ZITADEL (the open-source identity provider behind many self-hosted app logins): twenty vendor advisories between 2026-06-08 and 09-28, ten of them account takeovers that need only the victim's login name — unauthenticated passkey enrollment on identify-only sessions (CVE-2026-105212), external-IdP linking before any factor is verified (CVE-2026-105207, 9.8), cross-organisation enrollment codes (CVE-2026-105209, 9.6), forged IdP callbacks (CVE-2026-105215, 9.1), predictable session IDs and SAML provider confusion (unassigned, 4.19.2) — VulnCheck assigned ten CVEs on 10-04; fixed in 4.19.2, 3.x is end-of-life
TL;DR #
ZITADEL is the Go-based open-source identity provider that a lot of self-hosted and "I don't want Auth0's bill" stacks put in front of their apps. Between 2026-06-08 and 2026-09-28 its maintainers published twenty GitHub Security Advisories, and on 2026-10-04 VulnCheck (as CNA) assigned ten CVEs to the most serious ones. The common shape: ZITADEL's hosted login UIs accepted account-changing operations on an "identify-only" session — after the username was typed, before any password, passkey or second factor was checked. That gave an attacker who knew only a victim's login name the ability to enroll their own passkey (CVE-2026-105212, affected ≤ 4.16.1), bind their own external identity to the victim's account and sign in through the federated provider (CVE-2026-105207, CVSS 9.8, ≤ 4.17.2), pre-hijack an account through a forged external-IdP callback (CVE-2026-105215, 9.1, ≤ 4.16.1), enroll TOTP/SMS factors and overwrite the victim's phone number (CVE-2026-105210, 8.2), rename any user including admins (unassigned, ≤ 4.17.3), and — because session cookies were unsigned and session IDs time-ordered — guess another user's live session (unassigned, 8.1, fixed 4.19.2). Multi-tenant deployments got cross-organisation account takeover via enrollment codes (CVE-2026-105209, 9.6), and anyone with two SAML providers configured got IdP confusion (8.7, 4.19.2). Upgrade to 4.19.2 (skip 4.18.0, which the vendor says fails setup; 4.19.2 also requires setting ZITADEL_SESSION_COOKIE_SECRET on every Login UI replica before upgrading). 3.x reached end-of-life on 2026-08-31 and does not get the September fixes — the vendor's own advisories say "no patch available" for that line. If your app's login page is a ZITADEL instance, this is the auth-stack equivalent of the better-auth and NextAuth waves this repo already tracks, with higher scores and a longer tail.
What happened #
ZITADEL discloses through its own repository advisory tab, with no blog post and, until 10-04, no CVEs; nothing here ranked in a search query. The tab's two pages (fetched 2026-10-05) show twenty advisories from 2026-06-08 to 09-28. The CVE records VulnCheck published on 10-04 each reference exactly one GHSA, which is the mapping used below; scores are the vendor's where the GHSA page shows one, and VulnCheck's CVSS 4.0 / 3.1 pairs from the CVE records otherwise.
