Tinypool (the worker-thread pool under Vitest 1–3; 59.6M weekly downloads): two prototype-pollution-to-code-execution gadgets — worker options spread from a polluted Object.prototype into `new Worker()` so an inherited `execArgv: ['--require', …]` or `env.NODE_OPTIONS` runs in every worker (CVE-2026-104848), and `pool.run(task, options)` reads `filename` through the prototype chain so a polluted `Object.prototype.filename` swaps the worker module (CVE-2026-104849); both scored 9.5, both fixed 2026-08-23 (2.1.1 / 2.1.2), both reached the GitHub Advisory Database on 2026-10-05 — and Vitest 2.x and 3.x pin tinypool ^1.x, which has no patched release
TL;DR #
tinypool is the minimal worker_threads pool that Vitest spun out of piscina; it moved 59,633,803 copies in the week ending 2026-10-04, and Vitest itself 142,142,023. On 2026-08-30 its maintainers published two advisories, each a prototype-pollution gadget: tinypool does not pollute anything itself, but if any other code in the process has already written to Object.prototype, tinypool turns that into code execution inside every worker it spawns, "with the privileges of the host process."
- GHSA-5gmw-xhrv-c9v3 / CVE-2026-104848 —
ThreadPool.optionsis built with object spread from a normal options object, which materialises inherited properties as own properties, andexecArgvandenvare then handed tonew Worker(). Node's own protection against inherited worker options is defeated. A pollutedObject.prototype.execArgv = ['--require', '/path/attacker.js']orObject.prototype.env = { NODE_OPTIONS: … }executes in each worker. ≤ 2.1.0 → 2.1.1. CVSS 4.0 9.5. Reporter ambushneupane; PR #134. - GHSA-85c8-ppgw-ccpr / CVE-2026-104849 —
pool.run(task, options)readsoptions.filenamewithout requiring an own property, so a pollutedObject.prototype.filename"can replace the intended worker module." Only triggers when the caller passes its own options object torun(); inherited from piscina. < 2.1.2 → 2.1.2. CVSS 4.0 9.5. Reporter Fcmam5; PR #135.
The registry shows 2.1.1 at 2026-08-23 14:26 UTC and 2.1.2 at 15:03 UTC; the advisories followed a week later, the CVE records on 2026-10-02, and the database's reviewed npm critical listing on 10-05 — which is how a six-week-old fix looked like a fresh wave. The problem for Vitest users: the affected range is everything below 2.1.1, there is no 1.x or 0.x patch (the version list goes 1.1.1 → 2.0.0), and npm view on 2026-10-06 shows Vitest 3.2.x pinning tinypool: ^1.1.1, 2.1.x ^1.0.1, 1.6.x ^0.8.3; Vitest 4.x and 5.x do not list tinypool as a dependency at all. So npm update fixes a direct tinypool dependency and fixes nothing for a Vitest 1–3 project; the fix there is Vitest 4+.
What happened #
Why "gadget" and why high rather than the vendor's critical. Both advisories require a prior prototype pollution — an unrelated bug in a merge, deep-clone, query-string or config library — before tinypool does anything wrong. The vendor scores them 9.5 with AT:P (attack requirements present) to encode exactly that; this repo's severity reflects that an attacker needs two bugs, not one, while the consequence (arbitrary code in a process that may hold CI secrets or a service's credentials) is the full one. If your dependency graph has a known prototype-pollution CVE, treat this as critical; the gadget is what makes a "low-impact" pollution finding exploitable.
The mechanism, in the vendor's words. For CVE-2026-104848: "Tinypool constructs ThreadPool.options from a normal options object and reads the execArgv and env worker options … allowing values inherited from a polluted Object.prototype to reach new Worker()." The root cause is the spread ({...options}), which copies inherited keys onto a fresh object — after which Node's check that worker options are own properties sees own properties. For CVE-2026-104849: "If that object does not have an own filename property, the lookup falls through to Object.prototype." The limitation is real: calls to run() without a second argument use tinypool's trusted default and are not affected.
Where it sits. Vitest's default pool: 'threads' and 'forks' runners used tinypool through 3.x; Vitest's own advisory tab (fetched 2026-10-06) does not carry an entry for either CVE, and the GHSA for CVE-2026-104848 is the source for "tinypool's role in Vitest (~42M weekly downloads)" — the registry figure is now 142M. Tinypool is also used directly by servers that offload CPU-bound work per request, which is the deployment where an attacker-reachable prototype pollution is most likely to exist in the same process.
Am I affected? #
npm ls tinypool vitest --all 2>/dev/null | head -20
grep -n '"tinypool"' package-lock.json 2>/dev/null | head
# Which Vitest line pins which tinypool range (2026-10-06 values: 3.x ^1.1.1, 2.x ^1.0.1, 1.x ^0.8.3; 4.x/5.x none)
npm view vitest@3 dependencies.tinypool
# Known prototype-pollution findings elsewhere in the tree — the first half of the chain:
npm audit --json 2>/dev/null | grep -i -c 'prototype pollution'
- Direct dependency on tinypool < 2.1.2 → affected by both; 2.1.1 → still CVE-2026-104849.
