TL;DR

Coder published seven advisories between 2026-11-04 and 2026-11-12, none with a CVE when published. The one rated High (GHSA-w4m3-qhx8-c649, vendor 8.1) affects deployments that use AWS IAM database authentication. A failed database connection put the connection URL, with its temporary password, into API error responses that unauthenticated requests could trigger. Releases 2.39.1, 2.38.7, 2.37.11, 2.34.19 and 2.29.27, all dated 2026-11-10 on the Go module proxy, carry the fixes for all seven. The newest advisories list no patch for lines 2.30 to 2.33 and 2.35, which the vendor calls end-of-life, and most list none for 2.36.

What happened

The vendor tab (coder/coder, five pages, of which pages 1 and 2 were read) showed seven rows dated 2026-11-04 to 2026-11-12 when read on 2026-11-13. Earlier Coder advisories are in the Coder home file. All seven pages print "No known CVE".

GHSA Published Vendor score What it is First fixed releases
GHSA-w4m3-qhx8-c649 2026-11-11 8.1 High AWS IAM database password in API errors and logs 2.39.1, 2.38.7, 2.37.11, 2.34.19, 2.29.27
GHSA-6g9g-vmp7-r45p 2026-11-11 6.1 coder open app sends the session token to template app URLs 2.39.1, 2.38.7, 2.37.11, 2.34.19, 2.29.27
GHSA-5wcx-v9qj-4gj6 2026-11-11 4.6 Agent-supplied app status links can use unsafe URL schemes 2.39.0, 2.38.7, 2.37.11, 2.34.19, 2.29.27
GHSA-7hf9-gp2x-ppfm 2026-11-12 6.5 Any authenticated user can crash coderd with one tailnet message 2.37.3, 2.36.7, 2.35.9, 2.34.12, 2.29.27
GHSA-9h3q-h2rh-35gg 2026-11-06 6.5 Crafted workspace agent RPC calls crash coderd 2.37.1, 2.36.5, 2.35.8, 2.34.10, 2.29.21
GHSA-jvgx-787p-cfmg 2026-11-04 4.2 CSRF protection skipped for API paths matching unanchored patterns 2.39.0, 2.38.6, 2.37.10, 2.34.18, 2.29.26
GHSA-hm3r-4cg2-22xx 2026-11-04 3.1 Low Coder Agents read_skill_file follows symlinks out of the skill directory 2.39.0, 2.38.5, 2.37.9, 2.36.12, 2.34.17

Details the reader needs:

  • AWS IAM database password (GHSA-w4m3-qhx8-c649). Only deployments with CODER_PG_AUTH=awsiamrds are affected, and only while Coder is failing to open new database connections, such as during an outage or failover. The advisory says "Coder returned this error in API responses, including to unauthenticated requests." The password is valid for 15 minutes. An attacker who can also reach the database over the network could read or change data, including user accounts and roles. The error was also written to server logs and CLI output. The vendor's workarounds, restricting database network access and limiting the database user, "limit the impact but don't prevent the password from appearing in errors".
  • CLI session token (GHSA-6g9g-vmp7-r45p). coder open app replaced $SESSION_TOKEN in an external app's URL with the user's real session token wherever the URL pointed. A template author could collect the tokens of users who ran the command on that app. The dashboard path was fixed earlier under GHSA-2x8w-q434-f76p. Credits include Anthropic's Security Team and Ada Logics.
  • Agent status links (GHSA-5wcx-v9qj-4gj6). A process holding the agent token, including an AI agent manipulated through prompt injection in the advisory's words, could show an unsafe link to anyone viewing the workspace or task. The dashboard's Content Security Policy blocks javascript: links from running script. The fix keeps only http, https and file links, and applies to new status updates only.
  • Two crashes (GHSA-7hf9-gp2x-ppfm, GHSA-9h3q-h2rh-35gg). Availability only. The first needs any authenticated user and, since 2.18.0, no workspace access. The second needs an agent token.
  • CSRF (GHSA-jvgx-787p-cfmg). A same-site page, such as a workspace app on the wildcard access URL, could make a signed-in user's browser send some state-changing requests. The advisory says deployments started with --samesite-auth-cookie none "can be attacked from any website".
  • Skill symlink (GHSA-hm3r-4cg2-22xx). A malicious skill in the victim's workspace could return a file outside the skill directory to the model. The read stays inside what the workspace agent's user can already read. Line 2.29 is not affected.

