TL;DR

ComfyUI has five CVEs, all fixed by release 0.28.0 (2026-07-15). The most serious is CVE-2026-68771, scored 9.8 by VulnCheck: an unauthenticated network caller can run Python on the server through the LoadTrainingDataset node, which loaded pickle files. The other four are vendor advisories for two stored XSS bugs and two path traversals. Upgrade to 0.28.0 or later. Do not expose a ComfyUI port to a network you do not control.

What happened

CVE Source What it is Score Affected Fixed
CVE-2026-68771 VulnCheck CNA, 2026-07-31 LoadTrainingDataset deserializes an uploaded pickle file, unauthenticated 9.8 (3.1), 9.3 (4.0) 0.23.0 and earlier, per the record 0.26.0, see below
CVE-2026-56672 vendor GHSA-53g8-45wq-pcv8, 2026-07-15 stored XSS through /userdata/{file} 8.2 before 0.28.0 0.28.0
CVE-2026-56670 vendor GHSA-rj8c-c4p8-3c5h, 2026-07-15 stored XSS through SVG upload on /view 8.2 before 0.28.0 0.28.0
CVE-2026-56673 vendor GHSA-rvxv-29p8-pxgq, 2026-07-15 path traversal in LoadImage through /prompt, file probing and image read 7.5 before 0.28.0 0.28.0
CVE-2026-56671 vendor GHSA-pj59-g5vv-74q4, 2026-07-15 path traversal in /experiment/models/preview, image read 7.5 before 0.28.0 0.28.0

CVE-2026-68771 has no vendor advisory and no fixed version in its record. The record references commit 94ee49b, "harden: load training-dataset shards with weights_only=True", dated 2026-06-18. The GitHub compare API shows that commit is not in tags v0.23.0, v0.24.0, v0.25.0 or v0.25.1, and is in v0.26.0 (2026-06-23) and every later tag. So the record's upper bound of 0.23.0 is too low: 0.24.0, 0.25.0 and 0.25.1 do not contain the fix. For this id alone, 0.26.0 is the first fixed tag. Upgrade to 0.28.0 or later anyway, because the other four ids need it. The commit message calls the change defense-in-depth for installs pinned to an older PyTorch, and says recent PyTorch already loads with weights_only=True. VulnCheck's 9.8 does not state a PyTorch version.

The CVE records for CVE-2026-56672 and CVE-2026-56673 were published on 2026-07-31, sixteen days after the vendor advisories and the release. The newest release when read was v0.45.0 (2026-11-10).

Am I affected?

git -C /path/to/ComfyUI describe --tags      # a git install
  • Affected: any version before 0.28.0. The comfyui package on PyPI is a single 2024 release, 0.0.1, and is not how current ComfyUI is installed, so pip show comfyui does not answer this.
  • Highest exposure: a server started so that other machines can reach it, a cloud GPU instance with the port open, or a tunnel to a local instance.

If you are affected

Prevention

  • Bind ComfyUI to the local machine and reach it through an authenticated tunnel.
  • Load only model, dataset and workflow files from sources you trust. A pickle file is code.
  • See agent sandboxing for running generation tools away from credentials.

Sources

  • CVE Services: CVE-2026-68771, fetched 2026-11-16: VulnCheck CNA, published 2026-07-31, affected up to and including 0.23.0, 9.8 and 9.3, credit Bofei Chen, references to pull request 14543 and commit 94ee49b.
  • CVE Services: CVE-2026-56672, fetched 2026-11-16: GitHub CNA, published 2026-07-31, before 0.28.0, 8.2.
  • CVE Services: CVE-2026-56673, fetched 2026-11-16: GitHub CNA, published 2026-07-31, before 0.28.0, 7.5.
  • ComfyUI security advisories tab, read through the GitHub API on 2026-11-16: four advisories, all published 2026-07-15, all high, all patched in 0.28.0.
  • ComfyUI commit 94ee49b, read through the GitHub API on 2026-11-16: date, message, and the compare results against tags v0.23.0 through v0.28.0.
  • ComfyUI releases, read through the GitHub API on 2026-11-16: v0.23.0 2026-06-01, v0.25.0 2026-06-16, v0.28.0 2026-07-15, v0.45.0 2026-11-10.
  • CVE Services records for CVE-2026-56670 and CVE-2026-56671, fetched 2026-11-16: 8.2 and 7.5.
  • PyPI comfyui, queried 2026-11-16: one release, 0.0.1, dated 2024-06-13.
  • Not opened: the VulnCheck advisory page and pull request 14543.