ER27-529-000 · 2026-11-16 · New York Independent System Operator, Inc., Central Hudson Gas & Electric Corporation and 5 others
Att I Panel Testimony
PDF page 1
Attachment I
Panel Testimony and exhibit of Brian McNierney, Carol Teixeira, Yan Flishenbaum, and Stacy Powers
PDF page 2
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
)
Central Hudson Gas & Electric Corporation
)
Consolidated Edison Company of New York, Inc.
)
New York State Electric & Gas Corporation
) Docket No. ER27-___-000
Niagara Mohawk Power Corp.
)
Orange and Rockland Utilities, Inc.
)
Rochester Gas and Electric Corporation
)
)
PREPARED TESTIMONY OF
BRIAN MCNIERNEY, CAROL TEIXEIRA, YAN FLISHENBAUM, AND STACY POWERS
November 16, 2026
PDF page 3
TABLE OF CONTENTS
I. INTRODUCTION … 2
II. HISTORICAL BACKGROUND … 8
III. NYPSC BUNDLED DELIVERY RATES … 10
IV. THE NYPSC RATEMAKING PROCESS … 11
V. CURRENT RATES AND CHARGES … 13
VI. VOLTAGE DIFFERENTIATION OF PSC-APPROVED DELIVERY RATES … 15
VII. THE INDICATED NYTOS’ REVISIONS TO ISO OATT SECTION 5 … 25
VIII. THE NYISO’S COMPANION FILING … 27
IX. CONCLUSION … 29
PDF page 4
LIST OF EXHIBITS
Exhibit A – The NYTOs’ PSC Delivery Rates of the Applicable Transmission Owner to Large Loads
PDF page 5
Attachment I
Page 1 of 29
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
)
Central Hudson Gas & Electric Corporation
)
Consolidated Edison Company of New York, Inc.
)
New York State Electric & Gas Corporation
) Docket No. ER27-___-000
Niagara Mohawk Power Corp.
)
Orange and Rockland Utilities, Inc.
)
Rochester Gas and Electric Corporation
)
)
PREPARED TESTIMONY OF
BRIAN MCNIERNEY, CAROL TEIXEIRA, YAN FLISHENBAUM, AND STACY POWERS
PDF page 6
Attachment I
Page 2 of 29
I. INTRODUCTION
Q.
MR. MCNIERNEY, PLEASE STATE YOUR NAME AND BUSINESS ADDRESS.
A. My name is Brian McNierney. My business address is 18 Link Drive, Binghamton, New York 13902.
Q.
MR. MCNIERNEY, BY WHOM ARE YOU EMPLOYED AND IN WHAT
CAPACITY?
A. I am employed by Rochester Gas & Electric Corporation (“RG&E”) as Director – Regulatory for both RG&E and New York State Electric & Gas Corporation (“NYSEG”). Q.
MR. MCNIERNEY, WHAT ARE YOUR AREAS OF RESPONSIBILITY IN THIS
POSITION?
A. I am responsible for electric rate calculations, and rate design for NYSEG and RG&E as well as representing NYSEG and RG&E in various rate and regulatory proceedings. Q.
MR. MCNIERNEY, PLEASE BRIEFLY DESCRIBE YOUR EDUCATIONAL
BACKGROUND AND EMPLOYMENT EXPERIENCE.
A. In 1986, I graduated from St. Bonaventure University with a Bachelor of Business Administration. I began my employment at NYSEG and RG&E in 2000 as a Lead Analyst in Electric Supplier Services. Over the years since then, I have held several positions within the Companies and have been in the Regulatory Department since 2013. Q.
MR. MCNIERNEY, HAVE YOU PREVIOUSLY TESTIFIED IN REGULATORY
PROCEEDINGS?
A. Yes, I have submitted testimony in New York Public Service Commission (“NYPSC” or “PSC”) Cases 15-E-5 0283 et al., Cases 19-E-0378 6 et al., Cases 22-E-0317 7 et al. and Cases 25-E-0375 et al.
PDF page 7
Attachment I
Page 3 of 29
Q.
MS. TEIXEIRA, PLEASE STATE YOUR NAME AND BUSINESS ADDRESS.
A. My name is Carol Teixeira. My business address is 300 Erie Boulevard West, Syracuse, New York 13202.
Q.
MS. TEIXEIRA, BY WHOM ARE YOU EMPLOYED AND IN WHAT CAPACITY?
A. I am employed by the National Grid USA Service Company, Inc. (“National Grid Service Company”), a subsidiary of National Grid USA (“National Grid”), as Manager of New York Electric Pricing. I am responsible for supervising the study, analysis, and design of delivery service rates, rate contracts, surcharge adjustment factors, riders, and terms and condition of service for National Grid’s utility, Niagara Mohawk Power Corporation d/b/a National Grid (“NMPC” or “Niagara Mohawk”), including developing tariffs and testimony supporting such rates before the NYPSC.
Q.
MS. TEIXEIRA, PLEASE DESCRIBE YOUR EDUCATIONAL BACKGROUND.
A. In 1989, I graduated from Syracuse University with a Bachelor of Science in Electrical Engineering. In 2007, I received my Master of Business Administration from LeMoyne College.
Q.
MS. TEIXEIRA, PLEASE DESCRIBE YOUR PROFESSIONAL BACKGROUND.
A. I first joined Niagara Mohawk in 1989 when I was hired as an Assistant/Junior Engineer, Instrumentation Control and Design, where I was responsible for the design and installation of control and instrumentation systems at Niagara Mohawk’s fossil generating stations. From 1997 to 2002, I served as a Power Contract Specialist at Niagara Mohawk in various departments, including Unregulated Generation, Transmission Scheduling, and Customer Contract Services, where I was responsible for different aspects of power purchase agreements and other supply contracts with generators and customers interconnected to
PDF page 8
Attachment I
Page 4 of 29
Niagara Mohawk’s system. From 2002 to 2005, I was a Senior/Principal Analyst, Electric Pricing at Niagara Mohawk, with responsibility for developing and administrating Niagara Mohawk’s flexible retail electric contracts for large commercial and industrial customers. I became Transmission Account Manager, Transmission Commercial Services in 2005, where I had responsibility for managing the Company’s interconnection process in compliance with Federal Energy Regulatory Commission (“FERC” or “Commission”) policies and orders and acting as primary contact for wholesale generators interconnecting to National Grid’s transmission system in both New York and New England. In 2008, I was promoted to Manager, Load Research and Analysis. My responsibilities in this position included preparation of load research studies to support electric rate cases, customer retail billing, settlement, and special studies for all National Grid companies and the Long Island Power Authority (“LIPA”), as well as overseeing survey meter design sample studies for all companies and ensuring a sufficient sample of survey meters in the field to support load studies. I became the Manager of Billing Project Management Services in 2011, with responsibility for support and operations of customer billing for all National Grid companies and LIPA. I took my current position as Manager, New York Electric Pricing in May 2014.
Q.
MS.
TEIXEIRA,
HAVE YOU
PREVIOUSLY
TESTIFIED
BEFORE A
REGULATORY COMMISSION?
A. Yes. I testified before the NYPSC in support of the electric rate proposals in the NMPC’s 2017 electric rate case (Case 17-E-0238), the NMPC 2020 rate case (Case 20-E-0380) and the NMPC 2024 rate case (Case 24-E-0322). In addition, I have testified on behalf of
PDF page 9
Attachment I
Page 5 of 29
National Grid in support of the NMPC Wholesale Distribution Services tariff, filed with FERC on October 2, 2026, in Docket No. ER27-31, which is pending approval. Q.
MR. FLISHENBAUM, PLEASE STATE YOUR NAME AND BUSINESS ADDRESS.
A. My name is Yan Flishenbaum. My business address is 4 Irving Place, New York, NY 10003.
Q.
MR. FLISHENBAUM, BY WHOM ARE YOU EMPLOYED AND IN WHAT
CAPACITY?
A. I am employed by Consolidated Edison Company of New York, Inc. (“Con Edison”). Q.
MR. FLISHENBAUM, WHAT ARE YOUR AREAS OF RESPONSIBILITY IN THIS
POSITION?
A. I currently serve as Director of Con Edison’s Rate Engineering Department. Q.
MR. FLISHENBAUM, PLEASE BRIEFLY DESCRIBE YOUR EDUCATIONAL
BACKGROUND AND EMPLOYMENT EXPERIENCE.
A. I received a Bachelor of Business Administration in Economics from Pace University in 2001 and a Master of Business Administration in Finance and Economics from New York University in 2008. I began my career in 2001 in the Cost Analysis area of the Rate Engineering Department. In 2003, I was promoted to Analyst, where I focused on developing costing methodologies related to unbundling. I advanced to Senior Analyst in 2005, and in 2008, became a Senior Rate Analyst and was responsible for developing the Company’s cost-of-service models. In 2013, I was promoted to Section Manager of the Electric Rates area of the Rate Engineering Department. I later served as a Department Manager for the Load Research and Cost of Service group, as well as a Department
PDF page 10
Attachment I
Page 6 of 29
Manager of the Orange and Rockland Rates section. I assumed my current role as Director of the Rate Engineering Department in 2025.
Q.
MR. FLISHENBAUM, HAVE YOU PREVIOUSLY TESTIFIED IN REGULATORY
PROCEEDINGS?
A. Yes. I have filed testimony before the NYPSC and the New Jersey Board of Public Utilities.
Q.
MS. POWERS, PLEASE STATE YOUR NAME AND BUSINESS ADDRESS.
A. My name is Stacy Powers. My business address is 284 South Avenue, Poughkeepsie, New York 12601.
Q.
MS. POWERS, BY WHOM ARE YOU EMPLOYED AND IN WHAT CAPACITY?
A. I am employed by Central Hudson Gas & Electric Corporation (“Central Hudson”) as Director – Regulatory Forecasts & Planning.
Q.
MS. POWERS, WHAT ARE YOUR AREAS OF RESPONSIBILITY IN THIS
POSITION?
A. I am responsible for cost studies, rates, tariffs, revenue requirements and regulatory compliance.
Q.
MS. POWERS, PLEASE BRIEFLY DESCRIBE YOUR EDUCATIONAL
BACKGROUND AND EMPLOYMENT EXPERIENCE.
A. I received a Bachelor of Science degree in Business Administration and Accounting from Marist College in 2006 and a Master of Business Administration from Marist College in 2010. I have served in various capacities of increasing responsibility in the rates and regulatory area of Central Hudson since 2006.
PDF page 11
Attachment I
Page 7 of 29
Q.
MS. POWERS, HAVE YOU PREVIOUSLY TESTIFIED IN REGULATORY
PROCEEDINGS?
A. Yes, I have filed testimony before the NYPSC.
Q.
ON WHOSE BEHALF ARE YOU ALL TESTIFYING?
A. We are testifying on behalf of Central Hudson, Con Edison, NYSEG, NMPC, Orange and Rockland Utilities, Inc. (“O&R”), and RG&E (collectively, “Indicated New York Transmission Owners” or “Indicated NYTOs” and individually, “Transmission Owner”) as rates subject matter expert representatives.
Q.
WHAT IS THE PURPOSE OF THIS TESTIMONY?
A. The purpose of our testimony is to support the Indicated NYTOs’ proposed revisions to Section 5 of the New York Independent System Operator, Inc. (“NYISO”) Open Access Transmission Tariff (“ISO OATT”), which the Indicated NYTOs are submitting pursuant to section 205 of the Federal Power Act (“FPA”) in response to the Commission’s June 18, 2026 order in Docket No. EL26-69-000.1 Revised Section 5 continues the practice that has been in effect since the NYISO commenced operation in 1999. Under revised Section 5, Large Loads or Eligible Customers serving Large Loads, including Eligible Customers taking the new Firm and Non-Firm Withdrawal Service that the NYISO is proposing in its companion section 205 filing, will pay the existing retail delivery rates approved by the NYPSC or, in the case of LIPA, by the LIPA Board of Trustees. The Indicated NYTOs are not proposing new rates. Instead, revised Section 5 references the applicable delivery service classifications for each Transmission Owner, as approved by the NYPSC or the LIPA Board of Trustees, as applicable. Our testimony explains the history of Section 5,
1
N.Y. Indep. Sys. Operator, Inc., 195 FERC ¶ 61,216 (2026) (“Show Cause Order”).
PDF page 12
Attachment I
Page 8 of 29
how bundled New York delivery rates are developed and collected, how those rates are voltage-differentiated and offer Large Loads meaningful choices, and why a separate transmission-only rate for Large Loads at this time would be potentially harmful. Q.
ARE YOU ALL SPONSORING ANY EXHIBITS IN CONNECTION WITH THIS
TESTIMONY?
A. Yes. On behalf of the Indicated NYTOs,2 we are sponsoring the following exhibits, which are attached to and made a part of our testimony: Exhibit A – The NYTOs’ PSC Delivery Rates of the Applicable Transmission Owner to Large Loads.
II. HISTORICAL BACKGROUND
Q.
WHEN DID RETAIL ACCESS BEGIN IN NEW YORK RELATIVE TO THE
START OF THE NYISO’S OPERATIONS?
A. The PSC adopted retail access programs in 1996. Under retail access, electric commodity supply was unbundled from transmission and distribution service for eligible retail customers and the energy service companies (“ESCOs”) serving them. Retail access programs permit eligible retail customers to choose a competitive supplier or ESCO for the commodity while the local utility continues to provide the delivery function over its transmission and distribution system. Delivery rates applicable to this form of “retail wheeling” or “retail transmission service” are deliveries of third-party supplied energy to retail customers in New York.3
2
As a non-jurisdictional utility, LIPA is not a respondent to the Show Cause Order and its rates and charges for transmission service are reviewed and approved by LIPA’s Board of Trustees under applicable state law. Where addressed in this testimony, the discussion of LIPA’s delivery service classifications and related rates and charges is solely for informational purposes.
3 Case 94-E-0952, et al., Opinion No. 96-12 (issued and eff. May 20, 1996).
PDF page 13
Attachment I
Page 9 of 29
As part of the development of the initial ISO OATT, Section 5 of the ISO OATT was developed to address already State-approved retail access programs, and it identified the rates and charges under which retail access customers would receive service. FERC accepted Section 5 as part of the tariff filing effective at the start of the NYISO’s operations in 1999.4
Q.
HOW HAS SECTION 5 FUNCTIONED SINCE THE NYISO BEGAN
OPERATIONS?
A. Since the NYISO was formed, Section 5 of the ISO OATT has referenced each Transmission Owner’s PSC-approved retail access tariff or, for LIPA, the rates and terms established under State law, as the respective retail tariffs may be amended from time-to- time. Section 5 provides that the rates, terms, and conditions for retail access service are those set in the applicable retail tariff, and that the Transmission Owner bills and collects those charges in accordance with that tariff. The Commission accepted these provisions in 1999.5 In this way, the PSC has set the retail delivery rates for each of the Indicated NYTOs, and the ISO OATT has incorporated such rates by reference. This cooperative federalism arrangement has worked for the entire life of the NYISO, approximately 27 years.
4
Cent. Hudson Gas & Elec. Corp., 86 FERC ¶ 61,062, order on reh’g and compliance, 88 FERC ¶ 61,138 (1999).
5
Id.
PDF page 14
Attachment I
Page 10 of 29
III. NYPSC BUNDLED DELIVERY RATES
Q.
HOW DO THE INDICATED NYTOS RECOVER THEIR TRANSMISSION AND
DISTRIBUTION COSTS FROM RETAIL CUSTOMERS?
A. Central Hudson, Con Edison, NYSEG, NMPC, O&R, and RG&E recover their
transmission and distribution costs through bundled delivery rates set by the PSC. Through many proceedings, the PSC has unbundled the power supply function from delivery service. Capacity and energy supply are therefore not priced and billed under the Transmission Owner’s retail tariff delivery rates, and the retail customers either take unbundled supply from the Transmission Owner pursuant to its Provider of Last Resort (“POLR”) obligation or enter into separate purchases from a competitive load-serving entity (“LSE”), which several PSC-approved tariffs call an ESCO. Retail customers may also function as their own ESCO. While the commodity supply (capacity and energy) is unbundled from the delivery rates, the delivery rates remain bundled for the most part, even though they are voltage-differentiated based on cost allocations which intentionally remove certain distribution costs from the rates developed for transmission-level customers. There is, however, no separate retail rate consisting only of transmission-related costs. The Delivery rates are recovered, together with distribution, metering, customer service, and overhead costs, through the customer and demand charges of each service classification. Q.
WHY DOES THE BUNDLED NATURE OF THE NYPSC’S DELIVERY RATES
MATTER HERE?
A. There is no stand-alone, transmission-only retail rate in New York that could be applied to Large Loads. The transmission component of retail delivery service is embedded in rates that the PSC approved to recover each utility’s total delivery revenue requirement from all
PDF page 15
Attachment I
Page 11 of 29
retail customer classes. A Large Load connecting at transmission voltage will take service under one of these classifications. A Large Load customer’s charges will therefore reflect transmission costs together with its fair share of other delivery costs, as the PSC has determined.
IV. THE NYPSC RATEMAKING PROCESS
Q.
PLEASE DESCRIBE THE NYPSC RATE CASE PROCESS.
A. A rate case typically begins when the utility files proposed tariff changes with the NYPSC, together with testimony and exhibits supporting its revenue requirement. The revenue requirement covers all the costs of running the delivery business, including operation and maintenance expense, administrative and general expense, depreciation, taxes, and a return on rate base, and it is recovered through base delivery rates. Certain items, such as the System Benefits Charge (“SBC”), are separated out and billed through surcharges rather than base rates.
The utility also files an embedded cost of service (“ECOS”) study and rate design testimony. The ECOS study is used as a guide as part of the rate design process to allocate the revenue requirement among service classes. The rate design testimony proposes how each service class’s share will be recovered through customer charges, demand charges, energy charges, and time-of-use or other rate features.
Q.
WHO PARTICIPATES IN AN NYPSC RATE CASE?
A. The Staff of the Department of Public Service (“DPS Staff”) participates as a party in every major rate case. Other parties may also intervene, typically including the Utility Intervention Unit of the New York State Department of State, city agencies, municipalities, elected officials, large industrial and commercial customer associations, advocates for low-
PDF page 16
Attachment I
Page 12 of 29
income customers, ESCOs and their trade associations, environmental advocates, and others. These parties represent a wide range of customer classes and interests, including the interests of high-voltage, high load-factor customers.
Q.
HOW DO PARTIES TYPICALLY PARTICIPATE IN A NYPSC RATE CASE?
A. The parties conduct extensive discovery through information requests, and DPS Staff (and at times other intervenors) file responsive testimony. The utility may file rebuttal testimony. Contested issues may be tried in evidentiary hearings before PSC Administrative Law Judges (“ALJs”), at which parties may introduce direct testimony and exhibits and witnesses may be cross-examined. The ALJs may issue a recommended decision, and parties may file briefs and exceptions before the PSC acts. Q.
DO MOST RATE CASES PROCEED TO A FULLY LITIGATED DECISION?
A. No. Most rate cases are resolved through multi-party settlement negotiations that produce a joint proposal. Settlement negotiations are conducted under the PSC’s settlement procedures, and all parties have an opportunity to participate. A joint proposal typically resolves the revenue requirement, cost allocation, and rate design for every service class at once. It reflects negotiated exchanges of consideration, in which parties accept outcomes on some issues in return for outcomes on others.
Q.
HOW DOES THE PSC REVIEW A JOINT PROPOSAL?
A. The PSC does not simply accept a joint proposal because the parties have agreed to it. It reviews the joint proposal under its settlement guidelines, which consider, among other things, whether the settlement is consistent with law and PSC policy; whether it produces results within the range of reasonable outcomes that would likely arise from litigation; whether it balances the interests of ratepayers, investors, and the long-term viability of the
PDF page 17
Attachment I
Page 13 of 29
utility; and whether it is supported by testimony and evidence submitted in the formal record.6 The PSC may review items such as testimony, evidence, statements in support from the parties, and, if applicable a recommended decision, submitted in the formal record to support its rate order.
Q.
HOW DOES THE PSC RATEMAKING PROCESS CONCLUDE?
A. The PSC issues a final order adopting, modifying, or rejecting the joint proposal, or resolving litigated issues, and directs the utility to file compliance tariffs. Q.
DID THE CURRENT RATES OF THE INDICATED NYTOS RESULT FROM
SETTLEMENTS?
A. Yes. The current rates of Central Hudson, Con Edison, NMPC, and O&R are based on PSC-approved settlements rather than fully litigated orders. These rate plans generally run for three years. The rate plans may be extended pending new rate filings, or continued under temporary rates set by the PSC. NYSEG and RG&E are currently operating under a temporary rate order issued in May 2026 as they continue settlement negotiations in their ongoing rate case.
V. CURRENT RATES AND CHARGES
Q.
HAVE THE RATE DESIGNS FOR TRANSMISSION-VOLTAGE CUSTOMERS
BEEN DEVELOPED OVER TIME?
A. Yes. The service classifications available to transmission-voltage customers, including standby and optional demand rates, have been refined or resulted from an evolutionary process over many individual utility rate cases and statewide proceedings and many years.
6 Procedural Guidelines for Settlements, Cases 90-M-0255 et al. (1992).
PDF page 18
Attachment I
Page 14 of 29
Each iteration was refined through discovery, testimony, and negotiation among parties representing all customer classes, and each was approved by the PSC.
Q.
WHAT CHARGES DO TRANSMISSION-VOLTAGE DELIVERY CUSTOMERS
PAY PURSUANT TO PSC-APPROVED TARIFFS?
A. Base delivery rates for these classes generally consist of a monthly customer charge plus a per-kW demand charge. In addition, delivery customers pay a series of PSC-authorized pass-through surcharges, including the SBC and taxes. Depending on who serves as the customer’s LSE, the customer or its LSE also pays supply-related charges. Q.
MR. MCNIERNEY, DOES A TRANSMISSION-VOLTAGE SERVICE CLASS PAY
ONLY FOR TRANSMISSION COSTS?
A. No. Customers in a transmission-voltage service class pay more than transmission charges alone. For example, under NYSEG’s latest ECOS study for retail delivery service, approximately two-thirds of the transmission service class’s allocated costs are transmission-related. The remaining one-third is an allocable share of other delivery, metering, call center, and similar overhead costs that the utility incurs to serve all customers.
Q.
PLEASE DESCRIBE THE PSC-AUTHORIZED DELIVERY SURCHARGES.
A. Each Indicated Transmission Owner has several PSC-authorized surcharges that apply to its delivery load regardless of who serves as the customer’s LSE. All Indicated NYTOs have identical or similar surcharges, with some variation, and some surcharges are unique to particular companies. Electric surcharges are adjustments added to or subtracted from a customer’s bill to account for certain costs that are not included in the base electric rates.
PDF page 19
Attachment I
Page 15 of 29
Q.
HOW ARE THE SBC AND THE COSTS OF ZERO-EMISSION CREDITS
COLLECTED?
A. The components of the SBC related to cost recovery for the program budgets of the New York State Energy Research and Development Authority (“NYSERDA”) are split among the utilities on a load ratio share basis and billed to delivery customers as a per-kWh charge. On the other hand, zero-emission credit (“ZEC”) costs are handled differently. NYSERDA informs each LSE of its ZEC-related obligation. Each utility then sets an annual per-kWh rate that it bills to each utility’s respective commodity customers. Presumably, other non- utility LSEs then charge their allocated ZEC costs to their retail customers. Q.
WHAT IS THE ROLE OF THE WHOLESALE TRANSMISSION SERVICE
CHARGE UNDER ATTACHMENT H OF THE NYISO OATT?
A. Pursuant to Section 14.1 of Attachment H, the wholesale Transmission Service Charge (“TSC”) is of limited application and applies primarily to “wheel through” and “export” transactions that exit the New York Control Area. The wholesale TSC does not apply to retail delivery and Transmission Services within the NYISO, including the NYISO’s new proposed Firm and Non-Firm Withdrawal Services applicable to retail customers, which are PSC-established rates in Section 5 of the ISO OATT.
VI. VOLTAGE DIFFERENTIATION OF PSC-APPROVED DELIVERY RATES
Q.
PLEASE
SUMMARIZE
THE
DELIVERY
RATES
APPLICABLE
TO
TRANSMISSION-VOLTAGE INTERCONNECTED LARGE LOAD CUSTOMERS
FOR EACH NYTO.
A. The following table lists, by utility, the various service classifications that will apply to Large Loads, subject to meeting the requirements to receive the specified service.
PDF page 20
Attachment I
Page 16 of 29
Table 1: Summary of Applicable Service Classifications by Transmission Owner TRANSMISSION OWNER
DELIVERY SERVICE CLASSIFICATIONS
Central Hudson
SC 13: Transmission Service
SC 14: Standby Service
Consolidated Edison
SC 9: Rate II - General - Large - Time-of-Day
SC 9: Rate V - General - Large - Standby Service (Large)
LIPA
SC-2: MRP (Large General and Industrial Service With Multiple Rate Periods)
SC-12: Standby Service and Optional Rate Service
Niagara Mohawk
SC 3A: Standard Large General Service (or SC4 at the SC3A parent service class rates, if applicable)
SC 7: Standby Service and Optional Rate Service New York State Electric & Gas
Corporation
SC 7: Large General Service with Time-of-Use Metering
SC 11: Standby Service
Otherwise Applicable Service Class 7
SC 15: Optional Demand Service
Otherwise Applicable Service Class 7
Orange & Rockland Utilities, Inc.
SC 9 / SC 22: Standard Transmission Service
SC 9 / 22: Standby Transmission Service Rochester Gas and Electric
Corporation
SC 8: Large General Service with Time-of-Use Metering
SC 14: Standby Service
Otherwise Applicable Service Class 8
SC 15: Optional Demand Service
Otherwise Applicable Service Class 8
PDF page 21
Attachment I
Page 17 of 29
Q.
HAVE EACH OF THE INDICATED TOS PROVIDED THE SERVICE
CLASSIFICATIONS IN EXHIBIT A?
A. Yes.
Q.
MR. MCNIERNEY, ARE THE PSC-APPROVED DELIVERY RATES THAT WILL
APPLY TO LARGE LOADS DIFFERENTIATED BY VOLTAGE?
A. Yes. For example, for NYSEG’s PSC service classification SC 7, Large General Service with Time-of-Use Metering, there are three currently available voltages (SC 7-1, 7-2, and 7-4): 7-1 – Secondary, 120–480 volts; 7-2 – Primary, 2.4–34.5 kV or regulated 46 kV; and 7-4 – Transmission, 115 kV and above.
Q.
MR. MCNIERNEY, WHAT ARE THE RATES FOR HIGHER VOLTAGE
CUSTOMERS?
A. Yes. For example, for NYSEG’s PSC service classification SC 7, Large General Service with Time-of-Use Metering, the applicable demand charge (per kW) for each one of those voltages classifications is currently: 7-1 – $14.55; 7-2 – $13.76; and 7-4 – $2.07. Q.
MR. MCNIERNEY, CAN YOU PROVIDE A HYPOTHETICAL EXAMPLE OF
WHAT THE RESULTING CHARGE WOULD BE FOR A LARGE LOAD UNDER
NYSEG’S PSC SERVICE CLASSIFICATION SC 7, ASSUMING A 100 MW LOAD
AND 73,000 MWH PER MONTH UNDER THE LOWEST AND HIGHEST
VOLTAGE RATES?
A. Yes. A 100 MW Large Load with 73,000 MWh of energy consumption for a given month would have demand charges under NYSEG’s PSC service classification SC 7: 7-1 of $1,455,000 compared to $207,000 under NYSEG’s transmission voltage level demand charge 7-4 rate. I do not mean to imply that it is plausible to assume a 100 MW load would
PDF page 22
Attachment I
Page 18 of 29
connect at distribution voltage. But the application of the distribution demand charge versus the highest voltage level rate illustrates how substantially lower the rate and charges would be under the transmission level rate compared to the distribution rate. Q.
MS. TEIXEIRA, DOES NIAGARA MOHAWK HAVE SIMILAR VOLTAGE
DIFFERENTIATION?
A. Yes. NMPC electric rates have voltage differentiated delivery rates for all of its large commercial and industrial service classes. The voltage delivery levels for which distinct delivery rates apply are for customers connected to the NMPC distribution system at Secondary (0 – 2.2 kV), Primary (2.2 kV – 15 kV), Sub-transmission (22 kV – 50 kV) and Transmission (Over 60 kV). The Large Load customers at issue in this proceeding would be billed at SC3A or parent SC3A delivery rates at the Transmission voltage delivery level.
Q.
MS. TEIXEIRA, CONTINUING WITH NMPC, ARE THE RATES FOR HIGHER
VOLTAGE CUSTOMERS CONSIDERABLY LOWER THAN THE LOWER
VOLTAGE DISTRIBUTION RATES?
A. For a customer billed at standard SC3A rates, the customer would pay a much lower demand charge of $4.89 per maximum kW in the billing period at the Transmission level than: the $15.58 per maximum kW at the Secondary or Primary level and $5.42 at the Sub- transmission level. The monthly customer charge is higher at the Transmission level than at lower voltage levels but for a large load customer the customer charge would be an insignificant portion of their monthly bill compared to the demand charge (approximately 2% for a 100 MW large load customer, for example). See below for an example:
PDF page 23
Attachment I
Page 19 of 29
Q.
MS. TEIXEIRA,
DO
SC3A TRANSMISSION
RATES
INCLUDE ANY
DISTRIBUTION-RELATED CHARGES?
A. Yes, but only to a limited extent. SC3A Transmission rates are primarily composed of transmission-related costs. However, Niagara Mohawk’s Embedded Cost of Service Study also allocates a small amount of distribution-related costs to SC3A Transmission customers, including costs associated with metering, customer programs, and administrative functions. These costs are minimal relative to the overall cost allocation, with the vast majority of costs allocated to SC3A Transmission customers being transmission-related.
Q.
MS. TEIXEIRA, CAN YOU PROVIDE A HYPOTHETICAL EXAMPLE OF WHAT
THE RESULTING CHARGE WOULD BE FOR A LARGE LOAD UNDER
NMPC’S PSC SERVICE CLASSIFICATION SC 7 (PARENT SC3A), ASSUMING A
100 MW LOAD AND 73,000 MWH PER MONTH UNDER THE LOWEST AND
HIGHEST VOLTAGES RATES?
A. Yes. Similar to the example above but for a customer on the SC7 (parent SC3A) rate, below are the monthly delivery charges at current rates. See below for additional details:
PDF page 24
Attachment I
Page 20 of 29
Q.
WHAT DO THESE HYPOTHETICAL EXAMPLES BROADLY ILLUSTRATE?
A. These hypothetical rate scenarios broadly illustrate the impact of voltage differentiation on rates and the significantly lower demand charges applicable to a transmission level customer compared to a distribution customer based on PSC approved rates. These scenarios demonstrate that there are lower charges applicable to a Large Load customer. Q.
DO LARGE LOADS HAVE FLEXIBILITY TO CHOOSE AMONG SERVICE
CLASSIFICATIONS?
A. Yes, generally speaking. In accordance with applicable procedures for delivery service, Large Loads and their LSEs may choose among the applicable classifications identified in revised OATT Section 5.2.8. For all of the Indicated NYTOs, these include a standard transmission-voltage or large general service classification, a standby service classification and, for all Indicated NYTOs, an optional demand service classification. The customer can generally select the classification that makes the most sense given its load profile, although there may be instances in which the applicability criteria of the tariff limit some of the options available.
Q.
HOW DO THESE CLASSIFICATIONS ACCOMMODATE A LARGE LOAD
THAT IS CURTAILED OR REDUCES ITS WITHDRAWALS VOLUNTARILY?
A. Under the PSC-approved rate classifications, standby and optional demand rates include daily as-used demand charges. Under these designs, the customer’s demand charges reflect its actual demand during each daily peak or super-peak period rather than a single monthly maximum. A high load-factor Large Load that is curtailed by the NYISO, or that voluntarily reduces its withdrawals during the peak hours on any day, will pay lower demand charges for that day.
PDF page 25
Attachment I
Page 21 of 29
Q.
WOULD THE LARGE LOAD RECEIVE THE SAME RATE REDUCTION
BENEFIT REGARDLESS OF WHETHER IT IS CURTAILED BY THE NYISO OR
A UTILITY, OR IT VOLUNTARILY REDUCES ITS WITHDRAWALS?
A. Yes. Any Large Load demand reduction would produce the same rate reduction benefit whether it is directed by the NYISO or a utility, or it is the result of a voluntary reduction. Q.
MR. MCNIERNEY, ARE THERE RATE OPTIONS THAT COULD ALLOW A
FLEXIBLE LARGE LOAD TO LOWER ITS MONTHLY DELIVERY BILL BY
REDUCING ITS DAILY PEAK DEMAND?
A. Yes. NYSEG, as well as other Indicated NYTOs, offer Optional Demand Service/Standby Service which can apply to a Large Load customer. For example, with Optional Demand Service/Standby Service, the conventional monthly non-coincident demand-charge structure is replaced with a monthly contract demand charge and daily “as-used demand” charges. The Optional Demand Service/Standby as-used charges depend on the Large Load customer’s measured demand during defined “On-Peak” and “Super-Peak” periods whereas the standard Transmission level service class, by contrast, is based on monthly non-coincident peak demand. Accordingly, under Optional Demand Service/Standby, a significant portion of demand-related charges depend on what the Large Load customer does during these applicable periods (On-Peak and Super-Peak) on each day. Q.
MR. MCNIERNEY, CAN YOU PROVIDE A HYPOTHETICAL EXAMPLE OF
HOW A FLEXIBLE LARGE LOAD CAN LOWER ITS MONTHLY DELIVERY
BILL UNDER NYSEG’S SC 15, OPTIONAL DEMAND SERVICE?
A. Yes. Consider an example in which a Large Load is curtailed by the NYISO or a utility to zero for five weekdays during the billing period. Since as-used demand charges are based
PDF page 26
Attachment I
Page 22 of 29
on the sum of the daily On-Peak or Super-Peak demand during the billing period, a curtailment for a day reduces the On-Peak or Super-Peak demand by one day. In a month that has 20 days in which On-Peak demand is measured, at current NYSEG rates, a customer with 100 MW load in all peak hours would have an On-Peak as-used demand of 20 X 100 MW = 2,000 MW. If five days had no as-used demand due to curtailment, the On-Peak as-used demand for the month would be 1,500 MW. For a Large Load customer that would otherwise take service under the NYSEG SC 7-4 rate, at the current NYSEG SC 15 On-Peak daily as-used rate of $0.06030 per kW, there would be a reduction of $30,150 in charges. The reduction would be greater in months that had Super-Peak daily as-used demand in addition to On-Peak daily as-used demand.
Q. MS. TEIXEIRA, CAN YOU PROVIDE A HYPOTHETICAL EXAMPLE OF WHAT
THE RESULTING CHARGE WOULD BE FOR A LARGE LOAD UNDER
NMPC’S PSC STANDARD SERVICE CLASSIFICATION SC3A VS UNDER SC 7
(PARENT SC3A), WHEN THE CUSTOMER HAS REDUCED LOAD IN
RESPONSE TO INTERRUPTIBLE LOAD REDUCTION REQUESTS?
A. Yes, the chart below provides the total delivery charges in a month for a large load customer when a customer pays for As-used Daily Demand charges for 15 on-peak days of the month instead of all the on-peak days of the month in the previous NMPC examples. In this comparison, the SC3A customer would pay the same amount of fixed charges regardless of reduced load due to curtailments by the NYISO because the demand charge is based on the maximum demand in the billing period which has not changed (i.e., 100 MW in this example). But, the customer will pay less for As-used Daily Demand charges when curtailed.
PDF page 27
Attachment I
Page 23 of 29
Q.
WHAT DO THESE HYPOTHETICAL EXAMPLES BROADLY ILLUSTRATE?
A. These hypothetical rate scenarios illustrate that there are lower charges potentially applicable to a Large Load customer if it is subject to persistent curtailments or dispatch during peak or off-peak hours on any given day.
Q.
WHAT PROBLEMS COULD OCCUR IF THE INDICATED NYTOS’ EXISTING
DELIVERY
RATES
AND
PSC
RATEMAKING
PROCESSES
WERE
DISTURBED?
A. In the case of settled rates, isolating the transmission component in the Indicated NYTOs’ PSC-approved delivery service could potentially undermine the associated settlements and the exchanges of consideration that the settlement parties made to reach them. In the case of litigated rates, FERC action could upset rates determined following the conclusion of extensive procedures. Each joint proposal resolves the revenue requirement, cost allocation, and rate design for all classes as a package. Isolating the transmission component of one class’s rate could potentially leave the remaining costs, including that class’s share of distribution, metering, customer service, and overhead costs, to be reallocated. Changing rates for one or a few classes in isolation could potentially shift costs among classes and violate revenue neutrality, potentially producing unjust and unreasonable rates for other customers, including for residential and small commercial
PDF page 28
Attachment I
Page 24 of 29
customers. Moreover, the Indicated NYTOs could have to re-open retail settlements to adjust existing rate classes in a revenue-neutral manner. That process would require a significant, administratively inefficient undertaking, and would create needless uncertainty for all rate classes. Further, to the extent that certain subsections of customers are not included in the forecasts used to develop rates, there may need to be extensive rate changes. Q.
HOW WOULD A SEPARATE RATE AFFECT THE COLLECTION OF STATE
POLICY SURCHARGES?
A. It would likely disrupt their collection. Many state policy costs are collected through surcharges on delivery service. For example, certain demand response costs, adjustments up or down associated with revenue decoupling mechanisms, recovery of certain deferrals, and NYSERDA Program costs, are examples of costs or adjustments passed through delivery surcharges. Surcharges are not an insignificant portion of customers’ overall delivery charges and are necessary to achieve the overall retail cost allocation and rate design established in state regulatory proceedings.
If a Large Load’s delivery service were replaced by an unbundled transmission rate, a surcharge on delivery might no longer be available as a collection mechanism, even though a retail sale would still be taking place and the State would retain jurisdiction over that retail sale. The PSC might then have to change the collection mechanism, for example by reassigning those charges as commodity surcharges on the retail sale function. Doing so would affect competitive ESCOs and LSEs and every customer class and would potentially require the PSC to reexamine cost recovery for dozens of programs.
PDF page 29
Attachment I
Page 25 of 29
Q.
WOULD AN UNBUNDLED TRANSMISSION RATE ELIMINATE THE NEED
FOR STATE DELIVERY CHARGES?
A. Whether an unbundled transmission rate would displace a PSC delivery rate is an open question. If the Commission established a transmission rate but still permitted a distribution charge, the PSC would need to authorize utility re-designed delivery rates to remove transmission costs and to avoid double recovery. If the Commission established a transmission rate and prohibited a delivery rate, Large Loads might no longer contribute to distribution, metering, surcharges, and overhead costs that the PSC has allocated to them, and those costs would shift to other customers.
VII. THE INDICATED NYTOS’ REVISIONS TO ISO OATT SECTION 5
Q.
PLEASE SUMMARIZE THE INDICATED NYTOS’ PROPOSED REVISIONS TO
SECTION 5.
A. The revisions extend Section 5 to Eligible Customers serving Large Loads and reference the applicable PSC-approved, or LIPA Board of Trustees-approved, service classifications and delivery rates.7 The revised Section 5 details applicable delivery service classifications and rates for retail access service, including delivery service irrespective of whether a retail customer takes commodity supply from an ESCO or under a utility’s POLR obligation, and to Firm and Non-Firm Withdrawal Service for Eligible Customers on behalf of Large Loads under Attachment LL of the ISO OATT. It also clarifies that Section 5 applies to Large Loads themselves to the extent they are Eligible Customers.
7 LIPA’s delivery service classifications and rates are subject to review and approval by the LIPA Board of Trustees. Consistent with long-standing practice recognized by the Commission, LIPA rates are set forth in the ISO OATT section 5 are for informational purposes only.
PDF page 30
Attachment I
Page 26 of 29
Q.
WHAT DO THE REVISIONS PROVIDE REGARDING THE CHARGES THAT
APPLY TO LARGE LOADS?
A. As reflected in the Revised Section 5.1.1, each retail access customer, including an Eligible Customer serving a Large Load, is responsible for paying the Retail Transmission Service Charge to the affected Transmission Owner consistent with the rates, terms and conditions of that Transmission Owner’s retail tariff, as approved under applicable State law and referenced in Sections 5.2 and 5.3. An LSE serving the customer remains responsible for all applicable NYISO charges, including Transmission Usage Charges, billed under Section 2.7 and Attachment LL. Revised Section 5.1.3 provides that each Transmission Owner may collect its Retail Transmission Service Charge directly from each customer that takes service under its retail tariffs, including Eligible Customers serving Large Loads, and that the rates, terms, and conditions are those of the applicable retail tariff approved by the PSC or the LIPA Board of Trustees.
Q.
WHAT OTHER CHANGES DO THE REVISIONS MAKE?
A. The revisions update each company-specific description in Section 5.2 to cite the current PSC tariffs and to note the applicability to Eligible Customers serving Large Loads under Attachment LL. New Section 5.2.8 sets out the rates, terms, and conditions of service for Eligible Customers taking service on behalf of Large Loads and lists the applicable service classifications for each Transmission Owner. New Section 5.2.9 reserves each Transmission Owner’s right to modify its rates, terms, and conditions, subject to required approvals or filings under the New York Public Service Law, the New York Public Authorities Law, or the FPA as applicable. The revisions also require Eligible Customers to satisfy applicable interconnection requirements, including under Attachments HH and
PDF page 31
Attachment I
Page 27 of 29
LL, and require Eligible Customers serving Large Loads to execute the form of Transmission Service Agreement attached to the ISO OATT. In addition, a new Section 5.3 has been added to reference cost responsibility for Large Loads as further embodied by the Large Load Cost Recovery Agreement (“CRA”) included at Section 44.16.9 (Appendix
9) in the NYISO OATT to be executed between a Connecting Transmission Owner or Affected Transmission Owner and the Large Load Project. Newly created section 5.4.1 requires Transmission Owners to apply revenue credits or adjustments to prevent double recovery of costs recovered under CRAs through FERC-jurisdictional wholesale transmission rates. Finally, newly created section 5.4.2 requires Transmission Owners to file an annual informational report with FERC and the PSC to identify CRA revenues received by upgrade during the following year and demonstrate that appropriate revenue credits have been or will be applied.
VIII. THE NYISO’S COMPANION FILING
Q.
WHAT DOES THE NYISO’S COMPANION SECTION 205 FILING PROPOSE?
A. The NYISO’s filing proposes new Attachment LL to the ISO OATT, including, inter alia, new Firm Withdrawal Service and Non-Firm Withdrawal Service for Eligible Customers serving Large Loads.
Q.
HOW DO THE INDICATED NYTOS’ SECTION 5 REVISIONS RELATE TO THE
NYISO’S FILING?
A. The two filings are complementary. The NYISO’s charges do not address the embedded cost delivery charges that the utility holding the retail franchise applies under its PSC- authorized service classifications. Revised Section 5 fills that role by identifying the delivery rates that apply to Eligible Customers serving Large Loads, whether they take
PDF page 32
Attachment I
Page 28 of 29
Firm or Non-Firm Withdrawal Service. Together, the filings specify every charge a Large Load will pay: NYISO market and ancillary charges under the NYISO’s tariffs, and embedded cost delivery charges under the referenced retail tariffs.
Q.
DOES CURTAILMENT OF A LARGE LOAD UNDER THE NYISO’S NON-FIRM
SERVICE NECESSARILY REFLECT THE TRANSMISSION OWNER’S COST
TO PROVIDE DELIVERY SERVICE?
A. No. A Large Load that is using Non-Firm Withdrawal Service may be curtailed by the NYISO because of conditions on the Bulk Power System that are unrelated to the Connecting Transmission Owner’s obligation to deliver energy. The Connecting Transmission Owner may be planning and building its local system to serve that Large Load as a firm customer, consistent with the service the customer requested. The pendency of firm service awaiting a non-local upgrade on an Affected Transmission Owner’s system may thus have nothing to do with how the Connecting Transmission Owner provides delivery service. That is another reason why a discounted non-firm delivery rate, keyed to NYISO curtailments, would not necessarily reflect cost causation.
Q.
IS THERE TIME TO DEVELOP NEW RATES, IF ANY ARE NEEDED, BEFORE
THE NYISO’S NEW SERVICES TAKE EFFECT?
A. Yes. The terms of the NYISO’s Non-Firm Withdrawal Service have been evolving until very recently. Under the NYISO’s proposal, the earliest that new Non-Firm Withdrawal Services would be available is for projects in the transition Large Load Integration Process cluster. As filed, the NYISO’s process would result in Facilities Study completion and security posting during or after the third quarter of 2028, which should precede service to
PDF page 33
Attachment I
Page 29 of 29
new Large Loads. That leaves time for the PSC and the Indicated NYTOs to develop any new rates that prove appropriate.
IX. CONCLUSION
Q.
DOES THIS CONCLUDE THIS TESTIMONY?
A. Yes.
PDF page 34
[No extractable text on this page.]
PDF page 35
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
)
Central Hudson Gas & Electric Corporation
)
Consolidated Edison Company of New York, Inc.
)
New York State Electric & Gas Corporation
) Docket No. ER27-___-000
Niagara Mohawk Power Corp.
)
Orange and Rockland Utilities, Inc.
)
Rochester Gas and Electric Corporation
)
)
VERIFICATION OF CAROL TEIXEIRA
STATE OF PENNSYLVANIA
)
)
COUNTY OF DELAWARE
)
I, Carol Teixeira, being first duly sworn, state that I am the witness identified in the foregoing prepared testimony, and that the statements of fact in the testimony and supporting exhibits relating to my employer and the NYTOs as a collective group are true and correct to the best of my knowledge, information, and belief.
Carol Teixeira
SUBSCRIBED AND SWORN before me
the 10th day of November, 2026
Notary Public
My commission expires on:04/25/2028
Carol Teixeira
Patrick Wagner
Online Notary Public. This notarial act involved the use of
online audio/video communication technology. Notarization
facilitated by SIGNiX®
PDF page 36
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
)
Central Hudson Gas & Electric Corporation
)
Consolidated Edison Company of New York, Inc.
)
New York State Electric & Gas Corporation
) Docket No. ER27-___-000
Niagara Mohawk Power Corp.
)
Orange and Rockland Utilities, Inc.
)
Rochester Gas and Electric Corporation
)
)
VERIFICATION OF YAN FLISHENBAUM
STATE OF PENNSYLVANIA
)
)
COUNTY OF DELAWARE
)
I, Yan Flishenbaum, being first duly sworn, state that I am the witness identified in the foregoing prepared testimony, and that the statements of fact in the testimony and supporting exhibits relating to my employer and the NYTOs as a collective group are true and correct to the best of my knowledge, information, and belief.
Yan Flishenbaum
SUBSCRIBED AND SWORN before me
the 11th day of November, 2026
Notary Public
My commission expires on:04/25/2028
Yan Flishenbaum
Patrick Wagner
Online Notary Public. This notarial act involved the use of
online audio/video communication technology. Notarization
facilitated by SIGNiX®
PDF page 37
• UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
Central Hudson Gas & Electric Corporation
Consolidated Edison Company of New York, Inc. New York State Electric & Gas Corporation
Niagara Mohawk Power Corp.
Orange and Rockland Utilities, Inc.
Rochester Gas and Electric Corporation
t•
STATE OF NEW YORK
Docket No. ER27- -000
VERIFICATION OF STACY POWERS
COUNTY OF DUTCHESS
)
)
)
1, Stacy Powers, being first duly sworn, state that I am the witness identified in the
foregoing prepared testimony, and that the statements of fact in the testimony and supporting exhibits relating to my employer and the NYTOs as a collective group are true and correct to the best of my knowledge, information, and belief. SUBSCRIBED AND SWORN before me
the\ (:)
day of November, 2026
- • f\kA
.
Stacy Powers
SARAH ELIZABEM P1ZZOLA
NOTARY PUBLIC, STATE OF NEW YORK
Registration No. 02KE6325582
Qualified in Dutchess County •
Commission Expires June 1, 2027
My commission expires on:
PDF page 38
Exhibit A
The NYTOs’ PSC Delivery Rates of the Applicable Transmission Owner to Large Loads
PDF page 39
Central Hudson
Service Classification No. 13: Transmission Service
PDF page 40
PSC NO: 15 ELECTRICITY
LEAF: 246
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 25
INITIAL EFFECTIVE DATE: 09/01/2025
SUPERSEDING REVISION: 23
Issued in Compliance with Order in C. 24-E-0461 dated August 14, 2025
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE
APPLICABLE TO USE OF SERVICE FOR
Sales and delivery of electric power supply by the Company or delivery of electric power supply provided by a Retail Supplier to industrial customers for:
All purposes.
Effective March 31, 1991, regardless of the type of service offered, electric service utilized exclusively with such religious purposes or utilized at such community residences, as defined in the Service Classification No. 1 Section entitled Applicable to Use of Service For, shall be charged at rates no greater than the rates or charges applicable to residential customers receiving single phase service.
Effective June 2, 1998, regardless of the type of service offered, electric service utilized by such veteran’s organizations, as defined in the Service Classification No. 1 section entitled Applicable to Use of Service For, shall be charged at rates no greater than the rates or charges applicable to residential customers receiving single phase service.
CHARACTER OF SERVICE
Continuous, 60 cycle, three phase alternating current delivered at one transmission voltage, voltage depending on availability and the customer's requirements.
When a customer provides all equipment necessary to take service (a) directly from a substation having a line-side voltage of 69,000 volts or higher the Substation Rate will apply and (b) at a transmission voltage of 69,000 volts or higher the Transmission Rate will apply.
STANDBY SERVICE
Customers served under this Service Classification can elect to take service under the rates of Service Classification No. 14.
MONTHLY RATE
Substation
Effective
Effective
Effective
September 1, 2025
July 1, 2026
July 1, 2027
Customer Charge
$9,700.00
$11,050.00
$12,500.00
Delivery Charges
Basic Demand Charge per kW
$12.26
12.74
12.87
Reactive Demand per Rkva
$0.83
$0.83
$0.83
Received: 08/27/2025
Status: EFFECTIVE
Effective Date: 09/01/2025
PDF page 41
PSC NO: 15 ELECTRICITY
LEAF: 246.1
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 28
INITIAL EFFECTIVE DATE: 09/01/2025
SUPERSEDING REVISION: 26
Issued in Compliance with Order in C. 24-E-0461 dated August 14, 2025
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
MONTHLY RATE
Transmission
Effective
Effective
Effective
September 1, 2025
July 1, 2026
July 1, 2027
Customer Charge
$15,500.00
$18,000.00
$21,000.00
Delivery Charges
Basic Demand Charge per kW
$7.69
$8.04
$8.15
Reactive Demand per Rkva
$0.83
$0.83
$0.83
Bills rendered shall be based on periodic meter readings as provided in General Information Section 13.
ELECTRIC BILL CREDIT
The Electric Bill Credit, as described in General Information Section 36.B, shall apply to all customers served under this Service Classification.
SYSTEM BENEFITS CHARGE
The System Benefits Charge, as described in General Information Section 36.A, shall apply to all electricity delivered under this Service Classification.
Received: 08/27/2025
Status: EFFECTIVE
Effective Date: 09/01/2025
PDF page 42
PSC NO: 15 ELECTRICITY
LEAF: 247
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 19
INITIAL EFFECTIVE DATE: 08/01/2024
SUPERSEDING REVISION: 17
Issued in Compliance with Order in C. 23-E-0418 dated July 18, 2024
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
MISCELLANEOUS CHARGES
The provisions of the Company’s Miscellaneous Charges, as described in General Information Section 29, shall apply to all electricity delivered under this Service Classification.
ENERGY SUPPLY
The provisions of the Company’s Hourly Pricing Provision (HPP), as described in Special Provision 13.9, shall apply to electricity provided and sold by the Company under this Service Classification. Customers participating in the Retail Access Program as described in General Information Section 35 shall not be subject to the HPP.
MERCHANT FUNCTION CHARGE
The Merchant Function Charge, as described in General Information Section 36.E, shall apply to all electricity delivered under this Service Classification.
REVENUE DECOUPLING MECHANISM
The Revenue Decoupling Mechanism Adjustment, as described in General Information Section 36.G, shall apply to all electricity delivered under this Service Classification.
OTHER CHARGES
Customers taking service under this Service Classification may be subject to other rates and charges as applicable according to the provisions of the General Information Section of this rate schedule.
INCREASE IN RATES AND CHARGES
The rates and charges under this Service Classification, including the minimum charge, Electric Bill Credit System Benefits Charge, Miscellaneous Charges, energy supply charges under Special Provision 13.9, if applicable, Merchant Function Charge, Revenue Decoupling Mechanism and other charges pursuant to the General Information Section (as applicable) are increased pursuant to General Information Section 30 to reflect the tax rates applicable within the municipality where the customer takes service.
MINIMUM CHARGE
The Customer Charge, the Basic Demand Charge, and any non-bypassable charges pursuant to the General Information Section of this rate schedule.
Received: 07/30/2024
Status: EFFECTIVE
Effective Date: 08/01/2024
PDF page 43
PSC NO: 15 ELECTRICITY LEAF: 248 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: 09/01/2025
SUPERSEDING REVISION: 5
Issued in Compliance with Order in C. 24-E-0461 dated August 14, 2025
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
DETERMINATION OF DEMAND
The Basic Active Demand will be the highest 15-minute integrated kilowatt demand established during the month for which the bill is rendered, but not less than 500 kilowatts.
The Reactive Demand will be the highest 15-minute integrated kilovoltamperes of lagging reactive demand established during the month less one-half of the highest 15-minute integrated kilowatt demand established during that month.
Effective May 1, 2010, the Reactive Demand will be the highest 15-minute integrated kilovoltamperes of lagging reactive demand established during the month less one-third of the highest 15-minute integrated kilowatt demand established during that month.
METERING REQUIREMENT
Customers taking service under this Special Provision must have in place an interval meter, and have telecommunications to the meter, that is compatible with the Company’s MV-90 data acquisition system. On and after May 1, 2013, cellular communications to the meter will be installed by the Company for all new interval meter installations. Should the customer’s premises not have adequate signal strength and require a dedicated phone line, the Company will arrange for the installation of, and be responsible for the ownership and maintenance of, a dedicated phone line. In addition to the monthly customer charge, customers will be assessed an incremental monthly charge of $3.00 for customers where the Company has provided cellular communications to the meter. If a non-cellular enabled interval meter is installed and the customer’s dedicated phone line is not installed or operational, for reasons not caused by the Company’s equipment, when the Company attempts to read the meter, the customer shall be responsible for resolution of the problem, and the customer will be assessed an $80.00 on-site meter reading charge each monthly cycle until the condition is corrected
TERMS OF PAYMENT
Bills are due when personally served or three days after mailing. Bills shall be subject to a late payment charge in accordance with General Information, Section 16, if payment is not made by the date specified on the bill which date shall be not less than 20 days from the due date.
TERM
A minimum of one year from commencement of service under this classification and successive annual terms thereafter. A customer cannot resume service within one year at the same location under this classification if service has been taken during the intervening period under any other service classification. For a customer served on Service Classification No. 3 (Substation or Transmission Service) prior to the effective date of this service classification, the one year minimum term would include the period served on Service Classification No. 3.
Received: 08/27/2025
Status: EFFECTIVE
Effective Date: 09/01/2025
PDF page 44
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 17612
..TXT: PSC NO: 15 ELECTRICITY LEAF: 249 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 2 INITIAL EFFECTIVE DATE: 11/01/01 SUPERSEDING REVISION: 1 STAMPS: Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001 RECEIVED: 10/31/01 STATUS: Effective EFFECTIVE: 11/01/01
SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)
Reserved for future use.
Received: 10/31/2001
Status: EFFECTIVE
Effective Date: 11/01/2001
Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001
PDF page 45
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 17614
..TXT: PSC NO: 15 ELECTRICITY LEAF: 250 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 2 INITIAL EFFECTIVE DATE: 11/01/01 SUPERSEDING REVISION: 1 STAMPS: Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001 RECEIVED: 10/31/01 STATUS: Effective EFFECTIVE: 11/01/01
SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)
Reserved for future use.
Received: 10/31/2001
Status: EFFECTIVE
Effective Date: 11/01/2001
Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001
PDF page 46
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 17615
..TXT: PSC NO: 15 ELECTRICITY LEAF: 251 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 2 INITIAL EFFECTIVE DATE: 11/01/01 SUPERSEDING REVISION: 1 STAMPS: Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001 RECEIVED: 10/31/01 STATUS: Effective EFFECTIVE: 11/01/01
SERVICE CLASSIFICATION NO. 13 (Cont'd)
Reserved for future use.
Received: 10/31/2001
Status: EFFECTIVE
Effective Date: 11/01/2001
Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001
PDF page 47
PSC NO: 15 ELECTRICITY
LEAF: 252
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 9
INITIAL EFFECTIVE DATE: 10/01/2025 SUPERSEDING REVISION: 8 Issued in Compliance with Order in Case 22-E-0236 dated October 17, 2024
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS
The numbering of the paragraphs hereunder begins with the above service classification number.
13.1
A customer who takes service under this service classification that has EV charging sites will be eligible for the Demand Charge Rebate as follows: To be eligible for the Rebate, a customer with an EV charging site is required to have a Charging Ratio of 50 percent or greater. For customers that separately meter their EV load, the Charging Ratio will be equal to 100%. For all other Customers, the Charging Ratio is defined as the ratio of the sum of the EV charging capacity in kW to the sum of the maximum simultaneous demand of all load on the account in kW. The Charging Ratio shall be determined at the time of application and shall remain the Charging Ratio until such time that the Customer provides a new load letter with additional electrification plans; however, the Company reserves the right to re-evaluate the Charging Ratio and program eligibility subsequent to application for service. For Customers with a Charging Ratio of 50 percent or greater, the Rebate will be determined for each billing period by taking the billed Demand Delivery Charges times the Charging Ratio times 50%. The calculation of the Demand Charge Rebate shall not include delivery surcharges, supply charges, or any other demand-measured charges included on a customer’s bill.
Customers participating in the Company’s DCFC per-plug incentive program will have a one-time option to either continue participating in the Program for the remainder of the Customer’s eligibility period or to begin receiving the Rebate. Customers currently enrolled in the Excelsior Jobs Program pursuant to Special Provision 41 are ineligible to receive the Rebate. Effective October 1, 2025, the Rebate will no longer be made available to new participants. Any existing participants have the option to enroll in the EV-PIR, as described in General Information Section 52, for their energy and demand delivery charges. The Rebate for existing participants will continue until either the first full billing cycle under the EV-PIR or December 1, 2025, whichever happens first.
Received: 07/03/2025
Status: EFFECTIVE
Effective Date: 10/01/2025
PDF page 48
PSC NO: 15 ELECTRICITY
LEAF: 253
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: 01/01/12 SUPERSEDING REVISION: 5 Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS
13.2
For customers who are taking transmission service and who are leasing substation equipment from the Company, measured billing units will be multiplied by 1.004 to recover demand and energy losses in the transformation system.
13.3
Not in use.
Received: 09/22/2011
Status: EFFECTIVE
Effective Date: 04/01/2012
Effective date postponed to 04/01/2012. See Supplement No. 63.
PDF page 49
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 18285
..TXT: PSC NO: 15 ELECTRICITY LEAF: 254 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 6 INITIAL EFFECTIVE DATE: 05/01/02 SUPERSEDING REVISION: 5 STAMPS:
RECEIVED: 02/01/02 STATUS: Effective EFFECTIVE: 05/01/02 SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd) SPECIAL PROVISIONS (Cont'd)
13.3
Not in Use.
Received: 02/01/2002
Status: EFFECTIVE
Effective Date: 05/01/2002
PDF page 50
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 18286
..TXT: PSC NO: 15 ELECTRICITY LEAF: 255 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 6 INITIAL EFFECTIVE DATE: 05/01/02 SUPERSEDING REVISION: 5 STAMPS:
RECEIVED: 02/01/02 STATUS: Effective EFFECTIVE: 05/01/02 SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd) SPECIAL PROVISIONS (Cont'd)
13.4
Not in Use.
Received: 02/01/2002
Status: EFFECTIVE
Effective Date: 05/01/2002
PDF page 51
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 18287
..TXT: PSC NO: 15 ELECTRICITY LEAF: 256 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 7 INITIAL EFFECTIVE DATE: 05/01/02 SUPERSEDING REVISION: 6 STAMPS:
RECEIVED: 02/01/02 STATUS: Effective EFFECTIVE: 05/01/02 SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd) SPECIAL PROVISIONS (Cont'd)
13.4
Not in Use.
Received: 02/01/2002
Status: EFFECTIVE
Effective Date: 05/01/2002
PDF page 52
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 18288
..TXT: PSC NO: 15 ELECTRICITY LEAF: 257 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 4 INITIAL EFFECTIVE DATE: 05/01/02 SUPERSEDING REVISION: 3 STAMPS:
RECEIVED: 02/01/02 STATUS: Effective EFFECTIVE: 05/01/02 SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd) SPECIAL PROVISIONS (Cont'd)
13.4
Not in Use.
Received: 02/01/2002
Status: EFFECTIVE
Effective Date: 05/01/2002
PDF page 53
PSC NO: 15 ELECTRICITY
LEAF: 258
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 9
INITIAL EFFECTIVE DATE: 04/01/12
SUPERSEDING REVISION: 7
Issued in Compliance with Orders Establishing Filing Requirements Dated November 21, 2011 and March 16, 2012 Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
13.5
Not in use.
Received: 03/28/2012
Status: EFFECTIVE
Effective Date: 04/01/2012
PDF page 54
PSC NO: 15 ELECTRICITY
LEAF: 259
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 7
INITIAL EFFECTIVE DATE: 04/01/12 SUPERSEDING REVISION: 5 Issued in Compliance with Orders Establishing Filing Requirements Dated November 21, 2011 and March 16, 2012 Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
Reserved for future use.
Received: 03/28/2012
Status: EFFECTIVE
Effective Date: 04/01/2012
PDF page 55
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 17575
..TXT: PSC NO: 15 ELECTRICITY LEAF: 260 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 3 INITIAL EFFECTIVE DATE: 11/01/01 SUPERSEDING REVISION: 2 STAMPS: Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001 RECEIVED: 10/31/01 STATUS: Effective EFFECTIVE: 11/01/01
SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)
Reserved for future use.
Received: 10/31/2001
Status: EFFECTIVE
Effective Date: 11/01/2001
Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001
PDF page 56
PSC NO: 15 ELECTRICITY
LEAF: 261
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 3
INITIAL EFFECTIVE DATE: 01/01/14
SUPERSEDING REVISION: 2
Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
13.6
Not in use.
Received: 11/21/2013
Status: EFFECTIVE
Effective Date: 01/01/2014
PDF page 57
PSC NO: 15 ELECTRICITY
LEAF: 262
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 11
INITIAL EFFECTIVE DATE: 01/01/14
SUPERSEDING REVISION: 10
Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
Reserved for future use.
Received: 11/21/2013
Status: EFFECTIVE
Effective Date: 01/01/2014
PDF page 58
PSC NO: 15 ELECTRICITY
LEAF: 263
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 3
INITIAL EFFECTIVE DATE: 01/01/14
SUPERSEDING REVISION: 2
Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
Reserved for future use.