- Vitest 1.x–3.x → tinypool 0.x/1.x in the tree, no in-range fix. The practical exposure in a test runner is a polluted prototype inside the Vitest main process — a malicious dependency, a test that imports untrusted fixtures, or a vulnerable transitive library — which then runs code in every test worker with the CI job's credentials.
- Vitest 4.x / 5.x → tinypool is not a listed dependency (checked
vitest@4.1.11,vitest@5.0.3, and@vitest/runnerfor both).
If you are affected #
- Direct users: upgrade to
tinypool@2.2.0(latest; 2.1.2 is the minimum). Vitest 1–3 users: upgrade Vitest to 4.x or later; there is no tinypool release that satisfies^1.1.1and carries the fix, and overriding the transitive version to 2.x is a major bump tinypool's API may not honour — test it rather than assume. - Until then, fix the first half of the chain: run
npm audit, remove or upgrade anything with a prototype-pollution finding, and freezeObject.prototypeat process start in services where that is viable (Object.freeze(Object.prototype)breaks some libraries; measure). - In CI, this is a reason to keep test jobs on short-lived, minimally scoped tokens — code running in a Vitest worker has whatever the job has — prevention/ci-cd-hardening.md.
- If a service that used tinypool per request also had an exploitable pollution, treat it as a code-execution incident: if-your-webapp-was-compromised.md, then rotating-cloud-credentials.md.
Prevention #
- Treat prototype-pollution findings as code execution until proven otherwise; gadgets like this one, in libraries nobody audits, are why — prevention/package-vetting-checklist.md.
- When a security fix lands only in a new major of a transitive dependency, the fix has not reached you until the package that pins it moves; check
npm lsfor the installed version, not the advisory's "patched" line — prevention/npm-hardening.md. - Vendor advisories, CVE records and database listings for the same bug were six weeks apart here; the registry
timefield is the one date that does not move.
Why this matters for vibe coders #
Vitest is the test runner agents reach for in generated TypeScript projects, and the CI job that runs it usually holds a deploy token. The chain is: a dependency the agent added has a prototype-pollution bug, a test imports a fixture that triggers it, tinypool spawns the next worker with an inherited --require, and the deploy token leaves the runner. None of the three pieces is exotic, and the fix for two of them is a major-version upgrade nobody asked the agent to do.
Sources #
- GHSA-5gmw-xhrv-c9v3 — Tinypool: Prototype Pollution gadget in worker options leads to Remote Code Execution (CVE-2026-104848) — fetched 2026-10-06: 9.5
CVSS:4.0/AV:N/AC:L/AT:P/PR:N/UI:N/VC:H/VI:H/VA:H/SC:H/SI:H/SA:H,≤ 2.1.0→ 2.1.1, the spread-materialises-inherited-properties root cause, theexecArgv--requireandenv.NODE_OPTIONSvectors, "arbitrary code execution inside every worker the pool spawns, with the privileges of the host process," the "~42M weekly downloads" Vitest reference, reporter ambushneupane, PR tinylibs/tinypool#134, published 2026-08-30. - GHSA-85c8-ppgw-ccpr — Tinypool: Prototype Pollution Gadget to RCE in run() options (CVE-2026-104849) — fetched 2026-10-06: 9.5,
< 2.1.2→ 2.1.2, "falls through toObject.prototype," the own-options-object precondition, piscina lineage, reporter Fcmam5, PR #135, commit f41411a3, published 2026-08-30. - NVD API — CVE-2026-104848, CVE-2026-104849 — fetched 2026-10-06: both published 2026-10-02 by
security-advisories@github.com, 9.5 (4.0), status Deferred, references to commits 24df4e73 / f41411a3, PRs #134 / #135 and release tags v2.1.1 / v2.1.2. - tinylibs/tinypool — release v2.1.1 — fetched 2026-10-06: "guard worker options from proto pollution" (#134) referencing GHSA-5gmw-xhrv-c9v3. The page's rendered year is unreliable; the date below is the registry's.
- npm registry —
tinypooltimeandversions— queried 2026-10-06: 2.1.0 2026-01-03, 2.1.1 2026-08-23 14:26 UTC, 2.1.2 2026-08-23 15:03 UTC, 2.2.0 2026-09-13; version list ends1.0.2, 1.1.0, 1.1.1, 2.0.0, 2.1.0, 2.1.1, 2.1.2, 2.2.0— no 1.x release after 1.1.1. - npm registry —
vitestdependency pins — queried 2026-10-06 vianpm view:vitest@3.2.4→tinypool ^1.1.1;vitest@2.1.9→^1.0.1;vitest@1.6.1→^0.8.3;vitest@4.1.11andvitest@5.0.3list no tinypool dependency (nor does@vitest/runnerat either version). - npm downloads API —
tinypool,vitest(week ending 2026-10-04) — 59,633,803 and 142,142,023. - vitest-dev/vitest — security advisories tab — fetched 2026-10-06: seven advisories, none for the tinypool CVEs.
- GitHub Advisory Database — reviewed
npmcritical listing — fetched 2026-10-06: both tinypool entries listed Oct 5 (database date). - Related in this repo: Vitest browser-mode CDP RCE, vm2 / isolated-vm sandbox escapes.