LiteLLM: ZDI publishes stdio MCP command execution as a 0-day (CVE-2026-136535); vendor disputes it; stdio is off by default from 1.104.0
TL;DR #
ZDI-26-1031 says an authenticated attacker can run commands on a LiteLLM proxy through its handling of MCP stdio configurations. ZDI published it as a 0-day on 2026-11-18. LiteLLM told ZDI no separate patch is coming and that only proxy admins can create stdio servers. From 1.104.0 stdio servers are off unless LITELLM_ENABLE_MCP_STDIO=true is set in the environment. Upgrade, leave it unset, and replace any default master key.
What happened #
| Fact | Value | Source |
|---|---|---|
| Ids | ZDI-26-1031, ZDI-CAN-31815, CVE-2026-136535 | ZDI page, CVE record |
| ZDI page date | 2026-11-18, updated 2026-11-24 | ZDI page |
| CVE record published | 2026-11-24, CNA ZDI | CVE record |
| Score | 7.2, CVSS:3.0/AV:N/AC:L/PR:H/UI:N/S:U/C:H/I:H/A:H, from ZDI |
both |
| Affected, per the record | one entry, version 1.88.0, no range | CVE record |
| Credit | David Fiser and Alfredo Oliveira of TrendAI Research | ZDI page |
ZDI's description: "The specific flaw exists within the handling of MCP stdio configurations. The issue results from the lack of proper validation of a user-supplied string before using it to execute a system call."
ZDI's timeline of the vendor's replies:
- 2026-06-17: ZDI reported the flaw.
- 2026-09-15: "the vendor closed the report as a false positive".
- 2026-10-26 and 2026-10-29: ZDI disputed the closure "as the existing fix was incomplete", and the vendor reopened the report "agreeing the mitigation wasn't enough".
- 2026-11-13: the vendor "stated it planned to ship a fix and issue a GHSA before the 11/18 deadline".
- 2026-11-17: "the vendor clarified no separate patch is coming, and disputed that the report describes a vulnerability".
ZDI prints the vendor's recommended mitigation: "Stdio MCP servers run admin-chosen host commands; only proxy admins can create or test them. The CVE-2026-42271 allowlist doesn’t limit what admins can run, isn’t a security control, and will be removed. From v1.104.0, stdio servers are disabled unless LITELLM_ENABLE_MCP_STDIO=true is set in env (not via API/config/DB); to stay safe, upgrade to 1.104.0+ and leave unset. Always replace any default/example master key with a strong random value; v1.104.0+ blocks startup if unset, empty, or sk-1234."
PyPI shows litellm 1.88.0 uploaded 2026-06-06 and 1.104.0 uploaded 2026-10-03. The newest stable release on 2026-11-25 is 1.111.0.
Page 1 of 3 of the LiteLLM advisory tab had no row for this id when read on 2026-11-25. The vendor's statements above are known only through ZDI's page.
This file rates the flaw high on ZDI's 7.2. The vector needs high privileges. A proxy that still runs a default or example master key gives those privileges to anyone who can reach it.
CVE-2026-42271 is an earlier command injection in LiteLLM's MCP server preview endpoints. It is covered in the April 2026 LiteLLM file.
Am I affected? #
pip show litellm | grep -i '^version'
env | grep LITELLM_ENABLE_MCP_STDIO
- Below 1.104.0: stdio MCP servers can be created by a proxy admin with no environment switch.
- 1.104.0 or later with
LITELLM_ENABLE_MCP_STDIO=true: the same. - Any version: check that the master key is not a default or example value.
If you are affected #
- Upgrade to 1.104.0 or later. Running the current release also picks up the later LiteLLM fixes tracked in this repository.
- Leave
LITELLM_ENABLE_MCP_STDIOunset unless you need stdio MCP servers. - Replace the master key with a strong random value, and review who holds proxy admin rights.
- If the proxy ran with a default master key while reachable from a network you do not control, review the configured MCP servers and rotate the provider keys the proxy holds. See rotating cloud credentials.
Prevention #
- A gateway holds every provider key. Keep its admin API off the public internet. See MCP hygiene and credential hygiene.
Sources #
Single source: ZDI and its CNA record. The vendor's position is ZDI's account.
- ZDI-26-1031, dated 2026-11-18, updated 2026-11-24, read 2026-11-25 with
curl. Description, timeline, mitigation text. - CVE-2026-136535, CNA ZDI, published 2026-11-24. Score and the affected entry.
- LiteLLM advisory tab, page 1 read 2026-11-25. No row for this id.
- PyPI simple API for
litellm, read 2026-11-25. Upload dates. - GitHub Advisory Database
mcplisting: where the row surfaced, dated 2026-11-24.