ER27-518-000 · 2026-11-16 · LS Power Grid New York Corporation INew York Independent System Operator, Inc.
Arzola Testimony (Exhibit No. GNY-200)
PDF page 1
Exhibit No. GNY-200
UNITED STATES OF AMERICA BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
LS POWER GRID NEW YORK CORPORATION I
)
Docket No. ER27-__-000
NEW YORK INDEPENDENT SYSTEM
)
Docket No. EL26-69-000
OPERATOR, INC.
)
DIRECT TESTIMONY
OF
D. ERIC ARZOLA
I. INTRODUCTION AND EXPERIENCE
1
Q.
PLEASE STATE YOUR NAME AND BUSINESS ADDRESS.
2
A. My name is D. Eric Arzola. My business address is 16150 Main Circle Drive, Suite 310, 3
Chesterfield, Missouri 63017.
4
Q.
WITH WHAT ENTITY ARE YOU EMPLOYED?
5
A. I am employed as the Director of Transmission Rates at LS Power Development, LLC 6
(“LS Power Development”), the general partner and manager of LS Power Associates, 7
L.P. (“LS Power”), which is the indirect majority owner of LS Power Grid New York 8
Corporation I (“LSPGNY” or “Company”).
9
Q.
ON WHOSE BEHALF ARE YOU TESTIFYING IN THIS PROCEEDING?
10
A. I am testifying on behalf of LSPGNY.
11
Q.
HAVE YOU PREVIOUSLY FILED TESTIMONY BEFORE A REGULATORY
12
COMMISSION?
13
A. Yes. I have submitted testimony in FERC Docket Nos. ER22-221, ER23-206, ER24- 14
264, ER24-2668, ER25-321, ER25-2025, ER26-140, ER26-315, ER27-165, and ER27- 15
482.
16
PDF page 2
Exhibit No. GNY-200Page 2 of 20
Q.
PLEASE DESCRIBE YOUR EDUCATIONAL BACKGROUND AND
1
PROFESSIONAL EXPERIENCE.
2
A. I have a Bachelor of Arts degree in Economics from Rice University in Houston, Texas, 3
and a Graduate Certificate in Energy Policy and Management from Portland State 4
University in Portland, Oregon. I have over 22 years of experience in the energy 5
industry, with over 12 years focused on transmission cost of service rates, regulation, and 6
strategy. I have been employed by LS Power Development since 2020, where I am 7
responsible for overseeing transmission rates for LS Power’s Federal Energy Regulatory 8
Commission (“FERC” or “Commission”) jurisdictional entities. Prior to joining LS 9
Power, I held positions with similar responsibilities at GridLiance LLC and PacifiCorp. 10
II. PURPOSE AND SUMMARY OF TESTIMONY
11
Q.
WHAT IS THE PURPOSE OF YOUR TESTIMONY?
12
A. The purpose of my testimony is to explain the revisions LSPGNY proposes to its 13
Formula Rate Template and Formula Rate Implementation Protocols so that LSPGNY 14
can recover the cost of transmission facilities built to serve large loads and covered by a 15
Large Load Cost Recovery Agreement (“CRA”) (“Covered Upgrades”), and credit the 16
amounts Eligible Customers pay under their CRAs toward its transmission revenue 17
requirement. The revisions respond to the Commission’s June 18, 2026, order in Docket 18
No. EL26-69-000 (“Show Cause Order”). Specifically, my testimony (i) describes the 19
large load cost recovery framework the revisions implement; (ii) describes the changes to 20
the Formula Rate Template, including new Attachments 1a and 2a; (iii) describes several 21
ministerial corrections to the existing Formula Rate Template; (iv) describes the changes 22
to the Formula Rate Implementation Protocols; (v) describes the exhibits I sponsor, 23
including illustrative examples; and (vi) explains why the revisions are just and 24
PDF page 3
Exhibit No. GNY-200Page 3 of 20
reasonable. The pro forma CRA, including how each Eligible Customer’s annual 1
Minimum Transmission Revenue Contribution is established, is sponsored by LSPGNY 2
witness Mr. Hayes.
3
Q.
PLEASE SUMMARIZE THE PROPOSED REVISIONS TO THE FORMULA
4
RATE TEMPLATE.
