TL;DR

Five CVE records for MCP servers and products that ship one were published between 2026-11-24 and 2026-11-26. CVE-2026-137308 says an injected prompt can make markdownify-mcp fetch internal hosts and cloud metadata endpoints. The vendor advisory says 1.2.0 fixes it. npm's newest mcp-markdownify-server was 1.1.0 on 2026-11-26. Amazon's ECS MCP Server returned task-definition secrets its redaction setting should hide, fixed in 0.1.36. Update the two WordPress plugins and GitLab.

What happened

Product Id Score, provider Affected Fix
markdownify-mcp, npm mcp-markdownify-server CVE-2026-137308 8.3 CVSS 4.0 and 7.4 CVSS 3.1, VulnCheck before 1.2.0 1.2.0 per the vendor advisory. Not on npm when read.
Amazon ECS MCP Server, PyPI awslabs.ecs-mcp-server CVE-2026-135614 5.5 CVSS 3.1 and 6.8 CVSS 4.0, Amazon below 0.1.36 0.1.36
Secure MCP Server for Claude, ChatGPT, Gemini, Cursor and other AI Agents, WordPress slug miniorange-secure-mcp-server CVE-2026-131688 8.1 CVSS 3.1, Wordfence 1.5.8 and earlier none stated in the record
AI Engine, WordPress slug ai-engine CVE-2026-131589 7.2 CVSS 3.1, Wordfence 3.9.4 and earlier none stated in the record
GitLab EE, MCP server OAuth handling CVE-2026-135221 6.3 CVSS 3.1, GitLab 18.10 to below 19.4.11, 19.5 to below 19.5.9, 19.6 to below 19.6.2 19.4.11, 19.5.9, 19.6.2

markdownify-mcp

The vendor advisory, published 2026-11-25, says the SSRF protections in webpage-to-markdown, youtube-to-markdown, bing-search-to-markdown and git-repo-to-markdown could be bypassed. Its title names DNS hostnames, IPv6 and IPv4-mapped IPv6 literals, and scp-style SSH shorthand. VulnCheck's record, published 2026-11-26, says attackers can reach the tools "through prompt injection to fetch loopback services, internal hosts, and cloud metadata endpoints". The vendor page printed "No known CVE" when read on 2026-11-26.

The advisory names the npm package mcp-markdownify-server, affected <= 1.1.0, patched 1.2.0. The npm registry listed four versions on 2026-11-26, the newest 1.1.0 from 2026-05-01. npm has no package named markdownify-mcp. The record references a v1.2.0 release tag in the repository, which was not opened for this file.

Amazon ECS MCP Server

AWS bulletin 2026-200-AWS, published 2026-11-24, says that with the sensitive data setting at its default, the troubleshooting tool returned container environment variable values and secret references from ECS task definitions without redaction. It says a remote actor who can influence the agent's input, "for example through prompt injection", might obtain those values. The vendor advisory is GHSA-ppc7-5jf2-gcfc.

PyPI shows 0.1.36 uploaded on 2026-09-22 and 0.1.39 as the newest on 2026-11-17. The fixed release predates the bulletin.

WordPress plugins

Wordfence's record for CVE-2026-131688 says any valid MCP bearer token for the miniOrange plugin, including a scope-restricted connection-test token, can be sent to other WordPress endpoints and gives the sender's account the Administrator role. It scores attack complexity high. WordPress.org listed version 1.5.10, updated 2026-11-25, with 10,000+ active installs. The record names no fixed version and references a plugin changeset.

Wordfence's record for CVE-2026-131589 says an authenticated user with Editor access or above can upload HTML, SVG or JavaScript files through AI Engine's /mwai/v1/helpers/create_image endpoint. The record does not involve the plugin's MCP feature. Its references compare the 3.9.4 and 3.9.5 tags. WordPress.org listed version 3.9.7, updated 2026-11-26, with 90,000+ active installs.

GitLab

GitLab's record says that "under certain conditions" an authenticated user could make server-side requests to internal network resources "due to insufficient URL validation in MCP server OAuth handling". The patch release of 2026-11-25 names 15 CVE ids, this one included.

Am I affected?

  • npm ls mcp-markdownify-server, or check the version in your MCP client's server configuration. Every npm release is inside the range.
  • pip show awslabs.ecs-mcp-server. Below 0.1.36 is affected.
  • In WordPress, check the plugin versions under Plugins. miniOrange Secure MCP Server 1.5.8 or earlier and AI Engine 3.9.4 or earlier are affected.
  • Self-managed GitLab EE from 18.10 on a version below the three fixed releases is affected.

If you are affected

The vendor sources give upgrade steps only. The removal and review steps below are cautions beyond them.

  1. markdownify-mcp: no npm release carries the fix as of 2026-11-26. Remove the server from agents that read untrusted content, or run it where it cannot reach internal hosts or a cloud metadata endpoint. Check npm again before reinstalling.
  2. ECS MCP Server: upgrade to 0.1.36 or later. AWS says to "rotate any credentials stored as plaintext task definition environment variables".
  3. miniOrange Secure MCP Server: update to the newest version on WordPress.org, then revoke and reissue every MCP bearer token and review the Administrator list.
  4. AI Engine: update to the newest version and review the uploads directory for files Editors added through the plugin.
  5. GitLab: upgrade to 19.4.11, 19.5.9 or 19.6.2.

See if an MCP server was malicious for the review steps after an MCP server misbehaves.

Prevention

  • Run URL-fetching MCP servers with no route to internal networks or metadata endpoints. See MCP hygiene.
  • Keep secrets out of plaintext task-definition environment variables. See credential hygiene.

Sources