TL;DR

GHSA-m8fp-3f3g-j5p7 says a LiteLLM proxy request that carried its own api_key, api_base or base_url was added to the router's shared deployments for that model until restart. Where client-side api_base is allowed, an authenticated user could route part of other users' traffic to their own server and receive prompts and the operator's provider key. Affected 1.63.2 to below 1.103.0. Fixed in 1.103.0, on PyPI since 2026-09-27. The advisory was published 2026-11-23 with no CVE.

What happened

The vendor rates it High, CVSS 3.1 8.4, AV:N/AC:H/PR:L/UI:N/S:C/C:H/I:H/A:L. The advisory describes three outcomes by configuration:

Configuration Outcome the advisory describes
Default A caller's api_key could be used for other users' requests to that model. Those requests fail if the key is invalid.
forward_llm_provider_auth_headers on One user's provider key, sent in x-api-key, could serve other users' requests and be billed for them.
allow_client_side_credentials on, or api_base allowed on a deployment An authenticated user could redirect part of other users' traffic for that model to a server they control. That exposes prompts and the operator's provider API key, and lets the server return any response.

The added deployments stayed until the proxy restarted.

The fixed release predates the advisory. PyPI shows 1.103.0 uploaded 2026-09-27 and 1.110.2, the newest, uploaded 2026-11-20.

Two Moderate advisories the same day

Both are 4.3, need a logged-in low-privilege user, and expose no keys, prompts or responses according to the vendor.

Advisory Endpoint What a low-privilege user could read Affected as printed Patched as printed
GHSA-2364-6whj-g7vx GET /global/activity/cache_hits proxy-wide request, cache-hit and failure counts, key aliases and models >= 1.83.6, <= 1.108.0 1.108.0
GHSA-fjxr-j47c-4x2x GET /spend/tags every request tag with its request count and spend >= 1.40.4, <= 1.108.0 1.108.0

Each page prints 1.108.0 as both the last affected and the patched version. The affected range and the patched version overlap, so this file does not say whether 1.108.0 is fixed. PyPI shows 1.108.0 uploaded 2026-11-04 and 1.108.1 on 2026-11-05.

Am I affected?

pip show litellm | grep -i '^version'
grep -rn 'allow_client_side_credentials\|forward_llm_provider_auth_headers\|configurable_clientside_auth_params' .
  • Below 1.103.0, and people or agents you do not fully trust hold proxy keys.
  • The redirect outcome needs one of the settings in the table. The grep covers the three setting names the advisory gives. Run it in the directory that holds the proxy config.
  • No CVE exists, so a scanner keyed on CVE ids will not flag this.

If you are affected

  1. Upgrade to 1.103.0 or later. For the two Moderate advisories, run a version above 1.108.0.
  2. Restart the proxy. The advisory says added deployments last until restart.
  3. If client-side api_base was allowed while untrusted users held keys, rotate the provider keys for the affected models. This step is this file's advice. See playbooks/rotating-cloud-credentials.md.
  4. If you cannot upgrade, the vendor's workaround for the Moderate advisories is to block the two endpoints at a reverse proxy. That also blocks them for admins.

Prevention

Sources

Single source: the vendor.

  • GHSA-m8fp-3f3g-j5p7, GHSA-2364-6whj-g7vx, GHSA-fjxr-j47c-4x2x, fetched 2026-11-23 through a summarizing fetch: dates, scores, vectors, ranges, patched versions, impact by configuration, workarounds, "No known CVE". Paraphrased, not quoted.
  • BerriAI/litellm security advisories, fetched 2026-11-23: three rows dated 2026-11-23.
  • PyPI JSON for litellm, read 2026-11-23: upload dates for 1.63.2, 1.103.0, 1.108.0, 1.108.1 and 1.110.2.
  • OSV returned no record for any of the three ids on 2026-11-23.
  • Not covered: the fix commits and the release notes.