TL;DR

Nuxt 4 before 4.6.4 lets an unauthenticated request skip route rules and path-based server middleware on page routes, and sends the message and data of unhandled server errors to the client. The Nuxt team published eight advisories on 2026-11-02, all fixed in 4.6.4. Five also affect Nuxt 3, and four of those say "Nuxt 3 has reached end of life and will not receive a fix". Upgrade to nuxt 4.6.4. On Nuxt 3, move to Nuxt 4 or apply the workaround in each advisory.

What happened

The Nuxt advisory tab shows eight advisories dated 2026-11-02, read 2026-11-17. The npm registry shows nuxt 4.6.4 published on 2026-11-02. The GitHub Advisory Database listed seven of them on 2026-11-13 and 2026-11-16 with CVE ids. The eighth, GHSA-p4h3-4h99-9665, printed "No known CVE" when read.

Advisory CVE Severity Affected Nuxt 3
GHSA-r99w-jh2x-3mg9: a leading // in the path bypasses server/middleware path checks and server route rules CVE-2026-128077 Moderate 6.5 @nuxt/nitro-server 4.6.0 before 4.6.4 not affected
GHSA-f3x9-2chm-73c8: an encoded slash (%2F) bypasses route rules on catch-all page routes CVE-2026-128071 Moderate nuxt 4.0.0 before 4.6.4, and 3.x affected, no fix
GHSA-96x6-fvhx-49hg: message and data of unhandled server-rendering errors reach the client CVE-2026-128075 Moderate 5.3 nuxt 4.0.0 before 4.6.4, and 3.x affected, no fix
GHSA-mjrq-cffv-q4qc: dev server serves files from a parent directory that holds a stray lockfile or workspace file CVE-2026-128070 Moderate @nuxt/schema 3.5.0 before 4.6.4 affected from 3.5.0
GHSA-r9jc-w898-3fv6: quadratic cost for repeated slashes in the request path CVE-2026-128074 Moderate in the database, Low on the vendor tab nuxt 4.6.0 before 4.6.4 not listed
GHSA-hf59-9xwc-2g4p: colliding island props share one /__nuxt_island path CVE-2026-128076 Low nuxt 4.4.6 before 4.6.4, and 3.21.6 onward affected, no fix
GHSA-x2wv-5868-p7v2: webpack and rspack dev servers serve built source to DNS-rebinding pages CVE-2026-128072 Low @nuxt/webpack-builder, @nuxt/rspack-builder 4.0.0 before 4.6.4, and 3.x affected, no fix
GHSA-p4h3-4h99-9665: Vite server builder wildcard redirect rules can redirect to another origin none when read Low 3.1 @nuxt/vite-server 4.6.0 before 4.6.4 not affected

Route-rule bypasses. Two are incomplete fixes of earlier advisories. CVE-2026-128077 says the 4.6.3 fix for GHSA-9v7c-q64q-vv33 "covered dot segments but not this form". A request to //x/admin renders the page at /admin while server checks keyed on /admin do not run. CVE-2026-128071 says a request that spells a slash as %2F renders a catch-all page without the rules for the path it resolves to. The skipped rules include redirect, headers and appMiddleware.

Error details. For a failed server-side $fetch, the client receives the requested URL with its query string and the upstream error body. A token in that URL reaches anyone who can make the request fail.

Dev server. CVE-2026-128070 and CVE-2026-128072 affect nuxt dev only. The first lets anyone who can reach the dev server read files under a parent directory. The advisory says running npm install once in the home directory creates the lockfile that triggers it. Nuxt credits Anthropic for reporting CVE-2026-128072.

Nuxt 3. The newest 3.x release on npm is 3.21.11, published 2026-08-05. The 3x dist-tag points at it. No 3.x release carries these fixes.

Dist-tags. On 2026-11-17 latest was 4.6.4 and the 4x tag was 4.6.3. An install pinned to the 4x tag gets the affected version.

Am I affected?

npm ls nuxt @nuxt/nitro-server @nuxt/vite-server @nuxt/schema @nuxt/webpack-builder @nuxt/rspack-builder
grep -rn "routeRules" nuxt.config.* 2>/dev/null                    # rules that guard paths
ls server/middleware 2>/dev/null                                    # path checks on event.path
ls app/pages/**/\[...*\].vue pages/**/\[...*\].vue 2>/dev/null      # catch-all page routes
ls ~/package-lock.json ~/pnpm-lock.yaml ~/yarn.lock ~/pnpm-workspace.yaml 2>/dev/null   # stray files above the project
  • nuxt 4.x before 4.6.4: affected. From 4.6.0 the ranges of all eight apply, subject to each advisory's conditions.
  • nuxt 3.x at any version: affected by the encoded-slash bypass, the error-detail leak, the island collision and the webpack or rspack dev-server issue. From 3.5.0 the parent-directory dev-server issue applies too. No upgrade on the 3.x line fixes them.
  • Access control that lives only in routeRules or in server/middleware path checks is the exposed part. Checks inside the page's own data handlers still run.

If you are affected

  • Upgrade to nuxt 4.6.4. Check npm ls @nuxt/nitro-server afterwards, because the fix for CVE-2026-128077 is in that package.
  • On Nuxt 3, plan the move to Nuxt 4. Until then, reject page requests whose path contains %2f in a server middleware, and catch server-side $fetch errors and rethrow them with createError and a generic message.
  • Rotate tokens that server-side requests carried in a URL, if those requests could fail in production.
  • The dev port may have been reachable from an untrusted network while a stray lockfile sat above the project. In that case the advisory says to treat files in that parent directory as exposed and rotate SSH keys and cloud tokens.
  • See if your web app was compromised.

Prevention

  • Enforce authorization in the server handler that returns the data, not only in a route rule or a path prefix check.
  • Do not put tokens in URLs of server-side requests. Send them in headers.
  • Do not expose nuxt dev beyond localhost. See agent sandboxing for running dev servers that an agent starts.
  • Track the end-of-life date of the framework major you deploy.

Sources

  • Nuxt advisory tab: eight rows dated 2026-11-02, read 2026-11-17.
  • GHSA-r99w-jh2x-3mg9: range, score, workaround, Nuxt 3 not affected.
  • GHSA-96x6-fvhx-49hg: range, score, the Nuxt 3 end-of-life sentence.
  • GHSA-p4h3-4h99-9665: the advisory with no CVE.
  • GitHub Advisory Database, reviewed npm listing: seven rows, CVE ids and database dates.
  • OSV records for the seven GHSA ids with a CVE (api.osv.dev/v1/vulns/<id>): ranges, patch and workaround text for the advisories whose vendor pages were not opened.
  • npm registry time and dist-tags for nuxt, read 2026-11-17: 4.6.4 on 2026-11-02, 3.21.11 on 2026-08-05, 4x at 4.6.3.