Continue CLI runs chained commands past its Bash allow rules and denylist (CVE-2026-109560, CVE-2026-76072), no fix; VulnCheck batch adds sandboxed.sh, deepsec, Network-AI
TL;DR #
On 2026-10-12 VulnCheck published a further block of CVE records against agent tooling, and four of them concern products this corpus's readers run. Continue CLI, the terminal agent of the Continue IDE project, matches a static Bash(prefix*) allow rule against the whole command line, so a command chained after an allowed prefix with ;, && or | runs without the confirmation the dynamic evaluator would have asked for (CVE-2026-109560, CVSS 4.0 7.7). An older record, CVE-2026-76072 (8.3, published 2026-08-24 and untracked here until today), says the destructive-command denylist that is the only barrier in headless and auto mode misses most of the filesystem and misparses a home-directory variable. Both GitHub issues (opened 2026-07-19 and 2026-09-17) are open with no maintainer reply, npm's latest @continuedev/cli is still 1.5.47 from 2026-06-18, and the vendor's security tab is empty. sandboxed.sh, the Rust backend behind the Orb desktop and iOS clients that run Claude Code, Codex, OpenCode and other agents on remote machines, attached shells to container workspaces with nsenter and without --root, so agent-run code resolved absolute paths on the host and could read and rewrite host files (CVE-2026-109569, 9.3); the fix commit makes the hardened behaviour an environment flag that is off by default. Vercel deepsec, the agent-powered vulnerability scanner, extracted result tarballs from its sandboxes with plain tar, so a prompt-injected agent in the sandbox could plant a symlink and write files on the orchestrator host (CVE-2026-109375, 4.9); fixed in 1.1.17 in May, record published now. Network-AI's ClaudeHookBridge, a PreToolUse hook sold as an operator-facing hard gate for Claude Code, checked deny patterns against only the first candidate field of a tool call, so a payload in a Write body beside a benign path passed (CVE-2026-109331, 7.5; vendor 8.4), fixed 5.15.2 on 2026-09-27 as the second fix of the same control. If you run Continue CLI unattended on content you do not control, stop until a release carries a fix; everything else here is an upgrade or a flag.
What happened #
The GitHub Advisory Database's agent and mcp listings on 2026-10-13 showed unreviewed rows dated 2026-10-12 with no package metadata, the shape the 10-10 and 10-11 wave had. The CNA is VulnCheck on every record below, the references are issues, permalinks and vendor advisories, and the scores are VulnCheck's unless stated. These four are the ones with an audience here; the same listings' EdgeEver, conductor-oss (updated in its own file), FreeRDP and OTRS rows are out of scope.
Continue CLI: two unfixed records, the current release affected by both #
| CVE | Published | CVSS 4.0 (3.1) | What the record says | Vendor signal |
|---|---|---|---|---|
| CVE-2026-109560 | 2026-10-12 | 7.7 (7.5) | The permission system approves Bash commands by allowed prefix rules. The check does not account for ;, && or | after an approved prefix, so commands appended after it run without separate authorization. An attacker who can place instructions in repository files or fetched pages can make the agent append such commands and run code as the user. CWE-863. Credit Akıner Kısa and Tardfyou. Code cited: extensions/cli/src/permissions/permissionChecker.ts lines 162 to 174 and policyWriter.ts lines 18 to 31 at commit d3f60ba. |
Issue #13288, opened 2026-09-17 by Tardfyou: the static allow matches the entire command string and overrides the dynamic security evaluator's "ask" verdict. Open, no labels, no assignee, no linked pull request, no maintainer comment (2026-10-13). |
| CVE-2026-76072 | 2026-08-24 | 8.3 (7.4) | In headless and auto mode the default policy allows the Bash tool, and the only hard block is the terminal-security evaluator's isCriticalCommand. Its dangerous-path test covers /, ~, /usr, /etc, /bin and /sbin, so recursive deletion of /home, /root, /var, /opt or /srv is not disabled; the parser reduces a home-directory variable to an empty token the shell later expands; find -delete is rated high risk rather than disabled; shred, wipefs, truncate and pkexec are not handled. An indirect prompt injection in content the agent reads can make an unattended run destroy the invoking user's data. CWE-184. Credit George Chen. |
Issue #13001, opened 2026-07-19 by geo-chen after an email on 2026-06-13 got no response. Open, kind:bug from a bot, no maintainer comment; a fork commit on 2026-07-22 widens the denylist but is not a pull request. |
Registry facts, checked 2026-10-13: @continuedev/cli latest is 1.5.47, published 2026-06-18, four releases in 2026; 4,038 downloads in the week of 2026-10-05. continuedev/continue has no published security advisories. Both affected ranges are "through 1.5.47," which is every version that exists.