5
A. LSPGNY proposes the following changes:
6
• Add Attachment 2a – Project Plant Detail, to report plant and net investment 7
separately for the Marcy to New Scotland 345 kV Upgrade Project (“Segment A”) 8
and each Covered Upgrade;
9
• Use the project detail on Attachment 2a to calculate the revenue requirement of 10
each project on Attachment 4 – Incentives;
11
• Add Attachment 1a – Supplemental MTRC, to calculate, by Eligible Customer 12
and Covered Upgrade, the Supplemental MTRC and Annual Termination Fee 13
Remittances that make up Projected Large Load CRA Revenue, and to record the 14
Actual Large Load CRA Revenue LSPGNY receives;
15
• Credit Projected Large Load CRA Revenue in the Annual Projection, and Actual 16
Large Load CRA Revenue in the Annual Update, on a new Line 5a of Attachment 17
1 – Revenue Credits;
18
• Add lines to Appendix A that show the Large Load CRA Revenue the New York 19
Independent System Operator, Inc. (“NYISO”) will bill and remit to LSPGNY; 20
• Add a true-up of the Supplemental MTRC by Eligible Customer and Covered 21
Upgrade on Attachment 5 – True-Up; and
22
• Correct several ministerial errors in the existing Formula Rate Template. 23
PDF page 4
Exhibit No. GNY-200Page 4 of 20
LSPGNY also proposes limited changes to the Formula Rate Implementation Protocols to 1
define the new terms, add work paper and notice requirements, address how Large Load 2
CRA Revenue is reflected in the True-Up Adjustment, and address customer-specific 3
information.
4
Q.
DO THE REVISIONS CHANGE HOW LSPGNY’S REVENUE REQUIREMENT
5
IS CALCULATED?
6
A. No. The cost of service inputs, return, depreciation, taxes, and allocators are unchanged. 7
Covered Upgrades are included in LSPGNY’s rate base and revenue requirement in the 8
same manner as any other LSPGNY transmission plant. The revisions add project-level 9
detail and a new revenue credit for Large Load CRA Revenue. Absent any Covered 10
Upgrade or CRA, the revised Formula Rate Template produces the same revenue 11
requirement as the currently effective Formula Rate Template, apart from the ministerial 12
corrections described below.
13
Q.
OTHER THAN YOUR TESTIMONY, ARE YOU SPONSORING ANY
14
EXHIBITS?
15
A. Yes. I am sponsoring the following exhibits:
16
• Exhibit No. GNY-201, Clean Formula Rate Template;
17
• Exhibit No. GNY-202, Marked Formula Rate Template;
18
• Exhibit No. GNY-203, Clean Formula Rate Template in native Excel format with 19
all formulas intact;
20
• Exhibit No. GNY-204, Illustrative Formula Rate Template – Annual Projection; 21
• Exhibit No. GNY-205, Illustrative Formula Rate Template – Annual Update; 22
• Exhibit No. GNY-206, Clean Formula Rate Implementation Protocols; and 23
• Exhibit No. GNY-207, Marked Formula Rate Implementation Protocols. 24
PDF page 5
Exhibit No. GNY-200Page 5 of 20
III. LSPGNY AND FORMULA RATE BACKGROUND
1
Q.
PLEASE PROVIDE AN OVERVIEW OF LSPGNY AND ITS FORMULA RATE.
2
A. LSPGNY is a transmission-only company that owns Segment A, developed with the New 3
York Power Authority to meet the AC Transmission Public Policy Transmission Need. 4
LSPGNY’s formula rate consists of its Formula Rate Template (NYISO Open Access 5
Transmission Tariff (“OATT”) Section 6.10.7.2.1) and its Formula Rate Implementation 6
Protocols (Section 6.10.7.2.2) (together, the “Formula Rate”), which were accepted by 7
the Commission in Docket No. ER20-716. LSPGNY’s revenue requirement is recovered 8
under Rate Schedule 10 of the NYISO OATT.
9
Q.
HOW DOES THE FORMULA RATE OPERATE EACH YEAR?
10
A. By September 30, LSPGNY posts an Annual Projection of its revenue requirement for 11
the upcoming Rate Year. By June 30 after each Rate Year, LSPGNY posts an Annual 12
Update using actual FERC Form No. 1 or other Company data. The difference between 13
the revenue LSPGNY collected during the Rate Year and its actual revenue requirement, 14
with interest, is the True-up Adjustment, which is included in a later Annual Projection. 15
Q.
WHY MUST LSPGNY REVISE ITS FORMULA RATE?
16
A. In the Show Cause Order, the Commission directed the NYISO and its transmission 17
owners to show cause why their tariffs remain just and reasonable or to propose changes 18
for integrating large loads. Among other things, the Commission called for a mechanism 19
to ensure that large load payments are “credited toward transmission owners’ 20
transmission revenue requirements.” LSPGNY’s current Formula Rate Template reports 21
plant values only in total and has no means of identifying the facilities built to serve large 22
loads or of crediting the amounts Eligible Customers pay under their CRAs. The 23
revisions I describe provide that mechanism.