Account takeover with only a login name (unauthenticated) #
| Bug | Ids | Affected → fixed | What an attacker with only a username could do |
|---|---|---|---|
| Passkey enrollment on an identify-only session (Login V1 and V2) | GHSA-45f2-5q3r-xgg6, CVE-2026-105212 (VulnCheck 4.0 8.7 / 3.1 7.5; vendor: Critical) | 4.0.0–4.16.1 → 4.16.2; 3.0.0–3.4.13 → 3.4.14 | Enroll an attacker-controlled passkey "after the username was submitted, but before any password or other primary factor was verified," then log in — "without knowing the password, using an existing passkey, completing MFA, or interacting with the victim." Published 2026-07-29. |
| Account pre-hijacking via forged external-IdP callback (Login V1) | GHSA-738m-7888-jfv8, CVE-2026-105215 (4.0 9.3 / 3.1 9.1; vendor: Critical) | ≤ 4.16.1 → 4.16.2; ≤ 3.4.13 → 3.4.14 | Published 2026-07-29 alongside the passkey bug; the CVE title is the vendor's. |
| External-IdP linking before verification (Login V2 + API) | GHSA-g8gj-gq47-xgf4, CVE-2026-105207 (4.0 9.3 / 3.1 9.8; vendor: Critical 9.8) | 4.0.0–4.17.2 → 4.17.3; 3.x: no patch (EOL) | "Bind their own external identity to the victim's account" through Login V2's identify-only session, then authenticate as the victim through the federated provider; an authenticated user could also pre-claim arbitrary external identities via the API. Disabling IdP linking closes the UI vector but not the API one. Published 2026-09-04. |
| OTP-Email / OTP-SMS return-code bypass (Login V2) | GHSA-3gwm-5wx8-4gm6, CVE-2026-105211 (4.0 9.2 / 3.1 8.1; vendor: High 8.1) | 4.0.0–4.17.0 → 4.17.1 | The server action "exposed OTP codes directly in responses"; a victim with both OTP-Email and OTP-SMS enrolled could be fully authenticated by an attacker with only the login name. Published 2026-08-14. |
| Unauthenticated MFA enrollment and phone-number overwrite (Login V1) | GHSA-72q5-mv5c-vxv4, CVE-2026-105210 (4.0 8.8 / 3.1 8.2; vendor: High 8.2) | 4.0.0–4.17.0 → 4.17.1; 3.0.0–3.4.14 → 3.4.15 | Enroll TOTP/OTP/U2F factors and change a verified phone number before the password step; also enumerates valid accounts via differential errors. Not a takeover on its own. Published 2026-08-14. |
| Rename any user, including admins (Login V1) | GHSA-4hgj-wm6c-q7p2 (no CVE; vendor: High 8.2) | 4.0.0–4.17.3 → 4.19.1 (skip 4.18.0); 3.x: no patch | The change-username request "acted on the account bound to the login flow as soon as a login name had been entered" — lock users out, free usernames for squatting. Published 2026-09-24. |
| Predictable session IDs + unsigned session cookies (Login V2) | GHSA-jh92-5mrj-p2w2 (no CVE; vendor: High 8.1) | 4.0.0–4.19.1 → 4.19.2; 3.x: no patch | Guess time-ordered session IDs to obtain "valid session tokens for other users' authenticated sessions," complete OAuth/SAML flows as them, and for admin sessions take over the instance. Rate limiting is only partial mitigation. Published 2026-09-28. |
| Login V2 lets users of deactivated organisations log in | GHSA-558c-v5wc-9w4q, CVE-2026-105213 (4.0 8.8 / 3.1 8.2; vendor: High) | ≤ 4.17.0 → 4.17.1 | Published 2026-08-14. |
Cross-tenant and federated-provider bugs (authenticated or multi-provider) #
| Bug | Ids | Affected → fixed | Detail |
|---|---|---|---|
| Cross-organisation account takeover via passkey/passwordless enrollment codes | GHSA-pq2q-2c6r-75c4, CVE-2026-105209 (4.0 9.3 / 3.1 9.6; vendor: Critical 9.6) | 4.0.0–4.17.0 → 4.17.1; 3.0.0–3.4.14 → 3.4.15 | Issuing an enrollment code "did not verify that the caller was authorized in the organization that owns the target user" — user-write permission in one tenant takes over users in another. Published 2026-08-14. |
| SAML identity-provider confusion | GHSA-x4c7-fpcx-w9q6 (no CVE; vendor: High 8.7) | 4.0.0–4.19.1 → 4.19.2; 3.x: no patch | With two or more SAML providers configured, an attacker controlling one provider's signing key "could complete a login intent aimed at a second SAML identity provider and obtain an authenticated session as any user linked to that second provider." Published 2026-09-28. |
