MONAI Label 0.8.5 and earlier: unauthenticated file write through the datastore endpoints, exploited (CVE-2026-133968); fix merged, no release
TL;DR #
MONAI Label through 0.8.5 lets any client that can reach the server write files outside its datastore, per the project's advisory. Authentication is off by default. The CVE record says the flaw leads to code execution and was exploited from September 2026. A fix was merged on 2026-10-19, and PyPI's newest release is still 0.8.5 from 2024-11-25. Take the server off untrusted networks now.
What happened #
MONAI Label is a server for labelling medical images and training imaging models. It is a separate package from the MONAI framework.
Amazon Threat Intelligence published a report on 2026-11-20. It says an actor's AI agents found an unpatched path traversal in a medical imaging application and used it to take control of a server. The Hacker News says the server belonged to a university. Amazon's post does not name the product. The CVE record and The Hacker News name MONAI Label. Amazon assesses "with moderate confidence" that the actor is "Chinese-nexus".
| Fact | Value | Source |
|---|---|---|
| Vendor advisory | GHSA-qc22-rmgc-vg94, published 2026-11-18, Critical, "No known CVE" when read on 2026-11-21 | project advisory page |
| CVE | CVE-2026-133968, published 2026-11-20 by MITRE, CVSS 3.1 9.8 | CVE record |
| Affected | monailabel 0.8.5 and earlier |
both |
| Patched versions | "None" | project advisory page |
| Fix | pull request 1915, merged to main on 2026-10-19 |
pull request page |
| Newest release | 0.8.5, uploaded 2024-11-25 | PyPI, read 2026-11-21 |
The advisory says the image and label upload endpoints both use a caller-supplied identifier without checking that the path stays inside the datastore. With authentication enabled, the ANNOTATOR role is enough.
The CISA enrichment on the CVE record marks exploitation as "none" on 2026-11-20. The record's own description says exploited. Both are printed here.
Amazon says the maintainers "released a fix and a GitHub Security Advisory". The fix is a merged commit. No release carries it as of 2026-11-21.
Am I affected? #
pip show monailabelprints any version. Every published version is in the range.- The server listens on an address that other machines can reach.
- A source build is affected unless it includes the 2026-10-19 merge. Check with
git log --oneline | grep -i "confine datastore"in the checkout.
If the server was reachable, The Hacker News lists two things to look for: unexpected Python startup files, and unusual training jobs.
If you are affected #
- Block network access to the server from anything you do not trust. Use a firewall rule or bind to localhost.
- Apply the advisory's workarounds: enable authentication, do not give the ANNOTATOR role to untrusted users, and run the server as an unprivileged user whose write access is limited to the datastore.
- If the server was exposed, treat the host as compromised. Rebuild it and rotate every credential the service account could read. See if your local AI agent was exploited and rotating cloud credentials.
- There is no fixed release to upgrade to. A build from
mainafter 2026-10-19 is the only copy with the fix.
Prevention #
- Research servers that default to no authentication belong behind a VPN or an authenticating proxy. See agent sandboxing.
- Run training and labelling services under an account that cannot write to code or configuration directories.
Sources #
- Project-MONAI/MONAILabel advisory GHSA-qc22-rmgc-vg94: published 2026-11-18, read 2026-11-21. Range, patched versions, workarounds.
- CVE-2026-133968 record: MITRE, published 2026-11-20. Description, score, references, CISA enrichment.
- Pull request 1915: merged 2026-10-19. The page names no release.
- Amazon Threat Intelligence report: 2026-11-20. Attribution confidence, the fix sentence. Read for those facts only.
- The Hacker News: read 2026-11-21. Names the product and lists the host checks.
- PyPI: monailabel: versions and upload dates through
pip index versionsand the JSON API, 2026-11-21. - Not opened: The Register's article, which the CVE record lists as a reference.