________________________
B. Technology and ratings (aggregate nameplate MVA and MW for each technology):
____ Combustion turbine or reciprocating engine: ____MVA / ____MW Fuel: __________
____ Solar photovoltaic: _____ MVA / _____ MW
____ Battery energy storage: _____ MVA / _____ MW /
____ MWh
Charges from the ISO Controlled Grid (Y/N): ___
____ Fuel cell: _____ MVA / _____ MW Fuel: _________ ____ Other (describe): ________________
MVA / _____ MW___
Voltage (kV) at the common point where the co-located generation connects (e.g., high side of the generator step-up transformer or collector system): _______________
C. Gross and net withdrawal and requested service:
(1) Gross Large Load (MW) and gross co-located generation (MW), reported separately: _______ / _______
(2) Maximum net withdrawal from the ISO Controlled Grid with co- located generation online (MW): _______________
(3) Largest single co-located generating unit or storage device that could trip (MW): _______________
(4) Withdrawal requested when co-located generation is unavailable (MW): _______
D. Non-export controls (for non-exporting co-located generation):
(1) Method used to prevent export (e.g., reverse-power relay, export-limiting controls, power control system): _______________
_____________________________________________________
E. Ride-through, protection, and disturbance behavior:
(1) Voltage and frequency ride-through capability and protection settings of the co-located generation (attach curves and settings):
PDF page 138
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
____________________________________________________
(2) Expected response of the co-located generation to a sudden loss or reduction of the Large Load, and of the Large Load to a trip of the co-located generation, including the resulting change in flow at the Point of Interconnection (MW): _______________
(3) Transfer scheme (open or closed transition) and maximum duration of parallel operation: _______________
(4) Anti-islanding protection and time to separate from the Transmission System during a disturbance: _____________
(5) Protection coordination at the Point of Interconnection and disturbance monitoring equipment covering the co-located generation: _______________
F. Models and data:
(1) Power flow and dynamic models of the co-located generation and an electromagnetic transient (EMT) model if required.
(2) Evidence of model verification (e.g., manufacturer attestation, test data, or commissioning measurements), with as-built model updates provided before the Service Commencement Date.
G. NERC registration:
(1) Co-located generation (check one):
___ Bulk Electric System generation (BES Inclusion I2, I3, or I4): Category 1 Generator Owner / Generator Operator
___ Non-BES inverter-based resources with aggregate nameplate capacity of 20 MVA or more connected at 60 kV or above: Category 2 Generator Owner / Generator Operator
___ Excluded (e.g., BES Exclusion E1 or E2) or below registration thresholds; explain: _______________
(2) Does the Large Load expect to register as a Computational Load Owner or Computational Load Operator (Y/N)? _________
4. Generating Facility General Information (if applicable):
A. Total Generating Facility rated output (MW):
_______________
A1.
Maximum Generating Facility operating capacity (MW): _______________
(applicable if the Generating Facility output will be limited to less than rated capacity)
B. Generating Facility auxiliary load (MW): _______________
C. Net Generating Facility capacity at generator/inverter terminals (MW): _______________ (A-B) or (A1-B)
D. Collector system losses (MW): _______________ (insert “n/a” if not applicable or negligible)
PDF page 139
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
E. Main step-up transformer losses (MW): _______________ (insert “n/a” if not applicable or negligible)
F. Net Generating Facility capacity at high-side of main step-up transformer (MW): _______________ (C-D-E)
G. Gen-tie loss to Point of Interconnection (MW): _______________ (insert “n/a” if not applicable or negligible)
H. Net Generating Facility capacity at Point of Interconnection (MW): _______________ (F-G)
H1.
Maximum export capacity at Point of Interconnection (MW): _______________
(applicable if the requested export capacity at the Point of Interconnection is less than the Net Generating Facility capacity at the Point of Interconnection. If so, please indicate the reason (e.g., serving host load, etc.)) ___________________
I. Standby Load when Generating Facility is off-line (MW):
_______________
J.
Number of Generating Units: ___________________
(Please repeat the following items for each generator)
K.
Individual generator rated output (MW for each unit): _______________ L.
Manufacturer of the Generating Units: __________________________ M.
Year Manufactured: ____________
N.
Nominal Terminal Voltage (kV): ________________________________ O.
Rated Power Factor (%): _____________
P.
Type (induction, synchronous, D.C. with inverter): _________________
Q.
Phase (3 phase or single phase): _______
R.
Connection (Delta, Grounded WYE, Ungrounded WYE, impedance grounded): ________________________________________________ S.
Generator Voltage Regulation Range (+/- %): _____________________ T.
Generator Power Factor Regulation Range: ______________________ U.
For combined cycle plants, specify the plant net output capacity (MW) for an outage of the steam turbine or an outage of a single combustion turbine______________
5. Synchronous Generator –Information:
5A
Generator Information:
(Please repeat the following for each generator)
A. Rated Generator speed (rpm): ____________
B. Rated MVA: _______________
C. Rated Generator Power Factor: ____________
D. Generator Efficiency at Rated Load (%): ____________
E. Moment of Inertia (including prime mover): ____________
F. Inertia Time Constant (on machine base) H: ____________ sec or MJ/MVA
G. SCR (Short-Circuit Ratio - the ratio of the field current required for
PDF page 140
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
rated open-circuit voltage to the field current required for rated short-circuit current):
___________________________________________
H. Please attach generator reactive capability curves.
I. Rated Hydrogen Cooling Pressure in psig (Steam Units only): ________________________________________________
J.
Please attach a plot of generator terminal voltage versus field current that shows the air gap line, the open-circuit saturation curve, and the saturation curve at full load and rated power factor.
5B
Excitation System Information:
(Please repeat the following for each generator)
A. Indicate the Manufacturer ____________________ and Type _____________of excitation system used for the generator. For exciter type, please choose from 1 to 9 below or describe the specific excitation system.
(1) Rotating DC commutator exciter with continuously acting regulator. The regulator power source is independent of the generator terminal voltage and current.
(2) Rotating DC commentator exciter with continuously acting regulator. The regulator power source is bus fed from the generator terminal voltage.
(3) Rotating DC commutator exciter with non-continuously acting regulator (i.e., regulator adjustments are made in discrete increments).
(4) Rotating AC Alternator Exciter with non-controlled (diode) rectifiers. The regulator power source is independent of the generator terminal voltage and current (not bus-fed).
(5) Rotating AC Alternator Exciter with controlled (thyristor) rectifiers. The regulator power source is fed from the exciter output voltage.
(6) Rotating AC Alternator Exciter with controlled (thyristor) rectifiers.
(7) Static Exciter with controlled (thyristor) rectifiers. The regulator power source is bus-fed from the generator terminal voltage.
(8) Static Exciter with controlled (thyristor) rectifiers. The regulator power source is bus-fed from a combination of generator terminal voltage and current (compound-source controlled rectifiers system.
(9) Other (specify):
_______________________________________
B. Attach a copy of the block diagram of the excitation system from its instruction manual. The diagram should show the input, output, and all feedback loops of the excitation system.
PDF page 141
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
C. Excitation system response ratio (ASA): ______________
D. Full load rated exciter output voltage: ___________
E. Maximum exciter output voltage (ceiling voltage): ___________
F. Other comments regarding the excitation system? _____________________________________________________ _____________________________________________________
5C
Power System Stabilizer (“PSS”) Information:
(Please repeat the following for each generator model. All new generators are required to install PSS unless an exemption has been obtained from WECC. Such an exemption can be obtained for units that do not have suitable excitation systems.)
A. Manufacturer:
_____________________________________________
B. Is the PSS digital or analog?
__________________________________
C. Note the input signal source for the PSS?
_____ Bus frequency _____ Shaft speed _____
Bus Voltage _____________________ Other (specify source)
D. Please attach a copy of a block diagram of the PSS from the PSS Instruction Manual and the correspondence between dial settings and the time constants or PSS gain.
E. Other comments regarding the PSS?
_____________________________________________________ _____________________________________________________ _____________________________________________________
5D
Turbine-Governor Information:
(Please repeat the following for each generator model.)
Please complete Part A for steam, gas or combined-cycle turbines, Part B for hydro turbines, and Part C for both.
A. Steam, gas or combined-cycle turbines:
(1) List type of unit (Steam, Gas, or Combined-
cycle):__________
(2) If steam or combined-cycle, does the turbine system have a reheat process (i.e., both high and low pressure turbines)? _______
(3) If steam with reheat process, or if combined-cycle, indicate in the space provided, the percent of full load power produced by each turbine:
Low pressure turbine or gas turbine:______%
High pressure turbine or steam turbine:______%
PDF page 142
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
(4) For combined cycle plants, specify the plant net output capacity (MW) for an outage of the steam turbine or an outage of a single combustion
turbine:_____________________________________
B. Hydro turbines:
(1) Turbine efficiency at rated load: _______%
(2) Length of penstock: ______ft
(3) Average cross-sectional area of the penstock: _______ft2
(4) Typical maximum head (vertical distance from the bottom of the penstock, at the gate, to the water level): ______ft
(5) Is the water supply run-of-the-river or reservoir: ___________
(6) Water flow rate at the typical maximum head: _________ft3/sec
(7) Average energy rate: _________kW-hrs/acre-ft
(8) Estimated yearly energy production: ________kW-hrs
C. Complete this section for each machine, independent of the turbine type.
(1) Turbine manufacturer: _______________
(2) Maximum turbine power output: _______________MW
(3) Minimum turbine power output (while on line): _________MW
(4) Governor information:
(a) Droop setting (speed regulation): _____________
(b) Is the governor mechanical-hydraulic or electro- hydraulic (Electro-hydraulic governors have an electronic speed sensor and transducer.)?
_________________
(c) Other comments regarding the turbine governor system?
___________________________________________
___________________________________________
___________________________________________
___________________________________________
5E
Short Circuit Duty Information:
For each generator, provide the following reactances expressed in p.u. on the generator base:
• Xd – Direct Axis Synchronous Reactance: _____ p.u.
• X’d – Direct Axis Transient Reactance: _____ p.u.
PDF page 143
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
• X”d – Direct Axis Subtransient Reactance: _____ p.u.
• X2 – Negative Sequence Reactance: _____ p.u.
• X0 – Zero Sequence Reactance: _____ p.u.
Generator Grounding (select one for each model):
A. _____ Solidly grounded
B. _____ Grounded through an impedance
(Impedance value in p.u. on generator base.
R:_____________p.u.
X:_____________p.u.)
C. _____ Ungrounded
6. Induction Generator Information:
(Please repeat the following for each generator)
A. Motoring Power (kW): ______________
B. I22t or K (Heating Time Constant): ______________
C. Rotor Resistance, Rr: ______________
D. Stator Resistance, Rs: ______________
E. Stator Reactance, Xs: ______________
F. Rotor Reactance, Xr: ______________
G. Magnetizing Reactance, Xm: ______________
H. Short Circuit Reactance, Xd'': ______________
I. Exciting Current: ______________
J.
Temperature Rise: ______________
K.
Frame Size: ______________
L.
Design Letter: ______________
M.
Reactive Power Required In Vars (No Load): ______________ N.
Reactive Power Required In Vars (Full Load): ______________ O.
Total Rotating Inertia, H: _____________ Per Unit on kVA Base
7. Wind Turbine Generator (WTG) Information:
(Proposed projects may include one or more WTG types. Please repeat the following for each type of WTG).
A. Number of generators to be interconnected pursuant to this Interconnection Request: _____
B. Average Site Elevation: ______ Single Phase _____ Three Phase_____
C. Field Volts: _________________
D. Field Amperes: ______________
E. Motoring Power (MW): _______
F. Neutral Grounding Resistor (If Applicable): ____________
G. I22t or K (Heating Time Constant): ____________
PDF page 144
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
H. Rotor Resistance: ____________
I. Stator Resistance: ____________
J. Stator Reactance: ____________
K. Rotor Reactance: ____________
L. Magnetizing Reactance: ___________
M. Short Circuit Reactance: ___________
N. Exciting Current: ________________
O. Temperature Rise: ________________
P. Frame Size: _______________
Q. Design Letter: _____________
R. Reactive Power Required In Vars (No Load):________
S. Reactive Power Required In Vars (Full Load):________
T. Total Rotating Inertia, H: ________ Per Unit on 100 MVA Base
Note: A completed General Electric Company Power Systems Load Flow (PSLF) data sheet must be supplied with the Interconnection Request. If other data sheets are more appropriate to the proposed device then they shall be provided and discussed at Scoping Meeting.
Distribution Provider may require testing verification of voltage and harmonic performance during commissioning test of WTG based generation projects.
8. Inverter Based Generation Systems Information:
(Proposed inverter based generation projects may include one or more types of inverters. Please repeat the following for each type of inverter).
A. Inverter Manufacturer and Model: _________________________
B. Number of Inverters: ___________________
C. Nameplate Rating (AC, each inverter): _______/_______ kW
D. Nameplate Voltage Rating (AC): _______ kV
E. Maximum AC line current: _______ Amps
F. Nameplate Power Factor Rating (AC): _______
G. Please attach capability curve describing reactive power or power factor range from no output to full rated output
H. Inverter control mode (e.g. voltage, power factor, reactive power): _____
I. Short Circuit Characteristics: Applicant to provide technical data related to the short circuit characteristics of proposed inverter based generation systems. For example, the applicant can provide a sinusoidal waveform test data showing faulted condition at the AC side of the inverter for a three phase and single-line-to-ground fault.
J.
Harmonics Characteristics:
(1) Inverter switching frequency: _______
(2) Harmonic characteristics for each unit up to switching frequency: ___________________________________________________
PDF page 145
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
(3) Harmonic characteristics for aggregate generation facility: _______ K.
Inverter disconnection characteristics: Applicant to provide voltage sinusoidal waveform test data which shows the voltage characteristics during disconnection of inverter system from distribution system at 100% and at 50% of rated output.
L.
Provide documentation demonstrating compliance with the Smart Inverter requirements specified in Section 3.13 of the LLIP.
Distribution Provider may require testing verification of voltage and harmonic performance during commissioning test of the inverter based generation systems.
9. Step-Up Transformer Data:
For each step-up transformer (e.g. main step-up transformers, padmount transformers), fill out the data form provided in Table 1.
PDF page 146
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
TABLE 1
TRANSFORMER DATA
(Provide for each level of transformation)
UNIT*_____________________________________
NUMBER OF TRANSFORMERS_________ PHASE _______
RATING
H Winding
X Winding
Y Winding
Rated MVA
Connection (Delta, Wye, Gnd.)
Cooling Type (OA,OA/FA, etc) :
Temperature Rise Rating
Rated Voltage
BIL
Available Taps (% of rating)
Load Tap Changer? (Y or N)
Tap Settings
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
IMPEDANCE
H-X
H-Y
X-Y
Percent
MVA Base
Tested Taps
WINDING RESISTANCE
Ohms
__________
__________
__________
H
__________
__________
__________
__________
X
__________
__________
__________
__________
Y
__________
CURRENT TRANSFORMER RATIOS
H_____________
X______________
Y______________
N_____________
PERCENT EXCITING CURRENT 100 % Voltage; _________ 110% Voltage________
PDF page 147
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Supply copy of nameplate and manufacturer’s test report when available.
* For Generating Facilities with multiple step-up transformers, identify the transformer datasheet unit number with that of the single line.
10. Interconnection Facilities Line Data:
For transmission lines that are to be planned by the generation developer, please provide the following information:
Nominal Voltage: _______________ kV
Line Length (miles): ___________________
Line termination Points: ___________________
Conductor Type: ______ Size: ________
If bundled. Number per phase: ______, Bundle spacing: _____in. Phase Configuration. Vertical: _______, Horizontal: _______
Phase Spacing (ft): A-B: ______, B-C: _______, C-A: ________
Distance of lowest conductor to Ground at full load and 40°C: _________ft Ground Wire Type: ________ Size: _______ Distance to Ground: ______ft Attach Tower Configuration Diagram
Summer line ratings in amperes (normal and emergency) _________________ Positive Sequence Resistance ( R ):
__________ p.u.** (for entire line
length)
Positive Sequence Reactance: ( X ):
__________ p.u.** (for entire line
length)
Zero Sequence Resistance ( R0 ):
__________ p.u.** (for entire line
length)
Zero Sequence Reactance: ( X0 ):
__________ p.u.** (for entire line
length)
Line Charging (B/2):
__________ p.u.**
** On 100-MVA and nominal line voltage (kV) Base
11. For Wind/Photovoltaic Plants, provide Collector System Equivalence Impedance Data (if applicable):
Provide values for each equivalence collector circuit at all voltage levels.
Nominal Voltage: _______________ kV
Summer line ratings in amperes (normal and emergency): _______________
Positive Sequence Resistance ( R ): _____ p.u.** (for entire line length of each collector circuit)
Positive Sequence Reactance: ( X ): _____ p.u.** (for entire line length of each collector circuit)
Zero Sequence Resistance ( R0 ): _____ p.u.** (for entire line length of each collector circuit)
Zero Sequence Reactance: ( X0 ): _____ p.u.** (for entire line length of each collector circuit)
Line Charging (B/2): ______ p.u.**
PDF page 148
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
** On 100-MVA and nominal line voltage (kV) Base
12. Plant-Level Reactive Power Compensation Data:
Provide the following information for plant-level reactive power compensation, if applicable:
A. Number of individual shunt capacitor banks: _____________
B. Individual shunt capacitor bank rated voltage (kV): _____________
C. Individual shunt capacitor bank size (kVAR at rated voltage): _____________
D. Planned dynamic reactive control devices (SVC, STATCOM): _____________
E. Control range: _____________ kVAR (lead) _____________ kVAR (lag)
F. Control mode (e.g. voltage, power factor, reactive power): _____________
G. Please provide the overall plant reactive power control strategy
13. Storage System Information:
Description of the intended use of the storage system (e.g., export to the grid, peak shaving, load shifting, etc.):
___________________________________________
Provide the following information for each type of storage device:
A. Manufacturer and model: ____________________________________
B. Source Functions
(1) Total storage capability: ___________________ MWh
(2) Rated storage discharging power: ___________________ MW
(3) Maximum storage discharging power: ________________ MW
If the maximum storage discharging power is less than the rated storage discharging power, specify the device(s) used to limit the discharge (e.g., inverters, storage control, etc.): _____________________
(4) Discharge duration under rated power: ____ Hours
(5) Discharge duration under maximum power: ____ Hours
C. Charging Functions
(1) Rated storage charging power: ___________________ MW
(2) Maximum storage charging power: ________________ MW
If the maximum storage charging power is less than the rated storage charging power, specify the device(s) used to limit the charging (e.g., inverters, storage control, etc.):
_____________________
(3) Charge duration under rated power: ____ Hours
(4) Charge duration under maximum power: ____ Hours
PDF page 149
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
(5) Will the Distribution System be used to charge the storage device (Yes/No): _______
If No, specify the device(s) used to prevent charging from the
Distribution System (e.g., inverters, storage control, etc.):
_____________________
D. Primary frequency response operating range for electric storage resources (xx % of the upper charging limit of each storage component)
(1) Minimum State of Charge: _____________
(2) Maximum State of Charge: _____________
14. Load Flow and Dynamic Models:
The WECC Data Preparation Manual for Power Flow Base Cases and Dynamic Stability Data has established power flow and dynamic modeling requirements for generation projects in WECC base cases. In general, if the aggregate sum of generation on a bus exceeds 10 MVA, it should not be netted. Furthermore, the total netted generation in an area should not exceed five percent of the area’s total generation. Based on current WECC modeling requirements, the following information will be required for all generation projects whose net capacity is greater than 10 MVA. The following information may also be required for generation projects less than 10 MVA on a case- by-case basis, based on the amount of generation in the area of the requested Point of Interconnection. Each Large Load shall provide the load flow and dynamic model data specified in Item C of this section, in addition to the information in Items A and B for any co-located generation.
A. Provide load flow model for the generating plant and its interconnection facilities in GE PSLF *.epc format, including new buses, generators, transformers, interconnection facilities. An equivalent model is required for the plant with generation collector systems. This data should reflect the technical data provided in this Attachment A.
B. For each generator, governor, exciter, power system stabilizer, WTG, or inverter based generator, select the appropriate dynamic models from the General Electric PSLF Program Manual and provide the required input data. Include any user written *.p EPCL files to simulate inverter based plants’ dynamic responses (typically needed for inverter based PV/wind plants). Provide a completed *.dyd file that contains the information specified in this section.
C. For Large Loads, the Large Load Interconnection Customer shall provide a validated user-defined root mean squared (RMS) positive sequence dynamics model and an appropriately parameterized generic library RMS positive sequence dynamics model, including model block diagram of the inverter control and plant control systems, as defined by a model approved by the Western Electricity Coordinating Council, that
PDF page 150
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
corresponds to Large Load Interconnection Customer’s Generating
Facility. Refer to the PSLF User Manual and available NERC
documentation on the use and parameterization of model parameters.
Enter “N/A” for any field that is not applicable (e.g., distributed generation data). If multiple motors or Type 1 loads need to be represented, copy the relevant fields and identify the applicable parameters.
The GE PSLF manual is available upon request from GE. There are links within the GE PSLF User’s Manual to detailed descriptions of specific models, a definition of each parameter, a list of the output channels, explanatory notes, and a control system block diagram. In addition, GE PSLF modeling information and various modeling guidelines documents have been prepared by the WECC Modeling and Validation Work Group. This information is available on the WECC website (www.wecc.org).
If you require assistance in developing the models, we suggest you contact GE Vernova. Accurate models are important to obtain accurate study results. Costs associated with any changes in facility requirements that are due to differences between model data provided by the generation developer and the actual generator test data, may be the responsibility of the generation developer.
15. MODELS FOR NON-SYNCHRONOUS GENERATORS
For a non-synchronous Generating Facility, Large Load Interconnection Customer shall provide (1) a validated user-defined root mean squared (RMS) positive sequence dynamics model; (2) an appropriately parameterized generic library RMS positive sequence dynamics model, including model block diagram of the inverter control and plant control systems, as defined by a model approved by the Western Electricity Coordinating Council, that corresponds to Large Load Interconnection Customer’s Generating Facility; and (3) if applicable, a validated electromagnetic transient model if Distribution Provider performs an electromagnetic transient study as part of the interconnection study process. A user-defined model is a set of programming code created by equipment manufacturers or developers that captures the latest features of controllers that are mainly software based and represents the entities’ control strategies but does not necessarily correspond to any generic library model. Large Load Interconnection Customer must also demonstrate that the model is validated by providing evidence that the equipment behavior is consistent with the model behavior (e.g., an attestation from Large Load Interconnection Customer that the model accurately represents the entire Generating Facility; attestations from each equipment manufacturer that the user defined model accurately represents the component of the Generating Facility; or test data).
PDF page 151
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
ATTACHMENT 2 to LLIP
LARGE LOAD STUDY PROCESS AGREEMENT
THIS LARGE LOAD STUDY PROCESS AGREEMENT (“AGREEMENT”) is
made and entered into by and
between , a organized and existing under the laws of the State of , ("Large Load Interconnection Customer") and _________________________ a
existing under the laws of the State of____________, ("Participating TO"). Large Load Interconnection Customer and Participating TO each may be referred to as a "Party," or collectively as the "Parties."
RECITALS
WHEREAS, Large Load Interconnection Customer is proposing to develop a Large Load or capacity addition to an existing Large Load consistent with the Interconnection Request submitted by Large Load Interconnection Customer dated ____ ; and
WHEREAS, Large Load Interconnection Customer desires to interconnect the Large Load with the Participating TO’s Transmission System pursuant to the LLIP; and
WHEREAS, the Large Load Interconnection Customer has requested
Participating TO to perform Interconnection Studies to assess the system impact of interconnecting the Large Load to the Participating TO’s Transmission System, and any Affected Systems and to specify and estimate the cost of the equipment, engineering, procurement and construction work needed on the Participating TO’s electric system to physically and electrically connect the Large Load to the Participating TO’s Transmission System in accordance with Good Utility Practice;
NOW, THEREFORE, in consideration of and subject to the mutual covenants contained herein the Parties agree as follows:
1.0
When used in this Agreement, with initial capitalization, the terms
specified shall have the meanings indicated in Participating TO’s FERC approved LLIP.
2.0
Large Load Interconnection Customer elects and Participating TO shall cause to be performed Interconnection Studies consistent with Section 4 of the LLIP.
PDF page 152
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.0
The scope of the Interconnection Studies shall be subject to the assumptions set forth in Appendix A to this Agreement.
4.0
The Interconnection Studies will be based upon the technical information provided by Large Load Interconnection Customer in the Interconnection Request, as may be modified as the result of the Scoping Meeting, subject to any modifications in accordance with LLIP Section 4.6.1.6. Participating TO reserves the right to request additional technical information from Large Load Interconnection Customer as may reasonably become necessary consistent with Good Utility Practice during the course of the Interconnection Studies. If Large Load Interconnection Customer modifies its designated Point of Interconnection, Interconnection Request, or the technical information provided therein is modified, the Interconnection Studies may be modified as specified in the LLIP.
5.0
The Interconnection Study report for each Interconnection Study shall provide the information specified in the LLIP.
6.0
Large Load Interconnection Customer shall increase the Commercial Readiness Deposit after issuance of the final Large Load Interconnection Study report in accordance with LLIP Section 4.6.1.4.
7.0
Upon completion of the Interconnection Studies, Participating TO shall charge and Large Load Interconnection Customer shall pay the actual costs of the Interconnection Studies pursuant to LLIP Section 3.2.3.3.
8. 0 The Participating TO may provide copies of the Interconnection Studies results to the ISO, an Affected System Operator and the Western Electricity Coordinating Council. Requests for review and input from any Affected System Operators or the Western Electricity Coordinating Council may arrive at any time prior to interconnection.
9.0
Substantial portions of technical data and assumptions used to perform the Interconnection Studies, such as system conditions, existing and planned generation, and unit modeling, may change after the Participating TO provides the Interconnection Studies results to the Large Load Interconnection Customer. Interconnection Studies results will reflect available data at the time the Participating TO provides the Interconnection Study reports to the Large Load Interconnection Customer. The Participating TO shall not be responsible for any additional costs for Participating TO’s Interconnection Facilities, Distribution Upgrades and Large Load Network Upgrades, including, without limitation, costs of new or additional facilities, system upgrades, or schedule changes, that may be incurred by the Large Load
Interconnection Customer as a result of changes in such data and assumptions.
PDF page 153
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
10.0 The Participating TO shall maintain records and accounts of all costs incurred in performing the Interconnection Studies in sufficient detail to allow verification of all costs incurred, including associated overheads. The Large Load Interconnection Customer shall have the right, upon reasonable notice, within a reasonable time at the Participating TO’s offices and at its own expense, to audit the Participating TO’s records as necessary and as appropriate in order to verify costs incurred by the Participating TO. Any audit requested by the Large Load Interconnection Customer shall be completed, and written notice of any audit dispute provided to the Participating TO, within one hundred eighty (180) Calendar Days following receipt by the Large Load Interconnection Customer of the Participating TO’s notification of the final costs of the Interconnection Studies.
11.0 In accordance with LLIP Section 3.11, the Large Load Interconnection Customer may withdraw its Interconnection Request at any time by written notice to the Participating TO. Upon receipt of such notice, this Agreement shall terminate, subject to the requirements of LLIP Sections 4.2.1.1 and 7.1.
12.0 This Agreement shall become effective upon the date the fully executed Agreement is received by the Participating TO. If the Participating TO does not receive the fully executed Agreement pursuant to LLIP Section 4.4, then the Interconnection Request will be deemed withdrawn upon the Large Load Interconnection Customer’s receipt of written notice by the Distribution Provider pursuant to LLIP Section 3.11.
13.0 Miscellaneous.
13.1 Dispute Resolution.
13.1.1 Submission. In the event either Party has a dispute, or asserts a claim, that arises out of or in connection with the TSRA, the LLIP, or their performance, such Party (the "disputing Party") shall provide the other Party with written notice of the dispute or claim ("Notice of Dispute"). Such dispute or claim shall be resolved in accordance with the Dispute Resolution Procedures set forth in Section 14 of the TO Tariff.
13.2 Confidentiality. Confidential Information shall be treated in accordance with LLIP Section 7.1.
13.3 Binding Effect. This Agreement and the rights and obligations hereof, shall be binding upon and shall inure to the benefit of the successors and assigns of the Parties hereto.
PDF page 154
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
13.4 Conflicts. In the event of a conflict between the body of this Agreement and any attachment, appendices or exhibits hereto, the terms and provisions of the body of this Agreement shall prevail and be deemed the final intent of the Parties.
13.5 Rules of Interpretation. This Agreement, unless a clear contrary intention appears, shall be construed and interpreted as follows: (1) the singular number includes the plural number and vice versa; (2) reference to any person includes such person’s successors and assigns but, in the case of a Party, only if such successors and assigns are permitted by this Agreement, and reference to a person in a particular capacity excludes such person in any other capacity or individually; (3) reference to any agreement (including this Agreement), document, instrument or tariff means such agreement, document, instrument, or tariff as amended or modified and in effect from time to time in accordance with the terms thereof and, if applicable, the terms hereof; (4) reference to any applicable laws and regulations means such applicable laws and regulations as amended, modified, codified, or reenacted, in whole or in part, and in effect from time to time, including, if applicable, rules and regulations promulgated thereunder; (5) unless expressly stated otherwise, reference to any Article, Section or Appendix means such Article or Section of this Agreement or such Appendix to this Agreement, or such Section of the LLIP or such Attachment to the LLIP, as the case may be; (6) “hereunder”, “hereof”, “herein”, “hereto” and words of similar import shall be deemed references to this Agreement as a whole and not to any particular Article Section, or other provision hereof or thereof; (7) “including” (and with correlative meaning “include”) means including without limiting the generality of any description preceding such term; and (8) relative to the determination of any period of time, “from” means “from and including”, “to” means “to but excluding” and “through” means “through and including”.