The two findings compose. The first lets injected text run a command the operator never allowed in interactive use; the second says that in unattended use the allow list is already open and the denylist underneath it is partial. The reporter of the first argues the fix is to split compound commands and let the most restrictive verdict win; a community comment on each issue argues a string denylist cannot be made complete and the evaluator should resolve the command and validate arguments against tool schemas. Neither view has a maintainer response.
sandboxed.sh (Orb): the fix is a flag, and the flag is off #
CVE-2026-109569 (published 2026-10-12, CVSS 4.0 9.3, 3.1 8.8, CWE-1188): "code in container workspaces can access the host filesystem because nsenter attaches without --root. Agent-run code in a container workspace can resolve absolute paths on the host to read and modify host files, bypassing documented isolation." The record's affected.vendor is Th0rgal, the product sandboxed.sh, the range "through 1.3.0," and the repository Th0rgal/orb.
The referenced commit, "Harden deploy path: scoped nsenter root + versioned-symlink binary install," adds SANDBOXED_SH_NSENTER_USE_TARGET_ROOT=1, which appends --root to the nsenter arguments in build_nsenter_command so the attached shell sees only the container filesystem. The author's commit message says the change followed "a case where a mission escaped its container and rewrote host files," and that the flag stays off until each host has the agent binaries (Claude, Codex, OpenCode, MCP) inside the container, because with the host root hidden those binaries are no longer reachable. The commit page shows no date. The repository describes Orb as a desktop and iOS client for managing AI providers, machines and coding agents, with sandboxed.sh as its Rust backend; it runs Claude Code, Codex, Antigravity, OpenCode and Grok locally or on remote machines, "either on the configured host or in an isolated container workspace," and lists Hermes, ChatGPT, Grok Bot and Cursor Cloud as cloud agents. 530 stars.
Two things do not line up and are recorded rather than resolved. The releases page's newest tag is v0.12.0 (16 May, no year shown) and none of the ten releases shown mentions nsenter, --root or security, while the CNA range says "through 1.3.0"; the record's version source is not stated. And "fixed" here means a default-off environment variable, so a deployment that upgrades and does nothing else keeps the escape. There is no npm or PyPI package named sandboxed.sh; the product is installed from the repository. Status for this item: mitigated only where the operator sets the flag.
Vercel deepsec: a May fix, a November-shaped record #
CVE-2026-109375 (published 2026-10-12, CVSS 4.0 4.9, 3.1 6.1, CWE-59): extractTarballLocally in deepsec 0.1.0 before 1.1.17 "allows sandboxed code to write files outside the sandbox by planting links in result tarballs. Attackers controlling sandbox code, such as a prompt-injected coding agent, can plant symbolic or hard links in the host data directory to write arbitrary files on the orchestrator host." The record names 1.1.17 as unaffected.