| Forgeable IdP intent tokens → cross-user session hijack and IdP token theft | GHSA-jh3m-cr2x-qp88, CVE-2026-105208 (4.0 8.7 / 3.1 7.7; vendor: High 7.7) | 4.0.0–4.17.2 → 4.17.3; 3.x: no patch | Intent tokens lacked integrity protection; the vendor estimates ~1.25% success in a 15-second window per attempt, so a brute-forceable race rather than a deterministic bypass. Published 2026-09-04. |
| Cross-organisation authentication-method enumeration | GHSA-j344-gqv4-84ff, CVE-2026-105206 (4.0 5.3) | ≤ 4.17.2 → 4.17.3 | Published 2026-09-04. |
| SSRF in organisation-domain HTTP verification | GHSA-93hm-8q29-c8cr, CVE-2026-105214 (4.0 2.3; vendor: Low) | ≤ 4.16.1 → 4.16.2 | Published 2026-07-29. |
The June–July advisories on page 2 of the tab — MFA bypass via session reuse in Login V2 (GHSA-9993-rfwp-rhwf, High, 07-17), Actions V1 sandbox escape: host file read via require() (GHSA-fgmf-7rf8-m6vf, High, 07-17), stored XSS via default URI redirect in Login V2 (GHSA-5wcj-9wj4-j65h, High, 06-22), OAuth2 token-exchange privilege escalation (GHSA-vrh8-c9cm-wh8v, High, 06-22), users can self-verify email/phone via API (GHSA-jq8w-8q2f-ffm9, High, 06-08), improper role revocation on granted projects (GHSA-v859-c572-qh5p, Moderate, 07-10) and cross-tenant user leakage via recycled identifiers (GHSA-6x8v-2fq5-2229, Low, 06-17) — have no CVE and were not opened individually by this sweep; they are listed from the tab index and are all fixed in 4.19.2 by version ordering.
Why the scores differ. Every GHSA page says "No known CVE" because the vendor never requested one; VulnCheck assigned the ten ids on 2026-10-04 and scored them in CVSS 4.0 and 3.1 independently of the vendor's label. The two disagree in both directions — the passkey-enrollment bug is "Critical" on the vendor page but 8.7/7.5 at VulnCheck, while the deactivated-organisation login is 8.8 at VulnCheck against the vendor's "High" — so the table carries both and this file's critical rests on the three unauthenticated takeovers the vendor itself rates Critical.
Am I affected? #
- You run ZITADEL below 4.19.2 (any 4.x), or any 3.x — the vendor's September advisories state "3.x: no patch available (end-of-life as of 2026-08-31)."
- Your users log in through the hosted Login V1 or Login V2 UI (the default). Pure API/token deployments without the hosted login are exposed to fewer of these but still to the IdP-linking API vector (CVE-2026-105207) and the cross-organisation enrollment codes (CVE-2026-105209).
- You have external identity providers with account linking enabled, two or more SAML providers, or multiple organisations with delegated user administration — each adds a row above.
# Version check (API) — replace with your instance
curl -s "$ZITADEL_URL/debug/healthz"; curl -s "$ZITADEL_URL/admin/v1/healthz"
# Or from the container image tag / Helm values
grep -rn 'zitadel' docker-compose*.yml values*.yaml | grep -i 'image\|tag'
If you are affected #
- Upgrade to 4.19.2. Set
ZITADEL_SESSION_COOKIE_SECRET(identical, ≥ 32 characters, on every Login UI replica) before the upgrade — the 4.19.2 session-cookie fix depends on it — and skip 4.18.0 per the vendor's note on GHSA-4hgj-wm6c-q7p2. On 3.x, migrate; there is no 3.x fix for the September bugs. - Audit for takeover artefacts since the first affected version was deployed: passkeys and U2F/TOTP factors enrolled without a matching user action, external-IdP links added to accounts that never used federation, phone-number changes, username changes on admin accounts, and sessions from unfamiliar networks completing OAuth or SAML flows. ZITADEL's event store makes these queryable; the vendor pages do not supply a query, so use your audit-log export.