13.6 Entire Agreement. This Agreement, including all Appendices and Schedules attached hereto, constitutes the entire agreement between the Parties with reference to the subject matter hereof, and supersedes all prior and contemporaneous understandings or agreements, oral or written, between the Parties with respect to the subject matter of this Agreement. There are no other agreements, representations, warranties, or covenants which constitute any part of the consideration for, or any condition to, any Party’s compliance with its obligations under this Agreement.
13.7 No Third Party Beneficiaries. This Agreement is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the obligations herein assumed are solely for the use and
PDF page 155
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
benefit of the Parties, their successors in interest and, where permitted, their assigns.
13.8 Waiver. The failure of a Party to this Agreement to insist, on any occasion, upon strict performance of any provision of this Agreement will not be considered a waiver of any obligation, right, or duty of, or imposed upon, such Party.
Any waiver at any time by either Party of its rights with respect to this Agreement shall not be deemed a continuing waiver or a waiver with respect to any other failure to comply with any other obligation, right, or duty of this Agreement. Termination or default of this Agreement for any reason by the Large Load Interconnection Customer shall not constitute a waiver of the Large Load Interconnection Customer's legal rights to obtain an interconnection from the Participating TO. Any waiver of this Agreement shall, if requested, be provided in writing.
13.9 Headings. The descriptive headings of the various Articles and Sections of this Agreement have been inserted for convenience of reference only and are of no significance in the interpretation or construction of this Agreement
13.10 Multiple Counterparts. This Agreement may be executed in two or more counterparts, each of which is deemed an original but all constitute one and the same instrument.
13.11 Amendment. The Parties may by mutual agreement amend this Agreement by a written instrument duly executed by both of the Parties.
13.12 Modification by the Parties. The Parties may by mutual agreement amend the Appendices to this Agreement by a written instrument duly executed by both of the Parties. Such amendment shall become effective and a part of this Agreement upon satisfaction of all applicable laws and regulations.
13.13 Reservation of Rights. The Participating TO shall have the right to make a unilateral filing with FERC to modify this Agreement with respect to any rates, terms and conditions, charges, classifications of service, rule or regulation under section 205 or any other applicable provision of the Federal Power Act and FERC’s rules and regulations thereunder, and Large Load Interconnection Customer shall have the right to make a unilateral filing with FERC to modify this Agreement pursuant to section 206 or any other applicable provision of the Federal Power Act and FERC’s rules and regulations thereunder; provided that each Party shall have the right to protest any such filing by another Party and to participate fully in any proceeding before FERC in which such modifications may be
PDF page 156
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
considered. Nothing in this Agreement shall limit the rights of the Parties or of FERC under sections 205 or 206 of the Federal Power Act and FERC’s rules and regulations thereunder, except to the extent that the Parties otherwise mutually agree as provided herein.
13.14 No Partnership. This Agreement shall not be interpreted or construed to create an association, joint venture, agency relationship, or partnership between the Parties or to impose any partnership obligation or partnership liability upon any Party. No Party shall have any right, power or authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, another Party.
13.15 Assignment. This Agreement may be assigned by a Party only with the written consent of the other Party; and provided further that the Large Load Interconnection Customer shall have the right to assign this Agreement, without the consent of the other Party, for collateral security purposes to aid in providing financing for the Large Load, provided that the Large Load Interconnection Customer will require any secured party, trustee or mortgagee to notify the other Party of any such assignment. Any financing arrangement entered into by the Large Load Interconnection Customer pursuant to this Section will provide that prior to or upon the exercise of the secured party’s, trustee’s or mortgagee’s assignment rights pursuant to said arrangement, the secured creditor, the trustee or mortgagee will notify the other Party of the date and particulars of any such exercise of assignment right(s). Any attempted assignment that violates this Section is void and ineffective. Any assignment under this Agreement shall not relieve a Party of its obligations, nor shall a Party’s obligations be enlarged, in whole or in part, by reason thereof. Where required, consent to assignment will not be unreasonably withheld, conditioned or delayed.
IN WITNESS THEREOF, the Parties have caused this Agreement to be duly executed by their duly authorized officers or agents on the day and year first above written.
PDF page 157
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
[Insert name of Participating TO]
By:
Name: ___________________________
Title:
Date:
[Insert name of Large Load Interconnection Customer]
By:
Name: __________________________
Title:
Date: ___________________________
PDF page 158
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix A
Large Load Study Process
Agreement
ASSUMPTIONS USED IN CONDUCTING THE
LARGE LOAD INTERCONNECTION STUDY
The Interconnection System Impact Study will be based upon the information set forth in the Interconnection Request and agreed upon in the Scoping Meeting held on_________, subject to any modifications in accordance with LLIP Section 4.6.1.6, and the following assumptions:
1. Designation of Point of Interconnection and configuration to be studied.
2. Scope of the Study.
3. Other Assumptions.
4. Non-Binding Cost Estimate.
PDF page 159
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
ATTACHMENT 3 to LLIP
TRANSMISSION SECURITY AND RELIABILITY AGREEMENT (TSRA) FOR A LARGE LOAD INTERCONNECTION CUSTOMER
SUBJECT TO THE LARGE LOAD INTERCONNECTION PROCEDURES
PDF page 160
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
TABLE OF CONTENTS
Recitals ....................................................................................... Article 1. Definitions …
Article 2. Effective Date, Term, and Termination … 2.1 Effective Date … 2.2 Term of Agreement … 2.3 Termination Procedures … 2.3.1 Written Notice … 2.3.2 Default … 2.3.3 … 2.4 Termination Costs … 2.5 Disconnection … 2.6 Survival …
Article 3. Regulatory Filings … 3.1 Filing …
Article 4. Scope of Service … 4.1 Transmission Interconnection Service … 4.1.1 Transmission Service Implications …
4.2 Provision of Service … 4.3 Performance Standards … 4.4 No Transmission Service .......................................................... Article 5. Interconnection Facilities Engineering, Procurement, and
Construction … 5.1 ………………………………………………………………………….
5.2 Equipment Procurement … 5.3 Construction Commencement … 5.4 Work Progress … 5.5 Information Exchange … 5.6 Large Load Interconnection Customer’s Interconnection Facilities
5.6.1 Large Load Interconnection Customer’s Interconnection
Facility Specifications … 5.6.2 Participating TO’s Review … 5.6.3 Large Load Interconnection Customer’s Interconnection
Facilities Construction
5.6.4 Large Load Interconnection Customer to Meet Requirements
of the Participating TO’s Interconnection Handbook …
5.7 Participating TO’s Interconnection Facilities Construction...
5.8 Access Rights … 5.9 Permits … 5.10 Early Construction of Base Case Facilities …
PDF page 161
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
5.11 Taxes … 5.11.1 Large Load Interconnection Customer Payments Taxable
5.11.2 Tax Gross-Up Amount … 5.11.3 Private Letter Ruling or Change or Clarification of Law
5.11.4 Refund … 5.11.5 Taxes Other Than Income Taxes …
5.12 Tax Status … 5.13 Modification … 5.13.1 General … 5.13.2 Standards … 5.13.3 Modification Costs …
Article 6. Testing and Inspection … 6.1 Pre-Service Commencement Date Testing and Modifications
6.2 Post-Service Commencement Date Testing and Modifications
6.3 Right to Observe Testing … 6.4 Right to Inspect …
Article 7. Metering … 7.1 General … 7.2 Check Meters … 7.3 Participating TO Retail Metering …
Article 8. Communications … 8.1 Large Load Interconnection Customer Obligations …
8.2 Remote Terminal Unit … 8.3 No Annexation …
Article 9. Operations … 9.1 General … 9.2 Participating TO Obligations … 9.3 Large Load Interconnection Customer Obligations …
9.4 Start-Up and Synchronization … 9.5 Reactive Power … 9.5.1 Power Factor Design Criteria … 9.6 Outages and Performance Requirements …
9.6.1 Outage Coordination
9.6.2 Ride Through Capability and Performance …
9.6.3 System Protection and Other Control Requirements ..
9.6.3.1
System Protection Facilities …
9.6.4 Requirements for Protection …
9.6.5 Power Quality … 9.7 Operating Limitations Related to FILI
9.8 Switching and Tagging Rules … 9.9 Disturbance Analysis Data Exchange … 9.10 Compliance with ISO Tariff on Large Load Interconnections
PDF page 162
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Article 10. Maintenance … 10.1 Participating TO Obligations … 10.2 Large Load Interconnection Customer Obligations …
10.3 Coordination … 10.4 Secondary Systems … 10.5 Operating and Maintenance Expenses …
Article 11. Performance Obligations … 11.1 Large Load Interconnection Customer Interconnection Facilities
11.2 Participating TO’s Interconnection Facilities and Distribution
Upgrades
11.3 Large Load Network Upgrades … 11.3.1 Non-Export Co-Located Generation Large Load Network
Upgrades…………………………………………………………….
11.4 Provision of Interconnection Financial Security …
11.4.1 Participating TO’s Interconnection Facilities and Distribution
Upgrades……………………………………………………………..
11.4.2 Security Requirements
Article 12. Invoice …
12.1 General …
12.2 Final Invoice … 12.3 Payment
…
12.4 Disputes …
Article 13. Emergencies … 13.1 Definition … 13.2 Obligations …
13.3 Notice …
13.4 Immediate Action … 13.5 Participating TO Authority … 13.5.1 General … 13.5.2 Reduction and Disconnection …
13.6 Large Load Interconnection Customer Authority …
13.7 Limited Liability …
Article 14. Regulatory Requirements and Governing Law … 14.1 Regulatory Requirements … 14.2 Governing Law …
Article 15. Notices …
15.1 General …
15.2 Billings and Payments … 15.3 Alternative Forms of Notice … 15.4 Operations and Maintenance Notice …
PDF page 163
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Article 16. Uncontrollable Force … 16.1 Uncontrollable Force …
Article 17. Default …
17.1 Default …
17.1.1 General … 17.1.2 Right to Terminate …
Article 18. Indemnity, Consequential Damages and Insurance …
18.1 Indemnity … 18.1.1 Indemnified Person … 18.1.2 Indemnifying Party … 18.1.3 Indemnity Procedures … 18.2 Consequential Damages … 18.3 Insurance …
Article 19. Assignment …
19.1 Assignment …
Article 20. Severability …
20.1 Severability …
Article 21. Comparability … 21.1 Comparability …
Article 22. Confidentiality … 22.1 Confidentiality … 22.1.1 Term … 22.1.2 Scope … 22.1.3 Release of Confidential Information …
22.1.4 Rights … 22.1.5 No Warranties … 22.1.6 Standard of Care … 22.1.7 Order of Disclosure … 22.1.8 Termination of Agreement … 22.1.9 Remedies … 22.1.10 Disclosure to FERC, its Staff, or a State …
Article 23. Environmental Releases …
Article 24. Information Requirements … 24.1 Information Acquisition … 24.2 Information Submission by Participating TO …
24.3 Updated Information Submission by Large Load Interconnection
Customer……………………………………………………………………
PDF page 164
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
24.4 Information Supplementation …
Article 25. Information Access and Audit Rights … 25.1 Information Access … 25.2 Reporting of Non-Uncontrollable Force Events …
25.3 Audit Rights … 25.4 Audit Rights Periods … 25.4.1 Audit Rights Period for Construction-Related Accounts
and Records … 25.4.2 Audit Rights Period for All Other Accounts and Records
25.5 Audit Results …
Article 26. Subcontractors … 26.1 General
…
26.2 Responsibility of Principal … 26.3 No Limitation by Insurance …
Article 27. Disputes … 27.1 Submission …
Article 28. Representations, Warranties, and Covenants … 28.1 General
…
28.1.1 Good Standing … 28.1.2 Authority … 28.1.3 No Conflict … 28.1.4 Consent and Approval …
Article 29. Miscellaneous … 29.1 Binding Effect … 29.2 Conflicts … 29.3 Rules of Interpretation … 29.4 Entire Agreement … 29.5 No Third Party Beneficiaries … 29.6 Waiver
…
29.7 Headings … 29.8 Multiple Counterparts … 29.9 Amendment … 29.10 Modification by the Parties … 29.11 Reservation of Rights … 29.12 No Partnership …
Appendix A – Description of Participating TO’s Interconnection Facilities, Large Load Network Upgrades, Distribution Upgrades, Costs, Payments and Financial Security
Appendix B – Requirements for Mitigation of Potential Cost Shifting Related to New Transmission Facilities
PDF page 165
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix C – Milestones
Appendix D – Interconnection Details
Appendix E – Flexible Interim Load Interconnection (FILI) Conditions
Appendix F – Security Arrangements Details
Appendix G – Addresses for Delivery of Notices and Billings
PDF page 166
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
TRANSMISSION SECURITY AND RELIABILITY AGREEMENT
THIS TRANSMISSION SECURITY AND RELIABILITY AGREEMENT (“TSRA”
or “Agreement”) is made and entered into ______________, by and between _______________________, a ____________________________ organized and existing under the laws of the State/Commonwealth of ________________ (“Large Load Interconnection Customer” with a Large Load), and Southern California Edison Company, a corporation organized and existing under the laws of the State of California (“Participating TO”). Large Load Interconnection Customer and Participating TO each may be referred to as a “Party” or collectively as the “Parties.”
Recitals
WHEREAS, Participating TO owns the Participating TO’s Transmission System; and
WHEREAS, Large Load Interconnection Customer and Participating TO have agreed to enter into this Agreement for the purpose of defining certain transmission security and reliability terms necessary to interconnect the Large Load with the Participating TO’s Transmission System;
NOW, THEREFORE, in consideration of and subject to the mutual covenants contained herein, it is agreed:
Article 1.
Definitions
Terms used in this TSRA with initial capitalization shall have the meanings set forth below. The singular of any definition shall include the plural and the plural shall include the singular. If a term with initial capitalization used herein is not defined, such term shall have the meanings ascribed to such term in the LLIP and Section 3 of the TO Tariff.
Affiliate shall mean, with respect to a corporation, partnership or other entity, each such other corporation, partnership or other entity that directly or indirectly, through one or more intermediaries, controls, is controlled by, or is under common control with, such corporation, partnership or other entity.
Ancillary Services shall mean those services that are necessary to support the transmission of capacity and energy from resources to loads while maintaining reliable operation of the Participating TO’s Transmission System and Distribution System in accordance with Good Utility Practice.
Breach shall mean the failure of a Party to perform or observe any material term or condition of the TSRA.
PDF page 167
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Breaching Party shall mean a Party that is in Breach of the TSRA.
Customer-Financed Monthly Rate for Non-ISO-Controlled Facilities shall have the meaning as defined in Appendix X of the Transmission Owner Tariff. The currently effective Customer-Financed Monthly Rate for Non-ISO-Controlled Facilities is as provided in Appendix X of the Transmission Owner Tariff.
Default shall mean the failure of a Breaching Party to cure its Breach in accordance with Article 17 of the TSRA.
Distribution Upgrades Charge shall mean the monthly charge to the Large Load Interconnection Customer to recover the revenue requirements for the Participating TO’s Distribution Upgrades, calculated as the product of the Customer- Financed Monthly Rate for Non-ISO-Controlled Facilities and the Distribution Upgrades Cost. The Distribution Upgrades Charge is provided in Section 5 of Appendix A to the TSRA. The Distribution Upgrades Charge is not applicable to Large Load Interconnection Customers who are retail transmission customers of Participating TO.
Distribution Upgrades Completion Date shall mean the date upon which the construction of the Distribution Upgrades is complete and such facilities are successfully tested and ready for service.
Distribution Upgrades Cost shall mean the Large Load Interconnection
Customer’s allocated share of all costs, excluding One-Time Cost, determined by the Participating TO to be associated with the design, engineering, procurement, construction and installation of the Distribution Upgrades. The Distribution Upgrades Cost is provided in Section 5 of Appendix A to the TSRA.
Emergency Condition shall mean a condition or situation: (1) that in the judgment of the Party making the claim is imminently likely to endanger life or property; or (2) that, in the case of the ISO, is imminently likely (as determined in a non- discriminatory manner) to cause a material adverse effect on the security of, or damage to, the ISO Controlled Grid or the electric systems of others to which the ISO Controlled Grid is directly connected; (3) that, in the case of the Participating TO, is imminently likely (as determined in a non-discriminatory manner) to cause a material adverse effect on the security of, or damage to, the Participating TO’s Transmission System, Participating TO’s Interconnection Facilities, Distribution System, or the electric systems of others to which the Participating TO’s electric system is directly connected; or (4) that, in the case of the Large Load Interconnection Customer, is imminently likely (as determined in a non-discriminatory manner) to cause a material adverse effect on the security of, or damage to, the Large Load or Large Load Interconnection Customer’s Interconnection Facilities. System restoration shall be considered an Emergency Condition.
Hazardous Substances shall mean any chemicals, materials or substances defined as or included in the definition of “hazardous substances,” “hazardous wastes,”
PDF page 168
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
“hazardous materials,” “hazardous constituents,” “restricted hazardous materials,” “extremely hazardous substances,” “toxic substances,” “radioactive substances,” “contaminants,” “pollutants,” “toxic pollutants” or words of similar meaning and regulatory effect under any applicable Environmental Law, or any other chemical, material or substance, exposure to which is prohibited, limited or regulated by any applicable Environmental Law.
Interconnection Facilities Charge shall mean the monthly charge to the Large Load Interconnection Customer to recover the revenue requirements for the Participating TO’s Interconnection Facilities, calculated as the product of the Customer- Financed Monthly Rate for Non-ISO-Controlled Facilities and the Interconnection Facilities Cost. The Interconnection Facilities Charge is provided in Appendix A to the TSRA.
IRS shall mean the Internal Revenue Service.
ISO-Identified Network Upgrades shall mean the identified dollar amount determined by the ISO and identified in Appendix B, where the ISO determines that additional cost-shifting protection is needed concerning shared network upgrade costs.
ITCC (Income Tax Component of Contribution) shall have the meaning
assigned to it in Appendix X to the TO Tariff.
Metering Equipment shall mean all metering equipment installed or to be installed at the Large Load and co-located generation, if applicable, pursuant to the TSRA at the metering points, including but not limited to instrument transformers, MWh- meters, data acquisition equipment, transducers, remote terminal unit, communications equipment, phone lines, and fiber optics.
One-Time Cost shall mean all costs determined by the Participating TO to be associated with the installation of the Participating TO’s Interconnection Facilities and Distribution Upgrades which are not capitalized. The One-Time Cost is provided in Appendix A to the TSRA.
Party or Parties shall mean Participating TO, Large Load Interconnection Customer or any combination of the above.
Remedial Action Scheme (RAS) shall mean a scheme designed to detect predetermined system conditions and automatically take corrective actions that may include, but are not limited to, adjusting or tripping load or generation.
Service Commencement Date shall mean the date the Large Load is initially operated in parallel with the Participating TO’s Transmission System and transmission interconnection service is provided to the Large Load Interconnection Customer pursuant to the terms of an executed TSRA.
PDF page 169
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Uncontrollable Force shall mean any act of God, labor disturbance, act of the public enemy, war, insurrection, riot, fire, storm, flood, earthquake, explosion, breakage or accident to machinery or equipment, any curtailment, order, regulation or restriction imposed by governmental, military or lawfully established civilian authorities, or any other cause beyond the reasonable control of the Participating TO or Large Load Interconnection Customer which could not be avoided through the exercise of Good Utility Practice. An Uncontrollable Force event does not include acts of negligence or intentional wrongdoing by the Party claiming Uncontrollable Force.
Article 2.
Effective Date, Term, and Termination
2.1
Effective Date. This TSRA shall become effective upon execution by the Parties subject to acceptance by FERC (if applicable), or if filed unexecuted, upon the date specified by FERC. Participating TO shall promptly file this TSRA with FERC upon execution in accordance with Article 3.1, if required.
2.2
Term of Agreement. Subject to the provisions of Article 2.3, this TSRA shall remain in effect for a period of fifteen (15) years from the Effective Date.
2.3
Termination Procedures.
2.3.1 Written Notice. This TSRA may be terminated by Large Load
Interconnection Customer after giving Participating TO ninety (90)
Calendar Days advance written notice, or by Participating TO notifying FERC after the Large Load permanently ceases operation.
2.3.2 Default. Either Party may terminate this TSRA in accordance with Article
17.
2.3.3 Notwithstanding Articles 2.3.1 and 2.3.2, no termination shall become effective until the Parties have complied with all Applicable Laws and Regulations applicable to such termination, including the filing with FERC of a notice of termination of this TSRA, which notice has been accepted for filing by FERC, and the Large Load Interconnection Customer has
fulfilled its termination cost obligations under Article 2.4.
2.4
Termination Costs. If a Party elects to terminate this Agreement pursuant to Article 2.3 above, each Party shall pay all costs incurred (including any cancellation costs relating to orders or contracts for Interconnection Facilities and equipment) or charges assessed by the other Party, as of the date of the other Party’s receipt of such notice of termination, that are the responsibility of the Terminating Party under this TSRA. In the event of termination by a Party, the Parties shall use commercially Reasonable Efforts to mitigate the costs, damages and charges arising as a consequence of termination. Upon termination of this TSRA, unless otherwise ordered or approved by FERC:
PDF page 170
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
2.4.1 With respect to any portion of Participating TO’s Interconnection Facilities that have not yet been constructed or installed, Participating TO shall to the extent possible and with Large Load Interconnection Customer’s authorization cancel any pending orders of, or return, any materials or equipment for, or contracts for construction of, such facilities; provided that in the event Large Load Interconnection Customer elects not to authorize such cancellation, Large Load Interconnection Customer shall assume all payment obligations with respect to such materials, equipment, and contracts, and Participating TO shall deliver such material and equipment, and, if necessary, assign such contracts, to Large Load Interconnection Customer as soon as practicable, at Large Load Interconnection Customer’s expense. To the extent that Large Load Interconnection Customer has already paid Participating TO for any or all such costs of materials or equipment not taken by Large Load Interconnection Customer, Participating TO shall promptly refund such amounts to Large Load Interconnection Customer, less any costs, including penalties incurred by Participating TO to cancel any pending orders of or return such materials, equipment, or contracts.
If a Large Load Interconnection Customer terminates this TSRA, it shall be responsible for all costs incurred in association with that Large Load Interconnection Customer’s interconnection, including any cancellation costs relating to orders or contracts for Interconnection Facilities and equipment, and other expenses including any Distribution Upgrades and Large Load Network Upgrades for which Participating TO has incurred expenses and has not been reimbursed by Large Load Interconnection Customer.
2.4.2 Participating TO may, at its option, retain any portion of such materials, equipment, or facilities that Large Load Interconnection Customer chooses not to accept delivery of, in which case Participating TO shall be responsible for all costs associated with procuring such materials, equipment, or facilities.
2.4.3 With respect to any portion of the Interconnection Facilities, and any other facilities already installed or constructed pursuant to the terms of this TSRA, Large Load Interconnection Customer shall be responsible for all costs associated with the removal, relocation or other disposition or retirement of such materials, equipment, or facilities.
2.4.4 Large Load Interconnection Customer will also be responsible for any Withdrawal Fee or Exit Fee under Appendix B to this TSRA.
2.5
Disconnection. Upon termination of this TSRA, the Parties will take all appropriate steps to disconnect the Large Load from the Participating TO’s Transmission System. All costs required to effectuate such disconnection shall
PDF page 171
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
be borne by the terminating Party, unless such termination resulted from the non- terminating Party’s Default of this TSRA or such non-terminating Party otherwise is responsible for these costs under this TSRA.
2.6
Survival. This TSRA shall continue in effect after termination to the extent necessary to provide for final billings and payments and for costs incurred hereunder, including billings and payments pursuant to this TSRA; to permit the determination and enforcement of liability and indemnification obligations arising from acts or events that occurred while this TSRA was in effect; and to permit each Party to have access to the lands of the other Party pursuant to this TSRA or other applicable agreements, to disconnect, remove or salvage its own facilities and equipment.
Article 3.
Regulatory Filings
3.1
Filing. Participating TO shall file this TSRA (and any amendment hereto) with FERC and any other appropriate Governmental Authority, if required. Large Load Interconnection Customer may request that any information provided be subject to the confidentiality provisions of Article 22. If Large Load Interconnection Customer has executed this TSRA, or any amendment thereto, Large Load Interconnection Customer shall reasonably cooperate with Participating TO with respect to such filing and to provide any information reasonably requested by Participating TO needed to comply with applicable regulatory requirements.
Article 4.
Scope of Service
4.1
Transmission Interconnection Service. Transmission Interconnection Service allows Large Load Interconnection Customer to connect the Large Load to the Participating TO’s Transmission System and be eligible to receive power from the ISO Grid, using the capacity of the ISO Controlled Grid. To the extent Large Load Interconnection Customer wants to receive Transmission Interconnection Service, Participating TO shall construct facilities identified in Appendices A and D that the Participating TO is responsible to construct.
4.1.1 Transmission Service Implications. Transmission Interconnection Service does not necessarily provide Large Load Interconnection Customer with the capability to physically receive power from the ISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the ISO Controlled Grid, the Large Load Interconnection Customer shall be subject to the applicable congestion management procedures in the ISO Tariff in the same manner as all other Large Loads. The Large Load Interconnection Customer shall be solely responsible for completing all of the necessary arrangements required under the ISO Tariff to be eligible to schedule the power required for the
PDF page 172
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Large Load, except when the Large Load will be a retail transmission customer of the Participating TO.
4.2
Provision of Service. Participating TO shall provide Transmission Interconnection Service for the Large Load at the Point of Interconnection.
4.3
Performance Standards. Each Party shall perform all of its obligations under this TSRA in accordance with Applicable Laws and Regulations, Applicable Reliability Standards, and Good Utility Practice, and to the extent a Party is required or prevented or limited in taking any action by such regulations and standards, such Party shall not be deemed to be in Breach of this TSRA for its compliance therewith. If such Party is a Participating TO, then that Party shall amend the TSRA and submit the amendment to FERC for approval.
4.4
No Transmission Service. The execution of this TSRA does not entitle the Large Load Interconnection Customer to transmission service under the ISO Tariff and does not convey any right to the Large Load Interconnection Customer to receive electricity using the ISO Controlled Grid.
Article 5.
Interconnection Facilities Engineering, Procurement, and
Construction
5.1
Participating TO shall design, procure, and construct Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades, using Reasonable Efforts to complete Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades by the dates set forth in Appendix C. Participating TO shall not be required to undertake any action which is inconsistent with its standard safety practices, its material and equipment specifications, its design criteria and construction procedures, its labor agreements, and Applicable Laws and Regulations. In the event Participating TO reasonably expects that it will not be able to complete Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades by the specified dates, Participating TO shall promptly provide written notice to Large Load Interconnection Customer and shall undertake Reasonable Efforts to meet the earliest dates thereafter.
5.2
Equipment Procurement. The Participating TO shall commence design of Participating TO’s Interconnection Facilities, Distribution Upgrades, or Large Load Network Upgrades and procure necessary equipment as soon as practicable after all of the following conditions are satisfied, unless the Parties otherwise agree in writing:
5.2.1 Participating TO has completed the Interconnection Studies pursuant to the LLIP, except for any additional studies performed pursuant to this TSRA and in accordance with LLIP Section 4.6.3;
PDF page 173
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
5.2.2 Participating TO has received written authorization to proceed with design and procurement from Large Load Interconnection Customer by the date specified in Appendix C; and
5.2.3 Large Load Interconnection Customer has provided security to Participating TO in accordance with Article 11.4 by the dates specified in Appendix C.
5.3
Construction Commencement. Participating TO shall commence construction of Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades for which it is responsible as soon as practicable after the following additional conditions are satisfied:
5.3.1 Approval of the appropriate Governmental Authority has been obtained for any facilities requiring regulatory approval;
5.3.2 Necessary real property rights and rights-of-way have been obtained, to the extent required for the construction of a discrete aspect of Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades;
5.3.3 Participating TO has received written authorization to proceed with construction from Large Load Interconnection Customer by the date specified in Appendix C; and
5.3.4 Large Load Interconnection Customer has provided security to Participating TO in accordance with Article 11.4 by the dates specified in Appendix C.
5.4
Work Progress. The Parties will keep each other advised periodically as to the progress of their respective design, procurement and construction efforts. Either Party may, at any time, request a progress report from the other Party. If, at any time, Large Load Interconnection Customer determines that the completion of Participating TO’s Interconnection Facilities will not be required until after the specified Service Commencement Date, Large Load Interconnection Customer will provide written notice to Participating TO of such later date upon which the completion of Participating TO’s Interconnection Facilities will be required.
5.5
Information Exchange. As soon as reasonably practicable after the Effective Date, the Parties shall exchange information regarding the design and compatibility of the Parties’ Interconnection Facilities and compatibility of the Interconnection Facilities with Participating TO’s Transmission System, and shall work diligently and in good faith to make any necessary design changes.
PDF page 174
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
5.6
Large Load Interconnection Customer’s Interconnection Facilities. Large Load Interconnection Customer shall, at its expense, design, procure, construct, own and install the Large Load Interconnection Customer’s Interconnection Facilities, as set forth in Appendix A.
5.6.1 Large Load Interconnection Customer’s Interconnection Facility Specifications. Large Load Interconnection Customer shall submit initial specifications for the Large Load Interconnection Customer’s Interconnection Facilities, including System Protection Facilities, to Participating TO at least one hundred eighty (180) Calendar Days prior to the Service Commencement Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Service Commencement Date. Participating TO shall review such specifications to ensure that the Large Load Interconnection Customer’s Interconnection Facilities are compatible with the technical specifications, operational control, and safety requirements of Participating TO and comment on such specifications within thirty (30) Calendar Days of Large Load Interconnection Customer’s submission. All specifications provided hereunder shall be deemed confidential.
