Five malicious GGUF model repositories on Hugging Face (Mir2k, timdedid): delete the files and rotate browser-stored passwords
TL;DR #
Malspark reports five malicious GGUF model repositories on Hugging Face under the accounts Mir2k and timdedid, and the Hugging Face API showed all five as disabled on 2026-11-28. If you ran one, delete the file and rotate passwords saved in your browser, wallet extension credentials and anything else stored or typed on that machine.
Packages and versions #
| Ecosystem | Name | Bad versions | Clean version or action | Registry state (date checked) | Record |
|---|---|---|---|---|---|
| Hugging Face | Mir2k/Huihui-Qwen3.5-9B-abliterated-GGUF |
all, created 2026-11-22 | delete; no clean release | disabled (2026-11-28 15:23 UTC) | none |
| Hugging Face | Mir2k/Inkling-2-Mini-Uncensored-GGUF |
all, created 2026-11-24 | delete; no clean release | disabled (2026-11-28 15:23 UTC) | none |
| Hugging Face | timdedid/qwen3.8-cyber-uncensored |
all, created 2026-11-21 | delete; no clean release | disabled (2026-11-28 15:23 UTC) | none |
| Hugging Face | timdedid/qwen3-cyber-UNCENSORED-2 |
all, created 2026-11-22 | delete; no clean release | disabled (2026-11-28 15:23 UTC) | none |
| Hugging Face | timdedid/qwen3-cyber-UNCENSORED |
all, created 2026-11-21 | delete; no clean release | disabled (2026-11-28 15:23 UTC) | none |
| Ollama | timdedid/qwen3-1.7b-cyber, named by Malspark |
all | delete | not checked | none |
Malspark scanned 3,273,389 public model repositories on 2026-11-26 and counted 2,428 downloads of the five on 2026-11-27. It notes that Hugging Face counts downloads, not users. Its post said all five were online on 2026-11-27. The Hugging Face API listed 2,807 downloads across the five when read on 2026-11-28. Malspark's post is the only narrative source.
Am I affected? #
find ~ -name '*.gguf' 2>/dev/null | grep -iE 'Huihui-Qwen3.5-9B-abliterated|Inkling-2-Mini-Uncensored|qwen3.8-cyber-uncensored|qwen3-cyber'
ls ~/.cache/huggingface/hub 2>/dev/null | grep -iE 'Mir2k|timdedid'
ollama list 2>/dev/null | grep -i timdedid
The GGUF file names the API listed are Huihui-Qwen3.5-9B-abliterated-Q5_K_M.gguf, Inkling-2-Mini-Uncensored-Q4_K_M.gguf, qwen3.8-cyber-uncensored.gguf and qwen3-cyber-1.7b-Q4_K_M.gguf. Malspark publishes an open-source scanner, gguf-radar, that checks a file without running the model.
If you are affected #
- Delete the model files and remove them from LM Studio, Ollama and any internal model registry.
- Rotate passwords saved in Chrome, Edge or Brave, and wallet extension credentials. Malspark also lists any other credential stored on or typed into the machine.
- If the model ran inside an agent with tool access, follow if your local AI agent was exploited.
Prevention #
- Do not run a command that a model suggests without reading it.
- Malspark's advice for agents with tool access is to pass a reviewed chat template with
--chat-template-filein llama.cpp orTEMPLATEin an Ollama Modelfile. - Download models from publishers you can identify, and scan new files before they reach a developer machine. See the package vetting checklist.
Sources #
- Malspark, "Malicious GGUF models on Hugging Face", Düzgün, 2026-11-27, read 2026-11-28 through a summarizing fetch. The repositories, dates, download counts, runtimes, credential categories and remediation.
- Hugging Face API,
huggingface.co/api/models/<owner>/<name>for each of the five, read 2026-11-28 15:23 UTC. Creation dates,disabled: true, download counts, file names. - Hacker News item 50676752, 71 points on 2026-11-28. Where the sweep found the post.