24
PDF page 6
Exhibit No. GNY-200Page 6 of 20
IV. THE LARGE LOAD COST RECOVERY FRAMEWORK
1
Q.
WHAT IS A CRA?
2
A. A CRA is an agreement between LSPGNY and an Eligible Customer taking transmission 3
service on behalf of a large load. Under its CRA, the Eligible Customer commits to an 4
annual Minimum Transmission Revenue Contribution (“Annual MTRC”) for each 5
Covered Upgrade built to serve the large load, for the term of the CRA. The Annual 6
MTRC is calculated solely under the CRA. The terms of the pro forma CRA, including 7
how the Annual MTRC is established, termination, and credit support requirements, are 8
described in the transmittal letter and the testimony of Mr. Hayes. The Formula Rate 9
Template uses the Annual MTRC set by each CRA as an input.
10
Q.
HOW ARE THE COSTS OF COVERED UPGRADES RECOVERED?
11
A. The cost of each Covered Upgrade is included in LSPGNY’s rate base and revenue 12
requirement and recovered under the NYISO OATT together with the cost of Segment A. 13
Each Eligible Customer pays transmission charges for the service it takes, like any other 14
transmission customer. The transmission revenues that count toward an Eligible 15
Customer’s Annual MTRC, as determined under its CRA, are its “Qualifying 16
Transmission Revenues.”
17
Q.
WHAT IS THE SUPPLEMENTAL MTRC?
18
A. The Supplemental MTRC is the amount, if any, by which an Eligible Customer’s Annual 19
MTRC for a Covered Upgrade exceeds its Qualifying Transmission Revenues for that 20
Covered Upgrade. It requires the Eligible Customer to pay at least its committed Annual 21
MTRC each year, even if its load develops more slowly than expected. The 22
Supplemental MTRC is measured separately for each Covered Upgrade and is never less 23
PDF page 7
Exhibit No. GNY-200Page 7 of 20
than zero, so Qualifying Transmission Revenues above the Annual MTRC on one 1
Covered Upgrade do not offset a shortfall on another.
2
Q.
HOW IS THE SUPPLEMENTAL MTRC BILLED?
3
A. The Supplemental MTRC follows the same projection and true-up cycle as the rest of the 4
Formula Rate. In each Annual Projection, LSPGNY projects each Eligible Customer’s 5
Qualifying Transmission Revenues and resulting Supplemental MTRC for the Rate Year. 6
The NYISO bills each active Eligible Customer its projected Supplemental MTRC in 7
equal monthly installments during the Rate Year and remits the amounts to LSPGNY. In 8
the Annual Update, the Supplemental MTRC billed is compared to the Supplemental 9
MTRC based on actual Qualifying Transmission Revenues. The difference is included, 10
without interest, in that Eligible Customer’s Supplemental MTRC in a later Annual 11
Projection.
12
Q.
WHY IS THE SUPPLEMENTAL MTRC PROJECTED AND TRUED UP
13
RATHER THAN BILLED AFTER THE RATE YEAR?
14
A. Billing the projected amount during the Rate Year matches the timing of the 15
Supplemental MTRC credit to the Rate Year in which it reduces the revenue requirement, 16
spreads the Eligible Customer’s payments evenly over the year, and uses the projection 17
and true-up process that stakeholders already know. Because each Eligible Customer’s 18
Supplemental MTRC is trued up to actual Qualifying Transmission Revenues, the 19
Eligible Customer is ultimately responsible for its full Annual MTRC. Any difference 20
between the projected and actual amounts is corrected in a later Rate Year. 21
Q.
WHAT HAPPENS IF AN ELIGIBLE CUSTOMER TERMINATES ITS CRA?
22
A. If an Eligible Customer terminates its CRA after an applicable in-service date, it pays a 23
Termination Fee equal to its Remaining Cumulative Revenue Responsibility less any 24
PDF page 8
Exhibit No. GNY-200Page 8 of 20
Supplemental MTRC already billed and remaining unpaid as of the effective termination 1
date, as provided in CRA Section 3.3.4. The NYISO collects and holds that fee. The 2
excluded unpaid bills remain separately payable as Large Load Charges, and receipt of 3
the Termination Fee in full discharges only the remaining responsibility included in the 4
fee, not those unpaid bills. The NYISO remits to LSPGNY the scheduled Annual 5
Termination Fee Remittances determined under CRA Section 3.3.6 and the Termination 6
Fee Remittance Worksheet in Schedule 5. Those scheduled amounts reflect applicable 7
partial-year proration, are limited to the available Termination Fee Balance, and include 8
any residual balance and actual account earnings required to be remitted with the final 9
installment. LSPGNY credits the Annual Termination Fee Remittances in the same way 10
as the Supplemental MTRC, with projected remittances credited in the Annual Projection 11
and actual remittances received credited in the Annual Update. The Covered Upgrade 12
remains in rate base. The terms governing termination are described in the testimony of 13
Mr. Hayes.