5.6.2 Participating TO’s Review. Participating TO’s review of Large Load Interconnection Customer’s final specifications shall not be construed as confirming, endorsing, or providing a warranty as to the design, fitness, safety, durability or reliability of the Large Load, or the Large Load Interconnection Customer’s Interconnection Facilities. Large Load Interconnection Customer shall make such changes to the Large Load Interconnection Customer’s Interconnection Facilities as may reasonably be required by Participating TO, in accordance with Good Utility Practice, to ensure that the Large Load Interconnection Customer’s Interconnection Facilities are compatible with the technical specifications, operational control, and safety requirements of Participating TO.
5.6.3 Large Load Interconnection Customer’s Interconnection Facilities Construction. The Large Load Interconnection Customer’s
Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Service Commencement Date, unless the Parties agree on another mutually acceptable deadline, Large Load Interconnection Customer shall deliver to Participating TO “as-built” drawings, information and documents for the Large Load Interconnection Customer’s Interconnection Facilities and Large Load, such as: a one-line diagram, a site plan showing the Large Load, co-located generation, if applicable, and the Large Load Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Large Load Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay
PDF page 175
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
settings for all facilities associated with Large Load Interconnection Customer’s transformers, the facilities connecting the Large Load and co- located generation, if applicable, to the transformers and the Large Load Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated transformers and the Large Load and co-located generation, if applicable. The Large Load Interconnection Customer shall provide Participating TO
specifications for the excitation system, automatic voltage regulator, Large Load and co-located generation, if applicable, control and protection settings, transformer tap settings, and communications, if applicable.
5.6.4 Large Load Interconnection Customer to Meet Requirements of the Participating TO’s Interconnection Handbook. The Large Load
Interconnection Customer shall comply with the Participating TO’s Interconnection Handbook. In the event of a conflict between the terms of this TSRA and the terms of the Participating TO’s Interconnection Handbook, the terms in this TSRA shall govern.
5.7
Participating TO’s Interconnection Facilities Construction. Participating TO’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice.
5.8
Access Rights. Upon reasonable notice and supervision by a Party, and subject to any required or necessary regulatory approvals, a Party (“Granting Party”) shall furnish at no cost to the other Party (“Access Party”) any rights of use, licenses, rights of way and easements with respect to lands owned or controlled by the Granting Party, its agents (if allowed under the applicable agency agreement), or any Affiliate, that are necessary to enable the Access Party to obtain ingress and egress to construct, operate, maintain, repair, test (or witness testing), inspect, replace or remove facilities and equipment to: (i) interconnect the Large Load with the Participating TO’s Transmission System; (ii) operate and maintain the Large Load, the Interconnection Facilities and the Participating TO’s Transmission System; and (iii) disconnect or remove the Access Party’s facilities and equipment upon termination of this TSRA. In exercising such licenses, rights of way and easements, the Access Party shall not unreasonably disrupt or interfere with normal operation of the Granting Party’s business and shall adhere to the safety rules and procedures established in advance, as may be changed from time to time, by the Granting Party and provided to the Access Party.
5.9
Permits. Participating TO and Large Load Interconnection Customer shall cooperate with each other in good faith in obtaining all permits, licenses and authorizations that are necessary to accomplish the interconnection in compliance with Applicable Laws and Regulations.
PDF page 176
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
5.10 Early Construction of Base Case Facilities. The Large Load Interconnection Customer, in order to maintain its Service Commencement Date, may request that Participating TO construct all or any portion of any Distribution Upgrades or Large Load Network Upgrades required for Large Load Interconnection Customer to be interconnected to the Participating TO’s Transmission System which are included in the Base Case of the Large Load Interconnection Study for Large Load Interconnection Customer, and which also are required to be constructed for another project, but where such construction is not scheduled to be completed in time to achieve Large Load Interconnection Customer’s Service Commencement Date. Upon such request, Participating TO will use Reasonable Efforts to advance the construction of such Distribution Upgrades and Large Load Network Upgrades to accommodate such request, provided that Large Load Interconnection Customer commits to pay Participating TO any associated expediting costs.
5.11 Taxes.
5.11.1 Large Load Interconnection Customer Payments Taxable. The Parties acknowledge and agree that all payments or property transfers made by Large Load Interconnection Customer to Participating TO for the installation of Participating TO’s Interconnection Facilities, Distribution Upgrades, and, if applicable, Large Load Network Upgrades will be taxable to the Participating TO under the Internal Revenue Code and applicable state income tax laws. Participating TO will include in the amounts charged to Large Load Interconnection Customer a gross-up for the income tax cost consequences of such payments or property transfers, calculated in accordance with Article 5.11.2 (Tax Gross-Up Amount) and subject to Article 5.11.3 (Private Letter Ruling or Change or Clarification of Law) and Article 5.11.4 (Refund).
5.11.2 Tax Gross-Up Amount. Participating TO will include in the amounts it charges Large Load Interconnection Customer a gross-up for the income tax cost consequences of the payments and property the former receives from the latter. Large Load Interconnection Customer’s liability for the income tax cost consequences of such payments or property transfers under this Article 5.11 shall be calculated on a fully grossed-up basis. Except as may otherwise be agreed to by the parties, this means that Large Load Interconnection Customer will pay Participating TO, in addition to the amount paid for the Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades, an amount equal to (1) the current taxes imposed on Participating TO (“Current Taxes”) on the excess of (a) the gross income realized by Participating TO as a result of payments or property transfers made by Large Load Interconnection Customer to Participating TO under this TSRA (without regard to any payments under this Article 5.11) (the “Gross Income Amount”) over (b) the present value of future tax deductions for depreciation that will be
PDF page 177
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
available as a result of such payments or property transfers (the “Present Value Depreciation Amount”), plus (2) an additional amount sufficient to permit Participating TO to receive and retain, after the payment of all Current Taxes, an amount equal to the net amount described in clause (1).
For this purpose, (i) Current Taxes shall be computed based on Participating TO’s composite federal and state tax rates at the time the payments or property transfers are received and Participating TO will be treated as being subject to tax at the highest marginal rates in effect at that time (the “Current Tax Rate”), and (ii) the Present Value Depreciation Amount shall be computed by discounting Participating TO’s anticipated tax depreciation deductions as a result of such payments or property transfers by Participating TO’s current weighted average cost of capital. Thus, the formula for calculating Large Load Interconnection Customer’s liability to Participating TO pursuant to this Article 5.11.2 can be expressed as follows: (Current Tax Rate x (Gross Income Amount – Present Value of Tax Depreciation))/(1-Current Tax Rate). Large Load Interconnection Customer’s estimated tax liability in the event taxes are imposed shall be stated in Appendix A.
5.11.3 Private Letter Ruling or Change or Clarification of Law. At Large Load Interconnection Customer’s request and expense, Participating TO shall file with the IRS a request for a private letter ruling as to whether any property transferred or sums paid, or to be paid, by Large Load Interconnection Customer to Participating TO under this TSRA are subject to federal income taxation. Large Load Interconnection Customer will prepare the initial draft of the request for a private letter ruling, and will certify under penalties of perjury that all facts represented in such request are true and accurate to the best of Large Load Interconnection Customer’s knowledge. Participating TO and Large Load Interconnection Customer shall cooperate in good faith with respect to the submission of such request.
Participating TO shall keep Large Load Interconnection Customer fully informed of the status of such request for a private letter ruling and shall execute either a privacy act waiver or a limited power of attorney, in a form acceptable to the IRS, that authorizes Large Load Interconnection Customer to participate in all discussions with the IRS regarding such request for a private letter ruling. Participating TO shall allow Large Load Interconnection Customer to attend all meetings with IRS officials about the request and shall permit Large Load Interconnection Customer to prepare the initial drafts of any follow-up letters in connection with the request.
PDF page 178
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
5.11.4 Refund. In the event that (a) a private letter ruling is issued to Participating TO which holds that any amount paid or the value of any property transferred by Large Load Interconnection Customer to Participating TO under the terms of this TSRA is not subject to federal income taxation, (b) any legislative change or administrative announcement, notice, ruling or other determination makes it reasonably clear to Participating TO in good faith that any amount paid or the value of any property transferred by Large Load Interconnection Customer to Participating TO under the terms of this TSRA is not taxable to Participating TO, (c) any abatement, appeal, protest, or other contest results in a determination that any payments or transfers made by Large Load Interconnection Customer to Participating TO are not subject to federal income tax, or (d) if Participating TO receives a refund from any taxing authority for any overpayment of tax attributable to any payment or property transfer made by Large Load Interconnection Customer to Participating TO pursuant to this TSRA, Participating TO shall promptly refund to Large Load Interconnection Customer the following:
(i) any payment made by Large Load Interconnection Customer under this Article 5.11 for taxes that is attributable to the amount determined to be non-taxable, together with interest thereon,
(ii) interest on any amounts paid by Large Load Interconnection Customer to Participating TO for such taxes which Participating TO did not submit to the taxing authority, calculated in accordance with the methodology set forth in FERC’s regulations at 18 CFR §35.19a(a)(2)(iii) from the date payment was made by Large Load Interconnection Customer to the date Participating TO refunds such payment to Large Load Interconnection Customer, and
(iii) with respect to any such taxes paid by Participating TO, any refund or credit Participating TO receives or to which it may be entitled from any Governmental Authority, interest (or that portion thereof attributable to the payment described in clause (i), above) owed to Participating TO for such overpayment of taxes (including any reduction in interest otherwise payable by Participating TO to any Governmental Authority resulting from an offset or credit); provided, however, that Participating TO will remit such amount promptly to Large Load Interconnection Customer only after and to the extent that Participating TO has received a tax refund, credit or offset from any Governmental Authority for any applicable overpayment of income tax related to Participating TO’s
Interconnection Facilities.
PDF page 179
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
The intent of this provision is to leave the Parties, to the extent practicable, in the event that no taxes are due with respect to any payment for Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades hereunder, in the same position they would have been in had no such tax payments been made.
5.11.5 Taxes Other Than Income Taxes. Upon the timely request by Large Load Interconnection Customer, and at Large Load Interconnection Customer’s sole expense, Participating TO may appeal, protest, seek abatement of, or otherwise contest any tax (other than federal or state income tax) asserted or assessed against Participating TO for which Large Load Interconnection Customer may be required to reimburse Participating TO under the terms of this TSRA. Large Load
Interconnection Customer shall pay to Participating TO on a periodic basis, as invoiced by Participating TO, Participating TO’s documented reasonable costs of prosecuting such appeal, protest, abatement, or other contest. Large Load Interconnection Customer and Participating TO shall cooperate in good faith with respect to any such contest. Unless the payment of such taxes is a prerequisite to an appeal or abatement or cannot be deferred, no amount shall be payable by Large Load Interconnection Customer to Participating TO for such taxes until they are assessed by a final, non-appealable order by any court or agency of competent jurisdiction. In the event that a tax payment is withheld and ultimately due and payable after appeal, Large Load Interconnection Customer will be responsible for all taxes, interest and penalties, other than penalties attributable to any delay caused by Participating TO.
5.12 Tax Status. Each Party shall cooperate with the other to maintain the other Party’s tax status. Nothing in this TSRA is intended to adversely affect any Participating TO’s tax exempt status with respect to the issuance of bonds.
5.13 Modification.
5.13.1 General. Either Party may undertake modifications to its facilities. If a Party plans to undertake a modification that reasonably may be expected to affect the other Party’s facilities, that Party shall provide to the other Party sufficient information regarding such modification so that the other Party may evaluate the potential impact of such modification prior to commencement of the work. Such information shall be deemed to be confidential hereunder and shall include information concerning the timing of such modifications and whether such modifications are expected to interrupt the flow of electricity to the Large Load. The Party desiring to perform such work shall provide the relevant drawings, plans, and specifications to the other Party at least ninety (90) Calendar Days in advance of the commencement of the work or such shorter period upon
PDF page 180
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
which the Parties may agree, which agreement shall not unreasonably be withheld, conditioned or delayed.
In the case of Large Load modifications that do not require Large Load Interconnection Customer to submit an Interconnection Request, the proposed modification shall be evaluated in accordance with LLIP Section 4.6.1.6. If the proposed modification is determined not to be a Material Modification, the Participating TO shall provide, within forty-five (45) Calendar Days (or such other time as the Parties may agree), an estimate of any additional modifications to the Transmission System, Participating TO’s Interconnection Facilities, Distribution Upgrades, or Large Load Network Upgrades necessitated by such Large Load Interconnection Customer modification and a good faith estimate of the costs thereof.
5.13.2 Standards. Any additions, modifications, or replacements made to a Party’s facilities shall be designed, constructed and operated in accordance with this TSRA and Good Utility Practice.
5.13.3 Modification Costs. Large Load Interconnection Customer shall not be directly assigned for the costs of any additions, modifications, or replacements that Participating TO makes to Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System to facilitate the interconnection of a third party to Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System, or to provide transmission interconnection service to a third party under the TO Tariff. Large Load Interconnection Customer shall be responsible for the costs of any additions, modifications, or replacements to Large Load Interconnection Customer’s Interconnection Facilities that may be necessary to maintain or upgrade such Large Load Interconnection Customer’s Interconnection Facilities consistent with Applicable Laws and Regulations, Applicable Reliability Standards or Good Utility Practice.
Article 6.
Testing and Inspection
6.1
Pre-Service Commencement Date Testing and Modifications. Prior to the Service Commencement Date, Participating TO shall test Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades and Large Load Interconnection Customer shall test the Large Load and co-located generation (if applicable) and Large Load Interconnection Customer’s Interconnection Facilities to ensure their safe and reliable operation. Each Party shall make any modifications to its facilities that are found to be necessary as a result of such testing. Large Load Interconnection Customer shall bear the cost of all such testing and modifications. The Large Load Interconnection Customer shall not commence initial parallel operation of the Large Load and co-located generation (if applicable) with the Participating TO’s Transmission System until the Participating TO provides prior written approval as
PDF page 181
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
set forth in Appendix C, which approval shall not be unreasonably withheld, for operation of such Large Load and co-located generation (if applicable). Large Load Interconnection Customer shall receive test energy at the Large Load only if it has arranged for the receipt of such test energy.
6.2
Post-Service Commencement Operation Date Testing and Modifications. Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Load and co- located generation (if applicable) with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.
6.3
Right to Observe Testing. Each Party shall notify the other Party in advance of its performance of tests of its Interconnection Facilities, the Large Load and co- located generation (if applicable). The other Party has the right, at its own expense, to observe such testing.
6.4
Right to Inspect. Each Party shall have the right, but shall have no obligation to: (i) observe the other Party’s tests and/or inspection of any of its System Protection Facilities and other protective equipment; (ii) review the settings of the other Party’s System Protection Facilities and other protective equipment; and
(iii) review the other Party’s maintenance records relative to the Interconnection Facilities, the System Protection Facilities and other protective equipment. A Party may exercise these rights from time to time as it deems necessary upon reasonable notice to the other Party. The exercise or non-exercise by a Party of any such rights shall not be construed as an endorsement or confirmation of any element or condition of the Interconnection Facilities or the System Protection Facilities or other protective equipment or the operation thereof, or as a warranty as to the fitness, safety, desirability, or reliability of same. Any information that a Party obtains through the exercise of any of its rights under this Article 6.4 shall be deemed to be Confidential Information and treated pursuant to Article 22 of this TSRA.
Article 7.
Metering
7.1
General. Each Party shall comply with any Applicable Reliability Standards and the Electric Reliability Organization requirements. The Large Load Interconnection Customer shall comply with the provisions of the ISO Tariff regarding metering, including Section 10 of the ISO Tariff. Unless otherwise agreed by the Parties, Participating TO may install additional Metering Equipment at the Point of Interconnection prior to any operation of the Large Load and shall own, operate, test and maintain such Metering Equipment. Power flows to the Large Load shall be measured at or, at Participating TO’s
PDF page 182
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
option, compensated to, the Point of Interconnection. Large Load Interconnection Customer’s access to meter data shall be provided in accordance with the ISO Tariff. Large Load Interconnection Customer shall bear all reasonable documented costs associated with the purchase, installation, operation, testing and maintenance of the Metering Equipment.
7.2
Check Meters. Large Load Interconnection Customer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check the ISO-polled meters or Participating TO’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this TSRA, except in the case that no other means are available on a temporary basis at the option of the Participating TO. The check meters shall be subject at all reasonable times to inspection and examination by Participating TO or its designee. The installation, operation and maintenance thereof shall be performed entirely by Large Load Interconnection Customer in accordance with Good Utility Practice.
7.3
Participating TO Retail Metering. If the Large Load is a retail transmission customer of the Participating TO, the Participating TO shall install retail revenue quality meters and associated equipment, pursuant to the Participating TO’s applicable retail tariffs.
Article 8.
Communications
8.1
Large Load Interconnection Customer Obligations. Large Load
Interconnection Customer shall maintain satisfactory operating communications with Participating TO’s Transmission System dispatcher or representative designated by Participating TO. Large Load Interconnection Customer shall provide standard voice line and dedicated voice line at its control room or central dispatch facility through use of either the public telephone system, or a voice communications system that does not rely on the public telephone system. Large Load Interconnection Customer shall also provide the dedicated data circuit(s) necessary to provide Large Load Interconnection Customer data to Participating TO as set forth in Appendix F, Security Arrangements Details. The data circuit(s) shall extend from the Large Load to the location(s) specified by Participating TO. Any required maintenance of such communications equipment shall be performed by Large Load Interconnection Customer. Operational communications shall be activated and maintained under, but not be limited to, the following events: system paralleling or separation, scheduled and unscheduled shutdowns, equipment clearances, and hourly and daily load data.
8.2
Remote Terminal Unit. Prior to the Service Commencement Date of the Large Load, a Remote Terminal Unit, or equivalent data collection and transfer equipment acceptable to the Parties, shall be installed by Large Load Interconnection Customer, or by Participating TO at Large Load Interconnection
PDF page 183
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Customer’s expense, to gather accumulated and instantaneous data to be telemetered to the location(s) designated by Participating TO through use of a dedicated point-to-point data circuit(s) as indicated in Article 8.1. The communication protocol for the data circuit(s) shall be specified by Participating TO. Instantaneous bi-directional analog real power and reactive power flow information must be telemetered directly to the location(s) specified by Participating TO. The telemetered data shall provide, but not be limited to, operational status and real-time consumption to the ISO and Participating TO in accordance with the ISO’s standards for direct telemetry and consistent with the requirement for telemetry set forth in Section 7.6.1 of the ISO Tariff.
Each Party will promptly advise the other Party if it detects or otherwise learns of any metering, telemetry or communications equipment errors or malfunctions that require the attention and/or correction by the other Party. The Party owning such equipment shall correct such error or malfunction as soon as reasonably feasible.
8.3
No Annexation. Any and all equipment placed on the premises of a Party shall be and remain the property of the Party providing such equipment regardless of the mode and manner of annexation or attachment to real property, unless otherwise mutually agreed by the Parties.
Article 9.
Operations
9.1
General. Each Party shall comply with Applicable Reliability Standards and the Electric Reliability Organization requirements. Each Party shall provide to the other Party all information that may reasonably be required by the other Party to comply with Applicable Laws and Regulations and Applicable Reliability Standards.
9.2
Participating TO Obligations. The Participating TO and ISO shall cause the Participating TO’s Transmission System to be operated and controlled in a safe and reliable manner and in accordance with this TSRA. The Participating TO at the Large Load Interconnection Customer’s expense shall cause the Participating TO’s Interconnection Facilities to be operated, maintained and controlled in a safe and reliable manner and in accordance with this TSRA. The Participating TO and ISO may provide operating instructions to the Large Load
Interconnection Customer consistent with this TSRA and Participating TO and ISO operating protocols and procedures as they may change from time to time. The Participating TO and ISO will consider changes to their operating protocols and procedures proposed by the Large Load Interconnection Customer.
9.3
Large Load Interconnection Customer Obligations. The Large Load Interconnection Customer shall at its own expense operate, maintain and control the Large Load, co-located generation (if applicable), and the Large Load Interconnection Customer’s Interconnection Facilities, in a safe and reliable
PDF page 184
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
manner and in accordance with this TSRA. The Large Load Interconnection Customer shall operate the Large Load, co-located generation (if applicable), and the Large Load Interconnection Customer’s Interconnection Facilities, in accordance with all applicable requirements of the Balancing Authority Area of which it is part, including such requirements as set forth in Appendix D of this TSRA. Appendix D will be modified to reflect changes to the requirements as they may change from time to time. A Party may request that another Party provide copies of the requirements set forth in Appendix D of this TSRA. The Large Load Interconnection Customer shall not commence operation of the Large Load or co-located generation (if applicable) in parallel with the Participating TO’s Transmission System until the Participating TO provides prior written approval, which approval shall not be unreasonably withheld, for operation of the Large Load or co-located generation (if applicable).
9.4
Start-Up and Synchronization. Consistent with the Parties’ mutually acceptable procedures, Large Load Interconnection Customer is responsible for the proper synchronization of the Large Load and co-located generation (if applicable) to Participating TO’s Transmission System.
9.5
Reactive Power.
.
Power Factor Design Criteria.
Large Load Interconnection Customer shall design the Large Load to maintain a composite power flow at POI, at a power factor within the range of 0.99 leading to 0.97 lagging. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two.
9.6
Outages and Performance Requirements.
9.6.1 Outage Coordination. Large Load Interconnection Customer shall coordinate with Participating TO and provide reasonable notice of any outages or maintenance on Large Load Interconnection Customer’s Interconnection Facilities consistent with Good Utility Practice.
9.6.2 Ride Through Capability and Performance. The Participating TO’s Transmission System is designed to automatically activate a load-shed program as required by the Electric Reliability Organization in the event of an under-frequency system disturbance. Large Load Interconnection Customer shall implement under-frequency and over-frequency relay set points, or equivalent electronic controls, for the Large Load as required by the Electric Reliability Organization to ensure frequency “ride through” capability of the ISO Controlled Grid. Large Load response to frequency deviations of pre-determined magnitudes, both under-frequency and over-
PDF page 185
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
frequency deviations, shall be studied and coordinated with Transmission Provider in accordance with Good Utility Practice, the latest applicable reliability standards, and the Participating TO’s Interconnection Handbook. Large Load Interconnection Customer shall also implement under-voltage and over-voltage relay set points, or equivalent electronic controls, as required by the Electric Reliability Organization to ensure voltage “ride through” capability of the Participating TO’s Transmission System in accordance with Good Utility Practice, the latest applicable reliability standards, and the Participating TO’s Interconnection Handbook. The term “ride through” as used herein shall mean the ability of a Large Load to stay connected to and synchronized with the ISO Controlled Grid during system disturbances within a range of under-frequency, over-frequency, under-voltage, and over-voltage conditions, in accordance with Good Utility Practice and consistent with any standards and guidelines that are applied to other Generating Facilities in the Balancing Authority Area on a comparable basis. The Large Load must ensure “ride through” capability for abnormal frequency and voltage conditions within the “no trip zone” defined by the Participating TO’s Interconnection Handbook, subject to its physical limitations.
9.6.3 System Protection and Other Control Requirements.
9.6.3.1
System Protection Facilities. Large Load Interconnection
Customer shall, at its expense, install, operate and maintain System Protection Facilities as a part of the Large Load, and co- located generation, if applicable, or Large Load Interconnection Customer’s Interconnection Facilities. Participating TO shall install at Large Load Interconnection Customer’s expense any System Protection Facilities that may be required on Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System as a result of the interconnection of the Large Load and Large Load Interconnection Customer’s Interconnection Facilities.
9.6.3.2 Each Party’s protection facilities shall be designed and coordinated with other systems in accordance with Applicable Reliability Standards, Electric Reliability Organization criteria, and Good Utility Practice.
9.6.3.3 Each Party shall be responsible for protection of its facilities consistent with Good Utility Practice.
9.6.3.4 Each Party’s protective relay design shall incorporate the necessary test switches to perform the tests required in Article 6. The required test switches will be placed such that they allow operation of lockout relays while preventing breaker failure
PDF page 186
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
schemes from operating and causing unnecessary breaker
operations and/or the tripping of the Large Load.
9.6.3.5
Each Party will test, operate and maintain System Protection Facilities in accordance with Good Utility Practice and, if applicable, the requirements of the Participating TO’s Interconnection Handbook.
9.6.3.6
Prior to the Service Commencement Date, each Party or its agent shall perform a complete calibration test and functional trip test of the System Protection Facilities. At intervals suggested by Good Utility Practice, the standards and procedures of the Participating TO, including, if applicable, the requirements of the Participating TO’s Interconnection Handbook, and following any apparent malfunction of the System Protection Facilities, each Party shall perform both calibration and functional trip tests of its System Protection Facilities. These tests do not require the tripping of the Large Load. These tests do, however, require that all protective relays and lockout contacts be activated.
9.6.4 Requirements for Protection. In compliance with Good Utility Practice and, if applicable, the requirements of the Participating TO’s Interconnection Handbook, Large Load Interconnection Customer shall provide, install, own, and maintain relays, circuit breakers and all other devices necessary to remove any fault contribution of the Large Load, or co-located generation, if applicable, to any short circuit occurring on the Participating TO’s Transmission System not otherwise isolated by Participating TO’s equipment, such that the removal of the fault contribution shall be coordinated with the protective requirements of the Participating TO’s Transmission System. Such protective equipment shall include, without limitation, a disconnecting device or switch with load- interrupting capability located between the Large Load, and co-located generation, if applicable, and the Participating TO’s Transmission System at a site selected upon mutual agreement (not to be unreasonably withheld, conditioned or delayed) of the Parties. Large Load Interconnection Customer shall be responsible for protection of the Large Load, and co-located generation, if applicable, and Large Load Interconnection Customer’s other equipment from such conditions as negative sequence currents, over- or under-frequency, sudden load rejection, over- or under-voltage, and generator loss-of-field. Large Load Interconnection Customer shall be solely responsible to disconnect the Large Load, or co-located generation, if applicable, and Large Load Interconnection Customer’s other equipment if conditions on the Participating TO’s Transmission System could adversely affect the Large Load, or co-located generation, if applicable.
PDF page 187
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
9.6.5 Power Quality. Neither Party’s facilities shall cause excessive voltage flicker nor introduce excessive distortion to the sinusoidal voltage or current waves as defined by the latest applicable standards identified in the Participating TO’s Interconnection Handbook. In the event of a conflict among these standards, the alternative Applicable Reliability Standard or Electrical Reliability Organization standard shall control.
9.7
Operating Limitations Related to FILI. The conditions and limitations applicable to Flexible Interim Load Interconnection (FILI) service, including curtailments, shall be specified in Appendix E to this TSRA.
9.8
Switching and Tagging Rules. Each Party shall provide the other Party a copy of its switching and tagging rules that are applicable to the other Party’s activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.
9.9
Disturbance Analysis Data Exchange. The Parties will cooperate with one another in the analysis of disturbances to either the Large Load or Participating TO’s Transmission System by gathering and providing access to any information relating to any disturbance, including information from oscillography, protective relay targets, breaker operations and sequence of events records, and any disturbance information required by Good Utility Practice and Applicable Reliability Standards.
9.10 Compliance with ISO Tariff on Large Load Interconnections. Each Large Load must comply, as applicable, with the ISO Tariff provisions in ISO Tariff Section 25.7, and any complementary technical specifications contained in SCE's Interconnection Handbook.
Article 10.
Maintenance
10.1 Participating TO Obligations. Participating TO shall maintain the Participating TO’s Transmission System and Participating TO’s Interconnection Facilities in a safe and reliable manner and in accordance with this TSRA.
10.2 Large Load Interconnection Customer Obligations. Large Load Interconnection Customer shall maintain the Large Load and co-located generation, if applicable, and Large Load Interconnection Customer’s Interconnection Facilities in a safe and reliable manner and in accordance with this TSRA.
10.3 Coordination. The Parties shall confer regularly to coordinate the planning, scheduling and performance of preventive and corrective maintenance on the
PDF page 188
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Large Load, and co-located generation, if applicable, and the Interconnection Facilities.
10.4 Secondary Systems. Each Party shall cooperate with the other in the inspection, maintenance, and testing of control or power circuits that operate below 600 volts, AC or DC, including, but not limited to, any hardware, control or protective devices, cables, conductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and voltage and current transformers that directly affect the operation of a Party’s facilities and equipment which may reasonably be expected to impact the other Party. Each Party shall provide advance notice to the other Party before undertaking any work on such circuits, especially on electrical circuits involving circuit breaker trip and close contacts, current transformers, or potential transformers.
10.5 Operating and Maintenance Expenses. Subject to the provisions herein addressing the use of facilities by others, and except for operations and maintenance expenses associated with modifications made for providing interconnection or transmission service to a third party and such third party pays for such expenses, Large Load Interconnection Customer shall be responsible for all reasonable expenses including overheads, associated with: (1) owning, operating, maintaining, repairing, and replacing Large Load Interconnection Customer’s Interconnection Facilities; and (2) operation, maintenance, repair and replacement of Participating TO’s Interconnection Facilities and Distribution Upgrades.
Article 11.
Performance Obligation
11.1 Large Load Interconnection Customer Interconnection Facilities. Large Load Interconnection Customer shall design, procure, construct, install, own and/or control Large Load Interconnection Customer Interconnection Facilities described in Appendix A at its sole expense.
