TL;DR

VulnCheck published two records on 2026-11-24 and 2026-11-25 for local tools that a web page in your browser can reach. With Electerm's MCP Server widget running, a page can run commands locally and on open SSH sessions (CVE-2026-136630). With Prismor's local server running, a page can overwrite the policy that restricts your coding agent (CVE-2026-136185). Upgrade Electerm to 5.9.0 or later and Prismor to 1.57.0 or later.

What happened

Electerm Prismor
Product Terminal and SSH client with a built-in MCP Server widget Python package whose local API enforces file, shell and network policy on AI coding agents, per its advisory
Vendor advisory GHSA-45rj-2wq9-r9mr, 2026-11-02, High, 8.8 GHSA-9xjv-g2ch-rfhc, 2026-10-01, High, no number
CVE record CVE-2026-136630, VulnCheck, 2026-11-25, 7.7 (4.0) and 7.5 (3.1) CVE-2026-136185, VulnCheck, 2026-11-24, 7.1 (4.0) and 7.1 (3.1)
Default listener, per the advisory 127.0.0.1 port 30837, empty API key 127.0.0.1 port 7070
Flaw No Host or Origin check, so DNS rebinding reaches unauthenticated MCP tools PUT /api/policy/global and /api/policy/project need no authentication and every response allows any origin
Result Commands run on the machine and on open SSH sessions Policy files overwritten, guardrails disabled, session and event data read
Affected vendor: <= 5.8.1. CNA: before 5.9.0 vendor: <= 1.56.0. CNA: before 1.57.0
Fixed, registry date 5.9.0, npm, 2026-11-07 1.57.0, PyPI, 2026-10-01

The file is dated by the Electerm advisory, the later of the two vendor pages. Both flaws need the local server to be running and the user to open an attacker's page in a browser on the same machine.

Electerm's advisory does not say whether the widget is on by default. Its vendor score is 8.8 with low attack complexity, and the CNA scores 7.5 with high complexity. Both vendor pages said "No known CVE" when read on 2026-11-25.

npm lists Electerm 5.8.0 and 5.9.0 and no 5.8.1. The vendor's patched field reads > 5.8.1.

Prismor's advisory lists the reporter's recommended changes and does not say which of them 1.57.0 makes.

Newest on the registries on 2026-11-25: Electerm 5.15.0, prismor 1.80.1.

Am I affected?

npm ls -g electerm 2>/dev/null
pip show prismor 2>/dev/null | grep -i '^version'
  • Electerm below 5.9.0 and you have started the MCP Server widget.
  • Prismor below 1.57.0 and its local server is running.

If you are affected

  1. Upgrade both to the fixed versions or later.
  2. Electerm: if the widget ran on an affected version while you browsed, review shell history on the machine and on hosts with open SSH sessions, and rotate keys those sessions could read. See if your local AI agent was exploited.
  3. Prismor: open your global and project policy files and compare them with what you intended. A policy changed by a page stays changed after the upgrade.

Prevention

  • A service on localhost is reachable from every page your browser loads. It needs a Host and Origin check and a token. See MCP hygiene and agent sandboxing.
  • Stop local agent servers when you are not using them.

Sources