deepsec is Vercel Labs' "security harness for finding vulnerabilities in your codebase powered by coding agents" (8.1k stars, npm deepsec, latest 2.3.10 on 2026-10-13). Its README describes fanning large scans out to Vercel Sandbox microVMs: the working tree goes up as a tarball, the agents run inside, and results come back as tarballs that the orchestrator extracts. The threat model the README states is that the sandbox is untrusted and the orchestrator host is not. The referenced pull request #46 (aydinnyunus, opened 2026-05-05, not merged as of 2026-10-13) proposed switching to node-tar and rejecting symlink and hard-link members; the maintainer's pull request #47 ("Improve windows compat and make tar usage more robust," merged 2026-05-05) added tar@7.5.13 as a dependency with a commit titled "Support stricter tar," and the referenced commit c5a4e42 is on main. The record's fixed version, 1.1.17, is from May; the CVE is from October. Anyone on 1.1.17 or later, which npm has served since then, is past it. Status for this item: patched.
Network-AI: an incomplete fix to a Claude Code hard gate, fixed again #
Network-AI is an npm package whose network-ai hook pre-tool-use --deny ... command installs a PreToolUse hook for Claude Code and is documented as an operator-facing hard security gate; deny patterns are checked first and in the default observe mode are the only hard block. Three CVE records on 2026-10-12 at 16:05 UTC point at three vendor advisories published 2026-09-27:
| CVE | VulnCheck CVSS 4.0 (3.1) | Vendor GHSA and score | Affected, fixed | Finding |
|---|---|---|---|---|
| CVE-2026-109331 | 7.5 (7.4) | GHSA-9p2w-prp8-5722, High, CVSS 3.1 8.4 | 5.14.0 to 5.15.1, fixed 5.15.2 | extractFullTarget returns the first present field from a fixed candidate list and falls back to the full input only when none exists. A tool whose dangerous content sits in a non-first field (a Write body, an MCP script parameter) beside a benign file_path or command is matched on the benign value only, so a deny rule meant to block execution or file writes is bypassed. The vendor says the earlier fix for GHSA-743h-jr5x-mpcr addressed truncation and left this selection logic in place, making this an incomplete fix of the same control. Reporter zx (Jace), @manus-use. |
| CVE-2026-109330 | 5.3 (4.3) | GHSA-hr6v-mfxm-4438 | 5.0.0 to 5.15.1, fixed 5.15.2 | DashboardServer.handleUpgrade validates neither Origin nor a token, so a page the operator visits can open a WebSocket to the loopback dashboard and read agent ids, roles, task descriptions and token budgets. |
| CVE-2026-109332 | 2.3 (3.1) | GHSA-4pvg-m42h-c3x2 | before 5.15.2 | McpSseServer._handleRequest reflects any localhost Origin into Access-Control-Allow-Origin regardless of the bind interface, so when bound to a non-loopback address an attacker page with a localhost Origin reads unauthenticated endpoints cross-origin. |
Registry: network-ai 5.15.2 published 2026-09-27, latest 5.15.4 on 2026-09-29. The vendor rated the hook bypass 8.4 and VulnCheck 7.5; both are shown because the difference is the attack vector (the vendor assumes a local caller, VulnCheck's 4.0 vector has AT:P). Status for this item: patched. Why it is here: a hook that an operator installs to make Claude Code's deny rules hard is the kind of control LEARNINGS-class "tool definitions are documentation" findings keep reaching, and the fix had to be done twice.
Am I affected? #
# Continue CLI: any installed version is affected by both records
npm ls -g @continuedev/cli 2>/dev/null; cn --version 2>/dev/null
# Where it runs unattended: look for headless / auto invocations in CI and cron
grep -rn --include='*.yml' --include='*.yaml' --include='*.sh' -E 'cn (-p|--headless|--auto)|continuedev/cli' . 2>/dev/null | head