11.2 Participating TO’s Interconnection Facilities and Distribution Upgrades. Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities and Distribution Upgrades described in Appendix A at the sole expense of the Large Load Interconnection Customer. The Large Load Interconnection Customer shall be responsible for funding all costs related to Participating TO’s Interconnection Facilities and Distribution Upgrades. The costs set forth in Appendix A are estimates only and will not establish any cap or maximum cost responsibility limit on the cost responsibility of the Large Load Interconnection Customer for the Participating TO’s Interconnection Facilities and Distribution Upgrades. The Large Load Interconnection Customer shall be responsible for the actual costs related to Participating TO’s Interconnection Facilities and Distribution Upgrades. This Section 11.2 does not apply to Distribution Upgrades required by Large Load Interconnection Customers who are retail transmission customers of participating
PDF page 189
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
TO, as such facilities and their costs are governed by the Local Regulatory Authority.
11.3 Large Load Network Upgrades. Participating TO shall design, procure, construct, install, and own the Large Load Network Upgrades described in Appendix A. The Participating TO shall be responsible for securing the costs of the Large Load Network Upgrades attributable to the Large Load subject to the financial security and payment obligations specified in Appendix B. The costs set forth in Appendix A are estimates only.
11.3.1 Non-Export Co-Located Generation Large Load Network Upgrades.
Participating TO shall design, procure, construct, install, own and/or control the Large Load Network Upgrades attributable to non-export co- located generation, as described in Appendix A, at the sole expense of the Large Load Interconnection Customer. The Large Load Interconnection Customer shall be responsible for funding all costs related to such Large Load Network Upgrades. The costs set forth in Appendix A are estimates only and will not establish any cap or maximum cost responsibility limit on the cost responsibility of the Large Load Interconnection Customer for the Large Load Network Upgrades. The Large Load Interconnection Customer shall be responsible for the actual costs related to Large Load Network Upgrades. When the Large Load Interconnection Customer is the
Participating TO’s retail transmission customer, the cost assignment and responsibility for Large Load Network Upgrades associated with non- export co-located generation will be made in accordance with the Participating TO’s retail tariffs subject to the Local Regulatory Authority.
11.4 Provision of Interconnection Financial Security.
11.4.1 Participating TO’s Interconnection Facilities and Distribution Upgrades. At least thirty (30) Calendar Days prior to the commencement of the engineering, design, procurement, installation, or construction of the Participating TO’s Interconnection Facilities or Distribution Upgrades, Large Load Interconnection Customer shall provide Participating TO, at Large Load Interconnection Customer’s option, a guarantee, a surety bond, letter of credit or other form of security that is reasonably acceptable to Participating TO, in accordance with LLIP Section 4.7.1. Such security for payment, as specified in Appendix A of this TSRA, shall be in an amount sufficient to cover the costs for constructing, procuring and installing the applicable portion of Participating TO’s Interconnection Facilities and Distribution Upgrades and shall be reduced on a dollar-for-dollar basis for payments made to Participating TO for these purposes. Participating TO must specify, in Appendix C of this TSRA, the dates for which Interconnection Customer must provide additional security for construction of each discrete portion of Participating TO’s Interconnection Facilities and Distribution Upgrades and Large Load Interconnection Customer must provide such additional security. This Section 11.4.1 does not apply to Distribution
PDF page 190
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Upgrades required by Large Load Interconnection Customers who are retail transmission customers of participating TO, as such facilities and their costs are governed by the Local Regulatory Authority.
11.4.2 Security Requirements.
11.4.2.1 Large Load Network Upgrades and Minimum Annual Revenue Contribution. At least thirty (30) Calendar Days prior to the commencement of the engineering, design, procurement, installation, or construction of the Large Load Network Upgrades attributable to the Large Load, the Large Load Interconnection Customer shall provide Interconnection Financial Security to mitigate potential cost shifting to other users of the ISO Controlled Grid. Such additional security requirements, associated payment obligations, and the methodology utilized for calculating such requirements are specified in Appendix B to this TSRA.
11.4.2.2 Non-Export Co-Located Generation Large Load Network Upgrades. At least thirty (30) Calendar Days prior to the commencement of the engineering, design, procurement, installation, or construction of the Large Load Network Upgrades attributable to non-export co-located generation, Large Load Interconnection Customer shall provide Participating TO, at Large Load Interconnection Customer’s option, a guarantee, a surety bond, letter of credit or other form of security that is reasonably acceptable to Participating TO, in accordance with LLIP Section 4.7.1. Such financial security shall be in an amount as specified by the Participating TO in Appendix A of this TSRA and provided by the Large Load Interconnection Customer by the date(s) set forth in Appendix C. When the Large Load Interconnection Customer is the Participating TO’s retail transmission customer, the security for Large Load Network Upgrades associated with non-export co-located generation will be made in accordance with the Participating TO’s retail tariffs subject to the Local Regulatory Authority.
11.4.2.3 ISO-Identified Network Upgrades. At least thirty (30) Calendar Days prior to the commencement of the engineering, design, procurement, installation, or construction of the ISO-Identified Network Upgrades attributable to the Large Load, the Large Load Interconnection Customer shall provide financial security to mitigate shifting of the cost of the ISO-Identified Network Upgrades to other users of the ISO Controlled Grid. Such additional security requirements, associated payment obligations, and the methodology utilized for calculating such requirements are specified in Appendix B to this TSRA.
PDF page 191
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
11.4.2.4 Large Load Interconnection Customer may avoid duplicative Interconnection Financial Security requirements by demonstrating
to Participating TO’s satisfaction that security or payments
provided pursuant to a retail agreement with the Large Load
Owner satisfies some portion of Large Load Interconnection
Customer’s obligations under Articles 11.4.2.1, 11.4.2.2, and
11.4.2.3.
Article 12.
Invoice
12.1 General. The Participating TO shall submit to the Large Load Interconnection Customer, on a monthly basis, invoices of amounts due for the preceding month. Each invoice shall state the month to which the invoice applies and fully describe the services and equipment provided.
12.2
Final Invoice. Within twelve (12) months after completion of the construction of Participating TO’s Interconnection Facilities and Distribution Upgrades, Participating TO shall provide an invoice of the final cost of the construction of Participating TO’s Interconnection Facilities and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable Large Load Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. Participating TO shall refund to Large Load Interconnection Customer any amount by which the actual payment by Large Load Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice.
12.3 Payment. Invoices shall be rendered to the paying Party at the address specified in Appendix G. The Party receiving the invoice shall pay the invoice within thirty (30) Calendar Days of receipt. All payments shall be made in immediately available funds payable to the other Party, or by wire transfer to a bank named and account designated by the invoicing Party. Payment of invoices by either Party will not constitute a waiver of any rights or claims either Party may have under this TSRA.
12.4 Disputes. In the event of a billing dispute between Participating TO and Large Load Interconnection Customer, Participating TO shall continue to provide Transmission Interconnection Service under this TSRA as long as Large Load Interconnection Customer: (i) continues to make all payments not in dispute; and
(ii) pays to Participating TO or into an independent escrow account the portion of the invoice in dispute, pending resolution of such dispute. If Large Load Interconnection Customer fails to meet these two requirements for continuation of service, then Participating TO may provide notice to Large Load Interconnection Customer of a Default pursuant to Article 17. Within thirty (30) Calendar Days after the resolution of the dispute, the Party that owes money to
PDF page 192
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
the other Party shall pay the amount due with interest calculated in accord with the methodology set forth in FERC’s regulations at 18 CFR § 35.19a(a)(2)(iii).
Article 13.
Emergencies
13.1 Definition. "Emergency Condition" shall mean a condition or situation: (1) that in the judgment of the Party making the claim is imminently likely to endanger life or property; or (2) that, in the case of the ISO, is imminently likely (as determined in a non-discriminatory manner) to cause a material adverse effect on the security of, or damage to, the ISO Controlled Grid or the electric systems of others to which the ISO Controlled Grid is directly connected; (3) that, in the case of the Participating TO, is imminently likely (as determined in a non-discriminatory manner) to cause a material adverse effect on the security of, or damage to, the Participating TO’s Transmission System, Participating TO’s Interconnection Facilities, Distribution System, or the electric systems of others to which the Participating TO’s electric system is directly connected; or (4) that, in the case of the Large Load Interconnection Customer, is imminently likely (as determined in a non-discriminatory manner) to cause a material adverse effect on the security of, or damage to, the Large Load or Large Load Interconnection Customer’s Interconnection Facilities.
13.2 Obligations. Each Party shall comply with the Emergency Condition procedures of the ISO, Electric Reliability Organization, Applicable Reliability Standards, Applicable Laws and Regulations, and any emergency procedures set forth in this TSRA.
13.3
Notice. Participating TO shall notify Large Load Interconnection Customer promptly when it becomes aware of an Emergency Condition that affects Participating TO’s Interconnection Facilities, Distribution System or the ISO Controlled Grid that may reasonably be expected to affect Large Load Interconnection Customer’s operation of the Large Load or Large Load Interconnection Customer’s Interconnection Facilities. Large Load Interconnection Customer shall notify Participating TO promptly when it becomes aware of an Emergency Condition that affects the Large Load or Large Load Interconnection Customer’s Interconnection Facilities that may reasonably be expected to affect the Distribution System, ISO Controlled Grid or Participating TO’s Interconnection Facilities. To the extent information is known, the notification shall describe the Emergency Condition, the extent of the damage or deficiency, the expected effect on the operation of Large Load Interconnection Customer’s or Participating TO’s facilities and operations, its anticipated duration and the corrective action taken and/or to be taken. The initial notice shall be followed as soon as practicable with written notice.
13.4
Immediate Action. Unless, in Large Load Interconnection Customer’s reasonable judgment, immediate action is required, Large Load Interconnection Customer shall obtain the consent of Participating TO, such consent to not be
PDF page 193
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
unreasonably withheld, prior to performing any manual switching operations at the Large Load or Large Load Interconnection Customer’s Interconnection Facilities in response to an Emergency Condition either declared by Participating TO or ISO or in response to any other emergency condition.
13.5 Participating TO Authority.
13.5.1 General. Participating TO may take whatever actions or inactions with regard to the Distribution System and Participating TO’s Transmission System or Participating TO’s Interconnection Facilities it deems necessary during an Emergency Condition in order to (i) preserve public health and safety, (ii) preserve the reliability of the Distribution System and Participating TO’s Transmission System or Participating TO’s Interconnection Facilities, (iii) limit or prevent damage, and (iv) expedite restoration of service.
Participating TO shall use Reasonable Efforts to minimize the effect of such actions or inactions on the Large Load or Large Load Interconnection Customer’s Interconnection Facilities. Participating TO may, on the basis of technical considerations, require the Large Load to mitigate an Emergency Condition by taking actions necessary and limited in scope to remedy the Emergency Condition, including, but not limited to, directing Large Load Interconnection Customer to shut-down the Large Load; implementing a reduction or disconnection pursuant to Article 13.5.2. Large Load Interconnection Customer shall comply with all of Participating TO’s operating instructions concerning Large Load within the manufacturer’s design limitations of the Large Load’s equipment that is in service and physically available for operation at the time, in compliance with Applicable Laws and Regulations.
13.5.2 Reduction and Disconnection. Participating TO may reduce Transmission Interconnection Service or disconnect the Large Load or Large Load Interconnection Customer’s Interconnection Facilities, when such, reduction or disconnection is necessary under Good Utility Practice due to Emergency Conditions. These rights are separate and distinct from any right of curtailment of the ISO pursuant to the ISO Tariff. When Participating TO can schedule the reduction or disconnection in advance, Participating TO shall notify Large Load Interconnection Customer of the reasons, timing and expected duration of the reduction or disconnection. Participating TO shall coordinate with Large Load Interconnection Customer using Good Utility Practice to schedule the reduction or disconnection during periods of least impact to Large Load
Interconnection Customer and Participating TO. Any reduction or disconnection shall continue only for so long as reasonably necessary under Good Utility Practice. The Parties shall cooperate with each other to restore the Large Load, the Interconnection Facilities, and the
PDF page 194
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Participating TO’s Transmission System to their normal operating state as soon as practicable consistent with Good Utility Practice.
13.6
Large Load Interconnection Customer Authority. Consistent with Good Utility Practice and the TSRA and the LLIP, Large Load Interconnection Customer may take actions or inactions with regard to the Large Load or Large Load Interconnection Customer’s Interconnection Facilities during an Emergency Condition in order to (i) preserve public health and safety, (ii) preserve the reliability of the Large Load or Large Load Interconnection Customer’s Interconnection Facilities, (iii) limit or prevent damage, and (iv) expedite restoration of service. Large Load Interconnection Customer shall use Reasonable Efforts to minimize the effect of such actions or inactions on the Participating TO’s Transmission System and Participating TO’s Interconnection facilities. Participating TO shall use Reasonable Efforts to assist Large Load Interconnection Customer in such actions.
13.7 Limited Liability. Neither Party shall be liable to the other for any action it takes in responding to an Emergency Condition so long as such action is made in good faith and is consistent with Good Utility Practice.
Article 14.
Regulatory Requirements and Governing Law
14.1 Regulatory Requirements. Each Party’s obligations under this TSRA shall be subject to its receipt of any required approval or certificate from one or more Governmental Authorities in the form and substance satisfactory to the applying Party, or the Party making any required filings with, or providing notice to, such Governmental Authorities, and the expiration of any time period associated therewith. Each Party shall in good faith seek and use its Reasonable Efforts to obtain such other approvals.
14.2 Governing Law.
14.2.1 The validity, interpretation and performance of this TSRA and each of its provisions shall be governed by the laws of the state where the Point of Interconnection is located, without regard to its conflicts of law principles.
14.2.2 This TSRA is subject to all Applicable Laws and Regulations.
14.2.3 Each Party expressly reserves the right to seek changes in, appeal, or otherwise contest any laws, orders, rules, or regulations of a
Governmental Authority.
Article 15.
Notices.
15.1 General. Unless otherwise provided in this TSRA, any notice, demand or request required or permitted to be given by either Party to the other and any
PDF page 195
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
instrument required or permitted to be tendered or delivered by either Party in writing to the other shall be effective when delivered and may be so given, tendered or delivered, by recognized national courier, or by depositing the same with the United States Postal Service with postage prepaid, for delivery by certified or registered mail, addressed to the Party, or personally delivered to the Party, at the address set out in Appendix G.
Either Party may change the notice information in this TSRA by giving five (5) Business Days written notice prior to the effective date of the change.
15.2 Billings and Payments. Billings and payments shall be sent to the addresses set out in Appendix G.
15.3 Alternative Forms of Notice. Any notice or request required or permitted to be given by a Party to the other and not required by this Agreement to be given in writing may be so given by telephone or email to the telephone numbers and email addresses set out in Appendix G.
15.4 Operations and Maintenance Notice. Each Party shall notify the other Party in writing of the identity of the person(s) that it designates as the point(s) of contact with respect to the implementation of Articles 9 and 10.
Article 16.
Uncontrollable Force
16.1 Uncontrollable Force.
16.1.1 Economic hardship is not considered an Uncontrollable Force event.
16.1.2 Neither Party shall be considered to be in Default with respect to any obligation hereunder, including obligations under Article 4, other than the obligation to pay money when due, if prevented from fulfilling such obligation by Uncontrollable Force. A Party unable to fulfill any obligation hereunder (other than an obligation to pay money when due) by reason of an Uncontrollable Force shall give notice and the full particulars of such Uncontrollable Force to the other Party in writing or by telephone as soon as reasonably possible after the occurrence of the cause relied upon. Telephone notices given pursuant to this Article shall be confirmed in writing as soon as reasonably possible and shall specifically state full particulars of the Uncontrollable Force, the time and date when the Uncontrollable Force occurred and when the Uncontrollable Force is reasonably expected to cease. The Party affected shall exercise due diligence to remove such disability with reasonable dispatch, but shall not be required to accede or agree to any provision not satisfactory to it in order to settle and terminate a strike or other labor disturbance.
Article 17.
Default
PDF page 196
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
17.1 Default
17.1.1 General. No Default shall exist where such failure to discharge an obligation (other than the payment of money) is the result of an Uncontrollable Force as defined in this TSRA or the result of an act or omission of the other Party. Upon a Breach, the non-breaching Party shall give written notice of such Breach to the breaching Party. Except as provided in Article 17.1.2, the breaching Party shall have thirty (30) Calendar Days from receipt of the Default notice within which to cure such Breach; provided however, if such Breach is not capable of cure within thirty (30) Calendar Days, the breaching Party shall commence such cure within thirty (30) Calendar Days after notice and continuously and diligently complete such cure within ninety (90) Calendar Days from receipt of the Default notice; and, if cured within such time, the Breach specified in such notice shall cease to exist.
17.1.2 Right to Terminate. If a Breach is not cured as provided in this Article, or if a Breach is not capable of being cured within the period provided for herein, the non-breaching Party shall have the right to declare a Default and terminate this TSRA by written notice at any time until cure occurs, and be relieved of any further obligation hereunder and, whether or not that Party terminates this TSRA, to recover from the breaching Party all amounts due hereunder, plus all other damages and remedies to which it is entitled at law or in equity. The provisions of this Article will survive termination of this TSRA.
Article 18.
Indemnity, Consequential Damages and Insurance
18.1 Indemnity. The Parties shall at all times indemnify, defend, and hold the other Party harmless from, any and all damages, losses, claims, including claims and actions relating to injury to or death of any person or damage to property, demand, suits, recoveries, costs and expenses, court costs, attorney fees, and all other obligations by or to third parties, arising out of or resulting from the other Party’s action or inactions of its obligations under this TSRA on behalf of the Indemnifying Party, except in cases of gross negligence or intentional wrongdoing by the Indemnified Party.
18.1.1 Indemnified Person. If an Indemnified Person is entitled to indemnification under this Article 18 as a result of a claim by a third party, and the Indemnifying Party fails, after notice and reasonable opportunity to proceed under Article 18.1, to assume the defense of such claim, such Indemnified Person may at the expense of the Indemnifying Party contest, settle or consent to the entry of any judgment with respect to, or pay in full, such claim.
PDF page 197
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
18.1.2 Indemnifying Party. If an Indemnifying Party is obligated to indemnify and hold any Indemnified Person harmless under this Article 18, the amount owing to the Indemnified Person shall be the amount of such Indemnified Person’s actual Loss, net of any insurance or other recovery.
18.1.3 Indemnity Procedures. Promptly after receipt by an Indemnified Person of any claim or notice of the commencement of any action or
administrative or legal proceeding or investigation as to which the indemnity provided for in Article 18.1 may apply, the Indemnified Person shall notify the Indemnifying Party of such fact. Any failure of or delay in such notification shall not affect a Party’s indemnification obligation unless such failure or delay is materially prejudicial to the Indemnifying Party.
The Indemnifying Party shall have the right to assume the defense thereof with counsel designated by such Indemnifying Party and reasonably satisfactory to the Indemnified Person. If the defendants in any such action include one or more Indemnified Persons and the Indemnifying Party and if the Indemnified Person reasonably concludes that there may be legal defenses available to it and/or other Indemnified Persons which are different from or additional to those available to the Indemnifying Party, the Indemnified Person shall have the right to select separate counsel to assert such legal defenses and to otherwise participate in the defense of such action on its own behalf. In such instances, the Indemnifying Party shall only be required to pay the fees and expenses of one additional attorney to represent an Indemnified Person or Indemnified Persons having such differing or additional legal defenses.
The Indemnified Person shall be entitled, at its expense, to participate in any such action, suit or proceeding, the defense of which has been assumed by the Indemnifying Party. Notwithstanding the foregoing, the Indemnifying Party (i) shall not be entitled to assume and control the defense of any such action, suit or proceedings if and to the extent that, in the opinion of the Indemnified Person and its counsel, such action, suit or proceeding involves the potential imposition of criminal liability on the Indemnified Person, or there exists a conflict or adversity of interest between the Indemnified Person and the Indemnifying Party, in such event the Indemnifying Party shall pay the reasonable expenses of the Indemnified Person, and (ii) shall not settle or consent to the entry of any judgment in any action, suit or proceeding without the consent of the Indemnified Person, which shall not be reasonably withheld, conditioned or delayed.
18.2 Consequential Damages. In no event shall either Party be liable under any provision of this TSRA for any losses, damages, costs or expenses for any special, indirect, incidental, consequential, or punitive damages, including but not limited to loss of profit or revenue, loss of the use of equipment, cost of capital,
PDF page 198
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
cost of temporary equipment or services, whether based in whole or in part in contract, in tort, including negligence, strict liability, or any other theory of liability; provided, however, that damages for which a Party may be liable to the other Party under another agreement will not be considered to be special, indirect, incidental, or consequential damages hereunder.
18.3 Insurance. As indicated below, the designated Party shall, at its own expense, maintain in force throughout the period of this TSRA, and until released by the other Party, the following insurance coverages, with insurers rated no less than A- under A. M Bests’ current Key Rating Guides and authorized to do business in the state where the Point of Interconnection is located:
18.3.1 Workers’ Compensation Insurance and Employers’ Liability. The Participating TO and the Large Load Interconnection Customer shall maintain such coverage from the commencement of any construction activities in statutory limits for workers’ compensation coverage, and coverage amounts of one million dollars ($1,000,000) for employer’s liability for each employee for bodily injury by accident and one million dollars ($1,000,000) for each employee for bodily injury by disease in accordance with the laws and regulations of the state in which the Point of Interconnection is located.
18.3.2 Commercial General Liability Insurance. The Participating TO and the Large Load Interconnection Customer shall maintain commercial general liability insurance coverage commencing within thirty (30) Calendar Days of the Effective Date of this TSRA, including coverage for premises and operations, bodily injury (including death), personal injury, property damage, products and completed operations coverage, coverage for explosion, collapse and underground hazards, independent contractors coverage, and (i) liability of Participating TO and the Large Load Interconnection Customer that would be imposed without the TSRA, or (ii) liability assumed by the Participating TO and the Large Load Interconnection Customer in a contract or agreement that is an “insured contract” under commercial general liability insurance policy. Such insurance shall include cross liability or separation of insured clause or endorsement. Such insurance shall be in limits of one million dollars ($1,000,000) per occurrence and two million dollars ($2,000,000) in the aggregate.
18.3.3 Business Automobile Liability Insurance. Prior to the entry of any vehicles on any construction site in connection with work done by or on behalf of either Party, each shall provide evidence of coverage of owned and non-owned and hired vehicles, trailers or semi-trailers designed for travel on public roads, with a combined single limit of one million dollars ($1,000,000) per occurrence for bodily injury, including death, and property damage.
PDF page 199
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
18.3.4 Excess Liability Insurance. Commencing at the time of entry of any person on its behalf upon any construction site for the Large Load Network Upgrades, Distribution Upgrades, Interconnection Facilities, or Large Load, the Participating TO and the Large Load Interconnection Customer shall maintain excess liability insurance over and above the Employers’ Liability, Commercial General Liability, and Business Automobile Liability Insurance coverage, with a limit of five million dollars per MW, of Large Load capacity, rounded up to the nearest MW, per occurrence, up to a maximum of twenty-five million dollars ($25,000,000) per occurrence/twenty-five million dollars ($25,000,000) aggregate. The requirements of Articles 18.3.2 and 18.3.4 may be met by any combination of general and excess liability insurance.
18.3.5 As required in this Article 18.3, the Commercial General Liability Insurance, Business Automobile Liability Insurance and Excess Liability Insurance policies shall include the other Party identified in the articles above, its parent, their subsidiaries, respective directors, officers, agents, servants and employees ("Other Party Group") as additional insured. All policies shall contain provisions whereby the insurers waive all rights of subrogation in accordance with the provisions of this TSRA against the Other Party Group. If any Party can reasonably demonstrate that coverage policies containing provisions for insurer waiver of subrogation rights, or advance notice are not commercially available, then the Parties shall meet and confer and mutually determine to (i) establish replacement or equivalent terms in lieu of subrogation or notice or (ii) waive the requirements that coverage(s) include such subrogation provision or require advance written notice from such insurers.
18.3.6 As required in this Article 18.3, the Commercial General Liability Insurance and Business Automobile Liability Insurance policies shall contain provisions that specify that the policies are primary and non-contributory. Each Party shall be responsible for its respective deductibles or self- insured retentions.
18.3.7 As required in this Article 18.3, the Commercial General Liability Insurance, Business Automobile Liability Insurance and Excess Liability Insurance policies, if written on a Claims First Made Basis, shall be maintained in full force and effect for two (2) years after termination of this TSRA, which coverage may be in the form of extended reporting period coverage if agreed by the Parties.
18.3.8 If the activities of the Large Load Interconnection Customer are being conducted through the actions of an Affiliate, then the Large Load Interconnection Customer may satisfy the insurance requirements of this Article 18.3 by providing evidence of insurance coverage carried by such
PDF page 200
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Affiliate, together with the Large Load Interconnection Customer’s written representation to the Participating TO that the insured Affiliate is conducting all of the necessary pre-construction work. Within thirty (30) calendar days prior to the entry of any person on behalf of the Large Load Interconnection Customer onto any construction site to perform work related to the Interconnection Facilities or Large Load, the Large Load Interconnection Customer shall replace any evidence of Affiliate insurance with evidence of such insurance carried by the Large Load Interconnection Customer.
18.3.9 Thirty (30) Calendar Days prior to the start of any work at the construction site related to Interconnection Facilities or Large Load under this TSRA, and as soon as practicable after the end of each fiscal year or at the renewal of the insurance policy and in any event within ninety (90) Calendar Days thereafter, each Party shall provide a certificate of insurance for all insurance required in this TSRA, executed by each insurer or by an authorized representative of each insurer.
18.3.10 Notwithstanding the foregoing, each Party may self-insure (a) to meet the insurance requirements of Article 18.3.1, to the extent that it maintains a self-insurance program and is a qualified self-insurer within the state in which the Point of Interconnection is located, under the laws and regulations of such state; and (b) to meet the insurance requirements of Articles 18.3.2 through 18.3.4 to the extent it maintains a self-insurance program; provided that, such Party is organized under the laws of the United States or a political subdivision thereof and such Party’s rating for its senior unsecured, long-term debt (not supported by third party credit enhancements) or if such Party does not have a rating for its senior unsecured long-term debt, then the rating then assigned to such Party by Standard & Poor’s Rating Group (a division of McGraw-Hill, Inc.) or its successor (“S&P”) or Moody’s Investor Services, Inc. or its successor (“Moody’s”) is (i) if rated by S&P and Moody’s is rated at least ”BBB-” by S&P and “Baa3" by Moody’s, or (ii) if rated by only one of S&P or Moody’s, rated at least ”BBB-” by S&P or “Baa3” by Moody’s, and (iii) that its self- insurance program meets the insurance requirements of Articles 18.3.2 through 18.3.4. For any period of time that a Party’s senior unsecured, long-term debt is unrated by S&P or Moody’s, or its unsecured long-term debt or the rating assigned to such Party does not meet the requirements in (ii), such Party shall comply with the insurance requirements applicable to it under Articles 18.3.2 through 18.3.4. In the event that a Party is permitted to self-insure pursuant to this Article 18.3.10, it shall notify the other Party that it meets the requirements to self-insure and that its self- insurance program meets the insurance requirements in a manner consistent with that specified in Article 18.
PDF page 201
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
18.3.11 The Parties agree to report to each other in writing as soon as practical whenever an accident or incident occurs resulting in serious injuries to any person, including death, and any third-party property damage greater than $500,000 arising out of this Agreement.
Article 19.
Assignment
19.1 Assignment. This TSRA may be assigned by either Party only with the written consent of the other; and provided further that Large Load Interconnection Customer shall have the right to assign this TSRA, without the consent of Participating TO, for collateral security purposes to aid in providing financing for the Large Load, provided that Large Load Interconnection Customer will promptly notify Participating TO of any such assignment. Any financing arrangement entered into by Large Load Interconnection Customer pursuant to this Article will provide that prior to or upon the exercise of the secured party’s, trustee’s or mortgagee’s assignment rights pursuant to said arrangement, the secured creditor, the trustee or mortgagee will notify Participating TO of the date and particulars of any such exercise of assignment right(s), including providing the Participating TO with proof that it meets the requirements of Articles 11.5 and 18.3. Any attempted assignment that violates this Article is void and ineffective. Any assignment under this TSRA shall not relieve a Party of its obligations, nor shall a Party’s obligations be enlarged, in whole or in part, by reason thereof. Where required, consent to assignment will not be unreasonably withheld, conditioned or delayed.
Article 20.
Severability
20.1 Severability. If any provision in this TSRA is finally determined to be invalid, void or unenforceable by any court or other Governmental Authority having jurisdiction, such determination shall not invalidate, void or make unenforceable any other provision, agreement or covenant of this TSRA.
Article 21.
Comparability
21.1 Comparability. The Parties will comply with all applicable comparability and code of conduct laws, rules and regulations, as amended from time to time.
Article 22.
Confidentiality
22.1 Confidentiality. Confidential Information shall include, without limitation, all information relating to a Party’s technology, research and development, business affairs, and pricing, and any information supplied by either of the Parties to the other prior to the execution of this TSRA.
Information is Confidential Information only if it is clearly designated or marked in writing as confidential on the face of the document, or, if the information is
PDF page 202
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
conveyed orally or by inspection, if the Party providing the information orally informs the Party receiving the information that the information is confidential.
If requested by either Party, the other Party shall provide in writing, the basis for asserting that the information referred to in this Article 22 warrants confidential treatment, and the requesting Party may disclose such writing to the appropriate Governmental Authority. Each Party shall be responsible for the costs associated with affording confidential treatment to its information.
22.1.1 Term. During the term of this TSRA, and for a period of three (3) years after the expiration or termination of this TSRA, except as otherwise provided in this Article 22, each Party shall hold in confidence and shall not disclose to any person Confidential Information.
