Budibase: 30 vendor advisories on 2026-11-10, seven critical, including unauthenticated automation execution and a LiteLLM key exposure; fixed 4.0.0
TL;DR #
Budibase's advisory tab holds 30 advisories dated 2026-11-10, seven rated Critical and 23 High, plus four Moderate dated 2026-11-12. The three opened for this file list every version below 4.0.0 as affected and 4.0.0 as patched, with no CVE. One lets a caller with the lowest role run builder-authored automations, or a caller with no login where the automation is granted to Public. One returns a stored LiteLLM key to anyone who can reach the tenant. Run the v4.0.0 image or later and rotate any LiteLLM key Budibase stored.
What happened #
The tab has 13 pages and 125 rows. The rows are not in date order, so every page was read on 2026-11-23 and the rows counted by date.
| Published | Rows | Critical | High | Moderate |
|---|---|---|---|---|
| 2026-11-10 | 30 | 7 | 23 | 0 |
| 2026-11-12 | 4 | 0 | 0 | 4 |
Three advisories were opened. Each lists package @budibase/server, affected < 4.0.0, patched 4.0.0, and no CVE.
| Advisory | Severity | What the advisory says |
|---|---|---|
| GHSA-5rq2-4mjm-m7q2 | Critical 9.1 | POST /api/automations/:id/test runs builder-authored automations at service privilege with no builder check. A lowest-role account can call it, and no login is needed where a builder granted the automation to the Public role. Where a builder's step invokes a shell, that is command execution as root. |
| GHSA-wr7j-r9v4-6rjh | Critical 9.9 | A user-supplied attachment key is not bound to the app, so a low-privilege user can delete other tenants' files in the shared object-store bucket. Reading a file needs its random filename. The advisory says the caller needs write access to a table and that the finding comes from static analysis only. |
| GHSA-c24r-7gmq-4rgm | High 7.5 | GET /api/global/configs/public needs no login and returns the full global settings object. On tenants with a legacy liteLLM field, that includes a LiteLLM virtual key and secret. |
The other five Critical rows dated 2026-11-10 are GHSA-p7c8-m379-jf3x, GHSA-x4w8-596q-fmh7, GHSA-6wc7-w493-mw5m, GHSA-jm85-crv2-88px and GHSA-q4f7-c337-92c9. Their pages were not opened. The tab titles for the first three describe privilege escalation to server-side code execution, an anonymous MongoDB filter bypass in public query templates, and authenticated code execution as root through a datasource plugin.
Two advisories from the batch have CVE records, published by the GitHub CNA on 2026-11-20. CVE-2026-122247 (8.2) lets an unauthenticated caller create a global-admin record in an unused tenant namespace on a single-tenant install. CVE-2026-122244 (7.7) is stored script execution in the Builder. Both records say "fixed in versions 3.50.0 and 4.0.0" and give the affected range as < 3.50.0. The three advisories opened here name only 4.0.0.
GHSA-c24r-7gmq-4rgm's body says no fixed version was identified in the commit the reporter tested. Its metadata lists 4.0.0 as patched.
Where the fix is #
- npm:
npm view @budibase/server versionsends at 3.38.1, published 2026-05-12. The advisories name this package and a patched version the registry does not carry. - Docker Hub:
budibase/budibasehas tagsv3.50.0(pushed 2026-10-19),v4.0.0(2026-11-10) andv4.1.0(2026-11-23), read 2026-11-23.
Earlier advisories #
OSV returned 44 records for @budibase/server on 2026-11-23. This repo had no Budibase file before this one. The tab also holds nine rows dated 2026-09-10, four of them Critical, and batches from 2026-07-22 and earlier. Those pages were not opened.
Am I affected? #
Check the running image tag, not the npm package:
docker ps --format '{{.Image}}' | grep -i budibase
- A tag below
v4.0.0is affected by the three advisories opened here. - A scanner keyed on CVE ids flags at least two of the 30. Two CVE records were found, and 27 advisory pages were not opened.
For the LiteLLM key, request /api/global/configs/public on your own tenant without a session and look for a liteLLM field in the response.
If you are affected #
- Move to the
v4.0.0image or later. - If the public settings response held a
liteLLMfield, revoke that LiteLLM key. The advisory says to treat keys stored there as possibly exposed. - Review automations that include a shell step, and the run history of
/api/automations/:id/test, for runs no builder started. This step is this file's advice. - Check CouchDB for tenant databases you did not create. CVE-2026-122247 says the administrator record lands in a separate tenant database. This step is this file's advice.
See playbooks/if-your-webapp-was-compromised.md and playbooks/rotating-cloud-credentials.md.
Prevention #
- Do not expose a self-hosted builder to the internet. Put it behind a VPN or an authenticating proxy.
- Keep provider keys in the gateway, not in the app builder's settings. See prevention/credential-hygiene.md.
Sources #
Single source: the vendor, plus the GitHub CNA records.
- Budibase security advisories, pages 1 to 13, fetched 2026-11-23: GHSA id, severity and date per row. Counts were made in code.
- GHSA-5rq2-4mjm-m7q2, GHSA-wr7j-r9v4-6rjh, GHSA-c24r-7gmq-4rgm, fetched 2026-11-23 through a summarizing fetch: score, vector, range, patched version, impact. Paraphrased, not quoted.
- CVE-2026-122247 and CVE-2026-122244, CNA GitHub, published 2026-11-20: descriptions, ranges, scores.
npm view @budibase/server versionsandtime, run 2026-11-23.- Docker Hub tag API for
budibase/budibase, read 2026-11-23. - OSV package query for
@budibase/server, run 2026-11-23: 44 records. - Not covered: the other 27 advisories dated 2026-11-10, the four dated 2026-11-12, the 4.0.0 release notes, and which of the 30 the 3.50.0 image fixes.