14
Q.
HOW DOES THE FORMULA RATE TREAT LARGE LOAD CRA REVENUE?
15
A. The Supplemental MTRC and Annual Termination Fee Remittances (together, “Large 16
Load CRA Revenue”) are credited against LSPGNY’s revenue requirement as a revenue 17
credit. The credit reduces the revenue requirement dollar for dollar, so the benefit goes to 18
customers rather than to LSPGNY. In the Annual Projection, LSPGNY credits the Large 19
Load CRA Revenue it projects for the Rate Year (“Projected Large Load CRA 20
Revenue”). In the Annual Update, it credits the Large Load CRA Revenue it receives 21
during the Rate Year (“Actual Large Load CRA Revenue”): Supplemental MTRC 22
payments the NYISO collects and remits, Applied Security Proceeds applied to 23
Supplemental MTRC obligations and remitted by the NYISO, amounts LSPGNY 24
PDF page 9
Exhibit No. GNY-200Page 9 of 20
recovers directly from an Eligible Customer and applies to Supplemental MTRC 1
obligations, and Annual Termination Fee Remittances.
2
Q.
DO THE COVERED UPGRADES RECEIVE THE INCENTIVES GRANTED
3
FOR SEGMENT A?
4
A. No. The return on equity (“ROE”) incentive the Commission granted for Segment A in 5
Docket No. ER20-716 applies only to Segment A, as entered on Attachment 4, 6
Column (e) and documented under Note D. Covered Upgrades are separately identified 7
in LS Power Grid’s Formula Rate and use the capital structure and generally applicable 8
return components applicable to LS Power Grid under Rate Schedule 10, including any 9
Commission-approved generally applicable return on equity incentive, as applicable. 10
Covered Upgrades do not receive return on equity incentives that are specific to the AC 11
Transmission Project or become subject to the AC Transmission Project’s Competitive 12
Bid Concession, cost cap, or other project-specific cost-containment commitments. 13
V. LSPGNY’S PROPOSED FORMULA RATE TEMPLATE CHANGES
14
Q.
WHY IS ATTACHMENT 2A NEEDED?
15
A. The existing Formula Rate Template reports transmission plant only in total. To identify 16
the investment in each Covered Upgrade, the Formula Rate Template must report 17
Segment A and each Covered Upgrade separately. Attachment 2a provides that detail. 18
Q.
PLEASE DESCRIBE ATTACHMENT 2A.
19
A. Attachment 2a has five sections, each with a line for Segment A and lines for Covered 20
Upgrades. Additional project lines may be added as Covered Upgrades are placed in 21
service.
22
• Section 1 reports monthly transmission gross plant in service and its 13-month 23
average. The monthly totals populate Attachment 2, Lines 2–14.
24
PDF page 10
Exhibit No. GNY-200Page 10 of 20
• Section 2 reports monthly transmission accumulated depreciation and its 13- 1
month average. The monthly totals populate Attachment 2, Lines 78–90. 2
• Sections 3 and 4 report unamortized regulatory assets and unamortized abandoned 3
plant by project.
4
• Section 5 calculates each project’s net investment (Line 1 – Line 2 + Line 3 + 5
Line 4), which is used on Attachment 4, Column (b). The total ties to Appendix 6
A, Line 103.
7
Because the Attachment 2a totals flow to Attachment 2, total plant and accumulated 8
depreciation are unchanged. Project names entered on Attachment 2a carry to 9
Attachment 4, Column (a), and Attachment 5, Lines 2–2d.
10
Q.
PLEASE DESCRIBE THE REVISIONS TO ATTACHMENT 1.