22.1.2 Scope. Confidential Information shall not include information that the receiving Party can demonstrate: (1) is generally available to the public other than as a result of a disclosure by the receiving Party; (2) was in the lawful possession of the receiving Party on a non-confidential basis before receiving it from the disclosing Party; (3) was supplied to the receiving Party without restriction by a third party, who, to the knowledge of the receiving Party after due inquiry, was under no obligation to the disclosing Party to keep such information confidential; (4) was independently developed by the receiving Party without reference to Confidential Information of the disclosing Party; (5) is, or becomes, publicly known, through no wrongful act or omission of the receiving Party or Breach of this TSRA; or (6) is required, in accordance with Article 22.1.7 of the TSRA, Order of Disclosure, to be disclosed by any Governmental Authority or is otherwise required to be disclosed by law or subpoena, or is necessary in any legal proceeding establishing rights and obligations under this TSRA. Information designated as Confidential Information will no longer be deemed confidential if the Party that designated the information as confidential notifies the other Party that it no longer is confidential.
22.1.3 Release of Confidential Information. Neither Party shall release or disclose Confidential Information to any other person, except to its Affiliates (limited by the Standards of Conduct requirements), subcontractors, employees, consultants, or to parties who may be or considering providing financing to or equity participation with Large Load Interconnection Customer, or to potential purchasers or assignees of Large Load Interconnection Customer, on a need-to-know basis in connection with this TSRA, unless such person has first been advised of the confidentiality provisions of this Article 22 and has agreed to comply with such provisions. Notwithstanding the foregoing, a Party providing Confidential Information to any person shall remain primarily responsible
PDF page 203
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
for any release of Confidential Information in contravention of this Article
22.
22.1.4 Rights. Each Party retains all rights, title, and interest in the Confidential Information that each Party discloses to the other Party. The disclosure by each Party to the other Party of Confidential Information shall not be deemed a waiver by either Party or any other person or entity of the right to protect the Confidential Information from public disclosure.
22.1.5 No Warranties. By providing Confidential Information, neither Party makes any warranties or representations as to its accuracy or completeness. In addition, by supplying Confidential Information, neither Party obligates itself to provide any particular information or Confidential Information to the other Party nor to enter into any further agreements or proceed with any other relationship or joint venture.
22.1.6 Standard of Care. Each Party shall use at least the same standard of care to protect Confidential Information it receives as it uses to protect its own Confidential Information from unauthorized disclosure, publication or dissemination. Each Party may use Confidential Information solely to fulfill its obligations to the other Party under this TSRA or its regulatory requirements.
22.1.7 Order of Disclosure. If a court or a Government Authority or entity with the right, power, and apparent authority to do so requests or requires either Party, by subpoena, oral deposition, interrogatories, requests for production of documents, administrative order, or otherwise, to disclose Confidential Information, that Party shall provide the other Party with prompt notice of such request(s) or requirement(s) so that the other Party may seek an appropriate protective order or waive compliance with the terms of this TSRA. Notwithstanding the absence of a protective order or waiver, the Party may disclose such Confidential Information which, in the opinion of its counsel, the Party is legally compelled to disclose. Each Party will use Reasonable Efforts to obtain reliable assurance that confidential treatment will be accorded any Confidential Information so furnished.
22.1.8 Termination of Agreement. Upon termination of this TSRA for any reason, each Party shall, within ten (10) Calendar Days of receipt of a written request from the other Party, use Reasonable Efforts to destroy, erase, or delete (with such destruction, erasure, and deletion certified in writing to the other Party) or return to the other Party, without retaining copies thereof, any and all written or electronic Confidential Information received from the other Party.
PDF page 204
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
22.1.9 Remedies. The Parties agree that monetary damages would be inadequate to compensate a Party for the other Party’s Breach of its obligations under this Article 22. Each Party accordingly agrees that the other Party shall be entitled to equitable relief, by way of injunction or otherwise, if the first Party Breaches or threatens to Breach its obligations under this Article 22, which equitable relief shall be granted without bond or proof of damages, and the receiving Party shall not plead in defense that there would be an adequate remedy at law. Such remedy shall not be deemed an exclusive remedy for the Breach of this Article 22, but shall be in addition to all other remedies available at law or in equity. The Parties further acknowledge and agree that the covenants contained herein are necessary for the protection of legitimate business interests and are reasonable in scope. No Party, however, shall be liable for indirect, incidental, or consequential or punitive damages of any nature or kind resulting from or arising in connection with this Article 22.
22.1.10 Disclosure to FERC, its Staff, or a State. Notwithstanding anything in this Article 22 to the contrary, and pursuant to 18 CFR section 1b.20, if FERC or its staff, during the course of an investigation or otherwise, requests information from one of the Parties that is otherwise required to be maintained in confidence pursuant to this TSRA, the Party shall provide the requested information to FERC or its staff, within the time provided for in the request for information. In providing the information to FERC or its staff, the Party must, consistent with 18 CFR section 388.112, request that the information be treated as confidential and non-public by FERC and its staff and that the information be withheld from public disclosure. Parties are prohibited from notifying the other Party to this TSRA prior to the release of the Confidential Information to FERC or its staff. The Party shall notify the other Party to the TSRA when it is notified by FERC or its staff that a request to release Confidential Information has been received by FERC, at which time either of the Parties may respond before such information would be made public, pursuant to 18 CFR section 388.112. Requests from a state regulatory body conducting a confidential investigation shall be treated in a similar manner if consistent with the applicable state rules and regulations.
22.1.11 Subject to the exception in Article 22.1.10, any information that a Party claims is competitively sensitive, commercial or financial information under this TSRA ("Confidential Information") shall not be disclosed by the other Party to any person not employed or retained by the other Party, except to the extent disclosure is (i) required by law; (ii) reasonably deemed by the disclosing Party to be required to be disclosed in connection with a dispute between or among the Parties, or the defense of litigation or dispute; (iii) otherwise permitted by consent of the other Party, such consent not to be unreasonably withheld; or (iv) necessary to fulfill its obligations under this TSRA or as a transmission service provider or a Balancing Authority Area
PDF page 205
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
operator including disclosing the Confidential Information to an RTO or ISO or to a regional or national reliability organization. The Party asserting confidentiality shall notify the other Party in writing of the information it claims is confidential. Prior to any disclosures of the other Party’s Confidential Information under this subparagraph, or if any third party or Governmental Authority makes any request or demand for any of the information described in this subparagraph, the disclosing Party agrees to promptly notify the other Party in writing and agrees to assert confidentiality and cooperate with the other Party in seeking to protect the Confidential Information from public disclosure by confidentiality agreement, protective order or other reasonable measures.
Article 23.
Environmental Releases
23.1 Each Party shall notify the other Party, first orally and then in writing, of the release of any Hazardous Substances, any asbestos or lead abatement activities, or any type of remediation activities related to the Large Load or the Interconnection Facilities, each of which may reasonably be expected to affect the other Party. The notifying Party shall: (i) provide the notice as soon as practicable, provided such Party makes a good faith effort to provide the notice no later than twenty-four hours after such Party becomes aware of the occurrence; and (ii) promptly furnish to the other Party copies of any publicly available reports filed with any Governmental Authorities addressing such events.
Article 24.
Information Requirements
24.1 Information Acquisition. Participating TO and Large Load Interconnection Customer shall submit specific information regarding the electrical characteristics of their respective facilities to each other as described below and in accordance with Applicable Reliability Standards.
24.2 Information Submission by Participating TO. The initial information submission by Participating TO shall occur no later than one hundred eighty (180) Calendar Days prior to Service Commencement Date and shall include transmission system information necessary to allow Large Load Interconnection Customer to select equipment and meet any system protection and stability requirements, unless otherwise agreed to by the Parties. On a monthly basis Participating TO shall provide Large Load Interconnection Customer a status report on the construction and installation of Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades, including, but not limited to, the following information: (1) progress to date; (2) a description of the activities since the last report; (3) a description of the action items for the next period; and (4) the delivery status of equipment ordered.
PDF page 206
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
24.3 Updated Information Submission by Large Load Interconnection Customer. The updated information submission by Large Load Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Service Commencement Date. Large Load Interconnection Customer shall submit a completed copy of the Large Load data requirements contained in Appendix 1 to the LLIP. It shall also include any additional information provided to Participating TO for the Large Load Interconnection Study. Information in this submission shall be the most current Large Load design or expected performance data. Information submitted for stability models shall be compatible with Participating TO standard models. If there is no compatible model, Large Load Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information.
If Large Load Interconnection Customer’s data is materially different from what was originally provided to Participating TO pursuant to the Large Load Study Process Agreement between Participating TO and Large Load Interconnection Customer, then Participating TO will conduct appropriate studies to determine the impact on Participating TO’s Transmission System and Distribution System based on the actual data submitted pursuant to this Article 24.3. The Large Load Interconnection Customer shall not energize or operate the Large Load or co- located generation, if applicable, in parallel with the Participating TO’s Transmission System until such studies are completed. Changes not previously studied may require additional scope, may delay the Service Commencement Date, or, if determined by Participating TO to constitute a Material Modification, will require Large Load Interconnection Customer to submit a new Interconnection Request pursuant to the LLIP.
24.4 Information Supplementation. Prior to the Service Commencement Date, the Parties shall supplement their information submissions described above in this Article 24 with any and all “as-built” Large Load information or “as-tested” performance information that differs from the initial submissions or, alternatively, written confirmation that no such differences exist. The Large Load Interconnection Customer shall conduct tests on the Large Load as required by Good Utility Practice.
Subsequent to the Service Commencement Date, Large Load Interconnection Customer shall provide Participating TO any information changes due to equipment replacement, repair, or adjustment. Participating TO shall provide Large Load Interconnection Customer any information changes due to equipment replacement, repair or adjustment in the directly connected substation or any adjacent Participating TO-owned substation that may affect Large Load Interconnection Customer’s Interconnection Facilities equipment ratings, protection or operating requirements. The Parties shall provide such information no later than thirty (30) Calendar Days after the date of the equipment replacement, repair or adjustment.
PDF page 207
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Article 25.
Information Access and Audit Rights
25.1 Information Access. Each Party (the “disclosing Party”) shall make available to the other Party information that is in the possession of the disclosing Party and is necessary in order for the other Party to: (i) verify the costs incurred by the disclosing Party for which the other Party is responsible under this TSRA; and (ii) carry out its obligations and responsibilities under this TSRA. The Parties shall not use such information for purposes other than those set forth in this Article 25.1 and to enforce their rights under this TSRA.
25.2 Reporting of Non-Uncontrollable Force Events. Each Party (the “notifying Party”) shall notify the other Party when the notifying Party becomes aware of its inability to comply with the provisions of this TSRA for a reason other than an Uncontrollable Force event. The Parties agree to cooperate with each other and provide necessary information regarding such inability to comply, including the date, duration, reason for the inability to comply, and corrective actions taken or planned to be taken with respect to such inability to comply. Notwithstanding the foregoing, notification, cooperation or information provided under this Article shall not entitle the Party receiving such notification to allege a cause for anticipatory breach of this TSRA.
25.3 Audit Rights. Subject to the requirements of confidentiality under Article 22 of this TSRA, each Party shall have the right, during normal business hours, and upon prior reasonable notice to the other Party, to audit at its own expense the other Party’s accounts and records pertaining to either Party’s performance or either Party’s satisfaction of obligations under this TSRA. Such audit rights shall include audits of the other Party’s costs, calculation of invoiced amounts, and each Party’s actions in an Emergency Condition. Any audit authorized by this Article shall be performed at the offices where such accounts and records are maintained and shall be limited to those portions of such accounts and records that relate to each Party’s performance and satisfaction of obligations under this TSRA. Each Party shall keep such accounts and records for a period equivalent to the audit rights periods described in Article 25.4.
25.4 Audit Rights Periods.
25.4.1 Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Participating TO’s Interconnection Facilities, Distribution Upgrades, and Large Load Network Upgrades shall be subject to audit for a period of twenty-four months following Participating TO’s issuance of a final invoice in accordance with Article 12.2.
25.4.2 Audit Rights Period for All Other Accounts and Records. Accounts and records related to either Party’s performance or satisfaction of all
PDF page 208
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
obligations under this TSRA other than those described in Article 25.4.1 shall be subject to audit as follows: (i) for an audit relating to cost obligations, the applicable audit rights period shall be twenty-four months after the auditing Party’s receipt of an invoice giving rise to such cost obligations; and (ii) for an audit relating to all other obligations, the applicable audit rights period shall be twenty-four months after the event for which the audit is sought.
25.5 Audit Results. If an audit by a Party determines that an overpayment or an underpayment has occurred, a notice of such overpayment or underpayment shall be given to the other Party together with those records from the audit which support such determination.
Article 26.
Subcontractors
26.1 General. Nothing in this TSRA shall prevent a Party from utilizing the services of any subcontractor as it deems appropriate to perform its obligations under this TSRA; provided, however, that each Party shall require its subcontractors to comply with all applicable terms and conditions of this TSRA in providing such services and each Party shall remain primarily liable to the other Party for the performance of such subcontractor.
26.2 Responsibility of Principal. The creation of any subcontract relationship shall not relieve the hiring Party of any of its obligations under this TSRA. The hiring Party shall be fully responsible to the other Party for the acts or omissions of any subcontractor the hiring Party hires as if no subcontract had been made; provided, however, that in no event shall Participating TO be liable for the actions or inactions of Large Load Interconnection Customer or its subcontractors with respect to obligations of Large Load Interconnection Customer under Article 5 of this TSRA. Any applicable obligation imposed by this TSRA upon the hiring Party shall be equally binding upon, and shall be construed as having application to, any subcontractor of such Party.
26.3 No Limitation by Insurance. The obligations under this Article 26 will not be limited in any way by any limitation of subcontractor’s insurance.
Article 27.
Disputes
27.1 Submission. In the event either Party has a dispute, or asserts a claim, which arises out of or in connection with the TSRA, the LLIP, or their performance, such Party (the "disputing Party") shall provide the other Party with written notice of the dispute or claim ("Notice of Dispute"). Such dispute or claim shall be resolved in accordance with the Dispute Resolution Procedures set forth in Section 14 of the TO Tariff.
Article 28.
Representations, Warranties, and Covenants
PDF page 209
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
28.1 General. Each Party makes the following representations, warranties and covenants:
28.1.1 Good Standing. Such Party is duly organized, validly existing and in good standing under the laws of the state in which it is organized, formed, or incorporated, as applicable; that it is qualified to do business in the state or states in which the Large Load, Interconnection Facilities and Large Load Network Upgrades owned by such Party, as applicable, are located; and that it has the corporate power and authority to own its properties, to carry on its business as now being conducted and to enter into this TSRA and carry out the transactions contemplated hereby and perform and carry out all covenants and obligations on its part to be performed under and pursuant to this TSRA.
28.1.2 Authority. Such Party has the right, power and authority to enter into this TSRA, to become a Party hereto and to perform its obligations hereunder. This TSRA is a legal, valid and binding obligation of such Party, enforceable against such Party in accordance with its terms, except as the enforceability thereof may be limited by applicable bankruptcy, insolvency, reorganization or other similar laws affecting creditors’ rights generally and by general equitable principles (regardless of whether enforceability is sought in a proceeding in equity or at law).
28.1.3 No Conflict. The execution, delivery and performance of this TSRA does not violate or conflict with the organizational or formation documents, or bylaws or operating agreement, of such Party, or any judgment, license, permit, order, material agreement or instrument applicable to or binding upon such Party or any of its assets.
28.1.4 Consent and Approval. Such Party has sought or obtained, or, in accordance with this TSRA will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of this TSRA, and it will provide to any Governmental Authority notice of any actions under this TSRA that are required by Applicable Laws and Regulations.
Article 29.
Miscellaneous
29.1 Binding Effect. This TSRA and the rights and obligations hereof, shall be binding upon and shall inure to the benefit of the successors and assigns of the Parties hereto.
29.2 Conflicts. In the event of a conflict between the body of this TSRA and any attachment, appendices or exhibits hereto, the terms and provisions of the body of this TSRA shall prevail and be deemed the final intent of the Parties.
PDF page 210
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
29.3 Rules of Interpretation. This TSRA, unless a clear contrary intention appears, shall be construed and interpreted as follows: (1) the singular number includes the plural number and vice versa; (2) reference to any person includes such person’s successors and assigns but, in the case of a Party, only if such successors and assigns are permitted by this TSRA, and reference to a person in a particular capacity excludes such person in any other capacity or individually;
(3) reference to any agreement (including this TSRA), document, instrument or tariff means such agreement, document, instrument, or tariff as amended or modified and in effect from time to time in accordance with the terms thereof and, if applicable, the terms hereof; (4) reference to any Applicable Laws and Regulations means such Applicable Laws and Regulations as amended, modified, codified, or reenacted, in whole or in part, and in effect from time to time, including, if applicable, rules and regulations promulgated thereunder; (5) unless expressly stated otherwise, reference to any Article, Section or Appendix means such Article of this TSRA or such Appendix to this TSRA, or such Section to the LLIP or such Appendix to the LLIP, as the case may be; (6) “hereunder”, “hereof”, “herein”, “hereto” and words of similar import shall be deemed references to this TSRA as a whole and not to any particular Article or other provision hereof or thereof; (7) “including” (and with correlative meaning “include”) means including without limiting the generality of any description preceding such term; and (8) relative to the determination of any period of time, “from” means “from and including”, “to” means “to but excluding” and “through” means “through and including”.
29.4 Entire Agreement. This TSRA, including all Appendices and Schedules attached hereto, constitutes the entire agreement between the Parties with reference to the subject matter hereof, and supersedes all prior and contemporaneous understandings or agreements, oral or written, between the Parties with respect to the subject matter of this TSRA. There are no other agreements, representations, warranties, or covenants which constitute any part of the consideration for, or any condition to, either Party’s compliance with its obligations under this TSRA.
29.5 No Third Party Beneficiaries. This TSRA is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the obligations herein assumed are solely for the use and benefit of the Parties, their successors in interest and, where permitted, their assigns.
29.6 Waiver. The failure of a Party to this TSRA to insist, on any occasion, upon strict performance of any provision of this TSRA will not be considered a waiver of any obligation, right, or duty of, or imposed upon, such Party.
Any waiver at any time by either Party of its rights with respect to this TSRA shall not be deemed a continuing waiver or a waiver with respect to any other failure to
PDF page 211
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
comply with any other obligation, right, duty of this TSRA. Termination or Default of this TSRA for any reason by Large Load Interconnection Customer shall not constitute a waiver of Large Load Interconnection Customer’s legal rights to obtain an interconnection from Participating TO. Any waiver of this TSRA shall, if requested, be provided in writing.
29.7 Headings. The descriptive headings of the various articles of this TSRA have been inserted for convenience of reference only and are of no significance in the interpretation or construction of this TSRA.
29.8 Multiple Counterparts. This TSRA may be executed in two or more counterparts, each of which is deemed an original but all constitute one and the same instrument.
29.9 Amendment. The Parties may by mutual agreement amend this TSRA by a written instrument duly executed by the Parties.
29.10 Modification by the Parties. The Parties may by mutual agreement amend the Appendices to this TSRA by a written instrument duly executed by the Parties. Such amendment shall become effective and a part of this TSRA upon satisfaction of all Applicable Laws and Regulations.
29.11 Reservation of Rights. Participating TO shall have the right to make a unilateral filing with FERC to modify this TSRA with respect to any rates, terms and conditions, charges, classifications of service, rule or regulation under section 205 or any other applicable provision of the Federal Power Act and FERC’s rules and regulations thereunder, and Large Load Interconnection Customer shall have the right to make a unilateral filing with FERC to modify this TSRA pursuant to section 206 or any other applicable provision of the Federal Power Act and FERC’s rules and regulations thereunder; provided that each Party shall have the right to protest any such filing by the other Party and to participate fully in any proceeding before FERC in which such modifications may be considered. Nothing in this TSRA shall limit the rights of the Parties or of FERC under sections 205 or 206 of the Federal Power Act and FERC’s rules and regulations thereunder, except to the extent that the Parties otherwise mutually agree as provided herein.
29.12 No Partnership. This TSRA shall not be interpreted or construed to create an association, joint venture, agency relationship, or partnership between the Parties or to impose any partnership obligation or partnership liability upon either Party. Neither Party shall have any right, power or authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, the other Party.
PDF page 212
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
IN WITNESS WHEREOF, the Parties have executed this TSRA in duplicate
originals, each of which shall constitute and be an original effective Agreement between the Parties.
[Insert name of Participating TO
By:
Name: ___________________________
Title:
Date:
[Insert name of Large Load Interconnection Customer]
By:
Name: ___________________________
Title:
Date:
PDF page 213
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix A to TSRA
Description of Participating TO’s Interconnection Facilities, Large Load Network Upgrades, Distribution Upgrades, Costs, Payments and Interconnection Financial Security
PDF page 214
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix B to TSRA
Requirements for Mitigation of Potential Cost Shifting Related to New Transmission Facilities
1. Security For Large Load Network Upgrades and ISO-Identified Network Upgrades
a. Initial Amount of Security. For the Large Load Network Upgrades identified in Appendix A and any ISO-Identified Network Upgrades, Large Load Interconnection Customer must provide Interconnection Financial Security equal to the Participating TO’s estimated costs attributable to the applicable facilities, including engineering, design, procurement, permitting, construction, installation, testing, and commissioning costs, together with applicable labor, materials, contractor charges, and overhead. If the final engineering and design indicates a change in the scope of Large Load Network Upgrades or ISO-Identified Network Upgrades, the costs of the incremental resulting Large Load Network Upgrades and ISO-Identified Network Upgrades shall be included as additional Interconnection Financial Security.
i. Large Load Network Upgrades and ISO-Identified Network Upgrades Interconnection Financial Security: ____________ b. Reduction in Amount of Security. Large Load Interconnection Customer is entitled to annually reduce the Interconnection Financial Security identified in Section 1.a, in accordance with this Section. Reductions shall commence once the Large Load commences retail service. The amount reduced against the total security for the Large Load Network Upgrades and any ISO-Identified Network Upgrades will equal 75% multiplied by the amount of MWh counted as Gross Load of the Large Load Interconnection Customer associated with withdrawals by the Large Load multiplied by the Regional Access Charge. The Regional Access Charge will be set for purposes of this calculation in the same manner as set in Section 2.c of this Appendix B and will be fixed once set. In order to receive this reduction, the Large Load Interconnection Customer will inform the Participating TO of its Gross Load withdrawn as measured by the ISO revenue meter. Any remaining unreduced balance of Interconnection Financial Security for the Large Load Network Upgrades and any ISO-Identified Network Upgrades after fifteen (15) years will be drawn down by Participating TO and credited under Participating TO’s Transmission Revenue Balancing Account Adjustment.
2. Minimum Annual Revenue Obligation
PDF page 215
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
a. Calculation of Minimum Annual Revenue Obligation
i. The Minimum Annual Revenue Obligation (“MARO”) is an amount of revenue that will be collected in each yearly period to ensure that the Large Load Interconnection Customer contributes sufficiently to the Gross Load in the ISO Balancing Authority Area, or else pays a shortfall amount that will flow through the relevant revenue requirement (used to set the Regional Access Charge and Regional Wheeling Access Charge and, if relevant, used to set the Local Access Charge and Local Wheeling Access Charge) in accordance with the ISO Tariff. “Regional Access” Charge and “Regional Wheeling Access Charge” are all defined in the ISO Tariff.
ii. For each yearly period, Large Load Interconnection Customer’s Minimum Annual Revenue Obligation shall be calculated as follows: Minimum Annual Revenue Obligation = Minimum Obligation Capacity (MW) × [hours in the year] × 80% × 75% × Regional Access Charge (if connected to High Voltage facilities)
iii. The Regional Access Charge or the Regional Access Charge plus the Local Access Charge amount will be fixed at the most recent rates posted by the ISO as of the date of execution for the fifteen years that the Minimum Annual Revenue Obligation remains in effect. The ISO posts the relevant rates (using the term “TAC” rather than the term “RAC” on the “Settlements” page of its website (currently https://www.ISO.com/market-operations/settlements).
iv. “Requested Maximum Load” means the ultimate peak demand, expressed in MW, specified by the Large Load Interconnection Customer on behalf of the Large Load in the application process in the LLIP. For purposes of calculating the Minimum Annual Revenue Obligation during the load ramp, “Large Load Capacity” means the MW amount assigned to the applicable Year in the schedule below. The Large Load Capacity shall reflect the expected maximum capacity during the relevant annual period. The Large Load Capacity should be set at the Requested Maximum Load no later than Year 5.
Table 1. Minimum Capacity Schedule
Year
Date
Minimum Obligation Capacity
1
[Date]
MW
2
[Date]
MW
3
[Date]
MW
4
[Date]
MW
5
[Date]
MW
PDF page 216
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Year
Date
Minimum Obligation Capacity
6
[Date]
MW
7
[Date]
MW
8
[Date]
MW
9
[Date]
MW
10
[Date]
MW
11
[Date]
MW
12
[Date]
MW
13
[Date]
MW
14
[Date]
MW
15
[Date]
MW
b. Minimum Annual Revenue Obligation Reconciliation Process
i. After each year, Participating TO shall compare the Minimum Annual Revenue Obligation with the annual wholesale revenues associated with the Gross Load of the Large Load, as measured by the ISO revenue meter (“Annual LL Gross Load Revenue”). The Annual LL Gross Load Revenue would be calculated by the Large Load Interconnection Customer providing Participating TO the Gross Load of the Large Load End User and multiplying that amount by the Regional Access Charge only, or the Regional Access Charge plus Local Access Charge, as appropriate. The same Regional Access Charge and/or Local Access Charge rates used to calculate the Minimum Annual Revenue Obligation will be used to calculate the Annual LL Gross Load Revenue. If a Large Load is a retail transmission customer of the Participating TO, then its Annual LL Gross Load Revenue shall be equal to its retail transmission revenues. If the Annual LL Gross Load Revenue for the annual period is greater than Minimum Annual Revenue Obligation, the Annual LL Gross Load Revenue calculation need not be performed and no reconciliation will occur because the Minimum Annual Revenue Obligation has been met.
ii. If the Annual LL Gross Load Revenue is less than the Minimum Annual Revenue Obligation, Participating TO shall invoice the Large Load Interconnection Customer for the difference, payable within thirty (30) calendar days of receipt (“MARO Shortfall”). Payment of the MARO Shortfall shall satisfy the Minimum Annual Revenue Obligation under this Section for that year. Any MARO Shortfalls paid by the Large Load Interconnection Customer would be treated as revenue in Participating TO’s Transmission Revenue Balancing Account Adjustment.
iii. A delay in achieving the Requested Maximum Load shall not, by itself, postpone a scheduled increase in Minimum Annual Revenue
PDF page 217
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Obligation. The Parties may change the Minimum Capacity Schedule only by written amendment to this TSRA, subject to any required regulatory approval. The number of amendments to the Large Load Capacity Schedule are limited to one annually for the first four years after execution of the TSRA, with no amendments thereafter.
c. MARO Interconnection Financial Security
i. Provision of Interconnection Financial Security to Secure MARO. The Large Load Interconnection Customer shall provide additional Interconnection Financial Security separate and apart from the Interconnection Financial Security described in Section 1 of this Appendix B to secure its MARO.
ii. Amount of MARO Interconnection Financial Security. The Interconnection Financial Security to secure the MARO shall be maintained for as long as the Minimum Annual Revenue Obligation remains in effect, including any period necessary to resolve and pay a final annual reconciliation. The required amount of Interconnection Financial Security shall equal five years times the Minimum Annual Revenue Obligation calculated using the full Large Load Capacity, rather than the Minimum Obligation Capacity applicable during the load ramp.
1. MARO Interconnection Financial Security: __________
iii. Reduction and Release of MARO Interconnection Financial Security. In each of the Years 10-15 of this TSRA, Large Load Interconnection Customer may reduce its Interconnection Financial Security under this Appendix B, Section 2.c by one year’s Minimum Annual Revenue Obligation. Thirty days after the expiration of this TSRA, if all amounts due have been paid, the Participating TO will release the remaining MARO Interconnection Financial Security. d. Failure to Pay MARO Shortfall
i. Participating TO shall draw on the MARO Interconnection Financial Security for any MARO Shortfall that remains unpaid more than sixty (60) Calendar Days after its due date. Participating TO shall give Large Load Interconnection Customer written notice of the amount drawn and apply the proceeds to the unpaid obligation. A draw does not discharge Large Load Interconnection Customer’s obligation to pay amounts exceeding the proceeds or relieve Large Load Interconnection Customer of future payment obligations. Within thirty (30) Calendar Days after a draw, Large Load Interconnection Customer shall restore the available MARO
PDF page 218
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Interconnection Financial Security to the required amount in Section 2(c)ii.
3. Withdrawal Penalty; Exit Fee
a. Requirements Prior to Commencement of Service. Prior to the Service Commencement Date, the provisions of this Section apply.
i. Withdrawal Penalty. In accordance with LLIP Section 3.10.1(c), if Large Load Interconnection Customer fails to take service on or before its Service Commencement Date, the Large Load
Interconnection Customer’s Withdrawal Penalty will be the greater of twenty percent (20%) of its estimated Large Load Network Upgrade costs as reflected in the most recently completed Interconnection Study, or the actual cost of any Large Load Network Upgrade abandoned facilities.
b. Requirements Following Commencement of Service. Following the Service Commencement Date, the provisions of this Section apply.
i. Exit Fee. If the TSRA is terminated prior to the expiration of the Term, Large Load Interconnection Customer shall pay an Exit Fee equal to the value of the required remaining Interconnection Financial Security under this Appendix B on the date of termination, including all remaining Interconnection Financial Security for Large Load Network Upgrades, ISO-Identified Network Upgrades, and Large Load Interconnection Customer’s MARO. Such Exit Fee will be due thirty (30) Business Days after an invoice for the Exit Fee has been sent. If the Large Load Interconnection Customer does not pay the Exit Fee in full within thirty (30) Business Days, the Participating TO may draw on all Interconnection Financial Security to pay the Exit Fee. If this agreement is terminated, the Large Load Interconnection Customer’s right to Transmission Interconnection Service is terminated and the Large Load Interconnection Customer may be rendered incapable of delivering electric energy for consumption by the Large Load End User.