Received: 11/21/2013
Status: EFFECTIVE
Effective Date: 01/01/2014
PDF page 59
PSC NO: 15 ELECTRICITY
LEAF: 264
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 4
INITIAL EFFECTIVE DATE: 01/01/14
SUPERSEDING REVISION: 3
Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
Reserved for future use.
Received: 11/21/2013
Status: EFFECTIVE
Effective Date: 01/01/2014
PDF page 60
PSC NO: 15 ELECTRICITY
LEAF: 265
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 4
INITIAL EFFECTIVE DATE: 01/01/14
SUPERSEDING REVISION: 3
Issued by: Michael L. Mosher Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
13.7
Not in Use
Received: 11/21/2013
Status: EFFECTIVE
Effective Date: 01/01/2014
PDF page 61
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 17579
..TXT: PSC NO: 15 ELECTRICITY LEAF: 266 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 3 INITIAL EFFECTIVE DATE: 11/01/01 SUPERSEDING REVISION: 2 STAMPS: Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001 RECEIVED: 10/31/01 STATUS: Effective EFFECTIVE: 11/01/01
SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)
SPECIAL PROVISIONS (Cont'd)
13.8 Not in Use.
Received: 10/31/2001
Status: EFFECTIVE
Effective Date: 11/01/2001
Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001
PDF page 62
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 14674
..TXT: PSC NO: 15 ELECTRICITY LEAF: 267 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 2 INITIAL EFFECTIVE DATE: 02/01/01 SUPERSEDING REVISION: 1 STAMPS: Issued in Compliance with Order in C.96-E-0909 dated January 26, 2001 RECEIVED: 01/31/01 STATUS: Effective EFFECTIVE: 02/01/01
SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)
Reserved for future use.
Received: 01/31/2001
Status: EFFECTIVE
Effective Date: 02/01/2001
Issued in Compliance with Order in C.96-E-0909 dated January 26, 2001
PDF page 63
PSC NO: 15 ELECTRICITY
LEAF: 267.1
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: 07/01/09
SUPERSEDING REVISION: 5
Issued in Compliance with Order in C.08-E-0887 dated June 22, 2009
Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
13.9
HOURLY PRICING PROVISION
Customers taking service under this Service Classification and electing to purchase their energy requirements from the Company will be billed for these requirements based on charges set on an hourly basis according to the market price of electricity described below. The market price of electricity will be the hourly Day-Ahead Locational Based Market Price (DAM) as set forth by the New York State Independent System Operator (NYISO) for Central Hudson, Hudson Valley, Zone G (Zone G). The source of the hourly prices will be the NYISO website for the DAM. Such prices will be adjusted by the Factor of Adjustment set forth in General Information Section 29.
Customers taking service under this Special Provision will also be subject to charges for energy balancing as well as non-energy components of electric power supply, such as capacity, ancillary services and allowances for working capital costs and bad debts.
Prior to May 1, 2011, these charges will be recovered through the HPP UCAP Charge, which will be determined on a monthly basis, coincident with the development of the components of the Energy Cost Adjustment Mechanism, as described in General Information Section 29, will be stated in whole $0.00001 amounts per kilowatthour and will be filed with the Public Service Commission on the Statement of Market Price Charge and Market Price Adjustment. The UCAP Charge will be calculated as the sum of:
(A)
An energy balancing component calculated by subtracting the DAM
from the Real-Time LBMP (RTM) as set forth by the NYISO for Zone G for each hour in the current month, multiplying the difference by any purchases or sales made by the Company in the real-time market for load balancing purposes and dividing the net result by the estimate of full service sales, including HPP sales, described in General Information Section 29; and,
(B)
A component for capacity charges determined by taking the sum of HPP customers’
estimated unforced capacity (UCAP) requirements multiplied by the monthly NYISO
Spot Auction price for the New York Control Area (NYCA); and,
(C)
A component for ancillary service charges, including NYPA Transmission Access
Charges (NTAC), calculated by taking the sum of such charges incurred by the Company and dividing by the estimate of full service sales, including HPP sales, described in General Information Section 29; and,
Received: 06/30/2009
Status: EFFECTIVE
Effective Date: 07/01/2009
PDF page 64
PSC NO: 15 ELECTRICITY
LEAF: 267.2
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 22
INITIAL EFFECTIVE DATE: 07/01/2025
SUPERSEDING REVISION: 21
Issued in Compliance with Order in C. 15-E-0751 & 15-E-0082, dated October 17, 2024.
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
13.9
HOURLY PRICING PROVISION (Cont’d)
(D)
Allowances for working capital costs and bad debts equal to the average per kWh rate for these charges as otherwise included in the Market Price Charge (MPC)
For each billing period, the customer’s total energy supply cost will be calculated as the sum of: (1) the hourly DAM multiplied by the customer’s hourly measured loads, as adjusted by the Factor of Adjustment set forth in General Information Section 29, and (2) the HPP UCAP Charge per kWh multiplied by the customer’s total measured load in kilowatthours.
On and after May 1, 2011, capacity charges will be recovered through a separate charge, HPP UCAP. Each customer’s capacity charge will be calculated as the product of the customer’s demand during the previous summer’s ICAP market peak hour, as adjusted pursuant to the ICAP market peak load forecast for the corresponding capability period and NYISO UCAP requirements, and the monthly NYISO Spot Auction price for the capacity zone(s) from which the capacity is acquired pursuant to the requirements of the NYISO for the prior calendar month. The HPP UCAP will be stated in whole $0.01 amounts per kilowatt and will be filed with the Public Service Commission on the Statement of Market Price Charge and Market Price Adjustment.
The HPP UCAP Charge will be renamed the HPP Charge and will continue to recover charges for energy balancing, ancillary services, allowances for working capital and bad debts according to the provisions provided above.
Effective April 1, 2017, the HPP Charge will be increased by a component designed to recover or refund the costs or benefits of Renewable Energy Credits (REC’s), Zero Emissions Credits (ZEC’s) and Alternative Compliance Payments (ACP’s) for obligation years 2024 and prior, and the sale and transfer of Tier 1 VDER RECs pursuant to Case 15-E-0302. Pursuant to Case 18-E-0071, the HPP Charge shall also be increased to reflect the costs of Offshore Wind Renewable Energy Credits (OREC’s). In addition, pursuant to Case 15-E- 0751, the CDG H-Value compliance obligation including associated carrying charges calculated at the other customer capital rate will be recovered through this component. The REC/ZEC/ACP component, including an allowance for bad debts will be determined on an annual basis. A reconciliation of recoveries (eleven months actual, one month forecast) will also be performed annually, with any over or under recoveries included in the development of succeeding rates. Total costs will be divided by an estimate of billed sales for the collection period. The factor so determined will be stated in whole $0.00001 amounts per kilowatt-hour and will be filed on the Statement of Market Price Charges. The REC/ZEC/OREC/ACP component shall be filed to become effective with the eighth billing batch of April.
For billing purposes, REC/ZEC/OREC/ACP cost recovery will be included in the HPP Charge, with the combined amount shown as one line item on customer bills until December 31, 2024, after which the ACP cost recovery will no longer be included in the HPP charge.
Effective November 1, 2017, the HPP Charge will be increased by a component designed to recover the market value of the compensation paid to customers under General Information Section 48.B for the Environmental Component related to the purchase of generation. This component will be determined by taking the market value of the compensation paid and dividing by the estimate of full service sales, including HPP sales, as described in General Information Section 29 until December 31, 2024, after which the Environmental Component will be removed from the HPP charge and recovered through the REC charge.
For each billing period, the customer’s total energy supply cost will be calculated as the sum of: (1) the hourly DAM multiplied by the customer’s hourly measured loads, as adjusted by the Factor of Adjustment set forth in General Information Section 29, (2) the customer’s HPP UCAP, and (3) the HPP Charge per kWh multiplied by the customer’s total measured load in kilowatthours.
Received: 06/16/2025
Status: EFFECTIVE
Effective Date: 07/01/2025
PDF page 65
PSC NO: 15 ELECTRICITY
LEAF: 267.3
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 5 INITIAL EFFECTIVE DATE: January 1, 2014 SUPERSEDING REVISION: 4 Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
13.10
Emergency Demand Response Program
A customer who can purchase electric power supply from the Company under this Service Classification may elect to designate a portion of his load as curtailable and receive a billing credit subject to the terms defined below. The minimum curtailable load is 100 kW. Customers selecting this Special Provision must have in place an interval meter pursuant to the Metering Requirements section of the parent service classification and possess a fax machine with a dedicated phone line. Participating customers will be responsible for all metering and communication costs not otherwise covered by NYSERDA or any other source.
Central Hudson will process customer applications to the EDRP program within seven (7) business days after the customer submits a completed application, subject to any processing time required by the NYISO.
Program Description
The Central Hudson Emergency Demand Response Program (EDRP) will operate in conjunction with the New York Independent System Operator (NYISO) EDRP. The NYISO will notify Curtailment Service Providers (CSP), which includes the Company as a load serving entity, that the NYISO EDRP has been implemented and that CSPs should produce real-time, verified reductions of at least 100 kW.
The Company will provide as much notice in advance to customers to curtail, however, this is subject to the minimum of 2 hours notice to the Company by the NYISO. Implementation for the EDRP will occur due to the following conditions:
a) an in-day peak hour forecast response to an operating reserve shortage, as set forth in Section 4.1 of the NYISO Emergency Operations Manual; or
b) in conjunction with the NYISO’s call for special case resources as set forth in the NYISO ICAP Manual; or
c) in response to a major state of emergency as set forth in Section 3.2 of the NYISO Emergency Operations Manual; or
Received: 11/21/2013
Status: EFFECTIVE
Effective Date: 01/01/2014
PDF page 66
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 18970
..TXT: PSC NO: 15 ELECTRICITY LEAF: 267.4 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 2 INITIAL EFFECTIVE DATE: 05/01/02 SUPERSEDING REVISION: 1 STAMPS: Issued in Compliance with Order in C.02-E-0113 dated April 24, 2002 RECEIVED: 04/26/02 STATUS: Effective EFFECTIVE: 05/01/02
SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)
SPECIAL PROVISIONS (Cont'd)
13.10 Emergency Demand Response Program (Cont'd)
d) at the NYISO's discretion to relieve system or zonal
emergencies.
Program participation is voluntary and no penalties will be assessed for the failure to curtail load. Customers are encouraged to participate in multiple load curtailment programs but will be reimbursed only for the highest amount under any one program.
Load data will be provided to the NYISO by the Company, within 45 days of the event for verification.
A customer may meet the load curtailment requirement of this program by reducing electric usage or by displacing usage through the operation of on-site generating equipment located on its premises.
If the customer has an on-site generator, at the Company's discretion, metering of the customer's generator may be done in order to compare the customer base load to customer load reduction, as determined by the NYISO. The Company shall have the right to inspect its facilities on the customer's property and customer's facilities at reasonable times. The Company will have access to customer load data in order to determine if the customer has met its obligation to reduce load. Load reductions will be evaluated via the Customer Baseline (CBL) methodology contained in the NYISO EDRP Operating Manual.
Rates and Payments
Customers will be paid a sum equal to 90% of that paid to the Company by the NYISO for the customers' load reduction. The Company's payment to the customer will be contingent on the NYISO's payment to the Company. Received: 04/26/2002
Status: EFFECTIVE
Effective Date: 05/01/2002
Issued in Compliance with Order in C.02-E-0113 dated April 24, 2002
PDF page 67
PSC NO: 15 ELECTRICITY
LEAF: 267.5
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 3 INITIAL EFFECTIVE DATE: January 1, 2014 SUPERSEDING REVISION: 2 Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
13.11
Day-Ahead Demand Response Program (DADRP)
A customer who purchases electric power supply from the Company under this Service Classification and is capable of curtailing 1 MW of load may elect to participate in the NYISO’s Day-Ahead Demand Response Program by submitting day-ahead demand reduction bids in a form prescribed by the Company. Customers selecting this Special Provision must have in place an interval meter pursuant to the Metering Requirements section of the parent service classification and possess a fax machine with a dedicated phone line. Participating customers will be responsible for all metering and communication costs not otherwise covered by NYSERDA or any other source. Customers must be capable of curtailing demand for purposes of bidding into the Day-Ahead Market.
Term of Service
Service will be available under this Special Provision seven days after the customer supplies a completed application subject to any additional processing time required by the NYISO. Customers may terminate service under this Special Provision upon written notice to the Company.
Definitions
The following definitions are applicable under this Special Provision:
Bid: The customer’s load reduction nomination in kW for the Dispatch Day.
Bidding Day: The day on which the customer submits its Bid to the Company, two days prior to the Dispatch Day.
Calculated Load Reduction: The difference between the Customer Baseline Load and the customer’s actual metered load on an hourly basis. The Calculated Load Reduction shall not be less than zero.
Customer Baseline Load (CBL): Average hourly energy consumption, rounded to the nearest kWh, for each of the 24 hours in a day calculated in accordance with the NYISO methodology.
Demand Reduction Bus: The electrical location where the load reduction will take place and where Locational Based Marginal Price (LBMP) is measured. Each customer will be assigned to a specific Demand Reduction Bus for the entire term of service.
Received: 11/21/2013
Status: EFFECTIVE
Effective Date: 01/01/2014
PDF page 68
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 21610
..TXT: PSC NO: 15 ELECTRICITY LEAF: 267.6 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 3 INITIAL EFFECTIVE DATE: 05/12/03 SUPERSEDING REVISION: 2 STAMPS:
RECEIVED: 02/10/03 STATUS: Pending EFFECTIVE: 05/12/03
SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)
SPECIAL PROVISIONS (Cont'd)
13.11 Day-Ahead Demand Response Program (DADRP) (Cont'd)
Dispatch Day: The day when the customer is required to reduce load following acceptance by the NYISO of the Company's bid into the Day-Ahead Market. Notification Day: The day when the Company notifies the customer that it must reduce load on the Dispatch Day.
Criteria for Bids
Bids shall be submitted in 100 KW increments for the time period and the price level specified by the Company, subject to the zonal floor bid price requirement of the NYISO's DADRP.
The maximum hourly bid reduction that may be bid by a customer for any hour shall not be greater than the CBL for that hour.
Bidding Procedure
On any Bidding Day prior to 1 P.M., the customer may provide the Company a Bid in 100 KW increments per account. The Company will aggregate bids and submit them in 1 MW increments to the NYISO in accordance with NYISO requirements. The aggregation of Bids into 1 MW increments may require adjustments to the bid price level, which may reduce the competitiveness of the Company's bid to the NYISO. If aggregated Bids on any Demand Reduction Bus are less than 1 MW, the Company will reject all Bids at that Demand Reduction Bus. Prior to 5 A.M. on the Notification Day, the Company will submit its bids to the NYISO. Between 11 A.M. and 3 P.M., on the Notification Day, the Company will notify the customer which Bids are accepted. Any Bid not accepted is deemed rejected.
Rates and Charges
The customer will be subject to all other rates and charges in this Service Classification.
Received: 02/10/2003
Status: EFFECTIVE
Effective Date: 05/16/2003
Effective date postponed to 05/16/2003. See Supplement No. 22.
PDF page 69
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York PSC NO: 15 ELECTRICITY
LEAF: 267.7
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 3
INITIAL EFFECTIVE DATE: 03/17/05 SUPERSEDING REVISION: 2
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
13.11 Day-Ahead Demand Response Program (DADRP) (Cont’d)
Payments and Penalties for Load Reductions by Curtailment: Payments will only be made for bids submitted by the Company and scheduled by the NYISO. For each hour in which the customer reduced load under this Special Provision, the Company will pay the customer an amount equal to the customer’s bid in kW for such hour times 90 percent of the dollars received by the Company from the NYISO for scheduled Day-Ahead Load Reductions, excluding any Demand Reduction Incentive payments for such hour, times the ratio of the aggregated Bids at the customer’s Demand Reduction Bus for such hour, rounded to the nearest lower whole MW to the aggregated Bids at the Customer’s Demand Reduction Bus for such hour. The sum of the amounts so calculated in any billing cycle for the hours in which the customer’s Bids were accepted will be the amount paid to the customer for such billing cycle. The payment to the customer for each hour will in no event be less than 90 percent of the product of the customer’s Bid and the bid price level.
Payment, net of any penalties, will be made by bill credit on the customer’s bill following the Company’s receipt of payment from the NYISO.
Special Provision Term
Service under this Special Provision will be provided in accordance with the New York Independent System Operator’s Day-Ahead Demand Response Program. Received: 12/17/2004
Status: EFFECTIVE
Effective Date: 03/17/2005
PDF page 70
PSC NO: 15 ELECTRICITY
LEAF: 268
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: 10/01/2025
SUPERSEDING REVISION: 5
Issued in Compliance with Order in Case 22-E-0236 dated October 17, 2024
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
13.12
EV Phase-In Rates
Customers taking service under this service classification may be eligible to participate in EV-PIR as described in General Information Section 52, for their energy and demand delivery charges. Customers enrolled in EV-PIR are subject to all other rates and charges of their parent service classification including any minimum billing demands. Received: 07/03/2025
Status: EFFECTIVE
Effective Date: 10/01/2025
PDF page 71
PSC NO: 15 ELECTRICITY
LEAF: 269
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: 04/01/12
SUPERSEDING REVISION: 3
Issued in Compliance with Orders Establishing Filing Requirements Dated November 21, 2011 and March 16, 2012 Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 13 (Cont’d)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
Reserved for future use.
Received: 03/28/2012
Status: EFFECTIVE
Effective Date: 04/01/2012
PDF page 72
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 14706
..TXT: PSC NO: 15 ELECTRICITY LEAF: 270 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 2 INITIAL EFFECTIVE DATE: 02/01/01 SUPERSEDING REVISION: 1 STAMPS: Issued in Compliance with Order in C.96-E-0909 dated January 26, 2001 RECEIVED: 01/31/01 STATUS: Effective EFFECTIVE: 02/01/01
SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)
Reserved for future use.
Received: 01/31/2001
Status: EFFECTIVE
Effective Date: 02/01/2001
Issued in Compliance with Order in C.96-E-0909 dated January 26, 2001
PDF page 73
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York ..DID: 14707
..TXT: PSC NO: 15 ELECTRICITY LEAF: 271 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 2 INITIAL EFFECTIVE DATE: 02/01/01 SUPERSEDING REVISION: 1 STAMPS: Issued in Compliance with Order in C.96-E-0909 dated January 26, 2001 RECEIVED: 01/31/01 STATUS: Effective EFFECTIVE: 02/01/01
SERVICE CLASSIFICATION NO. 13 (Cont'd)
LARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)
Reserved for future use.
Received: 01/31/2001
Status: EFFECTIVE
Effective Date: 02/01/2001
Issued in Compliance with Order in C.96-E-0909 dated January 26, 2001
PDF page 74
Central Hudson
Service Classification No. 14: Standby Service
PDF page 75
PSC NO: 15 ELECTRICITY
LEAF: 272
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 6 INITIAL EFFECTIVE DATE: 01/01/2024 SUPERSEDING REVISION: 5 Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE
APPLICABLE TO USE OF SERVICE FOR:
All purposes, where a customer operates on-site generation (OSG) with a total nameplate rating greater than, or expected to be greater than, fifteen percent (15%) of its maximum potential demand served by all sources, and determined in the same manner as the Contract Demand set forth below, and where the customer elects to have the Company supply and/or deliver energy to the customer by means of the Company's delivery facilities. For purposes of this Service Classification, OSG shall be defined as a generation facility which does not supply energy to the customer by means of the Company’s delivery facilities and “delivery facilities” shall mean any facilities or equipment that are part of the Company’s electrical system regardless of the voltage level or functional classification.
Customers taking service under a metered service classification and not otherwise required to take Standby Service may “opt-in” to the rates offered under this Service Classification, as described in Special Provision 14.12.
With the exceptions listed below, OSG customers who decline service under this tariff are required to electrically isolate themselves from the Company’s electric system and the Company will not be required to maintain or supply service to such customers. A customer shall be considered electrically isolated if (a) the electrical points of contact where interconnection may occur are separated and at least one-hundred (100) feet from any other interconnected electrical service of such customer, or (b) the disconnected isolated service is not within the same building or structure as any other interconnected electrical services of the customer and not housed within a common enclosure with other interconnected breakers and/or fuses of the customer.
STANDBY SERVICE IS NOT APPLICABLE TO:
Standby service shall not be applicable in the following instances, and shall be so designated in the customer’s Application for Electric Standby Service, as applicable:
Non-Material Operation of On-Site Generation
Central Hudson shall have the right to exclude a customer from this Service Classification upon any appropriate grounds, including, without limitation, a demonstration that the customer (a) has installed OSG with a total nameplate rating greater than fifteen percent (15%) of its load, but (b) has not operated or is not operating that OSG in a material manner in order to serve the customer's load.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 76
PSC NO: 15 ELECTRICITY
LEAF: 272.1
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 9
INITIAL EFFECTIVE DATE: 01/19/24
SUPERSEDING REVISION: 8
Issued in compliance with Order in C.22-E-0236 dated November 20, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
STANDBY SERVICE IS NOT APPLICABLE TO: (Cont'd)
Technologies Eligible Under Public Service Law (“PSL”) §66-j and §66-l:
With the exception of customers taking service under Special Provision 14.12, Standby service rates shall not apply to customers owning or operating electric generating equipment as defined in PSL §66-j and §66-l, up to the system size limits contained in General Information Section 48.B, when such customers are taking service under the provisions of General Information Section 37, 38, 46 or 48 and comply with the Standardized Interconnection Requirements set forth in the SIR-Addendum of this Rate Schedule.
Hybrid Facilities
Standby service shall not apply to customers who pair energy storage systems with eligible electric generating equipment that receive compensation under General Information Section 48.B for Hybrid Energy Storage.
Energy Storage
Standby service shall not apply to customers with energy storage systems with a maximum capability up to and including 1MW. Standby service shall also not apply to customers with energy storage systems with inverter capability greater than 1 MW and less than or equal to the sum of nameplate EV charging capability.
Emergency Generators
Standby service shall not apply to customers whose only generating units are emergency generators. For the purposes of this Service Classification, a generating unit must be designated in the customer's Application for Electric Standby Service with the Company as an emergency generator and must meet each of the following requirements to be considered an emergency generator:
1) the emergency generator is not capable of being operated in parallel with the Company’s delivery system, except for closed-transition transfer switching where the term “closed-transition transfer” is characterized as a momentary make-before-break switching sequence, and
2) the emergency generator is used exclusively for purposes of supplying electrical power to the customer when electrical power is not available from the Company, and
3) no load is served by the emergency generator while electric service is available from the Company to the premises, except for regularly scheduled tests when the generator is required to operate under load or for NYISO Emergency Response Programs or for NYISO unforced capacity requirements for special case resources, and
Received: 01/18/2024
Status: EFFECTIVE
Effective Date: 01/19/2024
PDF page 77
PSC NO: 15 ELECTRICITY
LEAF: 272.2
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 3 INITIAL EFFECTIVE DATE: 01/01/2024 SUPERSEDING REVISION: 2 Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
STANDBY SERVICE IS NOT APPLICABLE TO: (Cont'd)
Emergency Generators (Cont’d)
4) the customer maintains an operating log for each emergency generator indicating the date, time, hours and purpose of each operation of each such facility. The log shall be made available to the Company upon request. Failure to do so shall permit the Company to bill the customer under the rates of this Service Classification for the amount of electric standby service which the Company can reasonably estimate was supplied to the customer during times when electric service was available from the Company.
Separately Metered Accounts Not Served by On-Site Generation
All separately metered service accounts within the premises whereby electricity consumption is not otherwise served directly through facilities owned by the customer shall be provided at the standard tariff rates for the Parent Service Classification. Parent Service Classification shall mean the Service Classification that the customer would otherwise qualify for based on the customer’s usage characteristics.
NYPA Programs and Individually Negotiated Contracts
Standby service rates shall not apply to that portion of a customer's delivery service associated with the provision of applicable NYPA programs or that portion of delivery service served under the terms and conditions of an individually negotiated contract.
APPLICATION FOR SERVICE
The Customer must apply for service by providing the Company with an executed Application For Electric Standby Service, as set forth below, and an executed Application for Interconnection and an executed Interconnection Agreement, if applicable, both of which are available from Company representatives.
CHARACTER OF SERVICE
Continuous, 60 cycle single or three phase alternating current delivered at one secondary or primary distribution voltage or transmission voltage, phase and voltage depending on availability and the customer’s requirements. Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 78
PSC NO: 15 ELECTRICITY
LEAF:
272.3
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 16
INITIAL EFFECTIVE DATE: 09/01/2025
SUPERSEDING REVISION: 15
Issued in Compliance with Order in C. 24-E-0461 dated August 14, 2025 Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
MONTHLY RATES EFFECTIVE SEPTEMBER 1, 2025
Customer Charge
Parent Service Classification shall mean the Service Classification that the customer would otherwise qualify for based on the customer’s usage characteristics.
Parent Service Classification
Service Classification No.1
$ 22.50
Service Classification No.2 -Non Demand
$ 33.50
Service Classification No.2 -Secondary Demand
$ 160.00
Service Classification No.2 -Primary Demand
$ 570.00
Service Classification No.3
$ 2,750.00
Service Classification No.6
$ 25.50
Service Classification No.13 -Substation
$ 9,700.00
Service Classification No.13 -Transmission
$ 15,500.00
DEMAND CHARGES
Contract Demand
Per kW
Parent Service Classification
Contract Demand
SC No.1
$ 4.93
SC No.2 -Non Demand
$ 8.43
SC No.2 -Secondary Demand
$ 1.44
SC No.2 -Primary Demand
$ 3.37
SC No.3
$ 4.63
SC No.6
$ 2.83
SC No.13 -Substation
$ 3.67
SC No.13 -Transmission
$ 2.65
Daily-As-Used Demand
On Peak
Super Peak
Parent Service Classification (SC)
Per kW
Per kW
SC No.1
$0.55433
$0.21469
SC No.2 -Non Demand
$0.50446
$0.22640
SC No.2 -Secondary Demand
$0.71147
$0.24069
SC No.2 -Primary Demand
$0.44708
$0.14120
SC No.3
$0.59914
$0.18439
SC No.6
$0.39954
$0.15375
SC No.13 -Substation
$0.41450
$0.13160
SC No.13 -Transmission
$0.23858
$0.07945
Reactive Demand Charge per Rkva
$0.83
Received: 08/27/2025
Status: EFFECTIVE
Effective Date: 09/01/2025
PDF page 79
PSC NO: 15 ELECTRICITY
LEAF: 272.3.1
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 10 INITIAL EFFECTIVE DATE: 09/01/2025 SUPERSEDING REVISION: 9 Issued in Compliance with Order in C. 24-E-0461 dated August 14, 2025
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
MONTHLY RATES EFFECTIVE JULY 1, 2026
Customer Charge
Parent Service Classification shall mean the Service Classification that the customer would otherwise qualify for based on the customer’s usage characteristics.
Parent Service Classification
Service Classification No.1
$ 24.00
Service Classification No.2 -Non Demand
$ 35.00
Service Classification No.2 -Secondary Demand
$ 180.00
Service Classification No.2 -Primary Demand
$ 610.00
Service Classification No.3
$ 2,950.00
Service Classification No.6
$ 27.00
Service Classification No.13 -Substation
$ 11,050.00
Service Classification No.13 -Transmission
$ 18,000.00
DEMAND CHARGES
Contract Demand
Per kW
Parent Service Classification
Contract Demand
SC No.1
$ 5.32
SC No.2 -Non Demand
$ 9.27
SC No.2 -Secondary Demand
$ 1.36
SC No.2 -Primary Demand
$ 3.53
SC No.3
$ 4.87
SC No.6
$ 2.97
SC No.13 -Substation
$ 3.87
SC No.13 -Transmission
$ 2.73
Daily-As-Used Demand
On Peak
Super Peak
Parent Service Classification (SC)
Per kW
Per kW
SC No.1
$0.59722
$0.23249
SC No.2 -Non Demand
$0.54221
$0.24334
SC No.2 -Secondary Demand
$0.75183
$0.25434
SC No.2 -Primary Demand
$0.47072
$0.14866
SC No.3
$0.63436
$0.19523
SC No.6
$0.42077
$0.16192
SC No.13 -Substation
$0.40914
$0.12990
SC No.13 -Transmission
$0.25615
$0.08530
Reactive Demand Charge per Rkva
$0.83
Received: 08/27/2025
Status: EFFECTIVE
Effective Date: 09/01/2025
PDF page 80
PSC NO: 15 ELECTRICITY
LEAF: 272.3.2
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 15
INITIAL EFFECTIVE DATE: 09/01/2025 SUPERSEDING REVISION: 13
Issued in Compliance with Order in C. 24-E-0461 dated August 14, 2025
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
MONTHLY RATES EFFECTIVE JULY 1, 2027
Customer Charge
Parent Service Classification shall mean the Service Classification that the customer would otherwise qualify for based on the customer’s usage characteristics.
Effective
Parent Service Classification
July 1, 2027
Service Classification No.1
$ 26.00
Service Classification No.2 -Non Demand
$ 37.00
Service Classification No.2 -Secondary Demand
$ 200.00
Service Classification No.2 -Primary Demand
$ 650.00
Service Classification No.3
$ 3,200.00
Service Classification No.6
$ 29.00
Service Classification No.13 -Substation
$ 12,500.00
Service Classification No.13 -Transmission
$ 21,000.00
DEMAND CHARGES
Contract Demand
Per kW
Parent Service Classification
Contract Demand
SC No.1
$ 5.64
SC No.2 -Non Demand
$ 9.86
SC No.2 -Secondary Demand
$ 1.22
SC No.2 -Primary Demand
$ 3.66
SC No.3
$ 4.96
SC No.6
$ 3.03
SC No.13 -Substation
$ 3.54
ISC No.13 -Transmission
$ 2.70
Daily-As-Used Demand
On Peak
Super Peak
Parent Service Classification (SC)
Per kW
Per kW
SC No.1
$0.63781
$0.24978
SC No.2 -Non Demand
$0.57480
$0.25797
SC No.2 -Secondary Demand
$0.78041
$0.26401
SC No.2 -Primary Demand
$0.49461
$0.15621
SC No.3
$0.65732
$0.20229
SC No.6
$0.43528
$0.16751
SC No.13 -Substation
$0.42331
$0.13440
SC No.13 -Transmission
$0.26780
$0.08918
Reactive Demand Charge per Rkva
$0.83
Received: 08/27/2025
Status: EFFECTIVE
Effective Date: 09/01/2025
PDF page 81
PSC NO: 15 ELECTRICITY
LEAF: 272.4
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 4 INITIAL EFFECTIVE DATE: 01/01/2024 SUPERSEDING REVISION: 3 Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
CONTRACT DEMAND
A customer opting into these rates under Special Provision 14.12 shall have their contract demand initially set at the maximum metered demand over the previous twelve (12) months measured based on the highest rolling 60 minute integrated demand established during the monthly period for Service Classification No 1, 2 non-demand, and 6 and measured based on the highest 15 minute integrated demand for all other customers. For customers without twelve months of metered demand history, the contract demand shall be initially set at the maximum metered demand over the entire billing history, measured based on the highest 60-minute or 15-minute integrated demand, as applicable, and may be adjusted upward each month until a maximum over the previous twelve months is established.
Non-mass market customers that operate on-site generation will have the option of:
1) establishing their own Contract Demand, and providing this nomination in writing to the Company at least ten (10) days prior to the first day of the customer's next billing cycle, for existing customers, or at least ten (10) days prior to commencing service, for new customers; or
2) accepting a Contract Demand established by Central Hudson in accordance with the following:
(a) In the case of an existing customer, the Contract Demand shall initially be set at the maximum metered demand over the previous twelve (12) months;
(b) In the case of a new customer, the Contract Demand shall be determined by assessing the nameplate rating of the equipment to be served, and projecting the coincidence and
diversity of the new customer's load. The Contract Demand so determined shall be
provided to the customer, in writing, at least ten (10) days prior to the customer
commencing service.
The Contract Demand may be increased by the customer at any time with written notice to the Company. Such notice must be provided at least ten (10) days prior to the first day of the customer's next billing cycle.
For customers whose parent service classification is Service Classification No. 1, 2 non-demand or 6, the monthly demand will be the highest rolling 60-minute integrated kilowatt demand established during the monthly period for which a bill is rendered. For all other customers, the monthly demand will be the highest 15-minute integrated kilowatt demand established during the monthly period for which a bill is rendered. For all instances where the customer's actual metered monthly demand exceeds the customer's Contract Demand, the customer's Contract Demand will be increased to the new peak. If, in any given billing month, there is a failure in meter data acquisition that results in the failure to measure the actual monthly peak demand, the Contract Demand shall be used for billing and recording purposes.
If the customer demonstrates that electricity-producing equipment has been removed or disabled in place or appropriate load limiting devices are installed and operated, the Contract Demand may be reduced upon written request from the customer and written acknowledgment of the request from the Company, except that if the Company does not accept or reject the request within ten (10) days of its receipt, the request shall be deemed granted. Such notice must be provided at least ten (10) days prior to the first day of the customer's next billing cycle.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 82
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York PSC NO: 15 ELECTRICITY
LEAF: 272.5
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 2 INITIAL EFFECTIVE DATE: 07/01/04 SUPERSEDING REVISION: 1 Issued in Compliance with Order in C. 02-E-1108 Dated December 4, 2003 SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
CONTRACT DEMAND (Cont’d)
The Contract Demand may be reduced no more than one time in a 365-day period and/or 365 days from any increase in Contract Demand. Seasonal and other temporary fluctuations in load of the customer's existing facilities such as heating and air conditioning, and temporary reductions in manufacturing, shall not qualify for reductions in Contract Demand.
CONTRACT DEMAND ADJUSTMENT CHARGES
For a customer that elects to establish its own Contract Demand, if, in any billing month, the customer’s actual metered demand exceeds the customer’s Contract Demand:
(a) by less than ten percent (10%) then an adjustment charge equal to the product of twelve (12) times the contract demand rate times the demand in excess of the Contract Demand shall apply to that monthly bill, or
(b) by ten percent (10%) but less than twenty percent (20%) then an adjustment charge equal to the product of eighteen (18) times the contract demand rate times the demand in excess of the Contract Demand shall apply to that monthly bill, or
(c) by twenty percent (20%) or more then an adjustment charge equal to the product of twenty-four (24) times the contract demand rate times the demand in excess of the Contract Demand shall apply to that monthly bill.
During the two (2) year period commencing July 1, 2004, one exceedence in the first year of OSG operation of less than ten percent (10%) in magnitude will be excused from any adjustment charges for new customers installing OSG and existing customers with OSG installed after September 19, 2003. For purposes of this paragraph, an OSG shall be deemed to have commenced operation when the OSG first delivers electricity to serve the customer's load.
Received: 03/31/2004
Status: EFFECTIVE
Effective Date: 07/01/2004
PDF page 83
PSC NO: 15 ELECTRICITY
LEAF: 272.6
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION:
12
INITIAL EFFECTIVE DATE: 01/01/2024
SUPERSEDING REVISION:
11
Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
DAILY AS USED DEMAND
The Daily-As-Used demand for Customers taking service under Service Classification No.1, 2 non-demand, and 6 shall be the highest rolling 60-minute integrated kilowatt demand and for all other Service Classifications shall be the highest 15-minute integrated kilowatt demand, established during:
1. On-peak peak hours of 7 a.m. to 11 p.m. of every weekday;
2. Super-peak hours of 2 p.m. to 7 p.m. of every weekday during the months of June-September; All remaining hours are defined as off-peak hours.
If, in any given billing month, there is a failure in the metered usage data acquisition that results in the failure to record daily demand data, Central Hudson reserves the right to estimate reasonable values for the missing data for billing and recording purposes.
Reactive Demand
The Reactive Demand will be the highest 15-minute integrated kilovoltamperes of lagging reactive demand established during the month less one-third of the highest 15-minute integrated kilowatt demand established during that month.
For customers operating induction generators, reactive demand will be the highest 15-minute integrated kilovoltamperes of lagging reactive demand established during the month less one-third of the highest 15-minute integrated kilowatt generated during that month. In instances where there is no generation or a customer does not fully offset their load in a given month, reactive demand will be calculated in the manner consistent with the parent service classification.
With the exception of customers taking service under Special Provision 14.12, Reactive Demand Charges will be applied to customers with induction generators having a total nameplate rating greater than or equal to 500 kW and customers whose demands in any two of the previous twelve months are 500 kW or larger.
ELECTRIC BILL CREDIT
The Electric Bill Credit, as described in General Information Section 36.B, shall apply to all customers served under this Service Classification.
SYSTEM BENEFITS CHARGE
The System Benefits Charge, as described in General Information Section 36.A, shall apply to all electricity delivered under this Service Classification.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 84
PSC NO: 15 ELECTRICITY
LEAF: 272.6.1
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 9 INITIAL EFFECTIVE DATE: 08/01/2024 SUPERSEDING REVISION: 8
Issued in Compliance with Order in C. 23-E-0418 dated July 18, 2024
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
MISCELLANEOUS CHARGES
The provisions of the Company’s Miscellaneous Charges, as described in General Information Section 29, shall apply to all electricity delivered under this Service Classification.
REVENUE DECOUPLING MECHANISM
The Revenue Decoupling Mechanism, as described in General Information Section 36.G, shall apply to all electricity delivered to Service Classification No. 14 customers whose parent service classification would be either Service Classification No. 1, 2, 3, 6, or 13.
Received: 07/30/2024
Status: EFFECTIVE
Effective Date: 08/01/2024
PDF page 85
PSC NO: 15 ELECTRICITY
LEAF: 272.7
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 11 INITIAL EFFECTIVE DATE: 02/01/2025 SUPERSEDING REVISION: 10
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
HOURLY PRICING PROVISION
All customers electing to purchase their energy requirements from the Company will be billed for these requirements based on the charges set on an hourly basis according to the market price of electricity described below.
The market price of electricity will be the hourly Day-Ahead Locational Based Market Price (DAM) as set forth by the New York State Independent System Operator (NYISO) for Central Hudson, Hudson Valley, Zone G (Zone G). The source of the hourly prices will be the NYISO website for the DAM.
OTHER CHARGES
Customers taking service under this Service Classification will also be subject to charges for energy balancing as well as non-energy components of electric power supply, such as capacity, ancillary services and allowances for working capital costs and bad debts.
Capacity charges will be recovered through a separate charge, HPP UCAP. Each customer’s capacity charge will be calculated as the product of the customer’s demand during the previous summer’s ICAP market peak hour, as adjusted pursuant to the ICAP market peak load forecast for the corresponding capability period and NYISO UCAP requirements, and the monthly NYISO Spot Auction price for the capacity zone(s) from which the capacity is acquired pursuant to the requirements of the NYISO for the prior calendar month. The HPP UCAP will be stated in whole $0.01 amounts per kilowatt and will be filed with the Public Service Commission on the Statement of Market Price Charge and Market Price Adjustment.
For customers without metered demand during the previous summer’s ICAP market peak hour, such demand shall be determined as follows:
1) Customers whose parent service classification is SC No. 1, 2 or 6 will utilize the demand of the customer’s respective load profile, adjusted for the customer’s specific usage factor; or
(2) Customers whose parent service classification is SC No. 3 or 13, the demand will be estimated by the Company on the basis of available data; and
(3) For customers in (1) or (2) above with OSG, the estimated demand will be reduced by an estimate of the output of the generator based on:
(a) the National Renewable Laboratory Photovoltaic Profiles (“NREL Profiles”) included in Appendix H of the Commission’s September 14, 2017 Order in Case 15-E-0751for solar; or
(b) rated capacity and anticipated usage of equipment for other technologies; and
(4) For customers with estimated demand during the previous summer’s ICAP market peak hour, actual metered demand during the previous summer’s ICAP market peak hour will be utilized beginning May 1 of the year following the ICAP market peak hour for which the customer had metered demand.
The HPP Charge will recover charges for energy balancing, ancillary services, allowances for working capital and bad debts.
INCREASE IN RATES AND CHARGES
All rates and charges billed under this Service Classification, including the Minimum Charge, and other charges pursuant to the General Information Section (as applicable), shall be increased pursuant to General Information Section 30 to reflect the tax rates applicable within the municipality where the customer takes service.
Received: 10/02/2024
Status: EFFECTIVE
Effective Date: 02/01/2025
PDF page 86
PSC NO: 15 ELECTRICITY
LEAF: 272.7.1
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 0
INITIAL EFFECTIVE DATE: 01/01/24 SUPERSEDING REVISION:
Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
MINIMUM CHARGE
The Customer Charge, incremental metering charge, if applicable, and the Contract Demand Charge, and any non- by passable charges pursuant to the General Information Section of this rate schedule. In addition, effective October 1, 2011, customers whose Parent Service Classification is S.C. No. 2 with demand exceeding 500 kW in any two of the previous twelve months (as measured semi-annually for the twelve months ending June and December) and effective October 1, 2012 all customers with demand exceeding 300 kW in any two of the previous twelve months (as measured semi-annually for the twelve months ending June and December, but initially for the twelve months ended June 30, 2010) will be assessed an incremental monthly charge as set forth in Special Provision 2.11.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 87
PSC NO: 15 ELECTRICITY
LEAF: 272.8
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 4
INITIAL EFFECTIVE DATE: 01/01/2024 SUPERSEDING REVISION: 3 Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
TERMS OF PAYMENT
Bills are due when personally served or three days after mailing. Bills shall be subject to a late payment charge in accordance with General Information Section 16, if payment is not made by the date specified on the bill which date shall be not less than twenty (20) days from the due date.
INTERCONNECTION REQUIREMENTS AND FEES
Customers with on-site generation must have an executed Application for Interconnection and an executed Interconnection Agreement with the Company and must meet all Company interconnection requirements. If the customer does not have an effective interconnection agreement with the Company, the Company shall have the right to back-bill the customer as stated in the Special Provisions section of this Service Classification.
The customer shall be required to pay for the costs that the Company incurs related to the generator that supplies the customer, subject to the Standard Interconnection Requirements, as set forth in the SIR-Addendum of this rate schedule, the Company's interconnection requirements for facilities sized greater than 5 MW, and other interconnection rules and regulations. These costs include, but are not limited to system modifications, cost of capital, transformers, metering, administration, engineering review, system studies, application fees and all verification tests.
METERING
Interval metering and remote meter reading capability are required of all customers taking service under the rates of this Service Classification including customers taking service under Special Provision 14.12. All customers shall be responsible for all meter and installation costs and all costs associated with providing telecommunications to the meter to enable remote meter reading capability.
TERM
A minimum of one year from commencement of service under this Service Classification and for such additional time as the customer continues to qualify for standby service. The Company may remove a customer not meeting the criteria for mandatory or elective standby service at any time after the minimum term. A customer cannot resume service within one year at the same location under this Service Classification if service has been taken during the intervening period under any other Service Classification.
A customer taking service under Special Provision 14.12 may discontinue service under this Service Classification at any time, but will not be able to opt back into Standby Service for a minimum of one year.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 88
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York PSC NO: 15 ELECTRICITY
LEAF: 272.9
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 0 INITIAL EFFECTIVE DATE: 07/01/04 SUPERSEDING REVISION: Issued in Compliance with Order in C. 02-E-1108 Dated December 4, 2003 SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS
The numbering of the paragraphs hereunder begins with the above service classification number.
14.1 Backbilling
If the customer has connected generation to its electric system without notification to the Company, the Company may disconnect the customer and shall backbill the customer for all service rendered subsequent to installation of such generation at the rates and charges set forth in this Service Classification including applicable interest. Backbills will be based on the generator’s nameplate rating and a one-hundred percent (100%) usage factor. The backbill period will be for the period from the time the generator was brought on line to the time the installation became known.
14.2 Maintenance Schedules
A customer supplied by a generator with a nameplate rating of 1000 kilowatts or greater must provide the Company with an annual schedule of planned maintenance outages. This schedule must be provided upon taking service and must be provided by October of the preceding year for each subsequent year thereafter. Schedules must include starting and ending times for all planned outages.
14.3
Demand Customers with Contract Demand Less Than 50 kW
Customers
who would otherwise qualify for service under Service
Classification No. 2 demand rates with a Contract Demand less than fifty
(50) kilowatts must elect to be served either under the standby rates of this Service Classification or the applicable rates of S.C. No. 2. Customers electing to be served under the standby rates of this Service Classification must install an approved interval meter pursuant to the requirements of this Service Classification.
Received: 03/31/2004
Status: EFFECTIVE
Effective Date: 07/01/2004
PDF page 89
PSC NO: 15 ELECTRICITY
LEAF: 272.10
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 10
INITIAL EFFECTIVE DATE: 01/01/2024
SUPERSEDING REVISION: 9
Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
14.4
Small Customer Exclusion
Excluding customers taking service pursuant to Special Provision 14.12, small non-demand metered customers, defined as those customers who would otherwise qualify for service under Service Classification Nos. 1, 2 or 6, that qualify for service under this Service Classification shall take service under this Service Classification but be billed pursuant to the rates, terms and conditions of their Parent Service Classification. This provision will expire after the month that 100 customers are billed under this Special Provision.
14.5
Standby Rates Billing Phase-In for Certain Technologies
Customers with OSG that enters service after July 29, 2003, and uses any of the designated technologies listed below shall have the option of: (a) an exemption from the standby rates of this Service Classification by taking service at the standard rates of the applicable Parent Service Classification; (b) a phase-in of the standby rates of this Service Classification with the customer joining the phase-in schedule as of the date the OSG enters service; or, (c) service at the standby rates of this Service Classification without a phase-in.
For the purposes of this Special Provision, the designated technologies shall be as follows:
1) fuel cell units which utilize biofuels or hydrogen, provided that the manufacture or production of such fuels does not include the combustion or electrolysis of fossil fuels, or the use of fossil fuel or nonrenewable grid power in the conversion process; 2) on land and offshore wind; 3) solar thermal; 4) photovoltaics; 5) hydroelectric; 6) tidal; 7) geothermal electric; 8) geothermal ground source heat; 9) wave energy; and 10) ocean thermal. Customers with sustainably managed biomass, biogas, and fuel cell units which utilize fossil fuel resources that enters service between July 29, 2003 and May 31, 2023, inclusive, are included as a designated technology.
Effective July 1, 2018, as approved by the Commission in its Order issued and effective June 14, 2018 in Case 17-E-0459, storage batteries are included as a designated technology, in addition to combined Nitrous Oxides (“NOx”) emissions of 1.6lbs/MW for customers that complete a Coordinated Electric System Interconnection Review (“CESIR”) on or after July 1, 2018. All CESIRs completed before July 1, 2018 are grandfathered under 4.4lbs/MWh of NOx emissions.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 90
PSC NO: 15 ELECTRICITY
LEAF: 272.11
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 3
INITIAL EFFECTIVE DATE: 07/01/18
SUPERSEDING REVISION: 2
Issued in Compliance with Order in C. 17-E-0459 dated June 14, 2018
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
14.5 (Cont'd)
During the phase-in period, a customer electing the phase-in, will take service under the standby rates of this Service Classification but be billed based on the otherwise applicable non-standby service rates, or Parent Service Classification rates, plus a percentage of the difference, if greater than zero, between the standby service rates and the Parent Service Classification rates, where the percentage will be determined from the table set forth below:
Percentage
From
To
0%
7/1/2004
6/30/2008
25%
7/1/2008
6/30/2009
50%
7/1/2009
6/30/2010
75%
7/1/2010
6/30/2011
100%
7/1/2011
6/30/2012
Completion of the phase-in and service at the full standby rates of this Service Classification will commence as of July 1, 2012.
An eligible customer may make a one-time election, upon sixty (60) days notice to the Company, to take service at the standby rates or according to the phase-in schedule at any time during the phase-in period, but may not return to non-standby service or switch between the phase-in and the full standby rates after making such election. Up to the time that it makes such an election, the designated technology customer shall be billed at the rates of the applicable non-standby Service Classification.
Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York
Received: 06/29/2018
Status: EFFECTIVE
Effective Date: 07/01/2018
PDF page 91
PSC NO: 15 ELECTRICITY
LEAF: 272.12
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 4
INITIAL EFFECTIVE DATE: 06/01/19
SUPERSEDING REVISION: 3
Issued in Compliance with Order in C. 19-E-0079 dated May 16, 2019
Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
14.6
Standby Rates Billing Phase-In for Certain Existing OSG Customers
Existing OSG customers are defined for this purpose as customers operating OSG (including renewable generators and wholesale generators) as of January 31, 2003 or who had, as of that date, commenced construction of an OSG facility within Central Hudson's service territory or received a binding, written financial commitment from a lending institution for the construction and installation of an OSG within Central Hudson's service territory, and that commences operation of that OSG within two (2) years of the commencement of construction or the receipt of the commitment. Existing OSG customers shall also include projects that, as of January 31, 2003, had been named by the New York State Research and Development Authority (NYSERDA) as an OSG project grant recipient or had been named by NYSERDA as an OSG feasibility study grant recipient, listed as follows: State University of New York at New Paltz. To remain qualified as an existing customer, a NYSERDA grant recipient must commence operation of its OSG by May 31, 2021.
During the phase-in period, an existing customer described above, will take service under the standby rates of this Service Classification but be billed based on the otherwise applicable non-standby service rates, or Parent Service Classification rates, plus a percentage of the difference, if greater than zero, between the standby service rates and the Parent Service Classification rates, where the percentage will be determined from the table set forth below:
Percentage
From
To
0%
7/1/2004
6/30/2008
25%
7/1/2008
6/30/2009
50%
7/1/2009
6/30/2010
75%
7/1/2010
6/30/2011
100%
7/1/2011
6/30/2012
Completion of the phase-in and service at the full standby rates of this Service Classification will commence as of July 1, 2012.
Received: 05/31/2019
Status: EFFECTIVE
Effective Date: 06/01/2019
PDF page 92
PSC NO: 15 ELECTRICITY
LEAF: 272.13
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 3 INITIAL EFFECTIVE DATE: 01/01/2024 SUPERSEDING REVISION: 2 Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
14.6
(Cont'd)
Qualifying existing OSG customers may make a one-time election within ninety (90) days following July 1, 2004 for those existing OSG customers operating OSG as of January 31, 2003, including wholesale generators and designated technology, as described in Special Provision 14.5, and thirty (30) days prior to the operation of the OSG facility for any other existing OSG customer that is not eligible for the designated technology exemption, to decline the phase-in and take service at the full standby rates of this Service Classification instead of the phase-in rates, by providing written notice to the Company.
14.7
Reserved for future use.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 93
PSC NO: 15 ELECTRICITY
LEAF: 272.13.1
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 3 INITIAL EFFECTIVE DATE: 01/01/2024 SUPERSEDING REVISION: 2
Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
14.7
Reserved for future use.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 94
PSC NO: 15 ELECTRICITY
LEAF: 272.14
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 1 INITIAL EFFECTIVE DATE: 01/01/2024
SUPERSEDING REVISION: 0
Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
14.7
Reserved for future use.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 95
Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York PSC NO: 15 ELECTRICITY
LEAF: 272.15
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 0 INITIAL EFFECTIVE DATE: 07/01/04 SUPERSEDING REVISION: Issued in Compliance with Order in C. 02-E-1108 Dated December 4, 2003 SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
14.8 Individually Negotiated Contracts
The Company shall have the option to negotiate a contract for standby service with a non-residential, interval-metered customer where more than fifty (50) percent of the customer's electric power requirement is supplied from a generation facility which does not supply energy to the customer by means of the Company's delivery facilities, or where the customer demonstrates that it can economically and legally isolate and that the customer will isolate absent a negotiated alternative. The customer seeking a negotiated contract will initiate the process by providing the Company with a term sheet describing the customer's requests and, in the case of potential electric isolation, with a written description of the potential isolation. The Company will, within sixty
(60) days, respond to the customer's request with a proposed rate agreement or with a written statement of the reason(s) why the Company declines to accept a customer's request for an individually negotiated contract.
Upon the mutual agreement of terms, between the customer and the Company, the customer will be required to execute a contract which specifies the terms and conditions of the agreement between the Company and the customer. The term of such contract shall be five (5) years or less. During the term of the contract, the customer will not have the right to isolate from the Company's system. Negotiated rates included in such contract shall be subject to all adjustments, surcharges and tax factors that apply to customers who receive service under this Service Classification. There will be no discounts of applicable adjustments, surcharges and tax factors. The terms and conditions of negotiated contracts may provide that provisions of the negotiated contracts supersede the terms of this Service Classification. In the event of conflict
between
the
contract
and
the
terms
of
this
Service
Classification, the provisions of the contract shall control. A contract summary and each executed contract shall be filed by the Company with the Public Service Commission. Each contract summary shall set forth the names of the parties to the contract, the location of the customer's facilities and the effective date of the contract. The terms and conditions of contracts entered into pursuant to this Special Provision and the applicable provisions of this Service Classification may Received: 03/31/2004
Status: EFFECTIVE
Effective Date: 07/01/2004
PDF page 96
Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York
PSC NO: 15 ELECTRICITY LEAF: 272.16 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 1 INITIAL EFFECTIVE DATE: 06/01/15 UPERSEDING REVISION: 0 Issued in Compliance with Order in C. 14-E-0488 Dated April 20, 2015
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont'd)
14.8 (Cont’d)
be the subjects of confidentiality agreements entered into between the Company and the customer. To the extent agreed upon in an individually negotiated contract, the Company will request that the Commission treat the filed document as confidential and exempt from disclosure under the Freedom of Information Law (FOIL); provided, however, that the Company shall have no obligation to obtain such treatment of any filing it makes with the Commission.
FORM OF CONTRACT SUMMARY
Summary
Negotiated Standby Service Contract
On [date] , the Company entered into a Negotiated Standby Service Contract pursuant to Special
Provision 14.8 of P.S.C. No. 15 - Electricity with [customer name] . Standby service under this
contract will be provided to the customer's facilities at [location] . The effective date of this Negotiated
Standby Service Contract is [date] .
This summary has been filed pursuant to Special Provision 14.8 of P.S.C. No. 15 - Electricity.
Issued by: [corporate officer] , Poughkeepsie, New York
Dated: ________
Received: 05/27/2015
Status: EFFECTIVE
Effective Date: 06/01/2015
PDF page 97
PSC NO: 15 ELECTRICITY
LEAF: 272.17
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 3 INITIAL EFFECTIVE DATE: 06/01/19 SUPERSEDING REVISION: 2 Issued in Compliance with Order in C. 19-E-0079 Dated May 16, 2019
Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
14.9 Standby Rate Exemptions for Certain Combined Heat and Power Systems
A customer who installs a new combined heat and power (CHP) system
(1) on or after June 1, 2015 and before May 31, 2021;
(2) with a capacity greater than 1 MW and less than 15 MW; and,
(3) that would otherwise be subject to the standby rates of this Service Classification
shall have the option of (a) a one-time exemption from the standby rates of this Service
Classification by taking service at the standard rates of the applicable Parent Service
Classification; or (b) service at the standby rates of this Service Classification.
A customer meeting the aforementioned requirements is required to install, at the customer’s expense, a revenue grade, interval meter to measure generation output with telecommunications capability at their on- site facility. The interval meter must be compatible with the Company’s metering infrastructure, and the customer must provide and maintain all meter communications services. In cases where the Company is unable to read the meter through the customer provided telecommunications equipment, and the Company has determined that the problem is not caused by the Company’s equipment, the customer will be assessed an $80.00 on-site meter reading charge each meter reading cycle until the condition is corrected.
A customer meeting the aforementioned requirements will have the opportunity to exercise between June 1, 2015 and May 31, 2021, inclusive, a one-time election to be exempt from the standby rates of this Service Classification. Once elected (a) such exemption will be effective for four years running from the in-service date of the system, or (b) the customer may exercise the option to exit the exemption one time prior to the end of its four-year exemption period.
Upon expiration of the exemption or exercise of the option to exit the exemption, the customer will be subject to the standby rates of this Service Classification as they may be modified or superseded as approved by the Public Service Commission.
Received: 05/31/2019
Status: EFFECTIVE
Effective Date: 06/01/2019
PDF page 98
Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York
PSC NO: 15 ELECTRICITY
LEAF: 272.17.1
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 0 INITIAL EFFECTIVE DATE: 01/01/17 SUPERSEDING REVISION: Issued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
14.10
A Customer with a private generating facility connected to the Company’s primary distribution system may use the output of the generating facility to supply two or more accounts taking service under this Service Classification (“Standby Service accounts”), as long as all of the following conditions are met:
(a) Eligibility:
(1) Standby Service Accounts:
(a) The Standby Service accounts designated by the customer and the account associated with export of the generating facility must all be established in a single customer’s name (“Single Party Offset”); or
(b) The generating facility and the Standby Service accounts designated by the customer to receive the output of the generating facility may be established in two or more customer names (“Multi-Party Offset”), provided all of the following conditions are met:
(i) at least one of the Standby Service accounts must be in the same customer name as the owner or operator of the generating facility (“Sponsor”) and have a Contract Demand equal to 10 percent or more of the nameplate rating of the generating facility;
(ii) the Sponsor will be responsible for coordinating the interconnection and operation of the generating facility with the Company; and
(iii) at the time of application under the Multi-Party Offset, the Sponsor must submit signed Multi-Party Offset Recipient Participation Forms for all Standby Service accounts to be supplied by the output of the Sponsor’s generating facility (“Recipient Accounts”) and a signed Multi-Party Offset Percentage Allocation Form. Both forms will be available on the Company’s website.
(2) The generating facility must: (i) have a total nameplate rating of over 2 MW but no more than 20 MW; and (ii) meet eligibility criteria for designation as efficient “combined heat and power” pursuant to the order of the Public Service Commission, dated January 23, 2004, in Case 02-E- 0781, except with respect to maximum generating capacity. The generating facility may have more than one generating unit so long as the aggregate nameplate rating conforms to (i) above.
Received: 08/01/2016
Status: EFFECTIVE
Effective Date: 01/01/2017
PDF page 99
PSC NO: 15 ELECTRICITY
LEAF: 272.17.2
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 1 INITIAL EFFECTIVE DATE: 01/01/2024 SUPERSEDING REVISION: 0 Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
14.10
(Cont’d)
(a) Eligibility: - (Cont’d)
(3) The generating facility and the Standby Service accounts must all be located within a single “premises.” For purpose of this Special Provision, “premises” is defined as follows:
(a) Under Single Party Offset, “premises” shall mean “a parcel of land; or more than one building and/or parcel of land proximate to each other if there is common use, whether or not such buildings or parcels are separated by public or private roads.” The accounts of a customer whose buildings or parcels of land are not physically interconnected may meet the definition of a single “premises” upon the customer’s demonstration of common use to the Company.
(b) Under Multi-Party Offset, “premises” means either (i) a single building or (ii) multiple buildings in which each Customer is connected to the generating facility by a private thermal loop.
(4) Each Recipient Account shall have no other source of generation located on the premises and shall not participate under the provisions of General Information Sections 37, 38 and 46.
(5) Each Standby Service account and the export of the generating facility (“Output Meter”) must be separately metered using Commission-approved, revenue grade, interval metering with telecommunications capability. The metering must be compatible with the Company’s metering infrastructure, including compatibility with the Company’s meter reading systems and communication systems. The communications service for the account associated with the generating facility’s export and for each Standby Service account must be provided and maintained at customer expense and must be operational before the customer may take service.
(6) The communications service for the account associated with the generating facility’s export and for each Standby Service account must be provided and maintained at customer expense and must be operational before the customer may take service.
(7) A Customer may take service under Service Classification No.10 if the export of the generating facility exceeds the aggregate registered kilowatt hour usage on the Standby Service accounts. Otherwise, at the Company’s discretion, the Company may terminate service under this Special Provision or make no payments for the export.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 100
Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York
272.17.3
PSC NO: 15 ELECTRICITY
LEAF: 272.17.3
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 0 INITIAL EFFECTIVE DATE: 01/01/17 SUPERSEDING REVISION: Issued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
14.10 (Cont’d)
(b) Interconnection:
The interconnection will be subject to the interconnection charges specified in the Interconnection Requirements and Fees provisions of this Service Classification. In addition, the interconnection must be technically and economically practicable, and the connection and operation of such facility shall not jeopardize the safety or operation of the Company’s system, facilities or other customers.
(c) Accounts Supplied by the Generating Facility’s Output:
(i) Each account must be eligible for billing under Standby Service rates and must be billed under the Standby Service rate applicable to that individual account.
(ii) All Standby Service accounts taking service under this Special Provision must be either all Full Service or all Retail Access.
(ii) If the customer is a Retail Access Customer, all supply in excess of that supplied by the customer’s private generating facility must be supplied by a single ESCO unless the customer elects to be a Direct Customer.
(iii) No account served under this Special Provision may be served under any economic development program specified in General Information Sections 40, 41 and 45.
(iv) None of the accounts may receive Consolidated Billing as described in General Information Section 35.
(d) Contract Demand for Each Account Supplied by the Generating Facility’s Output:
The Contract Demand for each account will be determined based on the maximum potential demand on the Company’s system to serve that individual account, including the delivery of supply from all sources.
Received: 08/01/2016
Status: EFFECTIVE
Effective Date: 01/01/2017
PDF page 101
PSC NO: 15 ELECTRICITY
LEAF: 272.17.4
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 0 INITIAL EFFECTIVE DATE: 01/01/17 SUPERSEDING REVISION: Issued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016
Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
14.10 (Cont’d)
(e) Billing Applicable to Each Account Supplied by the Generating Facility’s Output:
(1) For purposes of this Special Provision, the following definitions apply:
For Accounts Supplied under the Single Party Offset:
“Allocated As-Used Generator Demand” means, for each account supplied by the generating facility’s output, the demand registered on the account’s meter(s) multiplied by the lower of: (a) 1 or (b) the ratio of the demand registered on the meter(s) measuring the generating facility’s output to the sum of demands registered on the meters of all Standby Service accounts supplied by the generating facility’s output.
“Allocated Generator Supply” means, for each account supplied by the generating facility’s output, the total kilowattthours registered on the account’s meter(s) multiplied by the lower of: (a) 1 or (b) the ratio of the total kilowatthours registered on the meter(s) measuring the generating facility’s output to the sum of the kilowatthours registered on the meters of all Standby Service accounts supplied by the generating facility’s output.
For Accounts Supplied under the Multi-Party Offset:
“Allocated As-Used Generator Demand” means, for each Recipient Account, the lower of: (a) the demand registered on the Recipient Account or (b) the demand registered on the meter(s) measuring the generating facility’s output multiplied by the Recipient Account’s Percentage Allocation. If the generating facility’s output multiplied by the Recipient Account’s Percentage Allocation exceeds the demand registered on the Recipient Account, the excess amount shall not be redistributed to other accounts nor carried forward to the succeeding billing period.
“Allocated Generator Supply” means, for each Recipient Account, the lower of: (a) the total kilowatthours registered on the Recipient Account’s meter(s) or (b) the total kilowatthours registered on the meter(s) measuring the generating facility’s output multiplied by the Recipient Account’s Percentage Allocation. If the generating facility’s output multiplied by the Recipient Account’s Percentage Allocation exceeds the kilowatthours registered on the Recipient Account’s meter(s), the excess amount shall be credited to the extent described in Special Provision 14.10 (a)(6).
