FreeCAD before 1.1.4: opening a crafted FCStd document can run code or write files (nine advisories, six CVEs)
TL;DR #
FreeCAD's repository lists nine security advisories published between 2026-07-23 and 2026-09-29. Eight involve a crafted .FCStd document. Three run code, three write files outside the document and one reads local files through XML entities. The eighth runs Python from a FEM formula when the user accepts a constraint dialog in the document. Upgrade to FreeCAD 1.1.4 or later, which is the first release that fixes all eight. Do not open .FCStd files from a source you do not trust. The ninth, a DLL search-path issue in FreeCAD.exe, lists 26.3.0 as its fix, and only release candidates of 26.3 were published when read.
What happened #
All rows are from the advisory tab of FreeCAD/FreeCAD, read through the GitHub API on 2026-11-16. Severity is the vendor's label.
| Advisory | CVE | Vendor severity | What it is | Affected | Fixed |
|---|---|---|---|---|---|
| GHSA-8rfj-7956-6gwf | CVE-2026-34398 | high | eval() on .FCStd metadata in BIM Project Manager |
0.19 to 1.1.0 | 1.1.1 |
| GHSA-chv4-vm6r-wjqj | CVE-2026-34399 | high | eval() on an SVG template scale field in BIM TechDraw Page |
0.19 to 1.1.0 | 1.1.1 |
| GHSA-493w-pp4h-h77v | CVE-2026-34789 | high | module import in PropertyPythonObject::Restore |
1.1.1 and earlier | 1.1.2 |
| GHSA-5vqh-3v38-jw2r | CVE-2026-73234 | high | path traversal file write in PropertyFileIncluded::Restore() |
1.1.1 and earlier | 1.1.2 |
| GHSA-2rq3-gx3h-489q | CVE-2026-73233 | medium | FEM formula incomplete escape, runs when the user accepts the constraint dialog | 1.1.1 and earlier | 1.1.2 |
| GHSA-cp6c-87x9-xf49 | CVE-2026-73235 | medium | XML external entity file read and SSRF in the Document.xml parser |
1.1.1 and earlier | 1.1.2 |
| GHSA-9624-pf2m-8cgg | none | high | VRML resources in an FCStd write files on open | 1.1.3 and earlier | 1.1.4 |
| GHSA-9vjf-h8f4-c229 | none | high | Zip-Slip file write in PropertyPostDataObject::RestoreDocFile() |
1.1.3 and earlier | 1.1.4 |
| GHSA-2mfq-2h69-c873 | none | high | DLL search path in FreeCAD.exe |
before 26.3.0 | 26.3.0 |
Scores. The CVE records for the three ids fetched for this file are from GitHub's CNA, published 2026-08-11. CVE-2026-73234 is 7.8 (CVSS 3.1) and CVE-2026-73235 is 6.1 (CVSS 3.1), the same as the vendor pages. CVE-2026-73233 is 8.5 High (CVSS 4.0) in the CNA record, while the vendor page says medium and gives no score. The records for CVE-2026-34398 (7.8), CVE-2026-34399 (7.8) and CVE-2026-34789 (7.0) match the vendor's ranges and fixed versions. Not checked: the exact trigger for each of the other seven.
Releases. 1.1.1 is dated 2026-04-14, 1.1.2 2026-07-23, 1.1.3 2026-07-25 and 1.1.4 2026-09-28. The two no-CVE advisories were published on 2026-09-29, so a scanner keyed on CVE ids reports 1.1.2 and 1.1.3 as clean. For 26.3 the releases list held 26.3rc1 (2026-10-08) and 26.3rc2 (2026-10-18) and no stable tag.
Why this matters for agent users. An .FCStd file is a zip archive with XML and embedded resources. An agent or an MCP bridge asked to open, convert or inspect one runs the same restore code.
Am I affected? #
- Open FreeCAD and read the version in Help, About FreeCAD, or check the version of the package your system installed. Anything before 1.1.4 is affected by at least two advisories.
- Versions 1.1.2 and 1.1.3 fix the six CVEs and are still affected by the two no-CVE file-write advisories.
- You are exposed when FreeCAD opens an
.FCStdfile from someone else.
If you are affected #
- Upgrade to 1.1.4 or later.
- If an affected version opened documents from an untrusted source, treat the machine as you would after running untrusted code. See if your local AI agent was exploited.
- None of the sources below reports exploitation in the wild. CISA's entries on CVE-2026-73233 and CVE-2026-73234 mark a proof of concept as existing.
Prevention #
- Open only CAD documents you created or that come from a source you trust.
- Run agent-driven CAD conversion in a directory and account with no credentials. See agent sandboxing and MCP hygiene.
- Watch the project's advisory tab. Three of its nine advisories have no CVE.
Sources #
- FreeCAD security advisories tab, read through the GitHub API (
repos/FreeCAD/FreeCAD/security-advisories) on 2026-11-16: the nine rows above with ids, severities, ranges, patched versions and publication dates. - CVE Services: CVE-2026-73233, fetched 2026-11-16: GitHub CNA, published 2026-08-11, affected before 1.1.2, CVSS 4.0 8.5, CISA entry marks a proof of concept.
- CVE Services: CVE-2026-73234, fetched 2026-11-16: affected before 1.1.2, CVSS 3.1 7.8, CISA entry marks a proof of concept.
- CVE Services: CVE-2026-73235, fetched 2026-11-16: affected before 1.1.2, CVSS 3.1 6.1.
- FreeCAD releases, read through the GitHub API on 2026-11-16: the release dates above, and no stable 26.3 tag.
- CVE Services records for CVE-2026-34398, CVE-2026-34399 and CVE-2026-34789, fetched 2026-11-16: 7.8, 7.8 and 7.0.
- Not opened: the fix pull requests and commits the records reference.