11
A. LSPGNY proposes a new Line 5a, Large Load CRA Revenue – Supplemental MTRC 12
and Annual Termination Fee Remittances, which will be included in Total Revenue 13
Credits on Line 6. New Note 4 describes the new line. In an Annual Projection, Line 5a 14
equals the Projected Large Load CRA Revenue, the Attachment 1a total. In an Annual 15
Update, Line 5a equals the Actual Large Load CRA Revenue received during the Rate 16
Year, from new Lines 24–34 of Attachment 1a. Line 2 of the account detail on 17
Attachment 1 shows the Large Load CRA Revenue recorded in Account 456, and any 18
difference from Line 5a is reconciled in the work papers required by the Formula Rate 19
Implementation Protocols. Qualifying Transmission Revenues are not credited on Line 20
5a because they are already part of the transmission revenue LSPGNY collects. 21
Q.
WHY IS LARGE LOAD CRA REVENUE TREATED AS A REVENUE CREDIT?
22
A. Revenue credits are the Formula Rate Template’s existing means of passing revenue back 23
to customers. Crediting Large Load CRA Revenue on Attachment 1 reduces LSPGNY’s 24
PDF page 11
Exhibit No. GNY-200Page 11 of 20
revenue requirement on Appendix A, Line 2 and, through Line 106, the base carrying 1
charge used to calculate each project’s revenue requirement on Attachment 4. No new 2
allocation method is needed.
3
Q.
PLEASE DESCRIBE THE NEW ATTACHMENT 1A.
4
A. Attachment 1a calculates Projected Large Load CRA Revenue, and records Actual Large 5
Load CRA Revenue, by Eligible Customer and Covered Upgrade for the Rate Year. 6
Each of Lines 1–10 is one Eligible Customer and Covered Upgrade:
7
• Columns 1–3 identify the Eligible Customer, the Covered Upgrade, and its status 8
(Active or Terminated);
9
• Column 4 is the projected Qualifying Transmission Revenues, from the 10
workpaper on Lines 14–23, which calculates them as forecast load (MW) 11
multiplied by billing hours and the applicable transmission rate;
12
• Column 5 is the Annual MTRC under the Eligible Customer’s CRA;
13
• Column 6 is, for an active Eligible Customer, the Supplemental MTRC (Column 14
5 less Column 4, but not less than zero) and, for a terminated Eligible Customer, 15
the scheduled Annual Termination Fee Remittance for the Rate Year, entered 16
separately in Column K from the Termination Fee Remittance Worksheet in 17
Schedule 5 of the applicable CRA;
18
• Column 7 is any prior-period true-up adjustment from Attachment 5; and 19
• Column 8 is the total (Column 6 plus Column 7).
20
Line 11 totals each column, and Lines 12 and 13 separate the totals for active and 21
terminated Eligible Customers. In an Annual Projection, the Line 11 total is credited on 22
Attachment 1, Line 5a. In an Annual Update, Attachment 1a uses actual Qualifying 23
PDF page 12
Exhibit No. GNY-200Page 12 of 20
Transmission Revenues to determine the actual Supplemental MTRC for the true-up on 1
Attachment 5, and its labels change from “Projected” to “Actual.”
2
Q.
WHAT DO NEW LINES 24–34 OF ATTACHMENT 1A SHOW?
3
A. Lines 24–34 are completed in the Annual Update. For each Eligible Customer and 4
Covered Upgrade, they show the opening unpaid Supplemental MTRC, the Supplemental 5
MTRC billed during the Rate Year, and the amounts LSPGNY received during the Rate 6
Year: Supplemental MTRC payments the NYISO collected and remitted (Column (c)), 7
Applied Security Proceeds applied to Supplemental MTRC obligations and remitted by 8
the NYISO (Column (d)), amounts LSPGNY recovered directly from the Eligible 9
Customer and applied to Supplemental MTRC obligations (Column (e)), and Annual 10
Termination Fee Remittances (Column (f)). Column (g), the sum of Columns (c) through 11
(f), is the Actual Large Load CRA Revenue, and its total on Line 34 is credited on 12
Attachment 1, Line 5a. Column (h) is the closing unpaid Supplemental MTRC, which 13
carries forward to the next Annual Update so that a later collection is identified and 14
credited once, in the Rate Year in which it is received.
15
Q.
WHAT IS SHOWN IN THE NEW LINES ON APPENDIX A?
16
A. New lines a1 through c on Appendix A show the Large Load CRA Revenue the NYISO 17
will bill and remit during the Rate Year: the projected Supplemental MTRC (line a1), 18
prior-period true-up adjustments (line a2), the total Supplemental MTRC to be billed 19
(line a), Annual Termination Fee Remittances (line b), and total Large Load CRA 20
Revenue (line c), which is included in Line 2. New Note R describes these lines. These 21
informational lines are populated for the Annual Projection. They do not change the 22
calculation of the Net Adjusted Revenue Requirement on Line 5.