Received: 08/01/2016
Status: EFFECTIVE
Effective Date: 01/01/2017
PDF page 102
Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York
PSC NO: 15 ELECTRICITY
LEAF: 272.17.5
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 0 INITIAL EFFECTIVE DATE: 01/01/17 SUPERSEDING REVISION: Issued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
14.10 (Cont’d)
(1) For Accounts Supplied under the Multi-Party Offset: - (Cont’d)
“Percentage Allocation” means the percentage of the generating facility’s output that the Sponsor has allocated to each Recipient Account under the Multi-Party Offset, a single percentage will be applied to both the Allocated As-Used Generator Demand and the Allocated Generator Supply. The Percentage Allocations must total 100 percent, of which the Sponsor must establish: (a) a Percentage Allocation of 10 percent of more to a single Recipient Account in the Sponsor’ name; and (b) a Percentage Allocation of no less than 5 percent or more than 90 percent to each additional Recipient Account. The Recipient Accounts and the Percentage Allocation to each must be assigned in writing by the Sponsor, using the Multi-Party Offset Percentage Allocation Form found on the Company’s website, at least 30 days before commencing service under the Multi-Party Offset. The Percentage Allocations and the Recipient Accounts may be changes as described on the Form. No credits will be applied if the Sponsor ceases to have a Recipient Account or ceases to own or operate the generating facility. If a Recipient Account is closed, its credits will be forfeited unless the Company receives a new Form within 30 days of the account’s closure.
Allocated As-Used Generator Demand and Allocated Generator Supply will be determined for each 15-minute interval. Adjustments will be made for transformation losses as applicable.
(2) Each account supplied by the generating facility’s output will be billed under the Standby Service rates of this Service Classification, as modified below:
(i) An additional Customer Charge of $50.00 per account per billing period exclusive of the Increase in Rates and Charges will be applicable to cover incremental billing and administrative costs associated with providing service under this provision.
(ii) The per-kWh and per-kW delivery charges and adjustments described within General Information Section 36 will be applied to the total kilowattthours registered on the account’s meter(s) reduced by the Allocated Generator Supply for each 15-minute interval (adjusted for losses as applicable) and the Contract Demand, respectively.
(iii) For each 15-minute interval, the registered demand on the account’s meter(s) will be reduced by the Allocated Generator Demand for purposes of determining the daily maximum demand that is used for billing As-Used Daily Demand Delivery Charges.
(iv) If the Customer purchases supply from the Company, the per-kWh supply charges and adjustments described within this Service Classification, will be applied to the total kilowatthours registered on the account’s meter(s) reduced by the Allocated Generator Supply for each 15-minute interval, as adjusted for losses as applicable.
Received: 08/01/2016
Status: EFFECTIVE
Effective Date: 01/01/2017
PDF page 103
Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York
272
PSC NO: 15 ELECTRICITY
LEAF: 272.17.6
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 0 INITIAL EFFECTIVE DATE: 01/01/17 SUPERSEDING REVISION: Issued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
14.10 (Cont’d)
(3) The Allocated As-Used Generator Demand and Allocated Generator Supply will be assumed to be zero for time periods where there is insufficient interval data available to ascertain that the generating facility supplied output to any associated Standby Service account.
Bills may be estimated pursuant to General Information Section 14. If interval data is estimated on a Standby Service account, that data will be used in the calculation of the Allocated As-Used Generator Demand for all other accounts. If actual data later becomes available, the account will be rebilled based on the actual registered demand on the meter less the previously determined allocated As-Used Generator Demand for such account.
(f) The customer will be assessed a Reactive Demand Charge pursuant to the Reactive Demand section of this Service Classification.
Received: 08/01/2016
Status: EFFECTIVE
Effective Date: 01/01/2017
PDF page 104
PSC NO: 15 ELECTRICITY
LEAF: 272.17.7
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 4 INITIAL EFFECTIVE DATE: 01/01/2024 SUPERSEDING REVISION: 3 Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
14.11
Standby Reliability Credit
The Standby Reliability Credit shall not apply to customers billed under the revised Standby Service rates pursuant to case 15-E-0751 except for customers initiating service under this Service Classification prior to March 16, 2022. A Standby Reliability Credit (“Credit”) is available to Customers taking service under this service classification, excluding customers with stand-alone storage as referenced in General Information Section 48.B. Such credit will be available for service taken under this service classification during a previous Measurement Period for which interval metered data was available. The Credit will be earned when a Standby Customer reduces their load below their Contract Demand, over two consecutive Summer Periods in which interval metered data is available during defined Measurement Periods. In the event that a Customer does not yet have interval metered data available, they may determine their own maximum anticipated demand (net of load reduction or generation assets) pursuant to the Contract Demand provisions of this service classification for use in the calculation. The Credit will be equal to the difference between the Standby Customer’s Contract Demand in kW, and their highest kW demand recorded on the Customer’s interval meter (net of generation) during the previous Measurement Period, multiplied by the Contract Demand Delivery Charge per kW that is in effect on October 1 of the year in which the credit is determined. The Credit will be applied to the Customer’s successive 12 monthly bills commencing in November until the following October.
A Customer seeking a Credit must request such Credit by October 14 of each year for which the Credit is sought and, at the same time, specify the Outage Events that the Customer requests to be excluded from the Measurement Period. If October 14 falls on a weekend or holiday, the Company will accept requests until the next business day. If service is taken under the Multi-Party Offset of Special Provision 14.10, the Credit will be applied to the Recipient Account in the Sponsor’s name; provided, however, that if the Sponsor has more than one Recipient Account in its name, the Credit will be applied to the Sponsor’s account which has the highest Contract Demand.
If the Customer is billed under Special Provision 14.10, the kW to be credited on each Standby Service account supplied by the generating facility’s output will be based on the total kW to be credited multiplied by the ratio of the Contract Demand on the Standby Service account to the aggregated Contract Demands on all the Standby Service accounts supplied by the generating facility’s output.
If service is taken under the Multi-Party Offset of Special Provision 14.10, the Credit for any Measurement Period will be equal to the product of: (a) and the difference between the customer’s contract demand and customer’s highest recorded demand during the Measurement Period, excluding Outage Events, and (b) the Contract Demand Delivery Charge per kW that is in effect on October 14 of the year in which the Credit is determined.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 105
PSC NO: 15 ELECTRICITY
LEAF: 272.17.8
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 5 INITIAL EFFECTIVE DATE: 05/31/2025 SUPERSEDING REVISION: 3 Issued in Compliance with Order in C. 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
SPECIAL PROVISIONS (Cont’d)
14.11 (Cont’d)
For purposes of Special Provision 14.11 only, the following definitions apply:
“Measurement Period” is defined as weekdays from 7 a.m. to 11 p.m. during the previous two consecutive full Summer Periods provided, however, that the first year in which a Customer seeks a Credit, the Measurement Period is from 7 a.m. to 11 p.m. during the previous full Summer Period only. The measurement period will exclude Outage Events, regardless of cause, as selected by the Customer, as well as holidays (i.e., Independence Day (observed) if it falls on a weekday and Labor Day).
“Outage Events” are up to three time blocks for each Summer Period that, in aggregate, are comprised of no more than five 24-hour time periods, excluding weekends and holidays. If a time block contains a time period of less than 24 hours, the time period will be rounded up to the next 24 hours. 24-hour periods cannot be applied on a partial basis. If a time block encompasses a holiday or weekend, the start of the 24-hour period on the day prior to the holiday weekend until the same hour the next business day will be considered to be a single 24-hour period.
“Summer Period” for purposes of Special Provision 14.11 only, is June 1 through September 30.
To be eligible for the Credit: (a) the output of a Standby Customer’s generating facility must be separately metered using an Output Meter that the Customer arranges to be furnished and installed at the Customer’s expense; and (b) the Customer, at its expense, must provide and maintain communications service for the Output meter. The Output meter must be Commission-approved, revenue grade, interval metering with telecommunications capability. The metering must be compatible with the Company’s metering infrastructure, including compatibility with the Company’s meter reading systems and communication systems.
14.12 Optional Opt-in for Standby Service
Any customers taking service under a metered service classification who are not required to take Standby Service may “opt-in” to the rates offered under this Service Classification in lieu of the customer’s Parent Service Classification as of May 31, 2025. Customers initiating service under this Special Provision will be required to remain on Standby Service rates for a minimum of twelve months.
Metering
Customers taking service under this Special Provision must comply with the metering requirements of this Service Classification. and be subject to incremental metering charge applicable under the Hourly Pricing Provision of the tariff if the customer is required under their parent service classification.
Term
A customer taking service under this Special Provision may discontinue service under this Service Classification at any time, but will not be able to opt back into Standby Service for a minimum of one year.
Received: 05/16/2025
Status: EFFECTIVE
Effective Date: 05/31/2025
PDF page 106
PSC NO: 15 ELECTRICITY
LEAF: 272.18
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION:
1
INITIAL EFFECTIVE DATE: 01/01/2024
SUPERSEDINGREVISION: 0
Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
APPLICATION FOR ELECTRIC STANDBY SERVICE
CENTRAL HUDSON GAS & ELECTRIC CORPORATION
Application for Electric Standby Service
Pursuant to S.C. No. 14 of P.S.C. No. 15 – Electricity (“Tariff”)
Standby Service provided under S.C. No. 14 is generally applicable to a) any customer operating on-site generation (“OSG”) with a total nameplate rating greater than, or expected to be greater than, 15% of the customer’s maximum potential demand, or b) customers otherwise opting in to standby service rates, and where the customer elects to have Central Hudson (“Company”) supply and/or deliver energy by means of the Company’s delivery facilities.
1. Applicant
Account Name:
Address:
City:
Zip:
Contact:
Phone No.:
E-mail Address:
Central Hudson Acct. Number:
2. Generator/Service Specifications
Currently have OSG: YES / NO___________(if answered No, proceed to #3)
OSG In Service Date (Actual or Expected):
Nameplate Rating: kW
kVa
OSG Generator Technology Type:
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 107
Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York
PSC NO: 15 ELECTRICITY LEAF: 272.18.1 COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 0 INITIAL EFFECTIVE DATE: 01/01/17
SUPERSEDING REVISION: 0
Issued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
APPLICATION FOR ELECTRIC STANDBY SERVICE (Cont’d)
CENTRAL HUDSON GAS & ELECTRIC CORPORATION
Application for Electric Standby Service
Pursuant to S.C. No. 14 of P.S.C. No. 15 – Electricity (“Tariff”)
If your premises will be supplied by Efficient CHP that is rated over 2 MW but no more than 20 MW and connected to the Company’s primary distribution system check below if:
________ You request Standby Service for two or more of your accounts at your premises pursuant to the Single Party Offset described in Special Provision 14.10.
CH Acct Number
Service Address
Contract Demand (kW)
________ You request Standby Service pursuant to the Multi-Party Offset as described in Special Provision 14.10, such that you request that the output of the generating facility that you own or operate at your premises be used to serve your own account(s) and one or more other customers’ accounts in the same building. You must submit a Multi-Party Offset Recipient Participation Form from each customer who will receive an allocation and a Multi-Party Offset Percentage Allocation Form, both of which are available on the Company’s website.
Received: 08/01/2016
Status: EFFECTIVE
Effective Date: 01/01/2017
PDF page 108
PSC NO: 15 ELECTRICITY
LEAF: 272.19
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION REVISION: 2 INITIAL EFFECTIVE DATE: 01/01/2024 SUPERSEDING REVISION: 0 Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
APPLICATION FOR ELECTRIC STANDBY SERVICE (Cont’d)
3. Service Options
Applicant elects to take standby service under S.C. No. 14.
Applicant is opting-in pursuant to Special Provision 14.12.
Applicant would otherwise qualify for non-demand metered service under S.C. Nos. 1, 2 or 6 and elects to be billed pursuant to the rates, terms and conditions of their Parent Service Classification under Special Provision 14.4 of the Tariff.
Applicant has entered into a separately negotiated contract according to Special Provision 14.8 of the Tariff.
Applicant would otherwise qualify for service under S.C. No. 2 demand rates, has a Contract Demand less than 50 kW and declines to take service under the rates of S.C. No. 14. Applicant will be billed under the applicable rates of S.C. No. 2 pursuant to Special Provision 14.3 of the Tariff.
Applicant declines service under S.C. No. 14 and will electrically isolate their facility from the Company’s electric system in accordance with the Tariff.
Standby service is not applicable to the Applicant’s OSG for the following reason (do not complete Sections 4 through 7, below):
Applicant’s OSG has a total nameplate rating of 15% or
less of the Applicant’s maximum potential demand as
defined in the Tariff.
Applicant’s OSG qualifies as a photovoltaic generating
system of 10 kW or less or as a farm waste generating
system of 400 kW or less as defined in the Tariff.
Applicant’s OSG is defined as an Emergency Generator
according to the Tariff.
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 109
PSC NO: 15 ELECTRICITY
LEAF: 272.20
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 1
INITIAL EFFECTIVE DATE: 01/01/2024
SUPERSEDING REVISION: 0
Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
APPLICATION FOR ELECTRIC STANDBY SERVICE (Cont’d)
4. Contract Demand Election
The Applicant hereby requests the following Contract Demand option, in accordance with the Tariff: Applicant nominates a Contract Demand level of
kW.
Applicant requests Central Hudson to establish the Contract Demand
level.
5. Interconnection
In addition to submitting this Application for Electric Standby Service, Applicants installing OSG are required to submit an Application for Interconnection and an executed Interconnection Agreement, both of which are available from Company representatives.
6. Metering
The Applicant agrees to provide the Company with sufficient space to install its meters and metering facilities in locations acceptable to the Company, and agrees that the Applicant’s OSG will not be operated until such meters and metering facilities are installed and operational.
Interval metering and telemetering capability are required of Applicants taking service under S.C. No. 14. Applicants who would otherwise qualify for service under S.C. No. 2 demand rates, have a Contract Demand less than 50 kW and elect to take service under the rates of S.C. No. 14, in accordance with Special Provision 14.3, are required to install interval metering with telemetering capability. Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 110
PSC NO: 15 ELECTRICITY
LEAF: 272.21
COMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION
REVISION: 3
INITIAL EFFECTIVE DATE: 01/01/2024
SUPERSEDING REVISION: 1
Issued in Compliance with Order in Case 15-E-0751 dated October 13, 2023
Issued by: Joseph Hally, Vice President, Poughkeepsie, New York
SERVICE CLASSIFICATION NO. 14 (Cont’d)
STANDBY SERVICE (Cont’d)
APPLICATION FOR ELECTRIC STANDBY SERVICE (Cont’d)
7. Electricity Requirements Election
The Applicant can elect to purchase electric requirements in excess of the amounts supplied by their OSG from either the Company or a Retail Supplier, in accordance with the Tariff.
Applicant elects to purchase electricity requirements from the Company
pursuant to the provisions of the Hourly Pricing Provision.
Applicant elects to purchase electricity requirements pursuant to the
Company’s Retail Access Program.
This Application for Electric Standby Service supplements but does not supersede any pre-existing Applications for Electric Service under the Tariff.
Service to be supplied to the Applicant will be supplied and conditioned on the Applicant’s ongoing compliance with the terms, conditions and procedures set forth in both the Tariff and the Company’s Specifications and Requirements For Electric Installations (“Blue Book”) as both may be amended from time to time.
Central Hudson Gas & Electric Corp.
(Applicant)
By:
By:
(Title)
(Title)
Date:
Date:
Received: 12/15/2023
Status: EFFECTIVE
Effective Date: 01/01/2024
PDF page 111
Consolidated Edison
Service Classification No. 9: Rate II - General - Large
- Time-of-Day
PDF page 112
[No extractable text on this page.]
PDF page 113
[No extractable text on this page.]
PDF page 114
[No extractable text on this page.]
PDF page 115
[No extractable text on this page.]
PDF page 116
Consolidated Edison
Service Classification No. 9: Rate V - General - Large
- Standby Service (Large)
PDF page 117
[No extractable text on this page.]
PDF page 118
[No extractable text on this page.]
PDF page 119
[No extractable text on this page.]
PDF page 120
[No extractable text on this page.]
PDF page 121
[No extractable text on this page.]
PDF page 122
[No extractable text on this page.]
PDF page 123
[No extractable text on this page.]
PDF page 124
[No extractable text on this page.]
PDF page 125
[No extractable text on this page.]
PDF page 126
[No extractable text on this page.]
PDF page 127
[No extractable text on this page.]
PDF page 128
[No extractable text on this page.]
PDF page 129
[No extractable text on this page.]
PDF page 130
[No extractable text on this page.]
PDF page 131
[No extractable text on this page.]
PDF page 132
[No extractable text on this page.]
PDF page 133
LIPA
Service Classification 2: MRP (Large General and Industrial Service With Multiple Rate Periods)
PDF page 134
Long Island Power Authority
Fifth Revised Leaf No. 225
Effective: January 1, 2026
Tariff for Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
I. SERVICE CLASSIFICATION NO. 2 - MRP
Large General and Industrial Service With Multiple Rate Periods:
(Rate Codes: 284, 285, M284, M285)
1. Who Is Eligible
a) Customers who will use the service for any purpose other than Residential, when:
(1) The monthly recorded demand has been more than 145 kW in any two (2) consecutive months, or
(2) The Authority believes an Applicant's demand will be more than 145 kW in any month.
b) Customers may choose between Rate Codes 285 and 284 below when they qualify for the service.
c) Customers' options to transfer between Rate Codes 285 and 284 are covered under Special Provision 10.e below.
d) A Customer, as described in a. above, that has the option under Service Classification No. 12 – Standby Service, can choose to pay the rates and charges associated with a different Service Classification.
2. Character of Service
a) Continuous, 60 hertz, alternating current.
b) Radial secondary service at approximately 120/208, 120/240, or 277/480 volts, three- phase; network system 120/208 or 277/480, depending on the size and characteristics of the load and the circuit supplying the service.
c) Radial primary service at approximately 2,400/4,160 or 7,620/13,200 volts, depending on the size and characteristics of the load and the circuit supplying the service.
d) Radial Sub/Transmission Service Level at approximately 23,000 volts or higher, three phase, depending on the size and characteristics of the load and the circuit supplying the service.
PDF page 135
Long Island Power Authority
Eighteenth Revised Leaf No. 226
Effective: January 1, 2026
Tariff for Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
I. SERVICE CLASSIFICATION NO. 2 - MRP
Large General and Industrial Service With Multiple Rate Periods (continued): (Rate Codes: 284, 285, M284, M285)
Character of Service (continued):
e) The Authority may consider loads with a minimum estimated demand of 10,000 kW for service at 23,000 volts or higher.
f) The Primary Rate will also apply to Customers served at 2,400 through 13,200 volts.
g) The Sub/Transmission Service Level Rate will apply to Customers served at 23,000 volts or higher.
3. Rates and Charges per Meter per Month:
a) Schedule of Rates
The rates for the service code are set forth below.
Rate Code 285
Secondary
Primary
Sub/Transmission
Service Charge per day
$ 3.83
$ 5.20
$ 5.20
Rate Periods**
1
2
3
Off-Peak
On-Peak *
Intermediate
all year
June-Sept. except
all
midnight
Sundays
other
to 7 a.m.
10 a.m. to 10 p.m.
hours
Demand Charge per kW
Secondary
none
$ 30.00
$ 13.03
Primary
none
$ 24.82
$ 10.95
Transmission
none
$ 20.51
$ 8.98
Energy Charge per kWh
Secondary
$ 0.0071
$ 0.0489
$ 0.0311
Primary
$ 0.0041
$ 0.0425
$ 0.0271
Transmission
$ 0.0041
$ 0.0398
$ 0.0252
Minimum Demand Charge
per Meter per kW
Secondary
none
$ 33.50
$ 9.21
Primary
none
$ 28.76
$ 8.13
Transmission
none
$ 23.79
$ 6.68
*For Rate M285, the modified peak period is from 3 p.m. to 10 p.m. on weekdays (Monday – Friday)
** See Paragraph IV.A.10, “Daylight Savings Time,” on Leaf No. 99.
PDF page 136
Long Island Power Authority
Twentieth Revised Leaf No. 227
Effective: January 1, 2026
Tariff for Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
I. SERVICE CLASSIFICATION NO. 2 - MRP
Large General and Industrial Service With Multiple Rate Periods (continued): (Rate Codes: 284, 285, M284, M285)
Rates and Charges per Meter per Month (continued):
Rate Code 284
Secondary
Primary
Transmission
Service Charge per day
$ 3.83
$ 5.20
$ 5.20
Rate Periods**
1
2
3
Off-Peak
On-Peak *
Intermediate
all year
June - Sept
all
weekdays
other
11 p.m.
12 noon
hours
to 7 a.m.
to 8 p.m.
Demand Charge per kW
Secondary
none
$ 59.02
$ 11.68
Primary
none
$ 49.44
$ 8.94
Transmission
none
$ 36.96
$ 6.67
Energy Charge per kWh
Secondary
$ 0.0001
$ 0.0417
$ 0.0268
Primary
$ 0.0001
$ 0.0298
$ 0.0049
Transmission
$ 0.0001
$ 0.0279
$ 0.0047
Minimum Demand Charge
per Meter per kW
Secondary
none
$ 54.99
$ 7.25
Primary
none
$ 49.57
$ 6.68
Transmission
none
$ 36.88
$ 5.06
* For Rate Code M284, the modified peak period is from 3 p.m. to 8 p.m.
** See Paragraph IV.A.10, “Daylight Savings Time,” on Leaf No. 99.
b) Adjustments to Rates and Charges
Each Customer’s bill will be adjusted for the Power Supply Charge, Increases in Rates and Charges to Recover PILOT Payments, the Shoreham Property Tax Settlement Rider, the Distributed Energy Resources Cost Recovery Rate, the Merchant Function Charge, the New York State Assessment Factor, Revenue Decoupling Mechanism, the Securitization Offset Charge, and the Delivery Service Adjustment.
PDF page 137
Long Island Power Authority
Second Revised Leaf No. 228
Effective: January 1, 2009
Tariff for Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
I. SERVICE CLASSIFICATION NO. 2 - MRP
Large General and Industrial Service With Multiple Rate Periods (continued): (Rate Codes: 284, 285, M284, M285)
4. Reactive Demand Charges - Rate Codes 284, 285, M284, and M285
a) Transmission and primary service Customers who use electricity at a Power Factor of less than 90% and choose to pay a monthly Reactive Demand Charge of $0.27 per KVAR, shall pay for the additional metering equipment either when it is installed or through a monthly charge.
b) For the first twelve (12) months of billing for Reactive Demand Charges, the KVAR charges will not exceed 1% of the Customer's total bill.
5. How Demand is Determined
The Authority will furnish and maintain a demand meter of standard type to determine the demand. The demand is the maximum 15-minute demand during the month in each Rate Period, taken to the nearest one-tenth (1/10) kilowatt.
6. How the Minimum Demand Charges are Determined - All Rate Codes
a) The Authority will charge an annual Minimum Demand Charge to those Customers whose actual billed demand revenues in Periods 1, 2, and 3 are less than the Minimum Demand Charges given below. The Authority will not apply this charge to new Customers taking service for part of a calendar year or Customer-generators eligible for net billing.
b) The Authority will use the highest recorded demands for Periods 1, 2, and 3 and multiply those demands by the Minimum Demand Charges to determine the minimum amount the Customer is responsible for.
c) If the sum of the Minimum Demand Charges in the three (3) Periods is greater than the sum of the actual billed demand revenues for the year under review, the difference will be charged to the Customer's account, and
d) When this difference is more than ten percent (10%) of the total annual demand revenues, the Customer may choose to pay it in no more than twelve (12) equal monthly installments.
PDF page 138
Long Island Power Authority
First Revised Leaf No. 229
Effective: December 1, 2000
Tariff for Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
I. SERVICE CLASSIFICATION NO. 2 - MRP
Large General and Industrial Service With Multiple Rate Periods (continued): (Rate Codes: 284, 285, M284, M285)
7. How the Net Reactive Demand is Determined
a) The Net Reactive Demand is the 15-minute integrated kilovolt-amperes of lagging reactive demand minus 48% of the 15-minute integrated kilowatt demand recorded during the same 15-minute period.
b) The Customer will be billed monthly for the maximum Net Reactive Demand recorded between 7:00 a.m. through 11:00 p.m.
c) For billing purposes, the maximum Net Reactive Demand will be the greater of:
(1) The maximum Net Reactive Demand recorded for the month from 7:00 a.m. through 11:00 p.m., or
(2) 100% of the maximum Net Reactive Demand recorded from June through September, from 7:00 a.m. through 11:00 p.m., during the last eleven (11) months.
8. Terms of Payment
The Customer shall pay the balance due in cash, including checks and money orders, on receiving the bill. Late payments shall be subject to Late Payment Charges.
9. Term of Service
a) The Authority will provide service to the Customer for at least one (1) year and until service is terminated either by the Customer or the Authority.
b) The Customer shall give the Authority thirty (30) days written notice when requesting termination of service.
c) The Authority may terminate service to the Customer in accordance with the provisions of the Tariff, after giving the Customer thirty (30) days written notice.
d) The Authority may require the Customer to take service at rates effective for a longer term because of the investment required or other unusual conditions related to the service.
PDF page 139
Long Island Power Authority
Seventh Revised Leaf No. 230
Effective: January 1, 2026
Tariff for Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
I. SERVICE CLASSIFICATION NO. 2 - MRP
Large General and Industrial Service With Multiple Rate Periods (continued): (Rate Codes: 284, 285, M284, M285)
10. Special Provisions
a) Corrective Equipment Requirements
When the installation includes welders, x-rays, or other apparatus having a highly fluctuating or large instantaneous demand, the Customer shall provide batteries, rotating equipment, or other corrective equipment to reduce the inrush current to an amount acceptable to the Authority.
b) Requirements for Service at 69,000 Volts or Higher
The Applicant shall provide and maintain voltage regulating equipment and circuit breakers complete with accessory equipment, using the procedures and schedules specified by the Authority.
c) Changes in Eligibility of Existing Accounts
If there is an Applicant for an existing account, but the Authority believes the Applicant's business activity will change the characteristics of the account's loads, the account will be considered a new account for Service Classification purposes.
d) Business Development Programs
(1) Empire Zone Program
(a) The Empire Zone Program expired on June 30, 2010. Customers on this program, prior to July 1, 2010, will continue to receive rate discounts until their previously agreed upon term has expired.
(b) With the exception of the Calverton portion of the Suffolk County Empire Zone, Primary and Secondary Customers who qualify receive a 50% discount on their Base Rate Energy Charge per kWh and Period 3 Demand Charges, but only for the additional energy and demand.
(c) With the exception of the Calverton portion of the Suffolk County Empire Zone, Transmission Customers who qualify receive a 55% discount on their Base Rate Energy Charge per kWh and Period 3 Demand Charges, but only for the additional energy and demand.
(d) Qualifying Primary and Secondary customers within the Calverton portion of the Suffolk County Empire Zone receives a 6% discount on their Base Rate Energy Charge per kWh and Period 3 Demand Charges, but only for the additional energy and demand.
PDF page 140
Long Island Power Authority
Third Revised Leaf No. 230A
Effective: January 1, 2022
Tariff for Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
I. SERVICE CLASSIFICATION NO. 2 - MRP
Large General and Industrial Service With Multiple Rate Periods (continued): (Rate Codes: 284, 285, M284, M285)
Special Provisions (continued):
(e) Qualifying Transmission customers with the Calverton portion of the Suffolk County Empire Zone receive a 7% discount on their Energy Charges per kWh and Period 3 Demand Charges, but only for the additional energy and demand.
(2) Excelsior Jobs Program
(a) The Excelsior Jobs Program is intended to encourage business to expand or relocate the Authority’s Service Area.
(b) The Authority’s discount is available to certified participants who increase their load by at least 25%, to a minimum of 145 kW within one (1) year of Excelsior Program certification.
(c) Customers who qualify will pay $0.0158 for their Base Rate Energy Charge per kWh for the additional energy associated with the incremental load subsequent to the ESD Approval Date. There will be no demand charges associated with the incremental load subsequent to the ESD Approval Date.
PDF page 141
Long Island Power Authority
Eighth Revised Leaf No. 231
Effective: January 1, 2022
Tariff for Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
I. SERVICE CLASSIFICATION NO. 2 - MRP
Large General and Industrial Service With Multiple Rate Periods (continued): (Rate Codes: 284, 285, M284, M285)
Special Provisions (continued):
(3) Business Attraction/Expansion, Manufacturing Competitiveness, and Business Incubation Programs
(a) Customers who qualify after June 29, 2012 receive a 100% discount on their Base Rate Energy Charge per kWh for Periods 1, 2, and 3, in the first year of their participation in the program. Participants that qualified before June 29, 2012 will continue to receive a 50% discount on their Base Rate Energy Charge, subject to pro-ration as noted in the paragraph below.
(b) The discounts will decrease by one-fifth (1/5) each year after the first year until the Customers are billed at the rate's regular levels at the end of the fifth (5th) year.
(c) Customers who qualify may apply for modified rate periods. The modified peak Period 2 hours are June through September, Monday through Friday, from 3 p.m. to 8 p.m., for Rate Code M284 and June through– September, Monday through Friday, from 3 p.m. to 10 p.m., for Rate Code M285. The hours June through September, Monday through Friday from 12 noon to 3 p.m., are included in the Intermediate period for Rate Code M284. The hours June through September, Monday through Friday, from 10 a.m. to 3 p.m. and Saturday from 10 a.m. to 10 p.m., are included in the Intermediate period for Rate Code M285.
e) Choosing Rate Code 284 or Rate Code 285
New Customers shall choose either Rate Code 284 or Rate Code 285 at the time of qualification of service.
(1) Rate Code 284 Customers may choose to receive service under Rate Code 285.
(2) Rate Code 285 Customers will have one opportunity to transfer to Rate Code 284.
(3) Customers must request transfers between Rate Code 284 and Rate Code 285 in writing, thirty (30) days before their Anniversary Date.
(4) Customers eligible for modified rating periods under Rate Code M284 and Rate Code M285 must follow the same rules as for Rate Code 284 and Rate Code 285 respectively.
PDF page 142
Long Island Power Authority
Second Revised Leaf No. 231A
Effective: January 1, 2023
Tariff for Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
I. SERVICE CLASSIFICATION NO. 2 - MRP
Large General and Industrial Service With Multiple Rate Periods (continued): (Rate Codes: 284, 285, M284, M285)
Special Provisions (continued):
f) Transfer to Service Classification No. 2-L or 2L-VMRP
At their option, Customers taking service at Service Classification No. 2-MRP can be transferred to Service Classification No. 2-L or at their option 2L-VMRP when:
(1) The Customer requests a transfer, and
(2) The metered demand of the Customer has been less than 116 kW for twelve (12) consecutive billing periods, and
(3) The transfer will take place within ninety (90) days after the Authority certifies that the Customer qualifies for the services,
g) Service for Religious Purposes, Supervised Community Residences, or Veterans Organizations
Customers under this Service Classification who use electricity for religious purposes, for Community Residences, or Veterans Organizations as specified in Section 76 of the Public Service Law, may apply for a suitable residential service after a minimum term of one (1) year.
(1) The transferring Customer shall submit a new Application to the Authority before the transfer, and
(2) The transfer will take place at the time of the Customer’s next meter reading.
PDF page 143
LIPA
Service Classification No. 12: Standby Service and Optional Rate Service
PDF page 144
Long Island Power Authority
Original Leaf No. 264A
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service:
(Rate Codes: 179, 680, 682)
1. Who Is Eligible
This Service Classification (SC-12) is applicable to Customers meeting the requirements of
(a) through (d) below (Standby Service Customers) and Customers meeting the requirements of (e) through (f) below (Optional Rate Customers):
Standby Service
a) Customers who have generation installed on their site, whether the generation equipment is owned by the customer or a third party; or
b) Customers who are directly interconnected with a Generator, as defined as a company whose primary business is the production of electricity;
c) Generators who require service from the Authority when their own electric generating equipment is not sufficient to meet their own load; or
d) Customers with on-site generation compensated under Value Stack, that meet the requirements for compensation, and that are not otherwise exempt in accordance with Section P.4 of this SC-12.
Optional Rate Service
e) Customers that opt into SC-12, who do not otherwise meet the requirements of Standby Service (Optional Rate Customers). Any customer may opt into SC-12 with the exception of SC-5, SC-7, SC-10, SC-13 customers, unmetered customers and non-AMI metered customers. Optional Rate Customers can switch back to applicable non-Standby rates available to them at any time, however, to avoid customers switching to take advantage of seasonal fluctuations in rate design, Optional Rate Customers that switch back to a non-time-varying flat rate will not be allowed on Standby rates or other time-varying rate code for a period of not less than one year.
f) Customers on ReCharge NY service will be assigned to Rate 680 and cannot opt-in to Standby Rates.
g) More specifically, Standby Service shall apply to:
(1) Customers with on-site generation serving load that is not isolated from the grid;
(2) Generators that rely on the Authority to serve electric loads that would otherwise be served by the generator such as station power used for the heating, lighting, air- conditioning, and office equipment needs of the buildings housing the generator and associated support facilities located on a generating facility’s site, and/or to facilitate the re-starting of the generator following an outage. Standby rates will also apply to Generators that take station power through the same bus bar as they supply the grid.
h) For Standby Service Customers, the Parent Service Classification shall be defined based upon the applicable Contract Demand at the delivery point (as initially calculated by the Authority).
PDF page 145
Long Island Power Authority
Original Leaf No. 264B
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Who Is Eligible (continued)
i) Same Bus Bar
Same Bus Bar is defined as a common electrical point of interconnection on the same physical bus bar structure located at one substation of the utility and an individual customer’s system at the single voltage level at which the customer takes service. This common point of interconnection may include up to one load serving connection, or tap, (such tap is in addition to the single point of delivery service from the generating customer to the Authority’s delivery system being metered), from a single physical bus bar (one tap must be connecting the customer's generation output to the bus and a second tap must be connecting the customer's electric service to the bus) located at an Authority substation. The customer’s generation must be on a single unitary tract of land; adjoining and abutting the land upon which the Authority substation is located and the points of delivery and receipt must not be more than 500 feet apart. The presence of Authority equipment, including but not limited to switches, fuses, transformers, and circuit breakers, between the point(s) of delivery is not considered Same Bus Bar.
PDF page 146
Long Island Power Authority
Original Leaf No. 264C
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Who Is Eligible (continued)
2. Definitions
Standby Rates will be optional for Full Requirements Customers receiving service under the following Service Classifications. The terms and conditions of the Parent Service Classifications apply unless modified in Service Classification 12.
a) SERVICE CLASSIFICATION NO. 1 – Residential Service:
(1) Service Classification No. 1 (Rate Codes: 180, 194, 195, 580)
(2) Service Classification No. 1-VTOU (Rate Codes: 190, 191, 192, 193)
b) SERVICE CLASSIFICATION NO. 2- General Service - Small:
(1) Service Classification No. 2 (Rate Code: 280)
(2) Service Classification No. 2-VMRP (Rate Code: 292)
c) SERVICE CLASSIFICATION NO. 2-L – General Service - Large:
(1) Service Classification No. 2-L (Rate Codes: 281, 283, 291)
(2) Service Classification No. 2L-VMRP (Rate Codes: 294)
d) SERVICE CLASSIFICATION NO. 2 – MRP – Large General and Industrial Service With Multiple Rate Periods:
(1) Service Classification No. 2-MRP (Rate Codes: 284, 285, M284, M285) – Secondary Voltage
(2) Service Classification No. 2-MRP (Rate Codes: 284, 285, M284, M285) – Primary Voltage
(3) Service Classification No. 2-MRP (Rate Codes: 284, 285, M284, M285) – Transmission Voltage
3. Character of Service
a) Continuous, 60 hertz, alternating current.
b) Radial secondary service at approximately 120/208, 120/240, or 277/480 volts, three phase; network system 120/208 or 277/480, depending on the size and characteristics of the load and the circuit supplying the service.
c) Radial primary service at approximately 2,400/4,160, 7,620/13,200 volts depending on the size and characteristics of the load and the circuit supplying the service.
d) Radial Sub/Transmission service at approximately 24,000 volts or higher depending on the size and characteristics of the load and the circuit supplying the service.
e) The Primary Rate will apply to Radial primary service. The Sub/Transmission Rate will apply to Radial transmission service.
f) For Optional Standby Customers, service must comply with parent Service Classification based on the otherwise applicable Rate Code.
PDF page 147
Long Island Power Authority
Original Leaf No. 264D
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
4. Exemptions From SC-12
The following customers shall not be subject to SC-12, but shall be served under the customer's otherwise applicable service classification unless Customers make a one-time irrevocable election to forfeit or refuse the exemption and join the Standby Rate or the in progress Phase-In period of Standby Rates, identified in SC-12.14.g if still applicable. Customers that qualify for the Environmentally Advantageous Technologies (EAT) Exemption and that request a one-time irrevocable election to join Standby Rates or the in progress Phase-In period for Standby Rates if still applicable, will make the request by providing thirty
(30) days written notice to the Authority before commencing operation of the OSG.
a) Small Generators
Customers with a nameplate aggregate generator(s) 5 kVA or smaller that may run in parallel with the LIPA system.
b) Customers with On-Site Generators (OSG) Less than or Equal to 15% of Maximum Potential Demand as identified in SC-12.14.e.
c) Environmentally Advantageous Technologies (EAT) Exemptions
Customers who install OSG that are:
(1) Solar thermal;
(2) Solar photovoltaic;
(3) Onshore and offshore wind;
(4) Hydroelectric;
(5) Geothermal electric;
(6) Geothermal ground source heat;
(7) Tidal energy;
(8) Wave energy;
(9) Ocean thermal;
(10) Hybrid Solar and Battery Facilities
(11) Fuel cells which do not utilize a fossil fuel resource in the process of generating electricity. Fuel cells are permitted to utilize biomass, biogas, or hydrogen, provided that the manufacture or production of such fuels does not include the combustion or electrolysis of fossil fuels or non-renewable grid power in the conversion process.
PDF page 148
Long Island Power Authority
Original Leaf No. 264E
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Exemptions from SC-12 (continued)
(12) Small, efficient types of combined heat and power (CHP) generation that do not exceed 1 MW of capacity and meet the following criteria:
(i) Annual overall thermal and electrical energy efficiency should not be less than 60% based on the higher heating value (HHV) of the fuel input;
(ii) The usable thermal energy component should absorb a minimum of 20% of the CHP facility’s total usable annual energy output;
(iii) The OSG capacity shall be determined by aggregating the nameplate ratings of the generation units, installed at its location, excluding emergency generation units used only during a utility distribution system failure or in response to the NYISO Emergency Demand Response Program; and
(iv) An eligible CHP facility shall demonstrate to the Authority that its generation installation meets an environmental standard of no more than 1.4 lbs./MWh of NOx emissions based on its electrical and mechanical output or its rated capacity. Units that have completed a Coordinated Electric System Interconnection Review (CESIR) by April 1, 2018 will be subject to the previously applicable standard of no more than 4.4 lbs./MWh of NOx emissions.
(v) The CHP facility must be placed in service before May 31, 2021.
(vi) Customers shall comply with the above criteria and in addition:
1. Monitor and record efficiency data, which shall include the annual quantity of fuel fired, the annual quantity of generated electricity, and the annual quantity of the thermal heat recovered in the heat recovery process;
2. Have records available for Authority inspection; and
3. Retain the records for a 3-year period.
(13) Energy Storage technologies with inverter capability of up to 1 MW. However, customers who install energy storage systems to help manage the demand of EV charging load, with said energy storage systems having inverter capability greater than 1 MW and less than or equal to the sum of nameplate EV charging capability, are also exempt provided that such installations meet all other applicable interconnection and standby service requirements.
Customers qualifying for the EAT Exemption shall comply with all of the following requirements:
(i) The OSG is connected to the Customer’s electric system using an automated or manual transfer switch or the electrical equivalent of such a switch approved by the Authority.
(ii) The customer executes, and the Authority accepts, an Application for Electric Standby Service as required under the special provisions of the applicable Service Classification for all generators on the premises. The Customer shall state its intended use of the OSG facilities on the Application for Electric Standby Service in the blank spaces provided for special conditions.
PDF page 149
Long Island Power Authority
Original Leaf No. 264F
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Exemptions from SC-12 (continued)
In the event the Customer fails to comply with provisions (i) through (ii) above, the Authority shall have the following rights: To bill the customer Standby Service rates for those amounts of total Electric Service which the Authority reasonably estimated were received by the Customer during times when Electric Service from the Authority was available to the Customer.
d) Emergency Generators
Customers who install or have installed an emergency power system may be exempted from the requirement of service under this SC-12 if the OSG meet the following requirements:
(1) The Emergency OSG is not capable of being operated in parallel with the Authority's system other than for closed-transition transfer switching where the term "closed- transition transfer" is characterized as a momentary make-before-break switching sequence;
(2) The Emergency OSG is connected to the customer's electric system using an automated or manual transfer switch or the electrical equivalent of such a switch approved by the Authority;
(3) The Emergency OSG is used exclusively for purposes of emergency power system;
PDF page 150
Long Island Power Authority
Original Leaf No. 264G
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Exemptions from SC-12 (continued):
Emergency Generators (continued):
(4) No load may be served by Emergency OSG while Electric Service is being provided by the Authority to the premises except:
(i) For the periods of time as required by statute or regulation, and
(ii) In the absence of a statutory or regulatory requirement, such times so as to adequately test such systems, not to exceed 10 hours per month or as otherwise agreed to by the Authority; and
(iii) For periods of time called by the NYISO for Emergency Demand Response (EDR) or ICAP (UCAP).
(5) The customer shall maintain an operating log for each Emergency OSG indicating the date, time, hours, and purpose of each operation of each such facility. This log shall be made available to the Authority upon request. If the customer fails to maintain this log or to provide it to the Authority on request, the Authority shall have the following rights:
(i) To bill the customer for those amounts of Electric Service which the Authority reasonably estimated were inappropriately supplied by the customer’s generator during times when Electric Service from the Authority was available to the customer; and
(ii) In all cases, the customer shall remain obligated to execute and have the Authority accept a Standby Service Application as applicable under the special provisions of the applicable service classification for all Emergency Generators on the premises. The customer shall state its intended use of the OSG facilities on the Standby Service Application in the blank spaces provided for special conditions.
PDF page 151
Long Island Power Authority
Original Leaf No. 264H
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
5. Application for Service
Standby Service:
Customers with on-site generation that will run in parallel with the LIPA system must apply for service by providing the Authority with an executed Standby Service Application and SGIP, both of which are available on the Authority’s website or from an Authority representative.
Customers operating an OSG unit less than 10 MW and connected for parallel operation with the service of the Authority may apply for service using the SGIP, also available from Authority representatives. Customers in excess of 10 MW, that also have an OSG, must execute an Interconnection Agreement with the Authority.
Optional Rate Service:
Eligible customers must apply for service with the Authority.
6. Billing Parameters
Customers served under this service classification shall be billed according to the following parameters:
Customer Service Charge: a charge for customer-related services.
Contract Demand Charge: a reservation charge for the use of the Authority’s local distribution system.
As Used Peak Daily Demand Charge: a daily usage demand charge for the maximum use of the Authority’s delivery system during on-peak hours (as defined in the Determination of Contract Demand section of SC12).
As Used Off-peak Daily Demand Charge: a daily usage demand charge for the maximum use of the Authority’s delivery system during Off-peak hours (as defined in the Determination of Contract Demand section of SC12).
Power Supply Charge: a charge for the electricity supply service (Commodity) provided to the customer.
Surcharges and Adjustments: a set of itemized charges for specific adjustments as provided under the otherwise applicable service classification.
PDF page 152
Long Island Power Authority
Original Leaf No. 264I
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
7. Rates and Charges
Customers that receive their non-Authority supply from the New York Power Authority (NYPA) under the ReCharge NY program will be designated as Rate Code 680. Customers on ReCharge NY program will pay the rates and charges under another suitable Service Classification. In this case, the Customer will comply with the terms of this Service Classification including the interconnection provision, that are in addition to, and do not conflict with the requirements of the suitable Service Classification.
Applicable Rates and Charges: Standby Service Customers and Optional Rate Service Customers will be subject to the following SC 12 rates in accordance with their Parent Service Classification if a Standby Service Customer and their otherwise applicable service classification if an Optional Rate Service Customer.
a) Rate Code B1179: Parent Service Classification No. 1 – Residential Service
MONTHLY RATE:
Service Charge Per Day:
$0.56
Contract Demand Charges per kW:
Delivery for SC-12 Customers
$0.26
As Used Off-Peak Daily Demand Charges per kW:
Delivery for SC-12 Customers
$0.95
As Used Peak Daily Demand Charges per kW:
Delivery for SC-12 Customers
$1.57
SC-12 customers billed under Parent Service Classification No. SC-1 rates shall have the determination of their Contract Demand (kW) and As Used Daily Demand (kW) based on a 60-minute integrated metered demand, which shall be determined as the sum of the four 15-minute intervals in an hour.
PDF page 153
Long Island Power Authority
Original Leaf No. 264J
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Rates and Charges (continued)
b) Rate Code B1682: Parent Service Classification No. 2- General Service - Small
MONTHLY RATE:
Service Charge Per Day:
$0.56
Contract Demand Charges per kW:
Delivery for SC-12 Customers
$0.26
As Used Off-Peak Daily Demand Charges per kW:
Delivery for SC-12 Customers
$1.26
As Used Peak Daily Demand Charges per kW:
Delivery for SC-12 Customers
$2.14
Rate Code P1682: Phase-In Charges for Parent SC-2 Small
Delivery Charges will be calculated as identified in SC-12.14.g. Customer who elect to receive Phase-In Charges will do so based on the current delivery rates under Parent Service Class Rate 280.
SC-12 customers billed under Parent Service Classification SC-2 Small rates shall have the determination of their Contract Demand (kW) and As Used Daily Demand (kW) based on a 60-minute integrated metered demand, which shall be determined as the sum of the four 15-minute intervals in an hour.
PDF page 154
Long Island Power Authority
Original Leaf No. 264K
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Rates and Charges (continued)
c) Rate Code B2682: Parent Service Classification No. 2-L – General Service - Large
MONTHLY RATE:
Service Charge Per Day:
$2.92
Contract Demand Charges per kW:
Delivery for SC-12 Customers
$0.19
As Used Off-Peak Daily Demand Charges per kW:
Delivery for SC-12 Customers
$0.81
As Used Peak Daily Demand Charges per kW:
Delivery for SC-12 Customers
$1.20
Rate Code P2682: Phase-In Charges for Parent SC 2-L
Delivery Charges will be calculated as identified in SC-12.14.g. Customer who elect to receive Phase-In Charges will do so based on the current delivery rates under Parent Service Class Rate 281.
SC-12 customers billed under Parent Service Classification No. SC 2-L rates shall have the determination of their Contract Demand (kW) and As Used Daily Demand (kW) based on a 15-minute integrated metered demand.
PDF page 155
Long Island Power Authority
Original Leaf No. 264L
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Rates and Charges (continued)
d) Rate Code B3682/B4682: Parent Service Classification No. 2 – MRP – Large General and Industrial Service With Multiple Rate Periods (Secondary and Primary)
MONTHLY RATES:
(B4682)
(B3682)
Delivery Voltage
Secondary
Primary
Service Charge Per Day:
$3.83
$5.20
Contract Demand Charges per kW:
Delivery for SC-12 Customers
$0.11
$0.06
As Used Off-Peak Daily Demand Charges per kW:
Delivery for SC-12 Customers
$0.95
$0.83
As Used Peak Daily Demand Charges per kW:
Delivery for SC-12 Customers
$1.30
$1.21
Rate Code P3682/P4682: Phase-In Charges for Parent SC 2-MRP (Secondary & Primary)
Delivery Charges will be calculated as identified in SC-12.14.g. Customer who elect to receive Phase-In Charges will do so based on the current delivery rates under Parent Service Class Rate 285 Secondary or Rate 285 Primary depending on voltage level they are interconnected.
SC-12 customers billed under Parent Service Classification No. SC 2-MRP rates shall have the determination of their Contract Demand (kW) and As Used Daily Demand (kW) based on a 15-minute integrated metered demand.
PDF page 156
Long Island Power Authority
Original Leaf No. 264M
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Rates and Charges (continued)
e) Rate Code B5682: Parent Service Classification No. 2 – MRP – Large General and Industrial Service With Multiple Rate Periods (Transmission)
MONTHLY RATES:
Delivery Voltage
Transmission
Service Charge Per Day:
$5.20
Contract Demand Charges per kW:
Delivery for SC-12 Customers
$0.05
As Used Off-Peak Daily Demand Charges per kW:
Delivery for SC-12 Customers
$0.69
As Used Peak Daily Demand Charges per kW:
Delivery for SC-12 Customers
$1.17
Rate Code P5682: Phase-In Charges for Parent SC 2-MRP (Transmission)
Delivery Charges will be calculated as identified in SC-12.14.g. Customer who elect to receive Phase-In Charges will do so based on the current delivery rates under Parent Service Class Rate 285 Transmission.
e) Rate Code P6682: Phase-In Charges for Customers Previously on Closed Rate 681 (Transmission)
Delivery Charges will be calculated as identified in SC-12.14.g. Customers who elect to receive Phase-In Charges will do so based on the current delivery rates under Parent Service Class Rate 285 Transmission but will have zero demand charges and energy charges identified for Previously Closed Rate 681 as updated on a pro-rata percentage basis with Rate 285 Transmission.
Previously Closed Rate 681 Periods*
1
2
3
Midnight
June - Sept.,
All remaining
to 7 a.m.
except Sunday,
hours
all year
10 a.m. to 10 p.m.
Transmission
$ 0.0001
$ 0.2850
$ 0.0364
SC-12 customers billed under Parent Service Classification No. SC 2-MRP (Transmission) rates shall have the determination of their Contract Demand (kW) and As Used Daily Demand (kW) based on a 15-minute integrated metered demand.
PDF page 157
Long Island Power Authority
Original Leaf No. 264N
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
8. Adjustments to Rates and Charges
Each Customer’s bill will be adjusted for the Power Supply Charge, Increases in Rates and Charges to Recover PILOT Payments, the Shoreham Property Tax Settlement Rider, the Distributed Energy Resources Cost Recovery Rate, the Merchant Function Charge, the New York State Assessment Factor, the Securitization Offset Charge, and the Delivery Service Adjustment.
Each Customer that qualifies for Rate 285-Primary or Rate 285-Transmission will not be billed the Power Supply Charge. Such customers will be billed Hourly Market Power Supply charges based on the NYISO Day ahead market: Average Monthly Energy Component (based on published day ahead NYISO Hourly Zone K LBMP energy prices); plus
Capacity Charges based on customer’s individually assigned capacity tag (kW) times the NYISO Zone K Monthly Capacity Market Price; plus
The monthly local power supply charge.
9. Terms of Payment
The Customer shall pay the balance due in cash, including checks and money orders, on receiving the bill. Late payments shall be subject to Late Payment Charges.
10. Term of Service
a) The Authority will provide service to the Customer for at least one (1) year and until the service is terminated by the Customer or the Authority.
b) The Customer shall give the Authority thirty (30) days written notice when requesting termination of service.
c) The Authority may terminate service to the Customer in accordance with the provisions of the Tariff, after giving the Customer thirty (30) days written notice.
d) The Authority may require the Customer to take service at rates effective for a longer term because of the investment required or other unusual conditions related to the service.
PDF page 158
Long Island Power Authority
Original Leaf No. 264O
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
11 Determination of Contract Demand
a) Contract Demand for Standby Service Customers
Contract Demand shall initially be set at the maximum anticipated demand of the customer including any load that is not isolated referenced in the Standby Service Application and determined as the greater of the following and the Authority shall inform the customer of the resultant contract demand ten (10) days prior to the next billing cycle:
(1) the maximum demand from the Authority's system over the previous 12-months, or
(2) the customer's maximum load supplied by all sources including the OSG and Authority's supply system over the previous 12-months.
In the case of a new customer (i.e., a customer for whom historical consumption data does not exist), the Contract Demand shall be the maximum anticipated demand of load consumed as prescribed in the customer’s load letter.
The Contract Demand shall automatically be increased to the highest measured demand in any billing period during the term hereunder.
The Contract Demand of a Generator who is connected to a customer which would otherwise be served directly by the Authority shall be set at the maximum potential demand of the station power of the Generator when the generator is out of service plus the maximum potential demand of the customer.
The Contract Demand may be increased based upon a written notice by the customer to the Authority at any time.
The Contract Demand as determined above may be reduced based upon a written request by the customer to the Authority. Contract Demand requests may be made no more than one time in a 365-day period and/or 365 days from any increase or ratchet in Contract Demand. In the event the customer’s Contract Demand request is accepted by the Authority and the Contract Demand is reduced; if thereafter the recorded maximum demand at any time exceeds the customer's requested Contract Demand: (i) by 20% or greater than a penalty equal to the product of 24 times the Contract Demand rate times the demand in excess of the Contract Demand shall apply, (ii) by 10% or greater, but less than 20%, then a penalty equal to the product of 18 times the Contract Demand rate times the demand in excess of the Contract Demand shall apply, (iii) by less than 10% then a penalty equal to the product of 12 times the Contract Demand rate times the demand in excess of the Contract Demand shall apply.
Seasonal or other temporary fluctuations in load of the customer's existing facilities such as heating and air conditioning, and temporary reductions in manufacturing shall not qualify for reductions in the Contract Demand.
The effective date of the revised Contract Demand shall be the next billing cycle following the Authority's receipt of the customer's written notice provided such notice is received 10 business days prior to the first day of the next billing cycle.
PDF page 159
Long Island Power Authority
Original Leaf No. 264P
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Determination of Contract Demand (continued)
b) Contract Demand for Optional Rate Customers
Contract Demand will be established initially as the customer’s maximum measured demand during the first billing period. Thereafter, the Contract Demand shall automatically be increased to the highest measured demand in any billing period during the term hereunder. In the event the customer has installed energy efficient equipment or has altered the operation of their service such that the maximum potential demand at the premise is less than the Contract Demand, the customer may request a reconsideration of the Contract Demand by the Authority. Any reduction of the Contract Demand will be at the Authority’s discretion.
c) As Used Off-Peak Daily Demand
The As-Used Off-peak Daily Demand shall be the aggregate of the highest daily 15- minute integrated demand (measured in kW) occurring during the off-peak hours of each day during the billing period, except for customers of parent service classification is SC-1 or SC-2 Small non-demand it shall be the aggregate of the highest 60-minute integrated demand (measured in kW) during the off-peak hours of each day during the billing period.
Off-Peak hours are defined as follows: During the months of October through May, for the hours between 8:00 am and 10:00 pm, daily. During the months of June through September, for the hours between 8:00 am and 3:00 pm and 7:00 pm through 10:00 pm, Mondays through Fridays, and 8:00 am through 10:00 pm, Saturdays, Sundays and Federal Holidays.
d) As Used Peak Daily Demand
The As-Used Peak Daily Demand shall be the aggregate of the highest daily 15-minute integrated demand (measured in kW) occurring during the peak hours of each day during the billing period, except for customers of parent service classification is SC-1 or SC-2 Small non-demand it shall be the aggregate of the highest 60-minute integrated demand (measured in kW) during the peak hours of each day during the billing period.
Peak hours are defined as follows: During the months of June through September, for the hours between 3:00 pm and 7:00 pm, Mondays through Fridays, excluding Federal Holidays.
PDF page 160
Long Island Power Authority
Original Leaf No. 264Q
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
12. Interconnection Requirements
a) The Authority may disconnect a Customer from the system if the Customer operates a generator in parallel with the Authority’s system without an Interconnection Agreement (IA) with the Authority.
b) The Customer must sign an IA within ninety (90) days of written notice, including a draft IA, from the Authority, unless
c) The Customer has filed a complaint following the Consumer Complaint Procedures in Section VI of the Tariff. In this case, the Customer will not be disconnected until the complaint is resolved, unless the parallel generation creates a hazardous condition or threatens the integrity of the system.
d) The facility may be connected for parallel operation with the service of the Authority, or isolated for operation with Standby Service provided by a Wholesale Generator by means of a double throw transfer switch or transfer switching scheme acceptable to the Authority.
e) Customers with an OSG and connected for parallel operation with the service of the Authority are required to execute an IA with the Authority. Customers having an OSG in aggregate with other OSGs of less than 10 MW are eligible to apply the service using the SGIP. Customers without an OSG are not required to execute an IA with the Authority. All other customers must execute an Interconnection Agreement, available from Authority representatives.
13. Metering and Communications
Interval Metering
Standby Service Customers and Optional Rate Customers must have interval metering (AMI or MV90) and may not opt out of AMI interval meters.
PDF page 161
Long Island Power Authority
Original Leaf No. 264R
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
14. Special Provisions
a) Contract Demands Larger than 1,000 kW
All Standby Service Customers with Contract Demands greater than 1,000 kW applying for Service under this Service Classification are required to provide the Authority with an annual schedule of OSG maintenance by October of the preceding year for each subsequent year. This schedule will be provided at the time of subscription to this Service Classification and will be utilized for planning functions. Schedules must include starting and ending times for all planned outages. Customers will be allowed to update their schedules one month prior to their effective dates. After this time has passed, no modifications will be allowed to the schedules, unless Authority approval is granted. This provision does not take precedence with respect to any OSG maintenance provision in a power purchase agreement which may be in place with the Authority.
b) Compliance with Reliability Criteria
Standby Service Customers agree to comply with any existing or future criteria, guidelines, and procedures established by the North American Electric Reliability Council (or its successor) to ensure the continued reliability of North America's interconnected secured transmission electric systems.
c) Electrically Isolated Loads
(1) The Customer’s non-Authority supply may be isolated from the Authority’s service by a double throw switch, or
(2) Connected with the Authority’s service for parallel operation. In this case, the Authority will provide suitable metering and charge the Customer for any additional metering costs.
(3) The Customer may choose to have the Authority use its estimating procedure to determine the separation of energy and demand between the Standby Service.
(4) A Customer which is a Qualifying Facility under Part 292 of Title 18 of the Code of Federal Regulations or eligible for Net Metering under PSL 66-j or 66-l may choose, once in every 12-month period, to make its purchases of energy and demand for Standby Service at rates either:
(i) Under this Service Classification, or
(ii) Under a suitable firm Service Classification. In this case, the Customer will comply with the terms of this Service Classification, including the Interconnection Charge provision, that are in addition to and do not conflict with the requirements of the suitable firm Service Classification.
(5) Submetering may be available under certain conditions, as specified in the Tariff.
PDF page 162
Long Island Power Authority
Original Leaf No. 264S
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Special Provisions (continued)
d) Penalties for Reconnecting Isolated Loads without Notice
Notwithstanding any other provision of the Tariff, in the event that the customer connects on-site generation to its electric system without: (1) notifying the Authority; and (2) executing the Application for Electric Standby Service, and in the event that the Authority thereafter discovers that fact, the Authority shall backbill the customer for all service rendered subsequent to the estimated installation of such on-site generation.
In preparing such backbill, the Authority shall assess a Contract Demand Penalty Provision equal to 2 times that which would otherwise be computed under Determination of Demand Provision of SC-12 and assume the Contract Demand had been set at 0 kW. If the customer fails to pay the undisputed portion of any such backbill within the time for payment of bills established in SC-12, the Authority shall be authorized to exercise all of its rights in cases involving theft of service under this Tariff.
e) Billing for Customers with OSGs Less than or Equal to Fifteen Percent (15%) of Maximum Potential Demand
Standby Service Customers that install an OSG with a total nameplate rating that is fifteen percent (15%) or less of their maximum potential demand over the previous twelve
(12) months shall be subject to the delivery charges of their otherwise applicable service classification and shall not be subject to Standby Rates.
PDF page 163
Long Island Power Authority
Original Leaf No. 264T
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Special Provisions (continued)
f) Billing for Customers with Excelsior Jobs Program (“EJP”) Load Not Separately Metered
(1) Only customers billed at commercial rates are eligible to participate in the EJP program.
(2) Special Provision E of SC-12 shall not apply to customers with EJP load.
(3) The customer’s EJP demand and energy available for the EJP discount in each billing period shall be determined in accordance with Section VII.E.5.e for EJP. Customer shall be subject to all rates and charges applicable to the Excelsior Jobs Program as provided in Section VII.E.5.
(4) Customer shall be subject to all charges provided in SC-12. The billing determinants for customers with EJP qualifying load shall be determined as provided herein.
(i) Contract Demand: The Contract Demand shall initially be set by the Authority as the maximum value of the Customer’s monthly base year contract load in kilowatts specified in the signed EJP contract between the Authority and the Customer. The Contract Demand will be automatically increased to the maximum kilowatt demand in a billing period when the maximum kilowatt demand in the billing period exceeds the Contract Demand in that billing period. The maximum kilowatt demand in a billing period shall be calculated by subtracting the EJP incremental demand available for the EJP discount as determined for EJP from the metered billing demand (i.e., customer’s load net of generation) on an interval-by-interval basis. The demand shall not be less than zero (0) in any interval. The customer may elect to increase or reduce the Standby Contract Demand thereafter in accordance with the Determination of Contract Demand provisions of SC-12.
(ii) As-Used Daily Demand: The As-Used Daily Demand shall be the As-Used Daily Demand as specified in Determination of As-Used Daily Demand provisions of this SC for both As-Used On-peak Daily Demand and As Used Super-peak Daily Demand, less the product of the demand eligible for the EJP discount in the billing period and the number of on-peak or off-peak days in the billing period, as applicable.
(iii) Billing Energy: Billing Energy in kilowatt-hours for the purposes of applying the Electricity Supply Service and Surcharges and Adjustments provisions of SC-12 shall be calculated by subtracting the EJP incremental energy available for the EJP discounts from the metered billing energy (i.e., customer’s load net of generation) on an interval-by-interval basis. The Billing Energy shall not be less than zero (0) in any interval.
PDF page 164
Long Island Power Authority
Original Leaf No. 264U
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
Standby Service and Optional Rate Service (continued):
(Rate Codes: 179, 680, 682)
Special Provisions (continued)
g) SC-12 Phase-In Customers
Existing customers prior to December 1, 2025 may elect to be billed the SC-12 Phase-In Standby Rate delivery charges beginning January 1, 2026 (“Phase-In Customers”). Phase-In Customers may opt out of the Phase-In delivery charges at any time and be billed SC-12 Standby Rate delivery charges by providing written notice to the Authority, with such transition to SC-12 Standby Rate delivery charges occurring in the next billing period thirty days after notice is provided. Once a customer opts out of the SC-12 Phase- In Standby Rate delivery charges, they may not return to as a Phase-In-Customer. So long as the Phase-In is still in effect, the EAT exempt Customers may choose waive their EAT exemption and join the Phase-In Standby Rate already in progress.
The Phase-In period will be a fixed (i.e. will not vary by customer) time period that will begin January 1, 2026 (Phase-In Year 1) until December 31, 2030, when the Phase-In Period will end for all customers. A Phase-In Year is defined as January 1st until December 31st.
