13 malicious NuGet packages in fake .NET take-home assessments: remove them, reimage the machine and rotate developer credentials
TL;DR #
Socket lists 13 malicious NuGet package ids delivered through fake .NET job assessments, and six related npm packages from July 2026. Remove them. If you built a project that used one, reimage the machine and rotate browser-saved passwords and sessions, GitHub tokens, registry tokens and cloud credentials from a clean device.
Packages and versions #
Versions, publishers and removal dates are Socket's. Registry state was read on 2026-11-26: api.nuget.org/v3-flatcontainer/<id>/index.json returned 404 for all 13 ids.
| Ecosystem | Name | Bad versions | Clean version or action | Registry state (date checked) | Record |
|---|---|---|---|---|---|
| NuGet | VS_Builder.MSBuildAnalyzer |
1.0.1, 1.0.2, 1.0.8, 1.1.2, 1.1.3, and a 1.2.7 copy in the assessment repository | remove; no clean release | 404 (2026-11-26); Socket says deleted 2026-11-02 | Socket |
| NuGet | VS_Builder.WinUI3Controls |
1.0.6, 1.0.7 | remove; no clean release | 404 (2026-11-26) | Socket |
| NuGet | HappyOne.MSBuildAnalyzer |
1.2.8, 1.2.9, 1.3.0 | remove; no clean release | 404 (2026-11-26); Socket says deleted 2026-11-06 | Socket |
| NuGet | HappyOne.WinUI3Controls |
1.0.9, 1.1.0 | remove; no clean release | 404 (2026-11-26); Socket says deleted 2026-11-06 | Socket |
| NuGet | WinUI.Button |
1.0.0 | remove; no clean release | 404 (2026-11-26); Socket says still listed on 2026-11-23 | Socket |
| NuGet | WinUI3IconButton |
1.1.4 and later | remove; no clean release | 404 (2026-11-26) | Socket |
| NuGet | RevertButtonIcon |
1.0.1 and others | remove; no clean release | 404 (2026-11-26) | Socket |
| NuGet | StyledComponent |
1.0.0 | remove; no clean release | 404 (2026-11-26) | Socket |
| NuGet | Web3TotalButton, WindowsAccentColorName, SetButtonColor, InitializeCustomButton, StyledAppButton |
not stated | remove; no clean release | 404 (2026-11-26) | Socket |
| npm | axios-test-one |
1.18.1 through 1.19.7 | remove; unpublished | unpublished 2026-07-16 (2026-11-26) | MAL-2026-10727 |
| npm | telemetry-metrics |
0.2.1 through 0.2.5 | remove; unpublished | unpublished 2026-07-16 (2026-11-26) | MAL-2026-10750 |
| npm | telemetry-axios |
all; last version 0.1.6 | remove | security placeholder since 2026-07-17 (2026-11-26) | MAL-2026-10773 |
| npm | axios-native |
all; last version 1.16.4 | remove | security placeholder since 2026-07-17 (2026-11-26) | MAL-2026-10772 |
| npm | fs-extra-core |
all; last version 1.3.4 | remove | security placeholder since 2026-07-23 (2026-11-26) | MAL-2026-11027 |
| npm | vitest-axios |
all; last version 1.0.4 | remove | security placeholder since 2026-07-23 (2026-11-26) | MAL-2026-11030 |
Socket counts 28 versions across the 13 NuGet ids. It reports about 160 downloads for WinUI.Button and says the figure includes mirrors and scanners. NuGet publisher accounts named by Socket: VS_Builder, HappyOne, Carol-White-Super and Steven-White-Super. npm publisher accounts: gsanbus, jasonsayman and jasonsuperstar.
Am I affected? #
- Search
.csprojfiles,Directory.Packages.props, lock files andobj/project.assets.jsonfor the 13 ids. Check the local NuGet package cache too. - Look for a project folder named
WinUI3_Home_Assessment. - Look for
build/VS_Builder.MsBuildAnalyzer.targetsorbuild/HappyOne.MsBuildAnalyzer.targetsin packages or caches. - On Windows, look for
%LOCALAPPDATA%\osk\holdingOskSupport.dllandosk.exe, and for%TEMP%\Launcher.exe. - Search lockfiles for the six npm names.
- You are at risk if you built an assessment project a recruiter sent you between July and November 2026.
If you are affected #
- Isolate the machine and reimage it. Socket recommends this if you built or ran an affected project.
- From a clean device, rotate browser-saved passwords and end browser sessions.
- Rotate GitHub tokens, NuGet and npm registry tokens, and cloud provider credentials. See if your GitHub PAT leaked, if your npm token leaked and rotating cloud credentials.
- Remove the packages from project files, lock files and local caches.
- For the npm packages, follow if you installed a bad npm package.
Prevention #
- Build take-home assessments in a disposable virtual machine with no access to your credentials.
- Before building, check a project for extra package feeds, committed package files and unfamiliar package references.
- Restrict which feeds a project can restore from with NuGet package source mapping.
- See the package vetting checklist and credential hygiene.
Sources #
- Socket: 13 Malicious NuGet Packages Target .NET Developers With Fake Job Assessments, Kush Pandya, 2026-11-23, read 2026-11-26. Package ids, versions, publishers, removal dates, file names and remediation.
- The Hacker News, 2026-11-26: coverage of Socket's post. It adds no second researcher.
- Registry side, read 2026-11-26: the NuGet flat-container index returned 404 for all 13 ids.
registry.npmjs.orgshowed the six npm packages unpublished or replaced by a security placeholder.api.osv.devreturned oneMAL-record for each npm name.