- Force re-authentication and rotate admin credentials and any OAuth client secrets an instance-level takeover could have read, per rotating-cloud-credentials.md. If your app stores ZITADEL-issued tokens, invalidate them.
- If you use the SAML path with multiple providers, verify the provider in every callback matches the intent — the 4.19.2 fix does this; before it, assume any provider operator could have logged in as any user linked to another.
Prevention #
- Treat the identity provider as the highest-value service in the stack and keep it on the vendor's current minor; a login page that has not been upgraded in a quarter now carries ten CVEs — prevention/supply-chain-attack-surface.md.
- Watch the vendor's advisory tab, not only CVE feeds: the first critical here was public for 67 days before any CVE existed.
- Rate-limit and bot-protect the login UI and API in front of the instance; the vendor names this as partial mitigation for two of the bugs, and it is the only control that works before you can upgrade.
- Do not give delegated organisation admins user-write permission they do not need; CVE-2026-105209 turns that permission into cross-tenant takeover.
- For vibe-coded apps: if an agent scaffolded your login against a ZITADEL instance it also deployed, the instance version is in your
docker-compose.ymlor Helm values and nobody has bumped it since — check it the same way you would checknext— auditing-a-vibe-coded-repo.md.
Why this matters for vibe coders #
The auth layer is the one piece of a generated app that is almost never written by the generator: it is delegated to a library (better-auth, NextAuth, Clerk) or to an identity server like this one, and then forgotten. This repo now has a same-quarter account-takeover wave in all four. An identity server differs from a library in one way that matters: it is a running service with its own version, not a dependency npm audit will ever flag, so the only signal is the vendor's advisory tab or a CNA assigning ids months later — which is what happened here.
Sources #
- zitadel/zitadel — Security Advisories index, page 1 and page 2 — fetched 2026-10-05; the twenty advisories, titles, severities and dates used above.
- Vendor advisory pages, fetched 2026-10-05: GHSA-45f2-5q3r-xgg6 — passkey enrollment on Login V1/V2 (ranges, the "identify-only" quote, no-workaround statement, credits); GHSA-g8gj-gq47-xgf4 — external IdP linking (9.8, 3.x EOL, UI-vs-API workaround limit); GHSA-pq2q-2c6r-75c4 — cross-organisation enrollment codes (9.6); GHSA-jh92-5mrj-p2w2 — predictable session IDs (8.1, unsigned cookies, rate-limit partial); GHSA-x4c7-fpcx-w9q6 — SAML IdP confusion (8.7, two-provider prerequisite); GHSA-4hgj-wm6c-q7p2 — rename any user (8.2, skip 4.18.0); GHSA-jh3m-cr2x-qp88 — forgeable IdP intent tokens (7.7, the 1.25% estimate); GHSA-72q5-mv5c-vxv4 — MFA enrollment / phone overwrite (8.2); GHSA-3gwm-5wx8-4gm6 — OTP return-code bypass (8.1, both-OTP prerequisite).
- CVE Services records CVE-2026-105206 through CVE-2026-105215 — fetched 2026-10-05; each record's single GHSA reference is the mapping above; VulnCheck's CVSS 4.0 and 3.1 vectors;
datePublished2026-10-04. - VulnCheck — advisories index — fetched 2026-10-05; the ten ZITADEL entries dated 2026-10-04; VulnCheck — ZITADEL before 3.4.14 and 4.16.2 Account Takeover via Passkey Enrollment (CVE-2026-105212) — the only per-CVE page opened (CVSS 4.0 8.7, credits).
- The
ZITADEL_SESSION_COOKIE_SECRETupgrade prerequisite appears in search-result summaries of third-party release trackers and was not confirmed on a vendor page by this sweep; verify against the 4.19.2 release notes before upgrading. - Related in this repo: better-auth OAuth/OIDC wave, NextAuth magic-link homoglyph bypass, Clerk middleware bypass.