Delivery Rates for a Phase-In Year will be calculated as the delta to a Customer’s Parent Service Classification rate vs their applicable Standby Rate with the following formulas:
Phase-In Year 1 (2026): Parent Service Class Delivery Rate Revenue + (Standby Delivery Rate Revenue –Parent Service Class Delivery Rate Revenue)/6
Phase-In Year 2 (2027): Parent Service Class Delivery Rate Revenue + (Standby Delivery Rate Revenue –Parent Service Class Delivery Rate Revenue)*2/6
Phase-In Year 3 (2028): Parent Service Class Delivery Rate Revenue + (Standby Delivery Rate Revenue –Parent Service Class Delivery Rate Revenue)*3/6
Phase-In Year 4 (2029): Parent Service Class Delivery Rate Revenue + (Standby Delivery Rate Revenue –Parent Service Class Delivery Rate Revenue)*4/6
Phase-In Year 5 (2030): Parent Service Class Delivery Rate Revenue + (Standby Delivery Rate Revenue –Parent Service Class Delivery Rate Revenue)*5/6
Delivery Rate Revenue includes Service Charge, Delivery Demand Charge and Delivery Energy Charge revenues. All rate components identified in “Adjustments to Rates and Charges” will not be subject to the Phase-In.
PDF page 165
Long Island Power Authority
Twelfth Revised Leaf No. 265
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
[CANCELLED]
PDF page 166
Long Island Power Authority
Seventh Revised Leaf No. 266
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
[CANCELLED]
PDF page 167
Long Island Power Authority
Third Revised Leaf No. 267
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
[CANCELLED]
PDF page 168
Long Island Power Authority
Fourth Revised Leaf No. 268
Effective: January 1, 2026
Tariff For Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
[CANCELLED]
PDF page 169
Long Island Power Authority
Fourth Revised Leaf No. 269
Effective: January 1, 2026
Tariff for Electric Service
VIII. SERVICE CLASSIFICATIONS (continued):
P. SERVICE CLASSIFICATION NO. 12
[CANCELLED]
PDF page 170
Niagara Mohawk
Service Classification 3A: Standard Large General Service (or SC4 at the SC3A parent service class rates, if applicable)
PDF page 171
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 390
NIAGARA MOHAWK POWER CORPORATION
REVISION: 1
INITIAL EFFECTIVE DATE: FEBRUARY 1, 2026
SUPERSEDING REVISION: 0
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated July 18, 2025.
SERVICE CLASSIFICATION NO. 3A
LARGE GENERAL SERVICE - TIME OF USE RATE
APPLICABLE TO USE OF SERVICE FOR:
Service shall be available throughout the Company's service area from existing circuits of adequate capacity and appropriate character. Service shall be provided for all purposes required by a customer on the premises, inclusive of retail transmission, distribution and Electric Service, where such entire requirements are delivered at one Retail Delivery Point and singly metered with respect to the delivery voltage, and according to the following requirements below:
FOR CUSTOMERS SERVED UNDER SC-3A BEFORE SEPTEMBER 1, 1998
When the monthly demand has exceeded 2,000 kW in any two consecutive months of the previous twelve months, or whenever in the Company's opinion the applicant's demand will exceed 2,000 kW in any two consecutive months. A customer once served under this service classification shall remain on this service classification until the monthly measured demand has been 1,500 kW or less for twelve consecutive months following the initial Term of Service, whereupon service may be taken under another appropriate service classification.
For customers receiving Buyback Service from the Company under SC-6, the customer’s Service Demand kW as specified in SC-6 Sections 1.4 and 2.4, as applicable, shall be used in lieu of the monthly measured demand specified above when determining applicability of this SC-3A.
FOR CUSTOMERS SERVED UNDER SC-3A AFTER SEPTEMBER 1, 1998
When the monthly measured demand has exceeded 2,000 kW in any six consecutive months of the previous twelve months, or whenever in the Company's opinion the applicant's demand will exceed 2,000 kW in any six consecutive months. A customer once served under this service classification shall remain on this service classification until the monthly measured demand has been 1,800 kW or less for six consecutive months following the initial Term of Service, whereupon service shall be taken under the otherwise applicable service classification.
For customers receiving Buyback Service from the Company under SC-6, the customer’s Service Demand kW as specified in SC-6 Sections 1.4 and 2.4, as applicable, shall be used in lieu of the monthly measured demand specified above when determining applicability of this SC-3A.
APPLICATION FOR SERVICE:
The Company may require the customer to submit a written application for service on the Company's prescribed Form C, with all applicable riders attached, however, the customer's failure to submit a Form C application does not exempt the Customer from paying all rates and charges, and terms and conditions provided herein. When accepted by the Company, such application shall constitute an agreement for the provision of service hereunder.
CHARACTER OF SERVICE:
Continuous. Single or three phase alternating current, approximately 60 Hz, at one standard secondary voltage, or a primary distribution voltage or a transmission voltage. Company will indicate the voltage and type of service available and appropriate for the customer's requirements.
PDF page 172
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 391
NIAGARA MOHAWK POWER CORPORATION
REVISION: 27
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 26
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 3A (Continued)
Maximum demand shall be determined as the highest demand measured in the billing period. In the event the billing period consists of less than 27 days or more than 35 days, the maximum demand shall be prorated on the basis of the number of elapsed days divided by 30.
RATE PERIODS
On-peak hours are defined as the hours between 8:00 a.m. and 10:00 p.m., Monday through Friday, except for the following holidays when such holiday falls on other than a Saturday or a Sunday; New Year’s Day Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
All other hours are defined as off-peak.
CHARGES:
Delivery Voltage
Up to 2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Customer Charges:
Distribution Delivery
$4,150.00
$4,150.00
$5,100.00
$10,350.00
Plus Demand Charges:
Distribution Delivery
Charges; per kW:
$15.58
$15.58
$5.42
$4.89
PLUS REACTIVE DEMAND CHARGES:
All Delivery Voltages:
$1.02 Per kilovolt-ampere of lagging Reactive Demand
PDF page 173
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 392
NIAGARA MOHAWK POWER CORPORATION
REVISION: 26
INITIAL EFFECTIVE DATE: MARCH 1, 2026
SUPERSEDING REVISION: 25
STAMPS: Issued in Compliance with Order in Cases 14-M-0094, 18-M-0084, 25-M-0248, and 25-M-0249, dated November 14, 2025.
SERVICE CLASSIFICATION NO. 3A (Continued)
Company Supplied Electricity Supply Service Charges: Company supplied Electricity Supply Service Charges shall be set on an hourly basis according to the market price of electricity determined in accordance with Rule 46.1, Electricity Supply Cost.
ADJUSTMENTS TO STANDARD RATES AND CHARGES:
Customers served under this service classification may be subject to adjustments and applied in the manner described in each respective Rule.
Rule 32.2 - Municipal Undergrounding Surcharge
Rule 40.3 - Value of Distributed Energy Resource (VDER) Value Stack Cost Recovery Surcharge Rule 41 - System Benefits Charges
Rule 42 - Merchant Function Charge
Rule 43 - Transmission Revenue Adjustment
Rule 45 - Non-Wires Alternative Surcharge
Rule 46 - Supply Service Charges
Rule 49 - Earnings Adjustment Mechanism
Rule 50 - Reliability Support Services Surcharge
Rule 52 - Electric Vehicle Make-Ready Surcharge
Rule 56 - Energy Storage Surcharge
Rule 57 - Revenue Decoupling Mechanism
Rule 59 - Arrears Management Program Recovery (AMP) Surcharge
Rule 64 - Dynamic Load Management (DLM) Surcharge
Rule 67 - Rate Adjustment Mechanism (RAM)
Rule 68 - Other Delivery Surcharges (ODS)
Rule 73 - Proactive Planning Surcharge
PDF page 174
Issued by Kenneth D. Daly, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 393
NIAGARA MOHAWK POWER CORPORATION
REVISION: 3
INITIAL EFFECTIVE DATE: APRIL 15, 2016
SUPERSEDING REVISION: 2
SERVICE CLASSIFICATION NO. 3A (Continued)
INCREASE IN RATES AND CHARGES:
The rates and charges under this service classification, including System Benefits Charge, will be increased by a tax factor pursuant to Rule 32.
DETERMINATION OF DEMAND:
Distribution Delivery Charges:
Delivery voltage below 22 kV:
The Distribution Delivery Charges, for delivery voltage up to 2.2 kV and 2.2-15 kV, shall be determined utilizing the highest demand measured over any fifteen minute interval during the month, but not less than one-half of the highest such demand occurring during any of the preceding eleven months, nor less than the demand contracted for in Form C.
Delivery voltage above 22 kV
The Distribution Delivery Charges for delivery voltage 22-50 kV and over 60 kV, shall be determined utilizing the highest demand measured over any fifteen minute interval during the month, but not less than the demand contracted for in Form C.
PDF page 175
Issued by Thomas B. King, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 394
NIAGARA MOHAWK POWER CORPORATION
REVISION: 1
INITIAL EFFECTIVE DATE: JANUARY 1, 2012
SUPERSEDING REVISION: 0
SERVICE CLASSIFICATION NO. 3A (Continued)
CUSTOMERS PREVIOUSLY SERVED UNDER SERVICE CLASSIFICATION NO. 3
For customers served under Service Classification No. 3 in the twelve months prior to September 1, 1998, the initial demand contracted for in Form C under this service classification for Distribution Delivery Charges shall be no less than the lesser of one-half of the highest demand measured over a fifteen minute interval during any of the most recent twelve months or 1800 kW.
Reactive Demand:
The Reactive Demand shall be the highest average RkVA of lagging reactive demand measured over a fifteen minute interval during the month less one-third of the highest kW demand measured during the month.
Unless otherwise specified in this Special Provision, all other terms, conditions and surcharges as set forth in this Service Classification shall apply.
BILLING PERIOD:
The rates and charges contained in this service classification are based upon a monthly billing period. A monthly billing period is defined as any period consisting of not less than 25 days and not more than 35 days. Bills for shorter or longer periods than defined herein shall be prorated on the basis of the number of elapsed days divided by 30.
TERMS OF PAYMENT:
Bills are due and payable when rendered. Full payment must be received on or before the date shown on the bill to avoid a late payment charge of one and one-half percent (1 1/2%) pursuant to Rule 26.4.
PDF page 176
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 395
NIAGARA MOHAWK POWER CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: AUGUST 1, 2021
SUPERSEDING REVISION: 5
STAMPS: Issued in Compliance with Order issued July 19, 2021 in Case 21-E-0084
SERVICE CLASSIFICATION NO. 3A (Continued)
TERM:
Except as otherwise provided herein, the Term under this service classification shall be one year from commencement of service and continuously thereafter until permanently canceled by customer upon ninety days' prior written notice to the Company. Cancellation by customer followed by resumption of service at the same location within one year shall not modify in any way the Determination of Demand as above provided. When the amount of an investment by the Company or other conditions of the service are such as to warrant, the Company may, with the permission of Public Service Commission, require that the initial term be longer than one year and for successive one year terms thereafter until canceled effective at the expiration of the initial Term, or of any succeeding one year Term, by customer giving ninety days' prior written notice to Company.
SPECIAL PROVISIONS:
A. Combined Metering and Billing: When the Company, pursuant to Rule 25.1.4.3, has provided Electric Service at the customer's single location through more than one Retail Delivery Point, the quantities derived from all necessary meters will be combined for billing purposes in accordance with the provisions of such rule upon the execution of the rider for Combined Metering and Billing attached to Form C.
B. Metering Voltage: When a customer provides the high voltage equipment to accept a service voltage higher than 2,200 volts, the Electric Service voltage will be the Company's incoming line voltage. When the Company provides all or part of the high voltage equipment, the service voltage will be the secondary voltage of the Company's transformers. When service is metered at a voltage either higher or lower than the voltage of delivery, metered quantities will be adjusted for billing as provided in Rule 25.4.
C. Riders: Service taken under this service classification may be eligible for a limited-duration bill reduction treatment as described in Rule 34, Economic Development Programs.
D. RESERVED FOR FUTURE USE
PDF page 177
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 396
NIAGARA MOHAWK POWER CORPORATION
REVISION: 2
INITIAL EFFECTIVE DATE: MARCH 1, 2024
SUPERSEDING REVISION: 1
SERVICE CLASSIFICATION NO. 3A (Continued)
SPECIAL PROVISIONS (Continued)
E. On-Site Generation Special Provision - Customers are obligated to certify, subject to the Company’s approval, on-site generation (OSG) installations on the Company’s Form G, Application for Electric Standby Service, and will be subject to the provisions of Service Classification No. 7 unless the customer has electrically isolated a portion of their load as defined in Rule 1.48 or has installed the OSG to be used exclusively as an Emergency Power System as defined in Rule 1.50.
F. Retail Access: Customers served in this Rate Classification are eligible to participate in the Retail Access Program in accordance with Rule 39, Retail Access Program.
G. For customers who operate a generator in excess of 25 MVa or greater and install automatic voltage control (AVC) at their facilities, reactive demand charges shall be waived, with the parameters defined by the Company during the period in which such AVC is operating and maintained in good working order. The Company will not waive start-up reactive demand charges. The initial parameters will be determined by the Company and may be changed subject to system conditions and location of the generating unit. The waiver is subject to the Company's rights to review and approve the customer's AVC system and review its operation and performance for compliance with the system requirements.
H. Net Energy Billing for Certain Customers Operating Solar or Farm Waste Electric Generating Equipment- Customers who own or operate Solar Electric Generating Equipment located and used at its premises or Farm Waste Electric Generating Equipment located and used at the customer’s ‘Farm Operation”, as defined in Subdivision 11 of Section 301 of the Agriculture and Markets Law, may deliver electricity to the Company generated by the solar or farm waste electric generating system and the Company shall offset such electricity received from the customer against electricity supplied by the Company to the customer at other times pursuant to Rule No. 36 of this Tariff.
Qualifying demand customers will continue to pay applicable actual demand charges consumed in that billing period. However, the Company will not adjust this demand charge to reflect demand ratchets or monthly demand minimums that might be applied to a standard tariff.
I. Net Energy Billing for Certain Customers Operating Solar or Farm Service Electric Generating Equipment - Residential, farm service, and non-residential customers, who own or operate Wind Electric Generating Equipment may deliver electricity to the Company generated by the wind electric generating system and the Company shall offset such electricity received from the customer against electricity supplied by the Company to the customer at other times pursuant to Rule No. 37 of this Tariff.
Qualifying demand customers will continue to pay applicable actual demand charges consumed in that billing period. However, the Company will not adjust this demand charge to reflect demand ratchets or monthly demand minimums that might be applied to a standard tariff.
PDF page 178
Issued by John Bruckner, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 399
NIAGARA MOHAWK POWER CORPORATION
REVISION: 8
INITIAL EFFECTIVE DATE: JANUARY 1, 2021
SUPERSEDING REVISION: 7
STAMPS:
SERVICE CLASSIFICATION NO. 4
UNTRANSFORMED SERVICE TO CERTAIN CUSTOMERS TAKING POWER FROM
PROJECTS OF THE NEW YORK POWER AUTHORITY
APPLICABLE TO USE OF SERVICE FOR:
The supply by the Company of:
(1) transmission, distribution and delivery by the Company of Replacement Power and Expansion Power (collectively referred to herein as “Niagara Power”) produced by the New York Power Authority’s (“NYPA”) Niagara Project under the provisions of the Settlement Agreement dated April 21, 2004 and approved by the Federal Energy Regulatory Commission by order dated July 9, 2004 in Docket No. ER03-989-000 (“Niagara Power Delivery Service”); and
(2) transmission, distribution and delivery by the Company of High Load Factor (“HLF”) Power provided by NYPA from Authority Sources (as defined in section 1005 of the Public Authorities Law under the provisions of the Settlement Agreement between the Company, NYPA and the New York State Department of Public Service dated May 27, 1997 and approved by the Commission in Orders dated May 23, 1997, June 10, 1997 and August 20, 1997 in Cases 97-E-0528 and 97-E-0569 (“the May 22, 1997 Settlement”)(hereinafter referred to as “HLF Delivery Service”)); and
(3) transmission, distribution and delivery by the Company of that portion of the customer’s contract demand for Preservation Power produced by NYPA’s St. Lawrence Project that is sold to such customer pursuant to the provisions of section 1005(13) of the Public Authorities Law (“Preservation Power Delivery Service”); and
(4) the supplemental electric service requirements of an individual customer who has contracted to receive (A) Niagara Power Delivery Service; and/or (B) Preservation Power Delivery Service; and/or (C) HLF Delivery Service under this rate schedule SC-4 (hereinafter referred to as “SC-4 Supplemental Service”).
Customers receiving any form of ESS from NYPA other than:
(i) Niagara Power,
(ii) HLF Power,
(iii) Preservation Power eligible for delivery under subpart (3) above,
(iv) Recharge New York (“RNY”) Power under Rule 34.6, and
(v) NYPA Supply Service under Rule 31
shall receive all of their commodity requirements under the retail access program rules set out in Rule 39 of this Tariff at the delivery rates established therein.
Service hereunder is available throughout the Company's service area from existing circuits of adequate capacity and appropriate character.
PDF page 179
Issued by Kenneth D. Daly, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 400
NIAGARA MOHAWK POWER CORPORATION
REVISION: 7
INITIAL EFFECTIVE DATE: APRIL 1, 2018
SUPERSEDING REVISION: 5
STAMPS: Issued in Compliance with Order in Case 17-E-0238 Issued March 15, 2018.
SERVICE CLASSIFICATION NO. 4 (Continued)
The Company may require the customer to apply for service under this rate schedule upon the Company’s prescribed written forms and to attach any applicable riders thereto. When accepted by the Company, such application shall constitute an agreement for the supply of service hereunder, but the customer’s failure to submit such a written application shall not relieve it of the obligation to pay the rates and charges established herein for service subject to the provisions of this rate schedule. In no event shall a customer failing to execute a service agreement with the Company be eligible to participate in the Company’s Retail Access Program for the portion of the load met by SC-4 Supplemental Service.
CHARACTER OF SERVICE:
Continuous. Three-phase alternating current, approximately 60 Hz. Company will determine the voltage available and appropriate for the customer’s total Electric Service requirements.
PARENT SERVICE CLASSIFICATION RATES FOR SC-4 SUPPLEMENTAL SERVICE:
Customers receiving SC-4 Supplemental Service shall be assigned the following parent service classifications for supplemental service provided under this Rate Schedule:
1. Customers Served Under SC-3A Before September 1, 1998
When the sum of the customer’s monthly demand for SC-4 Supplemental Service, and HLF Delivery Service, but excluding Niagara Power Delivery Service, has exceeded 2,000 kW in any two consecutive months of the previous twelve months, or whenever in the Company’s opinion the applicant’s demand will exceed 2,000 kW in any two consecutive months. Effective July 1, 2013, billed demands for Niagara Power Delivery Service shall also be included in determining whether the customer’s demands exceed 2,000 kW. A customer once assigned under Service Classification No. 3-A and/or Parent Service Classification No. 3-A shall remain on this parent service classification until the monthly measured demand has been 1,500 kW or less for twelve consecutive months following the initial Term of Service.
2. Customers Served Under SC-3A After September 1, 1998
When the sum of the customer’s monthly demand for SC-4 Supplemental Service, and HLF Delivery Service, Preservation Power Delivery Service, but excluding Niagara Power Delivery Service, has exceeded 2,000 kW in any six consecutive months of the previous twelve months, or whenever in the Company’s opinion the applicant’s demand will exceed 2,000 kW in any six consecutive months. Effective July 1, 2013, billed demands for Niagara Power Delivery Service shall also be included in determining whether the customer’s demands exceed 2,000 kW. A customer once assigned under Service Classification No. 3-A and/or Parent Service Classification No. 3-A shall remain on this parent service classification until the monthly measured demand has been 1,800 kW or less for six consecutive months following the initial Term of Service.
3. All Other Customers
All customers receiving SC-4 Supplemental Service that do not qualify for Parent Service Classification No. 3-A will be assigned to Parent Service Classification No. 3.
PDF page 180
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 401
NIAGARA MOHAWK POWER CORPORATION
REVISION: 10
INITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025
SUPERSEDING REVISION: 8
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 4 (Continued)
In either event, the rates, terms and conditions specified in the applicable parent service classification shall apply to SC-4 Supplemental Service, with the exception of supplemental service that is EJP qualifying load, is subject to the terms of the Special Provisions of this Rate Schedule S.C. No. 4.
CALENDAR MONTH BILLING FOR NIAGARA POWER DELIVERY SERVICE, HLF DELIVERY SERVICE,
PRESERVATION POWER DELIVERY SERVICE, AND SC-4 SUPPLEMENTAL SERVICE
The rates applicable to Niagara Power Delivery Service, HLF Delivery Service, Preservation Power Delivery Service, and SC-4 Supplemental Service shall be for a calendar month billing period.
DETERMINATION OF BILLING QUANTITIES
1. Company will normally furnish and install meters at the customer’s expense to measure the total electric service taken by the customer, including SC-4 Supplemental Service, Niagara Power Delivery Service, Preservation Power Delivery Service and HLF Delivery Service. When the metering voltage is either higher or lower than the delivery voltage, such measurements shall be conformed to the delivery voltage measurements as provided in Rule 25.4 of the General Information.
2. Metering facilities may be installed by NYPA instead of by the Company with the Company’s approval. In this case, the metering equipment and installation must meet the specifications of both the Company and the New York State Public Service Commission and the customer shall be eligible for a metering credit pursuant to Rule 25.1.1.1.
3. Billing Quantities for deliveries of demand associated with Niagara Power Delivery Service for Expansion Power and Replacement Power Rate 1 and Replacement Power Rate 2
Effective until June 30, 2013, the customer’s billed demand for Niagara Power Delivery Service associated with Expansion, Replacement Power Rate 1 and Replacement Power Rate 2 shall be the kilowatts of such service which the customer is entitled to receive under its allocation agreement(s) with NYPA. Effective July 1, 2013, the customer’s billed demand for Niagara Power Delivery Service associated with Expansion Power and Replacement Power Rate 1 shall be the lesser of the customer’s contract demand for Niagara Power Delivery Service (adjusted for losses as provided in subparts (b) and 4(c) below) or the highest 30-minute integrated demand recorded on the customer’s meter for the current billing period, and the customer’s billed demand for Niagara Power Delivery Service associated with Replacement Power Rate 2 shall be the kilowatts of such service which the customer is entitled to receive under its allocation agreement(s) with NYPA (adjusted for losses from the Niagara Switchyard to the customer’s meter as provided in sections 4(b) and 4(c) below).
4. Billing Quantities for deliveries of energy associated with Niagara Power Delivery Service for Expansion Power and Replacement Power Rate 1
(a) Effective until June 30, 2013: The billed energy in each 30-minute billing interval for Niagara Power Delivery Service for Expansion Power and for Replacement Power Rate 1 shall be the total number of kilowatt-hours recorded on the customer’s meter for the billing period multiplied by the ratio of the customer’s demand for Expansion Power and Replacement Power Rate 1 (adjusted for losses as provided in subparts b and c below) to the greater of the customer’s loss-adjusted contract demand for Expansion Power and/or Replacement Power Rate 1 or the highest 30 minute integrated demand recorded on the customer’s meter in the twelve months ending with the current billing period.
PDF page 181
Issued by Kenneth D. Daly, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 402
NIAGARA MOHAWK POWER CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: JANUARY 12, 2012
SUPERSEDING REVISION: 4
STAMPS: Issued in Compliance with Order Issued December 16, 2011 in Case No. 10-E-0050
SERVICE CLASSIFICATION NO. 4 (Continued)
Effective July 1, 2013: The billed energy in each 30-minute billing interval for Niagara Power Delivery Service for Expansion Power and for Replacement Power Rate 1 shall be the total number of kilowatt-hours recorded on the customer’s meter for the billing period multiplied by the ratio of the customer’s billed demand for Expansion Power and Replacement Power Rate 1 to the greater of the customer’s billed demand for Expansion Power and/or Replacement Power Rate 1 or the highest 30 minute integrated demand recorded on the customer’s meter in the current billing period.
(b) Adjustments for Losses In Transmission For Existing and Additional Allocations of Expansion Power and Existing Allocations of Replacement Power Rate 1.
(i) Effective until June 30, 2013:
a. The customer’s contract demand for Existing and Additional Allocations of Expansion Power and for Existing Allocations of Replacement Power Rate 1shall be adjusted for losses from the Niagara Switchyard to the customer’s meter as provided for the allocation(s) in question in the Company’s Rate Schedule FERC Nos. 19 (for Replacement Power Rate 1) and 159 (for Expansion Power) prior to the performance of the calculations in subpart a above; and
b. The customer’s receipts of Niagara Power Delivery Service associated with Existing and Additional Allocations of Expansion Power and Existing Allocations of Replacement Power Rate 1 as determined in subpart a above shall be adjusted for losses from the customer’s meter to the Niagara Switchyard as provided for the allocation(s) in question in the Company’s Rate Schedule FERC Nos. 19 (for Replacement Power Rate 1) and 159 (for Expansion Power) to produce the final billing demands and billing energy for such service.
(ii) Effective July 1, 2013:
a. The customer’s contract demand for Existing and Additional Allocations of Expansion Power and Replacement Power Rate 1 shall be adjusted for losses from the Niagara Switchyard to the customer’s meter as provided in Rule 39.18 of this Tariff prior to the performance of the calculations in subpart a above; and
b. The customer’s metered receipts of electricity supplied in the form of Niagara Power Delivery service shall be adjusted for losses from the customer’s meter to the Niagara Switchyard as provided in Rule 39.18 of this Tariff.
(c) Adjustments for Losses In Transmission For New Allocations of Expansion Power and Replacement Power Rate 1.
(i) The customer’s contract demand for New Allocations of Expansion Power and Replacement Power Rate 1 shall be adjusted for losses from the Niagara Switchyard to the customer’s meter as provided in Rule 39.18 of this Tariff prior to the performance of the calculations in subpart a above; and
(ii) The customer’s metered demands for Niagara Power Delivery Service associated with New Allocations of Expansion Power and Replacement Power Rate 1 shall be adjusted for losses from the customer’s meter to the Niagara Switchyard as provided in Rule 39.18 of this Tariff.
PDF page 182
Issued by John Bruckner, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 403
NIAGARA MOHAWK POWER CORPORATION
REVISION: 4
INITIAL EFFECTIVE DATE: OCTOBER 1, 2020
SUPERSEDING REVISION: 3
STAMPS:
SERVICE CLASSIFICATION NO. 4 (Continued)
5. Billing Quantities for deliveries of energy associated with Niagara Power Delivery Service for Replacement Power Rate 2
a. The kilowatt-hours charged will be the customer’s contract demand for Replacement Power Rate 2 multiplied by the number of hours in the billing period.
b. For the purpose of determining the portion of the customer’s demands served by sources other than Replacement Power Rate 2:
(i) Effective until June 30, 2013: The customer’s contract demand for Replacement Power Rate 2 shall be adjusted for losses from the Niagara Switchyard to the customer’s meter as provided in paragraphs 4(b)(i) (in the case of Existing Allocations) and 4(c)(i) (in the case of New Allocations) above; and
Effective July 1, 2013: The customer’s metered demand for electricity supplied in the form of Replacement Power Rate 2 shall be subject to the adjustments for losses in transmission and distribution between the customer’s meter and the Niagara Switchyard set out in Rule 39.18 of this Tariff ; and
(ii) The total kilowatt-hours of Replacement Power Rate 2 received by the customer in any interval shall be the lesser of the total kilowatt-hours of Replacement Power Rate 2 received by the customer during that interval, adjusted for losses in Transmission from the Niagara Switchyard to the customer’s meter as described in paragraphs 4(b)(ii) (in the case of Existing Allocations) and 4(c)(ii) (in the case of New Allocations) above; or the total kilowatt-hours received by the customer during that interval as measured by the customer’s meter.
6. Billing Quantities for Preservation Power Delivery Service:
a. Subject to the provisions of subpart c below, the billed demand for Preservation Power Delivery Service shall be the product of the customer’s highest 30-minute integrated demand in the billing period recorded on the customer’s meter multiplied by the ratio of the customer’s contract demand for its allocations of Preservation Power Delivery Service (adjusted for losses as provided in subparts c below) to the greater of the customer’s contract demand for Preservation Power Delivery Service or the highest 30-minute integrated demand recorded on the customer’s meter for the current billing period.
b. Subject to the provisions of subpart c below, the billed energy in each 30-minute billing interval for Preservation Power Delivery Service shall be the total number of kilowatt-hours recorded on the customer’s meter for the billing period multiplied by the ratio of the customer’s loss-adjusted contract demand for Preservation Power Delivery Service (adjusted for losses as provided in subparts c and d below) to the greater of the customer’s loss-adjusted contract demand for Preservation Power or the highest 30 minute integrated demand recorded on the customer’s meter for the current billing period.
c. Adjustments for Losses In Transmission For Preservation Power Delivery Service.
(i) The customer’s contract demand for Preservation Power Delivery Service shall be adjusted for losses from the St. Lawrence Switchyard to the customer’s meter as provided in Rule 39.18 of this Tariff; and
PDF page 183
Issued by Kenneth D. Daly, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 404
NIAGARA MOHAWK POWER CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: JULY 1, 2013
SUPERSEDING REVISION: 4
SERVICE CLASSIFICATION NO. 4 (Continued)
(ii) The customer’s metered demands for Preservation Power Delivery Service shall be adjusted for losses from the customer’s meter to the St. Lawrence Switchyard as provided in Rule 39.18 of this Tariff.
7. Billing Quantities for HLF Delivery Service
a. Effective until June 30, 2013, the billed demand for HLF Delivery Service taken hereunder shall be the kilowatts of such service which the customer is entitled to receive under its allocation agreement(s) with NYPA. The metered demand for HLF Delivery Service taken hereunder shall be the product of the customer’s highest 30-minute integrated demand in the billing period recorded on the customer’s meter multiplied by the ratio of the customer’s contract demand for HLF Delivery Service to the greater of the customer’s contract demand for HLF Delivery Service or the highest 30-minute integrated demand recorded on the customer’s meter for the twelve months ending with the current billing period.
Effective July 1, 2013, the customer’s billed demand for HLF Delivery Service shall be the product of the customer’s highest 30-minute integrated demand in the billing period recorded on the customer’s meter multiplied by the ratio of the customer’s contract demand, adjusted for losses as provided in Sub Part (c) below, for HLF Delivery service to the greater of the customer’s contract demand for HLF Delivery Service or the highest 30-minute integrated demand recorded on the customer’s meter in the current billing period.
b. Effective until June 30, 2013, the billed energy in each 30-minute billing interval for HLF Delivery Service shall be the total number of kilowatt-hours recorded on the customer’s meter for the billing period multiplied by the ratio of the customer’s contract demand for HLF Delivery Service to the greater of the customer’s contract demand for HLF Delivery Service or the highest 30 minute integrated demand recorded on the customer’s meter in the twelve months ending with the current billing period.
Effective July 1, 2013, the billed energy in each 30-minute billing interval for HLF Delivery Service shall be the total number of kilowatt-hours recorded on the customer’s meter for the billing period multiplied by the ratio of the customer’s contract demand, adjusted for losses as provided in Sub Part (c) below, for HLF Delivery Service to the greater of the customer’s contract demand for HLF delivery or the highest 30 minute integrated demand recorded on the customer’s meter in the current billing period.
c. Adjustment for Losses for HLF Delivery Service: Effective July 1, 2013, the billed demand and billed energy in (a) and (b) above will be adjusted for losses as provided in Rule 39.18 of this tariff.
8. For each of the Company’s subzones in which NYPA power is delivered to customers under this Rate Schedule S.C. No. 4, the Company will calculate an Unaccounted for Energy Factor for NYPA load. Unaccounted for Energy is generally defined as the difference between the NYISO reported wholesale subzone(s) load and the sum of LSE load, Municipality load, Load Modifiers, NYPA load and the Company’s load, including adjustments for distribution losses (efficiency factor). The Company also adjusts applicable LSE’s load to account for the average system wide Unaccounted for Energy in accordance with Rule 39.
The difference between the monthly NYISO reported wholesale subzone load and the sum of the applicable subzone load of the Company, NYPA, Municipalities, and the Rule 39 adjusted LSE’s load, including adjustments for distribution losses (efficiency factor), is the monthly subzone Unaccounted for Energy. This quantity of monthly subzone Unaccounted for Energy in question is allocated to the Company and NYPA on an hourly based subzonal load ratio share. The Company will report to the NYISO for NYISO billing and settlement purposes, the NYPA subzone load requirements, inclusive of the monthly subzone Unaccounted for Energy adjustment and distribution loss adjustments.
PDF page 184
Issued by Kenneth D. Daly, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 405
NIAGARA MOHAWK POWER CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: JULY 1, 2013
SUPERSEDING REVISION: 4
SERVICE CLASSIFICATION NO. 4 (Continued)
9. Billing Quantities for SC-4 Supplemental Service
a. The demand billed for SC-4 Supplemental Service taken hereunder shall be the greater of:
(1) The amount, if any, by which the overall maximum 30 minute integrated demand as established by metering within the billing period exceeds the sum of:
(a) the customer’s demands for Niagara Power Delivery Service (adjusted for losses between the Niagara Switchyard and the customer’s meter as provided in paragraphs 4 and 5 above); and
(b) the customer’s demands for Preservation Power Delivery Service (adjusted for losses between the St. Lawrence Switchyard and the customer’s meter as provided in paragraph 4 above); and
(c) the customer’s demands for HLF Delivery Service as determined at the meter according to the provisions of paragraph 7 above; and
(d) the customer’s demands for EDP and/or PFJ Power supplied under Rule 34; or
(2) The number of kilowatts of SC-4 Supplemental Service contracted for by the customer with the Company and documented on the Company’s Form “C”; or
(3) The minimum demand provisions of the Parent Service Classification as defined above.
b. The billed kilowatt-hours of SC-4 Supplemental Service in each 30 minute interval shall be the amount, if any, by which the total kilowatt-hours at delivery voltage for that interval exceeds the sum of:
(1) the kilowatt-hours of Niagara Power Delivery Service received by the customer at the customer’s meter in that interval; and
(2) the kilowatt-hours of Preservation Power Delivery Service received by the customer at the customer’s meter in that interval; and
(3) the kilowatt-hours of HLF Delivery Service received by the customer at the customer’s meter in that interval; and
(4) the kilowatt-hours of EDP and/or PFJR Service received by the customer under Rule 34 in that interval;
PDF page 185
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 406
NIAGARA MOHAWK POWER CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: OCTOBER 1, 2025
SUPERSEDING REVISION: 5
STAMPS: Issued in Compliance with Order in Case 22-E-0236, dated October 17, 2024.
SERVICE CLASSIFICATION NO. 4 (Continued)
(4) the kilowatt-hours of EDP and/or PFJR Service received by the customer under Rule 34 in that interval;
Provided, however, that no customer shall be deemed to have received more kilowatt-hours from these four sources during any interval than its actual total metered kilowatt-hours received during that interval.
10. The Reactive Demand shall be the highest average RkVA of lagging reactive demand from all sources measured over a thirty-minute interval during the month less one-third of the highest kW demand measured during the month.
11. Customers taking service under SC4 are eligible for EV Phase-In Rates. Such customer’s Charging Ratio, as described in Rule 48.2.8; Load Factor Tier Level determination, as described in Rule 48.2.9; and Monthly EV Phase-In Rates, as described in Rule 48.2.11 will be applicable to the customers’ total load, inclusive of NYPA deliveries.
TERMS OF PAYMENT
Bills are due and payable when rendered. Full payment must be received on or before the date shown on the bill to avoid a late payment charge pursuant to Rule 26.4.
TERM
Initial term of one (1) year and to continue thereafter for successive one (1) year terms until canceled effective at the expiration of the initial or any succeeding one (1) year term by the customer by a notice in writing served on the Company not less than ninety (90) days prior to the termination of the initial or any succeeding term, provided however that the service hereunder will be supplied only when taken in conjunction with NYPA power and regardless of term provisions will terminate upon permanent cessation of the supply to customer of said NYPA power. In the event that the customer terminates its ESS arrangement with NYPA prior to its expiration according to its terms, the Company shall require written confirmation from both NYPA and the customer before terminating the customer’s SC-4 service agreement.
SPECIAL PROVISIONS:
A. Company Facilities: Company shall not be required to provide facilities for SC-4 Supplemental Service, Niagara Power Delivery Service, Preservation Power Delivery Service or HLF Delivery Service in excess of the amount of the total demands for such services specified in the customer’s Application for Service.
B. Billing Period Adjustments: For a fractional part of a billing period at the beginning or end of service, the kilowatt Demand and Reactive Demand charges and the minimum charge shall each be proportionately adjusted in the ratio that the number of hours that electric service is furnished to customer in such fractional billing period bears to the total number of hours in the billing period involved.
C. Metering Voltage: When service is metered at a voltage either higher or lower than the voltage of delivery, metered quantities will be adjusted for billing as provided in Rule 25.4.
D. On-Site Generation Special Provision: Customers are obligated to certify, subject to the Company’s approval, on-site generation (OSG) installations on the Company’s Form G, Application For Electric Standby Service, and will be subject to the provisions of Service Classification No. 7 unless the customer has electrically isolated a portion of their load as defined in Rule 1.48 or has installed the OSG to be used exclusively as an Emergency Power System as defined in Rule 1.50.
PDF page 186
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 407
NIAGARA MOHAWK POWER CORPORATION
REVISION: 14
INITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025
SUPERSEDING REVISION: 12
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 4 (Continued)
E. Individually Negotiated Rates: The Company will entertain, when circumstances warrant and when NYPA consents to any required changes in the applicable billing methodology for the delivery of NYPA Power, individually negotiated contracts under rate schedule S.C. No. 12 with customers who would otherwise be served under this Service Classification.
F. Exemption from Certain Provisions of Rate Schedule S.C. No. 3: Customers receiving SC-4 Supplemental Service under rate schedule S.C. No. 4 who are billed in accordance with the provisions of rate schedule S.C. No. 3 shall be exempt from Special Provisions E, F, and H of that rate schedule.
G. Special Rule for SC-4 Supplemental Service: SC-4 Supplemental Service, with the exception of supplemental service that is EJP qualifying load, shall be subject to all surcharges and tax factors imposed on service under the applicable Parent Service Classification, including without limitation the SBC established in Rule 41, the Renewable Portfolio Surcharge established in Rule 49 and the Tax Factor established in Rule 32.
H. Special Rules for HLF Delivery Service
(1) HLF Delivery Service shall be subject to all surcharges and tax factors imposed on service under the applicable Parent Service Classification, with the exception of Rule 41- SBC, Rule 57 - RDM and Rule 46.2 - LTC.
(2) In the event that the customer fails to execute a Form C Agreement specifying its contract demand for HLF Delivery Service, the customer’s contract demand for such service shall be deemed to be the lesser of:
(a) the customer’s maximum entitlement to HLF Delivery Service under the May 22, 1997 Settlement; or
(b) the amount of firm point-to-point transmission capacity on the Company’s system reserved by NYPA for deliveries to the customer, adjusted for losses in transmission and distribution.
(3) (a)
In the event that the customer’s total allocation(s) of HLF Power at a single location is reduced the following special rules shall apply:
(i) If SC-4 Supplemental Service did not contribute to meeting the customer’s maximum demand in the billing month or any of the eleven preceding months prior to July 1, 2013 only, the customer’s demand in the months preceding the reduction of the customer’s
total NYPA ESS shall not be considered in calculating the customer’s bills under subpart
(a) above, and
(ii) If SC-4 Supplemental Service did contribute to the customer’s maximum demand in the billing month or any of the preceding eleven billing months, the Company shall adjust the customer’s maximum demand for each of the preceding eleven months prior to July 1,
2013 only solely for the purpose of calculating the current month’s bills for HLF Service.
This adjustment shall be performed by subtracting the contribution to the customer’s maximum metered demand in each of the preceding eleven billing months prior to July 1, 2013 only, made by the customer’s reduced contract capacity for NYPA ESS from the customer’s overall maximum metered demand in each such month. These adjusted monthly maximum metered demands shall then be used to determine the customer’s bill for HLF Delivery Service for the current month.
PDF page 187
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 408
NIAGARA MOHAWK POWER CORPORATION
REVISION: 12
INITIAL EFFECTIVE DATE: FEBRUARY 1, 2022
SUPERSEDING REVISION: 11
STAMPS: Issued in Compliance with Order in Case 20-E-0380, issued January 20, 2022.
SERVICE CLASSIFICATION NO. 4 (Continued)
(b) Notwithstanding the provisions of subpart (a) of this Special Provision (H) (3), no deliveries of NYPA power received by the customer prior to September 1, 1998 shall be considered in calculating the amounts owed by the customer to the Company for HLF Delivery Service received by the customer on or after that date.
(4) HLF Delivery Service shall be restricted to customers that would qualify for service under the Company’s rate schedule S.C. No. 3-A based on their combined actual demands for SC-4 Supplemental Service, HLF Delivery Service and PFJR Service.
I. Special Rules for Niagara Power Delivery Service and Preservation Power Delivery Service
1. Preservation Power Delivery Service and Niagara Power Delivery Service associated with “New” allocations of Expansion and Replacement Power are subject to the Tax Factor established in Rule 32.,
2. Niagara Power Delivery Service associated with “Existing” allocations of Expansion and Replacement Power and “Additional” allocations of Expansion Power are subject to the Tax Factor established in Rule
32.
3. For those customers whose agreements with NYPA and the Company include an historic demand, the historic demand will be billed as SC-4 Supplemental Service and will be subtracted from the current month’s metered demand and (prior to July 1, 2013 only for Niagara Power Delivery Service) from the peak demand of the preceding 12 full months to establish the remaining demand then apportioned to NYPA Service (whether in the form of Niagara Power Delivery Service of Preservation Power Delivery Service) and SC-4 Supplemental Service (as additional power). In no instance, however, shall the total demand (the sum of the historic and additional power demands) billed by Company under its rates exceed the total metered demand for the billing period.
The energy associated with the historic demand will be determined by apportioning the total metered energy by the ratio that the historic demand (supplied by the Company) bears to the metered demand for the current month. The energy associated with all other deliveries of power will be determined in accordance with the applicable provisions of this Rate Schedule S.C. No. 4 with the following modifications:
1. The customer’s metered demand shall be reduced by the amount of the historic demand.
2. The customer’s maximum demand for the preceding 11 months shall be reduced by the amount of the historic demand. For Niagara Power Delivery Service provided prior to July 1, 2013 only, the customer’s maximum demand for the preceding 11 months shall be reduced by the amount of the historic demand.
3. The customer’s metered energy shall also be reduced by the amount of energy associated with the historic demand as determined above.
PDF page 188
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 408.1
NIAGARA MOHAWK POWER CORPORATION
REVISION: 20
INITIAL EFFECTIVE DATE: JULY 1, 2023
SUPERSEDING REVISION:19
STAMPS: Issued in Compliance with Order in Case 20-E-0380, issued January 20, 2022.
SERVICE CLASSIFICATION NO. 4 (Continued)
J.
Customer Charges For HLF Delivery Service, effective until June 30, 2013:
Customers eligible to receive HLF Delivery Service shall be subject to Customer Charges which are established based upon whether or not the customer utilizes supplemental electric service from the Company.
Customers who do not use supplemental electric service shall have their customer charges frozen at the rates below.
Without Supplemental
With Supplemental
Delivery Level
Electric Service
Electric Service
Secondary (<2.2 kV)
$902.00
$3,000.00
Primary (2.2 B 15 kV)
$902.00
$3,000.00
Subtransmission (22 B 50 kV)
$1,400.00
$3,700.00
Transmission (>60 kV)
$1,726.55
$7,500.00
Customers who utilize supplemental electric service shall have their customer charges set equal to the customer charges established in Rate Schedule S.C. No. 3A as shown above.
Customer Charges For HLF Delivery Service, effective July 1, 2013:
Effective July 1, 2013, the monthly Customer Charge will be equal to 90% of the HLF Delivery Service customer’s parent service classification Customer Charge.
Customer Charges For HLF Delivery Service, effective January 1, 2016:
Effective January 1, 2016, the monthly Customer Charge will be equal to 100% of the HLF Delivery Service customer’s parent service classification Customer Charge.
K.
Distribution Delivery Rates for HLF Delivery Service, effective until June 30, 2013:
Customers eligible to receive HLF Delivery Service shall be subject to distribution delivery rates as set out below:
Rate per kW of Delivery level Contract Demand
Secondary (<2.2 kV)
$6.09
Primary (2.2 B 15 kV)
$8.09
Subtransmission (22 B 50 kV)
$2.59
Transmission (>60 kV)
$2.08
Distribution Delivery Rates for HLF Delivery Service, effective July 1, 2013:
Effective July 1, 2013, the per kW Distribution Demand Charge will be equal to 90% of the HLF Delivery Service customer’s parent service classification Distribution Demand Charge.
Customer Charges For HLF Delivery Service, effective January 1, 2016:
Effective January 1, 2016, the per kW Distribution Demand Charge will be equal to 100% of the HLF Delivery Service customer’s parent service classification Distribution Demand Charge.
PDF page 189
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 408.4
NIAGARA MOHAWK POWER CORPORATION
REVISION: 20
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 19
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 4 (Continued)
The distribution delivery rates for New Allocations of Preservation Power and Niagara Power to S.C. 4 customers with supplemental service provided at the S.C. No. 3 rates are as follows:
Customer
Rate Per kW of
Delivery Level
Charge
Contract Demand
Secondary (<2.2 kV)
$870.00
$15.62
Primary (2.2 - 15 kV)
$950.00
$14.14
Subtransmission (22 - 50 kV)
$1,600.00
$4.36
Transmission (>60 kV)
$1,600.00
$4.36
The distribution delivery rates for New Allocations of Preservation Power and NYPA hydro to S.C. 4 customers with supplemental service provided at the S.C. No. 3A rates are as follows:
Customer
Rate Per kW of
Delivery Level
Charge
Contract Demand
Secondary (<2.2 kV)
$4,150.00
$15.58
Primary (2.2 - 15 kV)
$4,150.00
$15.58
Subtransmission (22 - 50 kV)
$5,100.00
$5.42
Transmission (>60 kV)
$10,350.00
$4.89
New Allocations are defined in Special Provision M below.
M.
Existing, Additional and New Allocations Defined
1. Rule for Allocations of Niagara Power:
a. Additional Allocations, as used in Special Provision L above shall be defined as allocations of Niagara Power approved by NYPA’s trustees between February 1, 2002 and September 1, 2006 that were allocated exclusively to serve incremental load at the customer’s premises. For the purpose of this provision, incremental load is load that is created by the construction or installation of new facilities (buildings, machinery and equipment) or expansion of existing facilities, provided that in the case of the expansion of existing facilities, incremental load shall not include the load of such facilities prior to expansion or addition.
b. New Allocations as used in Special Provision L above shall be defined as all allocations of Replacement Power approved by NYPA’s trustees on and after February 1, 2002 and those allocations of Expansion Power approved by NYPA’s trustees on and after February 1, 2002 that are not “Additional Allocations,” but shall not include Replacement Power that becomes available for reallocation prior to September 30, 2002 under Article V of the Agreement: “Allocation and Transfer of Replacement Power Pursuant to Niagara Contract NS-1” dated April 4, 1988; or Transfers and assignments of allocations from a customer premise /location on the Company’s system (i.e., a change in ownership/occupancy of a premise / location will not be deemed "new") .
PDF page 190
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 408.4
NIAGARA MOHAWK POWER CORPORATION
REVISION: 20
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 19
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 4 (Continued)
The distribution delivery rates for New Allocations of Preservation Power and Niagara Power to S.C. 4 customers with supplemental service provided at the S.C. No. 3 rates are as follows:
Customer
Rate Per kW of
Delivery Level
Charge
Contract Demand
Secondary (<2.2 kV)
$870.00
$15.62
Primary (2.2 - 15 kV)
$950.00
$14.14
Subtransmission (22 - 50 kV)
$1,600.00
$4.36
Transmission (>60 kV)
$1,600.00
$4.36
The distribution delivery rates for New Allocations of Preservation Power and NYPA hydro to S.C. 4 customers with supplemental service provided at the S.C. No. 3A rates are as follows:
Customer
Rate Per kW of
Delivery Level
Charge
Contract Demand
Secondary (<2.2 kV)
$4,150.00
$15.58
Primary (2.2 - 15 kV)
$4,150.00
$15.58
Subtransmission (22 - 50 kV)
$5,100.00
$5.42
Transmission (>60 kV)
$10,350.00
$4.89
New Allocations are defined in Special Provision M below.
M.
Existing, Additional and New Allocations Defined
1. Rule for Allocations of Niagara Power:
a. Additional Allocations, as used in Special Provision L above shall be defined as allocations of Niagara Power approved by NYPA’s trustees between February 1, 2002 and September 1, 2006 that were allocated exclusively to serve incremental load at the customer’s premises. For the purpose of this provision, incremental load is load that is created by the construction or installation of new facilities (buildings, machinery and equipment) or expansion of existing facilities, provided that in the case of the expansion of existing facilities, incremental load shall not include the load of such facilities prior to expansion or addition.
b. New Allocations as used in Special Provision L above shall be defined as all allocations of Replacement Power approved by NYPA’s trustees on and after February 1, 2002 and those allocations of Expansion Power approved by NYPA’s trustees on and after February 1, 2002 that are not “Additional Allocations,” but shall not include Replacement Power that becomes available for reallocation prior to September 30, 2002 under Article V of the Agreement: “Allocation and Transfer of Replacement Power Pursuant to Niagara Contract NS-1” dated April 4, 1988; or Transfers and assignments of allocations from a customer premise /location on the Company’s system (i.e., a change in ownership/occupancy of a premise / location will not be deemed "new") .
PDF page 191
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 408.6
NIAGARA MOHAWK POWER CORPORATION
REVISION: 8
INITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025
SUPERSEDING REVISION: 6
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 4 (Continued)
P.
The following rules apply to a customer combining SC4 Supplemental Service with the Excelsior Jobs Program (EJP) and whose total loss-adjusted NYPA demand allocations are greater than its lowest monthly EJP base period billing demand.
(1) When the customer accepts its NYPA allocation or whenever the Company receives notification from NYPA that the customer’s NYPA allocation is changing or whenever the customer qualifies for EJP, the customer must make an election to choose either:
(a) billing NYPA delivery demand pursuant to the billing methodology in this SC-4; or
(b) limiting the billed NYPA delivery demand to the lesser of the EJP base period billing demand or the billed NYPA delivery demand pursuant to the billing methodology in this SC-4.
(2) Regardless of the election made in Section 1 above, the customer will receive its NYPA commodity service pursuant to the billing methodology described in this SC-4.
(3) A customer who meets the initial requirements of this Special Provision P may receive additional discounts described in Section 3(a) below, provided the customer demonstrates a financial need as prescribed in Service Classification No.12, Special Contract Rates, in either Sections 4.3.2 and 4.3.3 (Revitalization) or Sections 4.4.2 and 4.4.3 (Relocation).
(a) Eligible customers who have a NYPA allocation and an EJP contract will be exempt from SBC established in Rule 41 on both their NYPA allocation and qualifying EJP load.
(b) To the extent that the financial need demonstrated by the customer is greater than the benefit derived from Section 3 (a), the customer may apply for a Special Contract pursuant to all terms and conditions of Service Classification No. 12.
Q.
RESERVED FOR FUTURE USE
PDF page 192
Niagara Mohawk
Service Classification 7: Standby Service and Optional Rate Service
PDF page 193
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 415
NIAGARA MOHAWK POWER CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025
SUPERSEDING REVISION: 3
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7
STANDBY SERVICE AND OPTIONAL RATE SERVICE
APPLICABLE TO USE OF SERVICE FOR:
This Service Classification No. 7 (“SC-7”) is applicable to customers meeting the requirements of (a) through (d) below (“Standby Service Customers”) and customers meeting the requirements of (e) below (“Optional Rate Customers”):
Standby Service:
(a) Customers who have generation installed on their site, whether the generation equipment is owned by the customer or a third party. Generation, for purposes of this service classification, shall include energy storage systems; or
(b) Customers who are directly interconnected with a Wholesale Generator, as defined in Rule 1.76; or
(c) Wholesale Generators who require service from the Company when their own generating equipment is not sufficient to meet their own load; or
(d) Customers with on-site generation compensated under Rule 40.2, Value Stack, that meet the requirements for compensation in accordance with Rule 40.2.1.1, and that are not otherwise exempt from SC-7 in accordance with Section 4 of SC- 7.
Optional Rate Service:
(e) Customer that opt into SC-7, who do not otherwise meet the requirements of Standby Service. (“Optional Rate Customers”) must remain on SC-7 for a minimum period of one year. Any customer may opt into SC-7 with the exception of SC-12 customers, streetlighting customers, and unmetered customers.
More specifically:
1. Standby Service shall apply to: (a.) customers with on-site generation serving load that is not isolated from the grid in accordance with Rule 1.48; (b.) Wholesale Generators that rely on the electric utility to serve electric loads that would otherwise be served by the generator such as station power used for the heating, lighting, air-conditioning, and office equipment needs of the buildings housing the generator and associated support facilities located on a generating facility's site, and/or to facilitate the re-starting of the generator following an outage. Standby rates will also apply to Wholesale Generators that take station service through the same bus bar as they supply the wholesale grid.
PDF page 194
PSC NO: 220 ELECTRICITY
LEAF: 415.1
NIAGARA MOHAWK POWER CORPORATION
REVISION: 0
INITIAL EFFECTIVE DATE: DECEMBER 9, 2019
SUPERSEDING REVISION:
STAMPS: Issued in Compliance with Order in Case 15-E-0751 issued December 13, 2018.
SERVICE CLASSIFICATION NO. 7 (Continued)
2. Same Bus Bar
“Same Bus Bar” is defined as a common electrical point of interconnection on the same physical bus bar structure located at one substation of the utility and an individual customer’s system at the single voltage level at which the customer takes service and has taken service as of March 2002. This common point of interconnection may include up to one load serving connection, or tap, (such tap is in addition to the single point of delivery service from the generating customer to the NMPC delivery system being metered), from a single physical bus bar (one tap must be connecting the customer's generation output to the bus and a second tap must be connecting the customer's electric service to the bus) located at an NMPC substation. The customer’s generation must be on a single unitary tract of land; adjoining and abutting the land upon which the NMPC substation is located and the points of delivery and receipt must not be more than 500’ apart. The presence of Company equipment, including but not limited to switches, fuses, transformers, and circuit breakers, between the point(s) of delivery is not considered Same Bus Bar. If the single physical bus bar or a portion thereof, is relied upon to deliver electricity between the customer’s generation and customer’s load, i.e., the point of common coupling, the customer will enter into a financial agreement with the Company for payment of use of that portion of the Company's equipment that comprises the point of common coupling necessary to move the generation from the customer to the customer’s load. The amount of the load will be netted from the customers’ generation on a 15-minute interval basis. The customer is responsible for all costs of metering, reconfiguration, instrument transformers and telemetry equipment necessary to implement the netting of generation and load that meets the requirements above. When the forgoing requirements are met, the customer will be eligible to net generation and load. In this case, the customer, upon entering into a financial agreement with the Company, will be considered as netting the customer’s load from "behind the meter” for the limited purposes of electricity supply service provision under Rule 46 and for delivery services.
PDF page 195
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 416
NIAGARA MOHAWK POWER CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: FEBRUARY 1, 2026
SUPERSEDING REVISION: 5
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated July 18, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
3. For Standby Service Customers, the Parent Service Classification shall be defined based upon the applicable Contract Demand at the delivery point (as initially calculated by the Company). For customers receiving Buyback Service from the Company under SC-6, the customer’s Service Demand kW as specified in SC-6 Sections 1.4 and 2.4, as applicable, shall be used in lieu of the monthly measured demand specified above when determining Parent Service Classification applicability of this SC7.
4. Exemptions From SC7
The following customers shall not be subject to SC-7 but shall be served under the customer's otherwise applicable service classification unless the customer chooses to opt into SC-7 as an Optional Rate Customer (with the exception of customers specific to 4E below who are not eligible to opt into SC-7 as an Optional Rate Customer).
A. “Behind the Meter” Service
Self-supplied electricity where a Wholesale Generator, when operating, supplies all of its electric energy needs from "behind the meter" (that is, the energy does not pass through the point of interconnection between the generator's facility and the utility's retail delivery system to which it is interconnected).
B. Separately Metered Accounts Not Served by OSG
All separately metered service accounts within the premises whereby electricity consumption is not otherwise served directly through facilities owned by the customer (e.g., power to the facility's outer buildings) shall be provided at the standard tariff rates for the Parent Service Classification.
C. Small Generators
Customers with a nameplate aggregate generator(s) 5 kVA or smaller shall be served at the standard tariff rates for the Parent Service Classification.
D. Certain Customers Grandfathered Under Form Gf: Standby service rates shall not apply to customers served on the standard classification as of January 1, 2002 that have executed a form Gf and were grandfathered as a result of Form Gf of PSC 207 as of January 1, 2002; except where such customer is a SC-3 subtransmission or transmission voltage level or SC-3A subtransmission or transmission voltage level customer and is a Wholesale Generator. Effective May 1, 2006, customers grandfathered under this provision may elect at any time to take service under this service classification. Such customers may exercise this option only once and may not elect to receive service under another service classification, unless otherwise eligible therefore. This grandfathering provision shall expire and no longer apply and Standby Service Rates shall apply if and at such time the customer installs any New Generating Equipment and this SC7 Tariff shall apply as defined herein.
PDF page 196
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 417
NIAGARA MOHAWK POWER CORPORATION
REVISION: 12
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 11
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
4. Exemptions From SC-7 (Continued)
D. Certain Customers Grandfathered Under Form Gf: (Continued)
For the purposes of this provision, New Generating Equipment shall include the installation or the replacement of the following items of electric plant:
(i) for steam production plant: boiler plant equipment; engines and engine-driven
generators; and turbogenerator units;
(ii) for nuclear production plant: reactor plant equipment, and turbogenerator units;
(iii) for hydraulic production plant: turbines, and generators; and
(iv) for other electric production equipment: fuel holders, producers, and
accessories; prime movers; and generators.
The installation or replacement of electric plant ordinarily classified as maintenance or repair expenses or replacements under warranty as a result of a defect or casualty loss, or of water wheels, automotive and marine internal combustion engines fired by natural gas which were designed and installed with the intention of routine replacement, and generator rewinds shall not be deemed to be New Generating Equipment.
E. NYPA Programs and SC 12 Contracts
Standby service rates shall not apply to that portion of a customer's delivery service associated with the provision of applicable NYPA programs or that portion of delivery service served under the terms and conditions of an SC-12 contract. Customers under this 4.E are not eligible to opt into SC-7 as an Optional Rate Customer.
F. Environmentally Advantageous Technologies (“EAT”) Exemptions
Standby service rates shall not apply to customers who install On-Site Generators (“OSG”) that are:
(1) solar thermal;
(2) solar photovoltaic;
(3) onshore and offshore wind;
(4) hydroelectric;
(5) geothermal electric;
(6) geothermal ground source heat;
(7) tidal energy;
(8) wave energy;
(9) ocean thermal;
(10) Fuel cells which do not utilize a fossil fuel resource in the process of generating electricity. Fuel cells are permitted to utilize biomass, biogas, or hydrogen, provided that the manufacture or production of such fuels does not include the combustion or electrolysis of fossil fuels, or the use of fossil fuel or non-renewable grid power in the conversion process.
PDF page 197
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 417.1
NIAGARA MOHAWK POWER CORPORATION
REVISION: 1
INITIAL EFFECTIVE DATE: JUNE 1, 2023
SUPERSEDING REVISION: 0
STAMPS: Issued in Compliance with Order in Case 19-E-0079 dated May 18, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
(11) small, efficient types of combined heat and power (“CHP”) generation that do not exceed 1 MW of capacity and meet the following criteria:
i. Annual overall thermal and electrical energy efficiency should not be less than 60% based on the higher heating value (“HHV”) of the fuel input;
ii. The usable thermal energy component should absorb a minimum of 20% of the CHP facility’s total
usable annual energy output;
iii. The OSG capacity shall be determined by aggregating the nameplate ratings of the generation units, installed at its location, excluding emergency generation units used only during a utility distribution system failure or in response to the NYISO Emergency Demand Response Program; and
iv. An eligible CHP facility shall demonstrate to the Company that its generation installation meets an environmental standard of no more than 1.4 lbs./MWh of NOx emissions based on its electrical and mechanical output or its rated capacity. Units that have completed a Coordinated Electric System Interconnection Review ("CESIR”) by April 1, 2018 will be subject to the previously applicable standard of no more than 4.4 lbs./MWh of NOx emissions.
v. The CHP facility must be placed in service before May 31, 2021.
vi. Customers shall comply with the above criteria and in addition:
1. Monitor and record efficiency data, which shall include the annual quantity of fuel fired, the annual quantity of generated electricity, and the annual quantity of the thermal heat recovered in the heat recovery process;
2. have records available for Company inspection; and
3. retain the records for a 3-year period.
PDF page 198
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 418
NIAGARA MOHAWK POWER CORPORATION
REVISION: 17
INITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025
SUPERSEDING REVISION: 15
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
4. Exemptions From SC-7 (Continued)
F. Environmentally Advantageous Technologies (“EAT”) Exemptions (Continued)
(12) Effective June 1, 2015, a customer who installs and places in service a new CHP facility before May 31, 2021, greater than 1 MW and up to 15 MW, exclusive, may exercise a one-time option to be exempt from standby rates and pay standard delivery rates for a period of four years.
i. The exemption, once obtained, would be applicable for a period of four years commencing from the in- service date of the CHP facility. After the four-year period, the customer will be subject to the then- applicable standby rates or to any such tariff which replaces standby rates, if applicable.
ii. Once exempt, the customer may exercise the option to exit the exemption one time prior to the end of the customer’s one- time exemption period.
iii. Customers exercising this option will also be required to install, at their expense, revenue grade, interval meters that will measure generation output, and attach telemetry equipment sufficient to transmit operational information to the Company.
iii. Customers under this Section 7 are also subject to the requirements of Section 6, Sub Sections i-v.
(13) Energy storage systems with inverter capability of up to 1 MW. However, customers who install energy storage systems to help manage the demand of EV charging load, with said energy storage systems having inverter capability greater than 1 MW and less than or equal to the sum of nameplate EV charging capability, are also exempt provided that such installations meet all other applicable interconnection and standby service requirements.
Customers qualifying for the EAT Exemption shall comply with all the following requirements:
a) The OSG is placed in service after July 1, 2002, except that for CHP
facilities, in accordance with Section 7 above, the OSG is placed in service between June 1, 2015 and May 31, 2021.
b) The OSG is connected to the customer’s electric system using an automated or manual transfer switch or the electrical equivalent of such a switch approved by the Company consistent with Electric System Bulletin 750 as it may be amended from time to time.
c) The customer executes, and the Company accepts, a Form G as required under the special provisions of the applicable Service Classification for all generators on the premises. The customer shall state its intended use of the OSG facilities on the Form G in the blank spaces provided for special conditions.
d) The EAT Exemption will not apply to sustainably managed biomass, biogas, and fuel cell units which utilize fossil fuel resources installed on or after June 1, 2023.
