ER27-513-000 · 2026-11-16 · Pacific Gas and Electric Company

Response to 11/16/2026, Show Cause Order of Pacific Gas and Electric Company

PDF page 1

1

UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION

Pacific Gas and Electric Company

Docket No.  EL26-71-000

NOTIFICATION OF SECTION 205 FILING

Pacific Gas and Electric Company (“PG&E”) hereby provides an update in this proceeding.

To ensure a complete record, PG&E reports that on November 16, 2026, it submitted a Section 205 filing responsive to the Order to Show Cause in Docket No. EL26-71-000, which was assigned a new docket number ER27-513-000, with eLibrary accession number 20261116-5257.

Respectfully submitted,

PACIFIC GAS AND ELECTRIC COMPANY

By:  /s/ John Perkins III

        JOHN PERKINS III

300 Lakeside Drive
Oakland, CA  94604
Telephone:  (501) 551-4036
E-mail:  John.Perkins@pge.com

Attorney for
PACIFIC GAS AND ELECTRIC COMPANY

PDF page 2

2

CERTIFICATE OF SERVICE
I hereby certify that I have on this day caused a copy of the foregoing document to be served upon all parties designated on the official service list in this proceeding in accordance with the requirements of Rule 2010 of the Commission’s Rules of Practice and Procedure.

Dated at Oakland, California, this 16th day of November, 2026.

 /s/ Gurjap Singh __
Gurjap Singh
Pacific Gas and Electric Company
FERC Electric Proceedings Dept.
300 Lakeside Drive
Oakland, California 94612-3534
E-mail: Gurjap.Singh@pge.com