PDF page 219
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix C to TSRA
Milestones
Check box if applicable
[ ]
PDF page 220
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix D to TSRA
Interconnection Details
PDF page 221
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix E to TSRA
Flexible Interim Load Interconnection (FILI) Conditions
Check box if applicable ☐
PDF page 222
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix F to TSRA
Security Arrangements Details
Infrastructure security of Participating TO’s Transmission System and Distribution System equipment and operations and control hardware and software is essential to ensure day-to-day reliability and operational security. FERC will expect the ISO, all transmission providers, market participants, and Large Load Interconnection Customers interconnected to the Participating TO’s Transmission System to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices.
PDF page 223
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix G to TSRA
Addresses for Delivery of Notices and Billings
Notices:
Participating TO:
[To be supplied.]
Large Load Interconnection Customer:
[To be supplied.]
Billings and Payments:
Participating TO:
[To be supplied.]
Large Load Interconnection Customer:
[To be supplied.]
Alternative Forms of Delivery of Notices (telephone or email):
Participating TO:
[To be supplied.]
Large Load Interconnection Customer:
[To be supplied.]
PDF page 224
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
ATTACHMENT 4 to LLIP
OPERATING CONDITIONS AGREEMENT
for
FLEXIBLE INTERIM LOAD INTERCONNECTION (FILI) AMONG
[LARGE LOAD INTERCONNECTION CUSTOMER]
AND
SOUTHERN CALIFORNIA EDISON COMPANY
AND
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
PDF page 225
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
OPERATING CONDITIONS AGREEMENT
for
FLEXIBLE INTERIM LOAD INTERCONNECTION (FILI)
THIS OPERATING CONDITIONS AGREEMENT for FLEXIBLE INTERIM LOAD
INTERCONNECTION (FILI) is made and entered into this ____ day of
______________ 20__, by and among _______________, a ______________
organized and existing under the laws of the State/Commonwealth of _____________ ("Large Load Interconnection Customer" with a Large Load), Southern California Edison Company, a corporation organized and existing under the laws of the State of California ("Participating TO"), and California Independent System Operator Corporation, a California nonprofit public benefit corporation organized and existing under the laws of the State of California ("CAISO"). Large Load Interconnection Customer, Participating TO, and CAISO each may be referred to as a "Party" or collectively as the "Parties."
RECITALS
WHEREAS, Large Load Interconnection Customer has entered into a
Transmission Security and Reliability Agreement (“TSRA”) with the Participating TO dated _________ and designated as Service Agreement No. ______ for the purpose of interconnecting its Large Load to the Participating TO’s Transmission System, which is part of the ISO Controlled Grid; and
WHEREAS, the Large Load Interconnection Customer elected FILI pursuant to the terms of the TSRA to allow interconnection and operation of the Large Load prior to the completion of the upgrades, subject to the conditions and limitations identified in Appendix E to the TSRA; and
WHEREAS, ISO exercises Operational Control over the ISO Controlled Grid; and
WHEREAS, the Participating TO owns, operates, and maintains the Participating TO’s Transmission System; and
WHEREAS, Section 25.7.2 of the ISO Tariff requires the Large Load
Interconnection Customer, the Participating TO, and the ISO to enter into this agreement for the purpose of describing the circumstances under which the ISO or Participating TO may temporarily curtail the Large Load receiving FILI, the mechanism the ISO or Participating TO will use to perform the curtailment, and other conditions or limitations of FILI; and
WHEREAS, Large Load Interconnection Customer, Participating TO, and ISO have agreed to enter into this agreement in accordance with Section 25.7.2 of the ISO Tariff;
PDF page 226
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
NOW, THEREFORE, in consideration of and subject to the mutual covenants contained herein, it is agreed:
NOW, THEREFORE, in consideration of and subject to the mutual covenants contained herein the Parties agree as follows:
1.0
When used in this Agreement, with initial capitalization, the terms specified shall have the meanings indicated in the LLIP, or if not defined in the LLIP, as defined in the TO Tariff.
2.0
This Agreement shall become effective upon execution by all Parties subject to acceptance by FERC (if required), or if filed unexecuted, upon the date specified by FERC. The ISO shall promptly file this Agreement with FERC upon execution, if required.
3.0
This Agreement shall remain in effect during the period in which the Participating TO is providing FILI service pursuant to the TSRA and shall terminate on the earlier of: (i) termination of the TSRA; (ii) upon completion of the upgrades required for the full service requested under the TSRA, identified in Appendix 4 to this Agreement, and such full service commences; or, (iii) upon Default under Section 9.0 of this Agreement. Upon termination of this Agreement, the Large Load Interconnection Customer shall not be entitled to FILI service.
4.0
ISO and Participating TO shall have the right to curtail FILI service in accordance with Appendix 1, in addition to any other rights provided pursuant to the TSRA, the TO Tariff or the ISO Tariff. The Participating TO and ISO shall not be subject to any damages with respect to their exercise of such curtailment rights.
5.0
The Large Load Interconnection Customer shall operate the Large Load in accordance with the conditions and limitations set forth in Appendix 2. 6.0
The failure of the Large Load Interconnection Customer to comply with an instruction to curtail FILI service issued by the Participating TO or ISO pursuant to Section 4.0, or to operate the Large Load pursuant to Section 5.0, may result in disconnection of the Large Load from the ISO Controlled Grid and shall be considered a Breach of this Agreement. For the purposes of this Agreement, Breach shall mean the failure of a Party to perform or observe any material term or condition of this Agreement.
7.0
The Parties have designated the individuals identified in Appendix 3 as the point(s) of contact with respect to the implementation of this Agreement and provision of notices.
PDF page 227
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
8.0
Conflicts. With regard to rights and obligations between the Participating TO and the Large Load Interconnection Customer, if and to the extent a matter is specifically addressed by a provision of this Agreement (including any appendices), the provisions of this Agreement shall govern. If and to the extent a provision of this Agreement is inconsistent with the ISO Tariff and dictates rights and obligations between the ISO and the Participating TO or the ISO and the Large Load Interconnection Customer, the ISO Tariff shall govern. In the event of a conflict between this Agreement and the TSRA, the terms and provisions of this Agreement shall govern.
9.0
Default. If a Breach is not cured as provided in this Section, or if a Breach is not capable of being cured within the period provided for herein, the non-breaching Party shall have the right to declare a default (“Default”) and terminate this Agreement by written notice at any time until cure occurs, and be relieved of any further obligation hereunder and, whether or not that Party terminates this Agreement, to recover from the breaching Party all amounts due hereunder, plus all other damages and remedies to which it is entitled at law or in equity. The provisions of this Section will survive termination of this Agreement.
No Default shall exist where such failure to discharge an obligation (other than the payment of money) is the result of an Uncontrollable Force or the result of an act or omission of the other Party. Upon a Breach, the non- breaching Party shall give written notice of such Breach to the breaching Party. The breaching Party shall have thirty (30) Calendar Days from receipt of the Default notice within which to cure such Breach; provided however, if such Breach is not capable of cure within thirty (30) Calendar Days, the breaching Party shall commence such cure within thirty (30) Calendar Days after notice and continuously and diligently complete such cure within ninety (90) Calendar Days from receipt of the Default notice; and, if cured within such time, the Breach specified in such notice shall cease to exist.
10.0 Consequential Damages. No Party shall be liable under any provision of this Agreement for any losses, damages, costs or expenses for any special, indirect, incidental, consequential, or punitive damages, including but not limited to loss of profit or revenue, loss of the use of equipment, cost of capital, cost of temporary equipment or services, whether based in whole or in part in contract, in tort, including negligence, strict liability, or any other theory of liability; provided, however, that damages for which a Party may be liable to another Party under another agreement will not be
PDF page 228
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
considered to be special, indirect, incidental, or consequential damages hereunder.
11.0 Indemnity. Each Party shall at all times indemnify, defend, and hold the other Parties harmless from, any and all losses arising out of or resulting from another Party's action or inactions of its obligations under this Agreement on behalf of the indemnifying Party, except in cases of gross negligence or intentional wrongdoing by the Indemnified Party.
12.0 Miscellaneous.
12.1 Dispute Resolution. In the event any Party has a dispute, or asserts a claim, that arises out of or in connection with this Agreement, or their performance, such Party (the "disputing Party") shall provide the other Party with written notice of the dispute or claim ("Notice of Dispute"). Such dispute or claim shall be resolved in accordance with the Dispute Resolution Procedures set forth in Section 14 of the TO Tariff.
12.2 Confidentiality. Confidential Information shall be treated in accordance with the TSRA.
12.3 Binding Effect. This Agreement and the rights and obligations hereof, shall be binding upon and shall inure to the benefit of the successors and assigns of the Parties hereto.
12.4 Rules of Interpretation. This Agreement, unless a clear contrary intention appears, shall be construed and interpreted as follows: (1) the singular number includes the plural number and vice versa; (2) reference to any person includes such person’s successors and assigns but, in the case of a Party, only if such successors and assigns are permitted by this Agreement, and reference to a person in a particular capacity excludes such person in any other capacity or individually; (3) reference to any agreement (including this Agreement), document, instrument or tariff means such agreement, document, instrument, or tariff as amended or modified and in effect from time to time in accordance with the terms thereof and, if applicable, the terms hereof; (4) reference to any applicable laws and regulations means such applicable laws and regulations as amended, modified, codified, or reenacted, in whole or in part, and in effect from time to time, including, if applicable, rules and regulations promulgated thereunder; (5) unless expressly stated otherwise, reference to any Section or Appendix means such Section of this Agreement or such Appendix to this Agreement; (6) “hereunder”, “hereof”, “herein”, “hereto” and words of similar import shall be deemed references to this Agreement as a whole and not to any particular Section, or other provision hereof or
PDF page 229
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
thereof; (7) “including” (and with correlative meaning “include”) means including without limiting the generality of any description preceding such term; and (8) relative to the determination of any period of time, “from” means “from and including”, “to” means “to but excluding” and “through” means “through and including”.
12.5 Entire Agreement. This Agreement, including all Appendices attached hereto, constitutes the entire agreement between the Parties with reference to the subject matter hereof, and supersedes all prior and contemporaneous understandings or agreements, oral or written, between the Parties with respect to the subject matter of this Agreement. There are no other agreements, representations, warranties, or covenants which constitute any part of the consideration for, or any condition to, any Party’s compliance with its obligations under this Agreement.
12.6 No Third Party Beneficiaries. This Agreement is not intended to and does not create rights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the obligations herein assumed are solely for the use and benefit of the Parties, their successors in interest and, where permitted, their assigns.
12.7 Waiver. The failure of a Party to this Agreement to insist, on any occasion, upon strict performance of any provision of this Agreement will not be considered a waiver of any obligation, right, or duty of, or imposed upon, such Party.
Any waiver at any time by either Party of its rights with respect to this Agreement shall not be deemed a continuing waiver or a waiver with respect to any other failure to comply with any other obligation, right, or duty of this Agreement. Any waiver of this Agreement shall, if requested, be provided in writing.
12.8 Headings. The descriptive headings of the various Sections of this Agreement have been inserted for convenience of reference only and are of no significance in the interpretation or construction of this Agreement
12.9 Multiple Counterparts. This Agreement may be executed in two or more counterparts, each of which is deemed an original but all constitute one and the same instrument.
12.10 Amendment. The Parties may by mutual agreement amend this Agreement by a written instrument duly executed by the Parties.
12.11 Modification by the Parties. The Parties may by mutual agreement amend the Appendices to this Agreement by a written instrument duly executed
PDF page 230
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
by the Parties. Such amendment shall become effective and a part of this Agreement upon satisfaction of all applicable laws and regulations.
12.12 Reservation of Rights. The Participating TO shall have the right to make a unilateral filing with FERC to modify this Agreement with respect to any rates, terms and conditions, charges, classifications of service, rule or regulation under section 205 or any other applicable provision of the Federal Power Act and FERC’s rules and regulations thereunder, and Large Load Interconnection Customer shall have the right to make a unilateral filing with FERC to modify this Agreement pursuant to section 206 or any other applicable provision of the Federal Power Act and FERC’s rules and regulations thereunder; provided that each Party shall have the right to protest any such filing by another Party and to participate fully in any proceeding before FERC in which such modifications may be considered. Nothing in this Agreement shall limit the rights of the Parties or of FERC under sections 205 or 206 of the Federal Power Act and FERC’s rules and regulations thereunder, except to the extent that the Parties otherwise mutually agree as provided herein.
12.13 No Partnership. This Agreement shall not be interpreted or construed to create an association, joint venture, agency relationship, or partnership between the Parties or to impose any partnership obligation or partnership liability upon any Party. No Party shall have any right, power or authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, another Party.
12.14 Assignment. This Agreement may be assigned by either Party only with the written consent of the other; and provided further that Large Load Interconnection Customer shall have the right to assign this Agreement, without the consent of Participating TO, for collateral security purposes to aid in providing financing for the Large Load, provided that Large Load Interconnection Customer will promptly notify Participating TO of any such assignment. Any financing arrangement entered into by Large Load Interconnection Customer pursuant to this article will provide that prior to or upon the exercise of the secured party’s, trustee’s or mortgagee’s assignment rights pursuant to said arrangement, the secured creditor, the trustee or mortgagee will notify Participating TO of the date and particulars of any such exercise of assignment right(s), including providing the Participating TO with proof that it meets the requirements of Articles 11.5 and 18.3. Any attempted assignment that violates this article is void and ineffective. Any assignment under this Agreement shall not relieve a Party of its obligations, nor shall a Party’s obligations be enlarged, in whole or in part, by reason thereof. Where required, consent to assignment will not be unreasonably withheld, conditioned or delayed.
PDF page 231
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
IN WITNESS THEREOF, the Parties have caused this Agreement to be duly executed by their duly authorized officers or agents on the day and year first above written.
[Insert Name of Large Load Interconnection Customer]
By:
____________________________________________
Name: ____________________________________________
Title: ____________________________________________
Date: ____________________________________________
Southern California Edison Company
By:
____________________________________________
Name: ____________________________________________
Title: ____________________________________________
Date: ____________________________________________
California Independent System Operator Corporation
By:
____________________________________________
Name: ____________________________________________
Title: ____________________________________________ Date: ____________________________________________
PDF page 232
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix 1
Conditions of Curtailment and Implementation Mechanisms
[Appendix 1 shall specify the circumstances, Contingencies, and operating conditions under which the Large Load may be curtailed; the curtailment mechanism; the entity responsible for implementing the curtailment; and the applicable notification method, response time, duration, restoration, testing, and verification requirements.]
PDF page 233
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix 2
Conditions and Limitations of FILI
[Appendix 2 shall specify the interim operating limits applicable both during and outside of curtailable events.]
PDF page 234
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix 3
Notices
PDF page 235
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Appendix 4
Upgrades Required For Full Service Requested Under The TSRA
PDF page 236
ATTACHMENT B
Redlined TO Tariff Sheets
Sections 1, 3, 4, 7-10, and 13
PDF page 237
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
TABLE OF CONTENTS
1. PREAMBLE … 1.1 Transmission Access for Participating TOs … 1.2 Transmission Access for Wheeling Customers … 1.3 Transmission Access for End-Users …
2. EFFECTIVE DATE …
3. TO DEFINITIONS …
4. ELIGIBILITY …
5. ACCESS CHARGES AND TRANSMISSION RATES … 5.1 Low Voltage Access Charge … 5.2 Wheeling Access Charge … 5.3 End-User Transmission Rates … 5.4 Transmission Revenue Requirement … 5.5 Transmission Revenue Balancing Account Adjustment (TRBAA) …
5.6 Transmission Access Charge Balancing Account Adjustment (TRBAA) …
6. ANCILLARY SERVICES - APPLICABILITY AND CHARGES …
7. BILLING AND PAYMENT … 7.1 End-Users … 7.2 Low Voltage Access Charge Revenues … 7.2.1 Billing Procedure … 7.2.2 Interest on Unpaid Balances … 7.2.3 Default … 7.3 Wheeling and Usage Charge Revenues …
8. OBLIGATION TO INTERCONNECT OR CONSTRUCT TRANSMISSION EXPANSIONS &
FACILITY UPGRADES … 8.1 Participating TO Obligation to Interconnect … 8.1.1 Interconnection to Transmission System … 8.1.1.1 Letter Agreement … 8.1.2 Costs Associated with Interconnection … 8.1.3 Interconnection Agreement … 8.1.4 Due Diligence to Construct … 8.1.5 Energization … 8.1.6 Coordination with ISO on Interconnection Requests …
8.2 Participating TO Obligation to Construct Transmission Expansions or Facility
Upgrades … 8.2.1 Obligation to Construct … 8.2.2 Local Furnishing Participating TO Obligation to Construct …
8.3 Request for FERC Deference Regarding Need Determination …
9. EXPANSION PROCESS … 9.1 Determination of Facilities … 9.1.1 Payment of Facilities Study’s Cost …
Tariff Record Proposed Effective Date: 06/15/202102/16/27
Version Number: 18.0.0
Option Code: A
PDF page 238
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
9.1.1.1 Market Participant to Pay for Facilities Study …
9.1.1.2 Project Sponsor or Project Proponent to Pay for Facilities Study …
9.1.1.3 Principal Beneficiaries to Pay for Facilities Study …
9.1.2 Payment Procedure … 9.1.3 Facilities Study Procedures … 9.2 Obligation to Build … 9.2.1 Due Diligence to Construct … 9.2.2 Delay in Construction or Expansion … 9.2.2.1 Alternatives to the Original Facility Additions …
9.2.2.2 Refund Obligation for Unfinished Facility Additions …
9.3 Provisions Relating To Transmission Construction On the Systems Of Other
TOs … 9.3.1 Responsibility for Third Party Additions … 9.3.2 Coordination of Third-Party System Additions … 9.3.3 Expansion by “Local Furnishing Participating TOs” …
10. INTERCONNECTION PROCESS … 10.1 Applicability … 10.2 Applications … 10.3 Interconnection Application … 10.4 Review of Completed Interconnection Application … 10.5 Notice of Need for System Impact Study … 10.6 System Impact Study Cost Reimbursement … 10.6.1 Cost Reimbursement … 10.6.2 Multiple Parties … 10.7 System Impact Study Procedures … 10.7.1 Procedures Upon Completion of System Impact Study …
10.8 Notice of Need for Facilities Study … 10.9 Facilities Study Procedures … 10.9.1 Execution of Interconnection Agreement … 10.10 Partial Interim Service … 10.11 Expedited Interconnection Procedures …
11. UNCONTROLLABLE FORCES AND INDEMNIFICATION …
11.1 Procedures To Follow if Uncontrollable Force Occurs …
11.2 Indemnification …
12. REGULATORY FILINGS … 12.1 Open Access … 12.2 STRANDED COST RECOVERY …
13. CREDITWORTHINESS … 13.1 UDCs, MSSs, and Scheduling Coordinators Using the Participating TO’s Low
Voltage Transmission Facilities … 13.2 End-Users …
14. DISPUTES …
15. RECOVERY OF RELIABILITY SERVICES COSTS …
16. MISCELLANEOUS … 16.1 Notices … 16.2 Waiver … 16.3 Confidentiality … 16.3.1 Maintaining Confidentiality If Not for Public Disclosure …
16.3.2 Disclosure of Confidential Information …
PDF page 239
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
16.4 TO Tariff Supersedes Existing Tariffs … 16.5 Titles … 16.6 Severability … 16.7 Preservation of Obligations … 16.8 Governing Law … 16.9 Appendices Incorporated … 16.10 Conflict With ISO Tariff … 16.11 Conflicting Operating Instructions … 16.12 Self Provision of Ancillary Services …
APPENDIX I - TRANSMISSION REVENUE REQUIREMENT ....................................................... APPENDIX II - CHARGES FOR WHOLESALE TRANSMISSION SERVICES …
APPENDIX III – TRANSMISSION RATES FOR END-USE SERVICE …
APPENDIX IV – RATES FOR CERTAIN ANCILLARY SERVICE BIDS …
APPENDIX V - NOTICES ............................................................................................................... APPENDIX VI - RELIABILITY SERVICES RATE SCHEDULE ..................................................... APPENDIX VII - INTERCONNECTION PROCEDURES IN EFFECT PRIOR TO JULY 1, 2005 ...
APPENDIX VIII – NOT USED ......................................................................................................... APPENDIX IX – FORMULA RATE ................................................................................................ APPENDIX X – RATE SCHEDULE FOR RECOVERY OF COSTS ASSOCIATED WITH
FACILITIES INSTALLED PURSUANT TO INTERCONNECTION AGREEMENTS.……………..
APPENDIX XI – TRANSMISSION MAINTENANCE AND COMPLIANCE REVIEW …
APPENDIX XII – STAKEHOLDER REVIEW PROCESS ............................................................... APPENDIX XIII – LETTER AGREEMENT ..................................................................................... APPENDIX XIV - WEST OF DEVERS FORMULA RATE……………………………… …
APPENDIX XV – LARGE LOAD INTERCONNECTION PROCEDURES…………………………..
PDF page 240
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
1. Preamble.
The Participating TO's revenue requirements and applicable rates and charges for transmission access over the ISO Controlled Grid and the terms and conditions for transmission expansion and interconnection are set forth in this TO Tariff and the ISO Tariff.
1.1 Transmission Access for Participating TOs.
Participating TOs are able to participate in the ISO and utilize the entire ISO Controlled Grid to serve their End-Use Customers. The applicable High Voltage Access Charges and Transition Charges shall be paid by Participating TOs to the ISO pursuant to the ISO Tariff. If a Participating TO utilizes the Low Voltage Transmission Facilities of another Participating TO, such Participating TO shall also pay the Low Voltage Access Charge of the other Participating TO.
1.2 Transmission Access for Wheeling Customers.
Wheeling allows Scheduling Coordinators to deliver Energy through or out of the ISO Controlled Grid to serve a load located outside the transmission or Distribution System of a Participating TO. Wheeling Access Charges shall be paid by Scheduling Coordinators to the ISO pursuant to the ISO Tariff.
1.3 Transmission Access for End-Users.
End-Users receive transmission service over the ISO Controlled Grid through the Utility Distribution Company, Small Utility Distribution Company, or MSS OperatorParticipating TO to whose transmission or distribution facilities the End-User is directly connected. Charges to End-Users for access to the ISO Controlled Grid shall be paid to the
PDF page 241
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
applicable Utility Distribution Company, Small Utility Distribution Company, or MSS OperatorParticipating TO to whose transmission or distribution facilities the End-User is directly connected.
PDF page 242
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3. TO Definitions.
Capitalized terms used in this TO Tariff shall have the meanings set out below or in Appendix XV unless otherwise stated. Capitalized terms used in this tariff and not defined below or in Appendix XV shall have the meanings set out in the ISO Tariff. 3.1
Access Charge. A charge paid by all UDCs, MSSs and, in certain cases, Scheduling Coordinators, delivering Energy to Gross Load, as set forth in Section 26.1 of the ISO Tariff. The Access Charge includes the High Voltage Access Charge, the Transition Charge, and the Low Voltage Access Charge.
3.2
Automatic Generation Control (AGC). Generation equipment that
automatically responds to signals from the ISO’s EMS control in real time to control the power output of electric generators within a prescribed area in response to a change in system frequency, tieline loading, or the relation of these to each other, so as to maintain the target system frequency and/or the established interchange with other areas within the predetermined limits.
3.3
Ancillary Services. Regulation, Spinning Reserve, Non-Spinning Reserve, Voltage Support and Black Start together with such other interconnected operation services as the ISO may develop in cooperation with Market Participants to support the transmission of Energy from Generation resources to Loads while maintaining reliable operation of the ISO Controlled Grid in accordance with Good Utility Practice.
Tariff Record Proposed Effective Date: 05/01/2026
Version Number: 16.0.0
Option Code: A
PDF page 243
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.4
Applicable Reliability Criteria. The reliability standards established by NERC, WECC, and Local Reliability Criteria as amended from time to time, including any requirements of the Nuclear Regulatory Commission.
3.5
Available Transfer Capacity. For a given transmission path, the capacity rating in MW of the path established consistent with ISO and WECC transmission capacity rating guidelines, less any reserved uses applicable to the path. 3.6
Base Transmission Revenue Requirement. The Transmission Revenue Requirement before deducting the Transmission Revenue Balancing Account Adjustment (TRBAA) and, for wholesale purposes, before deducting Standby Transmission Revenues.
3.7
Black Start. The procedure by which a Generating Unit self-starts without an external source of electricity thereby restoring power to the ISO Controlled Grid following system or local area blackouts.
3.8
Business Day. Monday through Friday, excluding federal holidays and the day after Thanksgiving Day.
3.9
(Omitted)
3.10 Completed Application Date. The date on which a party submits an Interconnection Application that satisfies the requirements of a Completed Interconnection Application.
3.11 Completed Interconnection Application. An Interconnection Application that satisfies all of the information and other requirements of Section 10.3 of this TO Tariff.
PDF page 244
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.12 Congestion. A condition that occurs when there is insufficient Available Transfer Capacity to implement all Preferred Schedules simultaneously or, in real time, to serve all Generation and Demand. “Congested” shall be construed accordingly. 3.13 Congestion Management. The alleviation of Congestion in accordance with applicable ISO Protocols and Good Utility Practice.
3.14 Converted Rights. Those transmission service rights as defined in Section 4.3.1.6 of the ISO Tariff.
3.15 CPUC. The California Public Utilities Commission, or its successor. 3.16 (Omitted)
3.17 Demand. The rate at which Energy is delivered to Loads and Scheduling Points by Generation, transmission or distribution facilities. It is the product of voltage and the in-phase component of alternating current measured in units of watts or standard multiples thereof, e.g., 1,000W = 1kW, 1,000kW = 1MW, etc.
3.18 Direct Assignment Facilities. Facilities or portions of facilities that are owned by the Participating TO necessary to physically and electrically interconnect a particular party requesting Interconnection under this TO Tariff to the ISO Controlled Grid at the point of interconnection. Direct Assignment Facilities shall be specified in the Interconnection Agreement that governs Interconnection service to such party and shall be subject to FERC approval.
3.19 Dispatch. The operating control of an integrated electric system to: i) assign specific Generating Units and other sources of supply to effect the supply to meet the relevant area Demand taken as Load rises or falls; ii) control operations and maintenance of high voltage lines, substations, and equipment, including administration
PDF page 245
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
of safety procedures; iii) operate interconnections; iv) manage Energy transactions with other interconnected Control Areas; and v) curtail Demand.
3.20 Distribution System. The distribution assets of a TO, UDC, or MSS. 3.21 Eligible Customer. (i) Any utility (including Participating TOs, Market Participants and any power marketer), Federal power marketing agency, or any person generating Energy for sale or resale; Energy sold or produced by such entity may be Energy produced in the United States, Canada or Mexico; however, such entity is not eligible for transmission service that would be prohibited by Section 212(h)(2) of the Federal Power Act; and (ii) any retail customer taking unbundled transmission service pursuant to a state retail access program or pursuant to a voluntary offer of unbundled retail transmission service by the Participating TO.
3.22 Encumbrance. A legal restriction or covenant binding on the Participating TO that affects the operation of any transmission lines or associated facilities and which the ISO needs to take into account in exercising Operational Control over such transmission lines or associated facilities if the Participating TO is not to risk incurring significant liability. Encumbrances shall include Existing Contracts and may include: (1) other legal restrictions or covenants meeting the definition of Encumbrance and arising under other arrangements entered into before the ISO Operations Date, if any; and (2) legal restrictions or covenants meeting the definition of Encumbrance and arising under a contract or other arrangement entered into after the ISO Operations Date. 3.23 End-Use Customer or End-User. A purchaser of electric power who purchases such power to satisfy a Load directly connected to the ISO Controlled Grid or to a Distribution System and who does not resell the power.
PDF page 246
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.24 Energy. The electrical energy produced, flowing or supplied by generation, transmission or distribution facilities, being the integral with respect to time of the instantaneous power, measured in units of watt-hours or standard multiples thereof, e.g., 1,000 Wh = 1kWh, 1,000 kWh = 1MWh, etc.
3.25 Entitlements. The right of the Participating TO obtained through contract or other means to use another entity's transmission facilities for the transmission of Energy.
3.26 Existing Contracts. The contracts which grant transmission service rights in existence on the ISO Operations Date (including any contracts entered into pursuant to such contracts) as may be amended in accordance with their terms or by agreement between the parties thereto from time to time.
3.27 Existing Rights. The transmission service rights and obligations of non- Participating TOs under Existing Contracts, including all terms, conditions, and rates of the Existing Contracts, as they may change from time to time under the terms of the Existing Contracts.
3.28 Expedited Interconnection Agreement. A contract between a party which has submitted a Request for Expedited Interconnection Procedures and the Participating TO under which the Participating TO agrees to process, on an expedited basis, the Completed Interconnection Application of such party and which sets forth the terms, conditions, and cost responsibilities for such interconnection.
3.29 Facilities Study Agreement. An agreement between a Participating TO and either a party requesting Interconnection to the ISO Controlled Grid, Market Participant, Project Sponsor, or identified principal beneficiaries pursuant to which the party
PDF page 247
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
requesting such Interconnection, Market Participants, Project Sponsor, or identified principal beneficiaries agrees to reimburse the Participating TO for the cost of performing or reviewing a Facilities Study.
3.30 Facility or Facilities Study. An engineering study conducted to determine required modifications to the Participating TO’s transmission system, including the estimated cost and scheduled completion date for such modifications that will be required to provide needed services.
3.31 FERC. The Federal Energy Regulatory Commission or its successor. 3.32 FPA. Parts II and III of the Federal Power Act, 16 U.S.C. § 824 et seq., as they may be amended from time to time.