In the event the customer fails to comply with provisions (a) through (c) above, the Company shall have the following rights:
(a) to bill the customer standby service rates for those amounts of total Electric Service which the Company reasonably estimated were received by the customer during times when Electric Service from the Company was available to the customer; and
(b) to require the customer to install OSG meter(s) on all its generators on the premises within a mutually acceptable schedule and upon receipt of written notice from the Company.
PDF page 199
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 418.1
NIAGARA MOHAWK POWER CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025
SUPERSEDING REVISION: 3
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
F. Environmentally Advantageous Technologies (“EAT”) Exemptions (Continued)
Customers qualifying for the EAT Exemption shall be allowed to make a one-time irrevocable election to refuse the EAT Exemption and, instead, take service at full standby service rates, upon providing thirty (30) days written notice to the Company before commencing operation of the OSG; provided, however, that if operation of the OSG commenced between July 1, 2002 and December 31, 2011, the Customer must make its one-time election by March 1, 2012. Customers qualifying for an EAT exemption under Section 12 above will have a one-time exemption in accordance with Section 4.F (12) (ii) above.
G. Net Metering for Solar, Farm Waste, Wind, Micro-Combined Heat and Power, Micro-Hydroelectric Generating Equipment, and Fuel Cell Electric Generating Systems - Standby service rates shall not apply to Customer-Generators who have the above electric generating equipment provided they have executed an SIR Contract and have complied with all the requirements of Rule 36 and Rule 37 of this tariff.
PDF page 200
PSC NO: 220 ELECTRICITY
LEAF: 419
NIAGARA MOHAWK POWER CORPORATION
REVISION: 3
INITIAL EFFECTIVE DATE: DECEMBER 9, 2019
SUPERSEDING REVISION: 2
STAMPS: Issued in Compliance with Order in Case 15-E-0751 issued December 13, 2018.
SERVICE CLASSIFICATION NO. 7 (Continued)
H. Emergency Generators
Customers who install an Emergency Power System (as defined in Rule 1.50) may be exempted from the requirement of service under this S.C. No. 7 if the customer commits in a written agreement with the Company that the on-site generators shall be subject to all of the following requirements:
1) Each such OSG shall be designated in the customer's Standby Service Application with the Company as an Emergency Power System ("Emergency OSG") pursuant to Rules 1.50;
2) Each such Emergency OSG is not capable of being operated in parallel with the Company's system other than for closed-transition transfer switching where the term "closed-transition transfer" is characterized as a momentary make-before-break switching sequence.
3) Each such Emergency OSG is connected to the customer's electric system using an automated or manual transfer switch or the electrical equivalent of such a switch approved by the Company.
4) The Emergency OSG is used exclusively for purposes of Emergency Power System (defined in Rule 1.50).
5) No load may be served by Emergency OSG while Electric Service is being provided by the Company to the premises except:
(i) for the periods of time as required by statute or regulation, and
(ii) in the absence of a statutory or regulatory requirement, such times so as to adequately test such systems, not to exceed 10 hours per month or as otherwise agreed to by the Company in the Standby Service Application, and
(ii) for periods of time called by the NYISO for EDRP or ICAP(UCAP).
6) The customer shall maintain an operating log for each Emergency OSG indicating the date, time, hours, and purpose of each operation of each such facility. This log shall be made available to the Company upon request. If the customer fails to maintain this log or to provide it to the Company on request, the Company shall have the following rights:
(i) to bill the customer for those amounts of Electric Service which the Company reasonably estimated were inappropriately supplied by the customer’s generator during times when Electric Service from the Company was available to the customer; and
In all cases, the customer shall remain obligated to execute and have the Company accept a Standby Service Application (Form G) as applicable under the special provisions of the applicable service classification for all Emergency Generators on the premises. The customer shall state its intended use of the OSG facilities on the Standby Service Application in the blank spaces provided for special conditions.
I. Customers served on SC-2D with a contract demand less than 50 kW may elect to remain on the SC-2D standard service classification or may choose to install an interval meter and receive standby rates.
J.
Customers who receive compensation under Rule 40.2.3.2 for Hybrid Facilities.
PDF page 201
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 419.1
NIAGARA MOHAWK POWER CORPORATION
REVISION: 2
INITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025
SUPERSEDING REVISION: 0
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
4. Exemptions From SC-7 (Continued)
K.
Customers with stand-alone energy storage systems charging for wholesale purposes will be billed pursuant to the WDS, at such time that the WDS tariff becomes effective, for charging purposes and are not subject to Standby Service rates.
PDF page 202
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 420
NIAGARA MOHAWK POWER CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: FEBRUARY 1, 2026
SUPERSEDING REVISION: 4
STAMPS: Issued in Compliance with Order in Case15-E-0751, dated July 18, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
APPLICATION FOR SERVICE:
Standby Rate Service:
Customers with on-site generation must apply for service by providing the Company with an executed Form G, Application For Electric Standby Service and interconnection agreement, both of which are available from Company representatives. Customers operating an on-site generator unit 5 MW or less may apply for service using the SIR, available from Company representatives. Customers in excess of 5 MW, that also have an on-site generator, must execute an Interconnection Agreement with the Company. Customers that do not have an on-site generator must apply using the Company’s Form C – Application for Electric Service.
Optional Rate Service:
Eligible customers must apply for service by providing the Company with an executed Form C which is available from Company representatives.
CHARACTER OF SERVICE:
Single or three phase alternating current, approximately 60 hertz, at a single standard delivery voltage with service metered at, or compensated to, that delivery point. Site-specific requirements will be determined by the Company.
BILLING PARAMETERS:
Customers served under this service classification shall be billed according to the following parameters:
Customer Charge - a charge for customer-related services.
Incremental Customer Charge - the incremental cost of metering and meter communications equipment necessary to administer this Standby Service.
Contract Demand Charge - a reservation charge for the use of the Company's local distribution system.
As Used On-peak Daily Demand Charge - a daily usage demand charge for the maximum use of the Company's delivery system during on-peak hours (as defined in the Determination of Contract Demand section of SC-7). As Used Super-peak Daily Demand Charge – a daily usage demand charge for the maximum use of the Company’s delivery system during super-peak hours (as defined in the Determination of Contract Demand section of SC-7).
Electricity Supply Service Charge - a charge for the electricity supply service (Commodity) provided to the customer.
Surcharges and Adjustments - a set of itemized charges for specific adjustments as provided under the otherwise applicable service classification.
RATES:
Rates are established on a calendar month basis and will only be prorated if the billing period is less than 25 days or more than 35 days.
PDF page 203
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 421
NIAGARA MOHAWK POWER CORPORATION
REVISION: 29
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 28
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
Applicable Rates and Charges – Standby Service Customers and Optional Rate Service Customers will be subject to the following SC-7 rates in accordance with their Parent Service Classification if a Standby Service Customer and their otherwise applicable service classification if an Optional Rate Service Customer.
SERVICE CLASSIFICATION NO. 1 – Residential – Prior to April 1, 2024
MONTHLY RATE:
Customer Charge:
$17.33
Metering and Communications/Incremental Customer Charge
All Load Zones
Leaf No. 429 (A-E)
Contract Customer Demand Charge:
Distribution Delivery
$28.81
As Used Daily Energy Charge, Per kWh:
Distribution Delivery
$0.2448
SERVICE CLASSIFICATION NO. 1 – Residential – Beginning April 1, 2024
MONTHLY RATE:
Customer Charge:
$19.00
Metering and Communications/Incremental Customer Charge
All Load Zones
Leaf No. 429 (A-E)
Contract Demand Charge, per kW:
Distribution Delivery
$6.29
As Used On-peak Daily Demand Charge, Per kW:
Distribution Delivery
$0.3600
As Used Super-peak Daily Demand Charge, per kW
Distribution Delivery
$0.7640
SC-7 customer’s billed under Parent Service Classification No. 1 rates shall have the determination of their Contract Demand (kW) and As Used Daily Demand (kW) based on a 60-minute integrated metered demand, which shall be determined as the sum of the four 15-minute intervals in an hour.
PDF page 204
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 421.1
NIAGARA MOHAWK POWER CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 4
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
SERVICE CLASSIFICATION NO. 2 Non-Demand – Prior to April 1, 2024
MONTHLY RATE:
Customer Charge:
$21.02
Metering and Communications/Incremental Customer Charge
All Load Zones
Leaf No. 429 (A-E)
Contract Customer Charge
Distribution Delivery
$22.36
As Used Daily Energy Charge, Per kWh:
Distribution Delivery
$0.2751
SERVICE CLASSIFICATION NO. 2 Non-Demand – Beginning to April 1, 2024
MONTHLY RATE:
Customer Charge:
$25.00
Metering and Communications/Incremental Customer Charge
All Load Zones
Leaf No. 429 (A-E)
Contract Demand Charge, per kW
Distribution Delivery
$6.93
As Used On-peak Daily Demand Charge, Per kW:
Distribution Delivery
$0.4169
As Used Super-peak Daily Demand Charge, per kW
Distribution Delivery $0.9111
SC-7 customer’s billed under Parent Service Classification No. 2ND rates shall have the determination of their Contract Demand (kW) and As Used Daily Demand (kW) based on a 60-minute integrated metered demand, which shall be determined as the sum of the four 15-minute intervals in an hour.
PDF page 205
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 422
NIAGARA MOHAWK POWER CORPORATION
REVISION: 30
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 29
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
SERVICE CLASSIFICATION NO. 2D
MONTHLY RATE:
Customer Charge:
$65.00
Metering and Communications/Incremental Customer Charge
All Load Zones
Leaf No. 429 (A-E)
Customer will be billed the SC-7 Phase-In Delivery charges below unless the SC-7 Delivery charges are elected in accordance with Special Provision M of this SC-7.
SC-7 Delivery
SC-7 Phase-In Delivery
Contract Demand Charge, per kW:
Distribution Delivery
$3.36
$4.26
As Used On-peak Daily Demand Charges, Per kW:
Distribution Delivery
$0.6599
$0.6511
As Used Super-peak Daily Demand Charge, Per kW:
Distribution Delivery
$1.1794
$0.9108
SC-7 customer’s billed under Parent Service Classification No. 2D rates shall have the determination of their Contract Demand (kW) and As Used Daily Demand (kW) based on a 15-minute integrated metered demand.
Whenever Company does not have to supply and maintain a transformer or transformers for such service there shall be a discount of ninety cents per kW per month for each kW of billed demand, applicable to the demand charge stated under Contract Demand Charge.
PDF page 206
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 423
NIAGARA MOHAWK POWER CORPORATION
REVISION: 31
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 30
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
SERVICE CLASSIFICATION NO. 3
MONTHLY RATE:
Customer Charge:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Distribution Delivery Charge:
$870.00
$950.00
$1,600.00
$1,600.00
Metering and Communications/Incremental Customer Charge:
All Load Zones
Leaf No. 429 (A-E)
Customer will be billed the SC-7 Phase-In Delivery charges below unless the SC-7 Delivery charges are elected in accordance with Special Provision M of this SC-7.
Contract Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Delivery for SC-7 Customers
$0.13
$0.45
$0.00
$0.00
Delivery for SC-7 Phase-in Customers
$1.15
$1.15
$0.09
$0.09
As Used On-peak Daily Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Delivery for SC-7 Customers
$0.6209
$0.5277
$0.1753
$0.1753
Delivery for SC-7 Phase-in Customers
$0.6271
$0.5455
$0.1892
$0.1892
As Used Super-peak Daily Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Delivery for SC-7 Customers
$1.1306
$0.9727
$0.3245
$0.3245
Delivery for SC-7 Phase-in Customers
$0.8819
$0.7680
$0.2638
$0.2638
SC-7 customer’s billed under Parent Service Classification No. 3 rates shall have the determination of their Contract Demand (kW) and As Used Daily Demand (kW) based on a 15-minute integrated metered demand.
Reactive Demand Charges:
All Delivery Voltages: $0.85 for each chargeable RkVA of lagging reactive demand.
PDF page 207
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 424
NIAGARA MOHAWK POWER CORPORATION
REVISION: 31
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 30
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
SERVICE CLASSIFICATION NO. 3A
MONTHLY RATE:
Customer Charge:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Distribution Delivery Charge:
$4,150.00
$4,150.00
$5,100.00
$10,350.00
Metering and Communications/Incremental Customer Charge:
All Load Zones
Leaf No. 429 (A-E)
Customer will be billed the SC-7 Phase-In Delivery charges below unless the SC-7 Delivery charges are elected in accordance with Special Provision M of this SC-7.
Contract Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Delivery for SC-7 Customers
$0.56
$0.56
$0.00
$0.66
Delivery for SC-7 Phase-in Customers
$1.17
$1.17
$0.14
$0.60
As Used On-Peak Daily Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Delivery for SC-7 Customers
$0.5819
$0.5819
$0.1956
$0.1575
Delivery for SC-7 Phase-in Customers
$0.6121
$0.6121
$0.2097
$0.1801
As Used Super-peak Daily Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Delivery for SC-7 Customers
$1.0825
$1.0825
$0.3612
$0.3096
Delivery for SC-7 Phase-in Customers
$0.8624
$0.8624
$0.2925
$0.2561
Reactive Demand Charges:
All Delivery Voltages: $1.02 for each chargeable RkVA of lagging reactive demand.
SC-7 customer’s billed under Parent Service Classification No. 3A rates shall have the determination of their Contract Demand (kW) and As Used Daily Demand (kW) based on a 15-minute integrated metered demand.
PDF page 208
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 425
NIAGARA MOHAWK POWER CORPORATION
REVISION: 26
INITIAL EFFECTIVE DATE: MARCH 1, 2026
SUPERSEDING REVISION: 25
STAMPS: Issued in Compliance with Order in Cases 14-M-0094, 18-M-0084, 25-M-0248, and 25-M-0249, dated November 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
Electricity Supply Service:
All Standby Service Customers and Optional Rate Service Customers taking supply service from the Company, with the exception of SC7 customers whose otherwise applicable service class is SC1 or SC2 (Non Demand), will be billed for commodity service based on their actual hourly usage and the hourly day-ahead market prices as described in Rule 46.1.3 herein. SC7 customers whose otherwise applicable service class is SC1 or SC2 (Non Demand) will be billed for commodity service per Rule 46.1.1 until April 30, 2025, after which these customers will be billed based on their actual hourly usage and hourly day-ahead market prices per Rule 46.1.3.
Company supplied Electricity Supply Service charges shall be set according to the market price of electricity determined in accordance with Rule 46.1, Electricity Supply Cost.
Customers served under SC-7 are also eligible to participate in Rule 39 - Retail Access Program.
Wholesale Generators receiving Station Power service from the NYISO in accordance with Special Provision J shall receive Electricity Supply Service from the NYISO and shall be exempt from Electricity Supply Service charges under Rule 46.1.
SURCHARGES AND ADJUSTMENTS
Customers served under SC-7 may be subject to the following surcharges and adjustments:
Rule 32.2 - Municipal Undergrounding Surcharge
Rule 40 - Value of Distributed Energy Resources’ Customer Benefit Contribution Charge
Rule 40.3 - Value of Distributed Energy Resource (VDER) Value Stack Cost Recovery Surcharge Rule 41 - System Benefits Charges
Rule 42 - Merchant Function Charge
Rule 43 - Transmission Revenue Adjustment
Rule 45 - Non-Wires Alternative Surcharge
Rule 46 - Supply Service Charges
Rule 49 - Earnings Adjustment Mechanism
Rule 50 - Reliability Support Services Surcharge
Rule 52 - Electric Vehicle Make-Ready Surcharge
Rule 56 - Energy Storage Surcharge
Rule 57 - Revenue Decoupling Mechanism
Rule 59 - Arrears Management Program Recovery (AMP) Surcharge
Rule 64 - Dynamic Load Management (DLM) Surcharge
Rule 67 - Rate Adjustment Mechanism (RAM)
Rule 68 - Other Delivery Surcharges (ODS)
Rule 73 - Proactive Planning Surcharge
MINIMUM CHARGE:
Customers served under SC7 shall be subject to a minimum Charge which shall be the Customer Charge, the Incremental Customer Charge (where applicable), and the Contract Demand Charge.
PDF page 209
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 426
NIAGARA MOHAWK POWER CORPORATION
REVISION: 1
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 0
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
INCREASE IN RATES AND CHARGES:
The rates and charges under this Service Classification, including the Minimum Charge, will be increased by a tax factor pursuant to Rule 32.
TERMS OF PAYMENT:
Bills are due and payable when rendered. Full payment must be received on or before the date shown on the bill to avoid a late payment charge pursuant to Rule 26.4.
TERM:
One year from commencement of service hereunder and continuously thereafter until permanently canceled by the customer upon 90 days' prior notice to the Company.
DETERMINATION OF CONTRACT DEMAND:
(1.a)
Contract Demand for Standby Service Customers:
Contract Demand shall initially be set at the maximum anticipated demand of the customer including any load that is not isolated pursuant to Rule 1.48 codified in a Standby Service Application and determined as the greater of the following and the Company shall inform the customer of the resultant contract demand ten (10) days prior to the next billing cycle:
(i) the maximum demand from the Company's system over the previous 12-months, or
(ii) the customer's maximum load supplied by all sources including the OSG and Company's supply system over the previous 12-months.
In the case of a new customer (i.e., a customer for whom historical consumption data does not exist) the Contract Demand shall be the maximum anticipated demand of load consumed as a National Electrical Code calculation in effect based upon the electrical equipment to be served.
The Contract Demand shall automatically be increased to the highest measured demand in any billing period during the term hereunder.
The Contract Demand of a Wholesale Generator who is connected to a customer which would otherwise be served directly by the Company shall be set at the maximum potential demand of the station loads of the Wholesale Generator when the generator is out of service plus the maximum potential demand of the customer connected to the Wholesale Generator.
The Contract Demand may be increased based upon a written notice by the customer to the Company at any time.
The Contract Demand as determined above may be reduced based upon a written notice by the customer to the Company and may be reduced no more than one time in a 365-day period and/or 365 days from any increase or ratchet in Contract Demand. In the event the customer’s Contract Demand is reduced thereafter and the recorded maximum demand at any time exceeds the customer's nominated and effective Contract Demand: (i) by 20% or greater than a penalty equal to the product of 24 times the Contract Demand rate times the demand in excess of the Contract Demand shall apply, (ii) by 10% or greater, but less than 20%, then a penalty equal to the product of 18 times the Contract Demand rate times the demand in excess of the Contract Demand shall apply, (iii) by less than 10% then a penalty equal to the product of 12 times the Contract Demand rate times the demand in excess of the Contract Demand shall apply.
PDF page 210
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 427
NIAGARA MOHAWK POWER CORPORATION
REVISION: 2
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 1
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
DETERMINATION OF DEMAND: (Continued)
Seasonal or other temporary fluctuations in load of the customer's existing facilities such as heating and air conditioning, and temporary reductions in manufacturing shall not qualify for reductions in the Contract Demand.
The effective date of the revised Contract Demand shall be the next billing cycle following the Company's receipt of the customer's written notice provided such notice is received 10 business days prior to the first day of the next billing cycle.
(1.b)
Contract Demand for Optional Rate Customers
Contract Demand will be established initially as the customer’s maximum measured demand during the first billing period under SC-7. Thereafter, the Contract Demand shall automatically be increased to the highest measured demand in any billing period during the term hereunder. In the event the customer has installed energy efficient equipment or has altered the operation of their service such that the maximum potential demand at the premise is less than the Contract Demand, the customer may request a reconsideration of the Contract Demand by the Company. Any reduction of the Contract Demand will be at the Company’s discretion.
(2) As-Used On-peak Daily Demand
The As-Used On-peak Daily Demand shall be the aggregate of the highest daily 15-minute integrated demand (measured in kW) occurring during the on-peak hours of each day during the billing period, except for customers of parent service classification is SC1 or SC2 Non-Demand it shall be the aggregate of the highest 60-minute integrated demand (measured in kW) during the on-peak hours of each day during the billing period.
On-Peak hours are defined as follows:
During the months of October through May, for the hours between 8:00 am and l0:00 pm, Mondays through Fridays, excluding holidays. During the months of June through September, for the hours between 8:00 am and 1:00 pm and 6:00 pm through 10:00 pm, Mondays through Fridays, excluding holidays. For this purpose, the holidays are specified as New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day, when such holidays fall on other than a Saturday or Sunday. All other hours are defined as Off-peak.
PDF page 211
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 427.1
NIAGARA MOHAWK POWER CORPORATION
REVISION: 0
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION:
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
DETERMINATION OF DEMAND: (Continued)
(3) As-Used Super-peak Daily Demand
The As-Used Super-peak Daily Demand shall be the aggregate of the highest daily 15-minute integrated demand (measured in kW) occurring during the Super-peak hours of each day during the billing period, except for customers of parent service classification is SC1 or SC2 Non-Demand it shall be the aggregate of the highest 60-minute integrated demand (measured in kW) during the on-peak hours of each day during the billing period.
Super-peak hours are defined as follows:
During the months of June through September, for the hours between 1:00pm and 6:00 pm, Mondays through Fridays, excluding holidays as defined in (2) above.
(4) The Reactive Demand
The Reactive Power Demand Charge shall be the highest average kilovolt-ampere of lagging reactive demand measured in a 15 minute interval during the month less one-third of the highest kilowatt demand measured during the month.
PDF page 212
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 428
NIAGARA MOHAWK POWER CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025
SUPERSEDING REVISION: 3
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
INTERCONNECTION REQUIREMENTS SPECIFIC TO STANDBY SERVICE:
The facility may be connected for parallel operation with the service of the Company, or isolated for operation with standby service provided by a Wholesale Generator by means of a double throw transfer switch or transfer switching scheme acceptable to the Company.
Customers with an on-site generator are required to execute an SIR Contract. Customers without an on-site generator are not required to execute an SIR Contract.
For parallel generator installations, the customer and the Company shall agree as to the operating mode, interconnection and equipment specifications as set forth in Specifications for Electrical Installations Supplement, Electric System Bulletin Nos. 756A or 756B as applicable and as amended from time to time, which is subject to Commission review and arbitration should a dispute arise.
The following provision shall not apply to Wholesale Generators that agree to pay for actual interconnection costs in the SIR Contract or other agreements with the Company. The customer shall agree to pay for all interconnection costs which exceed the costs ordinarily incurred in rendering service at the same Contract Demand under the applicable Service Classification. Upon a mutual agreement the customer may select from the following payment options, provided that upon request, the customer agrees to provide a compensatory letter of credit to the Company:
(1) The Company will furnish, own, operate, and maintain all special equipment, in return for which the customer, or its successors on the site, will pay a monthly charge of 1.5 percent of the total investment costs for the duration of its/their operations on the site, whether or not the equipment is in use.
(2) The customer will furnish, own, and operate all special equipment on their property and the Company will maintain such equipment, in return for which the customer, or its successors on the site, will pay a 9 percent annual operating charge based upon the customer's total investment in such interconnection equipment.
(3) The customer will furnish, own, operate and maintain all special equipment on their property
provided that the equipment and maintenance are suitable for interconnected operations. Such equipment shall be made available for Company inspection as may reasonably be required.
PDF page 213
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 429
NIAGARA MOHAWK POWER CORPORATION
REVISION: 3
INITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025
SUPERSEDING REVISION: 1
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
METERING AND COMMUNICATIONS/INCREMENTAL CUSTOMER CHARGE
A. Interval Metering: All Standby Service Customers and Optional Rate Customers shall utilize the Company's interval recording meter at the customer Premises. Where an interval-recording meter does not exist and must be installed, the Standby Service Customer shall be responsible for all metering and installation costs not otherwise covered by New York State Research and Development Authority (NYSERDA). The metering costs are a function of the individual customer's electric service. Metering and installation cost estimates are available from Company representatives. The Standby Service Customer is responsible for the actual costs incurred. Customers who have already installed the requisite interval recording meters as of the effective date of SC7 will not be subject to incremental metering costs.
Optional Rate Customers who do not already have interval metering installed will be required to have installed an interval meter at the customer Premises and will be subject to an incremental customer charge of $25.10/month, which is inclusive of the cost of required telecommunications. Optional Rate Customers will no longer be subject to the incremental customer charge once AMI meters are implemented for the customer’s otherwise applicable service class.
Standby Service Customers and Optional Rate Customers may not opt out of AMI interval meters when such meters are implemented for the customer’s parent service classification.
B. Telecommunications: Remote meter reading capability is also required for all Standby Service Customers and Optional Rate Service Customers. The Standby Service Customer will be responsible for all costs associated with providing the telecommunications to the meter. The customer may choose to either:
1) provide the Company access to a direct-dial, voice-grade, Public Switched Telephone Network analog connection to the meter, subject to Company approval, to be used exclusively for meter reading functions; or
2) have the Company provide communications to the meter at a cost to the customer including applicable overhead.
Standby Service Customers who have already installed the requisite remote meter reading capability as of the effective date of SC-7 will not be subject to incremental metering costs.
C. Customer-Provided Equipment: Customers providing a telephone connection to the meter will bear all costs associated with the installation, operation and maintenance of the telephone line including, but not limited to, all telephone service bills.
In cases where the Company is unable to read the meter through a customer-provided telephone line, and the Company has determined that the problem is not caused by the Company's meter or equipment, the customer will be responsible to resolve the problem with its telephone provider and will be responsible to reimburse the Company for expenses incurred for visits to the meter location in its efforts to resolve the problem.
D. Company-Provided Equipment: Customers who choose the Company-provided meter reading
communication option shall pay a monthly Incremental Customer Communications Charge as set forth in a schedule provided by the Company. Company-provided communications will be used exclusively for meter reading functions.
PDF page 214
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 430
NIAGARA MOHAWK POWER CORPORATION
REVISION: 1
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 0
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
METERING AND COMMUNICATIONS/INCREMENTAL CUSTOMER CHARGE (Continued)
E. Exceptions for Customers Smaller Than 50 kW: In addition, customers who would otherwise receive service under S.C. No. 2 Demand, who have Standby Contract Demands less than 50 kW will have the option of taking service at either (i) the otherwise applicable demand rate and shall not be subject to any additional metering and communication charges under S.C-7; or (ii) upon installation of required interval metering, the demand rate set forth under S.C.-7.
SPECIAL PROVISIONS
A. Contract Demands Larger than 1000 kW: All Standby Service Customers with Contract Demands greater than 1000 kW applying for Service under this Service Classification are required to provide the Company with an annual schedule of OSG maintenance by October of the preceding year for each subsequent year. This schedule will be provided at the time of subscription to this Service Classification and will be utilized for planning functions. Schedules must include starting and ending times for all planned outages. Customers will be allowed to update their schedules one month prior to their effective dates. After this time has passed, no modifications will be allowed to the schedules, unless Company approval is granted. This provision does not take precedence with respect to any OSG maintenance provision in a power purchase agreement which may be in place with the Company.
B. SC-4 Customers: Customers who would otherwise receive service under the provisions of Service Classification No. 4 shall have their demand measured on an integrated 30-minute basis, pursuant to the terms of that tariff.
C. Compliance with Reliability Criteria: Standby Service Customers agree to comply with any existing or future criteria, guidelines, and procedures established by the North American Electric Reliability Council (or its successor) to ensure the continued reliability of North America's interconnected secured transmission electric systems.
D. Electrically Isolated Loads: In the event that any customer elects to Electrically Isolate (as defined in Rule 1.48) some or all of the facilities at the Customer's Location and to thereafter serve such facilities with electricity from on-site generation without connection to the Company's system, the isolated portion of that customer's load will not be subject to SC-7 provided that the customer executes an agreement with the Company that provides for the following:
The Company will be entitled to inspect the electrical configuration of such facilities upon a customer's request for this exemption.
PDF page 215
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 431
NIAGARA MOHAWK POWER CORPORATION
REVISION: 1
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 0
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS:
D. (Continued)
If at any time, the Company has a reasonable suspicion that such facilities have not remained isolated from the Company's system, the Company is authorized to inspect the electrical configuration of such facilities.
If the Company discovers, through billing data and/or the inspection of the customer's facilities, that any of the facilities for which an isolation exemption had been applied have been reconnected to the Company's system, the Company will back bill the customer for the isolated load under SC7 from the effective date of the customer's reconnection, including applicable interest and penalties. Such back billing will be computed in the same manner as described under Special Provision E.
E. Penalties for Reconnecting Isolated Loads without Notice: Notwithstanding any other provision of this Tariff, in the event that the customer connects on-site generation to its electric system without: (1) notifying the Company; and (2) executing Form “G”, and in the event that the Company thereafter discovers that fact, the Company shall back-bill the customer for all service rendered subsequent to the estimated installation of such on-site generation.
In preparing such back-bills, the Company shall assess a Contract Demand Penalty Provision equal to 2 times that which would otherwise be computed under Determination of Demand Provision of SC-7 and assume the Contract Demand had been set at 0 kW. If the customer fails to pay the undisputed portion of any such back-bill within the time for payment of bills established in SC-7, the Company shall be authorized to exercise all of its rights in cases involving theft of service, including without limitation its rights under Rule 13.3 (a)(2) of the Commission Rules and Rule 14.4 of this Tariff.
PDF page 216
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 432
NIAGARA MOHAWK POWER CORPORATION
REVISION: 22
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 21
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS:
F. Reduced Customer Charge for Certain Wholesale Generators
SC-7 customers who are Wholesale Generators who:
(a) have a parent service classification of SC-3 or SC-3A and are served at the subtransmission or transmission voltage level and
(b) have paid for all of their interconnection facilities as defined in the applicable filed SIR Contract (or have arranged for payment by an entity other than the Company) and metering equipment, and pay the Company ongoing operation and maintenance costs for that equipment (or have arranged for payment by an entity other than the Company) shall pay a customer charge in lieu of the otherwise applicable customer charge, equal to the following:
SC-3 Customer Charge
Sub-Transmission
Transmission
Delivery Voltage
22-50 kV
Over 60 kV
Distribution Delivery Charge:
$1,210.68
$1,210.68
SC-3A Customer Charge
Sub-Transmission
Transmission
Delivery Voltage
22-50 kV
Over 60 kV
Distribution Delivery Charge:
$4,136.07
$8,166.00
PDF page 217
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 433
NIAGARA MOHAWK POWER CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 5
STAMPS: Issued in Compliance with Order in Case 15-E-0571, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS:
G. Billing for Customers With OSG’s Less Than or Equal to 15% of Maximum Potential Demand:
Standby Service Customers that install an OSG after December 31, 2011 with a total nameplate rating that is 15% or less of their maximum potential demand over the previous 12 months shall be subject to the delivery charges of their otherwise applicable service classification and shall not be subject to the delivery charges of SC-7.
PDF page 218
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 434
NIAGARA MOHAWK POWER CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: FEBRUARY 1, 2022
SUPERSEDING REVISION: 3
STAMPS: Issued in Compliance with Order in Case 20-E-0380, issued January 20, 2022.
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS:
H. Waiver of Reactive Demand Charges for Wholesale Generators Larger Than 25 MVA and With Automatic Voltage Control: For customers who operate a Wholesale Generator in larger than 25 MVA and install automatic voltage control (AVC) at their facilities, reactive demand charges shall be waived, within the parameters defined by the Company during the period in which such AVC is operating and maintained in good working order. The Company shall not waive start-up reactive demand charges. The initial parameters will be determined by the Company and may be changed subject to system conditions and location of the generating unit. The waiver is subject to the Company's rights to periodically review and approve the customer's AVC system and review its operation and performance for compliance with the system requirements.
PDF page 219
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 435
NIAGARA MOHAWK POWER CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 4
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
I. A Standby Service Customer with a private generating facility connected to the Company’s distribution system at primary voltage level or above may use the output of the generating facility to supply two or more Standby Service accounts, if all of the following conditions are met:
(a) Eligibility:
(1) Standby Service Accounts
(i) The Standby Service accounts designated by the customer and the account associated with export of the generating facility must be all established in a single customer’s name (“Single Party Offset”); or
(ii) The generating facility and the standby service accounts designated by the customer to receive the output of the generating facility may be established in two or more customer names (“Multi-Party Offset”), provided the following conditions are met:
(1) At least one of the standby service accounts must be in the same customer name as the owner or operator of the generating facility (the “Sponsor”) and have a contract demand equal to 10 percent or more of the nameplate rating of the generating facility.
(2) The Sponsor will be responsible for coordinating the interconnection and
operation of the generating facility with the Company, and
(3) At the time of application under the Multi-Party Offset, the Sponsor must submit signed Multi-Party Offset Recipient Participation Forms for all Recipient Accounts and a signed Multi-Party Offset Percentage Allocation Form.
(2) The generating facility must: (i) have a total nameplate rating of over 5 MW but no more than 20 MW; and (ii) meet eligibility criteria for designation as efficient “combined heat and power” pursuant to the order of the Public Service Commission, dated January 23, 2004, in Case 02-E-0781, except with respect to maximum generating capacity. The generating facility may have more than one generating unit so long as the aggregate nameplate rating conforms to the limitations in (2) (i) herein.
(3) The generating facility and the Standby Service accounts must all be located within a single “premises.” “Premises” is defined as follows for purposes of this Special Provision I only: (i.)
Under Single Party Offset, “premises” means “a parcel of land; or more than one building and/or parcel of land proximate to each other if there is common use, whether or not such buildings or parcels are separated by public or private roads.” The accounts of a customer whose buildings or parcels of land are not physically interconnected may meet the definition of a single “premises” upon the customer’s demonstration of common use to the Company.
(ii.)
Under Multi-Party Offset, “premises” means “either (i) a single building or (ii) multiple buildings in which each customer is connected to the generating facility by a private thermal loop that delivers steam, hot water, or chilled water.”
PDF page 220
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 436
NIAGARA MOHAWK POWER CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 5
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
(4) At least one of the Standby Service accounts must take service under secondary or primary voltage levels.
(5) Each Standby Service account must be separately interval metered. The export of the generating facility must also be separately interval metered. Metering requirements will be in accordance with the Metering and Communications of this Service Classification.
(6) A customer may take service under SC-6 if the export of the generating facility exceeds the aggregate kWh usage on the Standby Service accounts. The Customer must apply for service under SC6 and meet the eligibility requirements as specified therein.
(7) The communications service for the account associated with the generating facility’s export and for each Standby Service account must be provided and maintained at customer’s expense pursuant to the Metering and Communications/ contained in SC-7, and must be operational before the customer may take service under this Special Provision I.
(b) Interconnection:
The interconnection of the facilities will be subject to the interconnection requirements specified in Interconnection Requirements of this Service Classification. In addition, the interconnection must be technically and economically practicable, and the connection and operation of such facility shall not jeopardize the safety or operation of the Company’s system, facilities or other Customers.
(c) Accounts Supplied by the Generating Facility’s Output:
(1) Each account must opt in to Optional Rate Service, or otherwise be on Standby Service, to be eligible for service under this Special Provision I.
(2) The customer’s accounts must be either served by the Company or take service from an alternative energy supplier/ESCO as described in Rule 39 of this tariff.
(3) If the customer does take service from an alternative energy supplier/ESCO, all supply in excess of that supplied by the customer’s private generating facility must be supplied by a single ESCO unless the customer elects to be a Direct Customer as defined in Rule 1.54.
PDF page 221
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 437
NIAGARA MOHAWK POWER CORPORATION
REVISION: 4
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 3
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
(4) No account served under this rule may be served under the PASNY Rate Schedule (SC 4, RNY), economic development program specified in General Rule 34, net metering as specified in Rules 36 and 37, or special provision G of this Service Classification.
(5) Customers who take service under Special Provision I may not receive Consolidated Billing from the Company (described in Rule 39.10.2).
(d) Contract Demand for each account supplied by the Generating Facility’s Output: The Contract Demand will be determined for each account under this Special Provision I on an individual basis based on that account’s load and including the delivery of supply from all sources, and in conformance with the Contract Demand provisions of this Service Classification.
(e) Billing Applicable to Each Account Supplied by the Generating Facility’s Output:
(1) Allocated As-used Generator Demand and Allocated Generator Supply will be determined for each 15- minute interval. Adjustments will be made for transformation losses as applicable in accordance with Rule 39.18 of this tariff. For purposes of this Special Provision, the following definitions apply:
(i) For Accounts Supplied Under the Single Party Offset
“Allocated As-used Generator Demand” means, for each account supplied by the generating facility’s output, the demand registered on the account’s meter(s) multiplied by the lower of: (a) 1 or (b) the ratio of the demand registered on the meter(s) measuring the generating facility’s output to the sum of demands registered on the meters of all Standby Service accounts supplied by the generating facility’s output. “Allocated Generator Supply” means, for each account supplied by the generating facility’s output, the total kilowatt hours registered on the account’s meter(s) multiplied by the lower of: (a) 1 or (b) the ratio of the total kilowatt hours registered on the meter(s) measuring the generating facility’s output to the sum of the kilowatt hours registered on the meters of all Standby Service accounts supplied by the generating facility’s output.
(ii.)
For Accounts Supplied under the Multi-Party Offset
“Allocated As-used Generator Demand” means, for each Recipient Account, the lower of: (a) the demand on the Recipient Account’s meter or (b) the demand registered on the meter(s) measuring the generating facility’s output multiplied by the Recipient Account’s Percentage Allocation. If the generating facility’s output multiplied by the Recipient Account’s Percentage Allocation exceeds the demand registered on the Recipient Account’s meter, the excess amount shall not be redistributed to other accounts nor carried forward to the succeeding billing period.
“Allocated Generator Supply” means, for each Recipient Account, the lower of: (a) the total kWh registered on the Recipient Account’s meter(s) or (b) the total kWh registered on the meter(s) measuring the generating facility’s output multiplied by that Recipient Account’s Percentage Allocation. If the generating facility’s output multiplied by the Recipient Account’s Percentage Allocation exceeds the kWh registered on the Recipient Account(s) meter(s), the excess amount may be credited to the extent described in Special Provision (I)(a)(6) of this Service Classification.
“Percentage Allocation” means the percentage of the generating facility’s output that the Sponsor has allocated to each Recipient Account under the Multi-Party Offset. A single percentage will be applied to both the Allocated As-Used Generator Demand and the Allocated Generator Supply.
PDF page 222
Issued by Kenneth D. Daly, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 437.1
NIAGARA MOHAWK POWER CORPORATION
REVISION: 0
INITIAL EFFECTIVE DATE: JANUARY 1, 2017
SUPERSEDING REVISION:
STAMPS: Issued in accordance with Order in Case 16-M-0430 dated December 19, 2016
SERVICE CLASSIFICATION NO. 7 (Continued)
The Percentage Allocations must total 100 percent, of which the Sponsor must establish: (a) a Percentage Allocation of 10 percent or more to a single Recipient Account in the Sponsor’s name; and (b) a Percentage Allocation of no less than 5 percent or more than 90 percent to each additional Recipient Account. The Recipient Accounts and the Percentage Allocation to each must be assigned in writing by the Sponsor, using the SC7 Offset Rate Allocation Request Form, at least 30 days before commencing service under the Multi-Party Offset. The Percentage Allocations and the Recipient Accounts may be changed, provided the SC7 Offset Rate Allocation Request Form is submitted to the Company no less than 30 days before the Host-Generator Account’s cycle billing date to which the modification will apply. No credits will be applied if the Sponsor ceases to have a Recipient Account or ceases to own or operate the generating facility. If a Recipient Account is closed, its credits will be forfeited unless the Company receives a new Form within 30 days of the account’s closure.
(2) Each account supplied by the generating facility’s output will be billed under Standby Service rates, as modified below:
(i) An additional Customer Charge of $50.00 per account per billing period, exclusive of the Increase in Rates and Charges, will be applicable to cover incremental billing and administrative costs associated with providing service under this provision.
(ii) The per kWh delivery charges and adjustments applicable to the customer’s service classification will be applied to the total kilowatt hours registered on the account’s meter(s) reduced by the Allocated Generator Supply, for each 15-minute interval (adjusted for losses as applicable) in the Billing Period.
PDF page 223
Issued by Kenneth D. Daly, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 437.2
NIAGARA MOHAWK POWER CORPORATION
REVISION: 0
INITIAL EFFECTIVE DATE: JANUARY 1, 2017
SUPERSEDING REVISION:
STAMPS: Issued in accordance with Order in Case 16-M-0430 dated December 19, 2016
SERVICE CLASSIFICATION NO. 7 (Continued)
(iii) Customers who take electricity supply service under Rule 46.1.3 shall have their Capacity Tags reduced by the maximum of the Allocated As-used Generator Demands in the billing period for purposes of calculating the capacity charge specified in Rule 46.1.3.
(iv) For each 15-minute interval, the registered demand on the account’s meter(s) will be reduced by the Allocated Generator Demand for purposes of determining the daily maximum demand that is used for billing As-used Daily Demand Delivery Charges.
v) For any per kW surcharges applicable to the Customer, the otherwise applicable billed demand used to calculate the surcharge will be reduced by the maximum of the Allocated As-used Generator Demand in the billing period for purposes of calculating the applicable surcharge The customer’s Contract Demand shall remain unadjusted for purposes of calculating the customer’s contract demand charge.
(vi) If the Customer purchases supply from the Company, the per kWh supply charges and adjustments described in this Service Classification under Electricity Supply Service and will be applied to the total kilowatt hours registered on the account’s meter(s) reduced by the Allocated Generator Supply, for each 15-minute interval (adjusted for losses as applicable) in the billing period.
(3) The Allocated As-used Generator Demand and Allocated Generator Supply will be assumed to be zero for time periods where there is insufficient interval data available to ascertain that the generating facility supplied output to any associated Standby Service account.
Bills may be estimated pursuant to Rule 26.10.2. If interval data is estimated on a Standby Service account, that data will be used in the calculation of the Allocated As-used Generator Demand for all other accounts. If actual data later becomes available, the account will be rebilled based on the actual registered demand on the meter less the previously determined allocated As-used Generator Demand for such account.
(f) The Customer will be assessed a Reactive Power Demand Charge per kVar registered on the generating facility’s export meter(s) at the time of the kW maximum demand; provided, however, that if the meter registers no kW demand, the charge per kVar will be applied to the highest kVar recorded during the billing period.
PDF page 224
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 438
NIAGARA MOHAWK POWER CORPORATION
REVISION: 19
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 18
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS:
J.
Reduced Distribution Delivery Charges for Wholesale Generators Receiving Station Power Service from NYISO
SC7 customers who are Wholesale Generators who:
(a) are registered customers of the New York Independent Station Operator (“NYISO”) and
(b) who are receiving Station Power under the provisions of the NYISO Market Administration and Control Area Services Tariff
shall pay the following distribution delivery charges in lieu of the otherwise applicable distribution delivery charges:
SERVICE CLASSIFICATION NO. 3
MONTHLY RATE:
Contract Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Distribution Delivery
$0.13
$0.45
$0.00
$0.00
As-Used On-Peak Daily Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Distribution Delivery
$0.3250
$0.2135
$0.0000
$0.0000
As-Used Super-peak Daily Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Distribution Delivery
$0.5919
$0.3936
$0.0000
$0.0000
SERVICE CLASSIFICATION NO. 3A
MONTHLY RATE:
Contract Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Distribution Delivery
$0.56
$0.56
$0.00
$0.66
As-Used On-Peak Daily Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Distribution Delivery
$0.2403
$0.2403
$0.0000
$0.0000
PDF page 225
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 439
NIAGARA MOHAWK POWER CORPORATION
REVISION: 6
INITIAL EFFECTIVE DATE: APRIL 1, 2026
SUPERSEDING REVISION: 5
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (CONTINUED)
SPECIAL PROVISIONS:
J.
Reduced Distribution Delivery Charges for Wholesale Generators Receiving Station Power Service from NYISO (Continued)
As-Used Super-peak Daily Demand Charges, Per kW:
Delivery Voltage
0-2.2 kV
2.2-15 kV
22-50 kV
Over 60 kV
Distribution Delivery
$0.4470
$0.4470
$0.0000
$0.0000
K.
Billing for Customers with EJP Load Not Separately Metered
1. Customers with EJP load not separately metered shall be required to install interval metering and telecommunications on their on-site generator(s) in accordance with the Metering and Communications/Incremental Customer Charge provisions of SC-7.
2. Only customers billed at parent rate class SC-2D (50 kilowatts or greater), SC-3, and SC-3A are eligible to participate in the EJP program.
3. Special Provision G of SC-7 shall not apply to customers with EJP load.
4. The customer’s EJP demand and energy available for the EJP discount in each Billing Period shall be determined in accordance with Rule 34.7.3.3.2 for EJP. Customer shall be subject to all rates and charges applicable to the Excelsior Jobs Program as provided in Rule 34.
5. Customer shall be subject to all charges provided in SC-7. The billing determinants for customers with EJP qualifying load shall be determined as provided herein.
5.1
Contract Demand: The Contract Demand shall initially be set by the Company as the maximum value of the Customer’s monthly Base Year Contract Load in kilowatts specified in the signed EJP contract between the Company and the Customer per Rule 34.7.3.1.4 and Rule 34.7.3.3.1 for EJP. The Contract Demand will be automatically increased to the maximum kilowatt demand in a billing period when the maximum kilowatt demand in the billing period exceeds the Contract Demand in that billing period. The maximum kilowatt demand in a billing period shall be calculated by subtracting the EJP incremental demand available for the EJP discount as determined in Rule No. 34.7.3.3.2 for EJP from the metered billing demand (i.e., customer’s load net of generation) on an interval-by-interval basis. The demand shall not be less than zero (0) in any interval. The customer may elect to increase or reduce the Standby Contract Demand thereafter in accordance with the Determination of Contract Demand provisions of SC7.
PDF page 226
Issued by Sally Librera, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 439.1
NIAGARA MOHAWK POWER CORPORATION
REVISION: 2
INITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025
SUPERSEDING REVISION: 0
STAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.
SERVICE CLASSIFICATION NO. 7 (CONTINUED)
SPECIAL PROVISIONS:
K.
Billing for Customers with EJP Load Not Separately Metered (Continued)
5.2
As-Used Daily Demand: The As-Used Daily Demand shall be the As-Used Daily Demand as specified in Determination of As-Used Daily Demand provisions of this SC for both As-Used On-peak Daily Demand and As Used Super-peak Daily Demand, less the product of the demand eligible for the EJP discount in the billing period, as determined in Rule 34.7.3.3.2 for EJP, and the number of on-peak or super-peak days in the billing period, as applicable.
5.3
Billing Energy: Billing Energy in kilowatt-hours for the purposes of applying the Electricity Supply Service and Surcharges and Adjustments provisions of SC-7 shall be calculated by subtracting the EJP incremental energy available for the EJP discounts as determined in Rule 34.7.3.3.2 from the metered billing energy (i.e., customer’s load net of generation) on an interval-by-interval basis. The Billing Energy shall not be less than zero (0) in any interval.
PDF page 227
Issued by Rudolph L. Wynter, President, Syracuse, NY
PSC NO: 220 ELECTRICITY
LEAF: 440
NIAGARA MOHAWK POWER CORPORATION
REVISION: 5
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 4
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS:
L.
STANDBY RELIABILITY CREDIT
Standby Service Customers shall be provided an opportunity to earn a Standby Reliability Credit (Credit) against their Contract Demand Charges. Beginning January 1, 2024, the Standby Reliability Credit will be phased out over 5 years and will only be available to SC-7 Phase-In Customers as provided in Special Provision M of SC-7. The Credit would be earned when a standby customer reduces their maximum measured demand during the Defined Measurement Period below their established contract demand. To be eligible for the Credit the Customer must have an on-site generator and the following must also apply:
(1) The generating facility’s output must be separately metered using an output meter that
the customer arranges to be furnished and installed at the customer’s expense.
(2) The customer, at its expense, must provide and maintain the communications service for
the Output Meter.
(a) The Output Meter must be Commission-approved revenue grade, with interval
metering with telecommunications capability.
(b) The metering must be compatible with the Company’s infrastructure, including
compatibility with the Company’s meter reading system and metering communications
systems.
(c) All metering requirements shall be in accordance with Rule 25-Metering.
(3) The customer may not be receiving Value Stack Compensation per Rule 40.2 for the generating facility’s exports to the system.
(4) Must not be a stand-alone energy storage system or an energy storage system paired with other generating technologies that supports customer loads (other than loads directly related to or necessary to support the energy storage system) that are less than or equal to 25 percent of the energy storage system nameplate capacity rating or inverter capability.
For this Special Provision L, the following definitions apply:
(1) The “Defined Measurement Period” shall be defined as weekdays from 8:00 am to 10:00 pm during the previous two consecutive full Summer periods; provided however, that the first year in which a customer seeks the Credit, the Defined Measurement Period is weekdays from 8:00 am to 10:00 pm during the previous full Summer period only. The Defined Measurement Period shall exclude Outage Events, as selected by the customer, as well as holidays as defined in Rule 1.89.
(2) “Summer period” - For purposes of this Credit, the Summer Period is June 1 through September 30.
(3) “Outage Events” shall be defined as up to three (3) time blocks for each Summer Period that, in aggregate, are comprised of no more than five 24-hour time periods, excluding weekends and holidays. If a time block contains a period of less than 24 hours, the period will be rounded up to the next 24 hours (i.e., the 24-hour periods cannot be applied on a partial basis). If a time block encompasses a holiday or weekend, the start of the 24-hour period on the day prior to the holiday or weekend until the same hour the next business day will be considered to be a single 24-hour period.
PDF page 228
PSC NO: 220 ELECTRICITY
LEAF: 441
NIAGARA MOHAWK POWER CORPORATION
REVISION: 7
INITIAL EFFECTIVE DATE: JANUARY 1, 2024
SUPERSEDING REVISION: 6
STAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023.
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS:
L.
STANDBY RELIABILITY CREDIT (Continued)
The Credit for any Defined Measurement Period will be equal to the difference between the customer’s contract demand in kW, and the customer’s highest kW demand recorded on the customer’s interval meter(s) (net of generation), multiplied by the contract demand delivery charge per kW that is in effect on October 1 of the year in which the Credit is determined. For SC-7 Phase-in Customers the rate will be SC-7 Phase-in Contract Demand Rate billed to the customer as of October 1 of the year in which the Credit is determined. The Credit will be applied to the customer’s successive 12 monthly customer bills commencing in November until the following October.
A customer seeking the Credit must request such credit by October 14, in writing, of each year for which the reliability credit it sought and, at the same time, specify the Outage Events the customer requests to be excluded from the Defined Measurement Period. If October 14 falls on a weekend or holiday, the Company will accept requests until the next business day.
If a Standby Customer takes service under SC-7 Special Provision I, the Outage Events for all Recipient Accounts shall be the same and shall be specified by the Sponsor. Each Recipient Account’s Credit will be calculated individually. M.
SC-7 PHASE-IN CUSTOMERS
Existing SC-7 customers as of March 16, 2022 will be billed the SC-7 Phase-in delivery charges beginning January 1, 2024, (“SC-7 Phase-In Customers”). SC-7 Phase-in Customers may opt out of the SC-7 Phase-In delivery charges at any time and be billed SC7 delivery charges by providing written notice to the Company, with such transition to SC-7 delivery charges occurring in the next billing period thirty days after notice is provided. Once a customer opts out of the SC-7 Phase-in delivery charges they may not return to billing under the SC-7 Phase-In delivery charge.
Issued by Rudolph L. Wynter, President, Syracuse, NY
PDF page 229
New York State Electric & Gas Corporation
Service Classification 7: Large General Service with Time-of-Use Metering
PDF page 230
PSC No: 120 - Electricity
Leaf No. 211
New York State Electric and Gas Corporation
Revision: 1
Initial Effective Date: September 26, 2010
Superseding Revision: 0
Issued in compliance with Order in Case 09-E-0715 dated September 21, 2010
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7
APPLICABLE TO THE USE OF SERVICE FOR:
Large General Service (Primary and Secondary) with Time-of-Use Metering for any customer with a billing demand equal to or greater than 500 KW during any two of the previous twelve months and for continuing service thereafter.
Also optional for:
This option is not available to Service Classification No. 2 customers, effective December 3, 2002. Customers who qualify under the Economic Development Incentive or the Economic Development "Zone" Incentive Provision of the General Information Section of this Schedule;
Customers who qualify under the Controlled Load Service Option of Service Classification No. 3; Customers who qualify under the Agricultural Customers Time-of-Use Service Option of Service Classification No. 2.
Note:
Other than as set forth above, this service classification is not available to customers otherwise eligible for Residential Service, unless the size and/or nature of the customer's load or its impact on our system requires three phase service.
CHARACTER OF SERVICE:
Continuous - Alternating Current, 60 Cycle;
Secondary Service at 120, 120/208, 120/240, 208, 240, 240/416,
277/480, or 480 Volts; or
Primary (Distribution) Service at 2,400, 4,160, 4,800, 7,200, 8,320, 12,000,
12,470, 13,200, 34,500 or 46,000 Volts; or
Subtransmission Service* at 34,500 or 46,000 (Both Non-Regulated) Volts; and 34,500 (Regulated) Volts for "Grandfathered Customers" only*; or
Transmission Service at 115,000 Volts and above.
Single or Three Phase. (Characteristics depend upon available circuits and equipment.) * Effective September 26, 2010, Subtransmission Service will no longer be available to new service locations. However, grandfathering at the subtransmission rates contained herein will apply to the service location of the current subtransmission class customer, including the site as well as the existing buildings where the customer was taking Subtransmission Service before September 26, 2010. Grandfathering is applicable to any new owner acquiring possession of a grandfathered service location, as long as that customer meets the qualification criteria for grandfathered Subtransmission Service above. The grandfathering may apply to facility replacements and or expansions by customers taking grandfathered Subtransmission Service, if accomplished through existing subtransmission metering points at the service location. .
RATE PERIODS:
On-peak hours are defined as the hours between 7:00 A.M. and 10:00 P.M. (Local Time), Monday through Friday with the exception of the following holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. Those hours not designated as on-peak are defined as off-peak.
PDF page 231
PSC No: 120 - Electricity
Leaf No. 212
New York State Electric & Gas Corporation
Revision: 22
Initial Effective Date: June 1, 2026
Superseding Revision: 20
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:
Pursuant to General Information Section 25, Supply Service Options, customers served under this Service Classification shall choose from different electric rate choices offered by the Company as described below. The Company shall offer a Retail Access rate choice and Non-Retail Access rate choices as described below.
The Company shall provide Delivery Service regardless of the customer’s Supply Service Option.
1. ESCO Supply Service (ESS)
This Retail Access choice includes fixed charges for NYSEG delivery service and a Transition Charge. Supply Service shall be provided by an Energy Services Company (ESCO). Customers that elect ESS and receive a Consolidated Bill shall not be subject to the Bill Issuance Charge.
Delivery Service:
Rate: (Per Meter, Per Month)
Effective Date
6/01/2026
VOLTAGE SECONDARY
S.C. 7-1 DISTRIBUTION
Customer Charge
$375.00
Demand Charge
On-Peak Service
$14.55
Reactive Charge
Reactive kilovolt-ampere hours, per
billing reactive kilovolt-ampere hour
$0.00078
Non-Bypassable Charge (“NBC”):
All kWh, per kWh
See TCS Statement
Bill Issuance Charge (per bill):
$0.89, as described in General Information Section 16.J
Rate Adjustment Mechanism (“RAM”):
All kW, per kW
See RAM Statement, as described in Rule 38
PDF page 232
PSC No: 120 - Electricity
Leaf No. 213
New York State Electric & Gas Corporation
Revision: 20
Initial Effective Date: June 1, 2026
Superseding Revision: 18
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS (CONT'D.):
1. ESCO Supply Service (ESS) (cont’d)
Rate: (Per Meter, Per Month)
Delivery Service:
Non-Bypassable Charge (“NBC”):
All kWh, per kWh
See TCS Statement
Bill Issuance Charge (per bill):
$0.89, as described in General Information Section 16.J
Rate Adjustment Mechanism (“RAM”):
All kW, per kW
See RAM Statement, as described in Rule 38
Effective Date
6/01/2026
VOLTAGE PRIMARY
S.C. 7-2 DISTRIBUTION
Customer Charge
$1,350.00
Demand Charge
On-Peak Service
$13.76
Reactive Charge
Reactive kilovolt-ampere hours, per
billing reactive kilovolt-ampere hour
$0.00078
PDF page 233
PSC No: 120 - Electricity
Leaf No. 214
New York State Electric & Gas Corporation
Revision: 22
Initial Effective Date: June 1, 2026
Superseding Revision: 20
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)
1. ESCO Supply Service (ESS) (cont’d)
Rate: (Per Meter, Per Month)
Delivery Service:
Effective Date
VOLTAGE PRIMARY
S.C. 7-3 SUBTRANSMISSION
6/01/2026
Customer Charge
$3,000.00
Demand Charge
On-Peak Service
$3.72
Reactive Charge
Reactive kilovolt-ampere hours, per
billing reactive kilovolt-ampere
hour
$0.00078
Non-Bypassable Charge (“NBC”):
All kWh, per kWh
See TCS Statement
Bill Issuance Charge (per bill):
$0.89, as described in General Information Section 16.J
Rate Adjustment Mechanism (“RAM”):
All kW, per kW
See RAM Statement, as described in Rule 38
PDF page 234
PSC No: 120 - Electricity
Leaf No. 215
New York State Electric & Gas Corporation
Revision: 31
Initial Effective Date: June 1, 2026
Superseding Revision: 29
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)
1. ESCO Supply Service (ESS) (cont’d)
Rate: (Per Meter, Per Month)
Delivery Service:
VOLTAGE PRIMARY
S.C. 7-4 TRANSMISSION
Effective Date
6/01/2026
Customer Charge
$5,900.00
Demand Charge
On-Peak Service
$2.07
Reactive Charge
Reactive kilovolt-ampere
hours, per billing reactive
kilovolt-ampere hour
$0.00078
Non-Bypassable Charge (“NBC”):
All kWh, per kWh
See TCS Statement
Bill Issuance Charge (per bill):
$0.89, as described in General Information Section 16.J
Rate Adjustment Mechanism (“RAM”):
All kW, per kW
See RAM Statement, as described in Rule 38
PDF page 235
PSC No: 120 - Electricity
Leaf No. 215.1
New York State Electric & Gas Corporation
Revision: 7
Initial Effective Date: January 1, 2010
Superseding Revision: 6
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)
2. Reserved for Future Use
Issued in compliance with order in Case No. 09-E-0227 dated 09/28/09.
PDF page 236
PSC No: 120 - Electricity
Leaf No. 216
New York State Electric & Gas Corporation
Revision: 27
Initial Effective Date: November 1, 2023
Superseding Revision: 25
Issued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)
3. NYSEG Supply Service (NSS)
This Non-Retail Access choice includes the same fixed charges for NYSEG Delivery Service as the ESCO Supply Service (ESS), a Transition Charge, a commodity charge for electricity supplied by NYSEG which fluctuates with the market price of electricity, and a Merchant Function Charge. RATE: (Per Meter, Per Month)
Non-Bypassable Charge (
:
All kWh, per kWh
See TCS Statement
Commodity Service:
The charge for Electric Power Supply provided by NYSEG shall fluctuate each month as further described in General Information Section 25.I.C., Calculation of the Commodity Charge.
Merchant Function Charge
All kWh, per kWh
See Merchant Function Charge Statement
Bill Issuance Charge (per bill):
$0.89, as described in General Information Section 16.J.
All kW, per kW
See RAM Statement, as described in Rule 38
PDF page 237
PSC No: 120 - Electricity
Leaf No. 216.1
New York State Electric & Gas Corporation
Revision: 6
Initial Effective Date: December 1, 2020
Superseding Revision: 5
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)
4. Hourly Pricing
Mandatory and Voluntary
Mandatory
Customers with billed demand greater than or equal to 300 kW in any two months within the 12 months. A customer taking service under Hourly Pricing shall remain subject to this provision until their monthly metered demand has been less than 300 kW for 12 consecutive months.
Customers that received a NYPA allocation on or before December 31, 2006, are exempt from mandatory Hourly Pricing as set forth under Voluntary Hourly Pricing.
Voluntary:
Hourly Pricing is voluntary for any customer taking service under Service Classification No. 7 who does not meet the requirements for Mandatory Hourly Pricing set forth above. Once a customer voluntarily elects Hourly Pricing, they shall remain subject to this provision until their monthly metered demand has been less than 300 kW for 12 consecutive months.
Hourly Pricing is also voluntary to a customer with load supplied by NYPA beginning on or prior to December 31, 2006, and would have otherwise qualified for Mandatory Hourly Pricing. These customers shall have the following Supply Service Options, all described herein, for the non-NYPA load, NSS, ESS, or Hourly Pricing, until the end of their participation in the NYPA program at which time they shall be subject to Mandatory Hourly Pricing and have the two supply options ESS or Hourly Pricing, as described below.
PDF page 238
PSC No: 120 - Electricity
Leaf No. 217
New York State Electric & Gas Corporation
Revision: 15
Initial Effective Date: January 1, 2010
Superseding Revision: 14
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)
4. Hourly Pricing – Mandatory and Voluntary (Cont'd.)
Voluntary: (Cont’d.)
Additionally, Hourly Pricing is voluntary to a customer that is participating in any of the Company’s Economic Incentives that received the Economic Incentive beginning on or prior to December 31, 2006, and would have otherwise qualified for Mandatory Hourly Pricing until the term of the customer’s Economic Incentive expires. The customer must choose the same Supply Service Option for its incentive, non-incentive load and any future load. Upon the conclusion of their participation in the Economic Incentive, the customer will be subject to Mandatory Hourly Pricing and have two supply options, ESS or Hourly Pricing option, as described below.
PDF page 239
PSC No: 120 - Electricity
Leaf No. 217.1
New York State Electric & Gas Corporation
Revision: 6
Initial Effective Date: August 12, 2016
Superseding Revision: 5
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016.
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)
4. Hourly Pricing – Mandatory and Voluntary (Cont'd.)
DELIVERY CHARGES:
The delivery charges set forth in this Service Classification for standard service shall apply to a customer taking service under Hourly Pricing. A customer that qualifies for the Economic Development Zone Incentive shall pay the delivery charges set forth in the Special Provision (d)(3) Economic Development Zone Incentive. A customer that qualifies for the Industrial/High Load Factor Special Provision shall pay the delivery charges as set forth in the Special Provision (h).
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:
Customers served under this provision must select from the different electricity Supply Service Options offered by the Company as described below. NYSEG shall offer a Retail Access rate choice and a Non-Retail Access rate choice. The Retail Access choice (see 1 below) is the ESCO Supply Service (ESS). The Non-Retail Access choice (see 2 below) is the NYSEG Hourly Day-Ahead Market Pricing Option (“Hourly Pricing”).
NYSEG shall provide only delivery service for the Retail Access choice. Electricity supply is provided by an Energy Services Company (“ESCO”). Hourly Pricing customers are able to select ESCO commodity service at any time. NYSEG shall provide delivery service and commodity service for the Non-Retail Access choice. A customer who has not chosen an option, and for whom NYSEG has not received a retail access enrollment from an ESCO, shall default to the NYSEG Hourly Day-Ahead Market Pricing Option.