23
PDF page 13
Exhibit No. GNY-200Page 13 of 20
Q.
PLEASE DESCRIBE THE REVISIONS TO ATTACHMENT 5.
1
A. LSPGNY proposes a new section, Lines 14–24, that trues up the Supplemental MTRC 2
for each active Eligible Customer and Covered Upgrade. It compares the Supplemental 3
MTRC billed during the Rate Year to the Supplemental MTRC based on actual 4
Qualifying Transmission Revenues. The difference, without interest, flows to 5
Attachment 1a, Column 7, for that Eligible Customer and Covered Upgrade. In addition, 6
project names on Lines 2–2d now come from Attachment 2a, the interest calculation on 7
Lines 2a–2d now uses the same formula as Line 2 (previously it was zero), the notes are 8
moved below the calculations, Note 2 clarifies that revenue received excludes Large 9
Load CRA Revenue, and new Note 5 describes the Supplemental MTRC true-up. 10
Q.
WHY IS THE SUPPLEMENTAL MTRC TRUED UP BY ELIGIBLE
11
CUSTOMER?
12
A. The difference between projected and actual Qualifying Transmission Revenues relates to 13
a specific Eligible Customer’s commitment. Truing it up in that Eligible Customer’s 14
Supplemental MTRC keeps responsibility for the Annual MTRC with that Eligible 15
Customer, rather than with other customers. True-up adjustments for terminated Eligible 16
Customers are addressed under the CRA.
17
Q.
HOW DOES THIS TRUE-UP DIFFER FROM THE TRUE-UP OF LARGE LOAD
18
CRA REVENUE IN THE FORMULA RATE?
19
A. They address different things. The true-up by Eligible Customer on Attachment 5 20
corrects the forecast of Qualifying Transmission Revenues. It compares the 21
Supplemental MTRC billed with the Supplemental MTRC based on actual Qualifying 22
Transmission Revenues, and the difference, without interest, adjusts that Eligible 23
Customer’s Supplemental MTRC in a later Annual Projection. It does not depend on 24
whether the billed amount was paid. Separately, the Formula Rate’s existing True-Up 25
PDF page 14
Exhibit No. GNY-200Page 14 of 20
Adjustment compares the Projected Large Load CRA Revenue credited in the Annual 1
Projection with the Actual Large Load CRA Revenue received. If a billed amount is not 2
received during the Rate Year, LSPGNY’s actual revenue requirement is higher than 3
projected, and the difference is included, with interest, in the True-Up Adjustment in a 4
later Annual Projection, in the same manner as any other difference between projected 5
and actual revenue requirement. The Eligible Customer remains liable for the unpaid 6
amount, which is subject to the CRA’s security and collection provisions, and any later 7
receipt is credited in the Rate Year in which it is received. Exhibit No. GNY-205 8
illustrates both true-ups.
9
Q.
HOW IS CUSTOMER-SPECIFIC INFORMATION ADDRESSED?
10
A. Attachment 1a reports information by Eligible Customer and Covered Upgrade. Under 11
new Section 8 of the Formula Rate Implementation Protocols, which I describe below, 12
customer-specific information is treated as confidential, LSPGNY posts and files 13
versions of its Annual Projection and Annual Update that aggregate or redact that 14
information, and the unredacted information is available under the Formula Rate 15
Implementation Protocols’ existing confidentiality procedures.
16
Q.
ARE THERE OTHER CHANGES TO THE FORMULA RATE TEMPLATE?
17
A. Yes. Attachments 1a and 2a are added to the Index. In addition, LSPGNY proposes the 18
ministerial corrections described in the next section.
19
VI. MINISTERIAL CORRECTIONS
20
Q.
PLEASE DESCRIBE THE MINISTERIAL CORRECTIONS LSPGNY
21
PROPOSES.
22
A. LSPGNY proposes the following corrections to the existing Formula Rate Template: 23
PDF page 15
Exhibit No. GNY-200Page 15 of 20
• Attachment 4, Column (d): the heading now references Appendix A, Line 98, the 1
line its formula uses, rather than Line 94;
2
• Attachment 4, Column (n): the heading now reads (Col. (l) x Col. (m)) rather 3
than (Col. (l) x Col. (n)); and
4
• Attachment 5, Notes 3 and 4: typographical errors are corrected. 5
Q.
DO THESE CORRECTIONS CHANGE THE FORMULA RATE
6
METHODOLOGY?
7
A. No. Each correction conforms a formula or label to the methodology the Commission 8
accepted in Docket No. ER20-716.