The Go module proxy dates v2.39.1, v2.38.7, v2.37.11, v2.34.19 and v2.29.27 to 2026-11-10 between 14:20 and 15:10 UTC, and v2.39.0 to 2026-11-03.

Update 2026-11-22: two CVE ids from VulnCheck

VulnCheck published records for two of the seven advisories on 2026-11-21. The fixed versions in the records are at or below the releases above. An install already on the fixed lines above needs nothing new, and scanners keyed on CVE ids flag from 2026-11-21.

Vendor advisory CVE VulnCheck score Vendor score
GHSA-9h3q-h2rh-35gg, agent RPC crash CVE-2026-134361 7.1 (CVSS 4.0), 6.5 (CVSS 3.1) 6.5
GHSA-hm3r-4cg2-22xx, read_skill_file symlink CVE-2026-134363 2.3 (CVSS 4.0), 3.1 (CVSS 3.1) 3.1 Low

The other five advisories, including the High one, had no CVE id in the agent listing when read on 2026-11-22.

Update 2026-11-27: two more CVE ids from VulnCheck

VulnCheck published records for two more of the seven advisories on 2026-11-26. Four of the seven now have a CVE id. The fixed versions in the records match the vendor releases above, so an install on a fixed line needs nothing new. Scanners keyed on CVE ids flag these two from 2026-11-26.

Vendor advisory CVE VulnCheck score Vendor score
GHSA-7hf9-gp2x-ppfm, tailnet crash CVE-2026-137545 7.1 (CVSS 4.0), 6.5 (CVSS 3.1) 6.5
GHSA-5wcx-v9qj-4gj6, agent status links CVE-2026-137548 5.1 (CVSS 4.0), 4.6 (CVSS 3.1) 4.6

The record for CVE-2026-137548 lists 2.35.0 to below 2.37.0 as affected and marks 2.37.0 unaffected. It also lists 2.37.0 to below 2.37.11 as affected. The two entries disagree on 2.37.0. The vendor advisory's fixed releases, in the table above, include none on 2.35 or 2.36.

The High advisory, GHSA-w4m3-qhx8-c649, had no CVE id in the agent listing when read on 2026-11-27. The vendor tab's page 1 showed no row newer than 2026-11-12.

Am I affected?

coder version                      # server and client versions
env | grep -E '^CODER_PG_AUTH='    # awsiamrds = the High advisory applies
ps aux | grep -E 'samesite-auth-cookie[ =]none'   # widens the CSRF advisory
  • Below 2.39.1 on 2.39, below 2.38.7 on 2.38, below 2.37.11 on 2.37, below 2.34.19 on 2.34, or below 2.29.27 on 2.29: at least one of the seven applies.
  • On 2.30 to 2.33, 2.35 or 2.36: affected by the newer advisories with no patch on that line. The table shows the last patch each line received.
  • For the database password: check server logs and CLI output from any database outage for a connection URL.
  • For the CLI token: review templates for external app URLs that contain $SESSION_TOKEN.

If you are affected

  1. Upgrade to the patched release on your line. Move off end-of-life lines.
  2. If you use awsiamrds and had a database outage or failover on an affected version, review database audit logs for that window and check user accounts and roles for changes. The temporary password expires, but changes made with it do not.
  3. If users ran coder open app against templates you do not fully trust, have them sign out to end their sessions, and delete their API tokens. Rotating cloud credentials covers what a workspace owner's session can reach.
  4. Restart workspaces after the upgrade so they run the updated agent. The skill-symlink advisory says read_skill_file fails on workspaces running an older agent until they restart.

Prevention

  • Agent sandboxing: treat anything an agent can write into a dashboard, a status link or a skill directory as untrusted input.
  • Keep the database reachable only from Coder, and give its user the least privilege that works.
  • Install skills only from sources you trust, and review skill directories for symbolic links.
  • Keep the default --samesite-auth-cookie lax.

Sources

  • CVE-2026-137545 and CVE-2026-137548, CVE Services, VulnCheck CNA, published 2026-11-26, read 2026-11-27: ranges, scores, the referenced vendor advisories.
  • CVE-2026-134361 and CVE-2026-134363, CVE Services, VulnCheck CNA, published 2026-11-21, read 2026-11-22: ranges, scores, the referenced vendor advisories.

Single source: the vendor, for its own product.