1. ESCO Supply Service (ESS)
This Retail Access choice includes fixed charges for NYSEG delivery service and a Transition Charge set forth on the Transition Charge Statement. Electricity supply is provided by an ESCO. Customers that elect ESS and receive a Consolidated Bill shall not be subject to the Bill Issuance Charge.
2. NYSEG Hourly Day-Ahead Market Pricing Option (“Hourly Pricing”)
This Non-Retail Access choice includes fixed charges for NYSEG delivery service, a Transition Charge set forth on the Transition Charge Statement, a Merchant Function Charge, and a commodity charge for electricity supply that fluctuates hourly with the market price of electricity including losses, unaccounted for energy, capacity, and capacity reserves, as further described herein. Electricity supply is provided by NYSEG.
PDF page 240
PSC No: 120 - Electricity
Leaf No. 218
New York State Electric & Gas Corporation
Revision: 20
Initial Effective Date: May 3, 2017
Superseding Revision: 19
Issued in Compliance with Order in Case 15-E-0302, dated February 22, 2017 and 17-M-0106 dated April 20, 2017. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)
4. Hourly Pricing
Mandatory and Voluntary (Cont'd.)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS
2. NYSEG Hourly Day-Ahead Market
Reserved for Future Use
PDF page 241
PSC No: 120 - Electricity
Leaf No. 218.1
New York State Electric & Gas Corporation
Revision: 5
Initial Effective Date: April 1, 2017
Superseding Revision: 4
Issued in Compliance with Order in Case 15-E-0302, dated February 22, 2017. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)
4. Hourly Pricing – Mandatory and Voluntary (Cont'd.)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (Cont’d.)
2. NYSEG Hourly Day-Ahead Market Pricing Option (“Hourly Pricing”) (Cont’d.) Reserved for Future Use
PDF page 242
PSC No: 120 - Electricity
Leaf No. 219
New York State Electric and Gas Corporation
Revision: 8
Initial Effective Date: July 1, 2016
Superseding Revision: 6
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)
4. Hourly Pricing – Mandatory and Voluntary (Cont'd.)
METERING AND COMMUNICATION REQUIREMENTS:
1. Customer Responsibilities:
All customers subject to this special provision are required to have interval metering and remote meter reading capability. Such customers shall be responsible for the following:
a. the costs of providing remote meter reading capability through dedicated telecommunications to and from the meter; and
b. the dedicated telecommunications shall be approved by the Company, and
c. all costs associated with the installation, operation and maintenance of the telecommunications equipment, including but not limited to, all telecommunications service bills. If the Company is unable to read the meter through a customer provided connection, and the Company has determined that the problem is not caused by the Company's equipment, the customer shall be responsible for resolution of the problem. The customer shall also be responsible for reimbursement of the Company expenses incurred for visits to the meter location to ascertain the cause of the problem, including reimbursing the Company for any expenses the Company incurs, such as, but not limited to, the cost to provide a manual meter read.
2. Company Responsibilities:
a. Equipment shall be replaced at the Company’s discretion and shall be based upon available resources and Company Schedule.
b. In the absence of equipment failure, if the customer requests replacement of working equipment, it shall be scheduled by order of request and availability.
PDF page 243
PSC No: 120 - Electricity
Leaf No. 220
New York State Electric & Gas Corporation
Revision: 10
Initial Effective Date: November 1, 2023
Superseding Revision: 8
Issued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
MERCHANT FUNCTION CHARGE:
The Merchant Function Charge reflects the administrative costs of obtaining electricity supply. Customers whose
electricity is supplied by an ESCO are not charged for this service.
MINIMUM CHARGE:
The minimum charge for service under this Service Classification is the monthly Customer Charge as listed above plus the Bill Issuance Charge, if applicable, or unless otherwise stated in the applicable special provisions. The minimum charge for customers who choose to take all or part of their back-up or maintenance service under this service classification rather than under Special Provision (d) of NYSEG's Service Classification No. 11 is described in the "DETERMINATION OF DEMAND" section.
:
A customer taking service under this Service Classification shall be subject to a RDM adjustment (as explained in this Schedule, General Information Section 7). See RDM Statement.
PDF page 244
PSC No: 120 - Electricity
Leaf No. 221
New York State Electric & Gas Corporation
Revision: 34
Initial Effective Date: January 1, 2025
Superseding Revision: 33
Issued in compliance with Orders in Case No. 24-E-0493, dated December 19, 2024.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
SURCHARGE TO COLLECT SYSTEM BENEFITS CHARGE ("SBC"):
A surcharge shall be added to each customer bill for service under this Service Classification to collect the System Benefits Charge (as explained in this Schedule, General Information Rule 4). See SBC Statement. kWh supplied by NYPA are exempt from the System Benefits Charge.
The RAM shall be applied per kW to all kW delivered under this Service Classification (as explained in this schedule, General Information Rule 38). See RAM Statement.
EARNINGS ADJUSTMENT MECHANISM ( EAM ):
The EAM shall be applied per kW delivered under this Service Classification, (as explained in this Schedule General Information Rule 46). The rate shall be set forth on the EAM Statement.
NON-WIRES ALTERNATIVE ( NWA ) SURCHARGE:
The NWA Surcharge shall be applied per kW delivered under this Service Classification, (as explained in this Schedule General Information Rule 47). The rate shall be set forth on the NWA Statement. -
The EV Surcharge shall be applied per kW delivered under this Service Classification, (as explained in this Schedule General Information Rule 49). The rate shall be set forth on the EVMR Statement. RECOVERY CHARGE
The Recovery Charge shall be applied per kW delivered under this Service Classification, (as explained in this Schedule General Information Rule 57). The rate shall be set forth on the Recovery Charge Statement. METER OWNED BY CUSTOMER, INSTALLED AND MAINTAINED BY THE COMPANY:
Customers electing to own their meters, as described in Section 3.A.II of P.S.C. No. 119 Electricity, shall
receive a Meter Ownership Credit.
INCREASES IN RATES AND CHARGES:
The rates and charges under this Service Classification, including the minimum charge, shall be increased by a surcharge pursuant to Rule 6 of P.S.C. No. 120 to reflect the tax rates applicable within the municipality where the customer takes service.
DETERMINATION OF DEMAND:
The Determination of Demand shall be derived from the on-peak hours only. The metered demand shall be the highest average kW used in a 15-minute interval during the month.
(For customers whose meters are read bi-monthly, the billing demand shall be 95% of the metered demand.) For subtransmission and transmission customers also served by the Company under Special Provision F of Service Classification No. 10, the measured demand of the output provided by the customer's generating facility shall be added to the measured demand as determined by the Company's meter for service under this Classification.
PDF page 245
PSC No: 120 - Electricity
Leaf No. 222
New York State Electric and Gas Corporation
Revision: 5
Initial Effective Date: July 1, 2014
Superseding Revision: 4
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
DETERMINATION OF DEMAND: (Cont’d.)
Customers who choose to take all or part of their back-up or maintenance service under this service classification rather than under Special Provision (d) of the Company’s Service Classification No. 11 will pay a minimum demand charge as described in the Company’s Service Classification No. 11. Customers will pay a minimum demand charge related to generation, ancillary, and transmission costs. The minimum demand charge is based on a rate per kW of the contract demand and is accumulated over a 12-month period.
The accumulated contract demand charge component will be compared to the
accumulated demand charge in this service classification. If the contract demand charge is greater than the demand charge in this service classification, then the customer will only pay the contract demand charge in that month. If it is less than the demand charge in this service classification, then the customer will pay that difference in that month. DETERMINATION OF REACTIVE
KILOVOLT-AMPERE HOURS:
Whenever the customer's metered demand is 200 KW or more for two consecutive billing periods, the reactive kilovolt- ampere hours shall thereafter be metered. The billing reactive kilovolt-ampere hours shall be the reactive kilovolt- ampere hours in excess of one-third of the metered kilowatt hours.
Effective 05/01/2010:
Whenever the customer’s metered demand is 200 kW or more for two billing periods in any two of the previous 12 months, the reactive kilovolt-ampere hours shall thereafter be metered. The billing reactive kilovolt-ampere hours will be the reactive kilovolt-ampere hours in excess of one-fourth of the metered kilowatt-hours. TERMS OF PAYMENT:
All bills are rendered at the above "unit prices" and that amount is due on bills paid on or before the past due date indicated on the bill. A late payment charge at the rate of one and one-half percent (1 1/2%) per month will be billed on all amounts not paid by that date. (Further details in Section 4 of P.S.C. No. 119 - Electricity or superseding issues thereof.)
TERM:
One year and thereafter until terminated by 30 days' notice. However, the Company may, with the permission of the Public Service Commission, require the customer to agree to take service at rates from time to time effective for a longer term dependent upon the amount of investment required or other unusual conditions incident to the service. Time-of-use metering and billing will continue even if the customer's demands should remain below 500 KW and as set forth in Special Provision (e) herein.
VOLTAGE OPTION:
Customers taking service at other than the stated Secondary Voltages shall furnish and maintain the necessary transformer substation.
At the discretion of the Company, metering for Transmission Service may be on the secondary side of the customer's transformers and calculated transformer losses will be added to measured demand and energy prior to billing. When metering is on the secondary side of the customer's transformers, no load transformer losses will be based on manufacturer's published data for customer's transformers, or equivalent, assuming 730 hours per month. Load losses based on manufacturer's published data for customer's transformer, or equivalent, will be determined by multiplying metered demand and metered energy, respectively, by individually calculated factors developed in accordance with generally accepted engineering principles assuming 730 hours per month and taking cognizance of full load capacity of the customer's transformer, the customer's average peak load and the load factor and average power factor of the load. Such factors will be reviewed annually or as load changes require.
PDF page 246
PSC No: 120 - Electricity
Leaf No. 223
New York State Electric and Gas Corporation
Revision: 2
Initial Effective Date: May 1, 2017
Superseding Revision: 1
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS:
(a) Budget Billing:
Customers may, by signing an application, be billed monthly in accordance with the plan set forth in Section 4-P of P.S.C. No. 119 - Electricity or superseding issues thereof.
(b) Submetering:
Submetering may be available according to certain conditions as explained in the General Information leaves of this Schedule, Section 2, Submetering.
PDF page 247
PSC No: 120 - Electricity
Leaf No. 224
New York State Electric and Gas Corporation
Revision: 5
Initial Effective Date: November 1, 2021
Superseding Revision: 4
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(c) Reserved for Future Use
PDF page 248
PSC No: 120 - Electricity
Leaf No. 225
New York State Electric and Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
Reserved for Future Use
PDF page 249
PSC No: 120 - Electricity
Leaf No. 226
New York State Electric & Gas Corporation
Revision: 12
Initial Effective Date: March 20, 2021
Superseding Revision: 11
Issued in compliance with Order in Case 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(d) Economic Incentives:
(1) Reserved for Future Use
PDF page 250
PSC No: 120 - Electricity
Leaf No. 227
New York State Electric & Gas Corporation
Revision: 10
Initial Effective Date: December 1, 2020
Superseding Revision: 9
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(d) Economic Incentives: (Cont'd)
(1) Reserved for Future Use
(2) Reserved for Future Use
(3) Reserved for Future Use
PDF page 251
PSC No: 120 - Electricity
Leaf No. 228
New York State Electric & Gas Corporation
Revision: 27
Initial Effective Date: December 1, 2020
Superseding Revision: 25
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(d) Economic Incentives: (Cont'd)
(3) Reserved for Future Use
PDF page 252
PSC No: 120 - Electricity
Leaf No. 229
New York State Electric & Gas Corporation
Revision: 24
Initial Effective Date: December 1, 2020
Superseding Revision: 22
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(d) Economic Incentives: (Cont'd)
(3) Reserved for Future Use
PDF page 253
PSC No: 120 - Electricity
Leaf No. 230
New York State Electric & Gas Corporation
Revision: 27
Initial Effective Date: December 1, 2020
Superseding Revision: 25
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(d) Economic Incentives: (Cont'd)
Reserved for Future Use
PDF page 254
PSC No: 120 - Electricity
Leaf No. 231
New York State Electric & Gas Corporation
Revision: 21
Initial Effective Date: July 1, 2016
Superseding Revision: 19
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
Reserved for Future Use
PDF page 255
PSC No: 120 - Electricity
Leaf No. 232
New York State Electric & Gas Corporation
Revision: 8
Initial Effective Date: January 1, 2010
Superseding Revision: 7
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(d) Economic Incentives: (Cont'd)
(3) Economic Development Zone Incentive: (Cont'd)
Reserved for Future Use
Issued in compliance with order in Case No. 09-E-0227 dated 09/28/09.
PDF page 256
PSC No: 120 - Electricity
Leaf No. 233
New York State Electric & Gas Corporation
Revision: 9
Initial Effective Date: January 1, 2010
Superseding Revision: 8
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(d) Economic Incentives: (Cont'd)
(3) Economic Development Zone Incentive: (Cont'd)
Reserved for Future Use
Issued in compliance with order in Case No. 09-E-0227 dated 09/28/09.
PDF page 257
PSC No: 120 - Electricity
Leaf No. 234
New York State Electric and Gas Corporation
Revision: 5
Initial Effective Date: July 1, 2016
Superseding Revision: 3
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(d) Economic Incentives: (Cont’d)
(4) Reserved for Future Use
PDF page 258
PSC No: 120 - Electricity
Leaf No. 235
New York State Electric and Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(d) Economic Incentives: (Cont’d)
(4) Reserved for Future Use
PDF page 259
PSC No: 120 - Electricity
Leaf No. 236
New York State Electric & Gas Corporation
Revision: 10
Initial Effective Date: May 1, 2017
Superseding Revision: 9
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(d) (4) Reserved for Future Use
(5) Reserved for Future Use
PDF page 260
PSC No: 120 - Electricity
Leaf No. 237
New York State Electric & Gas Corporation
Revision: 7
Initial Effective Date: November 1, 2011
Superseding Revision: 6
Issued in compliance with order in Case 11-E-0176 dated September 19, 2011.
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(d) (6)
Recharge New York (“RNY”) Power Program
Customers who qualify for the Recharge NY Power Program pursuant to Section 11 of the General Information Section of this Schedule, will have such power billed in accordance with the provision therein. The customer's power requirements in excess of the RNY Power allocation will be billed in accordance with the ESCO Supply Service rate or the NYSEG Supply Service rate of this Service Classification applicable to the customer's voltage level.
PDF page 261
PSC No: 120 - Electricity
Leaf No. 238
New York State Electric and Gas Corporation
Revision: 5
Initial Effective Date: July 1, 2016
Superseding Revision: 3
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(d) Economic Incentives: (Cont’d)
(7) Reserved for Future Use
PDF page 262
PSC No: 120 - Electricity
Leaf No. 239
New York State Electric and Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(d) Economic Incentives: (Cont’d)
(7) Reserved for Future Use
PDF page 263
PSC No: 120 - Electricity
Leaf No. 240
New York State Electric and Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(d) Economic Incentives: (Cont’d)
(7) Reserved for Future Use
PDF page 264
PSC No: 120 - Electricity
Leaf No. 241
New York State Electric and Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(d) Economic Incentives: (Cont’d)
(7) Reserved for Future Use
(8) Reserved for Future Use
(9) High Load Factor Manufacturer Power ("HLFM")
Before service will commence under this Special Provision, the Company and NYPA must execute an agreement governing additional terms of HLFM service. During the Price Cap Period (March 3, 1998 through March 2, 2003) customers who qualify for this special HLFM power provision, pursuant to Section 18 of the General Information section of this Schedule, provided such load was not previously served by the Company, will have such power billed in accordance with the following rate schedule:
PDF page 265
PSC No: 120 - Electricity
Leaf No. 242
New York State Electric and Gas Corporation
Revision: 3
Initial Effective Date: December 1, 2020
Superseding Revision: 2
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(d) (9) High Load Factor Manufacturer Power ("HLFM") (Cont'd.)
Unit
RATE: (Per Month)
Price
Delivery Charge - All kilowatts, per kW
(applied to the customer's monthly NYPA
Billing Demand, adjusted for losses)
On-Peak
Transmission
NYSEG's then applicable OATT service rate
(subject to FERC review, acceptance or
approval)
Additional Charge for service below 34.5 kV
Primary
$ 3.81
Secondary
$ 4.32
Demand Charge - All kilowatts, per kW
NYSEG shall charge the customer for a NYPA
(applied to the customer's monthly NYPA
Demand Charge for HLFM service subject to
Billing Demand, adjusted for losses)
the execution of an agreement with NYPA for
HLFM service.
Energy Charge - per kWh
NYSEG shall charge the customer a NYPA
(applied to the customer's monthly NYPA
Energy Charge for HLFM service subject to
Billing Energy, adjusted for losses)
the execution of an agreement with NYPA for
HLFM service.
Reactive Charge: *
Reactive kilovolt-ampere hours,
$0.00078
per billing reactive kilovolt-ampere hours
HLFM customers may obtain energy loss compensation service, Operating Reserve - Spinning Reserve Service, and Operating Reserve - Supplemental Reserve Service (collectively referred to as "voluntary ancillary services") from NYPA or another supplier other than NYSEG. If such HLFM customer chooses to obtain the voluntary ancillary services from NYSEG, they shall be provided at the rates and charges included in the then effective OATT, or for loss compensation services at rates and terms mutually agreed upon by NYSEG and such customer. Other Billing Adjustments:
Increase in Rates applicable to Municipality where service is supplied shall be applied to the amounts billed. Billing:
Billing provisions related to HLFM service shall be subject to the execution of an agreement by the Corporation with NYPA related to the provision of HLFM service.
PDF page 266
PSC No: 120 - Electricity
Leaf No. 243
New York State Electric & Gas Corporation
Revision: 19
Initial Effective Date: December 1, 2020
Superseding Revision: 17
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(d) (10) Reserved for Future Use
PDF page 267
PSC No: 120 - Electricity
Leaf No. 243.1
New York State Electric & Gas Corporation
Revision: 6
Initial Effective Date: July 1, 2016
Superseding Revision: 4
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
Reserved for Future Use
PDF page 268
PSC No: 120 - Electricity
Leaf No. 243.2
New York State Electric & Gas Corporation
Revision: 16
Initial Effective Date: November 1, 2023
Superseding Revision: 14
Issued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(d) (11) Excelsior Jobs Program ( EJP )
Service taken under this Service Classification may be eligible for the rates and charges under the Excelsior Jobs Program. Any customer who meets the qualifications set forth under General Information Rule 32 shall pay for service at the following rate:
RATE: (per month)
For customers qualifying for the EJP, the Non-Bypassable Charge component of the Transition Charge and the Revenue Decoupling Mechanism (RDM) Adjustment does not apply to S.C. No. 7-1 Secondary, S.C. No. 7-2
Primary, S.C. No. 7-3
Subtransmission and S.C. No. 7-4 - Transmission. All customers
shall be required to pay Commodity, Capacity, Merchant Function, and Bill Issuance Charges, if applicable, in accordance with the standard NSS or ESS rates for this Service Classification. All customers are also required to pay the System Benefits Charges, and Reactive Charges in accordance with the standard NSS or ESS rates for this Service Classification.
If it is determined that a bill calculated with the incentive exceeds a bill calculated under the otherwise applicable standard service classification rates, the customer shall pay the lower of the two bills.
PDF page 269
PSC No: 120 - Electricity
Leaf No. 243.3
New York State Electric & Gas Corporation Revision: 9
Initial Effective Date: November 1, 2023 Superseding Revision: 7
Issued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023. ISSUED BY: Jeremy Euto, Vice President Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued) SPECIAL PROVISIONS: (Cont'd.)
(d) (11) Excelsior Jobs Program (EJP) VOLTAGE SECONDARY
S.C. 7-1 DISTRIBUTION
Effective Date
Delivery Charges
11/01/2023
05/01/2024
05/01/2025
Customer Charge
$271.00
$325.00
$375.00
Make-Whole Customer Charge
$12.42
$12.42
$12.42
Demand Charge
(All kW, per kW)
$4.18
$3.65
$3.19
Reactive Charge
Reactive kilovolt-ampere hours, per billing reactive kilovolt-ampere hour
$0.00078
$0.00078
$0.00078
VOLTAGE PRIMARY
S.C. 7-2 DISTRIBUTION
Effective Date
Delivery Charges
11/01/2023
05/01/2024
05/01/2025
Customer Charge
$947.00
$1,125.00
$1,350.00
Make-Whole Customer Charge
$41.17
$41.17
$41.17
Demand Charge
(All kW, per kW)
$3.61
$3.39
$3.09
Reactive Charge
Reactive kilovolt-ampere hours, per billing reactive kilovolt-ampere hour
$0.00078
$0.00078
$0.00078
VOLTAGE PRIMARY
S.C. 7-3 SUBTRANSMISSION
Effective Date
Delivery Charges
11/01/2023
05/01/2024
05/01/2025
Customer Charge
$1,974.00
$2,425.00
$3,000.00
Make-Whole Customer Charge
$88.22
$88.22
$88.22
Demand Charge
(All kW, per kW)
$1.03
$0.75
$0.36
Reactive Charge
Reactive kilovolt-ampere hours, per billing reactive kilovolt-ampere hour
$0.00078
$0.00078
$0.00078
Effective May 1, 2026, the Make-
shall not include the Make-Whole Rate.
PDF page 270
PSC No: 120 - Electricity
Leaf No. 243.4
New York State Electric & Gas Corporation
Revision: 11
Initial Effective Date: November 1, 2023
Superseding Revision: 10
Issued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(d) (11)
Effective May 1, 2026, the Make-Whole Rate shall expire and the Delivery Charge that appears on the -Whole Rate.
EJP customers shall be offered two supply service options and charged in accordance with their choice:
1. ESCO Supply Service
2. NYSEG Supply Service
(e) Billing Duration:
Service Classification No. 2 customers who opt for service under Service Classification No. 7 for the first time must remain on the Time-Of-Use rate for a period of not less than six months prior to becoming eligible to return to Service Classification No. 2. If a customer returns to Service Classification No. 2, the customer must remain a Service Classification No. 2 customer for at least 18 months before again becoming eligible for Service Classification No. 7. If the customer again opts for Service Classification No. 7, the customer must remain on Service Classification No. 7 in conformance with the TERM as set forth herein.
(f) RESERVED FOR FUTURE USE
(g) RESERVED FOR FUTURE USE
VOLTAGE PRIMARY
S.C. 7-4 TRANSMISSION
Effective Date
Delivery Charges
11/01/2023
05/01/2024
05/01/2025
Customer Charge
$3,950.00
$4,800.00
$5,900.00
Make-Whole Customer Charge
$168.58
$168.58
$168.58
Demand Charge
(All kW, per kW)
$0.47
$0.39
$0.26
Reactive Charge
Reactive kilovolt-ampere hours, per billing
reactive kilovolt-ampere hour
$0.00078
$0.00078
$0.00078
PDF page 271
PSC No: 120 - Electricity
Leaf No. 244
New York State Electric and Gas Corporation
Revision: 3
Initial Effective Date: December 1, 2020
Superseding Revision: 2
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(h) Reserved for Future Use
PDF page 272
PSC No: 120 - Electricity
Leaf No. 245
New York State Electric and Gas Corporation
Revision: 2
Initial Effective Date: December 1, 2020
Superseding Revision: 0
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(h) Reserved for Future Use
PDF page 273
PSC No: 120 - Electricity
Leaf No. 246
New York State Electric and Gas Corporation
Revision: 2
Initial Effective Date: December 1, 2020
Superseding Revision: 0
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(h) Reserved for Future Use
PDF page 274
PSC No: 120 - Electricity
Leaf No. 247
New York State Electric & Gas Corporation
Revision: 20
Initial Effective Date: December 1, 2020
Superseding Revision: 18
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
Reserved for Future Use
PDF page 275
PSC No: 120 - Electricity
Leaf No. 248
New York State Electric & Gas Corporation
Revision: 26
Initial Effective Date: December 1, 2020
Superseding Revision: 24
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
Reserved for Future Use
PDF page 276
PSC No: 120 - Electricity
Leaf No. 248.1
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: December 1, 2020
Superseding Revision: 2
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
(h) Reserved for Future Use
PDF page 277
PSC No: 120 - Electricity
Leaf No. 249
New York State Electric & Gas Corporation
Revision: 26
Initial Effective Date: December 1, 2020
Superseding Revision: 24
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
Reserved for Future Use
PDF page 278
PSC No: 120 - Electricity
Leaf No. 249.1
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: December 1, 2020
Superseding Revision: 2
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
(h) Reserved for Future Use
PDF page 279
PSC No: 120 - Electricity
Leaf No. 250
New York State Electric & Gas Corporation
Revision: 26
Initial Effective Date: December 1, 2020
Superseding Revision: 24
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
Reserved for Future Use
PDF page 280
PSC No: 120 - Electricity
Leaf No. 250.1
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: December 1, 2020
Superseding Revision: 2
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
Reserved for Future Use
PDF page 281
PSC No: 120 - Electricity
Leaf No. 251
New York State Electric & Gas Corporation
Revision: 20
Initial Effective Date: January 1, 2010
Superseding Revision: 19
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(h) Industrial/High Load Factor Rate Provision (Cont’d.):
(4) Rate for Industrial/High Load Factor Service: (Per Month) (Cont'd.) b. Reserved for Future Use
Issued in compliance with order in Case No. 09-E-0227 dated 09/28/09.
PDF page 282
PSC No: 120 - Electricity
Leaf No. 251.1
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: December 1, 2020
Superseding Revision: 2
Issued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
(h) Reserved for Future Use
PDF page 283
PSC No: 120 - Electricity
Leaf No. 252
New York State Electric & Gas Corporation
Revision: 19
Initial Effective Date: June 1, 2026
Superseding Revision: 17
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(h) Reserved for Future Use
(i) Reserved for Future Use
(j) Optional Election of Service Classification No. 11 Rates:
A demand-metered customer that does not have On-Site Generating facilities (“OSG”) may opt to select the applicable rates under Service Classification No. 11 and be billed under such rates for a period of not less than 12 months.
A customer that opts for these rates shall comply with the “Optional Election of Service Rate for Customers Without On-site Generation” as described in Service Classification No. 11.
PDF page 284
PSC No: 120 - Electricity
Leaf No. 253
New York State Electric and Gas Corporation
Revision: 4
Initial Effective Date: January 1, 2008
Superseding Revision: 2
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
Reserved for Future Use
Issued in compliance with order in Case No. 07-E-0479 dated 08/29/07.
PDF page 285
PSC No: 120 - Electricity
Leaf No. 254
New York State Electric and Gas Corporation
Revision: 4
Initial Effective Date: January 1, 2008
Superseding Revision: 2
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
Reserved for Future Use
Issued in compliance with order in Case No. 07-E-0479 dated 08/29/07.
PDF page 286
PSC No: 120 - Electricity
Leaf No. 254.1
New York State Electric and Gas Corporation
Revision: 2
Initial Effective Date: January 1, 2008
Superseding Revision: 0
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
Reserved for Future Use
Issued in compliance with order in Case No. 07-E-0479 dated 08/29/07.
PDF page 287
PSC No: 120 - Electricity
Leaf No. 254.2
New York State Electric and Gas Corporation
Revision: 1
Initial Effective Date: January 1, 2008
Superseding Revision: 0
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
Reserved for Future Use
Issued in compliance with order in Case No. 07-E-0479 dated 08/29/07.
PDF page 288
PSC No: 120 - Electricity
Leaf No. 254.3
New York State Electric and Gas Corporation
Revision: 2
Initial Effective Date: January 1, 2008
Superseding Revision: 0
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
Reserved for Future Use
Issued in compliance with order in Case No. 07-E-0479 dated 08/29/07.
PDF page 289
PSC No: 120 - Electricity
Leaf No. 254.4
New York State Electric and Gas Corporation
Revision: 1
Initial Effective Date: January 1, 2008
Superseding Revision: 0
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
Reserved for Future Use
Issued in compliance with order in Case No. 07-E-0479 dated 08/29/07.
PDF page 290
PSC No: 120 - Electricity
Leaf No. 255
New York State Electric & Gas Corporation
Revision: 6
Initial Effective Date: November 1, 2023
Superseding Revision: 5
Issued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 7 (Continued)
SPECIAL PROVISIONS: (Cont'd.)
(k) C.A.$.H.BACK Special Provision:
The Company shall provide a voluntary program for load normally supplied and delivered by the Company, for eligible customers to curtail load. The Company's program, entitled C.A.$.H.BACK, implements the NYISO's day- ahead economic load-curtailment program. Under this program, a customer agrees to curtail load when their bid is submitted and accepted by the NYISO.
Customers who are qualified under C.A.$.H.BACK in Section 21 of the General Information section of this Schedule may participate in the Company C.A.$.H.BACK Program as set forth therein.
(l) Farm Waste Electric Generating System Option:
This option is for a customer qualifying for the Farm Waste Electric Generating System Option pursuant to General Information Section 22 of this Schedule and taking service under S.C. No. 7. If electricity (kWh) supplied by the customer to the Company is not metered for the time-differentiated periods, an allocation to each TOU period shall be done according to allocation factors as described herein.
47% of the excess electricity (kWh) supplied by the
customer shall be considered On-Peak. 53% of the excess electricity (kWh) shall be considered Off-Peak.
(m) Wind Electric Service Option:
This option is for a customer qualifying for the Wind Non-Residential Service Option pursuant to General Information Section 22 of this Schedule and taking service under S.C. No. 7. If electricity (kWh) supplied by the customer to the Company is not metered for the time-differentiated periods, an allocation to each TOU period shall be done according to allocation factors as described herein.
47% of the excess electricity (kWh) supplied by the
customer shall be considered On Peak. 53% of the excess electricity (kWh) shall be considered Off Peak.
(n) Solar Non-Residential Electric Service Option:
This option is for a customer qualifying for the Solar Non-Residential Generating Service Option pursuant to General Information Section 22 of this Schedule and taking service under S.C. No. 7. If electricity (kWh) supplied by the customer to the Company is not metered for the time-differentiated periods, an allocation to each TOU period shall be done according to allocation factors as described herein.
47% of the excess electricity (kWh) supplied by the
customer shall be considered On Peak. 53% of the excess electricity (kWh) shall be considered Off Peak.
(o) Electric Hybrid Generating System Option:
This option is for a customer qualifying for the Electric Hybrid Generating System Option pursuant to General Information Section 22 of this Schedule and taking service under S.C. No. 7.
(p) Fuel Cell Electric Service Option:
This option is for a customer qualifying for the Fuel Cell Service Option pursuant to General Information Section 22 of this Schedule and taking service under S.C. No. 7.
(q) Micro-Hydroelectric Service Option:
This option is for a customer qualifying for the Micro-Hydroelectric Service Option pursuant to General Information Section 22 of this Schedule and taking service under S.C. No. 7.
(r) Community Distributed Generation Service Option:
This option is for a customer qualifying for the Community Distributed Generation Service Option pursuant to General Information Section 37 of this Schedule and taking service under S.C. No. 7.
PDF page 291
PSC No: 120 - Electricity
Leaf No. 255.1
New York State Electric & Gas Corporation
Revision: 1
Initial Effective Date: October 17, 2025
Superseding Revision: 0
Issued in compliance with Order in Case No. 22-E-0236, dated October 17, 2024.
ISSUED BY: Patricia Nilsen, Chief Executive Officer, Binghamton, New York
SERVICE CLASSIFICATION NO.7 (Continued)
SPECIAL PROVISIONS: (Cont'd)
(s) and Serve New Governmental Entities
Participants in the NYPA Program shall be subject to the otherwise applicable standard service classification rates, including the Transition Charge (Non-Bypassable Charge), Bill Issuance Charges, if applicable, in accordance with the standard ESS rates for this Service Classification. All customers are also required to pay the System Benefits Charges, and Rate Adjustment Mechanism in accordance with the standard ESS rates for this Service Classification. NYPA Program to Serve Governmental Entities .
(t) Electric Vehicle Phase-In Rate
An eligible customer may elect to participate in the Electric Vehicle Phase-In Rate pursuant to General Information Section 31 of this Schedule subject to the provisions and eligibility requirements therein.
PDF page 292
New York State Electric & Gas Corporation Service Classification 11: Standby Service Otherwise Applicable Service Class 7
PDF page 293
PSC No: 120 - Electricity
Leaf No. 282
New York State Electric & Gas Corporation
Revision: 5
Initial Effective Date: January 1, 2024
Superseding Revision: 4
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
STANDBY SERVICE RATE
SERVICE CLASSIFICATION NO. 11
APPLICABLE TO USE OF SERVICE FOR:
1. Delivery of standby service for any customer where all or a portion of a customer's electricity is supplied from On-Site Generating facil
and/or transmission system, regardless of voltage or functional classification). An OSG, whether owned by the customer or a third party, can produce electricity primari
delivery system for parallel operation, or operate under the control of a single pull, double-throw switch (or electrical services that are not electrically isolated from the OSG. All separately metered electricity supply and/or delivery ser
guardhouse or other facilities electrically isolated from the OSG) shall be provided under the Otherwise ). This service classification shall apply to a customer that installs
stand-alone storage, or storage paired with non-renewable OSG, with a maximum inverter capability greater than 1 MW.
2. Before a customer is allowed to install and operate an OSG, the customer must submit design and operating information for the proposed OSG in accordance with the appropriate application and review process described -
-
A customer operating OSG with a total nameplate rating equal to, or expected to be equal to, 15% or less of its maximum potential demand served by all sources, as that maximum potential demand is reasonably determined by the Company, shall take service under the OASC unless the customer opts to take service under this classification. NYSEG may disqualify a customer from Standby Service if the Company can demonstrate that the customer (a) has installed OSG with a total nameplate rating greater than 15% of its load, but (b) has not operated or is not operating that OSG in a materi
A customer who declines service under this tariff is required to electrically isolate its facility from the shall not be required to maintain electric delivery service to that
shall
Electrically Isolated Loads:
If a customer elects to electrically isolate and serve its load with OSG without connection to the Company's system, the isolated portion of that customer's load shall not be subject to standby service -- provided that the customer executes a letter agreement with the Company that provides for the following:
a) the Company shall be entitled to inspect the electrical configuration of the OSG facilities upon a customer's request for this exemption;
b) if, at any time, the Company has a reasonable concern that the custo
remained isolated from the Company's system, the Company is authorized to inspect the electrical configuration of such facilities, and the customer must cooperate with that inspection; and
PDF page 294
PSC No: 120 - Electricity
Leaf No. 283
New York State Electric & Gas Corporation
Revision: 6
Initial Effective Date: January 1, 2024
Superseding Revision: 5
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
c) if the Company discovers, through billing data and/or the inspection of the customer's OSG facilities, that any of the electrically isolated OSG fac
Company will backbill the customer. A contract demand will be established by the Company and the by Customer section, with Late Payment Charges as applicable, set forth in the Terms of Payment section of this Service Classification.
A facility shall
the Company could occur are separated and at least 100 feet from any other interconnected electrical service utilized by such customer, or (b) the isolated service is not within the same building or structure as any other interconnected electrical service of the customer and not housed within a common enclosure with other interconnected breakers and/or fuses of the customer. At its discretion, the Company may consider a separation of less than 100 feet -specific
configuration circumstances warranting such a determination.
Compliance:
A customer taking standby service shall comply with all federal, state and local laws, regulations, and requirements, including the requirements listed below in the Interconnection Requirements paragraphs 1 through 8.
STANDBY SERVICE NOT APPLICABLE TO:
1a. Net Metered Solar Generating System Option
Standby service will not apply to a customer operating solar generating equipment and taking service under General Information Rule 22
1b. Farm Waste Electric Generating System Option
Standby service will not apply to a customer taking service under the Farm Waste Electric Generating System Option, provided such customer meets criteria for service under General Information Rule 22 of this Schedule.
1c. Net Metered Wind Generating System Option
Standby service will not apply to a customer operating wind generating equipment and taking service under General Information Rule 22.
1d. Net Metered Hybrid Generating System Option
Standby service will not apply to a customer operating hybrid generating equipment and taking service under General Information Rule 22.
PDF page 295
PSC No: 120 - Electricity
Leaf No. 284
New York State Electric & Gas Corporation
Revision: 10
Initial Effective Date: July 1, 2023
Superseding Revision: 9
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
2. Emergency Generators
Standby service rates shall not apply to customers whose only generating units are emergency generators. For the purpose of this Service Classification, a generating unit must meet each of the following two criteria to be considered an emergency generator:
a) The emergency generator is used exclusively for purposes of supplying electrical power to the Customer when electrical power is not available from the Company.
b) No load is served by the emergency generator while electric service is available from the Company to the premises, except for regularly scheduled tests when the generator is required to operate under load
Emergency Demand Response Program.
Excluding residential customers, the customer must submit a one-line diagram and specification sheet on the switch for the OSG for the Company
w and approval. In addition, the customer must enter into a letter agreement with the
Company stating that the emergency generator shall
The customer shall maintain an operating log for each emergency generator indicating the date, time, hours, and purpose of each operation of each such facility. This log shall be made available to the Company upon request. Failure to do so shall permit the Company to (a) bill the customer under this Service Classification for the amount of standby service which the Company can reasonably estimate was delivered to and/or available to the customer during times when the Company did not charge the customer for such service due to this emergency generator exemption; and (b) establish a contract demand for one year, and thereafter as applicable.
3. New York Power Authority Allocations
Standby service shall
iated with the delivery of electricity
4. Stand-Alone Energy Storage Systems
A customer with a stand-alone energy storage system enrolled with NYISO to charge for wholesale purposes will be billed pursuant to the Wholesale Distribution Service ( WDS ), at such time that the WDS tariff becomes effective, and shall not be subject to Standby Service rates.
OPTIONAL STANDBY SERVICE RATE IS APPLICABLE TO:
1. Existing Customers
An Existing Customer is defined as a customer operating OSG (includ
and wholesale generators) or who:
a) had commenced construction of an OSG facility;
b) had been named by the New York State Energy Research and Development Authority ("NYSERDA") as an OSG project grant recipient as listed in the Commission Order Establishing Electric Standby Rates, issued and effective July 30, 2003, Attachment A, paragraph 4;
c) had been named by NYSERDA as an OSG feasibility study grant recipient, as listed in the Commission Order Establishing Electric Standby Rates, issued and effective July 30, 2003, Attachment A, paragraph 4;
d) had received a binding, written financial commitment from a lending institution for the construction and installation of an OSG; or
e) was being billed at standby rates as of January 31, 2003 as set forth in this Service Classification at Special Provision (d) below.
To remain qualified as an Existing Customer, the customer must commence operation of its OSG by May 31, 2021.
PDF page 296
PSC No: 120 - Electricity
Leaf No. 285
New York State Electric & Gas Corporation
Revision: 8
Initial Effective Date: June 1, 2023
Superseding Revision: 7
Issued in compliance with Orders in Case No.19-E-0079, dated May 18, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
2. A Designated Technology Customer is defined as:
a) A customer operating OSG that exclusively uses one or more of the following technologies and/or fuels for producing electricity: : solar thermal; photovoltaics ( PV ); on land and offshore wind; hydroelectric; geothermal electric; geothermal ground source heat; tidal energy; wave energy; ocean thermal; or
b) not exceed 15 MW of
capacity and is operational prior to May 31, 2021, and conforms with the following criteria:
i. ii. Annual overall efficiency should not be less than 60% based on the higher heating value (HHV) of the fuel input;
iii. The usable thermal energy compone
usable annual energy output;
iv. The size limits shall be determined by aggregating the nameplate ratings of the generation units, installed at its location, excluding emergency generation units used only during a utility distribution system failure or in response to the NYISO Emergency Demand Response Program:
v. An eligible CHP facility shall demonstrate to the utility that its generation installation meets an environmental standard of no more than 4.4 lbs./MWh of NOx emissions, based on its electrical and mechanical output or its rated capacity, or as updated by the Department of Environmental Conservation (DEC);
vi. Customers shall comply with the above criteria and;
1. Monitor and record efficiency data, which shall include the annual quantity of fuel fired, the annual quantity of generated electricity, and the annual quantity of the thermal heat recovered in the heat recovery process.
2. Have records available for utility inspection,
3. Retain the records for a 3-year period.
4. An additional meter will be required for CHP generating facilities greater than 1 MW. The customer shall be required to install, at their expense, revenue grade, interval meters to measure generation output and additional telemetry equipment capable of
transmitting operational information to the Company; or
c) A customer operating electric energy storage with a maximum inverter capability of up to and including 1 MW; or
d) A customer operating fuel cell units which utilize biofuels or hydrogen, provided that the manufacture or production of such fuels does not include the combustion or electrolysis of fossil fuels, or the use of fossil fuels or non-renewable grid power in the conversion process.
i. Biomass, Biogas and Fuel cells which utilize fossil fuel resources installed prior to June 1, 2023 shall remain exempt in accordance with the customer s election. Biomass, Biogas and Fuel cells which utilize fossil fuel resources installed on or after June 1, 2023 are not eligible for the Designated Technologies Exemption.
PDF page 297
PSC No: 120 - Electricity
Leaf No. 285.1
New York State Electric & Gas Corporation
Revision: 0
Initial Effective Date: January 19, 2024
Superseding Revision:
Issued in Compliance with Order in Case No. 22-E-0236, dated November 20, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
2. A Designated Technology Customer is defined as (Cont d):
e) A customer operating electric energy storage in conjunction with electric vehicle charging station(s) with inverter capability greater than 1 MW and less than or equal to the sum of nameplate electric vehicle charging capability.
PDF page 298
PSC No: 120 - Electricity
Leaf No. 286
New York State Electric & Gas Corporation
Revision: 10
Initial Effective Date: January 1, 2024
Superseding Revision: 9
Issued in compliance with order in Case No. 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
3. Designated Technology Exemption of Standby Rates
a) Customers whose facilities are placed in service after July 29, 2003, and meet the definitions of both Existing Customers and Designated Technology Customers, shall be considered to be Designated Technology Customers for purposes of this section.
b) Designated Technology Customers whose facilities are placed in service after July 29, 2003, have the option to make a one-time election to be permanently exempt from standby service rates rather than electing full standby service rates upon providing 30 days written notice before commencing operation of the OSG facility.
c) Existing OSG projects that upgrade by installing designated technology components, or hybrid projects comprised in part of designated technology components, are eligible for the designated technology exemption only for the upgraded components and only if those components are separately metered.
PDF page 299
PSC No: 120 - Electricity
Leaf No. 286.1
New York State Electric & Gas Corporation
Revision: 4
Initial Effective Date: July 1, 2019
Superseding Revision: 3
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
CHARACTER OF SERVICE
Continuous - Alternating Current, 60 cycle; Secondary Service at 120, 120/208, 120/240, 208, 240, 240/416, 277/480, or 480 Volts; or Primary (Distribution) Service at 2,400, 4,160, 4,800, 7,200, 8,320, 12,000, 12,470, 13,200, or 34,500 (Regulated) Volts; or Subtransmission Service at 34,500 or 46,000 (Both Non-Regulated) Volts; or Transmission Service at 115,000 Volts and above (Non-Regulated). Single or Three Phase. (Characteristics depend upon available circuits and equipment.)
PDF page 300
PSC No: 120 - Electricity
Leaf No. 287
New York State Electric & Gas Corporation
Revision: 34
Initial Effective Date: June 1, 2026
Superseding Revision: 32
Issued in compliance with Order in Case No 25-E-0375, dated May 14, 2026.
Issued by: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
RATES (Per Month)
An existing customer that taking service pursuant to this Service Classification as of January 1, 2024, shall be phased-in to the Redesigned Rates over a five-year period as described below for each year.
A customer may make a one-time election to take service at the Redesigned Rates in lieu of the phase-in. Such election shall be provided by the customer to the Company in writing. Once a customer has elected to take service at the Redesigned Rates, the customer may not return to the phase-in.
An existing customer that elects the phase-in shall be billed on the percentage basis shown below using the Prior Rates and the Redesigned Rates for each year:
Prior Rates
Redesigned Rates
Year 1
83.3%
16.7%
Year 2
66.6%
33.4%
Year 3
49.9%
50.1%
Year 4
33.2%
66.8%
Year 5
16.5%
83.5%
At the conclusion of Year 5, a customer shall be subject to the Redesigned Rates.
Delivery Charges: There are up to four rate components of the delivery rate portion of this Standby Service: Customer Charge, Contract Demand Charge, As-Used Demand Charge, and Reactive Charge, as applicable.
Transition Charge: The customer’s Otherwise Applicable Service Classification (“OASC”) shall determine the applicable charge. The charge shall apply to all kWh, per kWh.
Bill Issuance Charge (per bill):
$0.89, as described in General Information Section 16.J
PDF page 301
PSC No: 120 - Electricity
Leaf No. 287.0
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. Issued by: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
RATES (Per Month) (Cont’d)
Reserved for Future Use
PDF page 302
PSC No: 120 - Electricity
Leaf No. 287.1
New York State Electric & Gas Corporation
Revision: 19
Initial Effective Date: June 1, 2026
Superseding Revision: 17
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
RATES (Per Month) (Cont’d.)
1. Customer Charge
Per customer, per month.
Customer's OASC:
Customer Charge
Effective 6/01/2026:
Prior Rates
Redesigned Rates:
SC No. 1
$19.00
$19.00
SC No. 8
$19.00
$19.00
SC No. 12
$19.00
$19.00
SC No. 2
$49.00
$49.00
SC No. 3 - Primary
$185.00
$185.00
SC No. 3 - Subtransmission
$450.00
$450.00
SC No. 6
$22.00
$22.00
SC No. 7-1
$375.00
$375.00
SC No. 7-2
$1,350.00
$1,350.00
SC No. 7-3
$3,000.00
$3,000.00
SC No. 7-4
$5,900.00
$5,900.00
SC No. 9
$22.00
$22.00
PDF page 303
PSC No: 120 - Electricity
Leaf No. 287.1.0
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: June 1, 2026
Superseding Revision: 1
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
RATES (Per Month) (Cont’d.)
2. Contract Demand Charge: The Contract Demand Charge is determined by multiplying the Customer’s Contract Demand times the Contract Demand rate.
* Prior Rates are per Customer, per Meter
Effective 6/1/2026:
Prior Rates
Redesigned Rates:
Customer's OASC:
per kW of Contract
Demand
per kW of Contract
Demand
SC No. 1*
$30.76
$7.40
SC No. 8*
$48.54
$7.40
SC No. 12*
$141.45
$7.40
SC No. 2
$7.68
$5.13
SC No. 3 - Primary
$7.75
$9.24
SC No. 3 - Subtransmission
$2.45
$1.28
SC No. 6*
$26.24
$14.34
SC No. 7-1
$6.16
$1.49
SC No. 7-2
$6.46
$5.02
SC No. 7-3
$1.56
$0.00
SC No. 7-4
$0.24
$0.08
SC No. 9*
$44.72
$14.34
PDF page 304
PSC No: 120 - Electricity
Leaf No. 287.1.0.1
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
RATES (Per Month) (Cont’d.)
Reserved for Future Use
PDF page 305
PSC No: 120 - Electricity
Leaf No. 287.1.1
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
RATES (Per Month) (Cont’d.)
Reserved for Future Use
PDF page 306
PSC No: 120 - Electricity
Leaf No. 287.2
New York State Electric & Gas Corporation
Revision: 11
Initial Effective Date: June 1, 2026
Superseding Revision: 9
Issued in Compliance with Order in Case No. 25-E-0375, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
RATES (Per Month) (Cont’d.)
3. As-Used Demand Charge: Daily As-Used Demand Charge, per kW of daily metered demand, during On-Peak and Super-Peak hours, as applicable.
* All kWh, per kWh for Prior Rates
Effective: June 1, 2026
Prior Rates
Redesigned
Rates
Redesigned
Rates
Customer's OASC:
On-Peak
Super-Peak
SC No. 1*
$0.04655
$0.10478
$0.20957
SC No. 8*
$0.03332
$0.10478
$0.20957
SC No. 12*
$0.02763
$0.10478
$0.20957
SC No. 2
$0.37356
$0.31697
$0.63393
SC No. 3 - Primary
$0.41176
$0.19838
$0.39677
SC No. 3 - Subtransmission
$0.27158
$0.20352
$0.40704
SC No. 6*
$0.05640
$0.13133
$0.26265
SC No. 7-1
$0.33627
$0.35962
$0.71925
SC No. 7-2
$0.31011
$0.21056
$0.42113
SC No. 7-3
$0.11472
$0.10733
$0.21466
SC No. 7-4
$0.10475
$0.06030
$0.12060
SC No. 9*
$0.03554
$0.13133
$0.26265
PDF page 307
PSC No: 120 - Electricity
Leaf No. 287.3
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
Reserved for Future Use
PDF page 308
PSC No: 120 - Electricity
Leaf No. 287.4
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
Reserved for Future Use
PDF page 309
PSC No: 120 - Electricity
Leaf No. 288
New York State Electric & Gas Corporation
Revision: 34
Initial Effective Date: June 1, 2026
Superseding Revision: 32
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
RATES (Per Month) (Cont’d.)
4. Reactive Charge
Effective: 06/01/2026
Customer's OASC:
Reactive Charge
Reactive kilovolt-ampere hours, per
billing reactive kilovolt-ampere hour
SC No. 2
$0.00078
SC No. 3 - Primary
$0.00078
SC No. 3 - Subtransmission
$0.00078
SC No. 7-1
$0.00078
SC No. 7-2
$0.00078
SC No. 7-3
$0.00078
SC No. 7-4
$0.00078
Non-Bypassable Charge (“NBC”):
All kWh, per kWh
See TCS Statement
PDF page 310
PSC No: 120 - Electricity
Leaf No. 288.1
New York State Electric & Gas Corporation
Revision: 25
Initial Effective Date: January 1, 2024
Superseding Revision: 24
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023. ISSUED BY: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
Reserved for Future Use
PDF page 311
PSC No: 120 - Electricity
Leaf No. 288.2
New York State Electric & Gas Corporation
Revision: 18
Initial Effective Date: January 1, 2024
Superseding Revision: 17
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023. Issued by: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
Reserved for Future Use
PDF page 312
PSC No: 120 - Electricity
Leaf No. 288.3
New York State Electric & Gas Corporation
Revision: 7
Initial Effective Date: January 1, 2024
Superseding Revision:
6
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023. Issued by: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
Reserved for Future Use
PDF page 313
PSC No: 120 - Electricity
Leaf No. 289
New York State Electric & Gas Corporation
Revision: 51
Initial Effective Date: March 1, 2024
Superseding Revision: 50
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
Billing of Reactive Kilovolt Hours:
Unless it is determined by the Company that system operations require that the customer take reactive power from the Company's system, all metered reactive energy used by the customer shall be billed at the rate specified above. This includes reactive power used during normal operation of the customer's OSG or Wholesale Generator as well as that used when the Company provides standby service.
Rate Periods:
Prior Rates
Existing Customers that were taking service as of October 13, 2023:
For a customer whose OASC is S.C. Nos. 2, 3, or 7, On-Peak hours are defined for kW, kWh, and Daily As-Used Demand as the hours between 7:00 a.m. and 10:00 p.m. (Local Time), Monday through Friday with the exception of the following holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. Those hours not designated as On-Peak are defined as Off-Peak. Other rate periods are as defin
ASC, i.e., S.C.
Nos. 8, 9 or 12.
Redesigned Rates
On-Peak hours are defined for kW and kWh as the hours between 7:00 a.m. and 10:00 p.m., Monday through Friday. All remaining hours are defined
-
For As-Used Demand:
Summer Super-Peak hours
From 2:00 pm until 6:00 pm
on Non-Holiday Weekdays
Summer months are June, July, August, and
September
Winter Super-Peak hours
From 5:00 pm until 9:00 pm
on Non-Holiday Weekdays
Winter months are December, January, and
February
Summer On-Peak hours
From 7:00 am until 2:00 pm
and
From 6:00 pm until11:00 pm
on Non-Holiday Weekdays
Winter On-Peak hours
From 7:00 am until 5:00 pm
and
From 9:00 pm until 11:00 pm
on Non-Holiday Weekdays
Shoulder On-Peak hours
From 7:00 am until 11:00 pm
on Non-Holiday Weekdays
Non-Summer months are October, November,
March, April, and May
Off-Peak hours
All other hours including
Holidays*
* Holidays: New Year s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
SURCHARGE TO COLLECT SYSTEM BENEFITS CHARGE ("SBC"):
A surcharge shall be added to each customer bill for service under this Service Classification to collect the System Benefits Charge (as explained in this Schedule, General Information Rule 4). See SBC Statement.
A customer taking service under this Service Classification shall be subject to a Revenue Decoupling Mechanism adjustment (as explained in this Schedule, General Information Section 7). See RDM Statement.
A customer billed at OASC as provided in this Service Classification shall be subject to a Revenue Decoupling Adjustment (as explained in this Schedule, General Information Rule
OASC shall apply.
PDF page 314
PSC No: 120 - Electricity
Leaf No. 289.1
New York State Electric & Gas Corporation
Revision: 4
Initial Effective Date: January 1, 2025
Superseding Revision: 3
Issued in compliance with Orders in Case No. 24-E-0493, dated December 19, 2024.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
-
The EV Surcharge shall be applied per kWh delivered under this Service Classification, (as explained in this Schedule General Information Rule 49). The rate shall be set forth on the EVMR Statement. RECOVERY CHARGE
The Recovery Charge shall be applied per On-Peak As-Used Demand under this Service Classification, (as explained in this Schedule General Information Rule 57). The rate shall be set forth on the Recovery Charge Statement.
TERMS OF PAYMENT:
Bills rendered under this Service Classification are payable on receipt. A late payment charge of 1½%) per month No. 119
Electricity, Section 4.
PDF page 315
PSC No: 120 - Electricity
Leaf No. 290
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2019
Superseding Revision: 1
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
TERM
A minimum of one year and thereafter until terminated by 60 days written notice.
DETERMINATION OF DEMAND
Contract Demand:
A customer will have the option of accepting a contract demand (maximum potential demand at the facility to be provided standby service) established by the Company or the customer can establish the contract demand. he contract
1. Company Established Contract Demand:
a. Customer With OSG
For an Existing Customer, the contract demand will be established based on the maximum metered demand of that customer over the twelve (12) months prior to February 1, 2004, taking into consideration the output of existing OSG, the addition and/or removal of equipment, and the coincidence and diversity of the For a new customer (i.e., a customer for whom historical metered demand does not exist) or an Existing Customer where historical metered demand does not represent a reasonable contract demand level, the contract demand will be determined, in consultation with the customer, by assessing the nameplate rating of the equipment to be served, and projecting, through an engineering analysis, the coincidence and diversity The contract demand of a wholesale generator, who is connected to and provides electricity supply to a customer who would otherwise take delivery service from the Company, will be set at the maximum potential metered demand of the station loads of the wholesale generator when the generator is out of service, plus the maximum potential metered demand of the customer connected to, and generally provided electricity supply by, the wholesale generator.
Surcharge: Where a customer elects to have NYSEG establish the contract demand, that customer will not incur a surcharge if that contract demand is exceeded except as described in this paragraph. However, a customer shall be obligated to provide NYSEG with written notice prior to the installation or removal of equipment, or any change in operation, that can be reasonably expected to change in a material fashion (defined as a change of more than twelve and one-half percent (12.5%)) the system capacity required to deliver electricity to the customer. If the customer fails to provide written notice, and the customer exceeds the contract demand, NYSEG has the right to include a surcharge in the customer's subsequent bill equal to the product of the applicable Contract Demand Charge, the amount of the exceedence, and the number of billing periods from, and including, the billing period in which the customer first commenced taking standby service from NYSEG at the understated contract demand, i.e., the billing period in which the customer installed the equipment or changed the operation that caused the exceedence (as demonstrated by the customer to NYSEG in writing), through the billing period that includes the date of the exceedence. If the customer fails to demonstrate in writing when it installed such equipment or changed such operation, then NYSEG will apply the surcharge, each month, from the first billing period in which the customer commenced taking standby service from NYSEG.
PDF page 316
PSC No: 120 - Electricity
Leaf No. 290.1
New York State Electric & Gas Corporation
Revision: 1
Initial Effective Date: January 1, 2024
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0751, dated October 13, 2023. ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
Reserved for Future Use
PDF page 317
PSC No: 120 - Electricity
Leaf No. 291
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: July 16, 2018
Superseding Revision: 1
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
2. Customer Established Contract Demand:
facility and OSG. Subsequently, a customer may revise its contract demand downward by written notice to the Company once every 12 months. The revised contract demand level cannot be set at a level lower than the highest demand metered in the previous 12 months unless the customer demonstrates in writing to the Company's reasonable satisfaction that electricity-consuming equipment is removed or disabled in place (not simply disconnected). The Company has the right to inspect the premises of a customer upon reasonable notice and at reasonable times in order to confirm that such energy-consuming equipment has been so removed or disabled in place (not simply disconnected).
A customer may revise its contract demand upwards at any time upon written notice to the Company. Surcharge: Where the customer elects to establish its own contract demand and then exceeds the contract demand, a surcharge shall apply to the current monthly bill equal to the following: Exceeding Contract
Demand
Exceeding Contract
Demand
Exceeding Contract
Demand
0% to less than 10%
10% to less than 20%
20% or more occurs
12 times the sum of the
monthly contract demand
charge amount calculated
for the excess demand
18 times the sum of the
monthly contract demand
charge amount calculated
for the excess demand
24 times the sum of the
monthly contract demand
charge amount calculated
for the excess demand
Where a new customer installs OSG, or an Existing Customer initially adds OSG, during a two year period beginning February 1, 2004, one exceedence in the first year of OSG operation of less than 10% in magnitude would be excused from the above surcharge. For purposes of this paragraph, the OSG shall be d. As-Used Demand:
1. The as-used demand for customers with interval metering shall be the aggregate of the highest daily 15- minute integrated demand (measured in kW) occurring during the On-
ng period. If in any billing period, there is a failure in the metered usage
data acquisition that results in the failure to record daily as-used demand data, the Company reserves the right to estimate reasonable values for the missing data for recording and billing purposes.
2. The daily as-used demand, for customers without demand metering, and not billed at the OASC shall be the monthly metered kilowatt hours.
PDF page 318
PSC No: 120 - Electricity
Leaf No. 292
New York State Electric & Gas Corporation
Revision: 6
Initial Effective Date: January 1, 2024
Superseding Revision: 5
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023. ISSUED BY: Jeremy J. Euto, Vice President
Regulatory , Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
METERING AND COMMUNICATION REQUIREMENTS:
1. A customer with OSG and is demand-metered with 50 kW or more of Contract Demand shall be required to have interval metering and remote meter reading capability. Such customers will be responsible for the following:
a) the incremental costs of interval metering equipment and its installation;
b) the costs of providing remote meter reading capability through telecommunications to and from the meter; and
c) the costs associated with resolution of any problems with the telecommunications provider, including reimbursing the Company for any expenses the Company incurs.
2. A customer who provides telecommunications to the meter shall be responsible for all costs associated with the installation, operation and maintenance of the telecommunications line, including but not limited to, all telecommunications service bills.
If the Company is unable to read the meter through a customer provided connection, and the Company has determined that the problem is not caused by the Company's equipment, the customer shall be responsible for resolution of the problem. The customer shall also be responsible for reimbursement of Company expenses incurred for visits to the meter location to ascertain the cause of the problem. To the extent the Company installs an interval meter with telecommunication capability, the Company may assess the incremental fees to the customer.
3. Meter Credits:
a) Meter Owned By Customer, Installed And Maintained By The Company: A qualified customer that elects to own its own meters, as described in Section 3.A.2 of PSC No. 119 - Electricity, Service Connections, Meter Owned by Customer, Installed and Maintained by the Corporation, shall receive a Meter Ownership Credit as described in Section 3.A.2.a.i. of that Schedule.
PDF page 319
PSC No: 120 - Electricity
Leaf No. 293
New York State Electric & Gas Corporation
Revision: 33
Initial Effective Date: June 1, 2026
Superseding Revision: 31
Issued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
METERING AND COMMUNICATION REQUIREMENTS: (CONT’D)
3. Meter Credits: (Cont’d)
b) Customers That Have Fully Paid for Meter and Instrument Transformation Costs: A demand billed customer taking service under these standby rates that has fully paid for their meter and instrument transformation costs shall receive a monthly credit to the currently applicable monthly Customer Charge as well as a portion of the standby service transition dollars allocated for collection in the Customer Charge. Below are the customer credits:
Customer Charge
Credit
Delivery Charge
S.C. 2
S.C. 3P
S.C. 3S
S.C. 7-1
S.C. 7-2
S.C. 7-3
S.C. 7-4
Effective Date:
06/01/2026
$0.94
$14.98
$23.40
$3.94
$15.99
$23.85
$183.68
ELECTRICITY SUPPLY
A Customer taking service under S.C. No. 11 shall have the choice of the following Supply Service Options for its Electricity Supply:
For customers whose OASC is Service Classification No. 1, 6, 8, 9, or 12:
1. ESCO Supply Service (ESS); or
2. NYSEG Supply Service (NSS)
For a customer whose OASC is Service Classification No. 2, 3, or a Service Classification No. 7:
1. ESCO Supply Service (ESS); or
2. NYSEG Supply Service (NSS); or
3. Hourly Pricing*
* As set forth in General Information Section 25.I.F., Customer Eligibility Criteria, certain demand billed customers are required to participate in Mandatory Hourly Pricing.
Terms and conditions applicable to these rate choices are explained in the customer’s OASC. All customers served under this Service Classification taking electricity supply service from the Company shall be required to pay a Merchant Function Charge as set forth in the customer’s OASC.
INTERCONNECTION REQUIREMENTS
1. A customer may connect an OSG facility for parallel operation with the Company’s delivery system or isolate for operation with standby service provided by a wholesale generator by means of a double throw transfer switch, or another transfer switching scheme acceptable to the Company.
PDF page 320
PSC No: 120 - Electricity
Leaf No. 294
New York State Electric & Gas Corporation
Revision: 4
Initial Effective Date: December 1, 2016
Superseding Revision: 3
Issued in compliance with Order in Case 16-E-0497, dated November 17, 2016.
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
INTERCONNECTION REQUIREMENTS (CONT’D.)
2. A customer must complete an Application for Service and must operate in compliance with standards and requirements set forth in either the Distributed Generation Interconnection Requirements found in Section 9 of Schedule P.S.C. No. 119, and in Addendum-SIR of P.S.C. No. 119 entitled “New York State Standard Interconnection Requirements for New Generation Units 5 MW or Less Connected in Parallel with Utility Distribution Systems” or the Company’s Bulletin 86-01, entitled “Requirements for Independent Power Producers of Electricity.” In addition, customers must execute either the New York State Standardized Contract For Interconnection of New Distributed Generation Units With Capacity 5 MW or Less Connected in Parallel with Utility Distribution Systems (“SIR Contract”), as contained within Addendum-SIR of P.S.C. No. 119, or the applicable contract.
3. A customer and the Company shall agree as to the operating mode, interconnection and equipment specifications for the OSG facility pursuant to either a or b below, as may be amended or superseded:
a) the SIR Contract contained within Addendum-SIR of P.S.C. No. 119, or
b) the Company’s Bulletin 86-01.
