VTCode (open-source Rust coding agent): once a user approves three ordinary `find` commands, the agent auto-approves later `find` commands in that family, and an ANSI-C quote spliced into a destructive flag (`-exe$''c`) evades the block on `-exec`/`-delete` — so a prompt-injected agent runs an unapproved destructive command (CVE-2026-104247, CVSS 6.3, fixed 0.171.5)
TL;DR #
VTCode, an open-source Rust coding agent, learns to auto-approve commands: after a user approves three ordinary find commands in the same workspace subdirectory, it treats later find commands in that family as safe. Its guard against destructive flags (-exec, -delete) compares exact tokens, so splicing an empty ANSI-C quote into a flag — -exe$''c — slips a destructive command past the check and runs it without a prompt. With indirect prompt injection steering the agent, that is an unapproved destructive command on the user's machine. JFrog disclosed it as CVE-2026-104247, CVSS 6.3, fixed in 0.171.5 (2026-10-05).
What happened #
JFrog's Natan Nehorai found that VTCode's shell-approval logic has two reinforcing weaknesses: a family-learning rule that auto-approves find commands after three manual approvals under the same subdirectory, and a denylist for destructive find flags that matches exact tokens and so misses -exec/-delete written with an empty ANSI-C quote spliced in. Combined, a find command carrying a destructive predicate is classified as safe and executed without approval. Exploitation needs a local session with those prior approvals plus a way to steer the agent, such as indirect prompt injection in the content it reads. An earlier change (0.141.12) blocked the bypass only for bare find; the fix in 0.171.5 (PR #778) also stops family-learning for path-qualified find, quote-spliced and mixed-case flags, wrapper/environment prefixes and compound commands. JFrog rates it CVSS 6.3 (medium), advisory JFSA-2026-001694179 / GHSA-r249-hpfx-x2w7. The crates.io release line is at 0.174.0.
This is the same approval-bypass class as the Mistral Vibe, Cursor and Claude Code find/allowlist bypasses: a coding agent's auto-approve heuristic is a parser, and the shell parses more than the heuristic does. VTCode is niche, but the pattern is the point.
Am I affected? #
cargo install --list 2>/dev/null | grep -i vtcode # < 0.171.5 is affected
vtcode --version 2>/dev/null
You are exposed if you ran VTCode below 0.171.5 and relied on learned find approvals in a workspace where untrusted input can steer the agent.
If you are affected #
Upgrade to 0.171.5 or later. Until then do not rely on learned find approvals, and treat any workspace where untrusted content drives the agent as able to run shell commands after a few approved finds. See if-your-local-ai-agent-was-exploited.md and agent-sandboxing.md.
Prevention #
Prefer agents that sandbox rather than learn-to-approve, and never let an auto-approve heuristic stand in for an OS sandbox (agent-sandboxing.md); keep untrusted repos and content from steering an agent with command approvals banked (mcp-hygiene.md).
Sources #
- JFrog Security Research — VTCode is vulnerable to arbitrary command execution via an ANSI-C quote bypass of the find approval check (CVE-2026-104247) (2026-10-05, Natan Nehorai: family-learning + denylist bypass,
-exe$''cexample, fix 0.171.5 / PR #778, mitigations) - GitHub — vinhnx/vtcode GHSA-r249-hpfx-x2w7: 'Destructive find' Security Filter Bypass (CVE-2026-104247, CVSS 6.3
AV:L/AC:H/PR:H/UI:R/S:U/C:H/I:H/A:H, affected < 0.171.5, fixed 0.171.5, credit nnfrog / JFrog) - GitHub — vinhnx/VTCode releases (fix release 0.171.5; the crates.io line was at 0.174.0 at this sweep, confirming the fix is published)