MCP and agent CVE records 2026-11-26 to 11-27: Bagel, Crypto APIs MCP servers, bigcommerce-api-mcp, WhoDB, Pydantic Deep, SiYuan and four more
TL;DR #
VulnCheck published eleven CVE records for ten MCP servers and agent apps on 2026-11-26 and 2026-11-27. The fixes read on PyPI, npm and Docker Hub were uploaded between 2026-07-23 and 2026-11-26. CVE-2026-138028 says injected text can make Bagel's MCP server run commands, fixed in bagel-mcp 2.5.5. Three records cover servers that answered tool calls with no authentication when exposed over HTTP. Upgrade each package to the version in the table, or to the fix commit for Wazuh-MCP-Server.
What happened #
| Product, package | Id | Score, provider | Affected | Fix, registry date |
|---|---|---|---|---|
Bagel, PyPI bagel-mcp |
CVE-2026-138027 | 7.7 CVSS 4.0 and 7.5 CVSS 3.1, VulnCheck | before 2.5.5 | 2.5.5, PyPI 2026-11-15 |
Bagel, PyPI bagel-mcp |
CVE-2026-138028 | 7.7 CVSS 4.0 and 7.5 CVSS 3.1, VulnCheck | before 2.5.5 | 2.5.5, PyPI 2026-11-15 |
| bigcommerce-api-mcp | CVE-2026-138034 | 8.7 CVSS 4.0 and 7.5 CVSS 3.1, VulnCheck | 1.0.0 | 1.0.1 per the vendor advisory. Not an npm package. |
Pydantic Deep, PyPI pydantic-deep |
CVE-2026-137953 | 8.8 CVSS 4.0 and 8.6 CVSS 3.1, VulnCheck. Vendor page 7.5. | 0.2.18 to before 0.4.0 | 0.4.0, PyPI 2026-11-26 |
| SiYuan | CVE-2026-137469 | 7.7 CVSS 4.0 and 7.5 CVSS 3.1, VulnCheck | 3.7.0 to before 3.8.11 | 3.8.11 per the vendor advisory |
| Typebot | CVE-2026-138031 | 7.6 CVSS 4.0 and 6.8 CVSS 3.1, VulnCheck | 2.14.0 to before 3.19.0 | 3.19.0, Docker Hub tag 2026-09-14 |
| mcp-video-analyzer, npm | CVE-2026-138033 | 7.0 CVSS 4.0 and 6.1 CVSS 3.1, VulnCheck | 0.2.0 to before 0.10.1 | 0.10.1, npm 2026-09-05 |
Crypto APIs MCP servers, npm @cryptoapis-io/mcp-* |
CVE-2026-138026 | 6.9 CVSS 4.0 and 7.3 CVSS 3.1, VulnCheck | 14 packages, see below | 0.4.0, 0.5.0 or 0.2.0, npm 2026-09-24 |
WhoDB, npm whodb and @clidey/whodb-cli |
CVE-2026-138032 | 6.0 CVSS 4.0 and 5.3 CVSS 3.1, VulnCheck | 0.88.0 to before 0.132.0 | 0.132.0, npm 2026-09-29 |
| Wazuh-MCP-Server | CVE-2026-138029 | 5.3 CVSS 4.0 and 4.7 CVSS 3.1, VulnCheck | before commit 2bbfe12 | the commit. The record names no release. |
pdf-reader-mcp, npm @sylphx/pdf-reader-mcp |
CVE-2026-138030 | 2.3 CVSS 4.0 and 3.4 CVSS 3.1, VulnCheck | 2.4.1 to before 3.0.15, 3.0.16, 3.1.2 to before 3.2.0 | 3.2.0, npm 2026-07-23 |
All scores were read from the CVE records on 2026-11-28. Vendor pages were opened for Bagel, bigcommerce-api-mcp, Pydantic Deep and SiYuan. The other six products are described from their CVE records only.
Bagel #
Bagel is an MCP server for robotics logs. CVE-2026-138027 says its query_messages tool, annotated read-only, runs DuckDB SQL with no sandbox. The record says an attacker who injects text into recorded logs or topics can read and write files and make server-side requests. CVE-2026-138028 says the run_pipeline tool passes rsync options that run commands as the Bagel server process.
The vendor advisory covers both flaws. It was published on 2026-11-15, is labelled Critical with no score, and printed "No known CVE" when read on 2026-11-28. VulnCheck scores both records 7.7 with high attack complexity and user interaction. This file uses high because both paths need injected text to reach the model first.
Servers with no authentication over HTTP #
- bigcommerce-api-mcp 1.0.0. CVE-2026-138034 says the
/sseand/messagesroutes skipped the authentication check. A remote caller could read product, order and customer records with the operator's BigCommerce API key. The vendor advisory, published 2026-10-02, limits this to SSE mode on deployments that setMCP_AUTH_TOKEN. It says the server bound to all interfaces by default and that the exposed tools were read-only. The npm registry has no package namedbigcommerce-api-mcp. The 1.0.1 release tag in the repository was not opened. - Crypto APIs MCP servers. CVE-2026-138026 lists 14
@cryptoapis-io/mcp-*packages. Started with Streamable HTTP transport and--api-key, the server binds0.0.0.0and exposes/mcpwith no authentication. The record says callers can spend paid credits, read account data, redirect event subscriptions and delete HD wallet xPubs. Fixed versions are 0.5.0 formcp-blockchain-events,mcp-blockchain-fees,mcp-broadcastandmcp-prepare-transactions, 0.2.0 formcp-aml, and 0.4.0 for the other nine. npm shows the fixed versions of the seven packages queried uploaded on 2026-09-24. - Pydantic Deep. CVE-2026-137953 says the bundled DeepResearch FastAPI app exposes HTTP routes and a
/ws/chatWebSocket with no authentication. Callers can list sessions, read event logs and workspace files, drive the agent and delete sessions. The record describes a server "bound to all interfaces". The vendor advisory, published 2026-11-26, says the app binds to loopback by default and scopes the flaw to network-accessible deployments. It scores 7.5 with confidentiality impact only. The vendor page says to setDEEPRESEARCH_PASSWORDto require authentication.