4. A customer shall be responsible for all costs associated with its OSG interconnection as set forth in the requirements listed in paragraphs 3a or 3b above, as applicable.
5. Contribution toward CT & VT Costs: For installations requiring Current Transformers (CTs) and Voltage (or Potential) Transformers (VTs), to the extent that a customer, as part of its original interconnection with the Company’s system, paid for and installed CTs and VTs or compensated the Company for those costs up-front, the customer shall receive a monthly bill credit, as mutually agreed upon by the Company and the customer.
6. Maintenance Schedules: A customer applying for standby service with a standby contract demand greater than 2,000 kW is required to provide the Company with a schedule of OSG maintenance. A schedule must include the dates and times for the beginning and ending of all planned outages. A customer may revise the schedule one month prior to the effective date of the outage. However, modifications communicated with less than one month’s notice shall not be allowed, unless the customer obtains Company approval. The annual provision of planned maintenance schedules by the customer shall take place on October 1 of each year for standby service for the following calendar year. Such schedule shall be utilized by the Company for planning functions. This provision does not take precedence with respect to any OSG maintenance provision in a power purchase agreement that may be in effect with the Company.
PDF page 321
PSC No: 120 - Electricity
Leaf No. 294.1
New York State Electric & Gas Corporation
Revision: 10
Initial Effective Date: June 1, 2021
Superseding Revision: 9
Issued in compliance with order in Case No. 19-E-0079, dated May 14, 2021.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
7. At the time of agreement, the customer with an OSG greater than 300 kVA, excluding Net Metered Farm Waste Generators less than 2,000 kW, may select the payment method for paying the Company operations and maintenance charges on the interconnection equipment paid for by the customer but owned by the Company. The customer may select to pay either the actual charges for maintenance, as they may occur, or case proceedings) on the total investment in such equipment. The operations and maintenance costs on such equipment is billed on a monthly basis pursuant to the applicable contract or agreement.
8. NAERC Guidelines: A customer taking standby service shall comply with all reliability criteria, the same may be amended or superseded. Such compliance is necessary to ensure the continued reliability of North America's interconnected electric transmission electric systems.
UNAUTHORIZED OSG INTERCONNECTION BY CUSTOMER:
If a customer connects OSG to its electric system without: (a) notifying the Company; and (b) executing an appropriate standby service Application, and thereafter the Company discovers the interconnection, the Company shall backbill the customer for all standby service rendered subsequent to the estimated connection of such OSG. In preparing such backbills, the Company shall assess a standby service contract demand surcharge provision equal to two times that which would otherwise be computed under the Determination of Demand Provision, paragraph 1 (Company Established Contract Demand) of this Service Classification, and assume the standby contract demand had been inappropriately established at 0 kW.
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION
(a) Demand Metered Customer With Less Than 50 kW of Contract Demand:
A customer with a contract demand of less than 50 kW without interval metering shall be billed at the OASC. A customer with a contract demand of less than 50 kW can choose to be served at the standby rate, provided that the customer pays all one-time and ongoing costs associated with the purchase and installation of an interval meter, and .C.
No. 11 tariff.
(b) Small Customer Exclusion:
Small customers, defined as those customers qualifying for service under Service Classification Nos. 1, 6, 8, 9, and 12, shall be billed at the OASC rate instead of the standby service rate in S.C. No. 11. This exemption shall be discontinued upon the date that 200 such standby customers located east of Total East or 250 such standby customers west of Total East are billed under this provision, provided, however, that the discontinuance of this exemption shall not affect any customer that received the exemption prior to the date of discontinuance, which customers shall continue to receive the exemption until the conclusion of the phase-
Rate Phase-
PDF page 322
PSC No: 120 - Electricity
Leaf No. 294.2
New York State Electric & Gas Corporation
Revision: 1
Initial Effective Date: July 1, 2019
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION
(c) Individually Negotiated Contracts
1) Individual Agreements for Customers Considering Isolation
NYSEG is authorized to offer individually negotiated agreements for standby service to customers that may install back-up generation and disconnect their premises from the NYSEG system in lieu of taking tariff standby service. The customer must document that it can physically, environmentally, and economically isolate from NYSEG's grid by installing and operating back-up generation at a lower cost than paying for standby service, and that such option is the alternative the customer will select if NYSEG does not offer a negotiated rate alternative. At a minimum, the negotiated rate agreement must provide for recovery of will use its existing authorization under Service Classification No. 14 to gain contribution from any customer presently isolated from its delivery system. NYSEG will respond to a customer application for a negotiated rate agreement within ninety (90) days of its receipt, with a negotiated rate agreement offer or a written explanation for its rejection of the application. Either party may seek from Staff a non-binding resolution of a dispute over the negotiation of such an individual rate agreement
In the event of a conflict between any provisions of an agreement negotiated pursuant to this authority and -E-0779 or the standby rates
provisions of NYSEG's tariff on the same subject, the provision of the negotiated agreement shall take precedence and control.
2) Individual Agreements for Customers Selling into the Wholesale Market
NYSEG is authorized to offer individually negotiated agreements for standby service with customers that sell into the market, or to a third party, no less than 90% of their site's energy output, net of station power requirements, from generators located on the site having a total name plate rating equal to or greater than 50 MW. The rates and charges negotiated will reflect, where applicable, the characteristics of the specific interconnection arrangements, including, but not limited to, the voltage level of the interconnection, whether the interconnection is bi-directional, and the nature of the NYSEG facility where the generator is interconnected with the NYSEG system.
NYSEG will respond to a customer application for a negotiated rate agreement within ninety (90) days of its receipt with a negotiated rate agreement offer or a written explanation for its rejection of the application. Either party may seek from Staff a non-binding resolution of a dispute over the negotiation of such an individual rate agreement.
In the event of a conflict between any provision of an agreement negotiated pursuant to this authority and any provision o
-E-0779 or the standby rates
provisions of NYSEG's tariff on the same subject, the provision of the negotiated agreement shall take precedence and control.
PDF page 323
PSC No: 120 - Electricity
Leaf No. 294.3
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
SPECIAL PROVISIONS (CONT’D.)
(d) Reserved for Future Use
PDF page 324
PSC No: 120 - Electricity
Leaf No. 294.4
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
(d) Reserved for Future Use
PDF page 325
PSC No: 120 - Electricity
Leaf No. 294.5
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
(d) Reserved for Future Use
PDF page 326
PSC No: 120 - Electricity
Leaf No. 294.6
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: September 9, 2016
Superseding Revision: 2
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016. ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
(d) Reserved for Future Use
PDF page 327
PSC No: 120 - Electricity
Leaf No. 294.7
New York State Electric & Gas Corporation
Revision: 4
Initial Effective Date: July 1, 2016
Superseding Revision: 2
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
(d) Reserved for Future Use
PDF page 328
PSC No: 120 - Electricity
Leaf No. 294.8
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
(d) Reserved for Future Use
PDF page 329
PSC No: 120 - Electricity
Leaf No. 294.9
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
(d) Reserved for Future Use
PDF page 330
PSC No: 120 - Electricity
Leaf No. 294.10
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
(d) Reserved for Future Use
PDF page 331
PSC No: 120 - Electricity
Leaf No. 294.11
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: July 1, 2016
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0283, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
(d) Reserved for Future Use
PDF page 332
PSC No: 120 - Electricity
Leaf No. 294.12
New York State Electric & Gas Corporation
Revision: 10
Initial Effective Date: January 1, 2024
Superseding Revision: 9
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory , Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-
(d) Reserved for Future Use
Customers who qualify for the Recharge NY Power Program pursuant to Section 11 of the General Information Section of this Schedule, shall have such power billed in accordance with the provision therein as provided in Section 11, the maximum metered demand shall be used in the load share calculation for all standby customer. The customer's power requirements in excess of the RNY Power allocation shall be billed in accordance with the ESCO Supply Service rate or the NYSEG Supply Service rate of this Service Classification.
(f) Reliability Credit
1. Standby customers with OSG shall be provided an opportunity to earn credits against their contract demand charges. The credit would be earned by reliably reducing load below the contract demand over a defined Measurement Period. During the 5-year phase-in period, the calculation of the Reliability Credit shall be based -in Contract Demand Charge. A customer that elects to be billed at the new
rates in lieu of the phase-in shall no longer be eligible to receive a Reliability Credit. The Reliability Credit will be phased out and completely eliminated effective January 1, 2029, for all customers.
2. For purposes of this Credit, the Measurement Period is weekdays from 7:00 am to 10:00 pm during the previous two consecutive full Summer periods; provided however, that the first year in which a customer seeks a Credit, the Measurement Period is weekdays from 7:00 am to 10:00 pm during the previous full Summer period only. The Measurement Period shall exclude Outage Events, as selected by the customer, as well holidays (i.e., Independence Day (observed) if it falls on a weekday and Labor Day).
For purposes of this Credit, the Summer Period is June 1 through September 30.
3. Outage Events are up to three time blocks for each Summer Period that, in aggregate, are comprised of no more than five 24-hour time periods, excluding weekends and holidays. If a time block contains a time period of less than 24 hours, the time period shall be rounded up to the next 24 hours (i.e., the 24-hour periods cannot be applied on a partial basis). If a time block encompasses a holiday or weekend, the start of the 24-hour period on the day prior to the holiday or weekend until the same hour the next business day shall be considered to be a single 24-hour period.
4. The Credit for any Measurement Period shall be equal to
revenue meter (net of
generation), multiplied by the Contract Demand Delivery Charge per kW that is in effect on October 1 of the year in which the Credit is determined. The Credit shall
customer bills commencing in November until the following October. If a customer is billed under Special Provision (g) of this Service Classification, the Outage Events for all Recipient Accounts shall be the same and shall be calculated individually.
PDF page 333
PSC No: 120 - Electricity
Leaf No. 294.12.1
New York State Electric & Gas Corporation
Revision: 0
Initial Effective Date: January 1, 2024
Superseding Revision:
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
(f) Reliability Credit (Cont d)
5. A customer seeking a Credit must request such credit by October 14 of each year for which the Credit it sought and, at the same time, specify the Outage Events the Customer requests to be excluded from the measurement period. If October 14 falls on a weekend or holiday, the Company shall accept requests until the next business day. Prior to October 14, the Company shall notify Customers of their need to request the applicable Credit.
6. Credits provided to standby customers shall be recovered from all customers, including standby customers, through the applicable Transition Charge [Non-Bypassable Charge
.
PDF page 334
PSC No: 120 - Electricity
Leaf No. 294.13
New York State Electric & Gas Corporation
Revision: 1
Initial Effective Date: July 1, 2019
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-
(g) Standby Offset
A customer with qualifying on-
excess generation to supply two or more Standby Supplied Accounts as long as all of the requirements in this provision are met.
Definitions
Standby Generation Account: The customer meter where the generating equipment is located and tion system.
Standby Supplied Accounts: Additional meters billed under this standby service class designated by the Standby Generation Account for the application of excess generation that meet the Standby Supplied Account requirements listed below.
Eligibility
1. Standby Generation Account
a. over 2 MW but no more than 20 MW; and (ii) meet eligibility criteria for designation as efficient pursuant to the order of the Public Service Commission, dated January
23, 2004, in Case 02-E-0779, except with respect to maximum generating capacity. The generating facility may have more than one generating unit so long as the aggregate nameplate rating conforms to (i) above
b. The Standby Generation Account must have interval metering and meet the interval metering and telecommunication requirements of this service class before they will be eligible for the offset provision. The meter and telecommunications for the account associated with the Standby must be provided and maintained at the c
expense, and must be operational before the customer may take service under this provision. c. All interconnection requirements of this service class must be met before an account will be eligible for the offset provision. In addition, the interconnection must be technically and economically practicable, and the connection and operation of such facility shall not jeopardize the facilities, or other customers.
d. Accounts that are eligible for net metering, remote net metering, community net meter, standby exemption, NYPA allocations including RNY, or economic development rates are not eligible for this offset provision.
e. Each Standby Generation Account will be billed with the applicable standby service rates in this service class.
f. Each Standby Generation Account is eligible for the supply options as described in this service class.
PDF page 335
PSC No: 120 - Electricity
Leaf No. 294.14
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: January 1, 2024
Superseding Revision: 2
Issued in compliance with Order in Case 15-E-0751, dated October 13, 2023. ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-
(g) Standby Offset
Eligibility
1. Standby Generation Account
g. Customers that have a Standby Generation Account may take serv
Back service, Service Classification No. 10, if the export of the generating facility exceeds the aggregate registered kWh usage on the Standby Generation Accounts and the Standby Supplied Accounts.
2. Standby Supplied Accounts
The Standby Supplied Accounts designated by the Standby Generation Account customer must all be a. The Standby Generation Account and the Standby Supplied Accounts designated by the customer to receive the output of the generating facility may be established in two or more customer -
(1) at least one of the Standby Supplied Accounts must be in the same customer name as the have a Contract Demand equal to 10% or more of the nameplate rating of the generating facility;
(2) the Sponsor shall be responsible for coordinating the interconnection and operation of the generating facility with the Company; and
(3) at the time of application under the Multi-Party Offset, the Sponsor must submit a signed application for all Standby Supplied Accounts to be supplied by the
signed Percentage Allocation Form. Both
forms shall be available on
b. The Standby Generation Account, and the Standby Supplied Accounts must all be located within a
(1) and/or parcel of land proximate to each other if there is common use, whether or not such All of the Standby Supplied
must be within the same load zone as determined by the Locational Based Market Price. The accounts of a customer whose buildings or parcels of land are not physically interconnected c
proximity and common Company facilities to the Company.
PDF page 336
PSC No: 120 - Electricity
Leaf No. 294.14.1
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: January 1, 2024
Superseding Revision: 1
Issued in compliance with Order in Case 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 11 (Continued)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-
(g) Standby Offset
Eligibility
2. Standby Supplied Accounts
(2) Under Multi-
e building or multiple buildings in
which each customer is connected to the generating facility by private thermal loop that delivers steam, hot water, or chilled water.
c. Each Standby Supplied Account shall have no other source of generation located on the premises and shall not participate under the provisions of remote net metering, net metering for customer generators, or Community Distributed Generation.
d. Each Standby Supplied Account and the export of the Standby Generation Account must be separately metered using Commission-approved, revenue grade, interval metering with er reading systems and
communication systems.
e. Each Standby Supplied Account shall be billed with the applicable standby service rates in this service class.
f. Each Standby Supplied Account must have interval metering and meet the interval metering and telecommunication requirements of this service class before they shall be eligible for the offset provision. The meter and telecommunications for each Standby Supplied Account must be provided and maintained at the customer
expense, and must be operational before the customer
may take service under this provision.
g. Each Standby Supplied Account is eligible for the supply options as described in this service class.
PDF page 337
PSC No: 120 - Electricity
Leaf No. 294.15
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: July 1, 2019
Superseding Revision: 2
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-
(g) Standby Offset
3. Billing Applicable to Each Standby Supplied Account
a. Customer Charge
The Customer Charge and meter charges for each account (the Standby Generation Account and the Standby Supplied Accounts) shall be equal to the customer and meter charges listed in this service class plus the additional Customer Charge listed below.
b. Contract Demand
The Contract Demand for each account (the Standby Generation Account and the Standby Supplied Accounts) shall
serve that individual account, including the delivery of supply from all sources.
4. For Accounts Supplied under the Single Party Offset:
For purposes of this Offset Provision, the following definitions apply:
-
means, for each Standby Supplied Account supplied by the
excess generation, the demand registered on the Standby Supplied Account
meter(s) multiplied by the lower of: (a) 1 or (b) the ratio of the
generation measured in kilowatts to the sum of demands on the meters of all Standby Supplied Accounts. means, for each Standby Supplied Account supplied by the Standby
total kWhs
multiplied by the lower of: (a) 1 or (b) the ratio of the
excess generation
measured in kWhs to the sum of the kWhs registered on the meters of the Standby Supplied Accounts. Allocated As-used Generator Demand and Allocated Generator Supply shall be determined for each 5- minute interval. Adjustments shall be made for transformation losses as applicable.
5. For Accounts Supplied under the Multi-Party Offset:
For purposes of this Offset Provision, the following definitions apply:
-
Standby Supplied Account, the lower of: (a) the
demand registered on the Standby Supplied Account or (b) the demand registered on the meter(s) measuring Standby Supplied
f the
Standby Supplied
the demand registered on the Standby Supplied Account, the excess amount shall not be redistributed to other accounts nor carried forward to the succeeding billing period.
Standby Supplied Account, the lower of: (a) the total kWhs
registered on the Standby Supplied
kWhs registered on the meter(s)
measuring the generati
Standby Supplied
Standby Supplier
Allocation exceeds the kWhs
the excess amount shall be
credited to the extent described in Service Classification 11, Special Provision (g)1.b.
PDF page 338
PSC No: 120 - Electricity
Leaf No. 294.15.1
New York State Electric & Gas Corporation
Revision: 1
Initial Effective Date: July 1, 2019
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-
(g) Standby Offset
5. For Accounts Supplied under the Multi-Party Offset
:
that the Sponsor has
allocated to each Standby Supplied Account under the Multi-Party Offset. A single percentage shall be applied to both the Allocated As-Used Generator Demand and the Allocated Generator Supply. The Percentage Allocations must total 100%, of which the Sponsor must establish: a. a Percentage Allocation of 10% or more to a single Standby Supplied Account in the b. a Percentage Allocation of no less than 5% or more than 90% to each additional Standby Supplied Account. The Standby Supplied Accounts and the Percentage Allocation to each must be assigned in writing by the Sponsor, using the Percentage Allocation Form, at least 30 days before commencing service under the Multi-Party Offset. The Percentage Allocations and the Standby Supplier Accounts may be changed as described on the form. No credits shall be applied if the Sponsor ceases to have a Standby Supplied Account or ceases to own or operate the generating facility. If a Standby Supplied Account is closed, its credits shall be
6. Each Standby Supplied Account shall be billed under Standby Service rates listed in this service class, as modified below:
a. An additional Customer Charge of $50.00 per account per billing period, shall be applicable to cover incremental billing and administrative costs associated with providing service under this provision.
b. The per-kWh delivery charges and adjustments described in this service class shall be applied to the total kWhs
Supply for each 5-minute interval (adjusted for losses as applicable).
c. For each 5-minute interval, the registered de
shall be reduced
by the Allocated Generator Demand for purposes of determining the daily maximum demand that is used for billing As-used Daily Demand Delivery Charges.
PDF page 339
PSC No: 120 - Electricity
Leaf No. 294.16
New York State Electric & Gas Corporation
Revision: 3
Initial Effective Date: July 1, 2019
Superseding Revision: 2
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York SERVICE CLASSIFICATION NO. 11 (Continued)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-
(g) Standby Offset
Billing Applicable to Each Standby Supplied Account
6. Each Standby Supplied Account shall be billed under Standby Service rates listed in this service class, as modified below:
d. If the Customer purchases supply from the Company, the per-kWh supply charges and
adjustments described in this service class shall be applied to the total kilowatthours 5-
minute interval (adjusted for losses as applicable).
7. The Allocated As-used Generator Demand and Allocated Generator Supply shall be assumed to be zero for time periods where there is insufficient interval data available to ascertain that the Generating Facility supplied output to any associated Standby Service account.
8. The Reactive Charge shall be calculated as described in this service class and shall not be adjusted by this provision.
(h) 1. A customer that is not participating in Special Provision (f.) or Special Provision (g.) herein may opt to participate in Rule 40.B, Value Stack, with a qualifying generator (i.e. a CES Tier 1 eligible generator as provided in Rule 40.B.1.a.iii) for compensation of net hourly injections. The Company shall install appropriate metering capable of recording the net hourly consumption and injection for the customer. The customer shall be responsible for the cost of the meter, the installation, and any additional costs.
PDF page 340
New York State Electric & Gas Corporation Service Classification 15: Optional Demand Service Otherwise Applicable Service Class 7
PDF page 341
PSC No: 120 - Electricity
Leaf No. 325
New York State Electric & Gas Corporation
Revision: 0
Initial Effective Date: January 1, 2024
Superseding Revision:
Issued in compliance with Order in Case 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE
APPLICABLE TO USE OF SERVICE FOR:
A customer without On Site Generation (OSG), or a customer that installs OSG with a total nameplate rating less than 15% of its load, may opt to take service pursuant to this service classification.
This service classification s rates, terms, and requirements are for informational purposes and will be available on a phased in approach at a future date consistent with Order issued on October 13, 2023, under Case No. 15-E-0751. CHARACTER OF SERVICE:
Continuous, Alternating Current -
vailable and appropriate
for the Customer s requirement.
A customer that installs OSG with a total nameplate rating less than 15% of its load shall comply with all federal, state and local laws, regulations, and requirements, including the requirements listed below in the Interconnection Requirements paragraphs 1 through 7.
RATE PERIODS:
Summer Super-Peak hours
From 2:00 pm until 6:00 pm Summer months are June, July, August, and
September
Winter Super-Peak hours
From 5:00 pm until 9:00 pm Winter months are December, January, and
February
Summer On-Peak hours
From 7:00 am until 2:00 pm
and
From 6:00 pm until11:00 pm
Winter On-Peak hours
From 7:00 am until 5:00 pm
and
From 9:00 pm until 11:00 pm
Shoulder On-Peak hours
From 7:00 am until 11:00 pm Non-Summer months are October, November,
March, April, and May
Off-Peak hours
All other hours including
Holidays*
* Holidays: New Year s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:
Customers may select from two different Supply Service Options as described below. The Company shall offer a Retail Access rate choice and a Non-Retail Access rate choice.
The Retail Access choice (see below) is the ESCO Supply Service (ESS). The Company shall provide only delivery service for the Retail Access choice. Electricity supply is provided by an E
The Non-Retail choice is Hourly Pricing. The Company shall provide delivery service and commodity service for the Non-Retail Access choice.
1. ESCO Supply Service (ESS)
This Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as described in Section 25.I.B, and a Bill Issuance Charge. Electricity supply is provided by an ESCO and settled as described in Section 16.E.9. Delivery Rates are specified in the Delivery Charges section of this Service Classification.
PDF page 342
PSC No: 120 - Electricity
Leaf No. 326
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case 25-E-0375, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE (CONT’D)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (cont’d)
2. Hourly Pricing
This Non-Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as described in Section 25.I.B, a Bill Issuance Charge, and a commodity charge that fluctuates with the market price of electricity as described in Section 25.I.C. Electricity supply is provided by the Company. Delivery Rates are specified in the Delivery Charges section of this Service Classification.
RATES:
Delivery Charges: The rate components of the delivery portion of this service: Customer Charge, Bill Issuance Charge, Contract Demand Charge and Daily As-Used Demand Charge.
1. Customer Charges
Bill Issuance Charge (per bill): $0.89, as described in General Information Section 16.J.
Customer Charge, Per
customer, per month.
Effective Date
Customer's OASC:
6/01/2026
SC No. 1
$19.00
SC No. 2
$22.00
SC No. 3 - Primary
$185.00
SC No. 3 - Subtransmission
$450.00
SC No. 6
$22.00
SC No. 7-1
$375.00
SC No. 7-2
$1,350.00
SC No. 7-3
$3,000.00
SC No. 7-4
$5,900.00
PDF page 343
PSC No: 120 - Electricity
Leaf No. 326.1
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case 25-E-0375, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE (CONT’D)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (cont’d)
RATES: (Cont’d)
Reserved for Future Use
PDF page 344
PSC No: 120 - Electricity
Leaf No. 327
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case 25-E-0375, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE (CONT’D)
RATES: (cont’d)
2. Contract Demand Charge: The Contract Demand Charge is determined by multiplying the Customer’s Contract Demand times the Contract Demand rate.
Contract Demand Charge: Per
kW of Contract Demand
Customer's OASC:
Effective
Date
6/01/2026
SC No. 1
$7.40
SC No. 2
$5.13
SC No. 3 - Primary
$9.24
SC No. 3 - Subtransmission
$1.28
SC No. 6
$14.34
SC No. 7-1
$1.49
SC No. 7-2
$5.02
SC No.7-3
$0.00
SC No. 7-4
$0.08
3. As-Used Demand Charge: Daily As-Used Demand Charge, per kW of daily metered demand, during On-Peak and Super-Peak hours, as applicable.
Effective Date
6/01/2026
Customer's OASC:
On-Peak
Super-Peak
SC No. 1
$0.10478
$0.20957
SC No. 2
$0.31697
$0.63393
SC No. 3 - Primary
$0.19838
$0.39677
SC No. 3 - Subtransmission
$0.20352
$0.40704
SC No. 6
$0.13133
$0.26265
SC No. 7-1
$0.35962
$0.71925
SC No. 7-2
$0.21056
$0.42113
SC No. 7-3
$0.10733
$0.21466
SC No. 7-4
$0.06030
$0.12060
4. Transition Charge:
All kWh
Per Transition Charge Statement.
PDF page 345
PSC No: 120 - Electricity
Leaf No. 327.1
New York State Electric & Gas Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case 25-E-0375, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE (CONT’D)
RATES: (cont’d)
3. As-Used Demand Charge: (Cont’d)
Reserved for Future Use
PDF page 346
PSC No: 120 - Electricity
Leaf No. 328
New York State Electric & Gas Corporation
Revision: 1
Initial Effective Date: January 1, 2025
Superseding Revision: 0
Issued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE
MERCHANT FUNCTION CHARGE ( MFC ):
All kW hours, per kWh
Per MFC Statement, as described in Section 25.I.D.
SYSTEM BENEFITS CHARGE:
Each customer bill for service under this Service Classification shall be increased by multiplying all kWh delivered by the applicable System Benefits Charge rate shown in the System Benefits Charge Statement. -
The EV Surcharge shall be applied per kWh delivered under this Service Classification, (as explained in this Schedule General Information Rule 49). The rate shall be set forth on the EVMR Statement OASC (sub-classification) as provided in this Service Classification shall determine the applicable Revenue Decoupling Adjustment (as explained in this Schedule, General Information Section 7). See RDM Statement.
The RAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in in this Schedule General Information Rule 38). See RAM Statement.
RECOVERY CHARGE
The Recovery Charge shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in this Schedule General Information Rule 57). The rate shall be set forth on the Recovery Charge Statement.
MINIMUM CHARGE:
The minimum charge per month for service under this Service Classification is the Contract Demand Charge if applicable, plus the Customer Charge and Bill Issuance Charge, if applicable, as listed above. INCREASE IN RATES AND CHARGES:
The rates and charges under this Service Classification, including any adjustments and minimum charge, are increased by the applicable effective percentage shown in Rule 6 of this Schedule for service supplied within the municipality where the Customer is taking service.
TERMS OF PAYMENT:
Bills rendered under this Service Classification are payable on receipt. A late payment charge of 1½% per month shall be billed on all amounts not paid by the "past due" date. For additional information, 119
Electricity, Section 4.
TERM:
If a customer opts-in to this Service Classification, the customer shall remain on this Service Classification for a minimum of one year and thereafter until terminated by 60 days written notice.
PDF page 347
PSC No: 120 - Electricity
Leaf No. 328.1
New York State Electric & Gas Corporation
Revision: 0
Initial Effective Date: January 1, 2025
Superseding Revision:
Issued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE
EARNINGS ADJUSTMENT MECHANISM ( EAM) :
The EAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in this Schedule General Information Rule 4.K). The rate shall be set forth on the EAM Statement. NON-WIRES ALTERNATIVE ( NWA ) SURCHARGE:
The NWA Surcharge shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in this Schedule General Information Rule 47. The rate shall be set forth on the NWA Statement.
PDF page 348
PSC No: 120 - Electricity
Leaf No. 329
New York State Electric & Gas Corporation
Revision: 0
Initial Effective Date: January 1, 2024
Superseding Revision:
Issued in compliance with Order in Case 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Binghamton, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE
DETERMINATION OF DEMAND:
1. Contract Demand:
The Company shall establish the Contract Demand for a customer that opts for the rates under this Service Classification. For mass-market customers, the Company shall use the metered demand for the demand increases, the Contract Demand will increase. The Contract Demand will only be decreased if For a demand-billed customer, the Company shall
last 12-month period for the first bill. Thereafter, similar to the mass-market customers, if the metered demand increases, the Contract Demand will increase. The demand will only be decreased if the
2. As-Used Demand:
a) The as-used demand for mass market customers (a customer whose otherwise applicable service classification is non-demand billed) with interval metering will be sum of the highest daily 60- minute integrated demand (measured in kW) measured on the clock-hour occurring during the On-Peak hours as . If in any billing period, there is a failure in the
metered usage data acquisition that results in the failure to record daily as-used demand data, the Company reserves the right to estimate reasonable values for the missing data for recording and billing purposes.
b) For all other customers with interval metering, the as-used demand shall be the aggregate of the highest daily 15- minute integrated demand (measured in kW) occurring during the On-Peak hours as defined in lling period, there is a failure in the metered
usage data acquisition that results in the failure to record daily as-used demand data, the Company reserves the right to estimate reasonable values for the missing data for recording and billing purposes. METERING AND COMMUNICATION REQUIREMENTS:
a) A customer shall be required to have an Advanced Metering Infrastructure (AMI) meter as described in PSC No. 119 - Rule 3.A.III to be eligible for this service classification.
b) A customer that elects to opt-out of receiving an AMI meter pursuant to PSC No. 119 - Rule 3.A.III, is ineligible to take service under this service classification.
PDF page 349
Orange & Rockland
Service Classification 9
PDF page 350
[No extractable text on this page.]
PDF page 351
[No extractable text on this page.]
PDF page 352
[No extractable text on this page.]
PDF page 353
[No extractable text on this page.]
PDF page 354
[No extractable text on this page.]
PDF page 355
[No extractable text on this page.]
PDF page 356
[No extractable text on this page.]
PDF page 357
Orange & Rockland
Service Classification 22
PDF page 358
[No extractable text on this page.]
PDF page 359
[No extractable text on this page.]
PDF page 360
[No extractable text on this page.]
PDF page 361
[No extractable text on this page.]
PDF page 362
[No extractable text on this page.]
PDF page 363
[No extractable text on this page.]
PDF page 364
[No extractable text on this page.]
PDF page 365
[No extractable text on this page.]
PDF page 366
[No extractable text on this page.]
PDF page 367
Rochester Gas and Electric Corporation
Service Classification 8: Large General Service with Time-of-Use Metering
PDF page 368
PSC No: 19 - Electricity
Leaf No. 194
Rochester Gas and Electric Corporation
Revision: 25
Initial Effective Date: June 1, 2026
Superseding Revision: 23
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE
APPLICABLE TO USE OF SERVICE FOR:
All purposes, in Entire Territory, by any customer with a basic demand of not less than 300 kW during any three of the previous 12 months, provided, however, that whenever the monthly basic demand has been 200 kW or less for 12 consecutive months, the customer thereafter shall be billed under another appropriate service classification.
CHARACTER OF SERVICE:
Continuous, Alternating Current - 60 cycle; voltage and phase at the Company's option, as available and appropriate for the customer's requirements.
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:
Customers served under this Service Classification may select from two different Supply Service Options as described below. The Company shall offer a Retail Access rate choice and a Non-Retail Access rate choice.
The Retail Access choice (see below) is the ESCO Supply Service (ESS). The Non-Retail choice is the RG&E Supply Service (RSS). RG&E shall provide Delivery Service regardless of the customer’s supply service option.
1. ESCO Supply Service (ESS)
This Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as described in Section 12.B., and a Bill Issuance Charge. Customers that elect ESS and receive a Consolidated Bill shall not be subject to the Bill Issuance Charge. An Energy Service Services Company (“ESCO”) provides Electric Power Supply to the customer. The Company provides the delivery service only. Customers that elect ESS shall not be subject to the Merchant Function Charge (MFC).
2. RG&E Supply Service (RSS)
This Non-Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as described in Section 12.B., a Bill Issuance Charge, and a commodity charge that fluctuates with the market price of electricity and consists of energy, capacity, capacity reserves, losses, unaccounted for energy, ancillary services, NYPA Transmission Access Charge (NTAC), transmission project costs allocated to the Company under the NYISO tariff s approved by FERC, and Supply Adjustment Charge. Electricity supply is provided by the Company.
Electricity Supply Charge:
The charge for Electric Power Supply provided by the Company shall fluctuate with the market price of electricity and shall include the following components: Energy, Energy Losses, Unaccounted for Energy, Capacity, Capacity Reserves, Capacity Losses, ancillary services, NTAC, transmission project costs allocated to the Company under the NYISO tariff as approved by FERC, and Supply Adjustment Charge.
Merchant Function Charge:
All kWh, per kWh
Per MFC Statement, as described in Rule 12
PDF page 369
PSC No: 19 - Electricity
Leaf No. 194.1
Rochester Gas and Electric Corporation
Revision: 5
Initial Effective Date: January 1, 2010
Superseding Revision: 4
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont d)
Reserved for Future Use
PDF page 370
PSC No: 19 - Electricity
Leaf No. 194.1.1
Rochester Gas and Electric Corporation
Revision: 5
Initial Effective Date: January 1, 2010
Superseding Revision: 4
Issued in Compliance with Order in Case 09-E-0228 issued and effective September 28, 2009 ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)
Reserved for Future Use
PDF page 371
PSC No: 19 - Electricity
Leaf No. 194.2
Rochester Gas and Electric Corporation
Revision: 23
Initial Effective Date: June 1, 2026
Superseding Revision: 21
Issued in Compliance with Order in Case No. 25-E-0379, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)
RATE Applicable to both ESS and RSS: (Per Meter, Per Month)
Delivery Charges:
The Delivery Charges for Customer Charge and Delivery Demand Charge are specified in the Delivery Charges section of this Service Classification.
System Benefits Charge:
All kWh, per kWh
Per SBC Statement
Bill Issuance Charge (per bill):
$0.99, as described in Rule 11.F.
Non-Bypassable Charge (“NBC”):
All kWh, per kWh
Per TCS Statement.
Rate Adjustment Mechanism (“RAM”):
All kW, per kW
Per RAM Statement, as described in Rule 24
PDF page 372
PSC No: 19 - Electricity
Leaf No. 194.2.1
Rochester Gas and Electric Corporation
Revision: 9
Initial Effective Date: December 1, 2020
Superseding Revision: 8
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-
3. Hourly Pricing
Mandatory and Voluntary
Mandatory
A customer taking service under Hourly Pricing shall remain subject to this provision until their monthly measured demand has been less than 200 KW for 12 consecutive months, at which time the customer shall be billed under another appropriate service classification.
Voluntary:
Hourly Pricing is voluntary for any customer who would otherwise qualify for service under Service Classification No. 8
Large General Service
Time of Use Rate. Once a customer elects Hourly Pricing they
shall remain subject to this provision until their monthly measured demand has been 200 KW or less for 12 consecutive months, the customer shall then be billed under another appropriate service classification.
PDF page 373
PSC No: 19 - Electricity
Leaf No. 194.3
Rochester Gas and Electric Corporation
Revision: 10
Initial Effective Date: December 1, 2020
Superseding Revision: 9
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-
3. Hourly Pricing
Mandatory and Voluntary
Additionally, Hourly Pricing is voluntary
development programs without supply option restrictions beginning on or prior to-December 31, 2006, and would have otherwise qualified for Mandatory Hourly Pricing u
incentive expires. Upon the conclusion of their participation in the economic development program the customer shall be subject to Mandatory Hourly Pricing and have two supply options, ESS or Hourly Pricing option, as described below.
DELIVERY CHARGES:
The delivery charges set forth in this Service classification for standard service shall apply to a customer taking service under Hourly Pricing.
PDF page 374
PSC No: 19 - Electricity
Leaf No. 194.4
Rochester Gas and Electric Corporation
Revision: 11
Initial Effective Date: December 1, 2020
Superseding Revision: 9
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-
3. Hourly Pricing
Mandatory and Voluntary
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:
Customers served under this Service Classification may select from the different electricity Supply Service Options offered by the Company as described below. The Company shall offer a Retail Access rate choice and a Non-Retail Access rate choice.
The Retail Access choice (see 1. below) is the ESCO Supply Service (ESS). The Non-Retail choice is the (see 2. below) Company Hourly Day-Ahead Market Pricing Option (
The Company shall provide only delivery service for the Retail Access choice. Electricity supply is provided by an Energy Se
any time.
The Company shall provide delivery service and commodity service for the Non-Retail Access choice. A customer who has not chosen an option, and for whom the Company has not received a retail access enrollment from an ESCO, shall default to the Company Hourly Day-Ahead Market Pricing Option.
1. ESCO Supply Service (ESS)
This Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as described in Section 12.B., and a Bill Issuance Charge. Customers that elect ESS and receive a Consolidated Bill shall not be subject to the Bill Issuance Charge.
2. Hourly Day-Ahead Market
This Non-Retail Access choice includes fixed charges for the Company delivery service, a Transition Charge, as described in Section 12.B., a commodity charge for electricity supply that fluctuates hourly with the market price of electricity including losses as described in Section 12.C. Electricity supply is provided by the Company.
PDF page 375
PSC No: 19 - Electricity
Leaf No. 194.5
Rochester Gas and Electric Corporation
Revision: 4
Initial Effective Date: May 1, 2017
Superseding Revision: 3
Issued in compliance with Orders in Case 15-E-0302, dated February 22, 2017 and 17-M-0106 dated April 20, 2017. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York
SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)
Hourly Pricing – Mandatory and Voluntary (Cont’d)
Reserved for Future use
PDF page 376
PSC No: 19 - Electricity
Leaf No. 194.6
Rochester Gas and Electric Corporation
Revision: 3
Initial Effective Date: May 1, 2017
Superseding Revision: 2
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-
3. Hourly Pricing
Mandatory and Voluntary
METERING AND COMMUNICATION REQUIREMENTS:
1. Customer Responsibilities:
All customers subject to this special provision are required to have interval metering and remote meter reading capability. Such customers shall be responsible for the following:
a) the costs of providing remote meter reading capability through dedicated telecommunications to and from the meter; and
b) the dedicated telecommunications shall be approved by the Company, and
c) all costs associated with the installation, operation and maintenance of the telecommunications equipment, including but not limited to, all telecommunications service bills. If the Company is unable to read the meter through a customer provided connection, and the Company has determined that the problem is not caused by the Company's equipment, the customer shall be responsible for resolution of the problem. The customer shall also be responsible for reimbursement of the Company expenses incurred for visits to the meter location to ascertain the cause of the problem, including reimbursing the Company for any expenses the Company incurs, such as, but not limited to, the cost to provide a manual meter read.
2.Company Responsibilities:
a) Equipment shall
shall be based upon available resources and
Company Schedule.
b) In the absence of equipment failure, if the customer requests replacement of working equipment, it shall be scheduled by order of request and availability.
PDF page 377
PSC No: 19 - Electricity
Leaf No. 195
Rochester Gas and Electric Corporation
Revision: 18
Initial Effective Date: June 1, 2026
Superseding Revision: 16
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President – Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 8 (Cont’d)
LARGE GENERAL SERVICE - TIME-OF-USE RATE
DELIVERY CHARGES:
The following charges are applicable to a customer taking service under this Service Classification.
Effective Date
06/01/2026
Customer Charge: (per month)
Secondary
Primary
Subtransmission-Industrial
Subtransmission-Commercial
Transmission
Substation
$1,725.00
$2,175.00
$4,300.00
$4,050.00
$6,400.00
$3,875.00
Demand Charge: All kW, per kW of billing demand
Secondary
Primary
Subtransmission – Industrial
Subtransmission – Commercial
Transmission
Substation
$21.48
$21.28
$14.42
$15.12
$14.45
$12.59
PDF page 378
PSC No: 19 - Electricity
Leaf No. 195.1
Rochester Gas and Electric Corporation
Revision: 13
Initial Effective Date: December 1, 2020
Superseding Revision: 11
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE
REACTIVE CHARGE:
Reactive kilovolt-ampere hours, per billing reactive kilovolt-ampere hour: $0.00127
PDF page 379
PSC No: 19 - Electricity
Leaf No. 195.2
Rochester Gas and Electric Corporation
Revision: 22
Initial Effective Date: January 1, 2025
Superseding Revision: 21
Issued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE
All customers taking service under this Service Classification shall be subject to a RDM adjustment as explained in this Schedule, General Information Section 4.K. Customers taking Transmission service are excluded from the RDM. See RDM Statement.
The Merchant Function Charge reflects the administrative costs of obtaining electricity supply. All customers taking supply service under this Service Classification with the Company shall be subject to a MFC charge (as explained in this Schedule, General Information Section 12.). See MFC Statement.
The RAM shall be applied per kW to all kW delivered under this Service Classification, (as explained in this Schedule, General Information Rule 24). See RAM Statement.
EARNINGS ADJUSTMENT MECHANISM ( EAM ):
The EAM shall be applied per kW delivered under this Service Classification, (as explained in this Schedule General Information Rule 4.K). The rate shall be set forth on the EAM Statement.
NON-WIRES ALTERNATIVE ( NWA ) SURCHARGE:
The NWA Surcharge shall be applied per kW delivered under this Service Classification, (as explained in this Schedule General Information Rule 32). The rate shall be set forth on the NWA Statement.
-
The EV Surcharge shall be applied per kW delivered under this Service Classification, (as explained in this Schedule General Information Rule 33). The rate shall be set forth on the EVMR Statement.
RECOVERY CHARGE:
The Recovery Charge shall be applied per kW delivered under this Service Classification, (as explained in this Schedule General Information Rule 41). The rate shall be set forth on the Recovery Charge Statement.
PDF page 380
PSC No: 19 - Electricity
Leaf No. 195.3
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 8 (Cont’d)
LARGE GENERAL SERVICE - TIME-OF-USE RATE
INCREASE IN RATES AND CHARGES:
The rates and charges under this Service Classification, including any system benefits charge, adjustments and minimum charge, are increased by the applicable effective aggregate percentage shown in Rule 4.J for service supplied within the municipality where the customer is taking service.
MINIMUM DELIVERY DEMAND CHARGE:
The minimum monthly delivery demand charge is as follows per kW of service capacity contracted for:
Secondary
$6.94
Primary
$7.58
Substation
$5.01
Sub Transmission Industrial
$4.16
Sub Transmission Commercial
$4.37
Transmission
$4.82
PDF page 381
PSC No: 19 - Electricity
Leaf No. 196
Rochester Gas and Electric Corporation
Revision: 6
Initial Effective Date: September 26, 2010
Superseding Revision: 5
Issued in compliance with Order in Case 09-E-0717 dated September 21, 2010
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8 (Cont’d)
LARGE GENERAL SERVICE - TIME-OF-USE RATE
MINIMUM DELIVERY DEMAND CHARGE (Cont’d):
Whenever the monthly maximum demand registered and seasonally adjusted exceeds the service capacity contracted for, the customer's service capacity shall be automatically increased to such seasonally adjusted demand and the service capacity thus established may not be reduced during the next eleven months.
The seasonally adjusted demand shall be determined by multiplying the monthly maximum demand registered by a factor of 1.00 for the Summer Season, a factor of .75 for the Winter Season and a factor .85 for the Base Season. DETERMINATION OF DEMAND:
1. Basic Demand
The demand applicable to the minimum charge and power factor adjustment computation, will be the measured maximum 30-minute integrated demand occurring anytime during the monthly period for which bill is rendered.
2. Peak Hours Demand
The demand applied to the demand charge computation, will be the measured maximum 30-minute integrated demand occurring during the peak hours in the month for which bill is rendered.
DETERMINATION OF REACTIVE KILOVOLT-AMPERE HOURS:
Effective 09/22/2010, the determination of the billing reactive kilovolt-ampere hours will be the reactive kilovolt-ampere hours in excess of one-fourth of the metered kilowatt-hours.
DEFINITION OF HOURLY PERIODS:
Peak Hours Demand: Peak hours are defined as the hours between 7:00 am and 11:00 pm, Monday through Friday. All other hours are defined as "off-peak" hours.
Peak Hours Energy: Peak hours are defined as the hours between 7:00 am and 11:00 pm, Monday through Friday. Off-Peak Hours Energy: All remaining hours.
DEFINITION OF SEASONS:
Summer:
June 1-September 30, inclusive.
Winter:
December l-February 28/29, inclusive.
Base:
All other days.
HIGH VOLTAGE OPTION
Where service at a higher than secondary voltage is available, and where the customer elects to be served thereby, and the customer will at his own expense provide, install and maintain the necessary transformers and protective devices of a size and type approved by the Company, the primary or transmission rate charges will apply.
Primary charges will apply to customers taking service at 4,160, 11,500, 12,470, or 34,500 volts.
PDF page 382
PSC No: 19 - Electricity
Leaf No. 197
Rochester Gas and Electric Corporation
Revision: 10
Initial Effective Date: July 16, 2018
Superseding Revision: 9
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York
SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE- TIME-OF-USE RATE
HIGH VOLTAGE OPTION (Cont'd)
Effective September 26, 2010, Subtransmission Service shall be grandfathered. The grandfathering shall apply to the service location including the site and existing buildings where customers taking Subtransmission Service before September 26, 2010. Grandfathering is applicable to any new owner acquiring possession of a grandfathered service location, as long as they meet the qualification criteria for Subtransmission Service. The grandfathering may apply to facility replacements and or expansions by customers taking grandfathered Subtransmission Service, if accomplished through existing subtransmission metering points at the service location. Subtransmission service shall not be available to new service locations.
Subtransmission charges shall apply to:
1. Customers taking service at 34,500 volts, provided, however, such customers were taking service hereunder prior to September 26, 2010, or
2. Customers taking service at 11,500 volts, provided, however, such customers were taking service hereunder prior to August 1, 1988.
Transmission charges shall apply to customers taking service at 115,000 volts.
Substation charges shall apply to:
1. Customers taking service from a dedicated substation at primary or secondary voltages but whose incoming supply voltage is at 34,500 volts or above and who are metered with respect to the incoming supply voltage provided, or
2. Customers taking Substation service (formally known as Sub Transmission
Secondary service) prior to
September 26, 2010.
TERMS OF PAYMENT:
All bills are rendered at the above rate. A late payment charge of 1½% per month shall become due and payable if payment is not made on or before the "last day to pay" date specified on the bill in accordance with the provisions of Rule 4.C.(2).
TERM:
One year and thereafter until terminated by 30 days' notice. However, when the amount of investment required or other conditions of service are such as to warrant, the Company, with the permission of the Public Service Commission, may agree with the customer to render service at rates from time to time effective for a longer term. SPECIAL PROVISIONS:
1. Power Factor Adjustment
Applicable to customers not subject to a reactive charge, whenever the customer's equipment is so operated that the maximum kilovolt- amperes of lagging reactive demand exceed 48% of the maximum kW demand during the billing month, the customer shall remedy that condition in a manner deemed adequate by Company, by either:
a. Installing and maintaining at its own expense the power factor corrective equipment deemed necessary by Company to remedy the condition, or
b. Making a cash contribution of the actual reasonable cost of any power factor corrective equipment installed by Company on its side of the point of delivery to effect such correction.
PDF page 383
PSC No: 19 - Electricity
Leaf No. 198
Rochester Gas and Electric Corporation
Revision: 3
Initial Effective Date: May 1, 2017
Superseding Revision: 2
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE - TIME-OF-USE RATE
SPECIAL PROVISIONS: (Cont'd)
2. Submetering Service
Electric service under this service classification is available to any customer who qualifies for a submetering option as provided for under Rule 2.E.(2).
3. Exception to Applicability
Service under this service classification shall be available to those customers with a measured demand of less than 300 kW who were taking service under this service classification as of May 18, 1984.
4. Customers who qualify for the Recharge NY Power Program pursuant to Section L.5 of the General Information Section of this Schedule, shall have such power billed in accordance with the provision therein. The customer's power requirements in excess of the RNY Power allocation will be billed in accordance with the ESCO Supply Service rate or the RG&E Supply Service rate of this Service Classification applicable to the customer's voltage level.
(Continued on next leaf)
PDF page 384
PSC No: 19 - Electricity
Leaf No. 199
Rochester Gas and Electric Corporation
Revision: 13
Initial Effective Date: July 1, 2016
Superseding Revision: 12
Issued in compliance with Order in Case 15-E-0285, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS: (Cont’d)
5. Economic Development Programs
A. Reserved for Future Use
PDF page 385
PSC No: 19 - Electricity
Leaf No. 199.1
Rochester Gas and Electric Corporation
Revision: 14
Initial Effective Date: December 1, 2020
Superseding Revision: 12
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020. 6
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS: (Cont d)
5. Economic Development Programs
Reserved for Future Use
PDF page 386
PSC No: 19 - Electricity
Leaf No. 199.2
Rochester Gas and Electric Corporation
Revision: 13
Initial Effective Date: November 1, 2023
Superseding Revision: 11
Issued in compliance with Order in Case No. 22-E-0319, dated October 12, 2023.6
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Rochester, New York
\
SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS: (Cont d)
5. Economic Development Programs
B) Reserved for Future Use
C) Excelsior Jobs Program (EJP)
Service taken under this Service Classification may be eligible for the rates and charges under the Excelsior Jobs Program. Any customer who meets the qualifications set forth under General Information Section 4.L.3 shall pay for service at the following rate:
RATE: (per month)
For customers qualifying for the EJP, the Non-Bypassable Charge [ NBC ] component of the Transition Charge and the Revenue Decoupling Mechanism (RDM) Adjustment do not apply to the following S.C. No. 8 voltage levels: Secondary, Primary, Sub Transmission-Industrial, and Sub Transmission-Commercial. For certain adjustments approved by the Commission, a separate credit shall
All customers shall be required to pay
Commodity, Capacity, Merchant Function, and Bill Issuance Charges, if applicable, in accordance with the standard RSS or ESS rates for this Service Classification. All customers are also required to pay the System Benefits Charges, Rate Adjustment Mechanism, Non-Wires Alternative Surcharge, Earnings Adjustment Mechanism, and Reactive Charges in accordance with the standard RSS or ESS rates for this Service Classification.
PDF page 387
PSC No: 19 - Electricity
Leaf No. 199.3
Rochester Gas and Electric Corporation
Revision: 13
Initial Effective Date: November 1, 2023
Superseding Revision: 11
Issued in compliance with Order in Case No. 22-E-0319, dated October 12, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS: (Cont d)
5. Economic Development Programs
C) Excelsior Jobs Program (EJP)
Effective Date
11/01/2023
05/01/2024
05/01/2025
Customer Charge: (per month)
Secondary
Primary
Sub Transmission-Industrial
Sub Transmission-Commercial
Transmission
$1,350.00
$1,700.00
$3,250.00
$3,100.00
$4,925.00
$1,525.00
$1,925.00
$3,750.00
$3,525.00
$5,600.00
$1,725.00
$2,175.00
$4,300.00
$4,050.00
$6,400.00
Make-Whole Customer Charge: (per month)
Secondary
Primary
Sub Transmission-Industrial
Sub Transmission-Commercial
Transmission
$26.12
$33.69
$85.53
$79.20
$114.55
$26.12
$33.69
$85.53
$79.20
$114.55
$26.12
$33.69
$85.53
$79.20
$114.55
Demand Charge: All kW, per kW of billing demand
Secondary
Primary
Sub Transmission-Industrial
Sub Transmission-Commercial
Transmission
$0.00
$0.97
$0.58
$0.74
$10.91
$0.00
$0.67
$0.37
$0.37
$11.43
$0.00
$0.35
$0.13
$0.00
$11.53
Effective May 1, 2026, the Make-
bill shall not include the Make-Whole Rate.
For a customer qualifying for the EJP program and taking Substation service, such customer shall be subject to the otherwise applicable standard service classification rates, including the Transition Charge, Commodity, Merchant Function, and Bill Issuance Charges, if applicable, in accordance with the standard RSS or ESS rates for this Service Classification. All customers are also required to pay the System Benefits Charges, Rate Adjustment Mechanism, and Reactive Charges in accordance with the standard RSS or ESS rates for this Service Classification. Qualifying load shall be exempt from the Non-Bypassable Charge [ NBC ] component of the Transition Charge and the Revenue Decoupling Mechanism (RDM).
PDF page 388
PSC No: 19 - Electricity
Leaf No. 199.4
Rochester Gas and Electric Corporation
Revision: 6
Initial Effective Date: November 1, 2023
Superseding Revision: 5
Issued in compliance with Order in Case No. 22-E-0319, dated October 12, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS: (Cont d)
5. Economic Development Programs
C) Excelsior Jobs Program (EJP)
Effective Date
11/01/2023
05/01/2024
05/01/2025
Customer Charge: (per month)
Substation
$2,975.00
$3,400.00
$3,875.00
Make-Whole Customer Charge
$68.12
$68.12
$68.12
Demand Charge:
All kW, per kW of billing demand
Substation
$9.59
$10.87
$12.34
Make-Whole Demand Charge:
All kW, per kW of billing demand
Substation
$0.23
$0.23
$0.23
Effective May 1, 2026, the Make-
shall not include the Make-Whole Rate.
EJP customers shall be offered two supply service options and charged in accordance with their choice:
1. ESCO Supply Service
2. RG&E Supply Service
PDF page 389
PSC No: 19 - Electricity
Leaf No. 200
Rochester Gas and Electric Corporation
Revision: 22
Initial Effective Date: June 1, 2026
Superseding Revision: 20
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
6
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS: (Cont’d)
6. Optional Election of Service Classification No. 14 Rates:
A demand-metered customer that does not have On-Site Generating facilities (“OSG”) may opt to select the applicable rates under Service Classification No. 14 and be billed under such rates for a period of not less than 12 months, in lieu of the rates applicable under this Service Classification.
A customer that opts for these rates shall comply with the “Optional Election of Service Rate for Customers Without On- site Generation” as described in Service Classification No. 14.
PDF page 390
PSC No: 19 - Electricity
Leaf No. 200.1
Rochester Gas and Electric Corporation
Revision: 6
Initial Effective Date: July 1, 2016
Superseding Revision: 4
Issued in compliance with Order in Case 15-E-0285, dated June 15, 2016
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)
Reserved for future use
PDF page 391
PSC No: 19 - Electricity
Leaf No. 200.2
Rochester Gas and Electric Corporation
Revision: 7
Initial Effective Date: December 1, 2020
Superseding Revision: 5
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)
7. Reserved for Future Use
8. Reserved for Future Use
PDF page 392
PSC No: 19 - Electricity
Leaf No. 201
Rochester Gas and Electric Corporation
Revision: 4
Initial Effective Date: December 1, 2020
Superseding Revision: 2
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020. ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS: (Cont d)
8. Reserved for Future Use
PDF page 393
PSC No: 19 - Electricity
Leaf No. 202
Rochester Gas and Electric Corporation
Revision: 0
Initial Effective Date: June 1, 2003
Superseding Revision:
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS: (Contd.)
9. NYISO Incentivized Day-Ahead Economic Load Curtailment Program Rider
Any Customer that is taking service under this service classification and is participating in the NYISO's Incentivized Day-Ahead Economic Load Curtailment Program is eligible for service under this rider.
a) Term
The Demand Reduction Incentive Payments offered under this rider will expire on October 31, 2003.
b) Demand Reduction Provider
Customers taking service under this rider are responsible for enrolling with a NYISO approved Demand Reduction Provider ("DRP"). A DRP is an entity qualified pursuant to NYISO procedures that bids Demand Side Resources of at least 1 MW. The DRP shall aggregate the loads received from Demand Side Resources. The DRP shall, if necessary, pro-rate the demand reduction bids in order to submit bids in the whole MWs required by the NYISO.
RG&E will function as a DRP. Customers taking service under this rider will sign an agreement with RG&E.
c) Demand Side Resources
Demand Side Resources ("DSR") are customers that are capable of reducing demand in a responsive, measurable and verifiable manner within time limits, are qualified to participate in the program, and have signed an agreement with RG&E.
d) Registration Procedures
The DSR will enter into a signed agreement with RG&E specifying the terms under which the DSR will participate in the program. This agreement will include information needed by the NYISO for program administration. The data required will include at least the organization name, an administrative contact, 7x24 operations contacts, the LBMP zone and/or sub-zone, and billing meter number. RG&E will provide the DSR with the appropriate zonal designation.
e) Metering and Meter Data Provision
DSRs taking service under the Demand Reduction Program will be required to have an interval-billing meter. If the DSR does not already have an interval meter, it must acquire one per general information section 3.E of this tariff. Customers will bear the cost of such metering equipment only to the extent that it is not covered by NYSERDA.
(Continued on next leaf)
PDF page 394
PSC No: 19 - Electricity
Leaf No. 203
Rochester Gas and Electric Corporation
Revision: 0
Initial Effective Date: June 1, 2003
Superseding Revision:
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS: (Contd.)
9. NYISO Incentivized Day-Ahead Economic Load Curtailment Program Rider (continued)
f) Bidding by the DSR
1.)
The DSR will submit its demand reduction bids to the DRP in accordance with the agreement. 2.)
Bids must be submitted to the DRP by 11:00 a.m. two days ahead of the curtailment day, (e.g. by 11:00 a.m. on Monday for Wednesday). However, bids for Saturday and Sunday must be submitted by 11:00 a.m. on Thursday, and bids for Monday and Tuesday must be submitted by 11:00 a.m. on Friday.
3.)
Bids must be submitted in blocks in accordance with the agreement between the DSR and the DRP. 4.)
Bids must be submitted in dollar and/or cents increments per KW for the desired block(s) of time in accordance with the agreement between the DSR and the DRP.
5.)
The DSR could include a curtailment initiation cost as an integral part of their bid. 6.)
The DSR will submit bids that the DRP will aggregate into whole MW increments.
i) DSRs must bid in 0.10 MW (100 KW) increments.
ii) The 0.10 MW (100KW) units will be inclusive of the appropriate loss factor.
iii) The 0.10 MW (100KW) units may include the curtailment initiation factor.
7.)
A bid can not be recalled or changed once it has been accepted by the DPR.
g) Bidding by the DRP
The DRP must submit its demand reduction bid to the NYISO in whole MW units. The DRP will aggregate the DSR bids, at each price level bid by the DSRs, into whole MW units. In the event that the total aggregated demand reduction bid by the DSRs does not total to a whole MW unit, the individual DSR demand reduction bids will be pro-rated downward so that the total DRP bid will total to the next lowest whole MW (e.g. DSR bids that totaled 2.3 MW would be pro-rated so that the total DRP bid was 2.0 MW). The DRP will aggregate bids from all of the service classifications at each price level. The DRP will be notified of the acceptance of the bid by the NYISO one day ahead. The DRP will notify the DSR upon receipt of notification of the acceptance of a bid by the NYISO on the day prior to the day of the curtailment.
(Continued on next leaf)
PDF page 395
PSC No: 19 - Electricity
Leaf No. 204
Rochester Gas and Electric Corporation
Revision: 1
Initial Effective Date: October 2, 2006
Superseding Revision: 0
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS: (Contd.)
9. NYISO Incentivized Day-Ahead Economic Load Curtailment Program Rider (continued)
h) DSR Customer Baseline Load and Actual Consumption
The DSR Customer Baseline Load ("CBL") is an average hourly energy consumption that is used to determine the level of curtailment for each individual DSR. The CBL will be calculated according to the NYISO Day-Ahead Response Program Manual that is posted on the NYISO's web-site.
The DRP shall submit demand reduction bids to the NYISO. All DSRs whose bids are included, in whole or in part, in the DRP's demand reduction bid that is scheduled and accepted by the NYISO, are expected to reduce their real-time energy consumption by the amount of the bid accepted by the DRP. The amount of actual real-time curtailment determined for a DSR will be equal to its CBL less its actual real-time consumption during the specified curtailment.
i) Payment by DSR
DSRs taking service under this rider will pay the rates and charges that would otherwise be applicable under this service classification and will be subject to all other terms and conditions of this service classification. Failure to pay any charges associated with service under this service classification, including any penalties charged per section (k) of this rider, will result in the rescinding the DSR's right to participate in this program.
j) Payment to DSR
The DRP will be paid by the NYISO in accordance with the NYISO Day-Ahead Demand Response Program Manual. The DSR will receive a rebate equal to 90% of the rate paid to the DRP by the NYISO for the amount of its demand reduction bid that was accepted by the DRP.
k) Non-Performance Penalties
For DSRs who fail to comply with a scheduled NYISO curtailment, non-conformance penalties, as described in the NYISO Day-Ahead Demand Response Program Manual, will apply. These penalties will initially be charged to the DRP by the NYISO, and will be passed along, in their entirety to the non- complying DSRs.
10. Customer Owned Meters
As described in Rule 3.E.(2) and Rule 4.A.(2), Customers taking service under this service classification have the option of owning a Commission-approved meter. Such meters remain under the control of the Company. Each month, a Customer that owns a Commission-approved meter will not be charged the monthly Meter Ownership charge applicable to the customer s voltage level.
PDF page 396
PSC No: 19 - Electricity
Leaf No. 204.1
Rochester Gas and Electric Corporation
Revision: 6
Initial Effective Date: November 1, 2023
Superseding Revision: 5
Issued in compliance with Order in Case No. 22-E-0319, dated October 12, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 8 (Cont'd)
LARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)
SPECIAL PROVISIONS:
11. Farm Waste Electric Generating System Option
This option is for a customer qualifying for the Farm Waste Electric Generating System Option pursuant to General Information Section 13 of this Schedule and taking service under S.C. No. 8. If electricity (kWh) supplied by the customer to the Company is not metered for the time-differentiated periods, an allocation to each TOU period shall be done according to allocation factors as described herein. 40% of the excess electricity (kWh) supplied by the customer shall be considered On-Peak. 60% of the excess electricity (kWh) shall be considered Off-Peak.
PDF page 397
PSC No: 19 - Electricity
Leaf No. 204.2
Rochester Gas and Electric Corporation
Revision: 7
Initial Effective Date: November 1, 2023
Superseding Revision: 6
Issued in compliance with Order in Case No. 22-E-0319, dated October 12, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE
TIME-OF-USE RATE
12. Wind Electric Service Option
This option is for a customer qualifying for the Wind Electric Service Option pursuant to General Information Section 13 of this Schedule and taking service under S.C. No. 8 - TOU. If electricity (kWh) supplied by the customer to the Corporation is not metered for the time-differentiated periods, an allocation to each TOU period shall be done according to allocation factors as described herein. 40% of the excess electricity (kWh) supplied by the customer shall be considered On-Peak. 60% of the excess electricity (kWh) shall be considered Off- Peak.
13. Electric Hybrid Generating System Option
This Option is for a customer qualifying for the Electric Hybrid Generating System Option pursuant to General Information Section 13 of this Schedule and taking service under S.C. No. 8.
14. Solar Non-Residential Electric Generating System Option
This option is for a customer qualifying for the Solar Non-Residential Electric Generating System Option pursuant to General information Section 13 of this Schedule and taking service under S.C. No. 8. If electricity (kWh) supplied by the customer to the Corporation is not metered for the time-differentiated periods, an allocation to each TOU period shall be done according to allocation factors as described herein. 40% of the excess electricity (kWh) supplied by the customer shall be considered On-Peak. 60% of the excess electricity (kWh) shall be considered Off-Peak.
15. Fuel Cell Electric Service Option
This option is for a customer qualifying for the Fuel Cell Service Option pursuant to General Information Section 13 of this Schedule and taking service under S.C. No. 8.
