TL;DR

CVE-2026-130796 says Flowise 3.1.3 and 3.1.4 return a chatflow's MCP server bearer token to anyone who requests the public chatflow endpoint. The token then runs the chatflow on the owner's model quota. Flowise 3.1.4 is the last release, the project is end of life, and no fix exists. Take Flowise off the public internet or move off it. Three more records from the same two days cover Supergateway, NocoDB and HyperFrames.

Flowise: no fix will ship

VulnCheck published the record on 2026-11-17 and credits George Chen. It scores 8.8 (CVSS 4.0) and 8.2 (CVSS 3.1). The record says unauthenticated attackers can read MCP server bearer tokens "via the GET /api/v1/public-chatflows/:id handler", and use the token "to invoke chatflows, bypassing API key protection and consuming the owner's model quota."

Fact Value Source
Affected 3.1.3 through 3.1.4 CNA record
3.1.3 on npm 2026-06-25 npm time
3.1.4 on npm, newest 2026-07-29 npm time, read 2026-11-18
Code freeze announced 2026-07-29 Flowise sunset page
Repository archived "archived by the owner on Aug 13, 2026" repository banner, read 2026-11-18
End of life 2026-08-31 Flowise sunset page

The sunset page says the team "will no longer be reviewing or accepting new Pull Requests". It also says npm packages would be marked deprecated. npm view flowise deprecated returned nothing on 2026-11-18, so npm install prints no warning.

The record lists no fixed version. A scanner will keep flagging 3.1.4 and no upgrade clears it. The record does not say whether 3.1.2 and earlier are unaffected for another reason or only lack the MCP server feature.

Three more records

Product CVE What the record says Affected Fix state when read
Supergateway CVE-2026-131857, 8.7 (4.0), 7.5 (3.1) an unauthenticated request crashes the gateway in stdio-to-SSE mode and ends every attached MCP session 4.2.0 through 4.2.2 npm newest is 4.2.2 (2026-11-10), inside the range. Issue 378 is open with no maintainer reply
NocoDB CVE-2026-130711, 7.1 (4.0), 6.5 (3.1) a Viewer on one base can mint an MCP token and use its id to read another base's table list and member email addresses before 2026.09.0 fixed in 2026.09.0 per the vendor advisory of 2026-11-02
HyperFrames CVE-2026-130843, 8.7 (4.0), 8.8 (3.1) a web page the user visits can write project files through the unauthenticated Studio API, including package.json scripts or agent configs before 0.9.30 0.9.30 on npm 2026-11-10. Newest 0.9.66

Notes on the table:

  • All four records are VulnCheck's, published 2026-11-17 or 11-18. The scores are VulnCheck's.
  • The Supergateway record references a commit. It was not opened, and no npm release after 4.2.2 exists. The issue author says a second advisory was published under their own fork. This file covers only the id above.
  • NocoDB's vendor advisory rates the bug Moderate 6.5 and printed no CVE when read. The npm package nocodb stops at 0.301.3 (2026-02-27) and uses a different version scheme, so it is not the channel that carries 2026.09.0.
  • The HyperFrames record names HeyGen as the vendor.

Am I affected?

npm ls flowise supergateway hyperframes 2>/dev/null
npm ls -g flowise supergateway hyperframes 2>/dev/null
grep -rnE '"(flowise|supergateway|hyperframes)"' package.json package-lock.json 2>/dev/null
  • Flowise 3.1.3 or 3.1.4 with at least one public chatflow that has an MCP server configured is exposed to anyone who can reach the server.
  • Supergateway 4.2.0 to 4.2.2 in stdio-to-SSE mode is exposed to anyone who can reach its port.
  • NocoDB before 2026.09.0 with more than one base and users who should not see every base.
  • HyperFrames before 0.9.30 while the Studio preview server is running.

If you are affected

  • Flowise. Remove it from the public internet. Make public chatflows private or delete their MCP server configuration. Rotate the MCP tokens and review provider usage. Plan a move to a maintained fork or another tool.
  • Supergateway. Bind it to localhost or put it behind an authenticating proxy. No fixed release existed when read.
  • NocoDB. Upgrade to 2026.09.0 or later and review MCP tokens.
  • HyperFrames. Upgrade to 0.9.30 or later. Check package.json scripts and agent config files in projects opened while an older version ran.
  • See if your local AI agent was exploited.

Prevention

  • Inventory end-of-life tools that hold provider keys. No scanner entry will ever show them as fixed.
  • Local preview and gateway servers should check Origin and Host, and should not listen on all interfaces. See MCP hygiene.

Update 2026-11-19: a second Supergateway record, CVE-2026-132121, covers 2.4.0 through 4.2.2

VulnCheck published CVE-2026-132121 on 2026-11-18. It scores 8.6 (CVSS 4.0) and 8.1 (CVSS 3.1), both VulnCheck's.

  • The record says stdio-to-WebSocket mode does not check the Origin header. A web page the user visits can open the /message WebSocket, "even against localhost-bound gateways", and call the wrapped MCP server's tools.
  • Affected: 2.4.0 through 4.2.2. The record lists no fixed version.
  • npm's newest version was still 4.2.2 (2026-11-10) when read on 2026-11-19.
  • The record references issue 378 and the reporter's own research repository. Neither was re-opened on 2026-11-19.

Binding to localhost does not help for this id. Stop the gateway while browsing, or do not run it in stdio-to-WebSocket mode, until a release ships.

Sources