SiYuan #
CVE-2026-137469 says the AI agent chat panel writes assistant replies into the page without sanitising HTML. The record says an attacker who influences a model reply, through indirect prompt injection or a configured model endpoint, can run OS commands in desktop local-kernel mode. The vendor advisory was published on 2026-11-11. It says remote-kernel mode applies a Content-Security-Policy and that local mode is the exposed configuration. It also says a saved session renders the markup again each time it is opened.
SSRF and write-guard bypasses #
- mcp-video-analyzer. CVE-2026-138033 says any
http(s)URL ending in a video extension was fetched, including loopback, private and cloud metadata addresses. The record says prompt injection can trigger it through tools such asget_frames. - WhoDB. CVE-2026-138032 says the MCP
whodb_querytool ran file-writing SQL without approval, in confirmation and read-only modes. The record names PostgreSQLlo_exportand MySQLSELECT INTO OUTFILE. The Docker Hub tagclidey/whodb:0.132.0was pushed on 2026-09-29. - Wazuh-MCP-Server. CVE-2026-138029 says the
blueteam_check_webshelltool accepted hostnames that resolve to internal addresses. The record's range is a pair of commit hashes. - pdf-reader-mcp. CVE-2026-138030 says the PDF URL loader checked the resolved address and did not pin it for the fetch. The record lists 3.0.16 as affected on its own. npm also has 3.0.17, 3.0.18, 3.1.0 and 3.1.1, which the record does not list. npm's
latestwas 8.5.19 on 2026-11-28. - Typebot. CVE-2026-138031 says an authenticated bot author could reference another workspace's legacy webhook. The record says the author could read its URL, headers and body, or overwrite its URL.
Am I affected? #
pip show bagel-mcp pydantic-deep 2>/dev/null | grep -E '^(Name|Version)'
npm ls -g --depth=0 2>/dev/null | grep -E 'mcp-video-analyzer|@cryptoapis-io/mcp-|whodb|@sylphx/pdf-reader-mcp'
grep -rE 'bagel-mcp|mcp-video-analyzer|@cryptoapis-io/mcp-|whodb|pdf-reader-mcp|bigcommerce-api-mcp' \
~/.claude.json ~/.cursor/mcp.json .mcp.json 2>/dev/null
Compare each version with the table. For the three unauthenticated servers, check whether the process listens on a non-loopback address. SiYuan shows its version in the About dialog. Typebot self-hosters can read the image tag of the builder and viewer containers.
If you are affected #
- Upgrade to the fixed version in the table. For Wazuh-MCP-Server, update the checkout to commit 2bbfe12 or later.
- If a Crypto APIs or bigcommerce-api-mcp server was reachable from another host, rotate the API key it held. Review the provider account for calls you did not make.
- If a Pydantic Deep DeepResearch app was reachable from another host, treat its session logs and workspace files as read. Set
DEEPRESEARCH_PASSWORDafter upgrading. - If Bagel processed logs or topics from a source you do not control, follow if your local AI agent was exploited.
Prevention #
- Bind MCP servers to loopback and put authentication in front of any HTTP transport. See MCP hygiene.
- A tool annotated read-only is a label set by the server author. Run database and file tools under an OS account that cannot write outside the data they need. See agent sandboxing.
Sources #
- CVE Services records, read 2026-11-28: CVE-2026-138026, CVE-2026-138027, CVE-2026-138028, CVE-2026-138029, CVE-2026-138030, CVE-2026-138031, CVE-2026-138032, CVE-2026-138033, CVE-2026-138034, CVE-2026-137953, CVE-2026-137469. Descriptions, ranges, scores and references.
- Bagel vendor advisory GHSA-gx2g-3pch-43q5, read 2026-11-28 through a summarizing fetch. Date, label, package, range.
- bigcommerce-api-mcp vendor advisory GHSA-q9p3-23c9-686x, read 2026-11-28 through a summarizing fetch. Date, SSE and token conditions, default bind, fix.
- Pydantic Deep vendor advisory GHSA-26gv-pq4g-6m85, read 2026-11-28 through a summarizing fetch. Date, score, loopback default, password setting.
- SiYuan vendor advisory GHSA-3rvg-qxwg-f3c6, read 2026-11-28 through a summarizing fetch. Date, range, kernel modes.
- GitHub Advisory Database,
mcplisting andagentlisting, read 2026-11-28. The rows that led to the records. - Registries, queried 2026-11-28: PyPI simple index for
bagel-mcpandpydantic-deep, npmtimeformcp-video-analyzer,@sylphx/pdf-reader-mcp,whodb,@clidey/whodb-cliand seven@cryptoapis-io/mcp-*packages, Docker Hub tags forbaptistearno/typebot-builderandclidey/whodb. - Not opened: the vendor advisories for Crypto APIs, WhoDB, Wazuh-MCP-Server, pdf-reader-mcp, Typebot and mcp-video-analyzer, and every repository release page.