16. Micro-Hydroelectric Service Option
This Option is for a customer qualifying for the Micro-Hydroelectric Service Option pursuant to General Information Section 13 of this Schedule and taking service under S.C. No. 8.
17. Community Distributed Generation Service Option
This Option is for a customer qualifying for the Community Distributed Generation Service Option pursuant to General Information Section 13 of this Schedule and taking service under S.C. No. 8.
18. Serve New Governmental Entities
Participants in the NYPA Program shall be subject to the otherwise applicable standard service classification rates, including the Transition Charge (Non-Bypassable Charge), Bill Issuance Charges, if applicable, in accordance with the standard ESS rates for this Service Classification. All customers are also required to pay the System Benefits Charges, and Rate Adjustment Mechanism in accordance with the standard ESS rates for this Service Classification.
PDF page 398
PSC No: 19 - Electricity
Leaf No. 204.3
Rochester Gas and Electric Corporation
Revision: 3
Initial Effective Date: October 17, 2025
Superseding Revision: 2
Issued in compliance with Order in Case No. 22-E-0236, dated October 17, 2024.
ISSUED BY: Patricia Nilsen, Chief Executive Officer, Rochester, New York
SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE
19. Electric Vehicle Phase-In Rate
An eligible customer may elect to participate in the Electric Vehicle Phase-In Rate pursuant to General Information Section 19 of this Schedule subject to the provisions and eligibility requirements therein.
PDF page 399
PSC No: 19 - Electricity
Leaf No. 204.4
Rochester Gas and Electric Corporation
Revision: 7
Initial Effective Date:
August 1, 2011
Superseding Revision: 5
Issued in compliance with Order in Case 09-E-0717 issued and effective May 20, 2011 ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)
Reserved For Future Use
PDF page 400
PSC No: 19 - Electricity
Leaf No. 204.5
Rochester Gas and Electric Corporation
Revision: 4
Initial Effective Date: August 1, 2011
Superseding Revision: 2
Issued in compliance with Order in Case 09-E-0717 issued and effective May 20, 2011 ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)
Reserved For Future Use
PDF page 401
PSC No: 19 - Electricity
Leaf No. 204.6
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: August 1, 2011
Superseding Revision: 1
Issued in compliance with Order in Case 09-E-0717 issued and effective May 20, 2011 ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)
Reserved For Future Use
PDF page 402
PSC No: 19 - Electricity
Leaf No. 204.7
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: August 1, 2011
Superseding Revision: 1
Issued in compliance with Order in Case 09-E-0717 issued and effective May 20, 2011 ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 8
LARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)
Reserved For Future Use
PDF page 403
PSC No: 19 - Electricity
Leaf No. 205
Rochester Gas and Electric Corporation
Revision: 7
Initial Effective Date: January 1, 2007
Superseding Revision: 6
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York Reserved for Future Use
PDF page 404
PSC No: 19 - Electricity
Leaf No. 205.1
Rochester Gas and Electric Corporation
Revision: 1
Initial Effective Date: January 1, 2007
Superseding Revision: 0
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York Reserved for Future Use
PDF page 405
PSC No: 19 - Electricity
Leaf No. 206
Rochester Gas and Electric Corporation
Revision: 6
Initial Effective Date: January 1, 2007
Superseding Revision: 5
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York Reserved for Future Use
PDF page 406
PSC No: 19 - Electricity
Leaf No. 207
Rochester Gas and Electric Corporation
Revision: 4
Initial Effective Date: January 1, 2007
Superseding Revision: 3
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York Reserved for Future Use
PDF page 407
PSC No: 19 - Electricity
Leaf No. 208
Rochester Gas and Electric Corporation
Revision: 1
Initial Effective Date: January 1, 2007
Superseding Revision: 0
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York Reserved for Future Use
PDF page 408
PSC No: 19 - Electricity
Leaf No. 209
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: January 1, 2007
Superseding Revision: 1
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York Reserved for Future Use
PDF page 409
Rochester Gas and Electric Corporation Service Classification 14: Standby Service Otherwise Applicable Service Class 8
PDF page 410
PSC No: 19 - Electricity
Leaf No. 237
Rochester Gas and Electric Corporation
Revision: 5
Initial Effective Date: January 1, 2024
Superseding Revision: 4
Issued in compliance with Order in Case 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE
APPLICABLE TO USE OF SERVICE FOR:
1. Delivery of Standby Service for any customer where all or a portion of a customer's electricity is supplied from On-
on facility that does not provide electricity supply to
(defined as the distribution and/or transmission system, regardless of voltage or functional classification). An native load, to sell in the wholesale market or to carry out a combination thereof. Such OSG may be connected with the Company
-
throw switch (or similar device). For customers with multiple electrical services, this tariff applies to each of not electrically isolated from the OSG. All separately metered
electricity supply and/or delivery service not otherwise served by the OSG (e.g., separate delivery service to the shall be provided under the
Classification, Service Classification Nos. 1, 2, 3, 7, and 8 qualify as OASCs). This service classification shall apply to a customer that installs stand-alone storage, or storage paired with non-renewable OSG, with a maximum inverter capability greater than 1 MW.
2. Before a customer is allowed to install and operate an OSG, the customer must submit design and operating information for the proposed OSG in accordance with the appropriate application and review process described -01 Requir
-
A customer operating OSG with a total nameplate rating equal to, or expected to be equal to, 15% or less of its maximum potential demand served by all sources, as that maximum potential demand is reasonably determined by the Company, shall take service under the OASC unless the customer opts to take service under this classification. RG&E may disqualify a customer from Standby Service if the Company can demonstrate that the customer (a) has installed OSG with a total nameplate rating greater than 15% of its load, but (b) has not A customer who declines service under this tariff is required to electrically isolate its facility from the Co
shall not be required to maintain electric delivery service to that
shall
w.
PDF page 411
PSC No: 19 - Electricity
Leaf No. 238
Rochester Gas and Electric Corporation
Revision: 0
Initial Effective Date: February 1, 2004
Superseding Revision:
In compliance with order in Case 02-E-0551, Establishing Electric Standby Rates, Issued and Effective July 29, 2003 ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
Electrically Isolated Loads:
If a customer elects to electrically isolate and serve its load with OSG without connection to the Company's system, the isolated portion of that customer's load will not be subject to Standby Service -- provided that the customer executes a letter agreement with the Company that provides for the following:
a) the Company will be entitled to inspect the electrical configuration of the OSG facilities upon a customer's request for this exemption;
b) if, at any time, the Company has a reasonable concern that the customer’s OSG facilities have not remained isolated from the Company's system, the Company is authorized to inspect the electrical configuration of such facilities, and the customer must cooperate with that inspection; and
c) if the Company discovers, through billing data and/or the inspection of the customer's OSG facilities, that any of the electrically isolated OSG facilities have been reconnected to RG&E’s system, the Company will backbill the customer. A Contract Demand will be established by the Company and the backbill will consist of RG&E’s Standby Service rates, applied back to the time of OSG
interconnection to RG&E’s system, and include the surcharge as set forth below in the Unauthorized OSG Interconnection by Customer section, with Late Payment Charges as applicable, set forth in the Terms of Payment section of this Service Classification.
A facility shall be considered “electrically isolated” if: (a) the electrical points of contact where interconnection with the Company could occur are separated and at least 100 feet from any other interconnected electrical service utilized by such customer, or (b) the isolated service is not within the same building or structure as any other interconnected electrical service of the customer and not housed within a common enclosure with other interconnected breakers and/or fuses of the customer. At its discretion, the Company may consider a separation of less than 100 feet between a customer’s facilities and the Company’s system to be electrically isolated if there are site-specific configuration circumstances warranting such a determination.
Compliance:
A customer taking Standby Service shall comply with all federal, state and local laws, regulations, and requirements, including the requirements listed below in the Interconnection Requirements paragraphs 1 through 7.
PDF page 412
PSC No: 19 - Electricity
Leaf No. 239
Rochester Gas and Electric Corporation
Revision: 10
Initial Effective Date: January 1, 2024
Superseding Revision: 9
Issued in compliance with Order in Case 15-E-0751, dated October 13, 2023.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
STANDBY SERVICE IS NOT APPLICABLE TO:
1a. Net Metered Solar Generating System Option
Standby service will not apply to a customer operating solar generating equipment and taking service under General Information Section 13.
1b. Farm Waste Electric Generating System Option
Standby service will not apply to a customer taking service under the Farm Waste Electric Generating System Option, provided such customer meets criteria for service under General Information Section 13 of this Schedule.
1c. Net Metered Wind Generating System Option
Standby service will not apply to a customer operating wind generating equipment and taking service under General Information Section 13.
1d. Net Metered Hybrid Generating System Option
Standby service will not apply to a customer operating hybrid generating equipment and taking service under General Information Section 13.
2. Emergency Generators
Standby Service rates shall not apply to customers whose only generating units are emergency generators. For the purpose of this Service Classification, a generating unit must meet each of the following two criteria to be considered an emergency generator:
a) The emergency generator is used exclusively for purposes of supplying electrical power to the Customer when electrical power is not available from the Company.
b) No load is served by the emergency generator while electric service is available from the Company to the premises, except for regularly scheduled tests when the generator is required to operate under load Program or the Emergency Demand Response Program.
Excluding residential customers, the customer must submit a one-line diagram and specification sheet on the switch for the OSG for the Company
with the Company stating that the emergency generator shall not operate in parallel with th The customer shall maintain an operating log for each emergency generator indicating the date, time, hours, and purpose of each operation of each such facility. This log shall be made available to the Company upon request. Failure to do so shall permit the Company to (a) bill the customer under this Service Classification for the amount of Standby Service which the Company can reasonably estimate was delivered to and/or available to the customer during times when the Company did not charge the customer for such service due to this emergency generator exemption; and (b) establish a Contract Demand for one year, and thereafter as applicable. Standby Service rates shall not apply to that p
ery service associated with the delivery of
electricity supply pursuant to applicable NYPA programs.
4. Stand-Alone Energy Storage Systems
A customer with a stand-alone energy storage system enrolled with NYISO to charge for wholesale purposes will be billed pursuant to the Wholesale Distribution Service ( WDS ), at such time that the WDS tariff becomes effective, and shall not be subject to Standby Service rates.
PDF page 413
PSC No: 19 - Electricity
Leaf No. 240
Rochester Gas and Electric Corporation
Revision: 12
Initial Effective Date: June 1, 2023
Superseding Revision: 11
Issued in compliance with Order in Case No. 19-E-0079, dated May 18, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
OPTIONAL STANDBY SERVICE RATE IS APPLICABLE TO:
1. Existing Customers
and wholesale generators (defined as companies whose primary business is the production of electricity for sale into the wholesale electricity market)) or who:
a) had commenced construction of an OSG facility;
b) had been named by the New York State Energy Research and Development Authority ("NYSERDA") as an OSG project grant recipient as listed in the Commission Order Establishing Electric Standby Rates, issued and effective July 30, 2003, Attachment A, paragraph 4;
c) had been named by NYSERDA as an OSG feasibility study grant recipient, as listed in the Commission Order Establishing Electric Standby Rates, issued and effective July 30, 2003, Attachment A, paragraph 4; or
d) had received a binding, written financial commitment from a lending institution for the construction and installation of an OSG.
To remain qualified as an Existing Customer, the customer must commence operation of its OSG by May 31, 2021.
2. A Designated Technology Customer is defined as:
a) A customer operating OSG that exclusively uses one or more of the following technologies and/or fuels for producing electricity: solar thermal; photovoltaics ( PV ); on land and offshore wind; hydroelectric; geothermal electric; geothermal ground source heat; tidal energy; wave energy; ocean thermal;, or
b) Uses small, efficient types of combined heat and powe
not exceed 15 MW of
capacity and is operational prior to May 31, 2021, and conforms with the following criteria:
i. ii. Annual overall efficiency should not be less than 60% based on the higher heating value (HHV) of the fuel input;
iii. The usa
usable annual energy output;
iv. The size limits shall be determined by aggregating the nameplate ratings of the generation units, installed at its location, excluding emergency generation units used only during a utility distribution system failure or in response to the NYISO Emergency Demand Response Program:
v. An eligible CHP facility shall demonstrate to the utility that its generation installation meets an environmental standard of no more than 4.4 lbs./MWh of Noxemissions, based on its electrical and mechanical output or its rated capacity, or as updated by the Department of Environmental Conservation (DEC);
vi. Customers shall comply with the above criteria and;
1. Monitor and record efficiency data,
2. Have records available for utility inspection,
3. Retain the records for a 3-year period.
4. An additional meter will be required for CHP generating facilities greater than 1 MW. The customer shall be required to install, at their expense, revenue grade, interval meters to measure generation output and additional telemetry equipment capable of transmitting operational information to the Company; or
c) A customer operating electric energy storage with a maximum inverter capability of up to and including 1 MW; or
d) A customer operating fuel cell units which utilize biofuels or hydrogen, provided that the manufacture or production of such fuels does not include the combustion or electrolysis of fossil fuels, or the use of fossil fuels or non-renewable grid power in the conversion process.
i. Biomass, Biogas and Fuel cells which utilize fossil fuel resources installed prior to June 1, 2023 shall remain exempt in accordance with the customer s election. Biomass, Biogas and Fuel cells which utilize fossil fuel resources installed on or after June 1, 2023 are not eligible for the Designated Technologies Exemption.
PDF page 414
PSC No: 19 - Electricity
Leaf No. 240.1
Rochester Gas and Electric Corporation
Revision: 0
Initial Effective Date: January 19, 2024
Superseding Revision:
Issued in Compliance with Order in Case No. 22-E-0236, dated November 20, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
OPTIONAL STANDBY SERVICE RATE IS APPLICABLE TO
:
2. A Designated Technology Customer is defined as
:
e) A customer operating electric energy storage in conjunction with electric vehicle charging station(s) with inverter capability greater than 1 MW and less than or equal to the sum of nameplate electric vehicle charging capability.
PDF page 415
PSC No: 19 - Electricity
Leaf No. 241
Rochester Gas and Electric Corporation
Revision: 11
Initial Effective Date: January 1, 2024
Superseding Revision: 10
Issued in compliance with order in Case No. 15-E-0751, issued and effective October 13, 2023. ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
3. Designated Technology Exemption of Standby Rates
a) Customers whose facilities are placed in service after July 29, 2003, and meet the definitions of both Existing Customers and Designated Technology Customers, shall be considered to be Designated Technology Customers for purposes of this section.
b) Designated Technology Customers whose facilities are placed in service after July 29, 2003, have the option to make a one-time election to be permanently exempt from standby service rates rather than electing full standby service rates upon providing 30 days written notice before commencing operation of the OSG facility.
c) Existing OSG projects that upgrade by installing designated technology components, or hybrid projects comprised in part of designated technology components, are eligible for the designated technology exemption only for the upgrade components and only if those components are separately metered. CHARACTER OF SERVICE:
Continuous, Alternating Current - 60 cy
PDF page 416
PSC No: 19 - Electricity
Leaf No. 242
Rochester Gas and Electric Corporation
Revision: 22
Initial Effective Date: June 1, 2026
Superseding Revision: 20
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
RATES:
An existing customer that taking service pursuant to this Service Classification as of January 1, 2024, shall be phased-in to the Redesigned Rates over a five-year period as described below for each year.
A customer may make a one-time election to take service at the Redesigned Rates in lieu of the phase-in. Such election shall be provided by the customer to the Company in writing. Once a customer has elected to take service at the Redesigned Rates, the customer may not return to the phase-in.
An existing customer that elects the phase-in shall be billed on the percentage basis shown below using the Prior Rates and the Redesigned Rates for each year:
Prior Rates
Redesigned Rates
Year 1
83.3%
16.7%
Year 2
66.6%
33.4%
Year 3
49.9%
50.1%
Year 4
33.2%
66.8%
Year 5
16.5%
83.5%
At the conclusion of Year 5, a customer shall be subject to the Redesigned Rates.
Delivery Charges:
The rate components of the delivery portion of this service: Customer Charge, Bill Issuance Charge, Contract Demand Charge, Reactive Charge, and As-Used Demand Charge.
1. Per customer, per month.
Customer Charge
Effective: 6/1/2026
Customer's OASC:
Prior Rates
Redesigned Rates
S.C. No. 1
$23.00
$23.00
S.C. No. 2
$23.00
$23.00
S.C. No. 3
$401.00
$401.00
S.C. No. 7
$162.00
$162.00
S.C. No. 8 - Secondary
$1,725.00
$1,725.00
S.C. No. 8 - Substation
$3,875.00
$3,875.00
S.C. No. 8 - Primary
$2,175.00
$2,175.00
S.C. No. 8 - Sub Transmission-Industrial
$4,300.00
$4,300.00
S.C. No. 8 - Sub Transmission-Commercial
$4,050.00
$4,050.00
S.C. No. 8 - Transmission
$6,400.00
$6,400.00
PDF page 417
PSC No: 19 - Electricity
Leaf No. 242.0
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
RATES:
1. (Cont’d)
Reserved for Future Use
PDF page 418
PSC No: 19 - Electricity
Leaf No. 242.1
Rochester Gas and Electric Corporation
Revision: 10
Initial Effective Date: June 1, 2026
Superseding Revision: 8
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
RATES:
Delivery Charges: (Cont’d):
Reserved for Future Use
PDF page 419
PSC No: 19 - Electricity
Leaf No. 242.2
Rochester Gas and Electric Corporation
Revision: 10
Initial Effective Date: June 1, 2026
Superseding Revision: 8
Issued in Compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
RATES:
Delivery Charges: (Cont’d):
2. Contract Demand Charge:
The Contract Demand Charge is determined by multiplying the Customer’s Contract Demand times the Contract Demand rate.
Contract Demand
Prior Rates
Redesigned Rates
Customer's OASC:
Effective: June 1, 2026
Contract Demand
Charge,
per kW of Contract
Demand*
Contract Demand
Charge,
per kW of Contract
Demand
SC No. 1*
$25.00
$6.22
SC No. 2*
$23.93
$6.47
SC No. 3
$10.21
$4.32
SC No. 7
$12.47
$3.18
SC No. 8 - Secondary
$8.84
$1.08
SC No. 8 - Substation
$6.21
$0.00
SC No. 8 - Primary
$7.42
$3.73
SC No. 8 - Sub Transmission-Industrial
$2.02
$1.17
SC No. 8 - Sub Transmission-Commercial
$2.00
$1.91
SC No. 8 - Transmission
$9.43
$2.41
* Contract Demand Charge for Prior Rates is per customer, per month
PDF page 420
PSC No: 19 - Electricity
Leaf No. 242.3
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No.25-E-0379, dated May 14, 2026. ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
RATES:
Delivery Charges: (Cont’d):
Reserved for Future Use
PDF page 421
PSC No: 19 - Electricity
Leaf No. 243
Rochester Gas and Electric Corporation
Revision: 18
Initial Effective Date: August 12, 2016
Superseding Revision: 17
Issued in compliance with Order in Case 15-E-0285 dated June 15, 2016.
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
Delivery Charges: (Cont’d):
Reserved for Future Use
PDF page 422
PSC No: 19 - Electricity
Leaf No. 243.1
Rochester Gas and Electric Corporation
Revision: 17
Initial Effective Date: June 1, 2026
Superseding Revision: 15
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
Delivery Charges: (Cont’d):
3. As-Used Demand Charge:
Daily As-Used Demand Charge for customers with interval metering, on-peak kW, per kW of daily metered demand.
Prior Rates
OASC
SC No. 3
SC No. 7
SC No. 8
$0.54045
$0.17684
Secondary
$0.58368
Substation
$0.28982
Primary
$0.61041
Sub Trans- Industrial
$0.67693
Sub Trans – Commercial
$0.72874
Transmission
$0.14209
Redesigned Rates
Daily As-Used Demand Charge, per kW of daily metered demand, during On-Peak and Super-Peak hours, as applicable.
On-Peak:
OASC
SC No. 3
SC No. 7
SC No. 8
$0.64635
$0.67920
Secondary
$0.66614
Substation
$0.44363
Primary
$0.55341
Sub Trans-
Industrial
$0.48723
Sub Trans –
Commercial
$0.59360
Transmission
$0.35968
Super-Peak:
OASC
SC No. 3
SC No. 7
SC No. 8
$1.29269
$1.35841
Secondary
$1.33228
Substation
$0.88727
Primary
$1.10682
Sub Trans-
Industrial
$0.97446
Sub Trans –
Commercial
$1.18720
Transmission
$0.71935
PDF page 423
PSC No: 19 - Electricity
Leaf No. 243.1.1
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
Reserved for Future Use
PDF page 424
PSC No: 19 - Electricity
Leaf No. 243.2
Rochester Gas and Electric Corporation
Revision: 9
Initial Effective Date: June 1, 2026
Superseding Revision: 7
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
Daily As-Used Demand Charge for customers without demand metering.
Prior Rates:
Delivery
Effective Date
June 1, 2026
OASC:
SC No. 1
SC No. 2
$0.04533
$0.03800
Redesigned Rates:
Daily As-Used Demand Charge, per kW of daily metered demand, during On-Peak and Super-Peak hours, as applicable.
Delivery
Effective Date
June 1, 2026
OASC:
SC No. 1
SC No. 2
On-Peak
$0.17219
$0.21087
Super-Peak
$0.34438
$0.42174
4. Non-Bypassable Charge (“NBC”):
All kWh, per kWh
Per TCS Statement.
Rate Periods:
Prior Rates
Existing Customers that were taking service as of October 13, 2023:
On-Peak hours are defined for kW, kWh, and Daily As-Used Demand as the hours between 7:00 a.m. and 11:00 p.m., Monday through Friday. All remaining hours are defined as “Off-Peak” hours.
Redesigned Rates
On-Peak hours are defined for kW and kWh as the hours between 7:00 a.m. and 11:00 p.m., Monday through Friday. All remaining hours are defined as “Off-Peak” hours.
For As-Used Demand:
Summer Super-Peak hours
2:00 pm - 5:59 pm on
Non-Holiday Weekdays
Summer months are June, July,
August, and September
Summer On-Peak hours
7:00 am - 1:59 pm and
6:00 pm – 10:59 pm on
Non-Holiday Weekdays
Non-Summer months are October,
November,
December, January, February, March,
April, and May
Non-Summer On-Peak hours
7:00 am – 10:59 pm on
Non-Holiday Weekdays
Off-Peak hours
All other hours
including Holidays*
* Holidays are New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
PDF page 425
PSC No: 19 - Electricity
Leaf No. 243.3
Rochester Gas and Electric Corporation
Revision: 0
Initial Effective Date: January 1, 2024
Superseding Revision:
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
REACTIVE CHARGE:
Reactive kilovolt-ampere hours, per billing reactive kilovolt-ampere hour:
$0.00127
MERCHANT FUNCTION CHARGE (MFC):
All kW hours, per kWh
Per MFC Statement, as described in Rule 12
SYSTEM BENEFITS CHARGE:
Each customer bill for service under this Service Classification shall be increased by multiplying all kWh delivered by the applicable System Benefits Charge rate shown in the System Benefits Charge Statement as mandated by Public Service Commission Order issued January 26, 2001.
-
The EV Surcharge shall be applied per kWh delivered under this Service Classification, (as explained in this Schedule General Information Rule 33). The rate shall be set forth on the EVMR Statement.
PDF page 426
PSC No: 19 - Electricity
Leaf No. 244
Rochester Gas and Electric Corporation
Revision: 17
Initial Effective Date: January 1, 2025
Superseding Revision: 16
Issued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
MINIMUM CHARGE:
The minimum charge per month for service under this Service Classification is the Contract Demand Charge if applicable, plus the Customer Charge and Bill Issuance Charge, if applicable, as listed above.
A customer taking service under this Service Classification shall be subject to a Revenue Decoupling Mechanism adjustment (as explained in this Schedule, General Information Section 4.K.). See RDM Statement.
A customer billed at OASC as provided in this Service Classification shall be subject to a Revenue Decoupling Adjustment (as explained in this Schedule, General Information Section 7).
See RDM Statement.
The RDM Adjustment for the
shall apply.
The RAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in in this Schedule General Information Rule 24). See RAM Statement.
EARNINGS ADJUSTMENT MECHANISM (EAM):
The EAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in this Schedule General Information Rule 4.K). The rate shall be set forth on the EAM Statement. NON-WIRES ALTERNATIVE (NWA) SURCHARGE:
The NWA Surcharge shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in this Schedule General Information Rule 32). The rate shall be set forth on the NWA Statement. RECOVERY CHARGE
The Recovery Charge shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in this Schedule General Information Rule 41). The rate shall be set forth on the Recovery Charge Statement.
INCREASE IN RATES AND CHARGES:
The rates and charges under this Service Classification, including any adjustments and minimum charge, are increased by the applicable effective percentage shown in Rule 4.J of this Schedule for service supplied within the municipality where the Customer is taking service.
TERMS OF PAYMENT:
Bills rendered under this Service Classification are payable on receipt. A late payment charge of 1½% per month shall be billed on all amounts not paid by the "past due" date. For additional information, see Rule 4, Metering and Billing, of this Schedule.
TERM:
A minimum of one year and thereafter until terminated by 60 days written notice.
DETERMINATION OF DEMAND:
Contract Demand:
A customer shall have the option of accepting a Contract Demand established by the Company or of establishing its own Contract Demand in accordance with this tariff. Without regard to which party sets the customer's Contract Demand, upon the occurrence of an exceedence, the Contract Demand shall be ratcheted up by the amount of the exceedence.
PDF page 427
PSC No: 19 - Electricity
Leaf No. 245
Rochester Gas and Electric Corporation
Revision: 4
Initial Effective Date: January 1, 2024
Superseding Revision: 3
Issued in compliance with Order in Case 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
1. Company Set Contract Demand (Cont d)
Where a customer elects to have the Company establish the Contract Demand, that customer shall not incur a surcharge if that Contract Demand is exceeded except as described in this tariff. A customer shall be obligated to inform the Company in writing prior to the installation or removal of equipment, or any change in operation, that can be reasonably expected to change in a material fashion (defined as a change of more 12.5%) the capacity required to deliver electricity to the customer. If the customer fails to provide such notice, and the customer exceeds the Company-established Contract Demand, the Company shall have the right to include a surcharge in the customer's bill equal to the product of the applicable Contract Demand charge, the amount of the exceedence, and the number of billing periods from and including the billing period in which the customer first commenced taking Standby Service from the Company at the understated Contract Demand, i.e., the billing period in which the customer installed the equipment or changed the operation that caused the exceedence (as demonstrated by the customer to the Company in writing), to the billing period that includes the date of the exceedence. If the customer fails to demonstrate in writing when it installed such equipment or changed such operation, then the Company shall apply the surcharge from the first billing period in which the customer commenced taking Standby Service from the Company.
2. Customer Set Contract Demand
Upon prior written notice to the Company, a customer may revise its Contract Demand upward at any time. A customer that sets its own Contract Demand may revise its Contract Demand downward by written notice to the Company once every 12 months. The new Contract Demand level cannot be set at a level lower than the highest demand achieved in the previous 12 months unless the customer demonstrates in writing to the Company's reasonable satisfaction that electricity-consuming equipment is removed or disabled in place. The Company shall have the right to inspect the premises of a customer upon reasonable notice and at reasonable times in order to confirm that such energy-consuming equipment has been so removed or disabled.
Where a customer elects to establish its own Contract Demand, and (a) an exceedence of more than 0% but less than 10% occurs, a surcharge shall apply to the current monthly bill equal to 12 times the sum of the monthly Contract Demand charges calculated for the excess demand, (b) an exceedence of 10% or more but less than 20% occurs, a surcharge shall apply to the current monthly bill equal to 18 times the sum of the monthly Contract Demand charges calculated for the excess demand, and (c) an exceedence of 20% or more occurs, a surcharge shall apply to the current monthly bill equal to 24 times the sum of the monthly Contract Demand charges calculated for the excess demand.
Where a new customer installs OSG, or an Existing Customer installs new OSG, during a two year period commencing February 1, 2004, one exceedence in the first year of OSG operation of less than 10% in magnitude would be excused from any surcharge. For purposes of this paragraph, the OSG shall be deemed to have commenced operation when the OSG
PDF page 428
PSC No: 19 - Electricity
Leaf No. 246
Rochester Gas and Electric Corporation
Revision: 9
Initial Effective Date: January 1, 2024
Superseding Revision: 8
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
As-Used Demand:
1.The as-used demand for customers with interval metering shall be the aggregate of the highest daily 30- minute integrated demand (measured in kW) occurring during the On-
data acquisition that results in the failure to record daily as-used demand data, the Company reserves the right to estimate reasonable values for the missing data for recording and billing purposes. 2.The as-used demand, for customers without demand metering, and not billed at the OASC shall be the monthly metered kilowatt hours.
METERING AND COMMUNICATION REQUIREMENTS:
1. A customer with OSG and is demand-metered with 50 kW or more of Contract Demand shall be required to have interval metering and remote meter reading capability. Such customers will be responsible for the following:
a) the incremental costs of interval metering equipment and its installation;
b) the costs of providing remote meter reading capability through telecommunications to and from the meter; and
c) the costs associated with resolution of any problems with the telecommunications provider, including reimbursing the Company for any expenses the Company incurs.
2. A customer who provides telecommunications to the meter shall be responsible for all costs associated with the installation, operation and maintenance of the telecommunications line, including but not limited to, all telecommunications service bills.
If the Company is unable to read the meter through a customer provided connection, and the Company has determined that the problem is not caused by the Company's equipment, the customer shall be responsible for resolution of the problem. The customer shall also be responsible for reimbursement of Company expenses incurred for visits to the meter location to ascertain the cause of the problem. To the extent the Company installs an interval meter with telecommunication capability, the Company may assess the incremental fees to the customer.
PDF page 429
PSC No: 19 - Electricity
Leaf No. 246.1
Rochester Gas and Electric Corporation
Revision: 12
Initial Effective Date: December 1, 2020
Superseding Revision: 11
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:
Customers may select from two different Supply Service Options as described below. The Company shall offer a Retail Access rate choice and a Non-Retail Access rate choice.
The Retail Access choice (see below) is the ESCO Supply Service (ESS). The Non-Retail choice is the (see below) is the RG&E Supply Service (RSS).
The Company shall provide only delivery service for the Retail Access choice. Electricity supply is provided The Company shall provide delivery service and commodity service for the Non-Retail Access choice.
1. ESCO Supply Service (ESS)
This Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as described in Section 12.B, and a Bill Issuance Charge. Electricity supply is provided by an ESCO.
Delivery Rates are specified in the Delivery Charges section of this Service Classification.
PDF page 430
PSC No: 19 - Electricity
Leaf No. 246.2
Rochester Gas and Electric Corporation
Revision: 14
Initial Effective Date: December 1, 2020
Superseding Revision: 13
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS
2. RG&E Supply Service (RSS)
This Non-Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as described in Section 12.B., a Bill Issuance Charge, and a commodity charge that fluctuates with the market price of electricity and consists of energy, capacity, capacity reserves, losses, unaccounted for energy, ancillary services, NYPA Transmission Access Charge (NTAC), transmission project costs allocated to the Company under the NYISO tariff as approved by FERC. Electricity supply is provided by the Company.
Delivery Rates are specified in the Delivery Charge sections of this Service Classification. Electricity Supply Charge
Customers taking service under this RSS option must select from two different options for their electricity supply charge. One option is RSS
other option is Hourly Pricing, based on hourly metered usage, as described in (b) below.
(a) For RSS, the charge for electricity supply service shall fluctuate with the market price of electricity and shall include the following components: energy, capacity, capacity reserves, line losses, ancillary services, NYPA Transmission Access Charge (NTAC), transmission project costs allocated to the Company under the NYISO tariff as approved by FERC, Supply Adjustment Charge, and a Merchant Function Charge. Customers shall be charged for energy based on their class deemed load shape using day-ahead prices adjusted for losses. They shall be charged for capacity based on their class deemed contribution to peak using the monthly NYISO capacity auction price, including an appropriate adder for capacity reserve responsibility.
(b) Customers whose otherwise applicable service classification is S.C. No. 8 may elect to be served under the Hourly Pricing as described in detail below in Option 3
PDF page 431
PSC No: 19 - Electricity
Leaf No. 246.3
Rochester Gas and Electric Corporation
Revision: 11
Initial Effective Date: December 1, 2020
Superseding Revision: 9
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS
3. Hourly Pricing
Mandatory:
Once a customer qualifies for mandatory Hourly Pricing they shall remain subject to this provision until the Company determines their contract demand has been 200 KW or less for 12 consecutive months, at which time the customer shall be billed under another appropriate service classification.
Voluntary:
iod ending on or after September 22, 2012, Hourly Pricing is voluntary for any
customer who would otherwise qualify for service under Service Classification No. 8
Large General Service
Time of Use Rate and does not meet the phase in criteria listed above. Once a customer elects Hourly Pricing they shall remain on Hourly Pricing.
Pricing:
This Non-Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as described in Section 12.B, a Bill Issuance Charge, and a commodity charge that fluctuates with the market price of electricity as described in Section 12.C Electricity supply is provided by the Company. Delivery Rates are specified in the Delivery Charges section of this Service Classification.
PDF page 432
PSC No: 19 - Electricity
Leaf No. 246.4
Rochester Gas and Electric Corporation
Revision: 3
Initial Effective Date: April 1, 2017
Superseding Revision: 2
Issued in Compliance with Order in Case 15-E-0302, February 22, 2017.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS (Cont’d):
3. Hourly Pricing (Cont’d)
Reserved for Future Use
PDF page 433
PSC No: 19 - Electricity
Leaf No. 246.5
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: August 1, 2011
Superseding Revision: 1
Issued in compliance with Order in Case 09-E-0717 issued and effective May 20, 2011 ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
Reserved For Future Use
PDF page 434
PSC No: 19 - Electricity
Leaf No. 247
Rochester Gas and Electric Corporation
Revision: 5
Initial Effective Date: December 1, 2016
Superseding Revision: 4
Issued in compliance with Order in Case 16-E-0497 issued November 17, 2016.
ISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
The Customer is responsible for its appropriate share of any penalties incurred by the Company from the NYISO, or others, for unscheduled energy use. The penalties include, but are not limited to, congestion costs, marginal losses, and installed or unforced capacity deficiencies.
INTERCONNECTION REQUIREMENTS:
1. A customer may connect an OSG facility for parallel operation with the Company’s delivery system, or isolate for operation with Standby Service provided by a wholesale generator by means of a double throw transfer switch, or another transfer switching scheme acceptable to the Company.
2. A customer must complete an Application for Service and must operate in compliance with standards and requirements set forth in either the Distributed Generation Interconnection Requirements found in the SIR Addendum to this Schedule at Section II, “Interconnection Requirements” or RG&E’s Bulletin 86-01 In addition, customers must execute either the NYS Standardized Contract For Interconnection of New Distributed Generation Units With Capacity of 300 kVA or Less, or Farm Waste Generators of 2,000 kW of Less, to be Operated in Parallel (“SIR Contract”), as contained in the SIR Addendum to this Schedule, or the applicable contract.
PDF page 435
PSC No: 19 - Electricity
Leaf No. 248
Rochester Gas and Electric Corporation
Revision: 4
Initial Effective Date: May 1, 2017
Superseding Revision: 3
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
3. A customer and the Company shall agree as to the operating mode, interconnection and equipment specifications for the OSG facility pursuant to either a or b below, as may be amended or superseded:
a) the SIR Contract, or
-01.
4. A customer shall be responsible for all costs associated with its OSG interconnection as set forth in the requirements listed in paragraphs 3a or 3b above, as applicable.
5. Maintenance Schedules: A customer applying for Standby Service with a standby Contract Demand greater than 1000 kW is required to provide the Company with a schedule of OSG maintenance. A schedule must include the dates and times for the beginning and ending of all planned outages. A customer may revise the schedule one month shall not be allowed, unless the customer obtains Company approval. The annual provision of planned maintenance schedules by the customer shall take place on October 1 of each year for Standby Service for the following calendar year. Such schedule shall be utilized by the Company for planning functions. This provision does not take precedence with respect to any OSG maintenance provision in a power purchase agreement that may be in effect with the Company.
6. At the time of agreement, the customer with an OSG greater than 300 kVA, excluding Net Metered Farm Waste Generators less than 2,000 kW, may select the payment method for paying the Company operations and maintenance charges on the interconnection equipment paid for by the customer but owned by the Company. The customer may select to pay either the actual charges for maintenance, as they may occur, or the customer may total investment in such equipment. The operations and maintenance costs on such equipment is billed on a monthly basis pursuant to the applicable contract or agreement.
7. NAERC Guidelines: A customer taking Standby Service shall comply with all reliability criteria, guidelines, and procedures established by the North America
amended or superseded. Such compliance is necessary to ensure the continued reliability of North America's interconnected electric transmission electric systems.
UNAUTHORIZED OSG INTERCONNECTION BY CUSTOMER:
If a customer connects OSG to its electric system without: (a) notifying the Company; and (b) executing an appropriate Standby Service Application, and thereafter the Company discovers the interconnection, the Company shall backbill the customer for all Standby Service rendered subsequent to the estimated connection of such OSG. In preparing such backbills, the Company shall assess a Standby Service Contract Demand surcharge equal to two times that which would otherwise be computed under the Determination of Demand Provision, paragraph 1 (Company Set Contract Demand) of this Service Classification, and assume the standby Contract Demand had been inappropriately established at 0 kW.
PDF page 436
PSC No: 19 - Electricity
Leaf No. 249
Rochester Gas and Electric Corporation
Revision: 8
Initial Effective Date: June 1, 2021
Superseding Revision: 7
Issued in compliance with Order in Case 19-E-0079, dated May 14, 2021.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION:
(a) Demand Metered Customer With Less Than 50 kW of Contract Demand:
A customer with a Contract Demand of less than 50 kW without interval metering shall be billed at the OASC rate. A customer with a Contract Demand of less than 50 kW can choose to be served at the standby rate, provided that the customer pays all one-time and ongoing costs associated with the purchase and installation of an interval meter, Service Classification.
(b) Small Customer Exclusion:
Small customers, defined as those customers qualifying for service under Service Classification No. 1 Residential,
Service Classification No. 2 - Small General Service, or Service Classification No. 4
Residential Service
Time-of-Use Rate, shall be billed at the OASC rate instead of the Standby Service rate. This exemption shall be discontinued upon the date that 150 standby customers are billed under this provision, provided, however, that the discontinuance of this exemption shall not affect any customer that received the exemption prior to the date of discontinuance, which customers shall continue to receive the exemption until the conclusion of the phase-in l Standby Service Rate Phase-
(c) Power Factor Adjustment:
Applicable to customers not subject to a reactive charge, i
is so operated that the maximum kilovolt-amperes of lagging reactive demand exceed 48% of the maximum kW demand during the billing month, the Customer shall remedy that condition in a manner deemed adequate by the Company, by either:
1. Installing and maintaining at its own expense the power factor corrective equipment deemed necessary by the Company to remedy the condition, or
2. Making a cash contribution of the actual reasonable cost of any power factor corrective
equipment installed by the Company on its side of the point of delivery to affect such correction.
(d) Individually Negotiated Contracts:
1. Individual Agreements for Customers Considering Isolation
The Company is authorized to offer individually negotiated agreements for Standby Service to customers that may install back-up generation and disconnect their premises from the Company system in lieu of taking tariff Standby Service. The customer must document that it can physically, environmentally, and economically isolate from the Company's grid by installing and operating back-up generation at a lower cost than paying for Standby Service, and that such option is the alternative the customer shall select if the Company does not offer a negotiated rate alternative. At a minimum, the negotiated rate agreement must provide for recovery of the Company costs plus a reasonable contribution to the Company's recovery of its fixed costs. The Company shall respond to a customer application for a negotiated rate agreement within 90 days of its receipt with a negotiated rate agreement offer or a written explanation for its rejection of the application. Either party may seek from Staff a non-binding resolution of a dispute over the negotiation of such an individual rate agreement. In the event of a conflict between any provision of an agreement negotiated pursuant to this authority and any inconsistent provision of the Company Joint Proposal filed April 15, 2003 in Case 02-E-0551 or the standby rate provisions of the Company's tariff on the same subject, the provision of the negotiated agreement shall take precedence and control.
PDF page 437
PSC No: 19 - Electricity
Leaf No. 250
Rochester Gas and Electric Corporation
Revision: 9
Initial Effective Date: January 1, 2024
Superseding Revision: 8
Issued in compliance with Order in Case 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION
2. Individual Agreements for Customers Selling into the Wholesale Market
The Company is authorized to offer individually negotiated agreements for Standby Service with customers that sell into the market, or to a third party, no less than 90% of their site's energy output, net of station power requirements, from generators located on the site having a total name plate rating equal to or greater than 50 MW. The rates and charges negotiated shall reflect, where applicable, the characteristics of the specific interconnection arrangements, including, but not limited to, the voltage level of the interconnection, whether the interconnection is bi-directional, and the nature of the Company facility where the generator is interconnected with the Company system. The Company shall respond to a customer application for a negotiated rate agreement within 90 days of its receipt with a negotiated rate agreement offer or a written explanation for its rejection of the application. Either party may seek from Staff a non-binding resolution of a dispute over the negotiation of such an individual rate agreement. In the event of a conflict between any provision of an agreement negotiated pursuant to this authority and any inconsistent -E-0551 or the standby rate provisions of
control.
(e) Customers who qualify for the Recharge NY Power Program pursuant to Section 4.L.5 of the General Information Section of this Schedule, shall have such power billed in accordance with the provision therein, as provided in Section 4.L.5, the maximum metered demand will be used in the load share calculation for all standby customers. The customer's power requirements in excess of the RNY Power allocation shall be billed in accordance with the ESCO Supply Service rate or the RG&E Supply Service rate of this Service Classification.
(f) Reliability Credit
1. Standby Customers with OSG shall be provided an opportunity to earn credits against their contract demand charges. The credit would be earned by reliably reducing load below the contract demand over a defined Measurement Period. During the 5-year phase-in period the calculation of the Reliability Credit -in Contract Demand Charge. A customer that elects to
be billed at the new rates in lieu of the phase in shall no longer receive a Reliability Credit. The Reliability Credit will be phased out and completely eliminated effective January 1, 2029, for all customers.
2. For purposes of this Credit, the Measurement Period is weekdays from 7:00 am to 11:00 pm during the previous two consecutive full Summer periods; provided however, that the first year in which a Customer seeks a Credit, the Measurement Period is weekdays from 7:00 am to 11:00 pm during the previous full Summer period only. The Measurement Period shall exclude Outage Events, as selected by the Customer, as well holidays (i.e., Independence Day (observed) if it falls on a weekday and Labor Day). For purposes of this Credit, the Summer Period is June 1 through September 30.
3. Outage Events are up to three time blocks for each Summer Period that, in aggregate, are comprised of no more than five 24-hour time periods, excluding weekends and holidays. If a time block contains a time period of less than 24 hours, the time period shall be rounded up to the next 24 hours (i.e., the 24-hour periods cannot be applied on a partial basis). If a time block encompasses a holiday or weekend, the start of the 24-hour period on the day prior to the holiday or weekend until the same hour the next business day shall be considered to be a single 24-hour period.
PDF page 438
PSC No: 19 - Electricity
Leaf No. 251
Rochester Gas and Electric Corporation
Revision: 5
Initial Effective Date: December 1, 2020
Superseding Revision: 4
Issued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.
ISSUED BY: Joseph J. Syta, Vice President Controller and Treasurer, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION
(f) Reliability Credit
4. The Credit for any Measurement Period shall
multiplied by the Contract Demand Delivery Charge per kW that is in effect on October 1 of the year in which the Credit is determined. The Credit shall
commencing in November until the following October. If a customer is billed under Special Provision (g) of this Service Classification, the Outage Events for all Standby Supplied Accounts shall be the same and shall be specified by the Standby Generation Account. Each Standby Supplied
shall be calculated individually.
5. A customer seeking a Credit must request such credit by October 14 of each year for which the Credit is sought and, at the same time, specify the Outage Events the customer requests to be excluded from the measurement period. If October 14 falls on a weekend or holiday, the Company shall accept requests until the next business day. Prior to October 14, the Company shall notify customers of their need to request the applicable Credit.
6. Credits provided to standby customers shall be recovered from all customers, including standby customers, through the applicable Transition Charge.
7. A DER that receives compensation pursuant to Rule 26.B.Value Stack, for exports to the system, or a demand- metered customer without OSG that opts to select the applicable rates under this Service Classification in lieu of the rates under their OASC, are excluded from receiving the Reliability Credit.
i. A customer with grid-connected electric energy storage system or a DER that receives compensation pursuant to Rule 26.B. Value Stack, for exports to the system is excluded from receiving the Reliability Credit.
(g) Standby Offset
A customer with qualifying on-
m may use its excess
generation to supply two or more Standby Supplied Accounts as long as all of the requirements in this provision are met.
Definitions
Standby Generation Account: The customer meter where the generating equipment is located and interc
Standby Supplied Accounts: Additional meters billed under this standby service class designated by the Standby Generation Account for the application of excess generation that meet the Standby Supplied Account requirements listed below.
Eligibility
1. Standby Generation Account
a. The Standby Generation Account
but no more than 20 MW; and (ii) meet eligibility criteria for designation as
-E-
0551, except with respect to maximum generating capacity. The generating facility may have more than one generating unit so long as the aggregate nameplate rating conforms to (i) above
b. The Standby Generation Account must have interval metering and meet the interval metering and telecommunication requirements of this service class before they shall be eligible for the offset provision. The meter and tele
excess generation must be provided and maintained at the customer
expense, and must be operational
before the customer may take service under this provision.
PDF page 439
PSC No: 19 - Electricity
Leaf No. 252
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: July 1, 2019
Superseding Revision: 1
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION
(g) Standby Offset
Eligibility
1. Standby Generation Account
d) c.
All interconnection requirements of this service class must be met before an account shall be eligible for the offset provision. In addition, the interconnection must be technically and economically practicable, and the connection and operation of such facility shall not jeopardize the d. Accounts that are eligible for net metering, remote net metering, community net metering, standby exemption, NYPA allocations including RNY, or economic development rates are not eligible for this offset provision.
e. Each Standby Generation Account shall be billed with the applicable standby service rates in this service class.
f. Each Standby Generator Account is eligible for the supply options as described in this service class.
g. Customers that have a Standby Generation Account
Buy
Back service, Service Classification No. 5, if the export of the generating facility exceeds the aggregate registered kWh usage on the Standby Generation Accounts and the Standby Supplied Accounts.
2. Standby Supplied Accounts
The Standby Supplied Accounts designated by the Standby Generation Account customer must all be established in a single c
a. The Standby Generation Account and the Standby Supplied Accounts designated by the customer to receive the output of the generating facility may be established in two or more customer names
-
(1) at least one of the Standby Supplied Accounts must be in the same customer name as the Standby Generation Account (owner or operator of the generating facility or
) and
have a Contract Demand equal to 10% or more of the nameplate rating of the generating facility;
(2) the Sponsor shall be responsible for coordinating the interconnection and operation of the generating facility with the Company; and
(3) at the time of application under the Multi-Party Offset, the Sponsor must submit a signed application for all Standby Supplied Accounts to be
generating facility and a signed Percentage Allocation Form. Both forms shall be available on
PDF page 440
PSC No: 19 - Electricity
Leaf No. 252.1
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: January 1, 2024
Superseding Revision:
1
Issued in compliance with Order in Case 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION
(g) Standby Offset
Eligibility
2. Standby Supplied Accounts
b. The Standby Generation Account, and the Standby Supplied Accounts must all be located within a single
only
(1) more than one building
and/or parcel of land proximate to each other if there is common use, whether or not such All of the Standby Supplied
must be within the same load zone as determined by the Locational Based Market Price. The accounts of a customer whose buildings or parcels of land are not physically interconnected c
proximity and common Company facilities to the Company.
(2) Under Multi-
which each customer is connected to the generating facility by private thermal loop that delivers steam, hot water, or chilled water.
c. Each Standby Supplied Account shall have no other source of generation located on the premises and shall not participate under the provisions of remote net metering, net metering for customer generators, or Community Distributed Generation.
d. Each Standby Supplied Account and the export of the Standby Generation Account must be separately metered using Commission-approved, revenue grade, interval metering with communication systems.
e. Each Standby Supplied Account shall be billed with the applicable standby service rates in this service class.
f. Each Standby Supplied Account must have interval metering and meet the interval metering and telecommunication requirements of this service class before they shall be eligible for the offset provision. The meter and telecommunications for each Standby Supplied Account must be provided and maintained at the customer
expense, and must be operational before the customer
may take service under this provision.
g. Each Standby Supplied Account is eligible for the supply options as described in this service class.
PDF page 441
PSC No: 19 - Electricity
Leaf No. 253
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: July 1, 2019
Superseding Revision: 1
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION
(g) Standby Offset
Eligibility:
3. Billing Applicable to Each Standby Supplied Account
a. Customer Charge
The Customer Charge and meter charges for each account (the Standby Generation Account and the Standby Supplied Accounts) shall be equal to the customer and meter charges listed in this service class plus the additional Customer Charge listed below.
b. Contract Demand
The Contract Demand for each account (the Standby Generation Account and the Standby Supplied Accounts) shall be determined based on the maximum potential demand on the sources.
4. For Accounts Supplied under the Single Party Offset:
For purposes of this Offset Provision, the following definitions apply: Allocated As-
means, for each Standby Supplied Account supplied by the
excess generation, the demand registered on the Standby Supplied
Account
by the lower of: (a) 1 or (b) the ratio of the Standby Generating
excess generation measured in kWs to the sum of demands on the meters of all Standby Supplied Accounts.
means, for each Standby Supplied Account supplied by the Standby
excess generation, the demand registered on the
meter(s) multiplied by the lower of: (a) 1 or (b) the ratio of the
excess generation measured in kWhs to the sum of the kWhs registered on the meters of the Standby Supplied Accounts.
Allocated As-used Generator Demand and Allocated Generator Supply shall be determined for each 15-minute interval. Adjustments shall be made for transformation losses as applicable.
5. For Accounts Supplied under the Multi-Party Offset:
For purposes of this Offset Provision, the following definitions apply: -
Standby Supplied Account, the lower of:
(a) the demand registered on the Standby Supplied Account or (b) the demand registered on the Standby Supplied
lied by the Standby Supplied
Standby Supplied Account,
the excess amount shall not be redistributed to other accounts nor carried forward to the succeeding billing period.
PDF page 442
PSC No: 19 - Electricity
Leaf No. 253.1
Rochester Gas and Electric Corporation
Revision: 1
Initial Effective Date: July 1, 2019
Superseding Revision: 0
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Conroller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION
(g) Standby Offset
Eligibility:
5. For Accounts Supplied under the Multi-Party Offset
:
Standby Supplied Account, the lower of: (a) the total
kWhs registered on the Standby Supplied
kWhs registered on the
multiplied by the Standby Supplied
output multiplied by the Standby Supplied
kWhs registered on the Standby Supplied
meter(s), the excess amount shall be credited to the extent described in Service Classification 14, Special Provision (g)1.b.
that the Sponsor
has allocated to each Standby Supplied Account under the Multi-Party Offset. A single percentage shall be applied to both the Allocated As-Used Generator Demand and the Allocated Generator Supply.
The Percentage Allocations must total 100%, of which the Sponsor must establish: a. a Percentage Allocation of 10% or more to a single Standby Supplied Account in the b. a Percentage Allocation of no less than 5% or more than 90% to each additional Standby Supplied Account. The Standby Supplied Accounts and the Percentage Allocation to each must be assigned in writing by the Sponsor, using the Percentage Allocation Form, at least 30 days before commencing service under the Multi-Party Offset. The Percentage Allocations and the Standby Supplier Accounts may be changed as described on the form. No credits shall be applied if the Sponsor ceases to have a Standby Supplied Account or ceases to own or operate the generating facility. If a Standby Supplied Account is closed, its credits shall be
6. Each Standby Supplied Account shall be billed under Standby Service rates listed in this service class, as modified below:
a. An additional Customer Charge of $50.00 per account per billing period, shall be applicable to cover incremental billing and administrative costs associated with providing service under this provision.
b. The per-kWh delivery charges and adjustments described in this service class shall be applied to the total kWhs registered on
Supply for each 15-minute interval (adjusted for losses as applicable).
PDF page 443
PSC No: 19 - Electricity
Leaf No. 254
Rochester Gas and Electric Corporation
Revision: 3
Initial Effective Date: July 1, 2019
Superseding Revision: 2
Issued in compliance with Order in Case 15-E-0751, dated May 16, 2019.
ISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York SERVICE CLASSIFICATION NO. 14
STANDBY SERVICE (Cont'd)
SPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION
(g) Standby Offset
Eligibility:
6. Each Standby Supplied Account shall be billed under Standby Service rates listed in this service class, as modified below:
c. For each 15-
shall be
reduced by the Allocated Generator Demand for purposes of determining the daily maximum demand that is used for billing As-used Daily Demand Delivery Charges.
d. If the Customer purchases supply from the Company, the per-kWh supply charges and adjustments described in this service class shall be applied to the total kilowatthours h
15-minute interval (adjusted for losses as applicable).
7. The Allocated As-used Generator Demand and Allocated Generator Supply shall be assumed to be zero for time periods where there is insufficient interval data available to ascertain that the Generating Facility supplied output to any associated Standby Service account.
8. The Reactive Charge shall be calculated as described in this service class and shall not be adjusted by this provision.
(h) 1.
A customer that is not participating in Special Provision (f.) or Special Provision (g.) herein may opt to participate in Rule 26.B, Value Stack, with a qualifying generator (i.e. a CES Tier 1 eligible generator as provided in Rule 26.B.1.a.iii) for compensation of net hourly injections. The Company shall install appropriate metering capable of recording the net hourly consumption and injection for the customer. The customer shall be responsible for the cost of the meter, the installation, and any additional costs.
PDF page 444
Rochester Gas and Electric Corporation
Service Classification 15: Optional Demand Service Otherwise Applicable Service Class 8
PDF page 445
PSC No: 19 - Electricity
Leaf No. 255
Rochester Gas and Electric Corporation
Revision: 0
Initial Effective Date: January 1, 2024
Superseding Revision:
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE
APPLICABLE TO USE OF SERVICE FOR:
A customer without On Site Generation (OSG), or a customer that installs OSG with a total nameplate rating less than 15% of its load, may opt to take service pursuant to this service classification.
phased in approach at a future date consistent with Order issued on October 13, 2023, under Case No. 15-E-0751. CHARACTER OF SERVICE:
Continuous, Alternating Current -
A customer that installs OSG with a total nameplate rating less than 15% of its load shall comply with all federal, state and local laws, regulations, and requirements, including the requirements listed below in the Interconnection Requirements paragraphs 1 through 7.
RATE PERIODS:
Summer Super-Peak hours
From 2:00 pm until 6:00 pm
Summer months are June, July, August, and
September
Summer On-Peak hours
From 7:00 am until 2:00 pm and
From 6:00 pm until 11:00 pm
Non-Summer On-Peak hours
From 7:00 am until 11:00 pm
Non-Summer months are October,
November, December, January, February,
March, April, and May
Off-Peak hours
All other hours including
Holidays*
SUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:
Customers may select from two different Supply Service Options as described below. The Company shall offer a Retail Access rate choice and a Non-Retail Access rate choice.
The Retail Access choice (see below) is the ESCO Supply Service (ESS). The Company shall provide only delivery The Non-Retail choice is Hourly Pricing. The Company shall provide delivery service and commodity service for the Non-Retail Access choice.
1. ESCO Supply Service (ESS)
This Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as described in Section 12.B, and a Bill Issuance Charge. Electricity supply is provided by an ESCO and settled as described in Section 11.D.3. Delivery Rates are specified in the Delivery Charges section of this Service Classification.
2. Hourly Pricing
This Non-Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as described in Section 12.B, a Bill Issuance Charge, and a commodity charge that fluctuates with the market price of electricity as described in Section 25.I.C. Electricity supply is provided by the Company. Delivery Rates are specified in the Delivery Charges section of this Service Classification.
PDF page 446
PSC No: 19 - Electricity
Leaf No. 256
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE (Cont’d)
RATES:
Delivery Charges: The rate components of the delivery portion of this service: Customer Charge, Bill Issuance Charge, Contract Demand Charge, and Daily As-Used Demand.
1. Customer Charges
Per customer, per month.
Customer's OASC:
Effective Date
6/01/2026
SC No. 1
$23.00
SC No. 2
$23.00
SC No. 3
$401.00
SC No. 7
$162.00
SC No. 8 - Secondary
$1,725.00
SC No. 8 - Substation
$3,875.00
SC No. 8 - Primary
$2,175.00
SC No. 8 - Sub Transmission-Industrial
$4,300.00
SC No. 8 - Sub Transmission-Commercial
$4,050.00
SC No. 8 - Transmission
$6,400.00
Bill Issuance Charge (per bill): $0.99, as described in Rule 11.F
PDF page 447
PSC No: 19 - Electricity
Leaf No. 257
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE (Cont’d)
2. Contract Demand Charge: The Contract Demand Charge is determined by multiplying the Customer’s Contract Demand times the Contract Demand rate.
Effective Date
Customer's OASC:
6/01/2026
SC No. 1
$6.22
SC No. 2
$6.47
SC No. 3
$4.32
SC No. 7
$3.18
SC No. 8 - Secondary
$1.08
SC No. 8 - Substation
$0.00
SC No. 8 - Primary
$3.73
SC No. 8 - Sub Transmission-Industrial
$1.17
SC No. 8 - Sub Transmission-Commercial
$1.91
SC No. 8 - Transmission
$2.41
3. As-Used Demand Charge: Daily As-Used Demand Charge, on-peak kW or super-peak, per kW of daily metered demand.
Effective 6/01/2026
Customer's OASC:
On-Peak
Super-Peak
SC No. 1
$0.17219
$0.34438
SC No. 2
$0.21087
$0.42174
SC No. 3
$0.64635
$1.29269
SC No. 7
$0.67920
$1.35841
SC No. 8 - Secondary
$0.66614
$1.33228
SC No. 8 - Substation
$0.44363
$0.88727
SC No. 8 - Primary
$0.55341
$1.10682
SC No. 8 - Sub Transmission-Industrial
$0.48723
$0.97446
SC No. 8 - Sub Transmission-Commercial
$0.59360
$1.18720
SC No. 8 - Transmission
$0.35968
$0.71935
4. Non-Bypassable Charge:
All kWh
Per Transition Charge Statement.
REACTIVE CHARGE:
Reactive kilovolt-ampere hours, per billing reactive kilovolt-ampere hour: $0.00127
PDF page 448
PSC No: 19 - Electricity
Leaf No. 257.1
Rochester Gas and Electric Corporation
Revision: 2
Initial Effective Date: June 1, 2026
Superseding Revision: 0
Issued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026.
ISSUED BY: Lindsey N. Overton Orietas, Vice President – Regulatory, Rochester, New York SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE (Cont’d)
3. As-Used Demand Charge: (Cont’d)
Reserved for Future Use
PDF page 449
PSC No: 19 - Electricity
Leaf No. 258
Rochester Gas and Electric Corporation
Revision: 1
Initial Effective Date: January 1, 2025
Superseding Revision: 0
Issued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE
MERCHANT FUNCTION CHARGE ( MFC ):
All kW hours, per kWh, Per MFC Statement, as described in Rule 12
SYSTEM BENEFITS CHARGE
:
Each customer bill for service under this Service Classification shall be increased by multiplying all kWh delivered by the applicable System Benefits Charge rate shown in the System Benefits Charge Statement. -
The EV Surcharge shall be applied per kWh delivered under this Service Classification, (as explained in this Schedule General Information Rule 33). The rate shall be set forth on the EVMR Statement OASC (sub-classification) as provided in this Service Classification shall determine the applicable Revenue Decoupling Adjustment (as explained in this Schedule, General Information Section 7). See RDM Statement.
The RAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in in this Schedule General Information Rule 24). See RAM Statement.
EARNINGS ADJUSTMENT MECHANISM ( EAM) :
The EAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in this Schedule General Information Rule 4.K). The rate shall be set forth on the EAM Statement. NON-WIRES ALTERNATIVE ( NWA ) SURCHARGE:
The NWA Surcharge shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in this Schedule General Information Rule 32). The rate shall be set forth on the NWA Statement. RECOVERY CHARGE:
The Recovery Charge shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in this Schedule General Information Rule 41). The rate shall be set forth on the Recovery Charge Statement.
PDF page 450
PSC No: 19 - Electricity
Leaf No. 258.1
Rochester Gas and Electric Corporation
Revision: 0
Initial Effective Date: January 1, 2025
Superseding Revision:
Issued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE
MINIMUM CHARGE:
The minimum charge per month for service under this Service Classification is the Contract Demand Charge if applicable, plus the Customer Charge and Bill Issuance Charge, if applicable, as listed above. INCREASE IN RATES AND CHARGES:
The rates and charges under this Service Classification, including any adjustments and minimum charge, are increased by the applicable effective percentage shown in Rule 4.J of this Schedule for service supplied within the municipality where the Customer is taking service.
TERMS OF PAYMENT:
Bills rendered under this Service Classification are payable on receipt. A late payment charge of 1½% per month shall be billed on all amounts not paid by the "past due" date. For additional information, see Rule 4, Metering and Billing, of this Schedule.
TERM:
If a customer opts-in to this Service Classification, the customer shall remain on this Service Classification for a minimum of one year and thereafter until terminated by 60 days written notice.
PDF page 451
PSC No: 19 - Electricity
Leaf No. 259
Rochester Gas and Electric Corporation
Revision: 0
Initial Effective Date: January 1, 2024
Superseding Revision:
Issued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023
ISSUED BY: Jeremy J. Euto, Vice President
Regulatory, Rochester, New York
SERVICE CLASSIFICATION NO. 15
OPTIONAL DEMAND SERVICE RATE
DETERMINATION OF DEMAND:
1. Contract Demand:
For mass-market customers, the Company shall use the metered demand for the billing month of the first Contract Demand will increase. The Contract Demand will only be decreased if the Companies determine -billed customer, the Companies propose to
-month period for the first bill. Thereafter,
similar to the mass-market customers, if the metered demand increases, the Contract Demand will increase. changed.
2. As-Used Demand:
a) The as-used demand for mass market customers (a customer whose otherwise applicable service classification is non-demand billed) with interval metering will be sum of the highest daily 60- minute integrated demand (measured in kW) measured on the clock-hour occurring during the On-Peak hours as . For all other customers, the as-used demand for
customers with interval metering will be the aggregate of the highest daily 30- minute integrated demand (measured in kW) occurring during the On-Peak hours as defi
billing period. If in any billing period, there is a failure in the metered usage data acquisition that results in the failure to record daily as-used demand data, the Company reserves the right to estimate reasonable values for the missing data for recording and billing purposes.
METERING AND COMMUNICATION REQUIREMENTS:
a) A customer shall be required to have an Advanced Metering Infrastructure (AMI) meter as described in Rule 4.A.2), to be eligible for this service classification.
b) A customer that elects to opt-out of receiving an AMI meter pursuant to Rule 4.A.2), is ineligible to take service under this service classification.