TL;DR

LiteLLM's proxy did not block six Azure Entra ID credential parameters in request bodies. A user with any key that can call one Azure model could send them and get server-side values back in the error, including provider API keys, the database URL and LITELLM_MASTER_KEY. The vendor advisory, published 2026-11-12, scores it 7.7 and lists no CVE. Fixed in 1.106.9, 1.108.6, 1.109.1 and 1.110.0-rc.2. All four are on PyPI. The advisory names no fixed 1.107 release.

What happened

The vendor advisory GHSA-2rwg-2wh4-7c4f (High, CVSS 3.1 7.7, AV:N/AC:L/PR:L/UI:N/S:C/C:H/I:N/A:N) names the parameters: tenant_id, client_id, client_secret, azure_username, azure_password and azure_scope. A value supplied in a chat completion or image generation request to an Azure deployment overrides the deployment's default Azure credential. The resulting authentication error goes back to the caller and can include resolved server-side values. The advisory says this covers environment variables of the proxy process and the contents of files those variables point to, and that the master key gives full administrative control of the proxy.

The advisory limits the affected configurations to deployments with at least one Azure OpenAI or Azure AI model that do not set AZURE_API_KEY or AZURE_OPENAI_API_KEY.

The page prints "CVE ID: None known" when read on 2026-11-14 and lists no credit. pip listed 1.106.9, 1.108.6, 1.109.1 and 1.110.0rc2 on 2026-11-14.

This is a different bug from the unauthenticated file read in 2026-10-litellm-enterprise-unauthenticated-file-read-master-key-leak-ghsa-w4c7-34wj-hqm8.md. This one needs a valid key.

Am I affected?

pip show litellm | grep -i '^version'
  • The version is below the fixed release for your line.
  • The proxy config has an azure/ or azure_ai/ model.
  • Neither AZURE_API_KEY nor AZURE_OPENAI_API_KEY is set in the proxy's environment.
  • People or agents you do not fully trust hold proxy keys.

No CVE exists, so a scanner keyed on CVE ids will not flag this.

If you are affected

  1. Upgrade to 1.106.9, 1.108.6 or 1.109.1 for your line, or 1.110.0-rc.2 if you run the release candidate. From a 1.107 version, move to 1.108.6 or later.
  2. Until then, block the six parameters in request bodies at a reverse proxy in front of LiteLLM. This is the vendor's workaround.
  3. If untrusted callers held keys while you ran an affected version, rotate LITELLM_MASTER_KEY, the provider keys in the proxy's environment and the database password. This step is this file's advice. See playbooks/rotating-cloud-credentials.md.

Prevention

Sources

Single source: the vendor.

  • GHSA-2rwg-2wh4-7c4f, fetched 2026-11-14: published 2026-11-12, score and vector, affected and patched versions, the six parameters, affected configurations, the workaround, "None known".
  • BerriAI/litellm security advisories, fetched 2026-11-14: the row, first on page 1.
  • pip download litellm==99 version list, run 2026-11-14.
  • Not covered: the fix commit and the release notes.