9
VII. FORMULA RATE IMPLEMENTATION PROTOCOLS
10
Q.
WHAT CHANGES DOES LSPGNY PROPOSE TO THE FORMULA RATE
11
IMPLEMENTATION PROTOCOLS?
12
A. LSPGNY proposes the following changes:
13
• A new paragraph following the introductory paragraph defines “Cost Recovery 14
Agreement” (“CRA”), “Eligible Customer,” “Annual MTRC,” “Qualifying 15
Transmission Revenues,” “Supplemental MTRC,” “Large Load CRA Revenue,” 16
“Projected Large Load CRA Revenue,” and “Actual Large Load CRA Revenue” 17
as used in the Formula Rate Implementation Protocols and the Formula Rate 18
Template. These definitions are tied to the CRA, and other capitalized terms used 19
in connection with a CRA have the meanings given in the CRA;
20
• Section 1.B adds each Eligible Customer, Large Load Customer, and Successor 21
Eligible Customer under a CRA to the Service List;
22
• New Sections 1.E.6 and 3.C.11 require work papers, organized by Eligible 23
Customer, Large Load Facility, and Covered Upgrade, supporting the Projected 24
PDF page 16
Exhibit No. GNY-200Page 16 of 20
Large Load CRA Revenue in the Annual Projection and the Actual Large Load 1
CRA Revenue in the Annual Update, including a reconciliation of the amounts 2
billed, received, and unpaid. These work papers are provided with the Formula 3
Rate Template and are not part of it;
4
• A new paragraph in Section 2.B provides that, in determining the True-Up 5
Adjustment, the actual Net Revenue Requirement reflects the Actual Large Load 6
CRA Revenue in place of the Projected Large Load CRA Revenue, with the 7
difference reconciled with interest under Section 2.C; that a billed amount not 8
received is not credited, remains owed by the Eligible Customer, and is credited 9
when later received; and that this True-Up Adjustment is separate from the true- 10
up of an Eligible Customer’s Supplemental MTRC, which is without interest; 11
• New Section 8, Customer-Specific Information, provides that information specific 12
to an individual Eligible Customer, Large Load Customer, or CRA is treated as 13
confidential, that LSPGNY will post and file versions of the Annual Projection, 14
Annual Update, and work papers that aggregate or redact that information, and 15
that the unredacted information is available to interested parties under a 16
confidentiality agreement, as provided in Section 4.D, and to the Commission; 17
and
18
• Clean-up changes to capitalization, punctuation, and cross-references, including 19
correcting the cross-reference in Section 3.C.10.d.
20
Q.
WHY ARE THE PROTOCOL CHANGES LIMITED?
21
A. The existing posting, review, challenge, and true-up procedures apply to the Large Load 22
CRA Revenue calculations, and the calculations themselves are in the Formula Rate 23
PDF page 17
Exhibit No. GNY-200Page 17 of 20
Template. The terms of service, billing, and termination are addressed in the NYISO 1
OATT and the CRA. The Formula Rate Implementation Protocols therefore need only 2
define the new terms, specify how Large Load CRA Revenue is reflected in the True-Up 3
Adjustment, ensure Eligible Customers receive notice and supporting work papers, and 4
address customer-specific information.
5
VIII. NATIVE AND ILLUSTRATIVE FORMULA RATE TEMPLATES
6
Q.
PLEASE DESCRIBE EXHIBIT NO. GNY-203.
7
A. Exhibit No. GNY-203 is the revised Formula Rate Template in native Excel format with 8
all formulas and links intact, including new Attachments 1a and 2a. It is not populated 9
with LSPGNY or customer data. Reviewers can enter values in the input cells and 10
observe how the formulas respond.
11
Q.
PLEASE DESCRIBE EXHIBIT NO. GNY-204.