# Permission rules with wildcard Bash prefixes (the chaining bypass needs one)
grep -rn 'Bash(' ~/.continue 2>/dev/null | head
# Orb / sandboxed.sh: is the hardened nsenter path on?
grep -rn 'SANDBOXED_SH_NSENTER_USE_TARGET_ROOT' /etc/systemd /etc/default ~/.config 2>/dev/null
# unset or anything but 1 means container workspaces see the host root
# deepsec: below 1.1.17 is affected
npm ls deepsec 2>/dev/null; npm ls -g deepsec 2>/dev/null # local metadata only; do not use npx, which can fetch and run the latest package
# Network-AI: below 5.15.2 has the hook bypass; check the installed hook too
npm ls -g network-ai 2>/dev/null
grep -n 'network-ai' ~/.claude/settings.json .claude/settings.json 2>/dev/null
If you are affected #
- Continue CLI, unattended use: stop running it in headless or auto mode on repositories, pages or issues you do not control until a release names a fix for both issues. Where it must run, run it in a throwaway container with no credentials and no writable mount of anything you keep: prevention/agent-sandboxing.md.
- Continue CLI, interactive use: remove wildcard
Bash(prefix*)allow rules. Every allowed prefix is a chaining point until the matcher splits compound commands. - Orb / sandboxed.sh: set
SANDBOXED_SH_NSENTER_USE_TARGET_ROOT=1once the agent binaries are inside the container image, restart, and verify from inside a workspace that host paths no longer resolve. Treat any host where a mission ran on an untrusted task before that as touched: playbooks/if-your-local-ai-agent-was-exploited.md. - deepsec: upgrade past 1.1.17 (current is 2.3.10) and check the orchestrator host's data directory for links the sandboxes did not create.
- Network-AI: upgrade to 5.15.2 or later and re-read your deny rules against the new matcher; a rule that only names a
commandfield never coveredWritebodies.
Prevention #
- A prefix allow list is not a parser. Agent permission systems that approve by string prefix need to tokenize the command, apply the rule to every segment, and let the most restrictive verdict win. This is the third coding-agent tool in this corpus with a chaining or prefix bypass after Claude Code's
findconfirmation bypass and Gemini CLI's headless workspace-trust RCE: prevention/agent-sandboxing.md. - A denylist in unattended mode is a list of what the attacker may not say, not of what the attacker may not do. Unattended runs need a container with no credentials and a read-only host, not a longer list.
- Container isolation that leaves the host root mounted is not isolation. For any agent runner that "attaches" to a container, check the mount and root namespace it attaches with, and prefer running the agent binary inside the image.
- Result artefacts from a sandbox are untrusted input to the host. Extract with a library that rejects links and absolute paths, into a directory the host does not execute from: prevention/ci-cd-hardening.md.
Update 2026-10-27 — a VulDB record for Continue 2.0.0: OS command injection in the MCP server transport (CVE-2026-116109, CVSS 4.0 5.3); vendor did not respond #
VulDB published CVE-2026-116109 on 2026-10-26 for continuedev Continue 2.0.0: MCPManagerSingleton.setConnections in core/config/ConfigHandler.ts, the MCP server transport component, leads to OS command injection; the record says the attack can be executed remotely, that an exploit has been disclosed, and that "the vendor was contacted early about this disclosure but did not respond in any way". CVSS 4.0 5.3 (AV:N/AC:L/AT:N/PR:N/UI:P), 3.1 6.3; credit "scription (VulDB User)". The only references are VulDB's own pages; this file could not open a public proof or a vendor statement, and continuedev/continue's security tab has no published advisories (fetched 2026-10-27). Read it as what it is, a CNA record built on a user submission naming one version with no fix: a Continue install that loads MCP server configuration from a repository or a shared config is the exposure the record describes, which is the same shape as the config-driven findings above. No version carries a fix as of this date.
Sources #
- CVE Services (CNA: VulnCheck), fetched 2026-10-13, the ranges, scores, vectors, CWEs, descriptions and references above: CVE-2026-109560 (Continue CLI chaining, published 2026-10-12 20:55 UTC), CVE-2026-76072 (Continue CLI denylist, published 2026-08-24), CVE-2026-109569 (sandboxed.sh), CVE-2026-109375 (deepsec), CVE-2026-109331, CVE-2026-109330 and CVE-2026-109332 (Network-AI).