3.33 FTR (Firm Transmission Right). A contractual right, subject to the terms and conditions of the ISO Tariff, that entitles the FTR Holder to receive, for each hour of the term of the FTR, a portion of the Usage Charges received by the ISO for transportation of energy from a specific originating Zone to a specific receiving Zone and, in the event of an uneconomic curtailment to manage Day-Ahead congestion, to a Day-Ahead scheduling priority higher than that of a schedule using Converted Rights capacity that does not have an FTR.
3.34 FTR Holder. The owner of an FTR, as registered with the ISO.
3.35 Generating Unit. An individual electric generator and its associated plant and apparatus whose electrical output is capable of being separately identified and metered or a Physical Scheduling Plant that, in either case, is: (a) located within the ISO Control Area; (b) connected to the ISO Controlled Grid, either directly or via interconnected
PDF page 248
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
transmission, or distribution facilities; and (c) that is capable of producing and delivering net Energy (Energy in excess of a generating station’s internal power requirements). 3.36 Generation. Energy delivered from a Generating Unit.
3.37 Good Utility Practice. Any of the practices, methods, and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period, or any of the practices, methods, and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety, and expedition. Good Utility Practice is not intended to be any one of a number of the optimum practices, methods, or acts to the exclusion of all others, but rather to be acceptable practices, methods, or acts generally accepted in the region.
3.38 Gross Load. Gross Load is all Energy (adjusted for distribution losses) delivered for the supply of End-User Loads directly connected to the transmission facilities or Distribution System of the Participating TO. Gross Load shall exclude the portion of the Load of an individual End-Use Customer of the Participating TO that is served by a Generating Unit that: (a) is located on the customer's site or provides service to the customer's site through over-the-fence arrangements as authorized by Section 218 of the California Public Utilities Code; (b) is a qualifying small power production facility or qualifying cogeneration facility, as those terms are defined in the FERC's regulations implementing Section 201 of the Public Utility Regulatory Policies Act of 1978; (c) was serving the customer's Load on or before March 31, 2000; and (d) secured Standby Service from the Participating TO under terms approved by a Local
PDF page 249
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Regulatory Authority or FERC, as applicable, as of March 31, 2000 and continues to secure Standby Service from the Participating TO or can be curtailed concurrently with an outage of the Generating Unit serving the Load.
3.39 High Voltage Access Charge. A component of the Access Charge determined by the ISO and assessed to the Participating TO under Section 26.1 of the ISO Tariff. 3.40 High Voltage Existing Contracts Access Charge. A charge for access to the ISO Controlled Grid under certain specified Existing Contracts to be paid by the Existing Contract holder to the Participating TO. Such rate shall be calculated by dividing the High Voltage Transmission Revenue Requirement applicable to wholesale customers by the sum of Edison’s twelve monthly retail system peak demands measured at the ISO Controlled Grid level, consistent with such revenue requirement. 3.41 High Voltage Transmission Facility. A transmission facility under the operational control of the ISO that is owned by the Participating TO or to which the Participating TO has an Entitlement that is represented by a Converted Right and that operates at a voltage at or above 200 kilovolts, and supporting facilities, and the costs of which are not directly assigned to one or more specific customers. 3.42 High Voltage Transmission Revenue Requirement. The portion of the Participating TO's TRR associated with and allocable to the Participating TO's High Voltage Transmission Facilities and Converted Rights associated with High Voltage Transmission Facilities.
3.43 High Voltage Utility-Specific Rate. The Participating TO's High Voltage Transmission Revenue Requirement divided by the Participating TO's forecasted Gross Load.
PDF page 250
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.44 High Voltage Wheeling Access Charge. The Wheeling Access Charge
assessed by the ISO associated with the recovery of the Participating TOs' High Voltage Transmission Revenue Requirements in accordance with Section 26.1 of the ISO Tariff.
3.45 (Omitted)
3.46 Interconnection. Transmission facilities, other than additions or replacements to existing facilities that: i) connect one system to another system where the facilities emerge from one and only one substation of the two systems and are functionally separate from the ISO Controlled Grid facilities such that the facilities are, or can be, operated and planned as a single facility; or ii) are identified as radial transmission lines pursuant to contract; or iii) produce Generation at a single point on the ISO Controlled Grid; provided that such interconnection does not include facilities that, if not owned by the Participating TO, would result in a reduction in the ISO’s Operational Control of the Participating TO’s portion of the ISO Controlled Grid.
3.47 Interconnection Agreement. A contract between a party requesting
Interconnection and the Participating TO that owns the transmission facility with which the requesting party wishes to interconnect.
3.48 Interconnection Application. An application that requests Interconnection to the ISO Controlled Grid.
3.49 Interest. Interest shall be calculated in accordance with the methodology specified for interest on refunds in the regulations of FERC at 18 C.F.R. §35.19(a)(2)(iii)(1996). Interest on delinquent amounts shall be calculated from the due
PDF page 251
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
date of the bill to the date of payment. When payments are made by mail, bills shall be considered as having been paid on the date of receipt.
3.50 Independent System Operator (“ISO”). The California Independent System Operator Corporation, a state chartered, nonprofit corporation that controls the transmission facilities of all Participating TOs and dispatches certain Generating Units and Loads.
3.51 ISO ADR Procedures. The procedures for resolution of disputes or differences set out in Section 13 of the ISO Tariff, as amended from time to time. 3.52 ISO Controlled Grid. The system of transmission lines and associated facilities of the Participating TOs that have been placed under the ISO’s Operational Control. 3.53 ISO Protocols. The rules, protocols, procedures and standards promulgated by the ISO (as amended from time to time) to be complied with by the ISO Scheduling Coordinators, Participating TOs and all other Market Participants in relation to the operation of the ISO Controlled Grid and the participation in the markets for Energy and Ancillary Services in accordance with the ISO Tariff.
3.54 ISO Tariff. The California Independent System Operator Agreement and Tariff, dated March 31, 1997, as it may be modified from time to time.
3.55 Load. An end-use device of an End-Use Customer that consumes power. Load should not be confused with Demand, which is the measure of power that a Load receives or requires.
3.56 (Omitted)
PDF page 252
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.57 Local Furnishing Bond. Tax-exempt bonds utilized to finance facilities for the local furnishing of electric energy, as described in section 142(f) of the Internal Revenue Code, 26 U.S.C. § 142(f).
3.58 Local Furnishing Participating TO. Any Tax-Exempt Participating TO that owns facilities financed by Local Furnishing Bonds.
3.59 Local Publicly Owned Electric Utilities. A municipality or municipal corporation operating as a public utility furnishing electric service, a municipal utility district furnishing electric service, a public utility district furnishing electric services, an irrigation district furnishing electric services, or a joint powers authority that includes one or more of these agencies and that owns Generation or transmission facilities, or furnishes electric services over its own or its members’ electric Distribution System. 3.60 Local Regulatory Authority. The state or local governmental authority responsible for the regulation or oversight of a utility.
3.61 Local Reliability Criteria. Reliability criteria established at the ISO Operations Date, unique to the transmission systems of each of the Participating TOs. 3.62 Low Voltage Access Charge. The Access Charge applicable under Section 26.1 of the ISO Tariff to recover the Low Voltage Transmission Revenue Requirement of the Participating TO.
3.63 Low Voltage Existing Contracts Access Charge. A charge for access to the ISO Controlled Grid under certain specified Existing Contracts to be paid by the Existing Contract holder to the Participating TO. Such rate shall be calculated by dividing the Low Voltage Transmission Revenue Requirement applicable to wholesale customers by
PDF page 253
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
the sum of Edison’s twelve monthly retail system peak demands measured at the ISO Controlled Grid level, consistent with such revenue requirement.
3.64 Low Voltage Transmission Facility. A transmission facility under the operational control of the ISO owned by the Participating TO or to which the Participating TO has an Entitlement that is represented by a Converted Right, which is not a High Voltage Transmission Facility, and supporting facilities, and the costs of which are not directly assigned to one or more specific customers.
3.65 Low Voltage Transmission Revenue Requirement. The portion of the Participating TO's TRR associated with and allocable to the Participating TO's Low Voltage Transmission Facilities and Converted Rights associated with Low Voltage Transmission Facilities.
3.66 Low Voltage Wheeling Access Charge. The Wheeling Access Charge associated with the recovery of the Participating TO's Low Voltage Transmission Revenue Requirement in accordance with Section 26.1 of the ISO Tariff. 3.67 Market Participant. An entity, including a Scheduling Coordinator, who participates in the Energy marketplace through the buying, selling, transmission, or distribution of Energy or Ancillary Services into, out of, or through the ISO Controlled Grid.
3.68 MSS (Metered Subsystem). A geographically contiguous system located within a single zone which has been operating as an electric utility for a number of years prior to the ISO Operations Date as a municipal utility, water district, irrigation district, State agency or Federal power administration subsumed within the ISO Control Area and encompassed by ISO certified revenue quality meters at each interface point with the
PDF page 254
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
ISO Controlled Grid and ISO certified revenue quality meters on all Generating Units or, if aggregated, each individual resource and Participating Load internal to the system, which is operated in accordance with a MSS agreement described in Section 4.9.1 of the ISO Tariff.
3.69 NERC. The North American Electric Reliability Council or its successor. 3.70 (Omitted)
3.71 (Omitted)
3.72 New High Voltage Transmission Facility. A High Voltage Transmission Facility of the Participating TO that enters service after the beginning of the transition period described in Section 4 of Schedule 3 of Appendix F of the ISO Tariff, or a capital addition made after the beginning of the transition period described in Section 4.2 of Schedule 3 of Appendix F of the ISO Tariff to an Existing High Voltage Transmission Facility.
3.73 New Participating TO. A Participating TO that is not an Original Participating TO.
3.74 Non-Participating TO. A TO that is not a party to the TCA or for the purposes of Section 16.1 of the ISO Tariff the holder of transmission service rights under an Existing Contract that is not a Participating TO.
3.75 Non-Spinning Reserve. The portion of off-line generating capacity that is capable of being synchronized and ramping to a specified load in ten minutes (or load that is capable of being interrupted in ten minutes) and that is capable of running (or being interrupted) for at least two hours.
PDF page 255
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.76 Operational Control. The rights of the ISO under the Transmission Control Agreement and the ISO Tariff to direct Participating TOs how to operate their transmission lines and facilities and other electric plant affecting the reliability of those lines and facilities for the purpose of affording comparable non-discriminatory transmission access and meeting Applicable Reliability Criteria.
3.77 Original Participating TO. A Participating TO that was a Participating TO as of January 1, 2000. The Original Participating TOs are Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company. 3.78 Participating TO. A party to the TCA whose application under Section 2.2 of the TCA has been accepted and who has placed its transmission assets and Entitlements under the ISO’s Operational Control in accordance with the TCA. A Participating TO may be an Original Participating TO or a New Participating TO. For purposes of this TO Tariff, the Participating TO is Southern California Edison Company.
3.79 Participation Agreement. An agreement between a Participating TO and a Project Sponsor that specifies the terms and conditions under which the Participating TO will construct a transmission addition or upgrade on behalf of the Project Sponsor. 3.80 Physical Scheduling Plant. A group of two or more related Generating Units, each of which is individually capable of producing Energy, but which either by physical necessity or operational design must be operated as if they were a single Generating Unit and any Generating Unit or Units containing related multiple generating components which meet one or more of the following criteria: i) multiple generating components are related by a common flow of fuel which cannot be interrupted without a substantial loss of efficiency of the combined output of all components; ii) the Energy
PDF page 256
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
production from one component necessarily causes Energy production from other components; iii) the operational arrangement of related multiple generating components determines the overall physical efficiency of the combined output of all components; iv) the level of coordination required to schedule individual generating components would cause the ISO to incur scheduling costs far in excess of the benefits of having scheduled such individual components separately; or v) metered output is available only for the combined output of related multiple generating components and separate generating component metering is either impractical or economically inefficient. 3.81 (Omitted)
3.82 Project Proponent. A Market Participant or group of Market Participants that: (i) advocates a transmission addition or upgrade; (ii) is unwilling to pay the full cost of the proposed transmission addition and upgrade, and thus is not a Project Sponsor; and (iii) initiates proceedings under the ISO ADR Procedures to determine the need for the proposed transmission addition or upgrade.
3.83 Project Sponsor. A Market Participant or group of Market Participants or a Participating TO that proposes the construction of a transmission addition or upgrade in accordance with Section 24 of the ISO Tariff.
3.84 Regional Transmission Group (“RTG”). A voluntary organization approved by FERC and composed of transmission owners, transmission users, and other entities, organized to efficiently coordinate the planning, expansion and use of transmission on a regional and inter-regional basis.
3.85 Regulation. The service provided either by Generating Units certified by the ISO as equipped and capable of responding to the ISO’s direct digital control (AGC) signals,
PDF page 257
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
or by System Resources that have been certified by the ISO as capable of delivering such service to the ISO Balancing Authority Area, in an upward and downward direction to match, on a Real-Time basis, Demand and resources, consistent with established Applicable Reliability Criteria. Regulation is used to control the power output of electric generators within a prescribed area in response to a change in system frequency, tieline loading, or the relation of these to each other so as to maintain the target system frequency and/or the established Interchange with other Balancing Authority Areas within the predetermined Regulation Limits. Regulation includes both the increase of output by a Generating Unit or System Resource (Regulation Up) and the decrease in output by a Generating Unit or System Resource (Regulation Down). Regulation Up and Regulation Down are distinct capacity products, with separately stated requirements and ASMPs in each Settlement Period.
3.86 Reliability Criteria. Pre-established criteria that are to be followed in order to maintain desired performance of the ISO Controlled Grid under contingency or steady state conditions.
3.87 Reliability Services. Those services provided by the ISO: 1) that are deemed by the ISO as necessary to maintain reliable electric service in the ISO Control Area; and 2) whose costs are billed by the ISO to the Participating TO pursuant to the ISO Tariff. Reliability Services include services obtained from: Reliability Must-Run units; and generators committed pursuant to the ISO’s Exceptional Dispatch authority, which includes any costs of Exceptional Dispatches as well as any default costs allocated to the Participating TO resulting from its incurrence of Exceptional Dispatch costs pursuant to Section 11.29.17.2.1 of the CAISO Tariff.
PDF page 258
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.88 Reliability Upgrade. The transmission facilities, other than Direct Assignment Facilities, beyond the first point of Interconnection necessary to interconnect a wholesale load safely and reliably to the ISO Controlled Grid, which would not have been necessary but for the Interconnection of a wholesale load, including network upgrades necessary to remedy short circuit or stability problems resulting from the interconnection of a wholesale load to the ISO Controlled Grid. Reliability Upgrades also include, consistent with WECC practice, the facilities necessary to mitigate any adverse impact a wholesale load’s interconnection may have on a path’s WECC path rating. Reliability Upgrades shall be specified in the Interconnection Agreement that governs Interconnection service to the wholesale load and shall be subject to FERC approval.
3.89 (Omitted).
3.90 Request for Expedited Interconnection Procedures. A written request by which an applicant for Interconnection can request expedited processing of its Interconnection Application.
3.91 Scheduling Coordinator. An entity certified by the ISO for the purposes of undertaking the functions specified in Section 4.5.3 of the ISO Tariff. 3.92 Scheduling Point. A location at which the ISO Controlled Grid is connected, by a group of transmission paths for which a physical, non-simultaneous transmission capacity rating has been established for Congestion Management, to transmission facilities that are outside the ISO’s Operational Control.
PDF page 259
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.93 Spinning Reserve. The portion of unloaded synchronized generating capacity that is immediately responsive to system frequency and that is capable of being loaded in ten minutes, and that is capable of running for at least two hours. 3.94 Standby Rate. A rate assessed a Standby Service Customer by the Participating TO, as approved by the Local Regulatory Authority, or FERC, as applicable, for Standby Service which compensates the Participating TO, among other things, for costs of High Voltage Transmission Facilities.
3.95 Standby Service. Service provided by the Participating TO which allows a Standby Service Customer, among other things, access to High Voltage Transmission Facilities for the delivery of backup power on an instantaneous basis to ensure that Energy may be reliably delivered to the Standby Service Customer in the event of an outage of a Generating Unit serving the customer's Load.
3.96 Standby Service Customer. A retail End-Use Customer of the Participating TO that receives Standby Service and pays a Standby Rate.
3.97 Standby Transmission Revenue. The transmission rate revenues associated with Standby Service collected by the Participating TO from those Standby Service Customers who are not billed for Standby Service on a Gross Load basis. 3.98 System Impact Study. An engineering study conducted to determine whether a request for Interconnection to the ISO Controlled Grid would require new transmission additions, upgrades, or other mitigation measures.
3.99 System Impact Study Agreement. An agreement between a Participating TO and an entity that has requested Interconnection to the Participating TO’s transmission
PDF page 260
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
system pursuant to which the entity requesting Interconnection agrees to reimburse the Participating TO for the cost of performing or reviewing a System Impact Study. 3.100 TO Tariff. This Transmission Owner Tariff, as it may be amended or superseded.
3.101 Transition Charge. A component of the Access Charge determined by the ISO and assessed the Participating TO along with the High Voltage Access Charge in accordance with Section 5.7 of Appendix F, Schedule 3 of the ISO Tariff. 3.102 Transmission Access Charge Balancing Account Adjustment ("TACBAA"). A mechanism established by the Participating TO which will ensure that the difference between (i) the actual charges by the ISO pursuant to Section 26.1.2 of the ISO Tariff for the High Voltage Access Charge and Transition Charge and (ii) the revenues disbursed by the ISO pursuant to Section 26.1.3 of the ISO Tariff are recovered from the Participating TO's End-Use Customers.
3.103 Transmission Control Agreement (“TCA”). The agreement between the ISO and Participating TOs establishing the terms and conditions under which TOs will become Participating TOs and how the ISO and each Participating TO will discharge their respective duties and responsibilities, as may be modified from time to time. 3.104 Transmission Owner (“TO”). An entity owning transmission facilities or having firm contractual rights to use transmission facilities.
3.105 Transmission Revenue Balancing Account Adjustment (“TRBAA”). A mechanism established by the Participating TO which will ensure that all Transmission Revenue Credits and other credits specified in Sections 6 and 8 of Appendix F,
PDF page 261
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Schedule 3 of the ISO Tariff, flow through to ISO Tariff and TO Tariff transmission customers.
3.106 Transmission Revenue Credit. The sum of: 1) the revenues received by the Participating TO from the ISO for Wheeling service, including EDAM Recoverable Revenue; (2) the difference between the costs incurred by the Participating TO associated with Existing Rights and the amount of such costs recovered by the Participating TO from the Existing Rights customers (“ETC Cost Differentials”); and (3) any additional appropriate amounts included in the ISO Tariff definition of Transmission Revenue Credit set forth in Appendix A of the CAISO Tariff ; and (4) any remaining Interconnection Financial Security under the TSRA that has been drawn down by Participating TO.
3.107 Transmission Revenue Requirement (“TRR”). The TRR is the total annual authorized revenue requirements associated with transmission facilities and Entitlements turned over to the Operational Control of the ISO by the Participating TO, including the Projects under construction identified in Appendix VIII that are to be turned over to the Operational Control of the ISO upon completion. The costs of any transmission facility turned over to the Operational Control of the ISO, including the costs of the Projects under construction identified in Appendix VIII that are to be turned over to the Operational Control of the ISO upon completion, shall be fully included in the Participating TO's TRR. The TRR includes the costs of transmission facilities and Entitlements and deducts Transmission Revenue Credits; for wholesale purposes, credits for Standby Transmission Revenue; and the transmission revenue expected to
PDF page 262
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
be actually received by the Participating TO for Existing Rights and Converted Rights. The TRR is shown in Appendix I.
3.108 Uncontrollable Force. Any act of God, labor disturbance, act of the public enemy, war, insurrection, riot, fire, storm, flood, earthquake, explosion, any curtailment, order, regulation or restriction imposed by governmental, military or lawfully established civilian authorities or any other cause beyond the reasonable control of the ISO or Market Participant which could not be avoided through the exercise of Good Utility Practice.
3.109 Usage Charge. The amount of money, per 1 kW of scheduled flow, that the ISO charges a Scheduling Coordinator for use of a specific congested Inter-Zonal Interface during a given hour.
3.110 Utility Distribution Company (“UDC”). An entity that owns a Distribution System for the delivery of Energy to and from the ISO Controlled Grid, and that provides regulated retail electric service to Eligible Customers, as well as regulated procurement service to those End-Use Customers who are not yet eligible for direct access, or who choose not to arrange services through another retailer.
3.111 Voltage Support. Services provided by Generating Units or other equipment such as shunt capacitors, static var compensators, or synchronous condensers that are required to maintain established grid voltage criteria. This service is required under normal or system emergency conditions.
3.112 Western Electricity Coordinating Council (“WECC”). The Western Systems Coordinating Council or its successor.
PDF page 263
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
3.113 Wheeling Access Charge. The charge assessed by the ISO that is paid by a Scheduling Coordinator for Wheeling in accordance with Section 26.1 of the ISO Tariff. Wheeling Access Charges shall not apply for Wheeling under a bundled non-economy Energy coordination agreement of a Participating TO executed prior to July 9, 1996. The Wheeling Access Charge may consist of a High Voltage Wheeling Access Charge and a Low Voltage Wheeling Access Charge.
3.114 Wheeling Out. Except for Existing Rights exercised under an Existing Contract in accordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled Grid for the transmission of Energy from a Generating Unit located within the ISO Controlled Grid to serve a Load located outside the transmission and Distribution System of a Participating TO.
3.115 Wheeling Through. Except for Existing Rights exercised under an Existing Contract in accordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled Grid for the transmission of Energy from a resource located outside the ISO Controlled Grid to serve a Load located outside the transmission and Distribution System of a Participating TO.
3.116 Wheeling. Wheeling Out or Wheeling Through.
3.117 Wholesale Customer. A person wishing to purchase Energy and Ancillary Services at a Bulk Supply Point or a Scheduling Point for resale.
3.118 Omitted.
PDF page 264
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
4. Eligibility.
Wholesale tTransmission service over a Participating TO’s system shall be provided only to Eligible Customers who qualify for transmission service under the ISO Tariff. Any dispute as to whether a customer is eligible for wholesale transmission service shall be resolved by FERC and any dispute as to whether an End-Use Customer is eligible for retail transmission service or retail interconnection service under this TO Tariff shall be resolved by the Local Regulatory Authority.
PDF page 265
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
7. Billing and Payment.
7.1 End-Users.
Billing and payment rules applicable to End-Users shall be pursuant to the then-current rules of the applicable Local Regulatory Authority and, as applicable, Appendix XV. 7.2 Wholesale Customers.
7.2.1 Billing Procedure.
7.2.1.1 Low Voltage Access Charge Revenues. Within a reasonable time after the Participating TO receives from the ISO the monthly kilowatt-hours to which the Low Voltage Access Charge applies, the Participating TO shall submit an invoice to the applicable UDC, MSS or Scheduling Coordinator for the Low Voltage Access Charge billing. The invoice shall be paid by the UDC, MSS, or Scheduling Coordinator within twenty days of receipt. All payments shall be made in immediately available funds payable to the Participating TO, or by wire transfer to a bank named by the Participating TO.
7.2.1.2 Reliability Services Revenues. The Participating TO shall submit an invoice to applicable Wheeling customers for billings under the Reliability Services Rate Schedule. The invoice shall be paid by the Wheeling Customer within twenty days of receipt. All payments shall be made in immediately available funds payable to the Participating TO, or by wire transfer to a bank named by the Participating TO. 7.2.2 Interest on Unpaid Balances.
Interest on any unpaid amounts (including amounts placed in escrow) shall be calculated in accordance with the methodology specified for interest on refunds in
PDF page 266
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
FERC’s regulations at 18 C.F.R. Section 35.19a(a)(2)(iii). Interest on delinquent amounts shall be calculated from the due date of the bill to the date of payment. When payments are made by mail, bills shall be considered as having been paid on the date of receipt by the Participating TO.
7.2.3 Default.
In the event the UDC, MSS, Scheduling Coordinator, or Wheeling Customer fails, for any reason other than a billing dispute as described below, to make payment to the Participating TO on or before the due date as described above, and such failure of payment is not corrected within 30 calendar days after the Participating TO notifies the applicable UDC, MSS, Scheduling Coordinator, or Wheeling Customer to cure such failure, a default by the UDC, MSS, Scheduling Coordinator, or Wheeling Customer shall be deemed to exist. Upon the occurrence of a default, the Participating TO may initiate a proceeding with FERC (or the Local Regulatory Authority for a Local Publicly Owned Electric Utility) to terminate service but shall not terminate service until FERC, or the Local Regulatory Authority, as applicable, so approves any such request. In the event of a billing dispute between the Participating TO and the UDC, MSS, Scheduling Coordinator, or Wheeling Customer, the Participating TO will continue to provide service under this TO Tariff as long as the applicable UDC, MSS, Scheduling Coordinator, or Wheeling Customer: (i) continues to make all payments not in dispute, and (ii) pays into an independent escrow account the portion of the invoice in dispute, pending resolution of such dispute. If the UDC, MSS, Scheduling Coordinator, or Wheeling Customer fails to meet these two requirements for continuation of service, then the Participating TO
PDF page 267
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
may provide notice to the UDC, MSS, Scheduling Coordinator, or Wheeling Customer of its intention to suspend service in sixty days, in accordance with FERC policy. 7.3 Wheeling and Usage Charge Revenues.
The ISO, pursuant to the ISO Tariff, shall pay to Participating TOs all Wheeling and Usage Charge revenues, excluding Usage Charge revenues payable to FTR Holders.
PDF page 268
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
8. Obligation to Interconnect or Construct Transmission Expansions & Facility Upgrades.
8.1 Participating TO Obligation to Interconnect.
The Participating TO shall, at the request of a third party pursuant to Section 10, interconnect its system to the wholesale generation or wholesale load of such third party, or modify an existing wholesale Interconnection. Interconnections under this TO Tariff shall be available to entities eligible to request Interconnection consistent with the provisions of Section 210(a) of the FPA. Interconnections requested by entities or individuals that are not so eligible shall be governed by the Local Regulatory Authority. The procedures for Interconnections of wholesale generation to the ISO Controlled Grid shall be governed by the ISO Tariff, and if applicable, Appendix VII to the TO Tariff. Interconnections of Large Loads are governed by Appendix XV to the TO Tariff. 8.1.1 Interconnection to Transmission System.
Interconnection must be consistent with Good Utility Practice, in conformance with all Applicable Reliability Criteria, all applicable statutes, regulations, and ISO reliability criteria for the ISO Controlled Grid. The Participating TO will not accommodate the Interconnection if doing so would impair system reliability, or would otherwise adversely affect the ability of the Participating TO to honor its Encumbrances existing as of the time a party submits its Interconnection Application. The Participating TO shall identify any such adverse effect on its Encumbrances in the System Impact Study performed pursuant to Section 10.7. To the extent the Participating TO determines that the
PDF page 269
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Interconnection will have an adverse effect on Encumbrances, the party requesting Interconnection shall mitigate such adverse effect.
8.1.1.1 Letter Agreement.
Pursuant to Section 12 of Appendix DD of the ISO Tariff, prior to executing an Interconnection Agreement, a party seeking Interconnection may, in order to advance the implementation of its Interconnection, request, and the Participating TO shall offer the party, a Letter Agreement, a pro forma version of which is set forth in Appendix XIII to the TO Tariff, that authorizes the Participating TO to begin engineering, design, and procurement of long lead-time items, or construction necessary for the establishment of the Interconnection. However, Participating TO shall not be obligated to offer a Letter Agreement if the party seeking Interconnection is in Dispute Resolution as a result of an allegation that the party seeking Interconnection has failed to meet any milestones or comply with any prerequisites specified in the ISO Tariff. The Letter Agreement is an optional procedure. The Letter Agreement shall provide for the party seeking Interconnection to pay the cost of all activities authorized by the party and to make advance payments or provide other satisfactory security for such costs. Following a party seeking Interconnection’s request for a Letter Agreement, the Participating TO shall prepare and tender to the party seeking Interconnection a draft Letter Agreement in the form of the Participating TO’s FERC-approved Letter Agreement as set forth in Appendix XIII to the TO Tariff, including draft exhibits that include the proposed scope of work, estimated costs, payments, financial security and milestones, as applicable. The party seeking Interconnection shall provide written comments, or notification of no comments, to the draft exhibits within thirty (30)
PDF page 270
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Calendar Days. The Participating TO and the party seeking Interconnection shall negotiate concerning any disputed provisions of the exhibits to the draft Letter Agreement for not more than ninety (90) Calendar Days after the Participating TO tenders the draft Letter Agreement to the party seeking Interconnection. If the party seeking Interconnection determines that negotiations are at an impasse, it may request termination of the negotiations at any time after tender of the draft Letter Agreement and request submission of the unexecuted Letter Agreement with FERC or initiate dispute resolution procedures pursuant to Section 14 of this TO Tariff. If the party seeking Interconnection requests termination of the negotiations, but within ninety (90) Calendar Days after the Participating TO tenders the draft Letter Agreement to the party seeking Interconnection, fails to request either the filing of the unexecuted Letter Agreement or initiate dispute resolution procedures, it shall be deemed to have withdrawn its request for a Letter Agreement and the Participating TO shall have no further obligation to enter into a Letter Agreement, unless an extension is mutually agreed to by the parties. The Participating TO shall provide to the party seeking Interconnection a final Letter Agreement within fifteen (15) Business Days after the completion of the negotiation process.