12
A. Exhibit No. GNY-204 is the revised Formula Rate Template populated with hypothetical 13
data to illustrate the treatment of Covered Upgrades and Eligible Customers. The data 14
simulate an Annual Projection for the 2030 Rate Year with Segment A and four Covered 15
Upgrades serving three Eligible Customers, using a qualifying transmission rate of 16
$1.75/MWh:
17
• Customer A takes service from two Covered Upgrades. On Large Load Project 1, 18
its 400 MW of forecast load produces projected Qualifying Transmission 19
Revenues of $6,132,000, below its Annual MTRC of $7,320,060, for a
20
Supplemental MTRC of $1,188,060. These inputs match the illustrative CRA 21
worksheet sponsored by Mr. Hayes. On Large Load Project 2, its projected 22
Qualifying Transmission Revenues exceed its Annual MTRC, so the
23
Supplemental MTRC is zero and does not offset Project 1;
24
PDF page 18
Exhibit No. GNY-200Page 18 of 20
• Customer B takes service from Large Load Project 3, with projected Qualifying 1
Transmission Revenues below its Annual MTRC; and
2
• Customer C has terminated its CRA for Large Load Project 4, so the NYISO 3
remits an Annual Termination Fee Remittance equal to its Annual MTRC. 4
The example also includes prior-period true-up adjustments from a 2028 Annual Update 5
on Attachment 5, including both under-billed and over-billed Covered Upgrades, and a 6
True-up Adjustment for the project revenue requirements on Appendix A, Line 4. In the 7
example, the projected Supplemental MTRC is $2.54 million, prior-period true-up 8
adjustments add $0.08 million, and Annual Termination Fee Remittances are $3.57 9
million, for total Large Load CRA Revenue of $6.19 million credited on Appendix A, 10
Line 2. The illustrative data are hypothetical and are not LSPGNY or customer data. 11
Q.
PLEASE DESCRIBE EXHIBIT NO. GNY-205.
12
A. Exhibit No. GNY-205 is the revised Formula Rate Template populated with hypothetical 13
data to illustrate the Annual Update for the same 2030 Rate Year. To isolate the 14
treatment of Large Load CRA Revenue, the cost of service inputs are the same as in 15
Exhibit No. GNY-204, and:
16
• Customer A’s actual load on Large Load Project 1 is 380 MW rather than the 17
forecast 400 MW, producing an actual Supplemental MTRC of $1,494,660. 18
Attachment 5, Lines 14–23, compare that amount with the $1,188,060 billed, 19
before prior-period adjustments, and produce a customer-level true-up of 20
$306,600, without interest, for a later Annual Projection;
21
PDF page 19
Exhibit No. GNY-200Page 19 of 20
• Customer A pays the Supplemental MTRC billed for Large Load Projects 1 and 2 1
in full, and the NYISO remits Customer C’s Annual Termination Fee Remittance 2
of $3,573,810; and
3
• Customer B is billed $973,050 but pays $648,700. The NYISO applies $162,175 4
of Customer B’s Security, leaving $162,175 unpaid at year end. LSPGNY also 5
recovers directly from Customer B $50,000 that was unpaid from a prior Rate 6
Year.
7
Actual Large Load CRA Revenue on Attachment 1a, Line 34 is $6,083,665, or $112,175 8
less than the $6,195,840 projected in Exhibit No. GNY-204: the $162,175 not received, 9
less the $50,000 received for a prior Rate Year. Attachment 5 shows the resulting 10
$112,175 under-recovery, plus $17,948 of interest, as the True-Up Adjustment that would 11
be included in a later Annual Projection. Customer B remains liable for its $162,175 12
closing unpaid balance, which would be credited in the Rate Year in which it is received. 13
The illustrative data are hypothetical and are not LSPGNY or customer data. 14
IX. CONCLUSION
15
Q.
WHY ARE THE PROPOSED REVISIONS JUST AND REASONABLE?
16
A. The revisions implement the Commission’s direction that large load payments be credited 17
toward transmission owners’ revenue requirements, using the Formula Rate’s existing 18
revenue credit and true-up mechanisms. Each Eligible Customer is responsible for at 19
least its committed Annual MTRC for each Covered Upgrade, supported by Security and 20
the NYISO’s billing and collection, and the Large Load CRA Revenue LSPGNY 21
receives reduces the revenue requirement paid by all customers. LSPGNY retains none 22
of the Large Load CRA Revenue. The cost of service inputs and methods are unchanged, 23
the Covered Upgrades do not receive Segment A-specific ROE incentives, and every new 24
PDF page 20
Exhibit No. GNY-200Page 20 of 20
calculation ties back to Appendix A. The existing posting, review, and challenge 1
procedures apply to the new calculations, with customer-specific information protected. 2
Q.
DOES THIS CONCLUDE YOUR TESTIMONY?
3
A. Yes.
4
PDF page 21
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
LS Power Grid New York Corporation I
New York Independent System Operator, Inc.
)
)
)
)
Docket No. ER27-___-000
Docket No. EL26-69-000
VERIFICATION
I, D. Eric Arzola, verify under penalty of perjury that I have read the testimony, know the contents thereof, and that the facts and representations set forth therein are true to the best of my knowledge, information and belief.
_/s/ D. Eric Arzola________________
D. Eric Arzola
Date __November 14, 2026_________