agent-device 0.21.36: a remote caller with a daemon token can read host files through `file://` navigation (CVE-2026-129130); upgrade to 0.21.37
TL;DR #
agent-device 0.21.36, Callstack's device and browser automation CLI for AI agents, let an authenticated remote caller open a file:// URL in the managed browser and read the result with snapshot. That returns any plaintext file the daemon's account can read. Only 0.21.36 is listed as affected. It was on npm from 2026-11-02 until 0.21.37 on 2026-11-12. Upgrade to 0.21.37.
What happened #
The vendor advisory GHSA-g87j-p64h-w8wc was published on 2026-11-13. It rates the bug High, CVSS 3.1 7.7 (AV:N/AC:L/PR:L/UI:N/S:C/C:H/I:N/A:N), affected =0.21.36, patched 0.21.37. It says the caller needs a valid bearer token for the /rpc endpoint, and that the remote host input policy did not inspect URL schemes for the web open command. The page lists no workaround and credits naroSEC.
VulnCheck published CVE-2026-129130 the same day with the same range and two scores of its own: CVSS 4.0 7.1 and CVSS 3.1 6.5 with scope unchanged. The vendor page printed "No known CVE" when read on 2026-11-14. The scores differ on scope only. This file keeps high.
Registry facts, read 2026-11-14: 0.21.35 on 2026-10-29, 0.21.36 on 2026-11-02, 0.21.37 on 2026-11-12, latest 0.21.37. npm counted 682,584 downloads in the week 2026-11-07 to 2026-11-13. The package's repository field points to callstack/agent-device.
Am I affected? #
npm ls agent-device
npm ls -g agent-device
- Version 0.21.36, and the daemon accepts callers other than you.
- A local-only daemon with one user is not the case the advisory describes.
If you are affected #
- Upgrade to 0.21.37.
- If other people or agents held a daemon token between 2026-11-02 and your upgrade, treat files readable by the daemon account as read. Rotate keys kept in that account's home directory. This step is this file's advice.
Prevention #
- Run automation daemons under an account with no credentials in its home directory, and do not expose
/rpcbeyond the hosts that need it. - See prevention/agent-sandboxing.md.
Sources #
- GHSA-g87j-p64h-w8wc, fetched 2026-11-14: published 2026-11-13, score, range, impact, credit, "No known CVE".
- CVE Services: CVE-2026-129130, fetched 2026-11-14: VulnCheck, 2026-11-13, range, both scores, the reference to the vendor advisory.
npm view agent-device time dist-tags repository.urlandapi.npmjs.org/downloads/point/last-week/agent-device, run 2026-11-14.- Not covered: the fix commit, the release notes and VulnCheck's advisory page.