- VulnCheck — Continue CLI through 1.5.47 Bash Permission Rule Bypass via Command Chaining — fetched 2026-10-13: dated 10/12/2026, CWE-863, 7.7, credit Akıner Kısa and Tardfyou, no fixed version, no vendor timeline. VulnCheck — Continue CLI through 1.5.47 Incomplete Destructive Command Denylist in Headless and Auto Mode — fetched 2026-10-13: dated 8/24/2026, CWE-184, 8.3, credit George Chen, no fixed version.
- continuedev/continue — issue #13288 — fetched 2026-10-13: opened 2026-09-17, open, the static-allow-wins mechanism, no maintainer reply. continuedev/continue — issue #13001 — fetched 2026-10-13: opened 2026-07-19, the 2026-06-13 email with no response, open,
kind:bug, no linked pull request. continuedev/continue security advisories — fetched 2026-10-13: empty. - GitHub Advisory Database — GHSA-f54m-g39v-qf2p (Continue CLI), GHSA-xqq7-hjvp-gg2f (sandboxed.sh), GHSA-cchp-25pr-r776 (deepsec), GHSA-8x93-4278-4f5c (Network-AI) — fetched 2026-10-13: all unreviewed, no package or ecosystem shown, published 2026-10-12.
- Th0rgal/orb — commit 4ab42e9 "Harden deploy path: scoped nsenter root + versioned-symlink binary install" — fetched 2026-10-13: the opt-in
SANDBOXED_SH_NSENTER_USE_TARGET_ROOTflag, the "mission escaped its container and rewrote host files" note, the reason the flag stays off, no date shown. Th0rgal/orb repository and releases — fetched 2026-10-13: the product description, the agent list, 530 stars, newest tag v0.12.0, no security release. - vercel-labs/deepsec repository — fetched 2026-10-13: the description, the sandbox and orchestrator model from the README, 8.1k stars, npm
deepsec. Pull request #46 (opened 2026-05-05, not merged, the proposed link-rejecting extractor) and pull request #47 (merged 2026-05-05, "Support stricter tar,"tar@7.5.13added) — fetched 2026-10-13. - Jovancoding/Network-AI — GHSA-9p2w-prp8-5722 — fetched 2026-10-13: published 2026-09-27, High, CVSS 3.1 8.4, CWE-436 and CWE-863, affected 5.14.0 to 5.15.1, patched 5.15.2, the first-candidate-field mechanism, the GHSA-743h-jr5x-mpcr incomplete-fix statement, reporter zx (Jace).
- Registries, checked 2026-10-13:
npm view @continuedev/cli time(1.5.47 on 2026-06-18, latest),api.npmjs.orglast-week downloads for@continuedev/cli(4,038, 2026-10-05 to 10-11),npm view network-ai time(5.15.2 on 2026-09-27, 5.15.4 latest on 2026-09-29),npm view deepsec version(2.3.10),npm view sandboxed.sh(404) andpip index versions sandboxed-sh(no distribution). - Related in this corpus: the 10-10 to 10-12 VulnCheck wave (same CNA, same listing shape, mini-swe-agent and mistral.rs sandbox findings), Claude Code and Desktop GHSA batch, Gemini CLI TrustIssues, CVE-2026-12537, Trustfall MCP auto-execute.
- 2026-10-27 update sources — CVE Services — CVE-2026-116109 (queried 2026-10-27: CNA VulDB, published 2026-10-26, Continue 2.0.0, the function and file, the vendor non-response, CVSS 4.0 5.3 and 3.1 6.3, VulDB references only); continuedev/continue — Security Advisories (fetched 2026-10-27: "There aren't any published security advisories").