Following submission of the final Letter Agreement to the party seeking Interconnection, the party shall either: (i) execute two originals of the tendered Letter Agreement and return them to the Participating TO; or (ii) request in writing that the Participating TO file with FERC a Letter Agreement in unexecuted form. As soon as practicable, but not later than ten (10) Business Days after receiving either the two executed originals of the tendered Letter Agreement (if it does not conform with a FERC-approved Letter
PDF page 271
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Agreement) or the request to file an unexecuted Letter Agreement, the Participating TO shall file the Letter Agreement with FERC, together with its explanation of any matters as to which the party seeking Interconnection and the Participating TO disagree and support for the costs that the Participating TO proposes to charge to the party seeking Interconnection under the Letter Agreement. An unexecuted Letter Agreement should contain terms and conditions deemed appropriate by the Participating TO for the Interconnection request.
If the party seeking Interconnection executes the final Letter Agreement, the Participating TO and the party seeking Interconnection shall perform their respective obligations in accordance with the terms of the Letter Agreement, subject to modification by FERC. Upon submission of an unexecuted Letter Agreement, the party seeking Interconnection and the Participating TO shall promptly comply with the unexecuted Letter Agreement, subject to modification by FERC.8.1.2 Costs Associated with Interconnection.
Each party requesting Interconnection shall pay the costs of planning, installing, owning, operating, and maintaining any Direct Assignment Facilities and, if applicable, any Reliability Upgrades required to provide the requested Interconnection. In addition, such party shall implement all existing operating procedures necessary to safely and reliably interconnect such party’s wholesale load to the facilities of the Participating TO and to ensure the ISO Controlled Grid’s conformance with the ISO Grid Planning Criteria, and shall bear all costs of implementing such operating procedures. Any additional costs associated with accommodating the Interconnection shall be allocated
PDF page 272
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
in accordance with the cost responsibility methodology set forth in the ISO Tariff for transmission expansions or upgrades.
8.1.3 Interconnection Agreement.
Pursuant to Section 10.4, 10.7.1, or 10.9.1, a party requesting Interconnection shall request in writing that the Participating TO tender to such party an Interconnection Agreement that will be filed with FERC, or the Local Regulatory Authority, in the case of a Local Publicly Owned Electric Utility. The Interconnection Agreement will include, without limitation, cost responsibilities and payment provisions for any engineering, equipment, construction, ownership, operation and maintenance costs for any Direct Assignment Facilities, any Reliability Upgrades, and for any other mitigation measures. For an Interconnection request to remain a Completed Interconnection Application, the party requesting the Interconnection shall execute the Interconnection Agreement and return it to the Participating TO within thirty (30) Business Days of receipt. Alternatively, if an Eligible Customer requesting the Interconnection requests the Participating TO to file an unexecuted Interconnection Agreement and commits to abide by the terms, conditions, and cost assignments determined to be just and reasonable under the ISO ADR Procedures, including any determination by FERC or on appeal of a FERC determination in accordance with that process, the Participating TO shall promptly file an unexecuted Interconnection Agreement. Provided, however, that if the ISO ADR Procedures concerns whether the requesting entity is an Eligible Customer, the Participating TO shall not be obligated to file an unexecuted Interconnection Agreement or commence construction of the Interconnection facilities or incur other costs under the Interconnection Agreement until a final order determining the just and reasonable rates,
PDF page 273
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
terms, and conditions for such Interconnection Agreement has been issued by the applicable court or regulatory authority. The Interconnection Agreement will set forth a payment schedule that enables the Participating TO to recover its costs. If the applicant elects not to execute the Interconnection Agreement and does not request the Participating TO to file an unexecuted Interconnection Agreement, its Completed Interconnection Application shall be deemed withdrawn, and the applicant shall reimburse to the Participating TO all costs reasonably incurred in processing the application not covered by any System Impact Study Agreement or Facilities Study Agreement.
8.1.4 Due Diligence to Construct.
The Participating TO shall use due diligence to construct, within a reasonable time, any Direct Assignment Facilities and any Reliability Upgrades that it is obligated to construct pursuant to this TO Tariff. The Participating TO’s obligation to build will be subject to:
1) its ability, after making a good faith effort, to obtain any necessary approvals and property rights under applicable federal, state, and local laws; 2) the presence of a cost recovery mechanism with cost responsibility assigned in accordance with the ISO Tariff or applicable FERC precedent; and 3) a signed Interconnection Agreement or a signed Expedited Interconnection Agreement or, by mutual agreement of the parties, FERC acceptance for filing of an unexecuted Interconnection Agreement.
8.1.5 Energization.
The Participating TO shall not be obligated to energize, nor shall the wholesale load be entitled to have its interconnection to the ISO Controlled Grid energized, unless and until an Interconnection Agreement has been executed, or filed at FERC pursuant to
PDF page 274
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
Section 8.1.3, and becomes effective and such wholesale load has demonstrated to the ISO's reasonable satisfaction that it has complied with all of the requirements of the ISO Tariff and the requirements of this TO Tariff.
8.1.6 Coordination with ISO on Interconnection Requests.
The Participating TO shall coordinate with the ISO, pursuant to the provisions of the TCA, in developing Interconnection standards and guidelines for processing Interconnection requests under this TO Tariff.
8.2 Participating TO Obligation to Construct Transmission Expansions or Facility Upgrades.
The Participating TO shall be obligated to: (1) perform System Impact or Facility Studies where the Project Sponsor or the ISO agrees to pay the study cost and specifies the project objectives to be achieved, and (2) build transmission additions and facility upgrades where the Participating TO is obligated to construct or expand facilities in accordance with and subject to the limitations of Section 24 of the ISO Tariff and this TO Tariff.
8.2.1 Obligation to Construct.
A Participating TO shall not be obligated to construct or expand transmission facilities or system upgrades unless and until the conditions stated in Section 9.2.1 hereof have been satisfied.
8.2.2 Local Furnishing Participating TO Obligation to Construct.
A Local Furnishing Participating TO shall not be obligated to construct or expand transmission facilities or system upgrades unless and until the conditions stated in Section 9.3.3 hereof have been satisfied.
PDF page 275
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
8.3 Request for FERC Deference Regarding Need Determination.
It is intended that FERC grant substantial deference to the factual determinations of the ISO, (including the ISO’s ADR Procedures), the CPUC, WECC, or RTG coordinated planning processes as to the need for or construction of a facility, the need for full cost recovery, and the allocation of costs.
PDF page 276
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
9. Expansion Process.
9.1 Determination of Facilities.
A Participating TO shall perform a Facilities Study in accordance with this Section where (1) the Participating TO is obligated to construct or expand facilities in accordance with Section 24 of the ISO Tariff and this TO Tariff; (2) a Market Participant agrees to pay the costs of the Facilities Study and specifies the project objectives to be achieved in terms of increased capacity or reduced congestion; or (3) the Participating TO is required to perform a Facilities Study pursuant to the ISO Tariff. Eligible expansions on behalf of Large Loads are not governed by this Section 9 but are instead governed by Appendix XV to the TO Tariff.
9.1.1 Payment of Facilities Study’s Cost.
9.1.1.1 Market Participant to Pay for Facilities Study.
Where a Market Participant requests a Facilities Study and the need for the transmission addition or upgrade has not yet been established in accordance with the procedures established herein and the ISO Tariff, the Market Participant shall pay the cost of the Facilities Study.
9.1.1.2 Project Sponsor or Project Proponent to Pay for Facilities Study. Where the facilities to be added or upgraded have been determined to be needed in accordance with the procedures established herein and the ISO Tariff, the Project Sponsor, Project Proponent, or the ISO requesting the study shall pay the reasonable cost of the Facilities Study. When the Participating TO is the Project Sponsor in accordance with the ISO Tariff, the costs of the Facilities Study shall be recovered through the Access Charges and transmission rates.
PDF page 277
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
9.1.1.3 Principal Beneficiaries to Pay for Facilities Study.
Where the facilities to be added or upgraded have been determined to be needed and the principal beneficiaries have been identified by the ISO or ISO ADR Procedures in accordance with the ISO Tariff, the Project Sponsor and the identified principal beneficiaries shall pay the reasonable cost of the Facilities Study, in such proportions as may be agreed, or, failing agreement, as determined in accordance with the ISO ADR Procedures.
9.1.2 Payment Procedure.
Where a Facilities Study is being conducted pursuant to this TO Tariff, the Participating TO shall, within thirty days of the receipt of all reasonably required information, tender to the Market Participant, Project Sponsor, Project Proponent, ISO, or identified principal beneficiaries, as the case may be, a Facilities Study Agreement that defines the scope, content, assumptions, and terms of reference for such study, the estimated time required to complete it, and such other provisions as the parties may reasonably require and pursuant to which such Market Participant, Project Sponsor, Project Proponent, the ISO, or identified principal beneficiaries agree to reimburse the Participating TO the reasonable cost of performing the required Facilities Study. If the Market Participant, Project Sponsor, Project Proponent, the ISO, or identified principal beneficiaries, as the case may be, agree to the terms of the Facilities Study Agreement, they shall execute the Facilities Study Agreement and return it to the Participating TO within ten Business Days. Alternatively, if the Market Participant, Project Sponsor, Project Proponent, the ISO, or identified principal beneficiaries, as the case may be, request the Participating TO to proceed with the Facilities Study and commit to abide by the terms, conditions,
PDF page 278
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
and cost assignments ultimately determined under the ISO ADR Procedures, including any determination by FERC or appeal of a FERC determination in accordance with that process, the Participating TO shall promptly proceed with the Facilities Study, and the parties shall submit the disputed terms for resolution under the ISO’s ADR Procedures. 9.1.3 Facilities Study Procedures.
Upon receipt of an executed Facilities Study Agreement or alternative request to proceed as provided for in Section 9.1.2, a copy of which has been provided to the ISO by the party requesting the Facilities Study, the Participating TO will use due diligence to complete the required Facilities Study within a sixty (60) day period. If the Participating TO is unable to complete the Facilities Study in the allotted time period, the Participating TO shall notify the Market Participant and provide an estimate of the time needed to reach a final determination along with an explanation of the reasons that additional time is required to complete the study. If additional time is required, the Participating TO will use best efforts to complete the study within 10 months, provided adequate information is provided by all the parties.
9.2 Obligation to Build.
9.2.1 Due Diligence to Construct.
Subject to Section 9.3.3 of this TO Tariff, the Participating TO shall use due diligence to construct, within a reasonable time, additions or upgrades to its transmission system that it is obligated to construct pursuant to the ISO Tariff and this TO Tariff. Alternatively, if a Market Participant requests the Participating TO to file an unexecuted Participation Agreement and commits to abide by the terms, conditions, and cost assignments determined to be just and reasonable under the ISO ADR Procedures,
PDF page 279
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
including any determination by FERC or on appeal of a FERC determination in accordance with that process, the Participating TO shall promptly file an unexecuted Participation Agreement. Provided, however, that if the ISO ADR Procedures concerns whether the requesting entity is an Eligible Customer, the Participating TO shall not be obligated to file an unexecuted Participation Agreement or commence construction of the additions or upgrades or incur other costs under the Participation Agreement until a final order determining the just and reasonable rates, terms, and conditions for such Participation Agreement has been issued by the applicable court or regulatory authority. The Participating TO’s obligation to build will be subject to: 1) its ability, after making a good faith effort, to obtain the necessary approvals and property rights under applicable federal, state, and local laws; 2) the presence of a cost recovery mechanism with cost responsibility assigned in accordance with the ISO Tariff; and 3) a signed Participation Agreement. The Participating TO will not construct or expand its existing or planned transmission system, if doing so would impair system reliability as determined through systems analysis based on the Applicable Reliability Criteria.
9.2.2 Delay in Construction or Expansion.
If any event occurs that will materially affect the time for completion of new facilities, or the ability to complete them, the Participating TO shall promptly notify: (1) the Project Sponsor with regard to facilities determined to be needed; (2) the Parties to the Participation Agreement with regard to facilities determined to be needed pursuant to the ISO Tariff where principal beneficiaries were identified; and (3) the ISO. In such circumstances, the Participating TO shall, within thirty days of notifying such Project Sponsor, Parties to the Participation Agreement, and the ISO of such delays, convene a
PDF page 280
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
technical meeting with such Project Sponsor, Parties to the Participation Agreement, and the ISO to discuss the circumstances which have arisen and evaluate any options available. The Participating TO also shall make available to such Project Sponsor, Parties to the Participation Agreement, and the ISO, as the case may be, studies and work papers related to the cause and extent of the delay and the Participating TO’s ability to complete the new facilities, including all information that is in the possession of the Participating TO that is reasonably needed to evaluate the alternatives. 9.2.2.1 Alternatives to the Original Facility Additions.
If the review process of Section 9.2.2 determines that one or more alternatives exist to the originally planned construction project, the Participating TO shall present such alternatives for consideration to the Project Sponsor, Parties to the Participation Agreement, and the ISO, as the case may be. If upon review of any alternatives, such Project Sponsor, the ISO, or Parties to the Participation Agreement wish to evaluate or to proceed with one of the alternative additions or upgrades, such Project Sponsor, the ISO, or Parties to the Participation Agreement may request that the Participating TO prepare a revised Facility Study pursuant to Sections 9.1.1, 9.1.2, and 9.1.3 of this TO Tariff. In the event the Participating TO concludes that no reasonable alternative exists to the originally planned addition or upgrade and the Project Sponsor or Parties to the Participation Agreement or the ISO disagree, the dispute shall be resolved pursuant to the ISO ADR Procedure.
9.2.2.2 Refund Obligation for Unfinished Facility Additions.
If the Participating TO and the Project Sponsor, the ISO, or Parties to the Participation Agreement, as the case may be, mutually agree that no other reasonable alternatives
PDF page 281
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
exist, the obligation to construct the requested additions or upgrades shall terminate and any deposit not yet applied toward the expended project costs shall be returned with interest pursuant to FERC Regulation 35.19(a)(2)(iii). However, the Project Sponsor and any identified principal beneficiaries, as the case may be, shall be responsible for all costs prudently incurred by the Participating TO through the time the construction was suspended.
9.3 Provisions Relating To Transmission Construction On the Systems Of Other TOs.
9.3.1 Responsibility for Third Party Additions.
A Participating TO shall not be responsible for making arrangements for any engineering, permitting, and construction of transmission or distribution facilities on the system(s) of any other entity or for obtaining any regulatory approval for such facilities. The Participating TO will undertake reasonable efforts through the coordinated planning process to assist in making such arrangements, including, without limitation, providing any information or data required by such other electric system pursuant to Good Utility Practice.
9.3.2 Coordination of Third-Party System Additions.
Where transmission additions or upgrades being built pursuant to the ISO Tariff require additions or upgrades on other systems, to the extent consistent with Section 9.3.3 of this TO Tariff, the Participating TO shall coordinate construction on its own system with the construction required by others. The Participating TO, after consultation with the ISO, the Project Sponsor, and Parties to the Participation Agreement, as the case may be, may defer construction if the new transmission facilities on another system cannot
PDF page 282
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
be completed in a timely manner. The Participating TO shall notify such Project Sponsor, Parties to the Participation Agreement, and the ISO, in writing of the basis for any decision to defer construction and the specific problems which must be resolved before it will initiate or resume construction of the new facilities. Within forty Business Days of receiving written notification by the Participating TO of its intent to defer construction pursuant to this section, such Project Sponsor, Parties to the Participation Agreement, or the ISO may challenge the decision in accordance with the ISO ADR Procedure.
9.3.3 Expansion by “Local Furnishing Participating TOs”.
Notwithstanding any other provision of this TO Tariff, prior to requesting that a Local Furnishing Participating TO construct or expand facilities, the ISO or Project Sponsor shall tender (or cause to be tendered) an application under Section 211 of the FPA requesting FERC to issue an order directing the Local Furnishing Participating TO to construct or expand facilities as necessary to provide transmission service as determined pursuant to the ISO Tariff. Such Local Furnishing Participating TO shall thereafter, within ten Business Days of receiving a copy of the Section 211 application, waive its right to a request for service under Section 213(a) of the FPA and to the issuance of a proposed order under Section 212(c) of the FPA. Upon receipt of a final order from FERC under Section 211 of the FPA that is no longer subject to rehearing or appeal, such Local Furnishing Participating TO shall construct or expand facilities to comply with that FERC order and shall transfer to the ISO Operational Control over the Local Furnishing Participating TO’s expanded transmission facilities in accordance with the ISO Tariff.
PDF page 283
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
10. Interconnection Process.
10.1 Applicability.
All requests for Interconnection of wholesale load directly to the ISO Controlled Grid from parties eligible to request such Interconnection consistent with Section 210(a) of the FPA shall be processed pursuant to the provisions of this Section 10., except requests for interconnection on behalf of Large Loads to be located in the ISO BAA shall be subject to the procedures in Appendix XV of the TO Tariff. All requests for Interconnection of wholesale generation directly to the ISO Controlled Grid shall be processed pursuant to the provisions of the ISO Tariff, and if applicable, Appendix VII of the TO Tariff. Requests for interconnection on behalf of Large Loads by retail transmission customers of Participating TO shall be subject to the procedures in Appendix XV of the TO Tariff and the Local Regulatory Authority, as applicable.
10.2 Applications.
A party requesting Interconnection shall submit a written Interconnection Application which provides the information required in Section 10.3 to the Participating TO and shall send a copy of the application to the ISO. The Participating TO shall time-stamp the application to establish study priority.
10.3 Interconnection Application.
An Interconnection Application shall provide all of the information listed in 18 CFR § 2.20, including, but not limited to, the following:
(i) The identity, address, telephone number, and facsimile number of the party requesting Interconnection;
PDF page 284
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
(ii) The Interconnection point(s) to the ISO Controlled Grid contemplated by the applicant;
(iii) The resultant (or new) maximum amount of Interconnection capacity;
(iv) The proposed date for energizing the Interconnection and the term of the Interconnection service;
(v) Such other information as the Participating TO reasonably requires to process the application.
In addition to the information specified above, the following information may also be provided in order to properly evaluate system conditions:
(vi) The electrical location of the source of the power (if known) to be transmitted pursuant to the applicant’s request for Interconnection. If the source of the power is not known, a system purchase will be assumed.
Within ten (10) Business Days after receipt of an Interconnection Application, the Participating TO shall determine whether the application is complete (“Completed Interconnection Application”). Wherever possible, the Participating TO will attempt to remedy deficiencies in the Interconnection Application through informal communications with the applicant. If such efforts are unsuccessful, the Participating TO shall return the Interconnection Application to the applicant. The Participating TO will treat the information provided in the Interconnection Application, including the applicant’s identity, as confidential at the request of the applicant except to the extent that disclosure of this information is required by this TO Tariff, by regulatory or judicial order, for reliability purposes pursuant to Good Utility Practice, or pursuant to RTG or ISO transmission
PDF page 285
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
information sharing agreements. The Participating TO shall treat this information consistent with the standards of conduct contained in Part 37 of FERC’s regulations. 10.4 Review of Completed Interconnection Application.
After receiving a Completed Interconnection Application, the Participating TO will determine on a non-discriminatory basis whether a System Impact Study is required. Whenever the Participating TO determines that a System Impact Study is not required and that neither Reliability Upgrades nor changes in existing operating procedures are required, the Participating TO shall notify the applicant within fifteen (15) Business Days of the Completed Application Date. If the Interconnection can be accommodated without any Direct Assignment Facilities, then within thirty (30) Business Days of such notice from the Participating TO, the applicant shall request the Participating TO to tender to the applicant an Interconnection Agreement within thirty (30) Business Days of such request. The Participating TO shall tender to the applicant an Interconnection Agreement as provided in Section 8.1.3. If the Participating TO determines, upon the review of the Completed Interconnection Application, that Direct Assignment Facilities are required, the Participating TO shall tender to the applicant a Facilities Study Agreement within twenty (20) Business Days of the Completed Application Date and continue the interconnection process pursuant to Section 10.8.
10.5 Notice of Need for System Impact Study.
If the Participating TO determines that a System Impact Study is necessary to accommodate the requested Interconnection, the Participating TO shall so inform the applicant, as soon as practicable. In such cases, the Participating TO shall within twenty (20) Business Days of receipt of a Completed Interconnection Application, tender
PDF page 286
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
a System Impact Study Agreement that defines the scope, content, assumptions and terms of reference for such study to be completed by the Participating TO; the estimated time required to complete it; and such other provisions as the parties may reasonably require, and pursuant to which the applicant shall agree to reimburse the Participating TO for the reasonable actual costs of performing the required System Impact Study. A description of the Participating TO’s transmission assessment practices for completing a System Impact Study is provided in the Participating TO’s FERC Form 715. For an Interconnection request to remain a Completed Interconnection Application, the applicant shall execute the System Impact Study Agreement and return it to the Participating TO within ten (10) Business Days together with payment for the reasonable estimated cost of performing the System Impact Study. Alternatively, if the applicant requests the Participating TO to proceed with the System Impact Study and commits to abide by the terms, conditions, and cost assignments ultimately determined under the ISO ADR Procedures, including any determination by FERC or appeal of a FERC determination in accordance with that process, the Participating TO shall promptly proceed with the System Impact Study provided that such request is accompanied by payment for the reasonable estimated cost of the System Impact Study, and the parties shall submit the disputed terms for resolution under the ISO’s ADR Procedures. If the applicant elects not to execute a System Impact Study Agreement, and does not request that the Participating TO proceed with the System Impact Study, its application shall be deemed withdrawn, and the applicant shall reimburse to the Participating TO all costs reasonably incurred in processing the application.
PDF page 287
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
10.6 System Impact Study Cost Reimbursement and Agreement
10.6.1 Cost Reimbursement.
The System Impact Study Agreement shall clearly specify the charge, based on the Participating TO’s estimate of the cost and time for completion of the System Impact Study. The charge shall not exceed the reasonable actual cost of the study. In performing the System Impact Study, the Participating TO shall rely, to the extent reasonably practicable, on existing transmission planning studies. The applicant will not be assessed a charge for such existing studies; however, the applicant will be responsible for the reasonable charges associated with any modifications to existing planning studies that are reasonably necessary to evaluate the impact of the applicant’s request.
10.6.2 Multiple Parties.
If multiple parties request Interconnection at the same location, the Participating TO may conduct a single System Impact Study. The costs of that study shall be pro-rated among the parties requesting Interconnection.
10.7 System Impact Study Procedures.
Upon receipt of an executed System Impact Study Agreement or initiation of the ISO ADR Procedures and receipt of payment for estimated study costs, the Participating TO will use due diligence to complete the required System Impact Study within a sixty (60) calendar day period. The System Impact Study will identify whether any Direct Assignment Facilities or Reliability Upgrades are necessary, as well as whether any transmission additions or upgrades are necessary to serve a wholesale load. The System Impact Study will also identify any adverse impact on Encumbrances existing as
PDF page 288
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
of the applicant’s Completed Application Date. In the event that the Participating TO is unable to complete the required System Impact Study within such time period, it shall so notify the applicant, in writing, and provide an estimated completion date along with an explanation of the reasons why additional time is required to complete the required studies. A copy of the completed System Impact Study and related work papers shall be made available to the applicant and the ISO. The Participating TO will use the same due diligence in completing the System Impact Study for others as it uses when completing studies for its affiliated UDC load. The Participating TO shall notify the applicant immediately upon completion of the System Impact Study.
10.7.1 Procedures Upon Completion of System Impact Study.
Within fifteen (15) Business Days of completion of the System Impact Study, the Participating TO shall notify the applicant whether the transmission system will be adequate to accommodate all of a request for Interconnection. If no costs are likely to be incurred for any Direct Assignment Facilities, any Reliability Upgrades, or implementing any operating procedures, then within thirty (30) Business Days of receipt of the completed System Impact Study, the applicant shall request the Participating TO to tender an Interconnection Agreement within thirty (30) Business Days of such request. The Participating TO shall tender to the applicant an Interconnection Agreement as provided in Section 8.1.3. If costs are likely to be incurred to accommodate a request for Interconnection, the Participating TO shall tender to the applicant a Facilities Study Agreement pursuant to Section 10.8.
PDF page 289
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
10.8 Notice of Need for Facilities Study.
If a System Impact Study indicates that additions or upgrades to the ISO Controlled Grid are needed to satisfy an applicant’s request for Interconnection, the Participating TO shall, within fifteen (15) Business Days of the completion date of the System Impact Study tender to the applicant a Facilities Study Agreement that defines the scope, content, assumptions and terms of reference for such study; the estimated time required to complete the required study; and such other provisions as the parties may reasonably require, and pursuant to which the applicant agrees to reimburse the Participating TO for the reasonable actual costs of performing the required Facilities Study. For an Interconnection request to remain a Completed Interconnection Application, the applicant shall execute the Facilities Study Agreement and return it to the Participating TO within ten (10) Business Days together with payment for the reasonable estimated cost of performing the Facilities Study. Alternatively, if the applicant requests the Participating TO to proceed with the Facilities Study and commits to abide by the terms, conditions, and cost assignments ultimately determined under the ISO ADR Procedures, including any determination by FERC or appeal of a FERC determination in accordance with that process, the Participating TO shall promptly proceed with the Facilities Study provided that such request is accompanied by payment for the reasonable estimated cost of the Facilities Study, and the parties shall submit the disputed terms for resolution under the ISO ADR Procedures. If the applicant elects not to execute a Facilities Study Agreement and does not request that the Participating TO proceed with the Facilities Study, its application shall be deemed withdrawn and the applicant shall reimburse to the Participating TO all costs reasonably
PDF page 290
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
incurred in processing the application not covered by the System Impact Study Agreement.
10.9 Facilities Study Procedures.
Upon receipt of an executed Facilities Study Agreement or initiation of the ISO ADR Procedures and receipt of payment for the estimated study costs, the Participating TO will use due diligence to complete the required Facilities Study within a sixty (60) calendar day period. In the event that the Participating TO is unable to complete the required Facilities Study within such time period, it shall so notify the applicant, in writing, and provide an estimated completion date along with an explanation of the reasons why additional time is required to complete the required studies. A copy of the completed Facilities Study shall be made available to the applicant.
10.9.1 Execution of Interconnection Agreement.
Within thirty (30) Business Days of receipt of the completed Facilities Study, the applicant shall request the Participating TO to tender an Interconnection Agreement within thirty (30) Business Days of such request. The Participating TO shall tender to the applicant an Interconnection Agreement as provided in Section 8.1.3. 10.10 Partial Interim Service.
If the Participating TO determines that there will not be adequate transmission capability to satisfy the full amount requested in a Completed Interconnection Application, the Participating TO nonetheless shall be obligated to offer and provide the portion of the requested Interconnection that can be accommodated without any additional Direct Assignment Facilities or Reliability Upgrades. However, the Participating TO shall not be obligated to provide the incremental amount of requested Interconnection that
PDF page 291
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
requires such additional facilities or upgrades until such facilities or upgrades have been placed in service.
10.11 Expedited Interconnection Procedures.
In lieu of the procedures set forth above, the applicant shall have the option to expedite the processing of its Completed Interconnection Application. In order to exercise this option, the applicant shall submit in writing a Request for Expedited Interconnection Procedures to the Participating TO within ten (10) Business Days after receiving a copy of the System Impact Study for the proposed Interconnection. Within ten (10) Business Days after receiving a Request for Expedited Procedures, the Participating TO shall tender an Expedited Interconnection Agreement that requires the applicant to compensate the Participating TO for all costs reasonably incurred pursuant to the terms of this TO Tariff for processing the Completed Interconnection Application and providing the requested Interconnection. While the Participating TO agrees to provide the applicant with its best estimate of the costs of any needed Direct Assignment Facilities and, if applicable, Reliability Upgrades and other charges that may be incurred, unless otherwise agreed by the parties, such estimate shall not be binding and the applicant must agree in writing to compensate the Participating TO for all actual Interconnection costs reasonably incurred pursuant to the provisions of this TO Tariff. The applicant shall execute and return such Expedited Interconnection Agreement within ten (10) Business Days of its receipt or the applicant's request for Interconnection will cease to be a Completed Interconnection Application and will be deemed terminated and withdrawn. In that event, the applicant shall reimburse the Participating TO for all costs
PDF page 292
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
reasonably incurred in processing the application not covered by the terms of the System Impact Study Agreement.
PDF page 293
Southern California Edison CompanyFERC Electric Tariff, Third Revised Volume No. 6
13. Creditworthiness.
13.1 UDCs, MSSs, and Scheduling Coordinators Using the Participating TO's Low Voltage Transmission Facilities.
For the purpose of determining the ability of a UDC, MSS, and Scheduling Coordinator to meet its obligations related to service using the Participating TO's Low Voltage Transmission Facilities hereunder, the Participating TO may require reasonable credit review procedures for the UDC, MSS, or Scheduling Coordinator. This review shall be made in accordance with standard commercial practices. In addition, the Participating TO may require the UDC, MSS, or Scheduling Coordinator to provide and maintain in effect during the term of the service, an unconditional and irrevocable letter of credit as security to meet its responsibilities and obligations under this TO Tariff, or an alternative form of security proposed by the UDC, MSS, or Scheduling Coordinator and acceptable to the Participating TO, and consistent with commercial practices established by the Uniform Commercial Code, that protect the Participating TO against the risk of non- payment.
13.2 End-Users.
Creditworthiness rules applicable to End-Users shall be pursuant to the then-current rules of the applicable Local Regulatory Authority. and, as applicable, Appendix XV.
PDF page 294
CERTIFICATE OF SERVICE
I hereby certify that I have, this day, served a true copy of the foregoing document on all parties identified on the official service list(s) for FERC dockets EL26-71, the California Public Utilities Commission (“CPUC”) and SCE TO Tariff customers. Service was effected by transmitting copies via email to all parties who have provided an e-mail address. First class mail will be used if electric service cannot be effectuated.
Dated at Rosemead, California, this 16th day of November 2026.
/s/Sandra Sedano
Sandra Sedano
Sr Specialist, Legal Support
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, CA 91770
sandra.sedano@sce.com